محمد جمال

14
CURRICULUM VITAE Mohamed Gamal Abdul hameed Address: 15 Abdul hameed Hassan St., Mataria, Cairo, Egypt . Telephone: (+202) 48583382 Mobile: (+2) 01123408180 E-Mail: [email protected] Marital status: Married . Military service: Exempted Date of birth: 04/03/1987 . OBJECTIVE Seeking a challenging position where my skills, trainee experience and academic background can be utilized and developed . EDUCATION & QUALIFICATIONS Certificate: Bachelor of Engineering University: Helwan University .

Upload: mohamed-gamal

Post on 18-Aug-2015

42 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: محمد جمال

CURRICULUM VITAEMohamed Gamal Abdul hameed

►Address: 15 Abdul hameed Hassan St., Mataria, Cairo, Egypt .►Telephone: (+202) 48583382

►Mobile: (+2) 01123408180►E-Mail: [email protected]

►Marital status: Married.►Military service: Exempted

►Date of birth: 04/03/1987.

OBJECTIVE

Seeking a challenging position where my skills, trainee experience and academic background can be utilized and developed.

EDUCATION & QUALIFICATIONS

► Certificate: Bachelor of Engineering►University: Helwan University.

►Department: Mechanical Power.►Graduation year: 2008.

►Graduation year grade: good.►Graduation project: "HVAC "

►Graduation project grade: Excellent.►Cumulative grade: Pass.

 INSTITUTE & COMPUTER SKILLS

►Microsoft windows: (Win 2000 -Win Millennium -Win XP) ►Internet: Excellent deal with web applications

►Microsoft® (Word -Power Point – Excel) ►AutoCAD 2D ►Primavera 6

►Microsoft project 07 ►PMP (Project Management Professional)

Page 2: محمد جمال

EXPERIENCEFrom Jan. 2015 till now

►PROJECT: West Damietta 4*125 MW Simple Cycle Power Plant ►COMPANY: MEGA For construction & Industries ► Main-Contractor: ORASCOM & GE

►CONSULTANT: PGESCO►SCOPE OF WORK: Fast Track Gas Turbine Project (4 Unit x125 MW) Frame 9 E Mechanical scope & BOP Scope►Job: Planner & Cost Controller Project

►RESPONSIBILITIES: Preparing all Tender Documentation & Reviewing BOQ. Preparing all contract invoices of Mobilization, monthly progress,

CCC and TOAC. Reviewing Cash-In & Cash-Out of the project and prepare the

monthly cash flow report. Monitoring & controlling all subcontractors’ agreement. Reviewing & controlling all Progress sheets including “Piping,

Stack, Enclosure, Skid, and BOP”.Reviewing Man hours rate and compare it with planned Man hours.

From March 2015 till now►PROJECT: El-Menia Power Plant-Mobile Turbine-TM2500 ►COMPANY: MEGA For construction & Industries ► Main-Contractor: El-Sewedy Electric Trading & Distribution & GE

►CONSULTANT: PGESCO►SCOPE OF WORK: Fast Track Construction & Installation of TM 2500 Mobile Turbines "4 units" Mechanical & Electrical Scope►Job: Planner & Cost Controller Project

►RESPONSIBILITIES: Preparing all Tender Documentation & Reviewing BOQ. Preparing all contract invoices of Monthly progress, CCC and

TOAC. Reviewing Cash-In & Cash-Out of the project and prepare the

monthly cash flow report. Reviewing & controlling all Progress sheets including “Piping,

Pipes support, Mechanical Equipment and Electrical Equipment”. Reviewing Man hours rate and compare it with planned Man hours.

Page 3: محمد جمال

From Jan. 2015 till now ►PROJECT: Suez Thermal Power Plant 1*650 MW Gas/Oil fired unit ►COMPANY: MEGA For construction & Industries ► Main-Contractor: ANSALDO

►CONSULTANT: PGESCO►SCOPE OF WORK: Electrical works for CP-105 including Supply & Apply►Job: Planner & Cost Controller Project

►RESPONSIBILITIES: Preparing all contract invoices of Mobilization, monthly progress,

CCC and TOAC. Reviewing Cash-In & Cash-Out of the project and prepare the

monthly cash flow report. Monitoring & controlling all subcontractors’ agreement. Reviewing & controlling all Progress sheets including “Cables

Laying, Cables Termination and Electrical Equipment”. Reviewing Man hours rate and compare it with planned Man hours.

From March 2014 till Jan. 2015 ►PROJECT: Giza North Power Station 750 MW Combined Cycle ►COMPANY: MEGA For construction & Industries ► Main-Contractor: INITEC Energia

►CONSULTANT: PGESCO►SCOPE OF WORK: Construction of mechanical equipment / piping

for one module (CP-118) “Mechanical & Electrical Scope”►Job: Planner & Cost Controller Project

►RESPONSIBILITIES: Preparing all Tender Documentation & Reviewing BOQ. Preparing all contract invoices of monthly progress, CCC and

TOAC. Reviewing Cash-In & Cash-Out of the project and prepare the

monthly cash flow report. Monitoring & controlling all subcontractors’ agreement. Reviewing & controlling all isometrics drawings including

) Field weld, spools no. and material classification.( Reviewing & controlling all Progress sheets including “Piping,

Piping Supports, and Mechanical Equipment”.

Page 4: محمد جمال

From Jan. 2013 till March 2014 ►PROJECT: Giza North Power Station 1500 MW Combined Cycle ►COMPANY: MEGA For construction & Industries ► Main-Contractor: INITEC Energia

►CONSULTANT: PGESCO►SCOPE OF WORK: Construction of mechanical equipment / piping

for two modules (CP-118) “Mechanical & Electrical Scope”►Job: Planner & Cost Controller Project

►RESPONSIBILITIES: Preparing all Tender Documentation & Reviewing BOQ. Preparing all contract invoices of monthly progress, CCC and

TOAC. Reviewing Cash-In & Cash-Out of the project and prepare the

monthly cash flow report. Monitoring & controlling all subcontractors’ agreement. Reviewing & controlling all isometrics drawings including

) Field weld, spools no. and material classification.( Reviewing & controlling all Progress sheets including “Piping,

Piping Supports, and Mechanical Equipment”.

From Aug. 2013 till Feb. 2015 ►PROJECT: Gabel Elzeyt Wind Turbine 100 GT 60m ►COMPANY: MEGA For construction & Industries ► Main-Contractor: GAMESA & Wind 1000

►SCOPE OF WORK: Construction of Wind turbines 100 units Mechanical & Electrical Scope”"

►Job: Planner & Cost Controller Project ►RESPONSIBILITIES:

Preparing all Tender Documentation & Reviewing BOQ. Preparing all contract invoices of monthly progress, CCC and

TOAC. Reviewing Cash-In & Cash-Out of the project and prepare the

monthly cash flow report. Monitoring & controlling all subcontractors’ agreement. Reviewing & controlling Wind Turbine Installation Progress.

From Jun. 2012 till Feb. 2013 ►PROJECT: Damietta Power Plant Simple Cycle Gas Turbine ►COMPANY: MEGA For construction & Industries ► Main-Contractor: Kharafi National & GE

►SCOPE OF WORK: DLN Conversion Installation “3 units”

Page 5: محمد جمال

►Job: Planner & Cost Controller Project ►RESPONSIBILITIES:

Preparing all Tender Documentation & Reviewing BOQ. Preparing all contract invoices of monthly progress, CCC and

TOAC. Reviewing Cash-In & Cash-Out of the project and prepare the

monthly cash flow report.

From Feb. 2014 till Dec. 2014 ►PROJECT: West Damietta Power Plant Simple Cycle Gas Turbine ►COMPANY: MEGA For construction & Industries ► Main-Contractor: Kharafi National & GE

►SCOPE OF WORK: DLN Conversion Installation “4 units”►Job: Planner & Cost Controller Project

►RESPONSIBILITIES: Preparing all Tender Documentation & Reviewing BOQ. Preparing all contract invoices of monthly progress, CCC and

TOAC. Reviewing Cash-In & Cash-Out of the project and prepare the

monthly cash flow report.

From March 2013 till Feb. 2014 ►PROJECT: El-shabab Power Plant Simple Cycle Gas Turbine ►COMPANY: MEGA For construction & Industries ► Main-Contractor: Kharafi National & GE

►SCOPE OF WORK: DLN Conversion Installation “6 units”►Job: Planner & Cost Controller Project

►RESPONSIBILITIES: Preparing all Tender Documentation & Reviewing BOQ. Preparing all contract invoices of monthly progress, CCC and

TOAC. Reviewing Cash-In & Cash-Out of the project and prepare the

monthly cash flow report.

From May 2012 till Jan. 2013 ►PROJECT: Banha Power Station 750 MW Combined Cycle Combustion Turbine Generators►COMPANY: MEGA For construction & Industries► Main-Contractor: SEPCO III Electric Power Construction Corporation & GE

►CONSULTANT: PGESCO

Page 6: محمد جمال

►SCOPE OF WORK: Construction of mechanical and electrical works of gas turbine (2 units) CP-101 “Mechanical & Electrical Scope”

►Job: Technical office engineer & Quantity Surveyor ►RESPONSIBILITIES:

Make a daily , weekly and monthly progress Prepare all contract invoices of monthly progress, CCC and TOAC Controlling of all documents revision for the project Make As built drawings for the work Reviewing Cash-In & Cash-Out of the project and prepare the

monthly cash flow report Prepare the materials for construction department according to

erection sequence Reviewing & controlling all isometrics drawings including

) Field weld, spools no. , material classification( Preparing all the Hydro test data package (ISO drawings, P&IDs

drawings, line list, valve list, supports, test limits & all the documents) belong to technical office

From Jan, 2011till April 2012 ►PROJECT: Damietta Simple Cycle Gas Turbine {4 units} (500 MW)►COMPANY: MEGA For construction & Industries ► Main-Contractor: KHARAFI NATIONAL

►CONSULTANT: PGESCO►SCOPE OF WORK: Construction of mechanical and electrical work

of gas turbine (4 units) CP-101►Job: Technical office engineer & Quantity Surveyor

►RESPONSIBILITIES: Make a daily , weekly and monthly progress Prepare all contract invoices of monthly progress, CCC and TOAC Controlling of all documents revision for the project Make As built drawings for the work Reviewing all the materials delivered to the site and check it with

drawings Preparing the materials for construction department according to

erection sequence Reviewing & controlling all isometrics drawings including

) Field weld, spools no. , material classification( Preparing all the Hydro test data package (ISO drawings, P&IDs

drawings, line list, valve list, supports, test limits & all the documents) belong to technical office.

Page 7: محمد جمال

From Apr, 2010 till Jan, 2011 ►Project: Alexandria East Waste Water Treatment Plant►Company: PSC (Project Services Company)►Contractor: Degrémont S.A►Consultant: AAW►Scope of Work: Rehabilitation & Extension of Primary Treatment and Additional Secondary Treatment►Job: Technical Office Engineer & Material Controller engineer

►RESPONSIBILITIES: Make a daily , weekly and monthly reports Controlling of all documents revision for the project Make As built drawings for Rehabilitation work Reviewing all the materials delivered to the site and check it with

drawings Preparing the materials for construction department according to

erection sequence Reviewing all the isometrics drawings and make follow up for

fabrication and erection by Diameter inch

From Dec, 2008 to Apr, 2010 ►PROJECT: SIDI KRIR Power Station Combined Cycle (750 MW)►COMPANY: PSC (Project Services Company)► Main-Contractor: NEM

►CONSULTANT: PGESCO►SCOPE OF WORK: Construction of 2 HRSGs units 750 MW

Combined Cycle (CP-105) “Mechanical Scope”►Job: Technical office engineer

►RESPONSIBILITIES: Erection of Steel Structure (Platforms and Stair case) Unloading and Erection of 192 Harps of 2 HRSG Units Installation of the internal insulation of 2 HRSG Units Controlling all documents revision for the project Reviewing & controlling all isometrics drawings including

) Field weld, spools no. , material classification( Make all the Daily, Weekly and Monthly reports for main

contractor (NEM) and client (i.e. man power & equipment, erection schedule, S – Curves, piping progress & critical activity)

Prepare all the Hydro test data package (ISO drawings, P&IDs drawings, line list, valve list, supports, test limits & all the documents) belong to technical office

Page 8: محمد جمال

From June, 2008 to Dec, 2008 ►COMPANY: PSC (Project Services Company)

►SCOPE OF WORK: Tendering Engineer►Job: Tendering Engineer

►RESPONSIBILITIES: Make cost estimation of the projects. Prepare all the quotations of the projects. Reviewing BOQ of all quotations.

LANGUAGE SKILLS

►Arabic: Mother tongue.►English: Good command of read, written and spoken .

PERSONALITY KEY STRENGTH►Highly self motivated.

►Excellent self learning ability.►Excellent ability to work under pressure.

►Open minded to new ideas and new technologies.►Excellent team worker.

HOBBIES

►Reading.►Traveling.

►Sports.

REFERENCES

I'd appreciate the chance to meet with you to discuss how I could be a vital part of your project. You may reach me at the above telephone number or e-mail address. A certain degree of mobility is available.

Thank you for your consideration. I look forward to talking to you.

Sincerely,

Mohamed Gamal