© blue graphics concept sauer-danfoss 2007 bol projects review giulio mazzotti november 29 th 2007
TRANSCRIPT
© Blue Graphics Concept Sauer-Danfoss
© Blue Graphics Concept Sauer-Danfoss
2007 BOL Projects review
Giulio Mazzotti November 29 th 2007
Know-How in Motion™ 2
Project Title
2007 BOL Project reviewSPC System - TAC Target Area Control
D
M
A
I
C
Team: Y.Bonfiglioli, N.Pulsoni, S.Bonacini,E.Succi, L.Bandiera (external supplier S.Panigalli – I.T.A.)
Project purpose: implement our system of data collecting and analysis related to the measurement done during the process referred to critical and key feature mentioned on the drawing
8.325,00 € per year
230 working hours per year
7000,00 €
Manual recording data from Tac (paper form) to Stastical data analysis Software
Before Tac Project
After Tac Project
Know-How in Motion™ 3
Project Title
2007 BOL Project review
D
M
A
I
C
Identify process capability related to C or K characteristics mentioned on the drawing
SPC System - TAC Target Area Control
Know-How in Motion™ 4
Project Title
2007 BOL Project review
D
M
A
I
C
SPC System - TAC Target Area Control
Know-How in Motion™ 5
Project Title
2007 BOL Project review
D
M
A
I
C
SPC System - TAC Target Area Control
Task Title Responsible 0-25% 25%-50% 50%-75% 75%-100% End Data
1 Implement TAC on all key features (Increase # pc on the shop floor) Simone WK 52
2 Training to the operators Yuri WK 52
3 Data analysis Yuri, Nunzio WK50
4 Data analysis related to processes not aligned to Cpk required Yuri, Nunzio, Emanuele WK50
5 Evaluation improving process Nunzio, Emanuele WK 51
6 Print tolerance required review Yuri, Nunzio, Luca TBD
TAC ProjectTeam: Yuri, Nunzio, Simone, Emanuele, Luca
Know-How in Motion™ 6
Project Title
2007 BOL Project review
D
M
A
I
C
SPC System - TAC Target Area Control
Required: Cpk=1,33
Cp =1,88
Know-How in Motion™ 7
Project Title
2007 BOL Project review
D
M
A
I
C
Improve:
•Connection of the all machine to the system increasing the computers connected. Action: Implementation wireless connection on the shop-floor (action IT > Simone B.)
•Complete training to operatorsAction:Complete the training to the operator (Yuri B.)
•Connection between instrument utilized and software(planned for June ’08)
Action: Feedback from SD – Yuri B. and External Supplier /
I.T.A. - Stefano P.
SPC System - TAC Target Area Control