CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
Granby Trading And
Construction27554 Balai Bantayan 1
Brgy. Kabac,
Bantayan, Cebu6/8/2018 Final NHA 130.310 882 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory
"R.R. Seismundo
Construction & Supply"10961
Const./Widening/Upgrading/Rehab. of Del Pilar
(San Juan)-New Cortez-San Jose Carcor
Panas Rd.
Davao Del Norte 8/12/2013 2nd XI 45.784 205 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 -
"R.R. Seismundo
Construction & Supply"10961
Const./Widening/Upgrading/Rehab. of Del Pilar
(San Juan)-New Cortez-San Jose Carcor
Panas Rd.
New Corella,
Davao del Norte3/18/2013 1st XI 45.784 179 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 -
"R.R. Seismundo
Construction & Supply"10961
Widening of Surigao-Davao Coastal Rd.,
Km.1822+(-423)-Km.1822+821, Apokon Sect.
Tagum City,
Davao del Norte3/18/2013 1st XI 17.793 125 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 -
"R.R. Seismundo
Construction & Supply" /
Davao Concrete Products
Joint Venture
JV-12-116
Const. of Flood Control Structure (Sheet Piles
& Grouted Riprap) Agusan River, Brgy.
Inambatan
Monkayo,
COMVAL
Province
11/27/2012 1st XI 27.838 240 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 -
"R.R. Seismundo
Construction & Supply" /
Double J Construction And
Supply Joint Venture
JV-16-948
Rechanneling and Construction of Dike in
Kingking River, Mosahamat Section ( Left
Side)
Pantukan 2nd
LD, Compostela
Valley Province
3/20/2018 1st/Final
Compostel
a Valley
DEO
44.251 185 C 0.48 0.133 0.3 - - - 90.80 *90.8% Very
Satisfactory
(Cavdeal) Cavite Ideal
International Construction
And Development Corp.
5599Procurement of Fully Developed Lots and
Complete Housing Units
Basey Pointe,
Brgy. Tingib,
Basey, Samar
01/26/18 Final NHA 290.000 862 D 0.399 0.200 0.244 - - - 84.2984.13%
Satisfactory
(Cavdeal) Cavite Ideal
International Construction
And Development Corp.
5599 Basey Pointe 2Brgy. Tingib,
Basey, Samar2/3/2018 1st NHA 225.387 636 D 0.325 0.265 0.000 0.030 0.054 0.030 70.66 -
0405 Construction & Supply 34735
Repair/Rehab. of Drainage Canal along
Sorsogon-Bacon-Manito Road, Bibincahan,
Sorsogon City
Bibincahan,
Sorsogon City5/30/2017
1st &
Final
Sorsogon
1st DEO2.841 90 C 0.400 0.133 0.300 - - - 83.30
*83.3%
Satisfactory
0405 Construction & Supply 34735
Construction of Flood Mitigation Structures
(Baybay Dagat Dike) Sitio Bacolod along Bito
River, San Fernando, MasbateSan Fernando,
Masbate6/14/2016 1st
Masbate
3rd DEO4.653 115 O 0.38 0.24 0.15 0.022 0.04 0.05 88.40% -
0405 Construction & Supply 34735
Construction / Repair / Rehabilitation of Multi-
Purpose Building (Municipal Hall), Monreal,
Masbate
Monreal,
Masbate8/19/2017 1st
Masbate
3rd DEO3.881 150 O 0.488 0.133 0.300 - - - 92.10 -
11-16 Construction 29646
Construction/ Maintenance of Flood Mitigation
Structures and Drainage Systems-
Rehabilitation/ Improvement of Existing Dike
along Marimla River, Left Bank, Sta. 0+258 to
Sta. 0+630; Sta. 0+033 to Sta. 0+089.90 and
Sta. 0+033 to Sta. 0+129, Bamban, Tarlac
Bamban, Tarlac 11/21/20171st &
FinalDPWH 45.616 147 C 0.496 0.133 0.300 - - - 92.90
*92.9%
Very
Satisfactory
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 1 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
121 Construction Corporation
(Formerly: 121 Construction)21686
Improvement/Concreting with Drainage System
along Ballesteros Street
Brgy. Zaniga,
Mandaluyong
City
11/29/2014 1st NCR 6.684 120 O 0.355 0.240 0.150 0.030 0.035 0.033 84.30%84.30%
Satisfactory
128 Dragon Construction
And Supplies35408
Construction of Flood Control Structure, Brgy.
Kanluran, San Vicente, Camarines Norte, 2nd
Legislative District
Brgy. Kanluran,
San Vicente,
Camarines
Norte, 2nd
Legislative
District
3/14/2016 1st
Camarines
Norte
DEO
0.949 30 C 0.4 0.2 0.3 0 0 0 89.60%
89.6%
Very
Satisfactory
2M Construction &
Enterprises33331
Slope Protection (Grouted Riprap) along
Isabela-Maluso Rd., Matarling Sect. at
K15+190-K15+249
Basilan Province 3/13/2013 1st IX 4.842 75 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 -
2M Construction &
Enterprises33331 Construction of Water System Level II
at Lubigan Vitali
District
Zamboanga City
3/7/2016 1st
Zamboang
a City
DEO
1.945 75 C 0.43 0.147 0.3 0 0 0 87.50%87.5%
Satisfactory
2M Construction &
Enterprises33331
Road Widening Including Drainage along Ipil-
Magdaup Wharf Road (S01143MN)
(K2014+800 - K2015+297)
Ipil, Zamboanga
Sibugay3/13/18 2nd/Final
Zamboang
a Sibugay
2nd DEO
16.187 177 C 0.49 0.201 0.278 - - - 96.60 92.92%Very
Satisfactory
2-R Construction & Supply 15304
Concreting of Barangay Camanggaan -
Calapugan, FMR, Brgy. Camanggaan-
Calapugan
Natividad,
Pangasinan 3/19/2018 1st/Final
Pangasina
n 3rd DEO3.977 119 C 0.46 0.133 0.3 - - - 89.40 *89.40%
Very
Satisfactory
2-R Construction & Supply 15304
Raising of Grade of Dike Agno River Basin
Flood Control Project (Phase III), Brgy.
Cabalitian, Asingan, PangasinanAsingan,
Pangasinan11/16/2015 1st
PANGASI
NAN 3RD
DEO
9.167 120 O 0.39 0.24 0.15 0.03 0.05 0.05 91.10%
91.1%
Very
Satisfactory
2-R Construction & Supply 15304
Off Carriageway Improvement at Lingayen
Capitol Loop, K0364+(-219) to K0364+836,
Lingayen, Pangasinan
K0364+(-219) to
K0364+836,
Lingayen,
Pangasinan
9/2/2016 Final
Pangasina
n 2nd
DEO
9.34 105 C 0.47 0.133 0.3 - - - 90.60%*87.36%
Satisfactory
301 Engineers 38364
Indv. Project - Rehab./Reconst. of National
Roads w/ Slips, Slope Collapse and Landslide
along Iriga City-Masoli Road
Iriga City, KO
479+700-KO
479+923
11/16/20171st &
FinalDPWH 5.071 132 C 0.493 0.134 0.300 - - - 92.70
*92.7%
Very
Satisfactory
301 Engineers 38364
Construction of School Building, Brgy.
Caranan, Pasacao, Camarines SurBrgy. Caranan,
Pasacao,
Camarines Sur
8/25/20161st &
Final
Camarines
Sur 1st
DEO
1.937 90 C 0.5 0.133 0.3 0 0 0 0.9300
93%
Very
Satisfactory
3C'Sl Construction And
Supply36393
Construction of One Storey Two Classroom
(Toilet Attached) Tolosa CES, Cabadbaran
City, Agusan del Norte
Cabadbaran
City, Agusan del
Norte
3/14/2016 1st ADN DEO 1.927 90 C 0.44 0.133 0.3 0 0 0 87.40%87.4%
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 2 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
3Diamonds Construction
Corporation35457
Rehabilitation of San Francisco River Control
(San Francisco-Maguiron Section) Guinobatan,
Albay11/6/2017
1st &
FinalDPWH 9.328 105 C 0.500 0.134 0.300 - - - 93.40
*93.4%
Very
Satisfactory
3G A Construction & Supply 35033Construction of Flood Control along Cabugao
River, Brgy. Turod - Patac
Cabugao, Ilocos
Sur 3/16/2018 1st/Final
Ilocos Sur
1st DEO9.304 140 C 0.48 0.133 0.3 - - - 91.20 *91.20%
Very
Satisfactory
3K Rock Engineering 27908
Road Upgrading (Gravel to Paved) Based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standard (HDM-4
Project Analysis) Asin (KM 8)-Nangalisan San
Pascual, Tuba, Benguet-LU Road, K0273+707 -
K0273+728, K0273+790 - K0274+127,
K0275+351 - K0275+613, K0275+629 -
K0275+1014, K0275+1050 - K0275+1240,
Tuba, Benguet
Tuba, Benguet 11/17/20162nd &
Final
Benguet
1st DEO33.303 196 C 0.41 0.175 0.3 0 0 0 0.8830
86.32%
Satisfactory
3K Rock Engineering 27908
Rehabilitation/ Reconstruction/ Upgrading of
Damaged Paved National Roads including
drainage based on Pavement Management
System/Highway-4 Kennon KO 238 + 880-KO
239 + 048, KO237 + 123- KO238 + 000,
KO228 + 791-KO229+000, KO228+080-
KO228+440, Tuba, Benguet
Tuba, Benguet 11/16/2016 1stRegional
Office46.620 282 O 0.33 0.289 0.121 0.03 0.055 0.033 0.8590 -
3K Rock Engineering 27908
Road Upgrading (Gravel to Paved) Based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standard (HDM-4
Project Analysis) Asin (Km 8) - Nangalisan San
Pascual, Tuba, Benguet, K0273+707 to
K0273+728; K0273+790 to K0274+127;
K0275+531 to K0275+631; K0275+629 to
K0275+1014; K0275+1050 to K0275+1240,
Tuba, Benguet
Tuba, Benguet 3/29/20171st &
Final
Benguet
1st DEO33.303 195 C 0.437 0.132 0.300 - - - 86.90
*86.9%
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 3 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
3K Rock Engineering 27908
Road Upgrading (Unpaved to Paved) Based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards (HDM-4
Project Analysis) (Intermittent Sections) of
Kabugao - Pudtol - Luna - Cagayan Bdry.
Road, K0611+917 to K0612+961, K0612+973
to K0613+699, K0613+723 to K0614+500,
Apayao
Apayao 8/27/2015 1st CAR 75.709 221 O 0.36 0.241 0 0.03 0.061 0.033 72.80% -
3K Rock Engineering 27908
Road Upgrading (Gravel to Paved) Based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standard (HDM-4
Project Analysis) Asin Km. 8 - Naglisan - San
Pascual, Tuba, Benguet-La Union Road,
K0273+707 to K0273+728, K0273+790 to
K0274+
Tuba, Benguet 8/23/2016 1st
BENGUE
T 1ST
DEO
33.303 195 O 0.34 0.24 0.15 0.02 0.051 0.05 0.8500 -
3K Rock Engineering/Rvc
Construction (J.V.)27908
Road Upgrading (Gravel to Concrete) of Asin -
Nanganban - San Pascual Road K0270+594 -
K0272+220 ; K0275+5311 - K0275+7178
8/16/2014 1st CAR 91.358 237 O 0.379 0.240 0.150 0.024 0.060 0.050 90.30 -
3-L Construction 16745
Concreting of Barangay Road, Barangay
Salvacion, Del Gallego, Camarines SurDel Gallego,
Camarines Sur8/16/2017 1st
Camarines
Sur 5th
DEO
1.410 40 O 0.496 0.133 0.300 - - - 92.90 -
3-L Construction 16745
Construction/Improvement of Roads and
Concreting of Roads, Brgy. Alianza, San
Fernando, Camarines Sur
Brgy. Alianza,
San Fernando,
Camarines Sur
6/8/20161st &
Final
Camarines
Sur 1st
DEO
1.844 45 C 0.48 0.149 0.3 0 0 0 92.40%
92.4%
Very
Satisfactory
3-L Construction 16745Concreting of Mataoroc (Zone 3- Zone 5 FMR)
Barangay Mataoroc
Minalabac,
Camarines Sur4/6/2018 1st/Final
Camarines
Sur 1st
DEO
4.723 90 C 0.490 0.146 0.300 - - - 94.50 *94.50%Very
Satisfactory
3N Construction & Supply 37872
Cluster 5-Local Infrastructure Program-
Repair/Rehab. of Multi-Purpose Building,
Barangay Sweetland, Buenavista, Bohol
Barangay
Sweetland,
Buenavista,
Bohol
3/10/2016 1stBohol 2nd
DEO0.7682 75 C 0.47 0.133 0.3 0 0 0 90.00%
90%
Very
Satisfactory
3Rb Construction And Supply 19541
Cluster 6 - Network Development -
Improvement/Widening of National Roads -
Secondary Road along DM- Jct.-Legazpi-Sto.
Domingo-Tabaco-Cam. Sur Bdry. Roads,
Malinao, Albay and along Ligao-Tabaco
Roads, Buang, Tabaco City, Albay 1st LD
Malinao, Albay
and along Ligao-
Tabaco Roads,
Buang, Tabaco
City, Albay 1st
LD
6/8/2017 1stAlbay 1st
DEO92.711 190 O 0.387 0.232 0.150 0.03 0.061 0.033 89.30 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 4 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
3Rb Construction And Supply 19541
Cluster 6- Network Development -
Improvement/ Widening of National Roads -
Secondary Roads along DM- Junction -
Legazpi - Sto. Domingo- Tabaco - Camarines
Sur Bdry Roads, Malinao, Albay and along
Ligao- Tabaco Roads, Buang , Tabaco City,
Malinao and Tabaco City
Malinao and
Tabaco City8/24/2017 1st
Albay 1st
DEO92.771 190 O 0.369 0.295 0.150 0.022 0.037 0.033 90.60 -
3Rb Construction And Supply 19541
Construction/ Maintenance of Flood Mitigation
Structures and Drainage Systems -
Construction of Revetment along Pooc Creek,
Barangay Balibago and Barangay Macabling,
Sta. Rosa City, Laguna
Sta. Rosa City,
Laguna3/19/2017
1st &
Final
Laguna
2nd19.002 140 C 0.344 0.200 0.300 - - - 84.40
*84.4%
Satisfactory
3Rb Construction And Supply 19541
Extension of River Control, Sta. 0+112.50 -
Sta. 0+232.50, Bongabong, Tabaco City, AlbaySta. 0+112.50 -
Sta. 0+232.50,
Bongabong,
Tabaco City,
Albay
3/13/20171st &
Final
Albay 1st
DEO16.705 128 C 0.485 0.141 0.300 - - - 92.60
*92.6%
Very
Satisfactory
3Rb Construction And Supply 19541
Widening of National Roads Outside N1 DM
Jct-Legazpi-Sto. Domingo-Tabaco-Camarines
Sur Bdry. K0552+532-K0553+660, K0554+600-
K0555+400, Malilipot, Albay and Tabaco City
Malilipot, Albay
and Tabaco City3/7/2016 1st
Albay 1st
DEO43.1972 147 C 0.45 0.196 0.3 0 0 0 94.40%
94.4%
Very
Satisfactory
3Rb Construction And Supply 19541 Prieto Diaz Port Development ProjectPrieto Diaz,
Sorsogon8/19/2015 1st DOTC 8.512 124 O 0.367 0.300 0.150 0.030 0.054 0.050 95.10 -
3Rb Construction And Supply 19541
Cluster 9-
Construction/Rehabilitation/Improvement of
River Control Section, Estancia, Estancia,
Malinao, Albay
Estancia,
Malinao, Albay3/7/2016 1st
Albay 1st
DEO3.9755 218 C 0.48 0.133 0.3 0 0 0 91.30%
91.3%
Very
Satisfactory
3Rb Construction And Supply 19541
Cluster 9-
Construction/Rehabilitation/Improvement of
River Control, San Antonio and San Vicente,
Tabaco City and Diaro and Estancia, Malinao,,
Albay
San Antonio and
San Vicente,
Tabaco City and
Diaro and
Estancia,
Malinao,, Albay
6/11/20161st &
Final
Albay 1st
DEO29.927 218 C 0.49 0.133 0.3 0 0 0 91.80%
91.8%
Very
Satisfactory
3R'S Builders And
Resources35922 Construction of Multi-Purpose Building
Museum, Tudela,
Misamis
Occidental
3/16/2016 1st
MISAMIS
OCCIDEN
TAL 2ND
DEO
1.937 120 C 0.46 0.133 0.3 0 0 0 89.10%
89.1%
Very
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 5 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
4 A'S Construction 9446
Construction of 2STY 4CL School Building at
Andabuen National High School Benito
Soliven, Isabela
Benito Soliven,
Isabela3/18/2017 1st
Isabela
2nd5.996 150 O 0.341 0.299 0.000 0.03 0.047 0.033 75.00 -
4 A'S Construction 9446
Construction of Two (2) Storey Four (4)
Classroom School Building at Andabuen
National High School Benito Soliven, IsabelaBenito Soliven,
Isabela11/19/2016 1st
Isabela
2nd5.996 150 O 0.39 0.2 0.15 0.02 0.052 0.05 0.8610 -
4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection WorksFloridablanca,
Pampanga2/5/2015 2nd BCDA 18.951 120 O 0.377 0.293 0.000 0.030 0.041 0.033 77.44 -
4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection WorksFloridablanca,
Pampanga11/20/2014 1st BCDA 18.951 120 O 0.400 0.271 0.105 0.000 0.032 0.033 84.10 -
4B Construction Corporation
2014 heavy maintenance works along SCTEX
lot 2 - Bridge revetment, slope and drainage
repair works
Bataan and
Pampanga/Regio
n 3
10/31/2014 1st BCDA 12.430 90 O 0.298 0.288 0.135 0.000 0.035 0.050 80.53 -
525 Construction 28532
Repair/ Maintenance of Flood Control Structure
along Balagtas River, San Juan Section,
Balagtas, BulacanBalagtas,
Bulacan5/31/2017
1st &
Final
Bulacan
1st DEO18.325 150 C 0.469 0.133 0.300 - - - 90.20
*90.2%
Very
Satisfactory
525 Construction 28532
Construction of Flood Control Structure along
Balagtas at Dalig, Balagtas, BulacanBalagtas,
Bulacan8/25/2017
1st &
Final
Bulacan
1st4.628 90 C 0.367 0.200 0.300 - - - 86.70
*86.7%
Satisfactory
525 Construction 28532Rehabilitation of Roads Brgy. Igulot - Brgy.
Binang - Brgy. TuroBocaue, Bulacan 9/19/2016 1st
Bulacan
1st DEO34.143 210 O 0.31 0.3 0.15 0.03 0.042 0.05 0.8840 -
525 Construction 28532
Valenzuela-Obando-Meycauayan Flood
Control Project-Meycauayan, Construction of
River wall Protection, Meycauayan-Valenzuela
Boundary Phase I, RS , (Sta. 3+475.40-Sta.
3+567.00), Right Side, Meycauayan, Bulacan
(Sta. 3+475.40-
Sta. 3+567.00),
Right Side,
Meycauayan,
Bulacan
3/8/2016 1st
Bulacan
Second
DEO
24.1599 201 C 0.4 0.207 0.15 0.03 0.06 0.05 89.50%
89.5%
Very
Satisfactory
525 Construction 28532
Valenzuela-Obando-Meycauayan Flood
Control Project - Meycauayan - Construction of
Riverwall Protection, Meycauayan-Valenzuela
Boundary Phase I, RS (Sta. 3+475.40 - Sta.
3+567.00), Right Side
Meycauayan,
Bulacan6/7/2016
2nd &
Final
Bulacan
2nd24.159 201 C 0.49 0.102 0.3 0 0 0 89.30%
89.42%
Very
Satisfactory
525 Construction 28532
Construction of Flood Control Structure along
Angat River, Pulilan, BulacanPulilan, Bulacan 11/17/2017
1st &
FinalDPWH 10.880 150 C 0.472 0.133 0.300 - - - 90.50
*90.5%
Very
Satisfactory
5'S Construction & Supply 32404
Local Infrastructure Program - Improvement of
Multi-Purpose Building (Public Market) Iloilo
4th Legislative District , Brgy. Poblacion,
Banate Iloilo
Banate, Iloilo 3/9/2016 1stIloilo 2nd
DEO1.969 259 C 0.46 0.133 0.3 0 0 0 89.00%
89%
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 6 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
5'S Construction & Supply 32404
Improvement of Multi-Purpose Building/
Barangay Hall, Barangay Punong Lapuz, Iloilo
City
Iloilo City 3/23/2018 1st/FinalIloilo City
DEO1.914 118 C 0.49 0.133 0.3 - - - 92.50 *92.50%
Very
Satisfactory
6 Jewels Construction 34737
MFO 1 - National Road Network Services,
Network Development Off-Carriageway
Improvement including Drainage, Secondary
Roads Batangas Quezon Road, K0134+(-664) -
K0134+(-414), K0134+100 - K0134+407,
Batangas City, Batangas
Batangas City,
Batangas8/25/2017
1st &
Final
Batangas
2nd DEO5.287 45 C 0.483 0.133 0.300 - - - 91.60
*91.6%
Very
Satisfactory
6 Jewels Construction 34737
Local Infrastructure Program - Construction/
Improvement of Draiange Facilitites Brgy. Calicanto,
Batangas City9/21/2016
1st &
Final
Batangas
2nd1.880 56 C 0.48 0.133 0.3 0 0 0 0.9120
91.2%
Very
Satisfactory
626 Construction & Trading,
Inc.34990
Rehabilitation & Improvement of Bustos Dam
and Picnic GroundsBustos, Bulacan 9/27/18 2nd TIEZA 7.500 90 O 0.38 0.30 0.13 0.03 0.06 0.05 95.30 - On - Going
626 Construction & Trading,
Inc.34990 Improvement of Hot and Cold Spring Resort
Balungao,
Pangasinan10/9/2015 2nd TIEZA 12.000 240 O 0.395 0.300 0.103 0.030 0.047 0.050 92.49 -
626 Construction & Trading,
Inc.34990
Improvement of Balungao Hot and Cold Spring
Resort
Balungao,
Pangasinan5/27/2015 1st TIEZA 11.800 180 O 0.397 0.299 0 0.030 0.045 0.017 78.74
722 Construction,
Inc.(Formerly: 722
Construction)
21923
Repair/Rehabilitation/Improvement along
Baliuag-Candaba Road K0054+000 to
K0057+000
Baliuag, Bulacan 11/24/2014 1st III 12.104 72 O 0.295 0.240 0.150 0.030 0.037 0.033 78.50%
78.50%
Unsatisfacto
ry
739 Builders 31174
Provision of Techvoc Workshop
Buildings/Laboratories for Senior High School,
Narvacan NCHSNarvacan, Ilocos
Sur6/4/2017
1st &
Final
Ilocos Sur
2nd
District
Engineerin
g Office
2.307 85 C 0.484 0.199 0.240 - - - 92.30
*92.3%
Very
Satisfactory
739 Builders 31174
Construction of Drainage Canal, Vigan-Sta.
Catalina Road, K0407+405-K0408+288 Vigan, Ilocos Sur 8/17/20171st &
Final
Ilocos Sur
1st DEO11.177 120 C 0.488 0.172 0.228 - - - 88.80
*88.8%
Satisfactory
739 Builders 31174
Provision of Techvoc Workshop
Building/Laboratories for Senior High School,
Narvacan National High School, Narvacan,
Ilocos Sur
Narvacan, Ilocos
Sur3/18/2017 1st
Ilocos Sur
2nd DEO2.306 115 O 0.225 0.300 0.051 0.03 0.052 0.033 69.10 -
739 Builders / Arthit
Corporation
31174 /
40667
Upgrading and Improvement of Sta. Lucia -
Nagrebcan - Ronda Road
Sta. Lucia, Ilocos
Sur / Region 110/9/2018 1st
Provincial
Governme
nt of
Ilocos Sur
44.784 211 O 0.40 0.30 0.15 0.03 0.07 0.05 100.00 - On - Going
811 Trading & Construction 21215
Construction of Two (2) Storey, Four
Classroom Building for Punong NHS, Sta.
Cruz, Marinduque
Sta. Cruz,
Marinduq8/25/2017
1st &
Final
Marinduqu
e DEO7.115 262 C 0.473 0.200 0.154 - - - 82.70
*82.7%
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 7 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
811 Trading & Construction 21215
Construction of 2 Storey/ 8 Classrooms at
Doroteo S. Mendoza SR Memorial National
High School, Naujan, Oriental MindoroNaujan, Oriental
Mindoro8/17/2017
1st &
Final
Mindoro
Oriental
DEO
10.769 210 C 0.488 0.200 0.000 - - - 68.80*68.8%
Poor
811 Trading & Construction 21215
Construction of 2 Storey/8 Classrooms at
Doroteo S. Mendoza, Sr., Memorial National
High School, Naujan, Oriental MindoroNaujan, Oriental
Mindoro11/17/2016 1st
Mindoro
Oriental
DEO
10.821 150 O 0.35 0.3 0.109 0.03 0.058 0.033 0.8790 -
811 Trading & Construction/
Great Lakes Enterprises,
Joint Venture
JV-15-
1249
Construction of Wawa Seawall, Calapan City,
Oriental MindoroCalapan City,
Oriental Mindoro8/26/2016 2nd
Mindoro
Oriental
DEO
18.576 181 O 0.38 0.2 0.3 0 0 0 0.8820 -
876 Construction 24224
Paving of Shoulder with Drainage and Slope
Protection, Calapan North Road (CNR)San Teodoro,
Oriental Mindoro8/26/2016 2nd
Mindoro
Oriental
DEO
1.293 75 O 0.46 0.158 0.3 0 0 0 0.9130 -
888 Acy Enterprises 32898
Cluster-Road Widening along Daang Maharlika
(S00223LT), K1024+443-K1024+699,
K1024+721-K1025+607Southern Leyte 11/6/2017 1st DPWH 33.567 240 O 0.344 0.254 0.112 0.03 0.056 0.033 82.90 -
888 Acy Enterprises 32898
Off-Carriageway Improvement Along Jct. Taft-
Oras-San Policarpio-Arteche Road
(S00167SM) K0939+500-K0940+744;
K0942+280-K0943+344, K0943+432-
K0944+1087, Eastern Samar
K0939+500-
K0940+744;
K0942+280-
K0943+344,
K0943+432-
K0944+1087,
Eastern Samar
8/15/2017 1st
Eastern
Samar
DEO
39.857 210 O 0.364 0.300 0.150 0.03 0.012 0.033 88.90 -
888 Acy Enterprises 32898
Rehab./Major Repair of Permanent Bridges,
Canlawis Bridge along Lilo-an-San Ricardo
Road (B00368LT), Pintuyan, Southern Leyte- 3/30/2017
1st &
Final
Southern
Leyte
DEO
19.585 247 C 0.412 0.133 0.300 - - - 84.50*84.5%
Satisfactory
888 Acy Enterprises 32898
Rehab./Major Repair of Permanent Lo-oc
Bridge along Bdry. So. Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika
(B00330LT), Lo-oc, Tomas Oppus, Southern
Leyte
Lo-oc, Tomas
Oppus, Southern
Leyte
11/14/20161st &
Final
Southern
Leyte
DEO
9.699 170 C 0.44 0.133 0.3 0 0 0 0.875087.5%
Satisfactory
888 Acy Enterprises 32898
Rehab./Major Repair of Permanent Dinahugan
Bridge along Bdry. So. Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika
(B003011LT)
Padre Burgos,
Southern Leyte6/26/2016 1st
Southern
Leyte
DEO
19.148 202 O 0.37 0.24 0.15 0.03 0.056 0.05 89.30% -
888 Acy Enterprises 32898
Rehab/Major Repair of Permanent Bridges,
Pandan Bridge, Along Brdy, S. leyte-Maasin-
Macrohon-Sogod-Daang Maharlika
Along Brdy, S.
leyte-Maasin-
Macrohon-Sogod-
Daang Maharlika
6/3/2015 1st
Southern
Leyte
DEO
8.812 150 O 0.4 0.24 0.15 0.03 0.052 0.033 90.50% -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 8 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
888 Acy Enterprises 32898
Off-Carriageway Improvement along Taft -
Oras - San Policarpio - Arteche Road,
K0939+500 - K0940+744, K0942+280 -
K0943+344, K0943+432 - K0944+490,
K0944+672 - K0944+1087
Eastern Samar 4/10/2018 2nd/Final
Eastern
Samar
DEO
39.857 210 C 0.48 0.186 0.3 - - - 96.70 91.48% Very
Satisfactory
888 Acy Enterprises 32898
Road Widening along Daang Maharlika,
K1024+443-K1024+699.00; K1024+721-
K1025+607.000
Southern Leyte 04/09/18
1st/Final
Southern
Leyte
DEO
33.567 240 C 0.482 0.133 0.300 - - - 91.50 *91.50% Very
Satisfactory
8G Construction And General
Services35783
Construction of 4 STY, 8-CL at Amlan NHSAmlan 2nd
District, Negros
Oriental
11/18/20161st &
Final
Negros
Oriental
2nd DEO
14.868 230 C 0.49 0.133 0.3 0 0 0 0.9240
92.4%
Very
Satisfactory
8G Construction And General
Services35783
Rehabilitation/Improvement of Farm to Market
Road at Jandalamanon, Kilaban, Gomentoc
and Candanaay, Ayungon, Negros Oriental
Ayungon, Negros
Oriental3/11/2016 1st
Negros
Oriental
First DEO
3.7437 50 C 0.44 0.133 0.3 0 0 0 86.80%86.8%
Satisfactory
8G Construction And General
Services35783
Rehabilitation of Multi-Purpose Building,
Barangay Manalungon,Sta. Catalina,
Negros Oriental
3rd LD
8/24/20161st &
Final
Negros
Oriental
3rd DEO
1.940 180 C 0.44 0.133 0.3 0 0 0 0.869086.9%
Satisfactory
8R'S Construction 22997
Rehabilitation/ Reconstruction/ Upgrading of
Damaged Paved National Rd. including
Drainage (Marinduque Circumferencial Road),
K0004+000-K0004+600, K0005+300-
K0005+486, and K0005+670-K0005+832,
Boac-Mogpog, Marinduque
Boac-Mogpog,
Marinduque8/27/2016 1st
Marinduqu
e DEO26.202 257 O 0.35 0.259 0.15 0.03 0.025 0.033 0.8440 -
969 Construction & Supplies 35818
Barangay San Roque, Delfin Albano, IsabelaDelfin Albano,
Isabela6/2/2017
1st &
Final
Isabela
1st DEO1.410 91 C 0.442 0.138 0.300 - - - 88.00
*88%
Satisfactory
A B Aponesto Construction,
Parts & Supply22998
Repair/Rehab of Agusan River Flood Control,
Osmena Section, Compostela along
Montevista – Compostela – New Bataan –
Maragusan – Mati Bdry. Road.
Compostela
Valley8/9/2014 1st XI 30.533 183 O 0.384 0.219 0.123 0.030 0.042 0.033 83.10 -
A De Guia Construction 18228
Construction of River Bank Protection, Siffu
Flood Control Project, Sittio Gabit Section,
Roxas, Isabela
Roxas, Isabela 8/28/2015 1stIsabela
2nd DEO18.346 215 O 0.35 0.3 0.15 0.03 0.04 0.05 92.40% -
A J Taylan Construction &
Development/Jlp
Construction & Supply Joint
Venture
JV-14-518
Rehabilitation/Reconstruction/Upgrading of
Damaged Paved National Roads including
Drainage Based on Pavement Management
System/Highway Development and
Management- 4(HDM-4), Pinili-Nueva Era
Road, K0453+(-224)-K0454+1013, K0455+884-
K0456+433, Pinili Road, Ilocos Norte
Pinili-Nueva Era
Road, K0453+(-
224)-
K0454+1013,
K0455+884-
K0456+433,
Pinili Road,
Ilocos Norte
8/26/2015 1stIlocos Sur
2nd DEO37.519 219 O 0.36 0.209 0.15 0.03 0.051 0.05 84.50% -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 9 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A. B. Taylan Construction &
Development / North Tech
Builders And Construction
Supply Joint Venture
JV-14-115
MFO-1 National Road Network Services:
Network Development: Widening of National
Roads (Arterial)-along N1, Bangag-Magapit
Road, K0686+(-512) - K0687+980, Bangag-
Magapit, Allacapan, Cagayan
Allacapan,
Cagayan6/1/2017
1st &
Final
Regional
Office No.
II
74.138 294 C 0.452 0.134 0.300 - - - 88.60*88.6%
Satisfactory
A. C. Rivero Development
Corporation5122
Replacement/ Raising of PHHC Bridge
(S00130NR) along Bacolod Circumferential
Road, Bacolod CityBacolod City 11/16/2017 1st DPWH 19.600 255 O 0.391 0.240 0.150 0.03 0.04 0.05 90.10 -
A. C. Soliven Construction *
General Merchandise19278
Rehabilitation/ Improvement of Existing Dike
along Lucung River, Upstream of Sta. Maria
Section, Left Side, Sta. (-)2+050 to Sta. (-
)2+132 and Sta. (-)2+200 to Sta. (-)2+619.60,
Concepcion, Tarlac
Concepcion,
Tarlac8/20/2017
1st &
Final
Tarlac 2nd
DEO37.231 147 C 0.421 0.133 0.300 - - - 85.40
*85.4%
Satisfactory
A. D. Pendon Construction &
Supply, Inc. (Formerly: A. D.
P. Construction & Supply)
3466
Asset Preservation of National Roads
Preventive Maintenance - Asset Preservation
of National Roads -
Rehabilitation/Reconstruction/Upgrading of
Damaged Paved National Roads Including
Drainage, Odiong - Sibalom - San Remigio -
Leon Road, San Remigio, Antiq
San Remigio,
Antique6/9/2016 1st
ANTIQUE
DEO29.476 223 O 0.23 0.291 0.121 0.008 0.022 0 67.20% -
A. D. Pendon Construction &
Supply, Inc. (Formerly: A. D.
P. Construction & Supply)
3466
Rehabilitation/ Reconstruction/ Upgrading of
Damaged Paved National Roads including
Drainage, Iloilo-Capiz Road (Pavia Diversion),
K0010+449 to K0010+824.30, IloiloIloilo 11/16/2016 1st
ILOILO
4TH DEO7.258 170 O 0.34 0.24 0.15 0.03 0.05 0.05 0.8610 -
A. D. Pendon Construction &
Supply, Inc. (Formerly: A. D.
P. Construction & Supply)
3466
Upgrading of Delgado St. K0001+(-402)-
K0001+(-100), K0001+(-100)-K0001+080, Iloilo
CityIloilo City 9/1/2016 1st
ILOILO
DEO22.611 22.6 O 0.28 0.3 0.05 0.03 0.058 0 0.7130 -
A. De Guia Construction 18228
Construction/ Rehabilitation of Flood Control
Projects, Nagassican Flood Control Projects,
Sta. 0+000 to Sta. 0+224
Nagassican,
Santiago City8/12/2014 1st II 19.500 184 O 0.288 0.248 0.150 0.030 0.055 0.050 82.10 -
A. De Guia Construction 18228
Construction of Drainage System / Protection
Works along Daang Maharlika, Isabela 4th LD
K0311+590 - K0314+350, San Luis -
Caquilingan
Cordon, Isabela 10/27/2014 1st II 19.403 231 O 0.347 0.300 0.150 0.030 0.029 0.033 88.90%88.90%
Satisfactory
A. DE GUIA
CONSTRUCTION18228
Concreting of San Pablo-Salvacion Road,
Barangay San Pablo Alicia, IsabelaBarangay San
Pablo Alicia,
Isabela
11/11/20171st &
FinalDPWH 6.930 122 C 0.470 0.133 0.300 - - - 90.30
*90.3%
Very
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 10 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A. DE GUIA
CONSTRUCTION18228
Network Development - Improvement/
Widening of National Roads Primary Roads -
Other Primary Roads along National Roads
along Santiago - Tuguegarao Road,
K0369+000 - K0371+000, K0373+000 -
K0374+000, K0374+947 - K0376+000, Aurora
and San Miguel, Isabela
Aurora and San
Miguel, Isabela8/19/2017 1st
Isabela
2nd DEO91.157 251 O 0.381 0.240 0.150 0.03 0.07 0.033 90.40 -
A. DE GUIA
CONSTRUCTION18228
MFO 1 - National Road Network Services:
Network Development: Improvement/Widening
of National Roads, Primary Roads along N1
Daang Maharlika (LZ) - K0382+977-
K0383+450 L/S, K0383+830-K0386+182 L/S,
K0386+291-K0387+215 L/S, K0382+977-
K0383+450 R/S, K0383+83
K0382+977-
K0383+450 L/S,
K0383+830-
K0386+182 L/S,
K0386+291-
K0387+215 L/S,
K0382+977-
K0383+450 R/S,
K0383+830-
K0385+006 R/S,
K0385+220-
K0386+014 R/S,
K0386+102-
K0386+193 R/S,
6/15/2016 1stRegional
Office79.349 248 O 0.39 0.24 0.15 0.03 0.047 0.05 91.00% -
A. DE GUIA
CONSTRUCTION18228
Network Development-Improvement/Widening
of National Roads-Primary Roads-Other
Primary Roads along National Roads along
Santiago-Tuguegarao Road, K0369+000-
K0371+000, K0373+000-K0374+000 &
K0374+947-K0376+000
Aurora and San
Manuel, Isabela04/09/18
2nd/Final
Isabela
2nd DEO91.157 281 C 0.363 0.200 0.300 - - - 86.30 91.40%
Very
Satisfactory
A. DE GUIA
CONSTRUCTION18228
Network Development, Improvement/Widening
of National Roads, Santiago-Tuguegarao
Road, K0342+(-039)-K0343+884, Oscar,
Ramon
Isabela-Sinamar
Sur, San Mateo,
Isabela
3/20/2018 1st/FinalIsabela
3rd DEO45.847 179 C 0.461 0.176 0.300 - - - 93.70 *93.70%
Very
Satisfactory
A. Dela Cruz Builders Inc. 38836
Construction of Multi-Purpose Building at Dona
Aurora Elementary School, Brgy. Doña Aurora,
Quezon City
Quezon City 3/17/2018 1st/Final
Quezon
City 2nd
DEO
14.724 250 C 0.490 0.132 0.300 - - - 92.20 *92.20% Very
Satisfactory
A. J. Lava Builders Corp.
(Formerly: A. J. Lava
Builders)
22265
Flood Management Services
Construction/Maintenance of Flood Mitigation
Structures and Drainage System
Improvement/Riprapping of Sitio Kapatagan
River (Downstream), Brgy. San Jose, Antipolo
City, 2nd LD
Brgy. San Jose,
Antipolo City11/11/2015 1st
RIZAL
1ST DEO27.612 180 O 0.39 0.24 0.15 0.03 0.06 0.05 92.00%
92%
Very
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 11 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A. J. Taylan Construction
Corporation2336
Construction of Apatot Bridge and Approaches,
Pinili, Ilocos NortePinili, Ilocos
Norte11/15/2016
1st &
Final
Ilocos
Norte 2nd
DEO
27.042 270 C 0.35 0.3 0.101 0.03 0.055 0.033 0.869086.9%
Satisfactory
A. J. Taylan Construction
Corporation2336
Laoag River Basin Flood and Sabo Project,
Concrete Revetment along Bongo River, Brgy.
Sta Monica, Sitio 2, San Nicolas, Ilocos Norte
Brgy. Sta
Monica, Sitio 2,
San Nicolas,
Ilocos Norte
3/9/2016 2nd
ILOCOS
NORTE
2ND DEO
9.649 194 C 0.42 0.2 0.3 0 0 0 91.10%
91.1%
Very
Satisfactory
A. M. Oreta and Co.,
Incorporated108 Region 2-PIDP-CBIMO
Sta. Ana,
Cagayan9/19/2015 1st NIA 80.788 690 O 0.370 0.300 0.130 0.030 0.060 0.050 94.00 -
A. M. P. Construction 16574Construction of Flood Control Wall along
Agbalili River, Altavas, AklanAltavas, Aklan 8/28/2016 1st
AKLAN
DEO34.428 34.4 O 0.39 0.3 0.003 0.03 0.058 0 0.7790 -
A. M. P. Construction 16574Construction of Flood Control Revetment Wall
along Agbalili River, Altavas, AklanAltavas, Aklan 6/11/2016 2nd
AKLAN
DEO34.428 274 O 0.39 0.3 0.104 0.023 0.055 0.033 90.00% -
A. M. P. Construction/
Forthright Construction Joint
Venture
JV-16-
1612
Construction/ Maintenance of Flood Mitigation
Structures and Drainage System,
Rehabilitation/ Improvement of Pampanga
River Control, Brgy. Sapang Buho, Palayan
City, Nueva Ecija
Palayan City,
Nueva Ecija8/23/2017 1st
Nueva
Ecija 2nd
DEO
39.200 161 O 0.309 0.300 0.150 0.02 0.042 0.05 87.10 -
A. P. B. Construction 17055
Network Development/ Widening of National
Roads-Secondary Road-Abra-Ilocos Norte
Road K0409+000-K0409+100, K0409+115-
K409+178, K0409+307-K0409+404,
K0409+531-K0409+648, K0409+748-
K0410+139, K0410+159-K0410+360,
K0410+369-K0410+777, K0411+050-
K0411+220, K0412+122-K0412+499,
K0413+000-K0414+354, K0414+764-
K0415+747, K0416+175-K0416+445, K041
Abra 11/20/2015 1stRegional
Office81.971 286 O 0.32 0.29 0.15 0.022 0.045 0.033 85.80%
85.8%
Satisfactory
A. P. Consebido
Construction And Trading33616
Construction of Barangay Hall/Evacuation
Center, Brgy. Salvacion, Roxas, Palawan Brgy. Salvacion,
Roxas, Palawan11/23/2016
1st &
Final
Palawan
First DEO1.982 100 C 0.48 0.179 0.3 0 0 0 0.9600
96%
Very
Satisfactory
A. P. Consebido
Construction And Trading33616
Construction of Barangay Road, Barangay
Dumarao, Sta. 00+012.70-Sta. 0+149.00,
Roxas, Palawan
Sta. 00+012.70-
Sta. 0+149.00,
Roxas, Palawan
3/10/2016 1stPalawan
First DEO1.9478 100 C 0.43 0.2 0.27 0 0 0 89.90%
89.9%
Very
Satisfactory
A. P. D. Construction 17467
Retrofitting/Strengthening of Disiluad Br.
(B01939LZ) along Cordon-Aurora Boundary
Road (Isabela Boundary - Jct. Dumabato)
Disiluad, Aglipay,
Quirino3/17/2016 1st Quirino 29.4724 180 C 0.49 0.133 0.3 0 0 0 91.90%
91.9%
Very
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 12 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A. R. Lustre Jr. Construction 7680
Construction of Multi-Purpose Building,
Barangay Sta. Monica, Inagawan Sub. And
San Miguel, Puerto Princesa City
Barangay Sta.
Monica,
Inagawan Sub.
And San Miguel,
Puerto Princesa
City
3/11/2016 1stPalawan
3rd DEO1.9142 156 C 0.48 0.177 0.3 0 0 0 96.00%
96%
Very
Satisfactory
A. Sandoval Construction &
Supply35991
Local Infrastructure Program - Construction of
2 Storey, 4 Classroom School Building, Luyos
NHS, Brgy. Luyos, Tanauan City, Batangas
3rd LD
Brgy. Luyos,
Tanauan City,
Batangas 3rd LD
6/30/20161st &
Final
Batangas
3rd8.464 180 C 0.46 0.133 0.3 0 0 0 89.40%
89.4%
Very
Satisfactory
A. Y. U. Engineering And
Construction25632
Road Concreting, Bato to Likate Road, Brgy.
Bato and Kilate, Toril, Davao City Toril, Davao City 9/2/20162nd &
Final
Davao
City 2nd
DEO
9.800 105 C 0.48 0.133 0.3 0 0 0 0.916088.3%
Satisfactory
A.B Taylan Construction &
Development 25273
Netwrork Development, Improvement of
National Roads along Manila North Road,
K0508+050-K0508+125; K0508+140-
K0508+250; K0508+329; K0508+410-
K0509+755; K0509+760-K0510+501;
K0519+000-K0520+200; K0521+000-
K0522+500; K0522+500-K0523+060
Pasuguin, Ilocos
Norte11/8/2017
1st &
FinalDPWH 144.750 255 C 0.473 0.133 0.300 - - - 90.60
*90.6%
Very
Satisfactory
A.B. Opeña Builders 33996
Construction of Multi-Purpose Building, Brgy.
North Centro, Sipocot, Camarines SurBrgy. North
Centro, Sipocot,
Camarines Sur
6/6/20161st &
Final
Camarines
Sur 1st
DEO
1.881 120 C 0.48 0.147 0.3 0 0 0 93.10%
93.1%
Very
Satisfactory
A.B. Opeña Builders 33996
Construction of Multi-Purpose Building at
Colacling National High School Lupi, Camarines
Sur11/15/2017
1st &
FinalDPWH 0.955 60 C 0.488 0.133 0.300 - - - 92.10
*92.1%
Very
Satisfactory
A.B. Opeña Builders 33996
Concreting of Barangay Road at Brgy. Mabini,
Del Gallego, Camarines Sur Brgy. Mabini, Del
Gallego,
Camarines Sur
6/1/20171st &
Final
Camarines
Sur 5th
DEO
1.410 40 C 0.443 0.134 0.300 - - - 87.70*87.7%
Satisfactory
A.B. Opeña Builders 33996
Concreting of Barangay Road, Barangay Sta.
Cruz, Cabusao, Camarine SurCabusao,
Camarine Sur8/16/2017 1st
Camarines
Sur 5th
DEO
1.881 45 O 0.489 0.134 0.300 - - - 92.30 -
A.B. Opeña Builders 33996
Cluster: Completion/Construction of Multi-
Purpose Building at Brgy. Ragay, Camarines
SurBrgy. Ragay,
Camarines Sur11/24/2016
1st &
Final
Camarines
5th DEO2.883 90 C 0.47 0.133 0.3 0 0 0 0.8990
89.9%
Very
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 13 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A.B. Taylan Construction &
Development28233
Improvement/Widening of National Road along
N1, Manila North Roads, K0494+396-
K0495+024; K0496+164-K0496+423;
K0496+775-K0497+444; K0497+834-
K0498+000; K0499+200-K0500+676;
K0500+676-K0500+698; K0500+676-
K0500+756; K0503+380-K0506+084;
K0503+380-K0506+048, Bacarra, Ilocos Norte
K0494+396-
K0495+024;
K0496+164-
K0496+423;
K0496+775-
K0497+444;
K0497+834-
K0498+000;
K0499+200-
K0500+676;
K0500+676-
K0500+698;
K0500+676-
K0500+756;
11/16/2016 1st
Regional
Office No.
I
146.250 325 O 0.49 0.133 0.3 0 0 0 0.9230 -
A.B. Taylan Construction &
Development/ Badoc
Builders & Supply Joint
Venture
JV-16-621
Construction of Final Mitigation Structure along
Badoc River, U/S and D/S of Badoc Bridge Badoc, Ilocos
Norte 8/16/2017
2nd &
Final
Ilocos
Norte 2nd
DEO
44.100 225 C 0.457 0.200 0.300 - - - 95.70
*92.4%
Very
Satisfactory
A.B. Taylan Construction &
Development/ Badoc
Builders & Supply Joint
Venture
JV-15-404
Road Upgrading (Unpaved to Paved) Based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards (HDM-4)
along Batac-Pinili via Maipalig Road
(S04765LZ)
K0481+643-
K0482+046;
K0482+186-
K0485+624
8/17/20171st &
Final
Regional
Office No.
I
146.249 300 C 0.491 0.145 0.292 - - - 92.80
*92.8%
Very
Satisfactory
A.C Rivero Development
Corporation5122
Upgrading of Drainage System Along El
Dorado Street, Barangay Bosco, District IIParañaque City,
Manila11/21/2017 1st DPWH 14.035 261 O 0.376 0.300 0.079 0.03 0.056 0.033 87.40 -
A.C Rivero Development
Corporation5122
Rehabilitation/Reconstruction of Proposed
Slope Protection along Sta. Felomina-
Bonbonon-Digkilaan-Rogongon Road
K1526+000-K1526+200 R/S
Iligan City, Lanao
del Norte Lone
District
11/14/20171st &
FinalDPWH 33.582 193 C 0.448 0.175 0.300 - - - 92.30
*92.3%
Very
Satisfactory
A.C Soliven Construction &
General Merchandise19278
Agno River Basin & Allied Rivers Flood Control
Project - Heightening of Villasis-Alacala Earth
Dike Phase I, Agno River Control
Brgy. Gualsic,
Alcala,
Pangasinan
11/14/20171st &
FinalDPWH 44.687 220 C 0.438 0.133 0.300 - - - 87.10
*87.1%
Satisfactory
A.C. Mojares Construction,
Inc.1771
Concreting and Sidewalk Improvement of
Phase 2, Scout Tobias St., Brgy. Laging
Handa, Quezon City
Quezon City 6/3/2014 1st
Quezon
City 2nd
DEO
10.018 207 O 0.39 0.24 0.15 0.015 0.028 0.05 87.70% -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Rehabilitation/ Reconstruction of National
Roads with Slips, Slope Collapse and
Landslide along Tomas Oppus Street
K1135+300 to
K1136+000,
Maasin City,
Southern Leyte
6/3/20171st &
Final
Southern
Leyte
DEO
27.915 260 C 0.499 0.133 0.300 - - - 93.20
*93.2%
Very
Satisfactory
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
CY 2016 Basic Education Facilities Fund
(BEFF), Provision of Tech Voc. Laboratores,
Batch 12, Merida Vocation School, Merida,
Leyte
- 4/1/20171st &
Final
Leyte 4th
Deo2.556 90 C 0.462 0.133 0.300 - - - 89.50
*89.5%
Very
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 14 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Indv. Project - Concreting of Monte-Calvario-
Igbac-Barangay Road, Brgy. Monte-Calvario
and IgbacBuhi, Camarines 11/16/2017
1st &
FinalDPWH 9.860 83 C 0.484 0.132 0.300 - - - 91.60
*91.6%
Very
Satisfactory
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Off-Carriageway Improvement including
Drainage along Liloan-San Ricardo Road
(S00218LT), K1070+685 to K1072+000Southern Leyte 11/6/2017 1st DPWH 45.307 270 O 0.368 0.239 0.150 0.03 0.065 0.05 90.20 -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Replacement of PHHC Bridge along Bacolod
Circumferential Road Bacolod City 6/6/2017 2ndBacolod
City34.299 330 O 0.373 0.200 0.029 0.03 0.058 0.0333 72.33 -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Replacement of PHHC Bridge along Bacolod
Circumferential Road, Bacolod City Bacolod City 8/23/20172nd &
Final
Bacolod
City 34.299 330 C 0.490 0.134 0.000 - - - 62.40
*68.34%
Poor
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
MFO-1: National Road Network Services Off-
Carriageway Improvement including Drainage-
Secondary Roads Flaring of Intersection along
Carrmen-Patag-Bulua Road K1440+(-272) and
K1441+370
Cagayan de Oro
City03/16/18 1st/Final
Cagayan
de Oro
City 1st
DEO
9.221 195 C 0.477 0.200 0.120 - - - 79.70 *79.70% Unsatisfactory
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Road Upgrading (Unpaved to Paved) Based on
Gravel Road Strategies Traffic Benchmark for
Upgrading to Paved Road Standards (HDM-4
Project Analysis) along Sta. Felomina-
Bonbonon-Digkilaan-Rogongon Road
K1535+891-K1536+457
Iligan City 3/22/2018 1st/Final
Lanao del
Norte 2nd
DEO
33.269 202 C 0.492 0.133 0.300 - - - 92.50 *92.50% Very
Satisfactory
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Construction and Maintenance of Bridges
along National Roads (Replacement of Weak
Bridge) at Olingan BridgeOlingan, Dipolog
City3/15/2017
1st &
Final
Zamboang
a del
Norte 1st
DEO
21.622 355 C 0.459 0.199 0.152 - - - 81.00
*81%
Unsatisfacto
ry
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Upgrading/Conc. of San Juanico-Basey-
Sohoton Rd., K0913+721.75-K0917+915.72,
w/ exceptions
Basey, Samar 8/7/2012 1st VIII 47.065 200 O 0.357 0.240 0.150 0.030 0.040 0.033 85.00 -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122Const./Completion of Subang Daku Bridge,
Subang Daku River, San Miguel
Sogod,
Southern Leyte8/17/2012 1st VIII 42.820 220 O 0.383 0.300 0.150 0.030 0.040 0.033 93.60 -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Const./Impv't. of San Miguel-Jct. Buac Rd.,
Daang Maharlika Rd (Km1207+000 -
Km1209+454.40)
Sogod, Southern
Leyte8/19/2012 1st VIII 35.731 220 O 0.349 0.289 0.150 0.030 0.045 0.033 89.60 -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Const./Completion of Maasin Flood Control
along Tomas Oppus Street (Road ID
S00222LT)
Maasin City,
Southern Leyte6/26/2016 1st
Southern
Leyte
DEO
25.281 180 O 0.32 0.3 0.15 0.03 0.056 0.05 90.60% -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
1
Construction of River Control, Brgy. Calico-an,
Borongan City, Eastern SamarBorongan City,
Eastern Samar8/30/2016
1st &
Final
Eastern
Samar
DEO
9.794 95 C 0.42 0.133 0.3 0 0 0 0.848084.8%
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 15 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Construction and Maintenance of Bridges
along National Roads (Widening of Permanent
Bridges to more than 2 lanes) Miputak Bridge
along Dipolog-Oroquieta Road
Zamboanga Del
Norte11/21/2016
1st &
Final
Zamboang
a del
Norte 1st
DEO
22.247 295 C 0.44 0.2 0.3 0 0 0 0.9360
93.6%
Very
Satisfactory
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Widening of Permanent Bridges from 1 Lane to
2 Lanes Malatgao Bridge (B00168PW) along
Quezon, Punta, Baja Rd., Quezon, PalawanQuezon,
Palawan11/22/2016 1st
Palawan
Second
DEO
18.408 220 O 0.39 0.176 0.15 0.03 0.04 0.05 0.8340 -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Completion of Dodiongan Bridge along Sta.
Felomina-Bonbonon-Digkilaan-Rogongon
Road, Brgy. Bonbonon, Iligan City
K01526+058-K01526+118, K01526+910-
K01526+297
Brgy. Bonbonon,
Iligan City
K01526+058-
K01526+118,
K01526+910-
K01526+297y
9/3/2015 1st
Lanao del
Norte 2nd
DEO
37.105 236 O 0.38 0.285 0.15 0.02 0.045 0.05 93.40% -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Off-Carriageway Improvement along Jct. Taft -
Oras - San Policarpio-Arteche Road,
K0950+000 - K0955+000
K0950+000 -
K0955+0006/29/2015 1st
Eastern
Samar
DEO
33.355 150 O 0.3 0.3 0.15 0.03 0.04 0.033 85.00% -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Replacement of Permanent Weak Bridge,
Ramon Magsaysay Bridge (B00469MN) Along
Jct. Switch-Jct. Monte Alegre Road
Ramon
Magsaysay,
Zamboanga del
Sur
8/30/20162nd &
Final
Zamboang
a del Sur
1st DEO
29.101 290 C 0.47 0.133 0.3 0 0 0 0.900088.074%
Satisfactory
A.C. RIVERO
DEVELOPMENT
CORPORATION (Formerly:
A.C. Rivero Construction)
5122
Replacement of Permanent Weak Bridge,
Ramon Magsaysay Bridge (B0469MN) along
Jct. Switch-Jct.Monte Alegre Road
Ramon
Magsaysay,
Zamboanga del
Sur
8/29/2015 1st
Zamboang
a del Sur
1st
29.101 230 O 0.29 0.2989 0.15 0.03 0.051 0.05 86.79% -
A.C. RIVERO
DEVELOPMENT
CORPORATION (Formerly:
A.C. Rivero Construction)
5122
Construction and Maintenance of Bridges
along National Roads - (Widening of
Permanent Bridges to more than 2 lanes),
Miputak Bridge (BO1192MN) along Dipolog-
Oroquieta National Road
Zamboanga del
Norte6/11/2016 1st
Zamboang
a del
Norte 1st
DEO
22.574 250 O 0.39 0.24 0.12 0.03 0.04 0.033 85.10% -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Construction and Maintenance of Bridges
along National Roads (Replacement of
Permanent Weak Bridge), Olingan Bridge
(B01193MN)
Dipolog-
Oroquieta
National Road
8/25/2016 2nd
Zamboang
a del
Norte 1st
DEO
21.559 340 O 0.38 0.24 0.105 0.03 0.045 0.017 0.8170 -
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Construction and Maintenance of Bridges
along National Rd. (Replacement of
Permanent Weak Bridge) at Olingan Bridge
along Dipolog-Oroquieta National Road,
Olingan, Dipolog City, Zamboanga del Norte
Olingan, Dipolog
City, Zamboanga
del Norte
11/16/2015 1st
Zamboang
a Del
Norte 1st
DEO
21.218 220 O 0.37 0.22 0.15 0.022 0.042 0.05 85.50%85.5%
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 16 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A.C. Rivero Development
Corporation (Formerly: A.C.
Rivero Construction)
5122
Construction/ Maintenance of Flood Control
Mitigation Structure and Drainage,
Construction of Sibugay Flood Control Brgy.
Poblacion, Albuera, Leyte
Brgy. Poblacion,
Albuera, Leyte8/22/2017
1st &
Final
Leyte 4th
DEO9.299 90 C 0.403 0.200 0.300 - - - 90.30
*90.3%
Very
Satisfactory
A.C. Rivero Development
Corporation / Jqd
Construction And General
Services Joint Venture
JV-15-513
Const./Impv't./Concreting of Access Road
Leading to Napantao Dive Site (Napantao
Road), San Franciso, Southern LeyteSan Franciso,
Southern Leyte11/15/2016
1st &
Final
Southern
Leyte
DEO
37.270 220 C 0.42 0.154 0.3 0 0 0 0.878087.8%
Satisfactory
A.C. Rivero Development
Corporation / Jqd
Construction And General
Services Joint Venture
JV-14-
1038
Rehabilitation/Major Repair of Permanent
Weak Bridges, Otikon Bridge Along Daang
Maharlika (B00598LT), Libagon, Southern
Leyte
Libagon,
Southern Leyte11/16/2015 1st
Southern
Leyte
DEO
31.056 195 O 0.25 0.3 0.15 0.03 0.06 0.05 83.90%83.9%
Satisfactory
A.C. Rivero Development
Corporation / Jqd
Construction And General
Services Joint Venture
0
Rehabilitation/Major Repair of Permanent
Weak Bridge, Otikon Bridge along Daang
Maharlika, Libagon, Southern Leyte
Libagon,
Southern Leyte3/7/2016 2nd
Southern
Leyte31.056 195 C 0.45 0.194 0.3 0 0 0 88.10%
88.1%
Satisfactory
A.C Soliven Construction &
General Merchandise19278
Flood Management Services: Construction/
Maintenance of Flood Mitigation Structures and
Drainage System, Construction of Flood
Control Facilities at Paranum Creek, Sta.
0+000 - Sta. 0+110 and Sta. 0+390 - Sta.
1+170, (L/S), Brgy. Camias, Magalang,
Pampanga
Magalang,
Pampanga6/8/2017 1st
Pampanga
3rd DEO17.784 150 O 0.370 0.242 0.150 0.03 0.065 0.033 89.00 -
A.C Soliven Construction &
General Merchandise19278
Flood Management Services: Construction/
Maintenance of Flood Mitigation Structures and
Drainage System; Construction of Flood
Facilities at Paranum Creek, Barangay
Camias, Sta. 0+000 to Sta. 0+110, Magalang,
Pampanga
Magalang,
Pampanga8/19/2017
2nd &
Final
Pampanga
3rd DEO17.784 150 C 0.392 0.199 0.300 - - - 89.10
*89.04%
Very
Satisfactory
A.C Soliven Construction &
General Merchandise19278
Construction/Maintenance of Flood Mitigation
Structure & Drainage Systems - Agno River
Basin Flood Control Project-Extension/
Construction of Bank Protection of River
Course, Brgy. Mabanogbog, Namcamaliran
Pinmaludpod, Urdaneta City, Pangasinan
Brgy.
Mabanogbog,
Namcamaliran
Pinmaludpod,
Urdaneta City,
Pangasinan
11/25/2016 1stPangasina
n 3rd DEO34.299 250 O 0.4 0.3 0.15 0.03 0.035 0.025 0.9400 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 17 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A.C Soliven Construction &
General Merchandise19278
Construction/Maintenance of Flood Mitigation
Structures & Drainage Systems - Agno River
Basin Flood Control Project -
Extension/Construction of Bank Protection of
River Course, Brgy. Mabanogbog,
Nancamairan, Pinmalupod, Urdaneta City,
Pangasinan
Urdaneta City,
Pangasinan3/23/2017 2nd
Pangasina
n 3rd DEO34.299 250 O 0.400 0.300 0.060 0.03 0.04 - 83.00 -
A.C Soliven Construction &
General Merchandise19278
Construction of Bank Protection Works,
Agnooo River Basin Flood Control Project
(Phase III) Brgy. Bantog, Asingan, PangasinanAsingan,
Pangasinan11/16/2015 1st
PANGASI
NAN 3RD
DEO
18.336 180 O 0.39 0.24 0.15 0.03 0.055 0.05 91.40%
91.4%
Very
Satisfactory
A.C Soliven Construction &
General Merchandise19278
Construction of Bank Protection, Agno River
Basin Flood Control Project (Phase III),
Barangay Bantog, Asingan, Pangasinan
Barangay
Bantog, Asingan,
Pangasinan
3/18/2016 2nd
PANGASI
NAN 3RD
DEO
18.335 180 C 0.41 0.197 0.3 0 0 0 91.28%
91.28%
Very
Satisfactory
A.C Soliven Construction &
General Merchandise19278
Construction/Rehabilitation of Drainage along
National Roads, Villasis-Malassiqui-San Carlos
Road, K0190+785-K0192+800 with Exception
(B/S), Malasiqui, Pangasinan
Malasiqui,
Pangasinan3/15/2016 1st
PANGASI
NAN 4TH
DEO
34.3 226 C 0.36 0.2 0.3 0 0 0 86.20%86.2%
Satisfactory
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466
Construction of Drainage along Mandurriao-
Jaro Road,K0006+100-K0007+082,
K0007+082, Mandurriao, Iloilo City
K0006+100-
K0007+082,
K0007+082,
Mandurriao, Iloilo
City
8/24/2017 1stIloilo City
DEO38.376 191 O 0.392 0.200 0.150 0.022 0.037 0.05 85.10 -
A.D.L. Constrak 26442
Concreting of Ipil-Sagana Bridge Approaches
"A" and "B" and Sta. Cruz Road, Brgy. Ipil and
Sagan and Sta. Cruz, Bongabong, Oriental
Mindoro
Bongabong,
Oriental Mindoro8/24/2016 1st
Southern
Mindoro
DEO
3.290 35 O 0.42 0.164 0.3 0 0 0 0.8880 -
A.D.L. Constrak 26442
Rehabilitation/Reconstruction of Paclasan
Seawall, Roxas, Oriental MindoroRoxas, Oriental
Mindoro3/18/2017 1st
Southern
Mindoro
DEO
3.627 67 O 0.438 0.200 0.300 - - - 93.80 -
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466
Const. of Slope Protection along Jct. Bancal-
Leon-Antique Boundary Rd., K0031+722-
K0031+891
Leon, Iloilo 3/22/2013 1st VI 13.802 188 O 0.388 0.241 0.150 0.030 0.055 0.050 91.40 -
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466 Construction of Multi-Purpose BuildingPoblacion, Pavia,
Iloilo10/28/2014 1st VI 4.227 120 O 0.362 0.214 0.121 0.030 0.049 0.050 82.60%
82.60%
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 18 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466Construction/Rehab. Of Drainage System
along Balasan-Carles Road, Brgy. BarosbosCarles, Iloilo 10/29/2014 1st VI 43.954 274 O 0.373 0.218 0.150 0.030 0.054 0.050 87.50%
87.50%
Satisfactory
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466
Road Upgrading (Gravel to Paved) along
Davao-Sarangani Coastal Road km. 1671+600
to km. 1673+060, Biton-Lanao Section
Davao del Sur 8/7/2014 2nd XI 40.082 208 O 0.014 0.300 0.000 0.030 0.014 0.000 35.80 -
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466
Rd. Upgrading (Gravel to Paved) along Davao-
Sarangani Coastal Rd., Km.1671+600-
Km.1673+060, Biton-Lanao Sect.
Davao del Sur 8/6/2013 1st XI 40.082 179 O 0.322 0.248 0.000 0.030 0.033 0.033 66.60 -
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466
Malag-it Box Culvert along Iloilo East Coast-
Capiz Road (Construction of Malag-it Bridge
along Iloilo East Coast-Capiz Road)
Pontevedra,
Capiz10/29/2014 1st VI 35.132 240 O 0.388 0.249 0.000 0.030 0.054 0.033 75.40%
75.40%
Unsatisfacto
ry
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466Widening of Caradio-an Bridge alog Bacolod
South Road, Barangay Caradio-an
Himamaylan
City, Negros
Occidental
10/23/2014 1st VI 24.804 273 O 0.378 0.221 0.034 0.030 0.045 0.033 74.10%74.10%
Poor
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466Impvt./Conc. of Access Road, Tubalan Port,
Tubalan6/14/2010 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466
Rehab./Reconst./Upgrading of Damaged
Paved National Road, Roxas City Boundary-
Panitan Road-Jct. Bailan Road, Capiz
(KM.112+750-Km.122+705) with exception
8/31/2010 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466Construction of Drainage System along Iloilo
East Coast Capiz Road
K0204+106,
Sara, Iloilo6/9/2015 1st
Iloilo Third
DEO44.467 252 O 0.37 0.247 0.15 0.022 0.035 0.05 87.40% -
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466 Widening of Sara-San Dionisio Road
K0203+(-882) to
K0203+243,
Sara, Iloilo
6/9/2015 1stIloilo Third
DEO26.054 175 O 0.34 0.252 0.15 0.022 0.035 0.05 85.30% -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 19 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A.D. Pendon Construction &
Supply, Inc. (Formerly: Adp
Construction & Supply
3466
Network Development, Widening of National
Road, Secondary Road along Roxas City,
Cagay-Sibaguan Balijuangan-Cudian-Ijisan
Road
Chainage 0-200,
Chainage 942-
1182 10-200
(0+304.80)
(K0104+760-
K0105+000),
Pontevedra,
Capiz
6/6/2015 1stCapiz First
DEO10.341 121 O 0.37 0.251 0.105 0.03 0.035 0.033 82.20% -
A.F.G Construction &
Construction Supply17161
Construction of Standard One (1) Unit - 2 Sty
10-CL School Building, Eustacio Lopez NHS,
Silay City, Negros Occidental- 3/22/2017
2nd &
Final
Negros
Occidental
1st DEO
17.397 235 C 0.476 0.132 0.300 - - - 90.80*87.23%
Satisfactory
A.F.G Construction &
Construction Supply17161
Repair/Imporvement of Multi Purpose Building,
Barangay Kasambagan Cebu City 4/12/2018 1st/Final
Cebu City
DEO2.908 75 C 0.499 0.133 0.300 - - - 93.20 *93.20%
Very
Satisfactory
A.F.G Construction &
Construction Supply17161
Rehabilitation/Reconstruction/Upgrading of
Damaged Paved National Road including
Drainage Based on Pavement Management
System / Highway Development and
Management - 4 (HDM-4) (Intermittent Section)
along Hinigaran - Isabela Road, K0058+263 -
K0059+000
Barangay
Paticui,
Hinigaran,
Negros
Occidental
8/27/2015 1st
Negros
Occidental
2nd
12.674 127 O 0.36 0.239 0.15 0.03 0.05 0.033 86.00% -
A.F.G Construction &
Construction Supply17161
Concreting of Barangay Road, Brgy. Sta.
Teresa, Dumalag, Capiz Dumalag, Capiz 11/10/20171st &
FinalDPWH 9.407 97 C 0.420 0.135 0.300 - - - 85.50
*85.5%
Satisfactory
A.F.G Construction &
Construction Supply17161 Const. of Tangalan-Ibajay Rd. Aklan 3/19/2013 1st VI 45.834 179 O 0.387 0.259 0.150 0.024 0.030 0.033 88.30 -
A.F.G Construction &
Construction Supply17161
Odiong-Sibalom-San Remegio-Leon Rd.
Upgrading (Gravel to Paved), Km. 129+328-
Km. 131+275
San Remigio,
Antique8/15/2013 1st VI 40.453 179 O 0.336 0.240 0.150 0.030 0.037 0.033 82.60 -
A.F.G Construction &
Construction Supply17161
Construction of Standard One (1) Unit - 2 Sty
10-CL School Building at Brgy. Eustaquio
Lopez NHS, Silay City, Negros Occidental
Silay City,
Negros
Occidental
6/16/2016 1st
Negros
Occidental
First DEO
17.396 175 O 0.3 0.3 0.15 0.03 0.023 0.05 85.70% -
A.F.G Construction &
Construction Supply17161
Const. of Two (2) Storey, Eight (8) Cl Sch.
Bldg., Leonora Salapantan NHSSan Miguel, Iloilo 8/22/2013 1st VI 8.949 150 O 0.347 0.200 0.108 0.030 0.032 0.033 75.00 -
A.F.G Construction &
Construction Supply17161
Replacement/Const. of Tubog Bridge, Brgy.
TubogHamtic, Antique 8/15/2012 1st VI 7.587 180 O 0.372 0.230 0.150 0.010 0.035 0.033 83.00 -
A.F.G Construction &
Construction Supply17161
Construction of Multi-Purpose Building at
Brgy. Candumarao, Hinigaran, Negros
OccfidentalHinigaran,
Negros
Occfidental
6/15/20161st &
Final
Negros
Occidental
Second
DEO
1.965 60 C 0.5 0.107 0.3 0 0 0 90.40%
90.4%
Very
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 20 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A.F.G Construction &
Construction Supply17161
Construction of 2-CL Alimanguan National
High School Brgy. Alimanguan
San Vicente,
Palawan6/5/2015 1st
Palawan
1st DEO1.721 120 O 0.36 0.24 0.15 0.03 0.047 0.033 86.00% -
A.F.G Construction &
Construction Supply17161
Rehabilitation/Reconstruction/Upgrading of
Damaged Paved National Road Including
Drainage Based on Pavement Management
System/Highway Development and
Management-4 (HDM-4) (Intermittent Section)
along Hinigaran-Isabela Road, K0058+263 to
K0059+000Barangay
K0058+263 to
K0059+000Bara
ngay Paticui,
Hinigaran,
Negros
Occidental
3/14/2016 1st
Negros
Occidental
Second
DEO
12.6742 157 C 0.45 0.133 0.3 0 0 0 88.40%88.4%
Satisfactory
A.F.G Construction &
Construction Supply17161
Preventive Maintenance Based on Pavement
Management System/Highway Development
and Management -4 (HDM-4) Jct Bagonawa-
La Castellana-Isabela Road, K0057+244 to
K0072+800
La Castellana
and Isabela03/14/18 1st/Final
Negros
Occidental
2nd DEO
46.210 221 C 0.485 0.134 0.161 - - - 78.00 *78.00% Unsatisfactory
A.F.G. Construction And
Construction Supply/Yurich
Builders And Construction
Supplu Joint Venture
JV-15-
1239
Off-Carriageway Improvement including
Drainage of Puerto Princesa North Road,
K0090+000-K0090+600, K0091+100-
K0091+350, K0095+200-K0096+246,
K0103+600-K0103+961, K0107+600-
K0107+720, Roxas, Palawan
K0090+000-
K0090+600,
K0091+100-
K0091+350,
K0095+200-
K0096+246,
K0103+600-
K0103+961,
K0107+600-
K0107+720,
Roxas, Palawan
3/13/20172nd &
Final
Palawan
1st DEO45.859 280 C 0.380 0.200 0.300 - - - 88.00
*89.38%
Very
Satisfactory
A.H. Raga Construction 36952
MFO1-National Road Network Services-
Construction and Maintenance of Bridge along
National Roads-Rehabilitation/Major Repair of
Permanent Bridges-Zapote Br. (BO2887LZ)
Manila-Cavite (NCR Bdry-Jct Cavite City
Section), Bacoor City, Cavite
Bacoor City,
Cavite11/28/2017
1st &
FinalDPWH 9.593 180 C 0.500 0.133 0.300 - - - 93.30
*93.3%
Very
Satisfactory
A.I.P Construction 32458
Construction/Improvement of Access Roads
leading to Declared Tourism Destinations;
Guisset-Binga-Baloy-Tinongdan Road leading
to Binga Dam and Mt. Ugo, Site for
International Sky Running Event
Itogon, Benguet 11/8/2017 1st DPWH 96.500 386 O 0.376 0.240 0.150 0.03 0.056 0.05 90.20 -
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 21 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A.I.P Construction 32458
Rehabilitation/Reconstruction/Upgrading of
Damaged Paved National Roads including
Drainage Based on Pavement Management
System/Highway Development and
Management-4 (HDM-4) (Intermittent Section),
Lt. Takay Road, K0308+(-599) to K0308+000 &
K0308+616 to K0308+754, Baguio City
Baguio City 9/4/2015 1stBaguio
City DEO13.442 104 O 0.36 0.228 0.15 0.03 0.056 0.05 87.40% -
A.I.P Construction 32458
Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse and
Landslide, Marcos Highway, K0280+(-725) to
K0280+(-640), Baguio City
Baguio City 9/1/20161st &
Final
BAGUIO
CITY DEO5.509 84 C 0.42 0.133 0.3 0 0 0 0.8510
85.1%
Satisfactory
A.J Taylan Construction
Corporation2336
Road Opening/Const. of Missing Links of
National Road, Solsona-Kabugao Road, Ilocos
Norte Side
9/9/2009 1st I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -
A.J. Lava Builders Corp.
(Formerly: A.J. Lava
Builders)
22265
Repair & Maint. of Flood Control & Drainage
Structures along Rofriguez-San Jose-Quezon
City Rd.
Rodriguez, Rizal 11/19/2012 1st IVA 2.449 90 O 0.337 0.300 0.150 0.030 0.025 0.033 87.50 -
A.J. Lava Builders Corp.
(Formerly: A.J. Lava
Builders)
22265
Flood Management Services, Construction/
Maintenance of Flood Mitigation Structures and
Drainage System Improvement/ Riprapping of
Siito Kapatagan River (Upstream), Brgy. San
Jose, Antipolo City, 2nd LD
Brgy. San Jose,
Antipolo City,
2nd LD
6/21/20161st &
FinalRizal 1st 46.503 240 C 0.43 0.133 0.3 0 0 0 86.30%
86.3%
Satisfactory
A.J. Lava Builders Corp.
(Formerly: A.J. Lava
Builders)
22265
MFO2-Flood Management Services,
Construction/ Maintenance of Flood Mitigation
Structure and Drainage Systems -
Construction/ Maintenance of Flood Mitigation
Structures Drainage Systems - Construction of
Flood Control Structures along Montalban,
Rizal
Montalban, Rizal 3/12/2018 1st/FinalRizal 2nd
DEO28.350 212 C 0.497 0.133 0.300 - - - 93.00 *93.00%
Very
Satisfactory
A.J. Lava Builders Corp.
(Formerly: A.J. Lava
Builders)
22265
MFO-1 National Road Network Services-Asset
Preservation of National Roads Preventive
Maintenance Based on Pavement
Management System/Highway Development
and Management-4 (HDM-4) Cabrera -
Antipolo Road, K0026+(-554) to K0026+000,
Taytay, Rizal
Taytay, Rizal 11/21/20171st &
FinalDPWH 14.260 60 C 0.410 0.196 0.300 - - - 90.60
*90.6%
Very
Satisfactory
A.J. Taylan Construction
Corp/FR Espiritu Jr. Builders
(JV)
JV-14-074 Additional Priority Flood Control Project
San Isidro,
Dumalneg, Ilocos
Norte
10/21/2014 1st I 41.179 163 O 0.299 0.276 0.150 0.030 0.056 0.050 86.10%86.10%
Satisfactory
*1st/Final
* For DPWH, only the region and PMO office are listed 29th Release Page 22 of 866
-
CPES Report On-going and Completed Projects from July 1, 2016 to June 30, 2019
NAME OF CONSTRUCTOR LICENSE PROJECT PROJECT DATE OF NO. of *IMPL. CONTRACT STATUS WMS FINAL QUALITATIVE MTL TIME FAC ESH RDR CPES
A.J Taylan Construction
Corporation2336
Laoag River Basin Flood and Sabo Project,
Concrete Revetment along Bongo R