  • I'ld-r

    From

    Tcr

    Engineer-in-Chief, HaryanaPublic Health Engineering DepartmentPanchkula.

    All Superintending Engineers,Public Health Engineering Circlesin Haryana.

    All Executrve EngtneersPublic Health Engineering Divisronsin Haryana.

    Memo rv#o LS - {,',#D/Ljrb;rn Daiecj ZLt,€l ' I VSubject: STP matter - COCP F,lo. 1149 of ZCIflS * Anant Rfim ors Vikas Gupta

    lnstruction with respect to arguments held in Hon'ble Punjab &Haryana High Court duning the hearing on 20/01!2417.

    Above said case came up for hearrng on 20/0112017 in Hon'ble High

    Court. At the outset, HSPCB informecj tlre Hon Lrle l-lrgh Court about the status of

    monitoring done by them for various operational $1-Ps / CETPs and details of STPs /

    CETPs where samples have failed Legai samples of 11 STPs ie. Panipat (10 MLD& 35 MLD), Sonrpat (30 MLD), Rohtak (40 I\'lLD) .lind (15 MLD & 5 MLD), Narwan(375 MLD), Uchana (2 MLD), Farrdabad (45 IVILD & 50 MLD) & Flrsar (15 MLD) have

    failed. The aciion plan for above 11 STPs subrlrtted in Hon ble Punjab & Haryana

    High Court, Chan

  • I

    I

    {} r\

    c) Superintending Engineers / Executive Engineers have to grvecrlrrcentraied *tientrnn to STPs where independent feeders areurider r;cnstruction or estimates are to be submitted by thedistrii:ution cr:mpanies and ensure that work is got completed at theearliest.

    It is to be ensured that O&M staff is deployed by the contractor asper the tei"rns anri conditions of the contract agreement.Samples r:f treated effluent should be tested on daily basis in thel;ri:r:rarloi'ir:s esiablrsherl in STPs and should be got tested from thelaboratorres ;ipproveci by HSPCB or lab of HSPCB atleast once in amonth for each STP and test results should be uploaded on thewebsite of the departrnent.

    Superinternding Fngineers should inspect all operational STPs in his

    lurisdrctron atleast once in a month and submit inspection report on3'd of subsequent rnonth on prescribed format.

    lf it is ferund that any oontractor / agency is not running the plantsatisfactorily, then rmmediate action should be taken against theconlractrlr / agency, ai; per the contract agreement. Failure to doso shall attract disciplinary action against the officers / officials.

    2. $TFs unrier Ceinstructicrn.

    The detarls of S f Ps urider construction have been submitted toHSPCB and further to Hon ble High Court wherein stipulated date ofcornpletir:ri l'i;:l; ar:;r: i:i:en iriforrned. During the hearing in Hon'ble HighCourt l-lcn ble Ccurt a.pp:rehene.!ed that State is still far below in fulfilling itscomrnitrnent tcwards treatment of sewage. The list of STPs underconstrur:tion anej therr strpulated date of completion is attached asAnnexure ll. The same list has been given in affidavit submitted to Hon'bleCourt. lt should'oe ensured that STPs are constructed and made operationalby their"strpulateC date lf any contractor / agency is lagging behind, thenpenalty, as per the contract agreement must be imposed. Any laxity in thematter v;rll a*rtrer:t disr:rplinai"y action against the officer / officials.Superintendrng Engineer shoulcj visit all STPs under construction as well inhis;urisdictrnn every month :lnrj subnrit report on 3'd of subsequent month tof-lead Cffir:e

    d)

    e)

    !r)

    Nerw General Septe;mber 2016

  • cl

    3. Upgradation / Renovation of existing $TFs

    The latest standarcjs prescriberl by CPCB / HSPCB standscommunicated to your offices anrl .in various SEs meetings it has beenspecifically asked to ensure that all SfPs should meet the standards forwhichthese have been designed. Further, to meet the latest standards, if anyupgra

  • (l

    t?

    Yorrr attention is also inviteci towards ACS pHE letter .no. 221312011-4PH dated 1:i 01 2A1V encicrseri virie this office letter no 4649-4721lpHED/Urbandated 1B 01 2017 wherein duties of FEs / SDEs / JEs wrth respect to operation &maintenance of wr:rks have been elaborated and Govt has riecided that in case ofoperation & maintenance of S fPs and other works, concerned EE, SDE and JF shallbe deemed to be Head of the department within their jurisdiction. So, it is onceaEain stressed that above instructrons should be brought to the notice of allconcerned and take trnrnediate steps so that olficers do not face any embarrassingsituation

    Executiv gineer (U)For Errgineer-in-Chiffip7