2
Contents What is Project Management? Project Management Process Create Work Breakdown Structure (WBS) Define Activities Sequence Activities Estimate Activity Recourses Estimate Activity Duration Develop Schedule Cost Estimate Determine Budget Exercise
![Page 3: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/3.jpg)
3
What is Project Management?
According to the PMBOK guide, “project management is the application of knowledge, skills, tools and techniques to project activities to meet project requirement” (BMBOK, 2008).
![Page 4: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/4.jpg)
4
Project Management Process
Initiating Planning Execution
Monitoring and
Controlling
Closing
![Page 5: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/5.jpg)
Project Management Process
Initiating Planning Execution
Monitoring and
Controlling
Closing
5
Develop Project Charter
Identify Stakeholders
![Page 6: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/6.jpg)
Project Management Process
Initiating Planning Execution
Monitoring and
Controlling
Closing
6
Create Work Breakdown Structure (WBS)
Define Activities
Sequence Activities
Estimate Activity Recourses
Estimate Activity Durations
![Page 7: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/7.jpg)
Project Management Process
Initiating Planning Execution
Monitoring and
Controlling
Closing
7
Develop Schedule
Estimate Costs
Determine Budget
Plan Quality
Risk Analysis
![Page 8: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/8.jpg)
Project Management Process
Initiating Planning Execution
Monitoring and
Controlling
Closing
8
Direct and Manage Project Execution
Quality Assurance
Mange Project Team
Conduct Procurement
![Page 9: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/9.jpg)
9
Project Management Process
Initiating
Planning
Execution
Monitoring and
Controlling
Closing
Schedule
Control
Cost
Control
Quality
Control
![Page 10: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/10.jpg)
10
Project Management Process
Initiating
Planning
Execution
Monitoring and
Controlling
Closing
Close
Project
Cl
ose
Procure
ment
![Page 11: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/11.jpg)
11
Create Work Breakdown Structure (WBS)
Work breakdown structure is the process of dividing project into smaller, more manageable components.
Types of WBS:
1 • WBS for project elements (deliverables)
2 • WBS for project works.
![Page 12: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/12.jpg)
12
Create Work Breakdown Structure (WBS)
1 • WBS for project elements (deliverables)
As example, university project can be divides into many zones, each zone can be also divides into smaller units.
PROJECT
ZONE- A
ZONE- B
ZONE- C
ZONE- D
ZONE- E
ZONE- F
ZONE-G
ZONE-H ZONE-K
ZONE-LZONE-J
![Page 13: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/13.jpg)
13
Create Work Breakdown Structure (WBS)
1 • WBS for project elements (deliverables)PROJECT
ZONE- A
ZONE- B
ZONE- C
ZONE- D
ZONE- E
ZONE- F
ZONE-G
ZONE-H ZONE-K
ZONE-LZONE-J
ZONE- A
COLLEGE OF SCIENCE
COLLEGE OF COMPUTER
SCIENCE
COLLEGE OF MEDICINE
COLLEGE OF APPLIED MEDICAL SCINCE
COLLEGE OF NURSING
KINDER GARTEN
GATES AND SECURITY
(C)
BUSES STATION
DENTAL OUT PATIENT
ENTRANCE
![Page 14: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/14.jpg)
14
Create Work Breakdown Structure (WBS)
2 • WBS for project works
College of Deanship-B66
General Requirements
Site Works
ConcreteConcrete
Masonry
Metal works
Wood & Plastic
Doors& Windows
Thermal& Moisture
Protection
Specialties
FurnitureFinishes
Mechanical Works
Conveying System
Electrical Works
Special Constructions
![Page 15: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/15.jpg)
Create Work Breakdown Structure (WBS)
2 • WBS for project worksConcrete
Works(College of Deanship)
ConcreteWorks(College of Deanship)
(2)Super structure(2)Super structure (3)General& External Works
(3)General& External Works
(1)Substructure(1)Substructure
Site Works
Foundation Works
Waterproofing Works
Retaining Wall Column Neck & Grade Beams
Column Neck & Grade Beams
![Page 16: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/16.jpg)
16
Define Activities
Define activities is the process of identifying the specific tasks to be performed to produce the project elements.
Activity Code
Foundations A
Columns B
Slabs C
Walls D
Paints E
Electrical works F
Mechanical works G
![Page 17: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/17.jpg)
17
Sequence Activities
Sequence activities is the process of identifying and documenting relationships among the project activities.
Relations Dependency
Activity Code
Foundations A
FS=0 A Columns B
FS=0 B Slabs C
SF=1 C Walls D
FS=2 D Paints E
FS=0 D Electrical works F
FS=0 C Mechanical works
G
![Page 18: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/18.jpg)
18
Sequence Activities
OutcomeProject activity network diagram
![Page 19: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/19.jpg)
19
Estimate Activity Recourse
Estimate activity resources is the process of estimating the type and quantities of material, people, equipment, or suppliers required to perform each activity.
Outcomes Bill of Quantities
Material People
Equipment
![Page 20: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/20.jpg)
20
Estimate Activity Recourse
Estimate activity resources is the process of estimating the type and quantities of material, people, equipment, or suppliers required to perform each activity.
Outcomes QuantitiesMaterial People
Equipment
![Page 21: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/21.jpg)
21
Estimate Activity Duration
Estimate activity Duration is the process of approximating the number of work periods needed to complete individual activities with estimated resource.
![Page 22: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/22.jpg)
22
Develop schedule
Develop schedule is the process of analyzing activity sequence, durations, resource requirements, and schedule constrains to create the project schedule.
Any scheduling software can be used to perform this phase such as MS project and Primavera.
![Page 23: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/23.jpg)
23
Develop schedule
![Page 24: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/24.jpg)
24
Cost Estimate
Estimate costs is the process of developing an approximation of the monetary resources needed to complete project activates.
Outcome Bill of Quantities integrated with activities cost
![Page 25: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/25.jpg)
25
Determine Budget
Determine budget is the process of aggregating the estimated costs of individual activates or works packages to establish an authorized cost baseline.
Outcome Total cost of the
project
![Page 26: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/26.jpg)
26
ExerciseThe following figures shows the dimensions of simple store room.
![Page 27: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/27.jpg)
27
Exercise
![Page 28: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/28.jpg)
28
Exercise
Relations Duration (Week)
Dependency
Activity Code
1 Stone walls A
FS=0 2 A Brick walls B
FS=0 4 B Concrete slab (thickness =15 cm)
C
FS=0 1 C external paints D
FS=0 1 C Internal paints E
FS=0 1 D,E Installing windows
F
FS=0 2 D,E Installing doors G
FS=0 2 F,G Floor tiles H
![Page 29: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/29.jpg)
29
Exercise
Unit price Quantity Unit Activity Code
m2 Stone walls A
m2 Brick walls B
m3 Concrete slab (thickness =15 cm)
C
m2 external paints D
m2 Internal paints E
m2 Installing windows
F
m2 Installing doors G
m2 Floor tiles H
Total Budget
Bill of quantities
![Page 30: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/30.jpg)
30
ExerciseYour task is to:
Determine QuantitiesDevelop ScheduleCost EstimateDetermine BudgetDetermine the project cash flow
![Page 31: CE- 496 & CE498 Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim Elsulahi Prepared By Dr. Khalid Al-Dafer, Dr. Ali Alyami, & Eng. Ibrahim](https://reader035.vdocument.in/reader035/viewer/2022062407/56649d9e5503460f94a889c0/html5/thumbnails/31.jpg)
31
Reference BMBOK GUIDE, (2008). "A guide for the project
management body of knowledge." Fourth edition, project management institute, Newtown square, Pennsylvania, USA.