© 2014 hdr architecture, inc., all rights reserved.© 2014 ......senior asset management consultant...

28
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.

Upload: others

Post on 02-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • © 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.

  • © 2014 HDR, Inc., all rights reserved.

    Have Your Cake: Operator's Guide to

    Sustainable Asset

    Management

  • Senior Asset Management Consultant

    [email protected]

    503.867.7652

    Juston Manville

  • A practice that everybody has worked in, few

    have a complete definition of and everyone

    wants on their resume….

    Answer:

  • Conserve, protect, restore, and improve the

    supply and quality of natural resources.

    Align and integrate programs, tools,

    incentives, and indicators to achieve as

    many positive outcomes as possible in

    environmental, economic, and social

    systems.

    Consider the full life cycles of multiple

    natural resources, processes, and

    pollutants in order to prevent pollution,

    reduce waste, and create a sustainable

    future.

    EPA’s Strategic Approach to Sustainability

  • Institute of Asset Management; IAM.org

  • Institute of Asset Management; IAM.org

  • An Asset Management Practice is Sustainable

    Knowledge transfer for long-term

    sustainability

    Problem-solving approach

    Most effective use of money available

  • Institute of Asset Management; IAM.org

  • Institute of Asset Management; IAM.org

  • Are your funding, Maintenance and Capital Programs leveraging a triple bottom line approach?

    Align Frameworks

  • Business Risk Exposure (BRE)

    “A method of calculating (scoring) the nature and level of exposure that an

    organization is likely to confront through a potential failure of a specified asset or

    group of assets.” -- EPA

  • What goes into the decision to build infrastructure?

    How do you calculate consequence of failure for

    infrastructure?

    o Do you take a rick based approach to maintenance?

    How do you calculate condition and / or the

    performance of the asset?

    o Is there an condition assessment protocol?

    BRE = Consequence x Condition

    BRE is the “wild west” for Sustainability

  • ConsequenceThe risk of not meeting a level of service expectation

  • Community Levels of Service Drive Priorities

    Services Provided

    The Customers Who

    Use the Services

    Actions to Meet

    Service Expectation

    Alignment of

    Customer and

    Supplier

    Customer Needs

    and Expectations

    Information Needed

    to Run the Business

    Metrics for Good

    Performance

    Level of Service

    Key Performance Indicators

  • EPA WERF Simple

  • Consequence = Risk of not meeting Level of Service

  • What risk are you willing to take….

    Define the

    Acceptable Levels of

    Risk

  • What variables would be considered

    sustainable?

    Consequence = (X1 + X2 + X3 + XN)

  • Condition Assessment Is there a standard for the asset?

  • Cost rolls up from part(s) to site(s)

    Condition rolls up from part(s) to site(s)

    Depth of the hierarchy needs to consider:

    o Level of asset for maintenance: maintenance managed item(s)

    o Information system(s) used:

    • GIS is shallow

    • Maximo, Lucity, Cityworks

    • PeopleSoft, Tyler Technologies (Finance Systems)

    • CAD / BISDM / ArcFM

    Asset hierarchy best practices

    Sub-system

    SystemFacility

    Location

  • What components are critical?

    How do you weigh them?

    How do they add up to the big picture?

    Condition = (3X1 + 2X2 + YXN )

  • Condition:

    So BRE = Consequence:

  • Juston Manville

    Senior Asset Management Consultant

    [email protected]

    503.867.7652

    Discussion