Central Union High School District
Board of Trustees MeetingJune 18, 2014
Central Union High School District
2014-15 Budget Study SessionJune 18, 2014
Budget Study Discussion Topics California State Budget – Overview
of Educational Impacts Significant LCAP Services/Activities Budget Assumptions Historical Review of Revenues &
Expenditures (All Funds) Significant Variances in
Unrestricted GF Expenditures between 2013-14 & 2014-15
• Increases State revenue projections by $2.4 billion• Provides an additional $250 M towards LCFF
implementation. (slight increase in gap closure)• Includes 32-year plan, beginning in 2014-15, to tackle
$74 billion liability in STRS• Includes Rainy Day Fund (for voter approval in
November) and Prop 98 Reserve • Increases overall Prop 98 spending by only $242
million over January
2014-15 California State Budget – K-12 Impacts
• Continues intra-year deferral buy-down but does not eliminate them entirely
• Provides $400.5 million towards funding prior mandate claims on a per ADA basis (includes intent language that districts prioritize funds for implementation of CCSS, though districts can use funds for any one-time purpose)
• Includes controversial provision limiting school district reserves to 6% (if the Rainy Day Fund is approved by voters)
2014-15 California State Budget – K-12 Impacts
Items NOT included in May Revision
• Additional one-time Common Core funding• Proposals to address Adult Ed and CTE debates• Funding to absorb additional costs of increased
employers’ contribution to STRS• Funding for school transportation COLA or
equalization• Mandatory and full-day kindergarten• Funding for expanding Transitional Kindergarten to all
four-year olds
2014-15 California State Budget – K-12 Impacts
State General Fund Revenues(Billions of Dollars)
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 $95.0
$105.0
$115.0
$125.0
Jan. Budget
May Revision
May LAO
State General Fund RevenuesA Longer Term View (Billions of Dollars)
2006-07
2008-09
2010-11
2012-13
2014-15
2016-17
2018-19
$75.0
$85.0
$95.0
$105.0
$115.0
$125.0
Jan. Budget
May Re-vision
May LAO
Oops
Governor’s CalSTRS ProposalFuture Contribution Rates
2014–15 2015–16 2016–17 2017–18 2018–19 2019–20 2020–210.00%
5.00%
10.00%
15.00%
20.00%
8.88%
19.10%
3.45%
6.33%
10.25%
8.08% 9.21%
Employers State Employees (Pre-PEPRA) Employees (Post-PEPRA)
Eliminates the CalSTRS unfunded liability over the next 32 years
STRS: Employer ContributionsSchool Employer Contributions Under Governor’s CalSTRS Plan
(Dollars in Millions)
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
Current Law Rate 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25%
Proposed Increase .63 2.48 4.33 6.18 8.03 9.88 10.85
New Rate 8.88% 10.73% 12.58% 14.43% 16.28% 18.13% 19.1%
• 63% of funding burden on school employers– Statewide avg. impact $50 - $55 per ADA in 2014-15; as much as $560 per ADA in 2020-21– Actual impact will differ across districts– No additional funding for this purpose
Local Control Accountability Plan
Local Control Accountability PlanSignificant Activities/Services Additional 9th Grade Math Teachers (2) Release period for a math teacher to work on
formative/summative assessments Professional Development Expand after-school & in-class tutoring Increasing teacher time for instruction, intervention,
professional development, &/or collaboration (2%) New Guidance Support Specialists to provide
parent/student support activities Curricular planning and development
Local Control Accountability PlanSignificant Activities/Services Communication activities (including texting system for
school-to-home communication) Improve district/school websites Second semester parent event (open house/conferences) Expand AP offerings & continue development of IB Program
at SHS CCSS aligned instructional materials Technology (classroom sets of devices – CCSS funding) Facilities & Safety assessment – update site plans for
improvements
Local Control Accountability PlanSignificant Activities/Services AVID trained tutors for selected EL, 9th grade Math & ELA
classes Summer Connection program for incoming 9th graders 9th Grade Academy for socially promoted 9th
graders(Phoenix Rising) Half-time EL Program Coordinator Part-time Intervention Coordinator (SHS) Mandatory EL and Intervention Courses (8th Period) AP fees for low income students
Local Control Accountability PlanSignificant Activities/Services EL Program Assistants (one additional) Phase in of updated program of study for EL’s EL Support classes (refined/expanded) SST’s for all LTEL 1-2, and Foster Youth Investigate provision of Internet for low income students
who don’t have access at home ELA resource period for curriculum development .5 At Risk/Foster Youth counselors at each site
Budget Assumptions
Assumptions for the 2014-14 Budget Development
In May and June each year, the District finalizes its budget for the coming year.
In order to project the budget, a series of assumptions about the conditions of the District must be determined.
These assumptions are used as the basis for calculating revenues and determining expenditures, which make up the final budget for the next year.
The accuracy of the District's budget projection for the next year is only as good as the assumptions that are used in developing the budget. If the assumptions are wrong, so too will be the budget.
Assumptions for the 2014-15 Budget Development
Because it is impossible to accurately predict all of the assumptions that are needed in budget development, districts are required to update their budgets (and assumptions) three times after the original budget is adopted.
The 45 day update - a revision that occurs within 45 days after the adoption of the State Budget 1st Interim (December)
2nd Interim (March)
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
3,850
3,900
3,950
4,000
4,050
4,100
4,150
4,200
4,250
4,107
4,2364,221
4,169
4,102
4,009
4,056
4,1134,132 4,132
CBEDS Enrollment History 2005-06 to 2014-15
Assumption – enrollment remains
the same as prior year
CUHSD Financial Assumptions for 2014-15
Budget Development
Projections – Revenues & Funds
ADA change compared to prior year [3950.9] - 40.07
LCFF Per ADA Base Funding Amount $7,723.43
LCFF Supplemental/Concentration Funding $2,966,526
Total Funding Increase – All Revenue Sources $2,695,349
Agreement approval with IVROP (already recalculated i) -$ 229,928
No Mandated Costs, AP Fee Reimbursement, RDA, or MAA $ 0Transfer to Deferred Maintenance $500,000
Net Decrease in Contributions (RRM i & SpEd h ) $417,957
Estimated Unrestricted Beginning Fund Balance $9,620,287
Estimated Unrestricted Ending Fund Balance $8,930,417
CUHSD Financial Assumptions for 2014-15
Budget Development
Projections – Expenditures
• Certificated (non-admin) salaries (2013-14 on/off-schedule payments)
$855,640
• Certificated (non-admin) Ongoing Increases $1,087,890
• Certificated new positions (4) salaries $211,766
• Potential increases in Management Salary/Benes not included $0
• Classified – new LCAP positions (3) salaries $112,000• Benefits increases (Classified to Cap, STRS @ 9.5%) (Incl’s restricted) $783,008
• Decreases in Unrestricted materials, services & capital outlay $1,123,616• Utilities Decreases (Electricity) -$104,000
• New Bell System at SHS & CUHS (est’d @ $250 K) not included $0
• Voice Over IP phone systems for CUHS & SHS (est’d at $50 K) $0
REVENUESUnrestricted & Restricted
A Longitudinal Perspective
General Fund & Cafeteria
Revenue Limit/LCFF Sources (State Aid)
2007-08 to 2014-15 (GF)
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
$15,000,000
$17,000,000
$19,000,000
$21,000,000
$23,000,000
$25,000,000
$27,000,000
$29,000,000
$31,000,000
$33,000,000
$35,000,000
$26,085,421$25,933,038
$22,344,106
$23,435,819$23,198,785$23,803,460
$30,378,690
$33,849,845
Unrestricted State & Local Revenues 2007-08 to 2014-15
(GF)
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$3,500,000
$4,000,000
$4,500,000
$1,416,990
$1,997,077
$4,162,898$4,269,595
$4,208,573$4,100,304
$2,080,795
$1,340,314
Restricted State & Local Revenues 2007-08 to 2014-15
(GF)
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$5,780,836
$4,186,474
$2,057,839
$2,556,083$2,504,676$2,333,434
$2,775,563
$3,546,709
Federal Revenues (Unrestricted & Restricted)
2007-08 to 2014-15 (GF)
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
4,000,000
4,500,000
2,171,573
4,138,541
3,512,125
3,071,538
3,536,908
2,550,620
3,025,377
2,628,346
Combined Revenues (Unrestricted & Restricted) 2007-08 to 2014-15 (GF)
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
40,000,000
45,000,000
35,454,82036,255,130
32,076,96933,333,03533,448,94232,787,818
38,260,425
41,365,214
Cafeteria Revenues2007-08 to 2014-15
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
1,638,524 1,676,2971,729,583 1,764,650
1,697,6251,767,924
1,968,8681,903,919
REVENUES
Calculating the LCFF 101
2013/14 2014/15
LOCAL CONTROL FUNDING FORMULA TARGET 43,481,938 43,412,304
LOCAL CONTROL FUNDING FORMULA FLOOR 28,629,016 30,121,882
Difference or GAP (LCFF Target less LCFF Floor, if positive) 14,852,922 13,290,422
Multiply difference by funding rate 11.78% 1,749,674 28.05% 3,727,963
ECONOMIC RECOVERY PAYMENT 0 0
LCFF Entitlement before Minimum State Aid provision 30,378,690 33,849,845
CALCULATION OF LCFF PHASE-IN ENTITLEMENT
Calculating the LCFF Phase-in Entitlement Funding Target
(2020-21)
• Moving target recalculated annually based on each year’s ADA
• Standard base + supplemental & concentration $
2013/14 2014/15
LOCAL CONTROL FUNDING FORMULA TARGET 43,481,938 43,412,304
LOCAL CONTROL FUNDING FORMULA FLOOR 28,629,016 30,121,882
Difference or GAP (LCFF Target less LCFF Floor, if positive) 14,852,922 13,290,422
Multiply difference by funding rate 11.78% 1,749,674 28.05% 3,727,963
ECONOMIC RECOVERY PAYMENT 0 0
LCFF Entitlement before Minimum State Aid provision 30,378,690 33,849,845
CALCULATION OF LCFF PHASE-IN ENTITLEMENT
Calculating the LCFF Phase-in Entitlement
Funding Formula Floor
• Current year id based on ADA & deficited RL plus categoricals
• Next year is based on current year LCFF entitlement & ADA
2013/14 2014/15
LOCAL CONTROL FUNDING FORMULA TARGET 43,481,938 43,412,304
LOCAL CONTROL FUNDING FORMULA FLOOR 28,629,016 30,121,882
Difference or GAP (LCFF Target less LCFF Floor, if positive) 14,852,922 13,290,422
Multiply difference by funding rate 11.78% 1,749,674 28.05% 3,727,963
ECONOMIC RECOVERY PAYMENT 0 0
LCFF Entitlement before Minimum State Aid provision 30,378,690 33,849,845
CALCULATION OF LCFF PHASE-IN ENTITLEMENT
Calculating the LCFF Phase-in Entitlement
The “GAP”
• Difference between the target and the floor
2013/14 2014/15
LOCAL CONTROL FUNDING FORMULA TARGET 43,481,938 43,412,304
LOCAL CONTROL FUNDING FORMULA FLOOR 28,629,016 30,121,882
Difference or GAP (LCFF Target less LCFF Floor, if positive) 14,852,922 13,290,422
Multiply difference by funding rate 11.78% 1,749,674 28.05% 3,727,963
ECONOMIC RECOVERY PAYMENT 0 0
LCFF Entitlement before Minimum State Aid provision 30,378,690 33,849,845
CALCULATION OF LCFF PHASE-IN ENTITLEMENT
Calculating the LCFF Phase-in Entitlement
The “Funding Rate”
• The percentage of gap closure determined each year
• This amount is multiplied by the “gap”
2013/14 2014/15
LOCAL CONTROL FUNDING FORMULA TARGET 43,481,938 43,412,304
LOCAL CONTROL FUNDING FORMULA FLOOR 28,629,016 30,121,882
Difference or GAP (LCFF Target less LCFF Floor, if positive) 14,852,922 13,290,422
Multiply difference by funding rate 11.78% 1,749,674 28.05% 3,727,963
ECONOMIC RECOVERY PAYMENT 0 0
LCFF Entitlement before Minimum State Aid provision 30,378,690 33,849,845
CALCULATION OF LCFF PHASE-IN ENTITLEMENT
Calculating the LCFF Phase-in Entitlement
And determines the
Increase in Funding
2013/14 2014/15
LOCAL CONTROL FUNDING FORMULA TARGET 43,481,938 43,412,304
LOCAL CONTROL FUNDING FORMULA FLOOR 28,629,016 30,121,882
Difference or GAP (LCFF Target less LCFF Floor, if positive) 14,852,922 13,290,422
Multiply difference by funding rate 11.78% 1,749,674 28.05% 3,727,963
ECONOMIC RECOVERY PAYMENT 0 0
LCFF Entitlement before Minimum State Aid provision 30,378,690 33,849,845
CALCULATION OF LCFF PHASE-IN ENTITLEMENT
Calculating the LCFF Phase-in Entitlement
So the “floor” plus the
increase in funding due to “gap” closure
gets you to your LCFF
entitlement
RevenuesUnrestrictedGeneral Fund
Significant Variances
2014-15
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
REVENUE
LCFF/Revenue Limit Sources 30,378,690 33,849,845 3,471,155
Federal Revenue 35,325 - (35,325)
Other State Revenue 1,014,245 504,461 (509,784)
Other Local Revenue 1,066,550 835,853 (230,697)
TOTALS 32,494,809 35,190,159 2,695,350
Significant VariancesUnrestricted Revenues
Variance Due Primarily to:
• LCFF Increases. Gap funding plus all former Tier III programs and EIA - ($3.8 M)
• No RDA anticipated – ($304 K)
• Education Protection Act - ($44 K)
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
REVENUE
LCFF/Revenue Limit Sources 30,378,690 33,849,845 3,471,155
Federal Revenue 35,325 - (35,325)
Other State Revenue 1,014,245 504,461 (509,784)
Other Local Revenue 1,066,550 835,853 (230,697)
TOTALS 32,494,809 35,190,159 2,695,350
Significant VariancesUnrestricted Revenues
Variance Due Primarily to:
• Medi-Cal Administrative Activities (MAA) – ($23K)
• Advanced Placement – ($12 K)
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
REVENUE
LCFF/Revenue Limit Sources 30,378,690 33,849,845 3,471,155
Federal Revenue 35,325 - (35,325)
Other State Revenue 1,014,245 504,461 (509,784)
Other Local Revenue 1,066,550 835,853 (230,697)
TOTALS 32,494,809 35,190,159 2,695,350
Significant VariancesUnrestricted Revenues
Variance Due Primarily to:
• Elimination of Tier III & Transportation Programs (rolled into LCFF)
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
REVENUE
LCFF/Revenue Limit Sources 30,378,690 33,849,845 3,471,155
Federal Revenue 35,325 - (35,325)
Other State Revenue 1,014,245 504,461 (509,784)
Other Local Revenue 1,066,550 835,853 (230,697)
TOTALS 32,494,809 35,190,159 2,695,350
Significant VariancesUnrestricted Revenues
Variance Due Primarily To:
• IVROP Agreement
EXPENDITURESUnrestricted & Restricted
All FundsA Longitudinal Perspective
Certificated Salaries (Unrestricted & Restricted) 2007-08 TO 2014-15 (GF & AE)
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
10,000,000
12,000,000
14,000,000
16,000,000
18,000,000
20,000,000
22,000,000
17,099,71417,152,28416,901,84116,412,344
16,768,43716,653,036
18,539,305
20,468,575
Classified Salaries 2007-08 to 2014-15 (GF, AE & Caf)
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
6,454,813
6,161,5396,114,116
5,647,7325,592,2635,549,562
6,207,3676,272,660
Benefits2007-08 TO 2014-15 (GF, AE & CAF)
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
3,000,000
3,500,000
4,000,000
4,500,000
5,000,000
5,500,000
6,000,000
6,500,000
7,000,000
5,622,217 5,617,9815,709,935
5,482,969
5,849,046
5,621,859
6,032,569
6,803,218
Benefits 2007-08 to 2014-15 (GF, AE & Caf)
Materials and Supplies 2007-08 TO 2014-15 (GF, AE, CAF, FAC & DM)
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
2,854,026 2,740,982
1,553,686 1,472,825 1,544,721
2,159,153
5,233,230
4,206,767
Services & Other Operating Expenditures2007-08 TO 2014-15 (GF, AE, CAF, FAC, DM)
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
3,613,203
3,181,868
3,840,7973,976,1003,927,753
3,184,195
4,329,914
3,640,472
Capital Outlay2006-07 TO 2012-13 (GF, AE, CAF, FAC, DM)
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
1,673,8251,971,883
700,759
1,260,258
6,754,306
1,311,5561,545,205
711,870
EXPENDITURESUnrestrictedGeneral Fund
Significant Variances
2014-15
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
EXPENDITURES
Certificated Salaries 15,814,122 18,091,881 2,277,759
Classified Salaries 4,324,957 4,418,608 93,651
Employee Benefits 4,904,083 5,625,748 721,665
Books and Supplies 1,859,141 1,278,242 (580,898)
Services & Other Operating Expenditures 2,713,367 2,486,928 (226,438)
Capital Outlay 571,680 151,400 (420,280)
Other Outgo (excluding Transfers of Indirects) 1,531,130 1,619,992 88,862
Other Outgo Transfers of Indirects (233,802) (217,735) 16,067
SUB-TOTALS 31,484,677 33,455,065 1,970,388
Interfund Transfers In - - -
Interfund Transfers Out - 500,000 500,000
Contributions 2,342,921 1,924,964 (417,956) TOTALS 33,827,598 35,880,030 2,052,432
Significant VariancesUnrestricted Expenditures
Variance Primarily Due to:•Certificated Non-management salary increases – • Retro to Jan ‘14 7% – $548K • Off-schedule 2% - $308 K• Ongoing 7% - $1.08 M
•Add’l positions LC/ Step & Column/Separations & Replacements (net) - $99 K
•Shift of Restricted to Unrestricted - $196 K
• Hourly LC - $130 K• Class Overloads - $41 K• Administration - $46 K
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
EXPENDITURES
Certificated Salaries 15,814,122 18,091,881 2,277,759
Classified Salaries 4,324,957 4,418,608 93,651
Employee Benefits 4,904,083 5,625,748 721,665
Books and Supplies 1,859,141 1,278,242 (580,898)
Services & Other Operating Expenditures 2,713,367 2,486,928 (226,438)
Capital Outlay 571,680 151,400 (420,280)
Other Outgo (excluding Transfers of Indirects) 1,531,130 1,619,992 88,862
Other Outgo Transfers of Indirects (233,802) (217,735) 16,067
SUB-TOTALS 31,484,677 33,455,065 1,970,388
Interfund Transfers In - - -
Interfund Transfers Out - 500,000 500,000
Contributions 2,342,921 1,924,964 (417,956) TOTALS 33,827,598 35,880,030 2,052,432
Significant VariancesUnrestricted Expenditures
Variance Primarily Due to:
• New Positions LC –• Guidance Support Specialists
(2) & Add’l EL Program Specialist – $112K
• Hourly – • Add’l AVID trained Tutors LC -$117 K
• ‘13-‘14 Off-Schedule (non-
reoccurring) - $224 K• Miscellaneous
Adjustments (net) – $89 K
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
EXPENDITURES
Certificated Salaries 15,814,122 18,091,881 2,277,759
Classified Salaries 4,324,957 4,418,608 93,651
Employee Benefits 4,904,083 5,625,748 721,665
Books and Supplies 1,859,141 1,278,242 (580,898)
Services & Other Operating Expenditures 2,713,367 2,486,928 (226,438)
Capital Outlay 571,680 151,400 (420,280)
Other Outgo (excluding Transfers of Indirects) 1,531,130 1,619,992 88,862
Other Outgo Transfers of Indirects (233,802) (217,735) 16,067
SUB-TOTALS 31,484,677 33,455,065 1,970,388
Interfund Transfers In - - -
Interfund Transfers Out - 500,000 500,000
Contributions 2,342,921 1,924,964 (417,956) TOTALS 33,827,598 35,880,030 2,052,432
Significant VariancesUnrestricted Expenditures
Variance Due Primarily to:
• Proportional changes related to increases in salaries
•Certificated (including STRS to 9.5%*) – $557 K
•Classified - $165 K
*STRS Rate will be adjusted to newly adopted rate at 1st Interim
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
EXPENDITURES
Certificated Salaries 15,814,122 18,091,881 2,277,759
Classified Salaries 4,324,957 4,418,608 93,651
Employee Benefits 4,904,083 5,625,748 721,665
Books and Supplies 1,859,141 1,278,242 (580,898)
Services & Other Operating Expenditures 2,713,367 2,486,928 (226,438)
Capital Outlay 571,680 151,400 (420,280)
Other Outgo (excluding Transfers of Indirects) 1,531,130 1,619,992 88,862
Other Outgo Transfers of Indirects (233,802) (217,735) 16,067
SUB-TOTALS 31,484,677 33,455,065 1,970,388
Interfund Transfers In - - -
Interfund Transfers Out - 500,000 500,000
Contributions 2,342,921 1,924,964 (417,956) TOTALS 33,827,598 35,880,030 2,052,432
Significant VariancesUnrestricted Expenditures
Variance Primarily Due to:
• Over 250 line item adjustments
• Most significant•IVROP 13-14 One-time –
$242 K • Tier III IMFRP - $233 K• Operations - $37.5 K• Technology - $37 K• Site Budgets - $62 K• Athletics - $14 K• Miscellaneous - $58 K
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
EXPENDITURES
Certificated Salaries 15,814,122 18,091,881 2,277,759
Classified Salaries 4,324,957 4,418,608 93,651
Employee Benefits 4,904,083 5,625,748 721,665
Books and Supplies 1,859,141 1,278,242 (580,898)
Services & Other Operating Expenditures 2,713,367 2,486,928 (226,438)
Capital Outlay 571,680 151,400 (420,280)
Other Outgo (excluding Transfers of Indirects) 1,531,130 1,619,992 88,862
Other Outgo Transfers of Indirects (233,802) (217,735) 16,067
SUB-TOTALS 31,484,677 33,455,065 1,970,388
Interfund Transfers In - - -
Interfund Transfers Out - 500,000 500,000
Contributions 2,342,921 1,924,964 (417,956) TOTALS 33,827,598 35,880,030 2,052,432
Significant VariancesUnrestricted Expenditures
Variance Primarily Due to:
• Over 325 line item adjustments
• Most significant• Misc Travel/Conference-
$41.5 K• Electricity - $104 K• Professional/Consulting/
Operating - $118 K• Legal – $24 K • Communications/Phone/
Postage- $49.7 K• Miscellaneous Adjustments
(net) - $28 K
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
EXPENDITURES
Certificated Salaries 15,814,122 18,091,881 2,277,759
Classified Salaries 4,324,957 4,418,608 93,651
Employee Benefits 4,904,083 5,625,748 721,665
Books and Supplies 1,859,141 1,278,242 (580,898)
Services & Other Operating Expenditures 2,713,367 2,486,928 (226,438)
Capital Outlay 571,680 151,400 (420,280)
Other Outgo (excluding Transfers of Indirects) 1,531,130 1,619,992 88,862
Other Outgo Transfers of Indirects (233,802) (217,735) 16,067
SUB-TOTALS 31,484,677 33,455,065 1,970,388
Interfund Transfers In - - -
Interfund Transfers Out - 500,000 500,000
Contributions 2,342,921 1,924,964 (417,956) TOTALS 33,827,598 35,880,030 2,052,432
Significant VariancesUnrestricted Expenditures
Variance Primarily Due to:
• Non- Reoccurring Expenditures• One-time Technology –
$236K• Bus/Truck/Tractor –
$226 K•Bus Wash Rack - $50 K
• Misc. Site Budget Adjustments (net) – $8 K
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
EXPENDITURES
Certificated Salaries 15,814,122 18,091,881 2,277,759
Classified Salaries 4,324,957 4,418,608 93,651
Employee Benefits 4,904,083 5,625,748 721,665
Books and Supplies 1,859,141 1,278,242 (580,898)
Services & Other Operating Expenditures 2,713,367 2,486,928 (226,438)
Capital Outlay 571,680 151,400 (420,280)
Other Outgo (excluding Transfers of Indirects) 1,531,130 1,619,992 88,862
Other Outgo Transfers of Indirects (233,802) (217,735) 16,067
SUB-TOTALS 31,484,677 33,455,065 1,970,388
Interfund Transfers In - - -
Interfund Transfers Out - 500,000 500,000
Contributions 2,342,921 1,924,964 (417,956) TOTALS 33,827,598 35,880,030 2,052,432
Significant VariancesUnrestricted Expenditures
Variance Due to:
• Increase in ICOE transfer for students served in county programs
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
EXPENDITURES
Certificated Salaries 15,814,122 18,091,881 2,277,759
Classified Salaries 4,324,957 4,418,608 93,651
Employee Benefits 4,904,083 5,625,748 721,665
Books and Supplies 1,859,141 1,278,242 (580,898)
Services & Other Operating Expenditures 2,713,367 2,486,928 (226,438)
Capital Outlay 571,680 151,400 (420,280)
Other Outgo (excluding Transfers of Indirects) 1,531,130 1,619,992 88,862
Other Outgo Transfers of Indirects (233,802) (217,735) 16,067
SUB-TOTALS 31,484,677 33,455,065 1,970,388
Interfund Transfers In - - -
Interfund Transfers Out - 500,000 500,000
Contributions 2,342,921 1,924,964 (417,956) TOTALS 33,827,598 35,880,030 2,052,432
Significant VariancesUnrestricted Expenditures
Variance Due to:
• Decrease in indirect costs charged to categorical programs
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
EXPENDITURES
Certificated Salaries 15,814,122 18,091,881 2,277,759
Classified Salaries 4,324,957 4,418,608 93,651
Employee Benefits 4,904,083 5,625,748 721,665
Books and Supplies 1,859,141 1,278,242 (580,898)
Services & Other Operating Expenditures 2,713,367 2,486,928 (226,438)
Capital Outlay 571,680 151,400 (420,280)
Other Outgo (excluding Transfers of Indirects) 1,531,130 1,619,992 88,862
Other Outgo Transfers of Indirects (233,802) (217,735) 16,067
SUB-TOTALS 31,484,677 33,455,065 1,970,388
Interfund Transfers In - - -
Interfund Transfers Out - 500,000 500,000
Contributions 2,342,921 1,924,964 (417,956) TOTALS 33,827,598 35,880,030 2,052,432
Significant VariancesUnrestricted Expenditures
Variance Due to:
• Transfer of funds to Deferred Maintenance Fund
2013-14 Estimated
Actuals (June)
2014-15 Proposed
Budget Variance
EXPENDITURES
Certificated Salaries 15,814,122 18,091,881 2,277,759
Classified Salaries 4,324,957 4,418,608 93,651
Employee Benefits 4,904,083 5,625,748 721,665
Books and Supplies 1,859,141 1,278,242 (580,898)
Services & Other Operating Expenditures 2,713,367 2,486,928 (226,438)
Capital Outlay 571,680 151,400 (420,280)
Other Outgo (excluding Transfers of Indirects) 1,531,130 1,619,992 88,862
Other Outgo Transfers of Indirects (233,802) (217,735) 16,067
SUB-TOTALS 31,484,677 33,455,065 1,970,388
Interfund Transfers In - - -
Interfund Transfers Out - 500,000 500,000
Contributions 2,342,921 1,924,964 (417,956) TOTALS 33,827,598 35,880,030 2,052,432
Significant VariancesUnrestricted Expenditures
Variance Due to:
• Increased contributions to Special Ed - $255 K
• Decreased contribution to Routine Restricted Maintenance - $673 K
2014-15 Projected Unrestricted Expenses
$18,091,881
$4,418,608
$5,625,748
$1,278,242
$2,486,928
$151,400$2,424,964 $1,619,992
Certificated Salaries
Classified Salaries
Benefits
Supplies
Services
Capital Outlay
Transfers/ Contributions
Other Outgo
7%
16%
12%
4%
7%
4%
50%
Budget Study 2013-14 2014-15
Operating Proposed Budget(May)
Budget
Revenues 32,494,809 35,190,159 2,695,350
Expenses 31,484,677 33,455,065 1,970,388
Surplus (Deficit) 1,010,132 1,735,094 724,961
Transfers/Contributions (2,342,921) (2,424,964) (82,044)
Beginning Fund Bal 10,953,076 9,620,287 (1,332,788)
Ending Fund Bal 9,620,287 8,930,417 (689,871)
Difference
Unrestricted
The Overall PictureUnrestricted GF Revenues/Expenditures
Questions?