reply...government for road widening hence no noc from nh-58 is required. storm water plan is...

2

Upload: others

Post on 07-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Reply...government for road widening hence no NOC from NH-58 is required. storm water plan is attached as Annexure 3. Plan is herewith attached As Annexure 4 and discharge permission
Page 2: Reply...government for road widening hence no NOC from NH-58 is required. storm water plan is attached as Annexure 3. Plan is herewith attached As Annexure 4 and discharge permission