© 2009 bentley systems, incorporated derricke gray geopak product manager intersection design with...

24
© 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

Upload: madeline-halliwill

Post on 14-Dec-2015

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

Derricke GrayGEOPAK Product Manager

Intersection Design with Roadway Designer

Page 2: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

2 | WWW.BENTLEY.COM

Intersection Design

Designing an intersection can be a complex and iterative process. There are an abundance of criteria to consider such as min/max slopes, stopping sight distance, drainage and R/W constraints – just to name a few.

There are many techniques in Roadway Designer that can be used to model intersections. This presentation will cover the basic workflow used to model an at-grade intersection.

2

Page 3: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

3 | WWW.BENTLEY.COM

Project Review

3

CL-278

Reloc-2NW

NE

Page 4: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

4 | WWW.BENTLEY.COM

Project Review

Before we begin, let’s review our project data and the template that we’ll be using.

4

Page 5: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

5 | WWW.BENTLEY.COM

5

Page 6: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

6 | WWW.BENTLEY.COM

Design Corridors

The first step in the process is to design the separate corridors for the mainline and the side road.

6

Page 7: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

7 | WWW.BENTLEY.COM

7

Page 8: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

8 | WWW.BENTLEY.COM

Intersection Design

Now that we have designed our corridors, we are ready to begin work on our intersection.

First, we need to produce our curb return geometry, both horizontally and vertically.

8

Page 9: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

9 | WWW.BENTLEY.COM

Create Surfaces

There are several ways to calculate curb return elevations. • Vertical Offset from PGL• Pavement Slope from PGL• Elevation• Calculate from Surface Model

9

For this exercise, we’ll demonstrate how to calculate the beginning and ending elevations of the of the returns from a model. In order to do that, we’ll first need to create surfaces for both of our corridors.

Page 10: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

10 | WWW.BENTLEY.COM

10

Page 11: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

11 | WWW.BENTLEY.COM

Design Horizontal/Vertical Returns

Through the use of the Multi-Center Curve application, we can have GEOPAK design our preliminary Horizontal and Vertical curb return geometry.

11

Page 12: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

12 | WWW.BENTLEY.COM

Design Horizontal/Vertical Returns

The Multi-Center Curve application can create one-center, two-center or three-center compound curves at the intersection of two alignments. The applications creates a new horizontal alignment in the geometry database and, if desired, a vertical alignment as well.

12

Page 13: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

13 | WWW.BENTLEY.COM

13

Page 14: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

14 | WWW.BENTLEY.COM

Integrate Returns into Side Road

Now that we have the horizontal and vertical geometry for our curb returns, we can integrate this geometry into the design of the intersection.

14

Page 15: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

15 | WWW.BENTLEY.COM

Integrate Returns into Side Road

• Assign curb return alignments as Point Controls

• Increase the template drop interval through return

• Generate new surface for Reloc-2 and review

15

Page 16: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

16 | WWW.BENTLEY.COM

Page 17: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

17 | WWW.BENTLEY.COM

Integrate Returns into Mainline

We also need to integrate the curb returns into our mainline surface with the same workflow as we used for the side road.

17

Page 18: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

18 | WWW.BENTLEY.COM

Integrate Returns into Mainline

• Assign curb return alignments as Point Controls

• Increase the template drop interval through return

• Drop the end conditions and shoulder

• Generate new surface for CL-278 and review

18

Page 19: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

19 | WWW.BENTLEY.COM

Page 20: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

20 | WWW.BENTLEY.COM

Finished Model

With our intersection designed, we can now create our finished model, which will integrate both corridors into a single model.

20

Page 21: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

21 | WWW.BENTLEY.COM

Page 22: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

22 | WWW.BENTLEY.COM

Components

In the V8i SU1, we can take advantage of the new functionality of plotting ‘components’ when we create our model. These components allow us to visualize our model to much better detail.

22

Page 23: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

23 | WWW.BENTLEY.COM

Page 24: © 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Intersection Design with Roadway Designer

© 2

00

9 B

en

tley S

yst

em

s, In

corp

ora

ted

Derricke GrayGEOPAK Product Manager

Intersection Design with Roadway Designer