« fiabilisation & industrialization of risk analysis methods » a. mili 1 ; s. hubac 1 ; s....

1
« FIABILISATION & INDUSTRIALIZATION OF RISK ANALYSIS METHODS » A. MILI 1 ; S. HUBAC 1 ; S. BASSETTO 2 [email protected] ; [email protected] ; [email protected] 1 STMicroelectronics – 850 rue Jean Monnet, 38926 Crolles Cedex. 2 Laboratoire des Sciences pour la Conception, l'Optimisation et la Production - ENSGI-INPG, 46 Avenue Félix Viallet, 38000 Grenoble. We are at early phase of deployment. The futur model for risk management is complete. It consist of capitalizing in a data base the information concerning breakdowns and the risk analysis data in the objective of facilitating their exploitation. We have chosen a pilot workshop to start deployement and test the level of data transfert from CMMS data base to risk management system. We search after the test period to duplicate this I- Introduction Context: - Very important equipment cost - Wafer production costs - Variability of scrap number per month Continuous control and tool improvement to achieve the objectives in term of quality and due dates. Using powerful means of control and monitoring in real times and standard methods of risk analysis management (FMEA – Failure Mode and Effects Analysis, 8D…) Objectives: - Minimizing tool variability and remove accidental breakdowns - Deployement of the risk analysis method (FMEA) within Crolles2 alliance - Initiating a system for automatic risk analyses update according to events related to the process control in line. II- FMEA Management The aim of this study consist on setting up a risk management system within Crolles2 Alliance. Based on a standard method (FMEA), it was applied on three levels: products (FMEA Recipe), processes (FMEA Module) and equipment (FMEA Block Hardware). model for all workshops and the goal is to have a standart method for all. In second step, we aim to update our risk data base with informations of defects on product, client reclaim and all data at the origin of real or imminent risk. This new method allow us to quantify the benefit of risk analysis method on process. It symplifies also the control of the actions through reports generated automatically from database. V- Conclusion Use of FDC parameters: We propose to establish the link between FDC variables and the risk detection in the FMEA to set up a function g which allows starting from the whole variables of the machine (V = {V1, V2,… Vn}), the fulfilled function (F) and the risk (R), to determine the subset of potential parameters (X) at the origin of the dysfunction. III- APPROACH - Define the priority of actions axes - Use equipment events to define real or emminent risk - Standardise the language of the three parts: FMEA, maintenance interventions and FDC- Fault Detection and Control. A prototype application was developed allowing the automatic re-evaluation of the risks analyses according to the machines breakdowns . The coding used in the CMMS and the FMEA being very similar, the automatic translation could be carried out. The test of this operation during 100 days, shows that 6670 risks were generated, 4923 were identified beforehand. Their occurrences were updated, and 1747 new risks were identified, among which some with evaluation exceeding the threshold of action's release (RPN > 125). -C reationD ate : D ate -O w ner: C har -Title : C har -Type : D ate FM EA -Item Function -FailureM ode -SEV R isk C ontrolPlan A ction C ontrolprevention C ontroldetection Effect C ause V ariable 1 * C om posed by * * H ave * * H ave 1 * C om posed by 1 * C om posed by 1 * C om posed by * * associe * * associe RPN & conditions.. * * Preventive A ction C orrective A ction is an is an FM EA _BH FM EA _R ecipe FM EA_M odule is an is an is an O w ner * 1..* Update 1..* * control 1..* * C reate Fig 2. Risk management model Fig 1. Scrap evolution UNSHEDULED DOWN Maintenance LITHO REPORT ( PARETO OF FAILURE) ENG. REPORT CMMS FMEA Report (FMEA BH) Incoherent data with FMEA Formalism Inalienable information in risk analysis Fig 3. Maintenance data and FMEA Block Hardware Fig 4. Link between CMMS date and FMEA analyses Process Tool (F) X = g (F, V, R) Silver Box V = {V 1 , V 2 , …, V n } Fig 5. Control parameters 1 2 3 4 5 6 7 8 9 10 11 12 Scrap O ut Scrap rate (% )

Upload: charity-dawson

Post on 08-Jan-2018

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: « FIABILISATION & INDUSTRIALIZATION OF RISK ANALYSIS METHODS » A. MILI 1 ; S. HUBAC 1 ; S. BASSETTO 2 ; ;

« FIABILISATION & INDUSTRIALIZATION OF RISK ANALYSIS METHODS »

A. MILI1 ; S. HUBAC1 ; S. BASSETTO2

[email protected] ; [email protected] ; [email protected] STMicroelectronics – 850 rue Jean Monnet, 38926 Crolles Cedex.

2 Laboratoire des Sciences pour la Conception, l'Optimisation et la Production - ENSGI-INPG, 46 Avenue Félix Viallet, 38000 Grenoble.

We are at early phase of deployment. The futur model for risk management is complete. It consist of capitalizing in a data base the information concerning breakdowns and the risk analysis data in the objective of facilitating their exploitation. We have chosen a pilot workshop to start deployement and test the level of data transfert from CMMS data base to risk management system. We search after the test period to duplicate this …

I- IntroductionContext:

- Very important equipment cost - Wafer production costs- Variability of scrap number per month Continuous control and tool improvement to achieve the objectives in term of quality and due dates. Using powerful means of control and monitoring in real times and standard methods of risk analysis management (FMEA – Failure Mode and Effects Analysis, 8D…)

Objectives:- Minimizing tool variability and remove accidental breakdowns- Deployement of the risk analysis method (FMEA) within Crolles2 alliance- Initiating a system for automatic risk analyses update according to events related to the process control in line.

II- FMEA Management

The aim of this study consist on setting up a risk management system within Crolles2 Alliance. Based on a standard method (FMEA), it was applied on three levels: products (FMEA Recipe), processes (FMEA Module) and equipment (FMEA Block Hardware).

model for all workshops and the goal is to have a standart method for all. In second step, we aim to update our risk data base with informations of defects on product, client reclaim and all data at the origin of real or imminent risk. This new method allow us to quantify the benefit of risk analysis method on process. It symplifies also the control of the actions through reports generated automatically from database.

V- Conclusion

Use of FDC parameters:We propose to establish the link between FDC variables and the risk detection in the FMEA to set up a function g which allows starting from the whole variables of the machine (V = {V1, V2,… Vn}), the fulfilled function (F) and the risk (R), to determine the subset of potential parameters (X) at the origin of the dysfunction.

III- APPROACH

- Define the priority of actions axes- Use equipment events to define real or emminent risk- Standardise the language of the three parts: FMEA, maintenance interventions and FDC- Fault Detection and Control.

A prototype application was developed allowing the automatic re-evaluation of the risks analyses according to the machines breakdowns . The coding used in the CMMS and the FMEA being very similar, the automatic translation could be carried out. The test of this operation during 100 days, shows that 6670 risks were generated, 4923 were identified beforehand. Their occurrences were updated, and 1747 new risks were identified, among which some with evaluation exceeding the threshold of action's release (RPN > 125).

-CreationDate : Date-Owner : Char-Title : Char-Type : Date

FMEA

-ItemFunction-FailureMode-SEV

Risk

Control Plan

Action

Control preventionControl detection

EffectCause

Variable

1*

Composed by

* *

Have

* *

Have

1

*

Composed by

1

*

Composed by

1

*

Composed by

**

associe

*

*

associe

RPN & conditions..

*

*

Preventive Action Corrective Action

is an

is an

FMEA_BH

FMEA_Recipe

FMEA_Module

is an

is an

is an

Owner

*

1..*

Update

1..*

*

control

1..*

*

Create

Fig 2. Risk management modelFig 1. Scrap evolution

UNSHEDULED DOWN

Maintenance LITHO

REPORT( PARETO OF FAILURE) ENG. REPORT

CMMS

FMEA Report(FMEA BH)Incoherent

data with FMEA Formalism

Inalienable information in risk analysis

Fig 3. Maintenance data and FMEA Block Hardware

Fig 4. Link between CMMS date and FMEA analyses

Process Tool(F)

X = g (F, V, R)Silver Box

V = {V1, V2, …, Vn}

Fig 5. Control parameters

1 2 3 4 5 6 7 8 9 10 11 12

ScrapOutScrap rate (%)