© blue graphics concept sauer-danfoss 2007 bol projects review giulio mazzotti november 29 th 2007

7
© Blue Graphics Concept Sauer-Danfoss © Blue Graphics Concept Sauer-Danfoss 2007 BOL Projects review Giulio Mazzotti November 29 th 2007

Upload: lydia-floyd

Post on 18-Dec-2015

218 views

Category:

Documents


2 download

TRANSCRIPT

© Blue Graphics Concept Sauer-Danfoss

© Blue Graphics Concept Sauer-Danfoss

2007 BOL Projects review

Giulio Mazzotti November 29 th 2007

Know-How in Motion™ 2

Project Title

2007 BOL Project reviewSPC System - TAC Target Area Control

D

M

A

I

C

Team: Y.Bonfiglioli, N.Pulsoni, S.Bonacini,E.Succi, L.Bandiera (external supplier S.Panigalli – I.T.A.)

Project purpose: implement our system of data collecting and analysis related to the measurement done during the process referred to critical and key feature mentioned on the drawing

8.325,00 € per year

230 working hours per year

7000,00 €

Manual recording data from Tac (paper form) to Stastical data analysis Software

Before Tac Project

After Tac Project

Know-How in Motion™ 3

Project Title

2007 BOL Project review

D

M

A

I

C

Identify process capability related to C or K characteristics mentioned on the drawing

SPC System - TAC Target Area Control

Know-How in Motion™ 4

Project Title

2007 BOL Project review

D

M

A

I

C

SPC System - TAC Target Area Control

Know-How in Motion™ 5

Project Title

2007 BOL Project review

D

M

A

I

C

SPC System - TAC Target Area Control

Task Title Responsible 0-25% 25%-50% 50%-75% 75%-100% End Data

1 Implement TAC on all key features (Increase # pc on the shop floor) Simone WK 52

2 Training to the operators Yuri WK 52

3 Data analysis Yuri, Nunzio WK50

4 Data analysis related to processes not aligned to Cpk required Yuri, Nunzio, Emanuele WK50

5 Evaluation improving process Nunzio, Emanuele WK 51

6 Print tolerance required review Yuri, Nunzio, Luca TBD

TAC ProjectTeam: Yuri, Nunzio, Simone, Emanuele, Luca

Know-How in Motion™ 6

Project Title

2007 BOL Project review

D

M

A

I

C

SPC System - TAC Target Area Control

Required: Cpk=1,33

Cp =1,88

Know-How in Motion™ 7

Project Title

2007 BOL Project review

D

M

A

I

C

Improve:

•Connection of the all machine to the system increasing the computers connected. Action: Implementation wireless connection on the shop-floor (action IT > Simone B.)

•Complete training to operatorsAction:Complete the training to the operator (Yuri B.)

•Connection between instrument utilized and software(planned for June ’08)

Action: Feedback from SD – Yuri B. and External Supplier /

I.T.A. - Stefano P.