-1- return back next directory concur concur brite euram be96-3016 results

115
- Retur n Bac k Nex t Directo ry Concurrent Design and Concurrent Design and Engineering in Engineering in Building and Civil Building and Civil Engineering Engineering CONCUR CONCUR Brite EuRam BE96-3016 Results

Post on 18-Dec-2015

227 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-1--1-

Return

Back

Next

Directory

Concurrent Design and Concurrent Design and Engineering in Building Engineering in Building and Civil Engineeringand Civil Engineering

CONCURCONCURBrite EuRam BE96-3016

Results

Page 2: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-2--2-

Return

Back

Next

Directory

CONCUR Presentation Directory Page

Project Summary Demonstration Scenario Information Management System (IMS) Ifc Browser LexiCon Inception Modeller Facets (Skanska) PlantPower (Fortum Engineering) Technical, Commercial and External Exploitation External Results The Way Forward

Partners European Commission Project Details and Contact

Download area

Page 3: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-3--3-

Return

Back

Next

Directory

CONCURProject Summary

CONCUR was aimed at exploiting the developments that were made in Product Data Technology specifically for the construction industry during the mid 1990s. Mechanical, aeronautical, automobile and maritime engineering were successfully exploiting the STEP advances of the 1980s, AP225 and CIMsteel had made a start, but here were technologies aimed specifically at the wider construction industry. In particular, the CONCUR partners wanted to exploit the IAI-IFCs in the processes that were used in the pre-tender phases of construction.

The CONCUR partners examined the processes and the information flows with the aim of using ICT and open standards for integration. The project looked at the project inception stage, the concept design phase with links to power engineering processes, the scheme design phase and estimating. A common thread through the project was the desire to use product models and 3D modelling throughout the process and to move the start of modelling higher up the chain.

Where possible, established commercial software was used so that the project results could be deployed for commercial use. Technical assistance was both received from and given to software vendors. A number of vendors were involved as associate partners and undertook major enhancements to their software to support the goals of the CONCUR project.

Technically CONCUR has made major advances in: inception modelling, using web based Information Management Systems, linking these systems to advanced object oriented Product Data Technology, a method for PDT model merging, a method for using XML to interface with a PDT database, a metadata schema for the IAI, a set of derived attributes for the IAI-IFCs, driving forward the creation of a lexicon of construction terms which will support the needs of both PDT and eCommerce for construction, showing that IFCs can be used for storing models as well as exchanging them, and in methods for browsing and adding to the the contents of IFC models.

CONCUR has helped to move the IAI-IFCs closer to widespread use by using them on industrial information and by critiquing the IFC translators developed by the major vendors of modelling systems.

CONCUR has demonstrated that IFCs can integrate the processes of different companies using different software applications being used for different purposes.

CONCUR partners are deploying the results commercially and have a clearer vision of how to profitably extend the use of PDT further into their businesses.

CONCUR has identified weaknesses and gaps in these technologies and has helped initiate work to improve and strengthen them – The Way Forward.

Page 4: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-4--4-

Return

Back

Next

Directory

CONCUR Industry Need- Why Undertake the project?

Client Demand Clients are demanding: higher quality, greater predictability of time and cost, faster project delivery,

better documentation and better value for money.

Market Differentiation The construction industry needs: greater involvement in client planning, faster response to client

requirements, better defined processes and MOST OF ALL SATISFIED delighted clients.

Increasing Regulatory Drive Society is expecting: increased safety, improved sustainability, reduced energy consumption, reduced

waste, greater accountability and better documentation.

Quantifying Risk The construction industry needs to: reduce the cost of tendering, improve the accuracy of tenders and

quickly quantify the risks associated with a new project.

Integrate the Extended Enterprise The construction industry needs to: integrate the use of information in a dynamic supply chain, support

concurrent working in the supply chain, speed up the processes supporting tendering.

Page 5: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-5--5-

Return

Back

Next

Directory

CONCUR Initial Aims & Goals

Halve the cost of tendering

Speed up the processes supporting tendering

Improve the accuracy of bids

Integrate the processes

Integration of information use

Support concurrent working

Page 6: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-6--6-

Return

Back

Next

Directory

CONCUR Project Tactical Approach

Review Industrial Practice The partners rigorously examined the processes undertaken by commercial construction organisations

when preparing a bid. The results were presented in the form of IDEF0 diagrams with notes. The processes include: client brief, inception design, concept design, scheme design and preparing estimates.

Implement File based Architecture for Tendering CONCUR prepared a mid-term demonstration which linked the software applications using file tranfers

between the applications. The transfer files used comma separated variable, STEP Physical files (IAI-IFC). STEP Data Access Interface was also used. This demonstrated that interoperability was possible but was not commercially robust and flexible.

Implement Client/server based Architecture for Tendering The second half of the project concentrated on using a web based IMS system to support realistic

exchanges including an integration with a STEP database to provide a model server. Significant advances in using IFCs were also made. The results demonstration supported a realistic business scenario and is described in this web site.

Implement Enhanced Production Software Applications The project encouraged the development of IFC translators by major software vendors to the industry,

encouraged the enhancement of existing software to support the new ways of working required by the CONCUR partners, initiated the development of new commercial software applications to support the new ways of working and created prototype software for inception modelling and browsing IFC information models. New approaches for capturing and manipulating construction industry terms were also initiated.

Deploy in Trials The CONCUR industrial showed a realistic exchange in a demonstration and are starting to implement the

technology in their businesses. Taylor Woodrow are using the approach in their supply chain to integrate with architects, structural designers and steelwork fabricators; Fortum Engineering are integrating their internal use of information and Skanska are implementing an integration of 3D modelling, cost estimation and time programming systems using information from a company database of resources.

Page 7: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-7--7-

Return

Back

Next

Directory

European Commission Project Details and EC Contact

CONCUR Concurrent Design and Engineering in Building and Civil Engineering

Project Number BE96-3016Contract Number BRPR-CT96-0357Start date 1 February 1997Duration 4.5 yearsFinnish date 31 July 2001Man years 30 for eight partnersValue 5 454 000 Euros

Co-ordinating Partner Taylor Woodrow Construction Ltd.Project Manager David Leonard

EC Project Officer Maria Cristina MAROLDAEuropean CommissionResearch Directorate-GeneralCompetitive and Sustainable Growth

E-mail [email protected] +32 (0)2 295 83 91 Fax +32 (0)2 296 05 50Mail Rue de la Loi/Wetstraat 200, B-1050 Bruxelles/BrusselAddress Rue Montoyer/Montoyerstraat 75, B1050 Bruxelles/Brussel

Partners

Page 8: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-8--8-

Return

Back

Next

Directory

Project Partners

R & D Partners

Classification

Construction Companies

Page 9: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-9--9-

Return

Back

Next

Directory

CONCURDemonstration Scenario

Description Photograph of the Demonstration Building The Business Scenario The information Flows

The CONCUR project included demonstrations of technology using commercial software and realistic industrial information.

Page 10: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-10--10-

Return

Back

Next

Directory

CONCUR Demonstration Scenario Description

The demonstration scenario covers the activities in the process of moving from a client brief to preparing a bid for the building to house the steam powered turbine/generator for a small power station.

The demonstration mostly uses commercially available software applications and generally uses IAI IFCs for transferring and storing building and construction objects between partners and their software.

Fortum Engineering perform the role of the principal contractor who undertakes the plant design with alternative solutions from civil engineering contractors.

The demonstration scenario includes: Inception Design Concept Design Scheme Design Programme Planning Preparing Cost Plans

The innovations include: Using IAI-IFCs for exchanging information Using IAI-IFCs for storing information Using a web based IMS which includes an IFC model server Using a web based browser for viewing and using IFC objects Using an XML interface for interfacing with IFC models

This presentation shows the business activities being addressed, the information flows between the activities and further information on the activities which can be accessed by clicking on the activity boxes or information flow lines.

A power station typical of that used in the demonstration shown on the photograph with the Turbine House ringed.

Business Scenario

Page 11: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-11--11-

Return

Back

Next

Directory

Demonstration ObjectTurbine House

Fortum Engineering

Turbine house

Page 12: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-12--12-

Return

Back

Next

Directory

COMPARE suggested models andCHOOSE one

Fortum Eng.

Define SCHEME T- building

Taylor Woodrow

Scheme modeller

Define SCHEME T- building

Skanska

Scheme modeller

MERGE TW models

Fortum Eng.

Model Merger

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

FE Software

Define INCEPTION

TURBINE BUILDING

T.U. Delft Inception Modeller

Business Scenario

MERGE Skanska

models

Fortum Eng.

Model Merger

Clie

nt

Bri

e f

BidDefine

CONCEPT Turbine BUILDING

Fortum Eng.

FE Software

Information Flows

Business Scenario Description

Page 13: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-13--13-

Return

Back

Next

Directory

CONCUR Business Scenario Description

A flow diagram showing the business scenario for the CONCUR demonstration.

A client needing a power station approaches Fortum Engineering for a solution and a bid.

Fortum Engineering will be the principal contractor responsible for the delivery of the complete power station.

Fortum Engineering undertake the design of the plant and equipment in the power station.

Fortum Engineering invite Taylor Woodrow and Skanska to bid to design and construct alternative solutions for the Turbine House building.

Fortum Engineering merges each of the competing alternative solutions for the Turbine House with the plant and equipment scheme before choosing one.

Fortum Engineering prepares the bid for the client.

.

Page 14: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-14--14-

Return

Back

Next

Directory

Define SCHEME T- building

Skanska

FACETS

MERGE TW models

Fortum Eng.

Model Merger

Information Flows

MERGE Skanska

models

Fortum Eng.

Model Merger

ProjectWise

EPM-EDMProject IMS

Project IMS - I

IFC FE1

Project IMS

FE1TW1SK1

Project IMS

-

Project IMS

Project IMS - IV

FE1 +SK1

FE1 +TW1

Project IMS III

IFC FE1

IFC SK1

IFC TW1

IFC FE1+TW1

IFC FE1+SK1

IFC FE1

IFC SK1

IFC TW1

IFC FE2

IFC SK1

IFC TW1

IFC FE1

Project IMS - II

FE IMS

SK IMS

TW IMS

Client Brief

Web basedProject IMS

Define SCHEME T- building

IFC Browser

Taylor Woodrow

Define

CONCEPT Turbine BUILDING

Fortum Eng.

PlantPower

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

Scopepower

BidDefine Building

INCEPTION MODELLER

TU Delft

TUD Software

COMPARE suggested models and CHOOSE one

Fortum Eng.

Page 15: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-15--15-

Return

Back

Next

Directory

CONCUR Client Brief

Determining the client brief is a key role for the principal contractor. The client does not always know how to do this and usually requires assistance to do this. The client will have a business plan within which the new project will perform in terms of finance, operating costs, generating revenue and delivering a profit. The client requires input from the supplying contractor to support his business plans.

When the client brief is fully understood and agreed by the client and supplier, the supplier can develop the scheme and prepare a bid and programme for delivering the project.

There are systems for capturing client requirements and recording requirement revisions and the supplier response options. One such system is called Dynamic Object Oriented Requirement System (DOORS). This system was trialled in the first half of the CONCUR project and featured in the Mid Term Review Demonstration. DOORS, from Telelogic UK Ltd, can support the whole life cycle of a project. The mid term trial showed how information exported from DOORS could be imported into corporate systems

The development of the client brief takes place concurrently with the Inception modelling of a project,

the assessment of risk to the supplier and the effect on the potentially new project on the supplier business plan. Currently information is manually transferred between client brief and into inception modelling.

Page 16: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-16--16-

Return

Back

Next

Directory

CONCUR Inception Modeller

Inception Modelling The developing of an Inception Support Modeller was one of the most research oriented

parts of the CONCUR-project. At the start of the project it was quite clear that the inception stage of large-scale construction projects involves a number of heavy and interrelated information processing tasks. Clients have to establish the feasibility of the project. Facility designers and construction companies have to decide how to meet the client requirements. This means that in a relatively short period of time a tremendous amount of not well defined information and knowledge related to all the aspects of power plants has to be processed.

It was quite clear that an Inception Support Modeller could be quite beneficial and potentially could help to support the projects goals.

It was also known that, in principle, Product Data Technology could also be used in the inception and concept design stages where the information is normally less precisely defined.

The solution implemented in the CONCUR-project focuses, as an example, on the international power plant market.

The main characteristics of the approach implemented in the project are (1) the adoption of a three level approach and (2) the application of a hierarchy of power plant objects divided into functional and technical perspectives.

The three level approach, illustrated on the next screen, supports the work of the clients, power plant vendors and construction companies in one dynamic system. Changes in requirements can flow down stream to be solved, and changes in power plant solutions of construction solutions can flow up stream to be evaluated, thus the dynamic system allows for non-monotonic design.

The functional-technical object hierarchy supports the consistent modelling of knowledge in the form of rules of thumb.

Many of the ideas and solutions explored in the Inception Support development tasks have found their way to the industrial partners.

Page 17: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-17--17-

Return

Back

Next

Directory

CONCUR Inception Modeller

The three Level approach

Further information Reports describing the CONCUR Inception Modelling work are available in the

Download Area. Contacts at TU Delft are Professor Frits Tolman: [email protected] and Saban

Ozariyildiz [email protected]

Win, Designand RealizePower Plant

Project A0

market situation knowledge

power plant knowledge

construction knowledge

power plant project

Page 18: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-18--18-

Return

Back

Next

Directory

CONCUR The importance of Inception Modelling Why Inception Modelling? Inception modelling is a neglected phase of construction projects even though it is a key activity. It is

always done but tends to be a stand-a-lone manual process. CONCUR has looked at how company knowledge can be collected and presented to produce initial estimates. The work has not been integrated into the information flow.

Initial Assessment of Projects Inception modelling takes place when preparing the client brief and results in a first assessment of cost,

programme, resource requirement, cash flow and financial risk and ultimately whether or not a supplying company wants to proceed. It could easily interface with corporate financial and risk planning systems. It is potentially a customer facing tool as follows:

Interface with Customers Inception modelling can be used to support the client in his business planning because it can give him

information required to help assess the viability of a project, namely: Initial cost, time to complete, cash flow to first revenue, key figures such as floor area, maintenance cost, operating cost. When combined with his estimate of revenue potential , based on for example floor area, it can support his business planning.

Initiation of Contractor Downstream Processes Inception modelling is a knowledge based process requiring access to company data on costs and

planning. It is difficult to undertake in a generalised way and in concur was limited to numerical modelling , but without shape. However, it could be developed to first-guess the information required by downstream processes such as estimating and programming, and even be used to propose a model for structural engineering design and analysis. This would provide an easy route into starting the use of 3D modelling on a project and the first stages of 3D visualisation

Scope for Development A number of the CONCUR partners have realised the potential of linking Inception modelling to Product

Data Technology and plan to undertake further development.

For information contact Professor Frits Tolman: [email protected]

Page 19: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-19--19-

Return

Back

Next

Directory

COMPARE suggested models andCHOOSE one

Fortum Eng.

FE SW

Define SCHEME T- building

Skanska

Scheme modeller

MERGE TW models

Fortum Eng.

Model Merger

Plant configuration

MERGE Skanska

models

Fortum Eng.

Model Merger

Bid

FE IMS

Client Brief

Project

database

Define SCHEME T- building

Scheme modeller

Taylor Woodrow

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

FE Software

Define

CONCEPT Turbine BUILDING

Fortum Eng.

FE Software

Define Building

INCEPTION MODELLER

TU Delft

TUD Software

Page 20: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-20--20-

Return

Back

Next

Directory

CONCUR Fortum Engineering: PlantPower

Fortum Engineering use a suite of software called PlantPower which have been customised for the purpose of defining the requirements for power plant construction. The design procedure is:

Scoping Module In order to meet clients requirements, a scoping module called ScopePower is used for identifying a structure of power

plant delivery. This is a logical layout based on KKS code, forming a skeleton of the information technical product model for further study

Energy Balance Energy balance studies are made by Fortum Engineering’s process simulation tool Solvo. These results are defining

requirements for power plant processes as input data for further design Energy Balance Flow Charts

In practice it means, that there is unambigious dependence between energy balance flow charts and IT product model Design Rules

A knowledge module holding design rules, design dialogues, plant scope and and artificial intelligence facility based on Design++ is used for initial dimensioning of main equipment in order to fulfil process requirements. The results are presented in the main flow diagram.

Dimensions Dimensioning of main equipment continues for over all dimensions of the site so, that suitable plant layout can be

selected. The first cost estimate is carried out in order to support decision making at investment level Cost Estimation

Knowledge modules support more detailed design on steam turbine plant. Cost estimation on facility level will define costs accurate enough for tendering purpose. Actual cost data is in cost libraries of CostPower, where the commercial software of CM-Pro is used on cost estimation and further budgeting during pre-tender phase

Company IMS All design, cost estimation and scheduling information are stored in product model and in the attached relational

database. In the CONCUR demonstration data was exchanged with IFC files between project partners: Fortum Engineering, Taylor Woodrow and Skanska

PlantPower Flowchart

Back to Information Flows

Page 21: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-21--21-

Return

Back

Next

Directory

IFC

Scope

Energy balance

LOGICAL LAYOUT

PLANT CONFIGURATION

FACILITIES Cost Estimate for BID

BOQ,• Cost Estimate,

• Time schedules,• Procurement,• Subcontracts

CostPower

PLANT DATADASE

Invitation to Tender

PLANT LAYOUTMain Equipment 1st Cost Estimate

Plant configuration and layout- CONCUR / Fortum Engineering demonstration

Back to Information Flows

Page 22: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-22--22-

Return

Back

Next

Directory

CONCUR Fortum Eng.: Building Conceptual Design

In the CONCUR demonstration Fortum Engineering defined construction requirements from the client’s requirements and distributed the information by VTT’s Information Management System to other industrial partners. The used software was :

ScopePower for the definition of the delivery scope

Solvo for energy balance studies

Knowledge Modules for component dimensioning and layout design

MicroStation J for shape modelling and for interactive part of 3D modelling in CAD

CostPower for cost libraries, cost estimation and budgeting

Company IMS Fortum Engineering will be using their company Information Management System (IMS) for storing and exchanging

documents and models Project IMS

VTT’s IMS is the Communication Module for information management and data exchange between partners in CONCUR project

PlantPower Flowchart

Concept Design Flowchart

Back to Information Flows

Page 23: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-23--23-

Return

Back

Next

Directory

Scope

Energy balance

LOGICAL LAYOUT

PLANT CONFIGURATION

FACILITIES Cost Estimate for BID

FE/VTT IMS

Invitation to Tender

PLANT LAYOUTMain Equipment 1st Cost Estimate

Building Conceptual Design- CONCUR demonstration of Fortum Engineering/VTT IMS

• BOQ,• Cost Estimate,• Time schedules,• Procurement,• Subcontracts

DocumentsProduct model Data exchange

• STEP/IFCBack to Information Flows

Page 24: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-24--24-

Return

Back

Next

Directory

CONCUR Fortum Internal IMS & Information exchange

Most companies have an internal information management system

To support their internal engineering and business processes. They also have internal protocols for exchanging information between software applications. The protocols are usually based on proprietary native exchanges because they are information rich.

Why use open standards? Even though open standards are less rich than proprietary native standards for exchange they offer a

common denominator when exchanging information with other companies, especially when active trading relationships are short.

Proprietary standard are not particularly good at handling objects that are not supported by that software. At best they import and export the objects without altering them. At worst they corrupt them of just lose them so that they are not available for downstream activities. This usually happens at the interfaces between different engineering or business disciplines.

There are internal advantages to using open standards when using different types of software or purchasing new software.

Why use a web based IMS? Easy universal access. Partner companies like web based project IMS systems because they feel that they have a share in its

ownership. The web based systems can be transferred to the client to support downstream life cycle support.

Page 25: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-25--25-

Return

Back

Next

Directory

COMPARE suggested models andCHOOSE one

Fortum Eng.

Define SCHEME T- building

Skanska

Scheme modeller

MERGE TW models

Fortum Eng.

Model Merger

IMS Upload

MERGE Skanska

models

Fortum Eng.

Model Merger

Bid

ProjectWise

EPM-EDMProject IMS

Project IMS - I

IFC FE1

FE IMS

Client Brief

Project

database

Define SCHEME T- building

Scheme modeller

Taylor Woodrow

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

FE Software

DefineCONCEPT Turbine BUILDING

Fortum Eng.

FE Software

Define Building

INCEPTION MODELLER

TU Delft

TUD Software

Page 26: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-26--26-

Return

Back

Next

Directory

CONCUR Web based Project IMS

(Information Management System)

VTT Building Technology, Finland

•Summary

•IMS System Structure

•IMS User Interfaces

•IMS Main Functions

•Uploading & Downloading documents

•Model Merging

•XML Access

Page 27: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-27--27-

Return

Back

Next

Directory

Real life projects

Real life projects

D++ CM

Company specificIMS system

CONCUR IMS: Web based Project Environment

COMPANY 3

Achitect

COMPANY 2

Client

COMPANY 1

Companyspecificinformationrepository

Internal working

environment within

companyintranet

Internal working

environment within

companyintranet

Project mgr

Project document & Object database

Project information repository:

IMS Architecture

Page 28: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-28--28-

Return

Back

Next

Directory

SummaryWeb Based Project IMS

Used for information sharing between all project participants Can be hosted on a web site located anywhere Based on Bentley ProjectWise document management

system and incorporates the Express Data Manager software from EPM Technology

Combine functionalities of a document based system with product model server

Used IFC based models for exchanging information

Further informationReports describing the IMS system are available in the Download Area Contact at VTT is Maria Nikolaenko:[email protected]

Page 29: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-29--29-

Return

Back

Next

Directory

IMS system structure

Page 30: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-30--30-

Return

Back

Next

Directory

IMS user intefaces

Document managment system interface

Web interface

Documents,situated in choosen

folder

Documents,situated in choosen

folder Interface to upload, documents merge models in the system, XML browsing

Interface to upload, documents merge models in the system, XML browsing

Page 31: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-31--31-

Return

Back

Next

Directory

IMS user InterfaceViewing models in 3D

VR windo

w

VR windo

wAvailable methods for

the selected objects in

VR window

Available methods for

the selected objects in

VR window

Document related to the selected object

Document related to the selected object

Page 32: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-32--32-

Return

Back

Next

Directory

IMSIMSStore

product model

Main functions of IMS

Download

files from doc mgt

system

Merge product

models

Extract partialproduct model data

End user

Upload files

to doc mgt system

Link file toa product model

object

Page 33: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-33--33-

Return

Back

Next

Directory

IMSUpload files Diagram

Page 34: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-34--34-

Return

Back

Next

Directory

IMP user interfaceUpload files

Select”Add file”

Select”Add file”

Add new file form

User enters

metadata

User enters

metadata

Page 35: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-35--35-

Return

Back

Next

Directory

IMS Model Merging Diagram

ProjectWiseIMS servlet

Merge A, B

Get A, B

Insert A, B

OK

Merged model C

Merge A, B

OK

OK

OK

OK

(C stored in ProjectWise)

Command toEPM-EDM

Start situation: Source model files reside in ProjectWise

End situation:Merged model file is stored in ProjectWise

User

Page 36: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-36--36-

Return

Back

Next

Directory

IMS user interfaceModel Merging form

Select”Merge models”

Select”Merge models”

Merge models

User enters

metadata

User enters

metadata

Page 37: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-37--37-

Return

Back

Next

Directory

IMS product model server &XML interface

VTT Building Technology, Finland

Page 38: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-38--38-

Return

Back

Next

Directory

IMS - XML interface

Object properties

in XML format

Object properties

in XML format

Requestobjectdata

Requestobjectdata

Page 39: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-39--39-

Return

Back

Next

Directory

CONCUR EPM Technology’s Express Data Manager™ (EDM) - 1

How has CONCUR used EXPRESS Data Manager™ version 4.0 ? IMS support – EXPRESS Data Manager™ is used by the CONCUR project to implement a Product Model Server

(PMS) as an integral part of the Project Information Management System (IMS). The IMS is responsible to ensure consistency between the contractual document management system and the 3D project database stored in the PMS according to the IAI IFC151 specification. The PMS provides a facility for selective viewing, download and upload of 3D project data and their link to the contractual documents.

CONCUR is making use the ultimate object technology: Objects are defined as industry standard objects in IFC and the ISO Express-X language is used as a data manipulation language (DML) for improving the capability of these objects - independently of any particular software system.

Project database functionality: Partial download – Using a 3D browser (Promote) to select IFC objects to download using P21 and XML Upload and merge – Import IFC objects and merge the result using P21 and XML.. XML Access to IFC Models – EDM provides an access interface to objects, their attributes and properties

based on XML to enable the integration with material take-off applications in Excel and similar. IFC Browser - EDM provides the object database used by the TNO IFC Browser application which can view

IFC models and be used to add, edit and extract the properties and attributes of the IFC objects in the models.

Calculation of derived Attributes - EXPRESS Data Manager™ provides a virtual machine that interprets all Express and Express-X executable statements. CONCUR has used this capability to add semantics to the IFC151 schema by adding ‘Derived Attributes’ such as volume and surface area of the IFC 1.5.1 objects. This is a convenience to any application that does not include a geometric engine.

Further information Reports describing the CONCUR Project’s use of Express the Data Manager are available in the Download Area. Contacts: Maria Nikolaenko at VTT: [email protected], EPM Technology website & Jorulv Rangnes at EPM

[email protected]

Page 40: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-40--40-

Return

Back

Next

Directory

CONCUR EDM and CONCUR - 2

Further information Reports describing the CONCUR Project’s use of the Express Data Manager are available in the Download Area. Contact at VTT is Maria Nikolaenko: [email protected] & Jorulv Rangnes at EPM Jorulv.Rangnes@epmtech.

jotne.com

CADModelling

System

Project (IMS)[ProjectWise]

EPM-EDM

IFC Browser

OtherModelling

System

XML Access byMS-Office products

OtherApplication Type

Generation ofDerived Attributes

Express XModel Merging

Services from EDM

Page 41: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-41--41-

Return

Back

Next

Directory

CONCUR Express Data Manager (EDM)- 3

What is EPM Technology EDM? EXPRESS Data Manager™ (EDM) is a suite of applications providing an out-of-the-box solution for easily creating

data-models conforming to international standards. EDM's pick-and-place icon driven user interface allows anyone to easily learn EDM's data modeling methodology. Once familiar with EDM, the user can quickly implement data-models in conform-ance with ISO 10303 (STEP), and

other standards like IAI, STEP/NC, OIL & GAS and P-LIB making use of XML, Java and other environments.

How can EPM Technology EDM help construction industry users? EDM helps users to take a great leap towards cost efficient and reliable use of ICT in their organizations. EDM helps users to take ownership of their product data by using a single data source based on standards. EDM helps users to apply a unified methodology and a set of products that take them from concept to solution. EDM can assist users in the change of the design world from 2D to a 3D object based environment. The interoperability and re-use of building models will translate to increased collaboration amongst industrial

partners. In particular the knowledge stored in IFC based building models could be used for facility management and other

purposes during design, construction and after the building project is completed.

Further information Reports describing the CONCUR Project’s use of the Express Data Manager are available in the Download Area. Contact at EPM is Jorulv Rangnes [email protected]

Page 42: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-42--42-

Return

Back

Next

Directory

CONCUR Express Data Manager (EDM) - 4

What can EDM do? A powerful object-oriented database management system capable of being a users single source of information. A web enabler due to its thin-client technology. Complete applications written in EXPRESS and EXPRESS-X are

fully executed by the EDM-expressVM™ (Virtual Machine) within the database. These applications are controlled through local EDM interface™ calls.

A unified methodology for product data solutions. All functionality of the system is configured by EXPRESS and EXPRESS-X schemas, which are the ISO and industry standards for information requirement specifications.

An EXPRESS-G modelling environment which uses EDM visual-Express™ to design users data models and to publish them, for example on the web.

A Rule Engine to define a users corporate knowledge by constraining information models using the rules capabilities of EXPRESS and EXPRESS-X.

A standards solution in its support for EXPRESS (all statements, expressions, built-in functions and procedures), Part 21, and SDAI.

Further information Reports describing the CONCUR Project’s use of the Express Data Manager are available in the Download Area. Contact at EPM is Jorulv Rangnes [email protected]

Page 43: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-43--43-

Return

Back

Next

Directory

CONCUR Express Data Manager (EDM) - 5

Whats new in EDM version 4.5 EXPRESS-X implementation has been extended - among others with full exception handling -

to be the one built-in database control language (including EXPRESS) for EXPRESS Data Manager™ 4.5. It provides the user with functionality and performance for building entire applications on top of the users information models at reduced costs for programming and maintenance. With the one language for modelling, storage, and use of information models, the user avoids technology compatibility problems.

The Business Object layer of EXPRESS Data Manager™ 4.5 hides the complexity of an underlying data model and adds application specific functionality. The Business Object defines views and methods for the underlying database by means of the powerful EXPRESS based Query and Update Language in EXPRESS Data Manager™ 4.5. Business Objects are created on the server instead of locally, enabling thin clients and reducing network traffic. Business Objects tailor the same underlying information to the needs of the many disparate applications of data.

The Query and Update Language of EXPRESS Data Manager™ 4.5 is using EXPRESS-X. Any EXPRESS-X logical expression can be passed to a query as a parameter. This functionality is fully comparable to SQL.

Further information Contact at EPM: Jorulv Rangnes [email protected]

Page 44: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-44--44-

Return

Back

Next

Directory

COMPARE suggested models andCHOOSE one

Fortum Eng.

Define SCHEME Turbine Building

Skanska

Scheme modeller

Develop Scheme Skanska

MERGE Skanska

models

Fortum Eng.

Model Merger

Bid

ProjectWise

EPM-EDMProject IMS

Project IMS - I

IFC FE1

FE IMS

SK IMS

Client Brief

MERGE TW models

Fortum Eng.

Model Merger

Project

database

Define SCHEME T- building

Scheme modeller

Taylor Woodrow

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

FE Software

Define

CONCEPT Turbine BUILDING

Fortum Eng.

FE Software

Define Building

INCEPTION MODELLER

TU Delft

TUD Software

Page 45: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-45--45-

Return

Back

Next

Directory

CONCURSkanska Design Development

Skanska download the Conceptual Model and supporting documentation for the Turbine house from the project database.

Skanska design a scheme and prepare a cost plan and construction programme using ArchiCad, MS-Project and bespoke software from Solibri. They use their company IMS during this process.

The end result is uploaded to the Project Database as IFC-SK1 plus information such as the cost plan and construction programme.

Page 46: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-46--46-

Return

Back

Next

Directory

Turbine House Building Scheme

Page 47: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-47--47-

Return

Back

Next

Directory

Turbine House in ArchiCad

1 1

Explore SKANSKA FACETS

Page 48: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-48--48-

Return

Back

Next

Directory

Facets

Project development with split vision

Adina Jägbeck, Lennart Klintmalm - Skanska Teknik AB

Pasi Paasiala - Solibri OY

Page 49: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-49--49-

Return

Back

Next

Directory

Introduction 1

FacetsSkanska Teknik has since 1999 worked on the development of a new tool to combine information about the different aspects of a project. The purpose and functionality of the system have been defined by Adina Jägbeck and Lennart Klintmalm. It has been named "Facets".

Facets Site Developer – functions for the concept phase

The use context for Facets Site Developer is the very early project phase. The prerequisite for using Facets in this stage is that one needs to graphically investigate different alternatives for accommodating a space requirement schedule on a site and, at the time, calculate investment costs and rental levels based on rough estimates of.

Facets Site Developer was developed during the spring of 2001 in cooperation with a group of project developers in Skanska Hus, - Ingela Lindholm and Anders Rådestad. Facets Scheme Design – functions for scheme phase

The use context for Facets Scheme Design is co-ordination between design, cost estimation and process planning. The system imports CAD-information in IFC-format, while cost recipes and process schedules are imported as databases. By relating building objects to cost items, recipes and activities the system automatically creates, on-line, quantity take-off item and activity, calculation of recipe based costs and displaying building a 4D-view of time schedules.

The functions in Facets Scheme Design were developed during 2000 and 2001 in cooperation with a production group within Skanska Hus, including Katrin Eriksson.

Facets deals with information from CAD, cost estimation and process planning. Or, rather, it allows the user to create – otherwise sub-understood – relations between the various aspects, and display them. The development started as a part of a EU-supported project - Concur. The system has been built by Solibri OY and is certified for import of ifc 2.0 from CAD. It contains functions for two different project stages.

Page 50: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-50--50-

Return

Back

Next

Directory

ConceptConceptScale - 1:1000

Tme -1Info - 1

ConceptConceptScale - 1:1000

Tme -1Info - 1

SchemeSchemeScale - 1:100

Time -10Info - 1 000

SchemeSchemeScale - 1:100

Time -10Info - 1 000

Working docsWorking docsScale - 1:10

Time -100Info - 1 000 000

Pre-study Design - procurementProgramme

Introduction 2:

Such phase, such requirements

Facets’ context

Run - Maintain

Page 51: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-51--51-

Return

Back

Next

Directory

Introduction 3:

All aspects in every phase Concept phase -

Quick run through Customer’s area and function req Site possibilities Volume studies Time frame and economical picture Alternatives

Scheme phase -

Worked model with spaces and building objects

Architectural design, cost estimate, time schedule

Coordination between knowledge fields Reuse of key figures

Instant control!Face to face!

Professional tools!Standard exchange format!

Experience

Page 52: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-52--52-

Return

Back

Next

Directory

Concept phase – ”the target is to achieve a well studied

project suggestion, with the client, here and now.”

What is needed?

What does the site allow?

Do we have the space?

Is it attractive?

How much is it?

Test another idea?

Move on to next phase? In other words: In other words:

Complete basis for decision fasterComplete basis for decision faster

Page 53: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-53--53-

Return

Back

Next

Directory

Skiss 1Skiss 2Skiss 3

Facets Site Developer -

”all in one box”

Space use

Aesthetic

Rent

Site

Sketch ..

Function

Economy

Experience based figures

The boxes contain links. Use the ”back arrow” to return to

this page

Page 54: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-54--54-

Return

Back

Next

Directory

Result of using Facets Site Developer: Project suggestion at client meeting

Coordinated aspects (built spaces, space use, rent)

Experience from previous projects (key figures)

More alternatives investigated (volume studies, space use, construction period, effects of interest rate...)

Informative presentation (bird’s eye, 3D-sketches, rent/m2)

Direct communication with client Interactive way of work

Good basis for decision Good basis for decision Good definition for next phase Good definition for next phase

Page 55: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-55--55-

Return

Back

Next

Directory

Scheme phase”The target is to facilitate coordination between professionals”

Product definition – building objects and spaces with geometry and other attributes

Quantity take-off adjusted to cost structure (t.ex. BSAB, project divisions ....)

Cost estimation with different requirements degree of detail (e.g. recipes for walls, key-figures for HVAC, quotation sum for painting... )

Time schedule appropriate to planning needs (e.g. phases production activities with concerned building parts)

Every party works based on the same, updated information

In other words: In other words: coordinated professional project information coordinated professional project information

for procurement and detail designfor procurement and detail design

Page 56: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-56--56-

Return

Back

Next

Directory

Facets Scheme Design:

Coordinate information from professional tools

Cost Time

Product

MethodRecipe

Test project

The boxes contain links. Use the ”back arrow” to return to

this page

Page 57: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-57--57-

Return

Back

Next

Directory

Result of using Facets Scheme Design

Product model with several aspect

Product definition from CAD(now: ifc 2.0 import of architectural drawings Planned: also building services)

Cost calculation based on cost databases (now: recipe databases through odbc e.g. Mängda, Planned: through ifc)

Time schedule from project planning software (Now: database access to MS Project… Planned: ifc)

Relations between products, costs and activities

support for project leaders need of coordination: support for project leaders need of coordination:

designed designed costed costed planned planned

Page 58: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-58--58-

Return

Back

Next

Directory

COMPARE suggested models andCHOOSE one

Fortum Eng.

Define SCHEME Turbine Building

Skanska

Scheme modeller

Develop Scheme Skanska

MERGE Skanska

models

Fortum Eng.

Model Merger

Bid

ProjectWise

EPM-EDMProject IMS

Project IMS - I

IFC FE1

Project IMS

IFC SK1

IFC FE1

Project IMS -II

FE IMS

SK IMS

Client Brief

MERGE TW models

Fortum Eng.

Model Merger

Project

database

Define SCHEME T- building

Scheme modeller

Taylor Woodrow

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

FE Software

Define

CONCEPT Turbine BUILDING

Fortum Eng.

FE Software

Define Building

INCEPTION MODELLER

TU Delft

TUD Software

Page 59: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-59--59-

Return

Back

Next

Directory

COMPARE suggested models andCHOOSE one

Fortum Eng.

Define SCHEME T- building

Skanska

Scheme modeller

Develop Scheme Taylor Woodrow

MERGE Skanska

models

Fortum Eng.

Model Merger

Bid

ProjectWise

EPM-EDMProject IMS

Project IMS - I

IFC FE1

Project IMS

IFC SK1

IFC FE1

Project IMS - II

FE IMS

SK IMS

TW IMS

Client Brief

MERGE TW models

Fortum Eng.

Model Merger

Project

database

Define SCHEME T- building

Scheme modeller

Taylor Woodrow

Define

CONCEPT Turbine BUILDING

Fortum Eng.

FE Software

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

FE Software

Define Building

INCEPTION MODELLER

TU Delft

TUD Software

Page 60: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-60--60-

Return

Back

Next

Directory

CONCURTaylor Woodrow Design Development

Taylor Woodrow download the Conceptual Model and supporting documentation for the Turbine house from the project database.

Taylor Woodrow design a scheme and prepare a cost plan and construction programme. Taylor Woodrow show how the full IAI-IFC schema can be viewed and used as a source of information for generating a cost plan and how specification information can be included in the model. Taylor Woodrow use the estimators desktop software to assist with this task.

Taylor Woodrow use their company IMS during this process The end result is uploaded to the Project Database as IFC-TW1 plus information such as the

cost plan and programme A view of the major structural components of the Taylor Woodrow solution is shown in the

IFC Browser Viewer screen shots.

.

Page 61: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-61--61-

Return

Back

Next

Directory

Turbine House Building Scheme

Page 62: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-62--62-

Return

Back

Next

Directory

COMPARE suggested models andCHOOSE one

Fortum Eng.

Define SCHEME T- building

Skanska

Scheme modeller

Develop Scheme Taylor Woodrow

MERGE Skanska

models

Fortum Eng.

Model Merger

Bid

ProjectWise

EPM-EDMProject IMS

Project IMS - I

IFC FE1

Project IMS

IFC SK1

IFC TW1

IFC FE1

Project IMS - II

FE IMS

SK IMS

TW IMS

Client Brief

MERGE TW models

Fortum Eng.

Model Merger

Project

database

Define SCHEME T- building

Scheme modeller

Taylor Woodrow

Define

CONCEPT Turbine BUILDING

Fortum Eng.

FE Software

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

FE Software

Define Building

INCEPTION MODELLER

TU Delft

TUD Software

Page 63: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-63--63-

Return

Back

Next

Directory

CONCUR Ifc Browser

Client Server JAVA application which uses the Microsoft Internet Explorer to view Ifc 1.5.1 in HTML and VRML

Works on a network, intranet, extranet or internet. Can work with a modem connection.

Minimal system requirements; UNIX or Windows with freeware plug-ins for viewing.

Uses Ifc data stored in an EPM Technology Express Data Manager database on the server

Undertakes IFC to HTML translation on the client Undertakes IFC to VRML (3D) translation on the client Independent of proprietary modelling systems

Further informationReports describing the IFC Browser work are available in the Download Area.Contacts at TNO are Peter Bonsma: [email protected] & Michel Böhms [email protected]

Page 64: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-64--64-

Return

Back

Next

Directory

CONCUR Ifc Browser Architecture

EDM Supervisor

IfcBrowserJava Server

IFC1.5.1

EXPRESS-to-Java/SDAIGenerator in Java

JavaSDAI-Binding

(late)

IfcBrowserJava Client

+

RMI/HTTP

GeneratesRunning inJava-enabledInternet Browser

Meta-data (DD)Access

JavaIFC-Binding

(early)

IFC-data (MD)Access

NT4.0/W2K Unix/Microsoft

Here:MS IE5 +

Sun Java 1.2 Plug-in

EDM DB

C SDAI-Binding

Page 65: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-65--65-

Return

Back

Next

Directory

CONCUR Ifc Browser- Screen shot

Page 66: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-66--66-

Return

Back

Next

Directory

CONCUR Ifc Browser Functionality

Browse through the complete IFC 1.5.1 structure. Browse through the complete model. Show HTML or 3D based on every possible IFC object

selection, object selection help tools: Make a selection by hand in the modeltree Select all objects in the model based on a certain subset of the IFC 151

structure Filter out specific object types within the current selection

Add properties to the objects on the server through the client.

Show derived properties from an IFC object selection. Highlight a certain selection in the current 3D view.

Further informationReports describing the IFC Browser work are available in the Download Area.Contacts at TNO are Peter Bonsma: [email protected] & Michel Böhms [email protected]

Page 67: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-67--67-

Return

Back

Next

Directory

CONCUR Ifc Browser Details

All data is password protected Data is managed by EPM Express Data Manager (EDM)

object database. Which is accessed by the TNO Java/SDAI binding which is… Built on top of the third layer in the EPM Technology SDAI+

Toolkit using the Java Native Interface The base product developed by TNO and CSTB (VRML

generation) in the Esprit VEGA Project.

Further informationReports describing the IFC Browser work are available in the Download Area.Contacts at TNO are Peter Bonsma: [email protected] & Michel Böhms [email protected]

Page 68: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-68--68-

Return

Back

Next

Directory

CONCUR CONCUR Ifc Developments

PDM MetaData Structures for Documents Ifc Derived Attributes Ifc Model Merging Ifc Property Sets

Further informationReports describing the IFC Browser work are available in the Download Area.Contacts at TNO are Peter Bonsma: [email protected] & Michel Böhms [email protected]

Page 69: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-69--69-

Return

Back

Next

Directory

CONCUR PDM Meta data Structures for Documents

End users require metadata to automate the sorting, finding, storing and exchanging of files and documents.

The CONCUR Project has specified a simple PDM schema for documents for use in the project IMS.

The schema is in line with Ifc 2.0 A simplified version has been incorporated in Ifc 2x Metadata Criteria:

LINK - Easy link to PDT (Ifc 1.5.1 compliant in 1999) SIMPLICITY - Simple to understand and implement NEEDS - Satisfying the CONCUR Demonstration industrial need SUPPORT - IT vendor support

Analysed solution and described on the next sheet. The CONCUR schema is being used by IT vendors in ProCureFurther information

Reports describing the IFC Browser work are available in the Download Area.Contacts at TNO are Peter Bonsma: [email protected] & Michel Böhms [email protected]

Page 70: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-70--70-

Return

Back

Next

Directory

CONCUR PDM Metadata Development

CONCUR analysed 3 different Metadata solutions before preparing the CONCUR Schema:

STEP PDM Schema 1.1 (by the PDM Implementers Forum- Usage guide for the STEP PDM Schema, Jim Kendrick ERIM/PDES Inc. and Markus Hauser, ProSTEP GmbH, May 1999)

IAI Ifc 2.0 CD New CONCUR specific, top down approach (using Document Classification work prepared by Steve Race

in 1999)

Analysis Summary:  LINK SIMPLICITY NEEDS SUPPORT

STEP - --

IFC -

CONCUR (but if harmonized with the IAI)

Further informationReports describing the IFC Browser work are available in the Download Area.Contacts at TNO are Peter Bonsma: [email protected] & Michel Böhms [email protected]

Page 71: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-71--71-

Return

Back

Next

Directory

CONCUR Ifc – Derived Attributes- Why?

IAI-Ifc contains direct data on building elements such as: Height, Width, Length

However, users are also interested in properties like: Volume, Surface Area, Area

So CONCUR extended the standard Express Ifc 1.5.1 schema with derived property values which can be derived using the shape representation in Ifc 1.5.1

The EPM Technology Express Data Manager database can calculate the Derived Attributes in real time

The TNO IfcBrowser can view them via the client interface, calculating them on the server when the user requests them.

Further informationReports describing the IFC Browser work are available in the Download Area.Contacts at TNO are Peter Bonsma: [email protected] & Michel Böhms [email protected]

Page 72: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-72--72-

Return

Back

Next

Directory

CONCURIfc - Model merging – Why?

Commercial modelling software applications support their own specific disciplines and sometimes ignore or lose information from other disciplines!!!

End users often need to combine models from different disciplines End users often need to mix and match alternative solutions CONCUR developed a simple Model Merging technique using

Express-X The technique can merge models complying with the same Ifc

schema If the construction and related industries are to exploit object

modelling to the full, they will need sophisticated model merging technology.

CONCUR has not addressed the legal, responsibility ownership or model locking issues associated with multiple users taking parts of models, modifying them and merging the results back into the model.

The model merging is controlled by the Web based project IMS system and undertaken by the EPM-EDM database. Further informationReports describing the IFC Browser work are available in the Download Area.Contacts at TNO are Peter Bonsma: [email protected] & Michel Böhms [email protected]

Page 73: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-73--73-

Return

Back

Next

Directory

CONCURIfc - Model Merging Philosophy

Page 74: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-74--74-

Return

Back

Next

Directory

COMPARE suggested models andCHOOSE one

Fortum Eng.

Define SCHEME T- building

Skanska

Scheme modeller

MERGE TW models

Fortum Eng.

Model Merger

MERGE Skanska

models

Fortum Eng.

Model Merger

Bid

ProjectWise

EPM-EDMProject IMS

Project IMS - I

IFC FE1

Project IMS

FE1TW1SK1

IFC SK1

IFC TW1

IFC FE1

Project IMS - II

FE IMS

SK IMS

TW IMS

Client Brief

Merge Concept & Scheme

Project

database

Define SCHEME T- building

Scheme modeller

Taylor Woodrow

Define

CONCEPT Turbine BUILDING

Fortum Eng.

FE Software

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

FE Software

Page 75: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-75--75-

Return

Back

Next

Directory

CONCURModel Merging Rationale

The civil engineering companies have delivered alternative building solutions to the project database. The project database will have the facility to maintain the confidentiality of information where necessary.

Fortum Engineering can view both alternative schemes and can merge either with the original conceptual design for the plant and equipment or with an alternative design for the plant and equipment. It is also possible for Fortum to merge models for other parts of the plant into the same model.

Model merging requires the EPM-EDM part of the project database. Model merging instructions are assembled via a web based form.

The EPM-EDM software can also be used to extract individual objects from the Models.

The merged models have been loaded into the project database as IFC FE1+SK1 and IFC FE1+TW1. After the merging has been completed, the source and merged files are deleted from EPM-EDM.

The next view shows merged models.

.

Page 76: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-76--76-

Return

Back

Next

Directory

Ifc Model Merging Views

Page 77: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-77--77-

Return

Back

Next

Directory

CONCUR Ifc – Property Sets

Part of the content in IFC files is put in the properties. Property Sets can be defined to combine several properties

in a subgroup. This way we can define relations between different

properties. This saves a lot of space because we can refer to a specific

property set instead of a set of references to properties A property set can have 0 to many properties. One property can be found in several property sets.

Further informationReports describing the IFC Browser work are available in the Download Area.Contacts at TNO are Peter Bonsma: [email protected] & Michel Böhms [email protected]

Page 78: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-78--78-

Return

Back

Next

Directory

COMPARE suggested models andCHOOSE one

Fortum Eng.

Define SCHEME T- building

Skanska

Scheme modeller

MERGE TW models

Fortum Eng.

Model Merger

MERGE Skanska

models

Fortum Eng.

Model Merger

Bid

ProjectWise

EPM-EDMProject IMS

Project IMS - I

IFC FE1

Project IMS

FE1TW1SK1

Project IMS

-

FE1 +SK1

Project IMS III

IFC FE1

IFC SK1

IFC TW1

IFC FE1+TW1

IFC FE1+SK1

IFC SK1

IFC TW1

IFC FE1

Project IMS - II

FE IMS

SK IMS

TW IMS

Client Brief

Merge Concept & Scheme

Project

database FE1 +TW1

Define SCHEME T- building

Scheme modeller

Taylor Woodrow

Define

CONCEPT Turbine BUILDING

Fortum Eng.

FE Software

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

FE Software

Page 79: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-79--79-

Return

Back

Next

Directory

Define SCHEME T- building

Skanska

Scheme modeller

MERGE TW models

Fortum Eng.

Model Merger

Compare Scheme Solutions

MERGE Skanska

models

Fortum Eng.

Model Merger

Bid

ProjectWise

EPM-EDMProject IMS

Project IMS - I

IFC FE1

Project IMS

FE1TW1SK1

Project IMS

-

Project IMS

Project IMS - IV

FE1 +SK1

FE1 +TW1

Project IMS III

IFC FE1

IFC SK1

IFC TW1

IFC FE1+TW1

IFC FE1+SK1

IFC FE1

IFC SK1

IFC TW1

IFC FE2

IFC SK1

IFC TW1

IFC FE1

Project IMS - II

FE IMS

SK IMS

TW IMS

Client Brief

Project

database

Define SCHEME T- building

Scheme modeller

Taylor Woodrow

Define

CONCEPT Turbine BUILDING

Fortum Eng.

FE Software

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

FE Software

Description#

Fortum Eng.

COMPARE suggested models andCHOOSE one

Page 80: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-80--80-

Return

Back

Next

Directory

Turbine HousePlant & Skanska Building Solution

Page 81: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-81--81-

Return

Back

Next

Directory

Turbine HousePlant & TW Building Solution

Page 82: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-82--82-

Return

Back

Next

Directory

CONCUR Compare Scheme Solutions

Compare Solutions The different solutions offered by the building and civil engineering contractors are

compared. Try Combinations of Models

Model merging offers the opportunity to try different combinations of plant and building models. For example the mechanical engineering plant model may have changed or the principal contractor may want to try a new arrangement in an existing building model or try an existing plant arrangement in a different building. This could could occur when buildings are designed for a specific country or climate.

Choose the Most Appropriate Solution The principal contractor chooses the most appropriate combination to incorporate in the

bid.

Page 83: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-83--83-

Return

Back

Next

Directory

Define SCHEME T- building

Skanska

Scheme modeller

MERGE TW models

Fortum Eng.

Model Merger

Bid

MERGE Skanska

models

Fortum Eng.

Model Merger

ProjectWise

EPM-EDMProject IMS

Project IMS - I

IFC FE1

Project IMS

Project IMS

-

Project IMS

Project IMS - IVProject IMS III

IFC FE1

IFC SK1

IFC TW1

IFC FE1+TW1

IFC FE1+SK1

IFC FE1

IFC SK1

IFC TW1

IFC FE2

IFC SK1

IFC TW1

IFC FE1

Project IMS - II

FE IMS

SK IMS

TW IMS

Client Brief

COMPARE suggested models andCHOOSE one

Fortum Eng.

Project

database

Define SCHEME T- building

Scheme modeller

Taylor Woodrow

Define

CONCEPT Turbine BUILDING

Fortum Eng.

FE Software

Design

CONFIGURATION for Steam Turbine Plant

Fortum Eng.

FE Software

Bid

Page 84: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-84--84-

Return

Back

Next

Directory

CONCUR Bid to Client

The bid to the client usually includes:

The Proposed Scheme Solution In the past, proposed scheme solutions were usually described on drawings which were contractual documents. In the

future it is expected that this information will be presented as models which can be re-used. The models can be used to create views (drawings) for construction purposes. Models are presenting challenges to how contracts are written and undertaken. CONCUR has explored some of the practical technical requirements.

Cost Plan All bids require a price. How this is provided varies from country to country and even varies for different types of

construction project. Although detailed bills of quantities are still prepared for pricing, the construction industry is tending to use cost plans which are easier to prepare and use. They also relate to the object oriented way of thinking and working. A typical UK Cost Plan format for commercial buildings is shown which will be recognisable to most of the European construction industry. Taylor Woodrow and Skanska, in particular, have addressed how models can support the preparation of cost plans. External software partners have developed this further.

Programme The bid usually includes a programme for executing the work. Fortum Engineering and Skanska have developed this

aspect during the project.

Specifications Specifications are a key component of bids. This is the speciality of STABU. The TNO IFC Browser can be used to

insert specification information relating to building objects into the models.

Schedules Schedules of principal components such as doors and windows. Schedules can be created from the information models

Company Supporting Information Financial Statements Health & Safety Plan – including Construction Design & Management (CDM) risk assessments Quality Plans and Company Procedures Company Policies on issues such as safety, sustainability and environmental protection

Page 85: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-85--85-

Return

Back

Next

Directory

CONCUR Typical Cost Plan

FUNCTION SUMMARY and COST PLAN

Job Nr L97198 Office SouthallVersion 1 Contact D. WilliamsJob Name Turbine HouseJob Location None remote England SfB Code 162.1Client Fortum Engineering BCIS Region Northern

Contract Type JCT 81 Gross Floor Area 2,785 m2

Contract Period 29 weeks Basement Area 0 m2

Tender Date Nov-00 Ground Slab Area 1385 m2

Start on Site Apr-01 Upper Floors Area 1400 m2

Practical Completion Sep-01 Wall Area 600 m2

Date of Cost Plan Oct-00 Wall to Floor Area 0.22Average Storey Height 5 m

Cost Base Date Nov-00 Nr of Storeys 2

FUNCTION Function Total Cost/m2 % of Job of Gross at

Floor Area Base Date€ € %

1 Substructure 280,375.00 100.67 9.7%2 Structure 331,500.00 119.03 11.5%3 Envelope Completion 423,530.00 152.08 14.7%4 Cellular Completion 195,940.00 70.36 6.8%5 Finishes 141,189.00 50.70 4.9%6 Fittings 26,600.00 9.55 0.9%7 Services 833,499.00 299.28 29.0%8 External Works 314,497.00 112.93 10.9%

Sub-total of all Functions 2,547,130.00 914.59 88.5%

Preliminaries 9.7% 247,071.61 88.72 8.6%

TOTAL EXCLUDING CONTINGENCIES 2,794,201.61 1,003.30 97.1%

Contingencies 3.0% 83,826.05 30.10 2.9%

Total cost plan at base date 2,878,027.66 1,033.40 100.0%

Inflation between base date & completion date 3.5% 100,730.97 36.17 3.5%

TOTAL COST PLAN AT COMPLETION 2,978,758.63 1,069.57 103.5%

Page 86: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-86--86-

Return

Back

Next

Directory

CONCUR LexiCon

LexiCon Description A collection of common concept definitions and descriptions used by the

construction industry in multiple languages. They are presented in classes with associations to other classes and associated aspects.

LexiCon Explorer A software tool for preparing, editing and inputting content into a

LexiCon database.

Spec Explorer A software tool for preparing and editing project composition trees.

The LexiCon Vision The LexiCon is continuing to grow as an international collaboration.

Page 87: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-87--87-

Return

Back

Next

Directory

CONCUR LexiCon Description

Common concept definitions and descriptions for the construction industry

Definition of concepts Definition of relations between concepts Naming of concepts

Based on Framework of ISO PAS 12006-3 Building construction

Organization of information about construction worksPart 3: Framework for object-oriented information exchange

Multi-lingual, support for synonyms and homonyms Concepts can have an unlimited set of names in any language, and names may refer multiple concepts

International co-operation Content of the LexiCon is developed by STABU in co-operation with organizations in Europe, Australia,

New Zealand and Canada

Further informationContact at STABU is Kees Woestenenk: [email protected] describing the LexiCon work are available in the Download Area.

Page 88: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-88--88-

Return

Back

Next

Directory

CONCUR LexiCon Explorer

Browser and Editor of LexiCon Classes

LexiCon Classes (based on ISO PAS 12006-3): Subjects (e.g. Built objects, Spaces, Products) Activities (Work associated with Subjects) Aspects (Grouping of Properties) Properties, Measures and Values Units (e.g. SI units)

Descriptions of Classes and associated Names Names and Descriptions in any language

Associations between Classes Specialization hierarchy Composition (Part-of associations) Associated Aspects, Properties, Measures and Values

References to external documents Standards (e.g. ISO standards, local standards) Classification systems (e.g. SfB, Master Format, EPIC

Page 89: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-89--89-

Return

Back

Next

Directory

CONCUR LexiCon Explorer

Screen shot

Page 90: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-90--90-

Return

Back

Next

Directory

CONCUR SpecExplorer

Editor for project specifications

Covers whole lifespan over projects Based on project composition

Stand alone, user defined Imported from geometrical model (not available yet)

Each node in composition tree is treated as a distinct project Usage of LexiCon classes as templates Additional assignment and specification of Tasks

Task specification Contractual conditions Participants

Associated Contacts database

Page 91: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-91--91-

Return

Back

Next

Directory

CONCUR SpecExplorer

Screen shot

Page 92: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-92--92-

Return

Back

Next

Directory

CONCUR The LexiCon Vision

A common language for the Construction Industry The LexiCon provides definitions and descriptions of concepts that are of interest for the construction

industry. The definitions and descriptions are structured according to a model that allows both human and

computer interpretation. The conceptual language of the LexiCon may use any lexical human language to express its contents.

The formal definition of a concept consists of its set of associated properties, whereas the names and descriptions given to that concept allow humans to quickly associate that concept with their own understanding of the meaning of that concept.

Framework for information exchange The LexiCon concepts live in the background, providing templates that help structuring information in

such a way that this information can be interpreted by different applications, as long as these applications have access to the LexiCon concepts. Hence, end users won’t see much of the LexiCon in practice because the LexiCon will often be hidden by the user application’s interface.

Examples of applications using the LexiCon are: CAD applications which want to combine gemotrical object descriptions and quality data Product information systems and Catalogues describing products Specification systems, cost estimating system and the like.

Further informationContact at STABU is Kees Woestenenk: [email protected] describing the LexiCon work are available in the Download Area.

Page 93: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-93--93-

Return

Back

Next

Directory

CONCUR LexiCon Glossary - 1

Lexicon Concepts - are abstractions of things that exist in the real world. A concept groups similar things into one thing, e.g. the concept of Door is the abstraction of all doors and represents the meaning of what a door is

Multiple Concepts - any set of concepts Relations between Concepts - are properties of, part of and type of

relationships that exist between concepts LexiCon Classes - Concepts defined in the LexiCon are called Classes. The

main categories of Classes in the LexiCon are: subjects, activities, properties, property collections, measures and units

LexiCon Subjects - are the more or less tangible things being described, such as buildings, parts of buildings, spaces and products

LexiCon Activities - are the processes causing changes in the state of a subject, e.g. the activity of casting concrete

Assignment - assigning names to concepts and setting relationships between concepts

Page 94: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-94--94-

Return

Back

Next

Directory

CONCUR LexiCon Glossary - 2

LexiCon Aspects - characteristics of Subjects or Activities consisting of a set of related properties. Most aspects in the LexiCon describe a function or role of a Subject or Activity, e.g. the function Fire Barrier

Associated Aspects - Aspects associated to a Subject or an Activity Lexicon Database - the actual storage of the LexiCon data Lexicon Properties - characteristics and quantities describing Subjects and

Activities Composition - the components that together constitute a Subject or an Activity,

e.g. door leaf and frame are components of a door set Project Composition - all the components of any Subject or Activity in a project Composition Trees - the hierarchical structure of Subjects or Activities based

on their composition Geometrical model - the geometry of Subjects, modelled in another application,

such as a CAD application

Page 95: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-95--95-

Return

Back

Next

Directory

CONCUR LexiCon Glossary - 3

Contacts Database - a database containing names and addresses of persons and organizations

Associated Aspects - Aspects describing a Subject or an Activity Specialization hierarchy - the hierarchical structure of concepts based on the

type-of relationship, e.g. a door is a type of separation construction Classification systems - a set of interrelated classification tables

Collaborating organizations in LexiCon development STABU foundation, the Netherlands Construction Information Systems (CIS), Australia Construction Information Limited, New Zealand Norwegian Council for Building Standardization (NBR) Digicon Information Inc., Canada

Page 96: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-96--96-

Return

Back

Next

Directory

CONCUR Results and Exploitation

Technical Results Industrial Results Partner Exploitation External Exploitation The Way Forward from CONCUR

Page 97: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-97--97-

Return

Back

Next

Directory

CONCUR Technical Results Common concepts for naming and definition in AEC (Lexicon)

The development of common concepts for naming and defining construction terms for international use and in multiple languages starting with Dutch, English, German, Norwegian and French.

STABU have also developed tools for collecting and manipulating definitions. Moving IFC product models into use

CONCUR has contributed to the the development of IFCs and provided criticism to the developers. The major contribution was in the area of document metadata.

The project partners have provided a test bed for trialling the advanced use of IFCs with industrial information. CONCUR has demonstrated early applications of IFC v1.5.1 and IFCv2.0 CAD system translators for IFCs have been tested and feedback has been provided to software vendors. Encouraging software vendors IFCs were originally intended for exchanging information. CONCUR has show that they can also be used for storage. CONCUR has shown how IFCs can be used in in STEP (Express) object databases for both storage and manipulation

(Model Merging). The partners showed how XML could be used to interface with models in a STEP database. This showed that models

can be used without the need for sophisticated modelling systems. (none CAD tools) The partners developed a prototype IFC/Browser for viewing and extracting information from IFC models. (a none CAD

tool) Technical Issues

IFCs and their translators are still immature and are very limited in their application. Serious general commercial exploitation is unlikely to happen before 2004. There is a need for funding to develop the depth and breadth of the models, especially in the product area.

Currently cost and time are not being supported by vendors. There is a need for JAVA 3D development for viewing to replace the limited VRML. The modelling technology needs to keep pace with XML developments so that IFCs can be integrated with eCommerce

applications Technical adoption

Vendor uptake and translator production is at least 9 months behind model development. Different vendors are using different versions of IFC which leads to incompatiblity

There is an increasing vendor interest in IFCs, especially from the smaller vendors. Related R&D Projects

Page 98: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-98--98-

Return

Back

Next

Directory

CONCUR Industrial ResultsWhat has CONCUR Achieved?

Used commercially available software

Used open standard product models

Established a web based multi-user environment for exchanging project information

Demonstrated a link between Electronic Document Management Systems (EDMS) and a Product Data Technology (PDT) object database

Demonstrated with real industrial information

Deployed on real projects

Contributed to the development of open standards

Has shown that bidding can take less time and effort

Page 99: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-99--99-

Return

Back

Next

Directory

CONCUR Results: Partner Commercial Exploitation Taylor WoodrowTaylor Woodrow is making extensive use of project web sites. The company is wanting to move from a

project to product way of doing business. A live construction project is using IFC and CIS standards for exchanging information down and integrating the supply chain. The company is now starting to address the human and organisational issues. The project results are influencing the TW ICT investment programme for product and project modelling.

SkanskaSkanska is developing and investing in the the Facets work where modelling is supporting the

programming and estimating for projects. IFCs are a important part of this thinking.

Fortum EngineeringFortum Engineering are also moving to a product way of doing business. CONCUR has helped the

company to start integrating processes and the results are the basis of data warehouse plans for corporate information. The project has helped Fortum to integrate the use of information so that risks can be quantified quickly.

STABUThe Lexicon development is the basis of an international standardisation initiative to identify a taxonomy

of construction terms with definitions. These can be used for eCommerce purposes and will eventually provide a logical integration with Product Data Technology and specifications. STABU are also exploiting the work commercially by populating the taxonomy with construction product and service information which will complement their existing business.

All partners have much better knowledge and expertise with which to make investment decisions

Page 100: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-100--100-

Return

Back

Next

Directory

CONCUR Results: External Commercial Exploitation

Software Vendors using CONCUR Results Directly:

EPM Technology Ltd (Express Data Manager) Solibri (Facets) Elstree Computing Ltd (Cost Planning)

Indirectly: Autodesk (Arcitectural Desktop) Nemetschek (All-Plan) Graphisoft(ArchiCad)

Significant interest from the Smaller Vendors Smaller vendors usually provide specialist software Smaller vendors see interoperability as a route to a wider market Smaller vendors can react and customise more quickly

Commercial Software is expensive to Develop Research Projects and partners do not have the resource to develop commercial software

which requires 10x the resource required for a prototype. Commercial software requires maintenance and a commercial support infrastructure Therefore it is essential to involve commercial vendors

Open standards are developing Slowly Many vendors are wary of open standards With proprietary standards being an issue Open standards development is under funded and often voluntary Vendors are driven by the market which has an 18 month cycle Demand & demand – and you might get – sometime in the not too distant future!!!

Page 101: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-101--101-

Return

Back

Next

Directory

CONCUR Links to External Partners

EPM Technology Solibri Elstree Computing Ltd DOORS (Telelogic UK Ltd)

Related R&D Projects

Related Software Autodesk Nemetschek ArchiCad

Page 102: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-102--102-

Return

Back

Next

Directory

CONCUR Related R&D Projects

ProCureInformation & Communication Technology (ICT) at work for the Large Scale Engineering (LSE) ProCurement Chain

OSMOS??

Globeman ??

eLegal??

eConstructElectronic Business in the Building and Construction Industry. Preparing for the Next Generation Internet

WeConstruct????

Page 103: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-103--103-

Return

Back

Next

Directory

CONCUR - The Way Forward Make better use of information models

CONCUR used IFC based object models throughout the project where the objects are the building elements. The project explored the limits of using these models and found that although the objects can be used there is a great need to deepen and broaden the IFCs. It is also clear that models which are native to modelling systems will always be richer than standard models but with the penalty of limited or no interoperability. The partners found that it is essential for users to create project models from an object point of view based on the building elements. Major advantages of using IFCs were the facility to exchange objects between different sectors of industry without losing or corrupting information and the ability to exchange and store property and attribute information in addition to geometry for use in other systems, such as estimating. The effective use of standard models aids the change from project to product ways of thinking .

Do more work on the inception area During the project it became clear that the front end work with the client and the inception modelling area requires more

R&D effort. This is a key area which can initiate models, programmes and cost plans. There are clear links with knowledge management, data warehouses and artificial intelligence systems to ‘first guess’ project models to speed up the conceptual work downstream. There is a need for Building Wizards.

Make links to E-commerce & business There is a need to develop links between the worlds of Product Data Technology and eCommerce. This will widen the

usefulness of project models to support the needs of estimating, purchasing and facilities management. This will move product modelling into the mainstream of business. This will result in models being used by software other than modelling systems. Access will be required to extract and add information to the models by applications such as spreadsheets. The VTT XML interface to a STEP database is a move in this direction. It is important to have compatibility between PDT, EDI, catalogue formats and eCommerce.

Continue RTD investment European and national bodies need to find ways to support the development of model schemas and research into related

applications. It is of general use throughout the industry but beyond the scope of individual companies. The work is currently being moved forward by member based (not for profit) organisations which supply funding for the work.

Involve vendors It is essential that the software vendors are involved in the R&D work. Experience has shown that vendors value being

kept informed about developments. Within CONCUR software vendors became involved towards the end of the project as associate contractors where they implemented the research ideas and brought them to market. This was a good fit with their development programmes which are usually less than 24 months. Only commercial vendors have the skills and resources to commercially robust software and support.

Page 104: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-104--104-

Return

Back

Next

Directory

Taylor Woodrow Construction Limited

Organisation Taylor Woodrow Construction LimitedDivision Engineering DivisionDepartment Research and DevelopmentDept. No. N951Secretary Reeta MoholkarE-mail [email protected] +44 (0)20 8575 4856 Fax +44 (0)20 8575 4277Mail See addressAddress 345 Ruislip Road, Southall, Middlesex, UB1 2QX, United KingdomWWW Taylor Woodrow Construction Ltd http://www.twc.co.uk/

Consultancy in Design & Technology http://www.tel-consult.co.uk/

Contacts David Leonard Jeff StephensE-mail [email protected] [email protected] +44 (0)20 8575 4888 +44 (0)20 8575 4626 GSM +44 (0)7747 756 024 +44 (0)7798 831 899Visit Floor 3 Zone 6 Floor 3 Zone 6

Travel Address, MapHotels Details

Page 105: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-105--105-

Return

Back

Next

Directory

Organisation Skanska TeknikDivisionDepartmentDept. No.Secretary Anne-Marie BeverlooE-mailPhone Fax +46 8 753 60 48Mail 169 83 Solna, Stockholm, Sweden Address Råsundavägen 2visits:

WWW Teknik Skanska AB

Contacts Per Hogard Lennart Klintmalm Adina JagbeckE-mail [email protected] [email protected] adina.jagbeck@teknik.

skanska.se

Phone +46 8 753 8806 +468 753 8369 +46 8 5043 5000

GSM +4670 659 4871 n.a +46 70 835 04 15

VisitTravel

Skanska Teknik

Page 106: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-106--106-

Return

Back

Next

Directory

Fortum Engineering Organisation Fortum Engineering LtdDivisionDepartmentDept. No.SecretaryE-mailPhoneFaxMail See addressAddress POB 10, FIN - 000 48 Fortum, Rajatorpantie 8, Vantaa, FinlandWWW Fortum Engineering Ltd http://www.fortum.com

Contacts Jari Puttonen Pekka ValikangasE-mail [email protected] [email protected] +358 10 453 2222 +358 10 453 2245

Travel

Page 107: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-107--107-

Return

Back

Next

Directory

STABU

Organisation Stichting Standaardbestek Burger-en UtilitsbouwDivision n.aDepartment Research & DevelopmentDept. No. n.aSecretary Tineke Simonse, Christa Bruis E-mail [email protected] +31 318 633026 Fax +31 318 635957Mail See addressAddress PO Box 36, NL-6710 BA, Ede, The Netherlands

Willy Brandtlaan 81NL-6716 RJ, Ede, The Netherlands

WWW http://www.stabu.nl/

Contacts Maarten van Hezik Kees WoestenenkE-mail [email protected] [email protected] + 31 318 633 026 +31 318 633026 GSM + 31 651 36 96 71 n.a.

Travel Route, MapHotel Reehorst, Route, Map (as above)

Page 108: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-108--108-

Return

Back

Next

Directory

VTTOrganisation Technical Research Centre of FinlandDivision Building TechnologyDepartment Concurrent EngineeringDept. No. RTE23Secretary Jaana StrengE-mail [email protected] + 358 9 456 6938Fax +358 9 4566 251Mail See addressAddress PO Box 1801, FIN-02044 VTT, FinlandWWW VTT Building Technology http://cic.vtt.fi/

Contacts Matti Hannus Maria NikolaenkoE-mail [email protected] [email protected] +358 9 456 6948 +358-9-456 6993 GSM +358 40505 4577 +358 408259394 Visit Floor 2 Room Floor 2 Room 203B

Travel

Page 109: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-109--109-

Return

Back

Next

Directory

KTH Organisation Kungliga Tekniska Hogskolan (Royal School of Engineering)DivisionDepartmentDept. No.SecretaryE-mailPhone FaxMail See addressAddress Byggandets Org & Ekonomi, Drottning Kristinas väg 30, S-100 44 Stockholm

WWW KTHContacts Robert Noack Professor Örjan WikforssE-mail [email protected] [email protected] Phone +468 790 9073 +GSM +4670 511 6913 +Visit

Travel

Page 110: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-110--110-

Return

Back

Next

Directory

TUD Organisation Technische Universiteit DelftDivision Faculty of Civil Engineering & Geosciences Department Civil Engineering InformaticsDept. No. n.a.Secretary Gina de KokE-mail [email protected] +31 15 2784239Fax +31 15 2787700Mail See addressAddress PO Box 5048, NL-2600 GA, Delft, The Netherlands

Stevinweg 1, 3th floorDelft, The Netherlands

WWW http://cti.ct.tudelft.nl

Contacts Prof. Frits Tolman Saban OzsariyildizE-mail [email protected] [email protected] +31 15 2781652 +3115 278 4330 GSM n.a n.aVisit Room 3.39 n.a

Travel http://cti.ct.tudelft.nl/general/location.htmlHotel http://www.delfthotels.nl/engels/index.html

Page 111: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-111--111-

Return

Back

Next

Directory

TNO Organisation Nederlandse Organisatie voor Toegepast Natuurwetenschappelijk OnderzoekDivision Engineering Mechanics and Information Technology (MIT)Department Information Technology for Building and Construction (ITBC)Dept. No. -Secretary Jolanda van der GaagE-mail [email protected] Phone +31(15)2695226Fax +31(15)2695335Mail See addressAddress PO Box 49, NL-2600 AA, Delft, The Netherlands

Schoemakerstraat 97, NL-2628 VK, Delft, The NetherlandsTNO Zuidpolder Complex, Building MN, 3th Floor

WWW TNO Building and Construction Research (BOUW) http://www.bouw.tno.nl/

Contacts Michel Böhms Peter BonsmaE-mail [email protected] [email protected] Phone +31 15 269 5304 +31 15 269 5306Visit Room MN 3.157 Room MN 3.152

Travel http://www.bouw.tno.nl/TnoBouwWWW/about_us/locations/delft.html Hotel http://www.delfthotels.nl/engels/index.html

Page 112: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-112--112-

Return

Back

Next

Directory

CONCUR Mid Term Review Demonstration Scenario

Requirements & IssuesManagement

DOORS © QSS (UK)

Requirements & IssuesRequirements & IssuesManagementManagement

DOORS DOORS © QSS (UK)© QSS (UK)

ProductProject &

ProductionBase

© EPM/CSC

ProductProductProject &Project &

ProductionProductionBaseBase

© EPM/CSC© EPM/CSC

Issue &Decision

Base

Issue &Issue &DecisionDecision

BaseBase

ExternalLibrary

DataBCIS/Spons

ExternalExternalLibraryLibrary

DataDataBCIS/BCIS/SponsSpons

Facility InceptionDesign

Design++, © IVO Power

Facility InceptionFacility InceptionDesignDesign

Design++, Design++, © IVO Power© IVO PowerPlantModel

DatabaseD++ © Design Power

PlantPlantModelModel

DatabaseDatabaseDD++ ++ © Design Power© Design Power

ResourceEstimation

D++© Design Power/Skanska

ResourceResourceEstimationEstimation

D++D++© Design Power/Skanska© Design Power/Skanska

SKANSKASKANSKASKANSKA

IVOPEIVOPEIVOPE

TU DELFTTU DELFTTU DELFT

TAYWOODTAYWOODTAYWOOD

STABUSTABUSTABU

TNOTNOTNO

KTHKTHKTH

ProductProject &

ProductionBase

ProductProductProject &Project &

ProductionProductionBaseBase

Cost EstimationCatoPro

© Elstree Computing (UK)

Cost EstimationCost EstimationCatoProCatoPro

© © Elstree Elstree Computing (UK)Computing (UK)

Concept DesignArchitectural Desktop

© AutoDesk

Concept DesignConcept DesignArchitectural DesktopArchitectural Desktop

© AutoDesk© AutoDesk

SpecApplierExcitech

SpecApplierSpecApplierExcitechExcitech

Process SimulationSOLVO © IVO Power

Process SimulationProcess SimulationSOLVO ©SOLVO © IVO PowerIVO Power

Cost EstimationTCM

© ToCoMan (Fi)

Cost EstimationCost EstimationTCMTCM

© © ToCoMan ToCoMan (Fi)(Fi)

Inception Modeller(as Cost Assessor)

TUD

Inception Inception ModellerModeller(as Cost Assessor)(as Cost Assessor)

TUDTUD

SchedulingMS Project

SchedulingSchedulingMS ProjectMS Project

VRMLVRMLVTTVTTVTT

WWWBrowsersWWWWWW

BrowsersBrowsers

PM Browser

VEGA © TNO

PM Browser

PM Browser

VEGA

VEGA © TNO© TNO

PM

View

er

PM

View

er

PM

View

er

LexiConSTABU

LexiConLexiConSTABUSTABU

Requirements & IssuesManagement

DOORS © QSS (UK)

Requirements & IssuesRequirements & IssuesManagementManagement

DOORS DOORS © QSS (UK)© QSS (UK)

ProductProject &

ProductionBase

© EPM/CSC

ProductProductProject &Project &

ProductionProductionBaseBase

© EPM/CSC© EPM/CSC

Issue &Decision

Base

Issue &Issue &DecisionDecision

BaseBase

ExternalLibrary

DataBCIS/Spons

ExternalExternalLibraryLibrary

DataDataBCIS/BCIS/SponsSpons

Facility InceptionDesign

Design++, © IVO Power

Facility InceptionFacility InceptionDesignDesign

Design++, Design++, © IVO Power© IVO PowerPlantModel

DatabaseD++ © Design Power

PlantPlantModelModel

DatabaseDatabaseDD++ ++ © Design Power© Design Power

ResourceEstimation

D++© Design Power/Skanska

ResourceResourceEstimationEstimation

D++D++© Design Power/Skanska© Design Power/Skanska

SKANSKASKANSKASKANSKA

IVOPEIVOPEIVOPE

TU DELFTTU DELFTTU DELFT

TAYWOODTAYWOODTAYWOOD

STABUSTABUSTABU

TNOTNOTNO

KTHKTHKTH

ProductProject &

ProductionBase

ProductProductProject &Project &

ProductionProductionBaseBase

Cost EstimationCatoPro

© Elstree Computing (UK)

Cost EstimationCost EstimationCatoProCatoPro

© © Elstree Elstree Computing (UK)Computing (UK)

Cost EstimationCatoPro

© Elstree Computing (UK)

Cost EstimationCost EstimationCatoProCatoPro

© © Elstree Elstree Computing (UK)Computing (UK)

Concept DesignArchitectural Desktop

© AutoDesk

Concept DesignConcept DesignArchitectural DesktopArchitectural Desktop

© AutoDesk© AutoDesk

Concept DesignArchitectural Desktop

© AutoDesk

Concept DesignConcept DesignArchitectural DesktopArchitectural Desktop

© AutoDesk© AutoDesk

SpecApplierExcitech

SpecApplierSpecApplierExcitechExcitech

SpecApplierExcitech

SpecApplierSpecApplierExcitechExcitech

Process SimulationSOLVO © IVO Power

Process SimulationProcess SimulationSOLVO ©SOLVO © IVO PowerIVO Power

Process SimulationSOLVO © IVO Power

Process SimulationProcess SimulationSOLVO ©SOLVO © IVO PowerIVO Power

Cost EstimationTCM

© ToCoMan (Fi)

Cost EstimationCost EstimationTCMTCM

© © ToCoMan ToCoMan (Fi)(Fi)

Cost EstimationTCM

© ToCoMan (Fi)

Cost EstimationCost EstimationTCMTCM

© © ToCoMan ToCoMan (Fi)(Fi)

Inception Modeller(as Cost Assessor)

TUD

Inception Inception ModellerModeller(as Cost Assessor)(as Cost Assessor)

TUDTUD

SchedulingMS Project

SchedulingSchedulingMS ProjectMS ProjectSchedulingMS Project

SchedulingSchedulingMS ProjectMS Project

VRMLVRMLVTTVTTVTT

WWWBrowsersWWWWWW

BrowsersBrowsers

PM Browser

VEGA © TNO

PM Browser

PM Browser

VEGA

VEGA © TNO© TNO

PM

View

er

PM

View

er

PM

View

er

LexiConSTABU

LexiConLexiConSTABUSTABU

LexiConSTABU

LexiConLexiConSTABUSTABU

Page 113: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-113--113-

Return

Back

Next

Directory

CONCUR Mid Term Review - UK Overview

Drawings & CalculationsReports

Assess EnquiryAnalyse Requirements

Respond toRequirements

Develop Concept Design

Price Concept

Client Enquiry

Reports

Bid

Cost Plan

Page 114: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-114--114-

Return

Back

Next

Directory

CONCUR Mid Term Review - UK Detailed Scenario

Enquiry Information

CostAssessor

CATOPro

SpecApplier

SpecComposer

VTT PROMOTE

TNO Browser

AutoCadArchitectural DeskTop

IFC Squasher

Price Utility

MS-Access

CATOProCost Plan

Report

Drawings

Reports

TEXT

SPF

SPF

CSV

SPF

CSVSPF

SDAIJAVA

DWG/DXF

EPM-EDMProject

InformationRepository

CSTBCSC v2

NATIVE file link

SPF

SDAI

CSV

CSVCSV

SPF ODBC

CSV

DOORS

CSV = Comma separated Variable File

SPF = STEP Physical File (IAI-IFC)

SDAI = STEP Data Access Interface

Page 115: -1- Return Back Next Directory CONCUR CONCUR Brite EuRam BE96-3016 Results

-115--115-

Return

Back

Next

Directory

CONCUR Download Area

Reports A list of CONCUR public reports :

??? ???

A list of other reports : ??? ???

Software ? Digital Information Lexicon etc?