February File: 1214 Sydney T 1 Inglis St PO Box 1 Sydney, N Attention Dear Ms. Referenc At the req as the Ind inspection mentioned Projec Projec Febru Projec Projec the m Projec report Projec were Summ We trust t hesitate to Sincerely, STANTEC Rabi Morel Geotech/M rabi.morelly v:\1214\active\12 8, 2012 410955.215 ar Ponds Age treet 028, Stn. A NS B1P 6J7 n: Ms. Di Ingraham: ce: STPA IQAC quest of Sydne dependent Qu n/testing serv d project elem ct Item PM-01 ct Item PM-03 uary 2012. ct Item PM-04 ct Item PM-05 month of Octob ct Item QCP-0 ts). ct Item Env-T within the spe mary Table” in this informatio o contact us. , C CONSULTI lly, M.Sc., P.En Materials Quality y@stantec.com 21410xxx\121410955 Stantec Consu 207-201 Churc Membertou NS Tel: (902) 564- Fax: (902) 564- ency iane Ingraha Project Elem – October 20 ey Tar Ponds uality Assuran ices and mee ment between 1: One daily f 3: One month 4: Two progre 5: Other meet ber 2011. 02: Submittal T-01: One nois ecified limits a n this report fo on meets you ING LTD ng. y Lead m -stpa combined eleme ulting Ltd chill Drive S B1S 0H1 -1855 -8756 am, PhD., PM ment TP7 – N 011 Monthly s Agency (ST nce Consultan etings in acco n October 1 a field report. hly report (Oct ess meetings tings and freq reviews (Oct se monitoring at 2 of the 3 s or more inform r present req ents\215 tp7\300 repor MP, Quality C North & Sout Summary Re PA), Stantec nt (IQAC) has rdance with t nd October 3 tober 2011) c were attende quent opinion tober 2011 Q g event compl sampling loca mation. uirements. If rting\qa reports\tp7 oc ontracts Ma h Tar Ponds eport Consulting L s completed th he project req 1, 2011: completed by ed by Stantec s and emails QC monthly/da leted on Octo ations; see “M you have any W P w ctober 2011 monthly q nager s Surface Cap td. (hereafter he following q quirements at Stantec in th c on October were provide aily and testin ober 18, 2011 Monthly Noise y questions, p Willie McNeil, B Project Manage willie.mcneil@s a report_rm_tm.docx p r Stantec) acti quality assura t the above e month of 13 and 27, 20 ed by Stantec ng/inspection . Noise levels QA Testing please do not B.Tech. (Env.), er stantec.com ing ance 011. c in s CET

Upload: others

Post on 17-Jun-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

February File: 1214

Sydney T1 Inglis StPO Box 1Sydney, N

Attention

Dear Ms.

Referenc

At the reqas the Indinspectionmentioned

• Projec• Projec

Febru• Projec• Projec

the m• Projec

report• Projec

were Summ

We trust thesitate to

Sincerely,

STANTEC

Rabi MorelGeotech/Mrabi.morelly

v:\1214\active\12

8, 2012 410955.215

ar Ponds Agetreet 028, Stn. A

NS B1P 6J7

n: Ms. Di

Ingraham:

ce: STPA IQAC

quest of Sydnedependent Qun/testing servd project elem

ct Item PM-01ct Item PM-03uary 2012. ct Item PM-04ct Item PM-05

month of Octobct Item QCP-0ts). ct Item Env-Twithin the spe

mary Table” in

this informatioo contact us.

,

C CONSULTI

lly, M.Sc., P.EnMaterials Quality

[email protected]

21410xxx\121410955

Stantec Consu207-201 ChurcMembertou NSTel: (902) 564-Fax: (902) 564-

ency

iane Ingraha

Project Elem– October 20

ey Tar Pondsuality Assuranices and mee

ment between

1: One daily f3: One month

4: Two progre5: Other meetber 2011. 02: Submittal

T-01: One noisecified limits an this report fo

on meets you

ING LTD

ng. y Lead m

-stpa combined eleme

ulting Ltd chill Drive S B1S 0H1 -1855 -8756

am, PhD., PM

ment TP7 – N011 Monthly

s Agency (STnce Consultanetings in accon October 1 a

field report. hly report (Oct

ess meetingstings and freq

reviews (Oct

se monitoringat 2 of the 3 sor more inform

r present req

ents\215 tp7\300 repor

MP, Quality C

North & SoutSummary Re

PA), Stantec nt (IQAC) hasrdance with tnd October 3

tober 2011) c

were attendequent opinion

tober 2011 Q

g event complsampling locamation.

uirements. If

rting\qa reports\tp7 oc

ontracts Ma

h Tar Pondseport

Consulting Ls completed thhe project req1, 2011:

completed by

ed by Stantecs and emails

QC monthly/da

leted on Octoations; see “M

you have any

W P w

ctober 2011 monthly q

nager

s Surface Cap

td. (hereafterhe following qquirements at

Stantec in th

c on October were provide

aily and testin

ober 18, 2011Monthly Noise

y questions, p

Willie McNeil, BProject Managewillie.mcneil@s

a report_rm_tm.docx

p

r Stantec) actiquality assurat the above

e month of

13 and 27, 20ed by Stantec

ng/inspection

. Noise levelsQA Testing

please do not

B.Tech. (Env.), er stantec.com

ing ance

011. c in

s

CET

Page 2: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

Stantec Consulting Ltd207-201 Churchill Drive

Membertou, NS B1S 0H1Ph: (902) 564-1855Fx: (902) 564-8756

CLIENT: Sydney Tar Ponds Agency STANTEC PROJECT No: 121410955

PROJECT TITLE: Element TP 7 DATE: August 31, 2011

SAMPLE DESCRIPTION: Low Permeable Fill SAMPLE No.: TP7-SAB

INITIAL SAMPLE DATA FINAL SAMPLE DATA Length (cm) 8.93 Length (cm) 8.93 Diameter (cm) 6.91 Diameter (cm) 6.91 Area (cm ²) 37.50 Area (cm ²) 37.50 Total Mass (g) 750.5 Total Mass (g) 755.9 Volume (cm³) 334.9 Volume (cm³) 334.9 Water Content (%) 12.0 Water Content (%) 12.3 Degree of Saturation (%) 98.1 Degree of Saturation (%) 102.8 Wet Density (g/cm³) 2.241 Wet Density (g/cm³) 2.257 Dry Density(g/cm³) 2.002 Dry Density(g/cm³) 2.009 Assumed Specific Gravity 2.65

CONSOLIDATION PHASE HYDRAULIC CONDUCTIVITY PHASE Cell Pressure(kPa) 380 Cell Pressure (kPa) 420 Top Cap Pressure(kPa) 360 Top Cap Pressure (kPa) 370 Bottom Cap Pressure(kPa) 360 Bottom Cap Pressure(kPa) 390 Consolidation Pressure(kPa) 20 Hydraulic Gradient 22.8

Comments:

Note: Section 31 22 16 of the Project Specifications requires a maximum Hydraulic Conductivity of 1x10 -7 cm/s.

Date: 8-Sep-11

Date: 8-Sep-11

Tested By: Blair MacVicar, B.Tech

Checked By: Rabi Morelly, M.Sc., P.Eng.

FLEXIBLE WALL HYDRAULIC CONDUCTIVITY TEST REPORT(ASTM D5084-03 Modified)

Test specimen met the specified maximum Hydraulic Conductivity.

cm/s2.90E-08HYDRAULIC CONDUCTIVITY=

0.00

0.50

1.00

1.50

2.00

2.50

0 500 1000 1500 2000

Cum

ulat

ive

Flow

(ml)

Elapsed Time (min.)

Flow During Testing

Cumulative Flow In

Cumulative Flow Out

1.0E-09

1.0E-08

1.0E-07

1.0E-06

1.0E-05

0 500 1000 1500 2000

Hyd

raul

ic C

ondu

ctiv

ity, k

(cm

/s)

Elapsed time (min.)

Hydraulic Conductivity During Testing

Page 3: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

CLIENT: PROJECT:

PROCTOR TYPE STD 2092 7.2 %

4‐Aug‐2011 1 Grade 2133.0 5.2 102.0 X 200

2 Grade 2120.0 5.8 101.3 X 200

3 Grade 1987.0 6.7 95.0 X 200

4 Grade 2117.0 6.3 101.2 X 200

5 Grade 2123.0 6.5 101.5 X 200

6 Grade 2073.0 6.8 99.1 X 200

7 3rd Lift 2075 9.6 99.2 X 200

8 3rd Lift 2126 10.1 101.6 X 200

9 3rd Lift 2126 9.3 101.6 X 200

REVIEWED BY: Rabi Morelly, M.Sc., P.Eng. DATE:

FIELD TECHNICIAN: DATE:

207-201 Churchill DriveMembertou, NS B1S 1H0Ph: (902) 564-1855Fx: (902) 564-8755

SOILS COMPACTION REPORT SHEET

Sydney Tar Ponds Agency Element TP7 - North and South Tar Ponds Surface Cap PROJECT NO: 121410955.215-500

MATERIAL AND PROCTOR DATA

COMPACTION SPECIFICATION 95% Minimum MATERIAL TYPE Cohesive Backfill - Protective Fill (P/F) SAMPLED FROM Beechmont Quarry

REMARKS

MAX. DRY DENSITY (kg/m3) OPTIMUM MOISTURE GAUGE SERIAL # 16731

FIELD TEST DATA

DATE TEST    NO.TEST LOCATIONS

(GPS Coordinates/ ATS‐77 System)(Northing, Easting)

APPROX. ELEV. DRY

DENSITY(kg/m3)

MOISTURECONTENT 

(%)

COMPACTION(%)

PASS FAILPROBE DEPTH(mm)

5112538, 4601214

The measured percent compactions met the requirements of the project specifications  (Minimum 95%).

5112517, 4601199

5112531, 4601205

5112602, 4601451

5112640, 4601443

5112629, 4601372

5112589, 4601369

5112517, 4601384

5112456, 4601419

Total approval of a fill project requires continuous inspection and a brief report written by a geotechnical engineer. Note: A compaction test only provides data for the specific test location and to a depth of up to 300 mm below the surface at the time of the test.

4-Aug-11

Derek Corbett RESULTS REPORTED ON SITE TO: Not Applicable 4-Aug-2011

Page 4: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

CLIENT: PROJECT:

PROCTOR TYPE STD 2092 7.2 %

18‐Aug‐2011 1 2nd Lift 2000.0 9.5 95.6 X 200

2 2nd Lift 2003.0 10.5 95.7 X 200

3 2nd Lift 2012.0 9.8 96.2 X 200

REVIEWED BY: Rabi Morelly, M.Sc., P.Eng. DATE:

FIELD TECHNICIAN: DATE:

207-201 Churchill DriveMembertou, NS B1S 1H0Ph: (902) 564-1855Fx: (902) 564-8755

SOILS COMPACTION REPORT SHEET

Sydney Tar Ponds Agency Element TP7 - North and South Tar Ponds Surface Cap PROJECT NO: 121410955.215-500

MATERIAL AND PROCTOR DATA

COMPACTION SPECIFICATION 95% Minimum MATERIAL TYPE Cohesive Backfill - Grading and Bedding (G/B) SAMPLED FROM Peter's Pit/Beechmont

REMARKS

MAX. DRY DENSITY (kg/m3) OPTIMUM MOISTURE GAUGE SERIAL # 29763

FIELD TEST DATA

DATE TEST    NO.TEST LOCATIONS

(GPS Coordinates/ ATS‐77 System)(Northing, Easting)

APPROX. ELEV. DRY

DENSITY(kg/m3)

MOISTURECONTENT 

(%)

COMPACTION(%)

PASS FAILPROBE DEPTH(mm)

5112697, 4601030

5112674, 4601043

5112704, 4601023

Derek Corbett RESULTS REPORTED ON SITE TO: Not Applicable 18-Aug-2011

The measured percent compactions met the requirements of the project specifications  (Minimum 95%).

Note: A compaction test only provides data for the specific test location and to a depth of up to 300 mm below the surface at the time of the test. Total approval of a fill project requires continuous inspection and a brief report written by a geotechnical engineer.

18-Aug-11

Page 5: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

CLIENT: PROJECT:

PROCTOR TYPE STD 2092 7.2 %

30‐Aug‐2011 1 8th Lift 1994.0 8.9 95.3 X 200

2 8th Lift 2006.0 8.0 95.9 X 200

3 8th Lift 2002.0 9.8 95.7 X 200

REVIEWED BY: Rabi Morelly, M.Sc., P.Eng. DATE:

FIELD TECHNICIAN: DATE:

207-201 Churchill DriveMembertou, NS B1S 1H0Ph: (902) 564-1855Fx: (902) 564-8755

SOILS COMPACTION REPORT SHEET

Sydney Tar Ponds Agency Element TP7 - North and South Tar Ponds Surface Cap PROJECT NO: 121410955.215-500

MATERIAL AND PROCTOR DATA

COMPACTION SPECIFICATION 95% Minimum MATERIAL TYPE Cohesive Backfill - Low Permeable Fill (L/P) SAMPLED FROM Peter's Pit/Beechmont

REMARKS

MAX. DRY DENSITY (kg/m3) OPTIMUM MOISTURE GAUGE SERIAL # 14630

FIELD TEST DATA

DATE TEST    NO.TEST LOCATIONS

(GPS Coordinates/ ATS‐77 System)(Northing, Easting)

APPROX. ELEV. DRY

DENSITY(kg/m3)

MOISTURECONTENT 

(%)

COMPACTION(%)

PASS FAILPROBE DEPTH(mm)

5112585, 4601148 The measured percent compactions met the requirements of the project specifications  (Minimum 95%).

5112590, 4601161

5112600, 4601171

Derek Corbett RESULTS REPORTED ON SITE TO: Not Applicable 30-Aug-2011

Note: A compaction test only provides data for the specific test location and to a depth of up to 300 mm below the surface at the time of the test. Total approval of a fill project requires continuous inspection and a brief report written by a geotechnical engineer.

30-Aug-11

Page 6: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

CLIENT: PROJECT:

PROCTOR TYPE STD 2092 7.2 %

31‐Aug‐2011 1 Top Lift 2000.0 8.0 95.6 X 200

2 Top Lift 1991.0 10.3 95.2 X 200

3 Top Lift 1993.0 8.9 95.3 X 200

REVIEWED BY: Rabi Morelly, M.Sc., P.Eng. DATE:

FIELD TECHNICIAN: DATE:

207-201 Churchill DriveMembertou, NS B1S 1H0Ph: (902) 564-1855Fx: (902) 564-8755

SOILS COMPACTION REPORT SHEET

Sydney Tar Ponds Agency Element TP7 - North and South Tar Ponds Surface Cap PROJECT NO: 121410955.215-500

MATERIAL AND PROCTOR DATA

COMPACTION SPECIFICATION 95% Minimum MATERIAL TYPE Cohesive Backfill - Low Permeable Fill (L/P) SAMPLED FROM Peter's Pit/Beechmont

REMARKS

MAX. DRY DENSITY (kg/m3) OPTIMUM MOISTURE GAUGE SERIAL # 29763

FIELD TEST DATA

DATE TEST    NO.TEST LOCATIONS

(GPS Coordinates/ ATS‐77 System)(Northing, Easting)

APPROX. ELEV. DRY

DENSITY(kg/m3)

MOISTURECONTENT 

(%)

COMPACTION(%)

PASS FAILPROBE DEPTH(mm)

5112599, 4601171 The measured percent compactions met the requirements of the project specifications  (Minimum 95%).

5112594, 4601162

5112606, 4601180

Derek Corbett RESULTS REPORTED ON SITE TO: Not Applicable 31-Aug-2011

Note: A compaction test only provides data for the specific test location and to a depth of up to 300 mm below the surface at the time of the test. Total approval of a fill project requires continuous inspection and a brief report written by a geotechnical engineer.

31-Aug-11

Page 7: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

CLIENT: PROJECT:

PROCTOR TYP 10 %

13‐Sep‐2011 1 2041.0 7.4 96.8 X 2002 2063.0 8.0 97.9 X 2003 2021.0 8.6 95.9 X 200

REVIEWED BY: Rabi Morelly, M.Sc., P.Eng. DATE:

FIELD TECHNICIAN: Derek Corbett Not Applicable DATE:

207-201 Churchill DriveMembertou, NS B1S 0H1Ph: (902) 564-1855Fx: (902) 564-8755

SOILS COMPACTION REPORT SHEET

Sydney Tar Ponds Agency Element TP7 - North and South Tar Ponds Surface Cap PROJECT NO: 121410955.215

16731

MATERIAL AND PROCTOR DATA

COMPACTION SPECIFICATION 95% MATERIAL TYPE Cohesive Backfill SAMPLED FROM Beechmont Quarry

STD MAX. DRY DENSITY 2108 OPTIMUM MOISTURE GAUGE SERIAL #

FIELD TEST DATA

DATETEST NO.

TEST LOCATIONS

(ATS77 Coordinate)Easting ‐ Northing

APPROX. ELEV. 

DRY DENSITY (kg/m3)

MOISTURE CONTENT      

(%)

PERCENT PROCTOR    

(%)PASS FAIL

PROBE DEPTH

REMARKS

13-Sep-11

GradeL/P

RESULTS REPORTED ON SITE TO: 13-Sep-2011

Note: A compaction test only provides data for the specific test location and to a depth of up to 300 mm below the surface at the time of the test. Total approval of a fill project requires continuous inspection and a brief report written by a geotechnical engineer.

5112438, 46012175112402, 46012325112322, 4601250

The measured percent compactions met the requirements of the project specifications  (Minimum 95%). However, the measured moisture contents were below the specified expected moisture content limits.  

Page 8: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

CLIENT: PROJECT:

PROCTOR TYP 7.2 %

23‐Sep‐2011 1 2068.0 8.9 98.9 X 2002 2015.0 9.6 96.3 X 2003 2057.0 7.9 98.3 X 2004 2058.0 9.3 98.4 X 2005 2035.0 9.0 97.3 X 2006 2047.0 9.3 97.8 X 200

1 2019.0 7.5 96.5 X 2002 2022.0 8.1 96.7 X 2003 2068.0 8.8 98.9 X 200

REVIEWED BY: Rabi Morelly, M.Sc., P.Eng. DATE: 23-Sep-11

FIELD TECHNICIAN: Derek Corbett Not Applicable DATE:RESULTS REPORTED ON SITE TO: 23-Sep-2011

Note: A compaction test only provides data for the specific test location and to a depth of up to 300 mm below the surface at the time of the test. Total approval of a fill project requires continuous inspection and a brief report written by a geotechnical engineer.

Phase II BERM ‐ 5112776, 4600968Phase II BERM ‐ 5112785, 4600955Phase II BERM ‐ 5112756, 4600944

The measured percent compactions met the requirements of the project specifications  (Minimum 95%). However, few measured moisture contents were below the specified expected moisture content limits.  

Grade G/B

Grade L/P

Phase II BERM ‐ 5112726, 4601020Phase II BERM ‐ 5112739, 4601018

Receiving Pit ‐ 5112598, 4601117Receiving Pit ‐ 5112605, 4601115

Phase II BERM ‐ 5112747, 4601018

Receiving Pit ‐ 5112585, 4601129

FIELD TEST DATA

DATETEST NO.

TEST LOCATIONS

(ATS77 Coordinate)Easting ‐ Northing

APPROX. ELEV. 

DRY DENSITY (kg/m3)

MOISTURE CONTENT      

(%)

PERCENT PROCTOR     

(%)PASS FAIL

PROBE DEPTH

REMARKS

29763

MATERIAL AND PROCTOR DATA

COMPACTION SPECIFICATION 95% MATERIAL TYPE Cohesive Backfill SAMPLED FROM Beechmont Drive

STD MAX. DRY DENSITY 2092 OPTIMUM MOISTURE GAUGE SERIAL #

207-201 Churchill DriveMembertou, NS B1S 0H1Ph: (902) 564-1855Fx: (902) 564-8755

SOILS COMPACTION REPORT SHEET

Sydney Tar Ponds Agency Element TP7 - North and South Tar Ponds Surface Cap PROJECT NO: 121410955.215

Page 9: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

CLIENT: PROJECT:

PROCTOR TYP 7.2 %

29‐Sep‐2011 1 1990.0 6.2 95.1 X 2002 2001.0 7.5 95.7 X 2003 2115.0 6.3 101.1 X 200

REVIEWED BY: Rabi Morelly, M.Sc., P.Eng. DATE: 29-Sep-11

FIELD TECHNICIAN: Derek Corbett Not Applicable DATE:

207-201 Churchill DriveMembertou, NS B1S 0H1Ph: (902) 564-1855Fx: (902) 564-8755

SOILS COMPACTION REPORT SHEET

Sydney Tar Ponds Agency Element TP7 - North and South Tar Ponds Surface Cap PROJECT NO: 121410955.215

29763

MATERIAL AND PROCTOR DATA

COMPACTION SPECIFICATION 95% MATERIAL TYPE Cohesive Backfill SAMPLED FROM Frenchvale and Beechmont

STD MAX. DRY DENSITY 2092 OPTIMUM MOISTURE GAUGE SERIAL #

FIELD TEST DATA

DATETEST NO.

TEST LOCATIONS

(ATS77 Coordinate)Easting ‐ Northing

APPROX. ELEV. 

DRY DENSITY (kg/m3)

MOISTURE CONTENT      

(%)

PERCENT PROCTOR     

(%)PASS FAIL

PROBE DEPTH

REMARKS

The measured percent compactions met the requirements of the project specifications  (Minimum 95%). However, the measured moisture contents were below the specified expected moisture content limits.  

5112468, 46013465112505, 46013575112571, 4601384

GradeP/F

RESULTS REPORTED ON SITE TO: 29-Sep-2011

Note: A compaction test only provides data for the specific test location and to a depth of up to 300 mm below the surface at the time of the test. Total approval of a fill project requires continuous inspection and a brief report written by a geotechnical engineer.

Page 10: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

Contractor: HAZCO Client: STPA Form Number: TP7 Noise October 2011Element: TP7 Oversight: AECOM/CBCL Project: Remediation of the Tar Ponds and Coke Ovens SitesMonth: OCTOBER 2011 IQAC: Stantec

NOTES

EPP ENV-T-01 NoiseCBRM Noise By-

Law & NSE Criteria

once per month 18-Oct-11 <65 dBA TP7-10-18-2011-0820-1023 460 1068511 2966 58.9dBA Pass Y

Sample location is at East Side Hill Top. Hazco dozing/levelling material for construction of new road/culvert. Nordleys added

activities below hill.

EPP ENV-T-01 NoiseCBRM Noise By-

Law & NSE Criteria

once per month 18-Oct-11 <65 dBA TP7-10-18-2011-1030-1236 460 1498511 2789 60.8dBA Pass Y Sample location is at East Gate Entrance off Inglis. Trucks

entering on/off site.

EPP ENV-T-01 NoiseCBRM Noise By-

Law & NSE Criteria

once per month 18-Oct-11 <65 dBA TP7-10-18-2011-1246-1448 460 0741511 3017 66.5dBA Fail Y

Sample location is at West Side at Narrows (Lay down area). Trailers (Contractors trucks) using lay down area for large

radius turning (<5m away)Activities onsite at the time of the sampling events included dozing/levelling material for new road/culvert install, trucks entering on/off site, trailers using lay down area for large radius turning.

Sample LocationGPS Coordinates

NAD 83

SPECIFIED REQUIREMENTS

Date CollectedQA Frequency Spec

Section Standard QAQA Pass/Fail

Monthly Noise QA Testing Summary Table

RESULTS

Spec Description Test Type QA Frequency

Met? Y/NQA Test ResultQA Sample ID Criteria

October TP7 NOISE.xls Page 1 of 1

Page 11: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

Stantec Consulting Ltd 207-201 Churchill Drive Membertou, NS B1S 0H1 Tel: (902) 564-1855 Fax: (902) 564-8756

February 7, 2012 File: 121410955.215

Sydney Tar Ponds Agency 1 Inglis Street PO Box 1028, Stn. A Sydney, NS B1P 6J7

Attention: Ms. Diane Ingraham, Ph.D., PMP, Quality Contract Manager

Dear: Ms. Ingraham

Reference: Geotechnical/Materials Quality Assurance of Quality Control Program

Element TP7, Sydney Tar Ponds Project, Sydney, NS

Review of Contractor’s October 2011 Quality Control (QC) Report

At the request of the Sydney Tar Ponds Agency (STPA), Stantec Consulting Ltd. (hereafter Stantec), acting

as the project Independent Quality Assurance Consultant (IQAC), has completed a Quality Assurance Review

of the Contractor’s (HAZCO) and their quality control consultant (exp Global Inc)) Monthly Quality Control

(QC) Report for the month of October 2011 for project Element TP7.

Comments are prepared using a three tier system as requested by the STPA:

Level 1 - Critical comments which need to be addressed promptly. The IQAC requests responses on

any critical comments within one week.

Level 2 - Comments for which a response is required. All comments for which a response is required

should be responded to in the form of a written response or by providing the necessary information as

requested.

Level 3 - Comments that would improve the quality of the work but for which the agency need not

respond to.

Based on our review of the QC information provided from the referenced period, the IQAC offers the following

comments for your considerations:

Level 2

Despite the fact that all compactions performed in October 2011 on the placed cohesive backfill soil exceeded the specified 95% minimum compaction criteria, nearly 50% of the associated moisture contents were below the specified expected moisture content limits.

Level 2 Low permeable fill samples P2B‐SA#1 (air dried) and P2B‐SA#1 (oven dried) did not meet the specified gradation requirements of the 4.75 mm sieve.

Level 2 Topsoil samples #1 to #8 did not meet the specified gradation requirements of the 5 mm sieve.

Page 12: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

February 7, 2012

Ms. Diane Ingraham, Ph.D., PMP, Quality Contract Manager

Page 2 of 2

Reference: Geotechnical/Materials Quality Assurance of Quality Control Program

Element TP7 Sydney Tar Ponds Project, Sydney, NS

Review of Contractor’s October 2011 Quality Control (QC) Report

Level 2 Topsoil samples #4 and #6 did not meet the specified gradation requirements of the 0.075 mm sieve.

Level 2 Topsoil samples #2, #3, #4, #5, #7 and #8 did not meet the specified requirements of the organic material content limits.

Level 3 All reports should be signed by the applicable QC testing and review personnel, with names clearly printed, and dated once they are completed and reviewed.

This report covers the quality control aspects for both the geotechnical and materials portions of the project.

We trust this information meets your present needs. If you have any questions, or if we can be of further

assistance, please do not hesitate to contact us at your convenience.

Sincerely,

STANTEC CONSULTING LTD

Rabi Morelly, M.Sc., P.Eng. Willie McNeil, B.Tech. (Env.), CET Geotech/Materials Quality Lead Project Manager [email protected] [email protected]

\\cd1177-f02\workgroup\1214\active\121410xxx\121410955-stpa combined elements\215 tp7\400 reviews\geo iqac - qc review\mat -geo iqac - qc review - tp7 (october 2011)

rm.docx

Page 13: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

Stantec Consulting Ltd. 207-201 Churchill Drive Membertou, NS B1S 0H1 Tel: (902) 564-1855 Fax: (902) 564-8756

February 9, 2012 File: 121410955.215

Sydney Tar Ponds Agency 1 Inglis Street PO Box 1028, Stn. A Sydney, NS B1P 6J7

Attention: Ms. Diane Ingraham, Ph.D., PMP, Quality Contract Manager

Dear: Ms. Ingraham

Reference: Environmental Quality Assurance of Quality Control Program Element TP7, Sydney Tar Ponds Project, Sydney, NS Review of Contractor’s October 2011 Quality Control (QC) Report

At the request of the Sydney Tar Ponds Agency (STPA), Stantec Consulting Limited (Stantec), acting as the

project Independent Quality Assurance Consultant (IQAC), has completed a Quality Assurance Review of the

Contractor’s (Hazco and their quality control consultant (exp. Global Inc.), Monthly Quality Control (QC)

Report for the month of October 2011 for project element TP7.

Comments are prepared using a three tier system as requested by the STPA:

Level 1 - Critical comments which need to be addressed promptly. The IQAC requests responses on

any critical comments within one week.

Level 2 - Comments for which a response is required. All comments for which a response is required

should be responded to in the form of a written response or by providing the necessary information as

requested.

Level 3 - Comments that would improve the quality of the work but for which the agency need not

respond to.

Based on our review of the QC information provided from the referenced period, the IQAC offers the following

comments for your consideration:

Level 3

Environmental Inspection Logs (EILs) - Appendix F

Page 2 of 2 for each set (730, 1130, 1530) on Oct. 13, 2011 is dated as October 12.

Page 14: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

February 8, 2012

Ms. Diane Ingraham, Ph.D., PMP, Quality Contract Manager

Page 2 of 2

Reference: Environmental Quality Assurance of Quality Control Program

Element TP7 Sydney Tar Ponds Project, Sydney, NS

Review of Contractor’s October 2011 Quality Control (QC) Report

We trust this information meets your present needs. If you have any questions, or if we can be of further

assistance, please do not hesitate to contact us at your convenience.

Sincerely,

STANTEC CONSULTING LTD

Tanya MacDonald, B.Tech.(Env.), AScT William McNeil, B.Tech.(Env.),CET Project Environmental Manager Project Manager Tel: (902) 564-1855 Tel: (902) 564-1855 Fax: (902) 564-8756 Fax: (902) 564-8756 [email protected] [email protected]

v:\1214\active\121410xxx\121410955-stpa combined elements\215 tp7\400 reviews\environmental reviews\tp7 2011 10 env iqac qc

review.docx

Page 15: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

Contractor: HAZCO Client: STPA Quality Control (QC) and Quality Assurance (QA) Environmental Testing Summary Table Element: TP 7 Oversight: AECOM/CBCL

IQAC: Stantec

WeeklyMonthly From:

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 27-Sep-11 Noise-TP7-Inglis St access gate - 27 Sept 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

58.3 Leq (dBA) Pass Y

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 27-Sep-11 Noise-TP7-South Pond Look off- 27 Sept 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

52.7 Leq (dBA) Pass Y

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 27-Sep-11 Noise-TP7-NW Corner stockpile - 27 Sept 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

55.0 Leq (dBA) Pass Y

ENV-T-02 Turbidity Monitoring Turbidity sampling with portable turbidity meter EPP Req. No Testing No Testing No Testing 8 NTU above

background No Testing No Testing No TestingNo turbidity monitoring was conducted because HAZCO has not performed any intrusive work in or near waterways during the reporting period.

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 4-Oct-11 Noise-TP7-NW Corner stockpile - 04 Oct 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

54.6 Leq (dBA) Pass Y

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 4-Oct-11 Noise-TP7-Inglis St access gate- 04 Oct 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

56.7 Leq (dBA) Pass Y

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 4-Oct-11 Noise-TP7-Terminal Rd fence line - 04 Oct 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

50.7 Leq (dBA) Pass Y

ENV-T-02 Turbidity Monitoring Turbidity sampling with portable turbidity meter EPP Req. No Testing No Testing No Testing 8 NTU above

background No Testing No Testing No TestingNo turbidity monitoring was conducted because HAZCO has not performed any intrusive work in or near waterways during the reporting period.

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 11-Oct-11 Noise-TP7-West access Rd - 11 Oct 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

53.2 Leq (dBA) Pass Y

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 11-Oct-11 Noise-TP7-Inglis St access gate- 11 Oct 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

54.5 Leq (dBA) Pass Y

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 11-Oct-11 Noise-TP7-Terminal Rd fence line - 11 Oct 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

49.5 Leq (dBA) Pass Y

ENV-T-02 Turbidity Monitoring Turbidity sampling with portable turbidity meter EPP Req. No Testing No Testing No Testing 8 NTU above

background No Testing No Testing No TestingNo turbidity monitoring was conducted because HAZCO has not performed any intrusive work in or near waterways during the reporting period.

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria Once weekly Once Monthly 18-Oct-11 Noise-TP7-Phase II E ramp - 18 Oct 2011 CBRM Bylaw and NSE

Criteria 65 Leq (dBA) 55.9 Leq (dBA) Pass YTP7-10-18-2011-0820-

102318-Oct-11 63.6dBA Pass Y

Based on 2 hour Leq - Side by side with QC. Refer to Monthly Noise QA Testing Summary Table provided in this report for further details.

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria Once weekly Once Monthly 18-Oct-11 Noise-TP7-Phase I scale entrance- 18 Oct 2011 CBRM Bylaw and NSE

Criteria 65 Leq (dBA) 56.6 Leq (dBA) Pass YTP7-10-18-2011-1030-

123618-Oct-11 53.6dBA Pass Y

Based on 2 hour Leq - Side by side with QC. Refer to Monthly Noise QA Testing Summary Table provided in this report for further details.

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria Once weekly Once Monthly 18-Oct-11 Noise-TP7-Phase II Narrows turn around- 18 Oct

2011CBRM Bylaw and NSE Criteria 65 Leq (dBA) 56.2 Leq (dBA) Pass Y

TP7-10-18-2011-1246-

144818-Oct-11 64.3dBA Fail Y

Based on 2 hour Leq - Side by side with QC. Refer to Monthly Noise QA Testing Summary Table provided in this report for further details.

ENV-T-02 Turbidity Monitoring Turbidity sampling with portable turbidity meter EPP Req. No Testing No Testing No Testing 8 NTU above

background No Testing No Testing No TestingNo turbidity monitoring was conducted because HAZCO has not performed any intrusive work in or near waterways during the reporting period.

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 29-Oct-11 Noise-TP7-Phase I scale entrance- 29 Oct 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

63.6 Leq (dBA) Pass Y

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 29-Oct-11 Noise-TP7-Ferry St crossing- 29 Oct 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

52.2 Leq (dBA) Pass Y

ENV-T-01 Noise Montiroing Noise Montiroing with dosimeter or equivalent

CBRM Bylaw and NSE Criteria

Once weekly 29-Oct-11 Noise-TP7- Narrows bridge crossing- 29 Oct 2011 CBRM Bylaw and NSE Criteria 65 Leq (dBA)

52.5 Leq (dBA) Pass Y

ENV-T-02 Turbidity Monitoring Turbidity sampling with portable turbidity meter EPP Req. No Testing No Testing No Testing 8 NTU above

background No Testing No Testing No TestingNo turbidity monitoring was conducted because HAZCO has not performed any intrusive work in or near waterways during the reporting period.

29-Oct-11

29-Oct-11

No Testing

No Testing

Week 2

Spec Description Date QA Result Received

Week 5

29-Oct-11

4-Oct-11

Spec Section

4-Oct-11

27-Sep-11

27-Sep-11

27-Sep-11

Week 1

Form Number: 97918-QAF-073

Note: This summary table shall be submitted with the Contractor's Monthly QC Report only after all revisions are made to the data here contained based on any DE Environmental comments of the information submitted weekly.

Project: Remediation of the Tar Ponds and Coke Ovens Sites

NOTES

Criteria QC Test Result QC Pass/Fail

RESULTS

QA Pass/Fail

SPECIFIED REQUIREMENTS

29-Oct-1125-Sep-11

QC Frequency Met? Y/N

QCDate Collected

QA Frequency Met? Y/N

QA Sample ID QA Frequency Date QC Result Received

Standard QC Frequency QAQA Test Result

Week 4

18-Oct-11

No Testing

4-Oct-11

QC Sample IDTest Type

18-Oct-11

18-Oct-11

No Testing

Week 3

11-Oct-11

11-Oct-11

11-Oct-11

No Testing

TP7 2011-10 QA QC Mthly Env Testing Summary.xlsForm Revision: April 07, 2010, Rev. 0 Page 1 of 1

Page 16: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

Contractor: Hazco Client: STPA

Quality Control (QC) and Quality Assurance (QA) Testing Summary Table Element: TP7 Oversight: AECOM/CBCL

IQAC: Stantec

Weekly

Monthly From: 25-Sep-11 To: 29-Oct-11

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 31-May-11 Perm-PF-1 ≤ 1 x 10-6 cm/sec 4.4E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Atterberg Limits ASTM D698 Every 10 000 m3 21-Jun-11 PF SA#2 Not Specified pending %

For Information

OnlyY

31 22 16 Cohesive Soil BackfillParticle Size

AnalysisASTM D422 Every 10 000 m

3 30-Jun-11 GB-SA#5 (air dried)

100% passing 150 mm

≥ 95% passing 100 mm

≥ 80% passing 4.75 mm

≥ 30% passing 0.075 mm

100% passing 150 mm

100% passing 100 mm

83.8% passing 5 mm

60.9% passing 0.075 mm

% pass Y

31 22 16 Cohesive Soil BackfillParticle Size

AnalysisASTM D422 Every 10 000 m

3 30-Jun-11 GB-SA#5 (oven dried)

100% passing 150 mm

≥ 95% passing 100 mm

≥ 80% passing 4.75 mm

≥ 30% passing 0.075 mm

100% passing 150 mm

100% passing 100 mm

83.2% passing 5 mm

61.7% passing 0.075 mm

% pass Y

31 22 16 Cohesive Soil BackfillStandard

ProctorASTM D698 Every 10 000 m

3 30-Jun-11 GB SA#5 Not Specified 2041 (10.2) kg/m3 (%)

For Information

OnlyY

31 22 16 Cohesive Soil BackfillParticle Size

AnalysisASTM D422 Every 10 000 m

3 30-Jun-11 PF SA#4

100% passing 150 mm

≥ 95% passing 100 mm

≥ 80% passing 4.75 mm

≥ 30% passing 0.075 mm

pending % pending Y

31 22 16 Cohesive Soil Backfill Atterberg Limits ASTM D698 Every 10 000 m3 30-Jun-11 PF SA#4 Not Specified pending %

For Information

OnlyY

31 22 16 Cohesive Soil BackfillStandard

ProctorASTM D698 Every 10 000 m

3 30-Jun-11 PF SA#4 Not Specified 2104 (10.8) kg/m3 (%)

For Information

OnlyY

31 22 16 Cohesive Soil BackfillParticle Size

AnalysisASTM D422 Every 10 000 m

3 5-Jul-11 PF-SA#5

100% passing 150 mm

≥ 95% passing 100 mm

≥ 80% passing 4.75 mm

≥ 30% passing 0.075 mm

pending % pending Y

31 22 16 Cohesive Soil Backfill Atterberg Limits ASTM D698 Every 10 000 m3 5-Jul-11 PF-SA#5 Not Specified pending %

For Information

OnlyY

31 22 16 Cohesive Soil BackfillStandard

ProctorASTM D698 Every 10 000 m

3 5-Jul-11 PF-SA#5 Not Specified 2128 (8.0) kg/m3 (%)

For Information

OnlyY

31 22 16 Cohesive Soil BackfillParticle Size

AnalysisASTM D422 Every 10 000 m

3 7-Jul-11 PF-SA#6

100% passing 150 mm

≥ 95% passing 100 mm

≥ 80% passing 4.75 mm

≥ 30% passing 0.075 mm

pending % pending Y

31 22 16 Cohesive Soil Backfill Atterberg Limits ASTM D698 Every 10 000 m3 7-Jul-11 PF-SA#6 Not Specified pending %

For Information

OnlyY

31 22 16 Cohesive Soil BackfillStandard

ProctorASTM D698 Every 10 000 m

3 7-Jul-11 PF-SA#6-A Not Specified 2132 (8.6) kg/m3 (%)

For Information

OnlyY

31 22 16 Cohesive Soil BackfillStandard

ProctorASTM D698 Every 10 000 m

3 7-Jul-11 PF-SA#6-B Not Specified 2146 (8.6) kg/m3 (%)

For Information

OnlyY

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 25-Aug-11 Perm-P2B-1 ≤ 1 x 10-6 cm/sec 8.2E-08 cm/s pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift29-Aug-11 P2B-Com-29 Aug 11

95% (or 92% if moisture

≥ opt. +6%)pending % pending Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 29-Aug-11 Perm-P2B-2-A ≤ 1 x 10-6 cm/sec 9.4E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 29-Aug-11 Perm-P2B-2-B ≤ 1 x 10-6 cm/sec 5.0E-08 cm/s pass Y

31 22 16 Cohesive Soil BackfillParticle Size

AnalysisASTM D422 Every 10 000 m

3 29-Aug-11 P2B-SA#1 (air dried)

100% passing 150 mm

≥ 95% passing 100 mm

≥ 80% passing 4.75 mm

≥ 30% passing 0.075 mm

100% passing 150 mm

100% passing 100 mm

75.6% passing 5 mm

39.3% passing 0.075 mm

% fail Y

31 22 16 Cohesive Soil BackfillParticle Size

AnalysisASTM D422 Every 10 000 m

3 29-Aug-11 P2B-SA#1 (oven dried)

100% passing 150 mm

≥ 95% passing 100 mm

≥ 80% passing 4.75 mm

≥ 30% passing 0.075 mm

100% passing 150 mm

100% passing 100 mm

77% passing 5 mm

38.5% passing 0.075 mm

% fail Y

31 22 16 Cohesive Soil Backfill Atterberg Limits ASTM D698 Every 10 000 m3 29-Aug-11 P2B-SA#1 Not Specified

Liquid Limit: 30.1

Plastic Limit: 20.5

Plastic Index: 9.6

%For Information

OnlyY

31 22 16 Cohesive Soil BackfillStandard

ProctorASTM D698 Every 10 000 m

3 29-Aug-11 P2B-SA#1 Not Specified 2058 (9.3) kg/m3 (%)

For Information

OnlyY

31 22 16 Cohesive Soil BackfillLaboratory

MoistureASTM D2216 Not Specified 29-Aug-11 P2B-SA#1 Not Specified 13.6 %

For Information

OnlyY

11-Oct-11

26-Sep-11

26-Sep-11

pending

26-Sep-11

pending

26-Sep-11

27-Sep-11

27-Sep-11

pending

27-Sep-11

27-Sep-11

pending

26-Sep-11

26-Sep-11

Week 1 25 Sept - 01 Oct 2011

pending

pending

26-Sep-11

27-Sep-11

26-Sep-11

pending

pending

QC Sample ID

SPECIFIED REQUIREMENTS

QC Frequency Date CollectedQA Frequency Spec Section Spec Description Test Type Standard

26-Sep-11

26-Sep-11

Form Number: 97918-QAF-059

QA Pass/Fail

NOTES

QA

Project: Remediation of the Tar Ponds and Coke Ovens Sites

RESULTS

QA Frequency

Met? Y/N

QC Frequency

Met? Y/NQC Pass/FailDate QC Result Received QC Test Result QA Test Result

Date QA Result

ReceivedQA Sample ID QCUnitsCriteria

TP7 2011-10 QA QC Monthly Testing Summary-RM.xlsx

Form Revision: April 07, 2010 Rev 4 Page 1 of 4

Page 17: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

Contractor: Hazco Client: STPA

Quality Control (QC) and Quality Assurance (QA) Testing Summary Table Element: TP7 Oversight: AECOM/CBCL

IQAC: Stantec

Weekly

Monthly From: 25-Sep-11 To: 29-Oct-11

QC Sample ID

SPECIFIED REQUIREMENTS

QC Frequency Date CollectedQA Frequency Spec Section Spec Description Test Type Standard

Form Number: 97918-QAF-059

QA Pass/Fail

NOTES

QA

Project: Remediation of the Tar Ponds and Coke Ovens Sites

RESULTS

QA Frequency

Met? Y/N

QC Frequency

Met? Y/NQC Pass/FailDate QC Result Received QC Test Result QA Test Result

Date QA Result

ReceivedQA Sample ID QCUnitsCriteria

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift

1 test or 10% of QC

tests whichever is

greater.

30-Aug-11 P2B-Com-30 Aug 1195% (or 92% if moisture

≥ opt. +6%)pending % pending Y

Cohesive Backfill (L/P)

Tests 1-3

(30-Aug-11)

30-Aug-11

% Compaction:

95.3-95.9

% M.C.:

8.0-9.8

Pass YAll compactions met the specified 95% minimum

compaction criteria.

31 22 16 Cohesive Soil BackfillLaboratory

MoistureASTM D2216 Not Specified 30-Aug-11 MC-P2B-#1 Not Specified pending %

For Information

OnlyY

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift

1 test or 10% of QC

tests whichever is

greater.

31-Aug-11 P2B-Com-31 Aug 1195% (or 92% if moisture

≥ opt. +6%)pending % pending Y

Cohesive Backfill (L/P)

Tests 1-3

(31-Aug-11)

31-Aug-11

% Compaction:

95.2-95.6

% M.C.:

8.0-10.3

Pass YAll compactions met the specified 95% minimum

compaction criteria.

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3

1 test or 10% of QC

tests whichever is

greater.

31-Aug-11 Perm-RP-1 ≤ 1 x 10-6 cm/sec 5.0E-08 cm/s pass Y

Cohesive Backfill (L/P)

Perm

TP7-SAB

(31-Aug-11)

8-Sep-11 2.90 x10-8

cm/s Pass YPerm-P2B-3 renamed to Perm-RP-1 in revised exp

daily report for 31 Aug 2011.

Met the specified maximum Permeability of 1 x

10-7

cm/s.

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift1-Sep-11 P2B-Com-01 Sept 11

95% (or 92% if moisture

≥ opt. +6%)pending % pending Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift2-Sep-11 P2B-Com-02 Sept 11

95% (or 92% if moisture

≥ opt. +6%)pending % pending Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 2-Sep-11 Perm-WLP-1 ≤ 1 x 10-6 cm/sec 5.0E-08 cm/s pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift6-Sep-11 P2B-Com-06 Sept 11

95% (or 92% if moisture

≥ opt. +6%)pending % pending Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 6-Sep-11 Perm-WLP-2 ≤ 1 x 10-6 cm/sec 1.9E-08 cm/s pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift7-Sep-11 P2B-Com-07 Sept 11

95% (or 92% if moisture

≥ opt. +6%)pending % pending Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 7-Sep-11 Perm-WLP-3 ≤ 1 x 10-6 cm/sec 4.4E-08 cm/s pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift8-Sep-11 P2B-Com-08 Sept 11

95% (or 92% if moisture

≥ opt. +6%)97.8 (8.7) % pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 9-Sep-11 Perm-WLP-4-A ≤ 1 x 10-6 cm/sec 3.1E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 9-Sep-11 Perm-WLP-4-B ≤ 1 x 10-6 cm/sec 3.2E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 12-Sep-11 Perm-P2B-3 ≤ 1 x 10-6 cm/sec 3.8E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 13-Sep-11 Perm-WLP-5 ≤ 1 x 10-6 cm/sec 2.5E-08 cm/s pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift14-Sep-11 RP-Com-14 Sept 11

95% (or 92% if moisture

≥ opt. +6%)97.1-99.9 (10.0-10.7) % pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 14-Sep-11 Perm-RP-2-A ≤ 1 x 10-6 cm/sec 2.5E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 14-Sep-11 Perm-RP-2-B ≤ 1 x 10-6 cm/sec 3.8E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 14-Sep-11 Perm-P2B-4 ≤ 1 x 10-6 cm/sec 6.9E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Atterberg Limits ASTM D698 Every 10 000 m3 14-Sep-11 RP-SA#1 Not Specified pending %

For Information

OnlyY

31 22 16 Cohesive Soil BackfillStandard

ProctorASTM D698 Every 10 000 m

3 14-Sep-11 RP-SA#1 Not Specified pending kg/m3 (%)

For Information

OnlyY

31 22 16 Cohesive Soil BackfillParticle Size

AnalysisASTM D422 Every 10 000 m

3 14-Sep-11 RP-SA#1

100% passing 150 mm

≥ 95% passing 100 mm

≥ 80% passing 4.75 mm

≥ 30% passing 0.075 mm

pending % pending Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift15-Sep-11 RP-Com-15 Sept 11

95% (or 92% if moisture

≥ opt. +6%)99.0-100.6 (9.0-12.0) % pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 15-Sep-11 Perm-P2B-5 ≤ 1 x 10-6 cm/sec 2.5E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 15-Sep-11 Perm-P2B-6 ≤ 1 x 10-6 cm/sec 1.9E-08 cm/s pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift16-Sep-11 RP-Com-16 Sept 11

95% (or 92% if moisture

≥ opt. +6%)97.1-98.0 (9.4-12.1) % pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift16-Sep-11 P2B-Com-16 Sept 11

95% (or 92% if moisture

≥ opt. +6%)98.4-96.6 (9.6-11.5) % pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift19-Sep-11 LP-Com-19 Sept 11

95% (or 92% if moisture

≥ opt. +6%)100.9-101.0 (9.1-9.8) % pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift19-Sep-11 PF-Com-19 Sept 11

95% (or 92% if moisture

≥ opt. +6%)97.3-100.2 (9.6-11.3) % pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift21-Sep-11 PF-Com-21 Sept 11

95% (or 92% if moisture

≥ opt. +6%)96.0-99.4 (8.7-11.9) % pass Y

pending

pending

26-Sep-11

28-Sep-11

pending

pending

pending

26-Sep-11

26-Sep-11

pending

26-Sep-11

11-Oct-11

11-Oct-11

4-Oct-11

26-Sep-11

pending

26-Sep-11

26-Sep-11

26-Sep-11

28-Sep-11

28-Sep-11

4-Oct-11

pending

26-Sep-11

11-Oct-11

26-Sep-11

26-Sep-11

11-Oct-11

11-Oct-11

pending

pending

TP7 2011-10 QA QC Monthly Testing Summary-RM.xlsx

Form Revision: April 07, 2010 Rev 4 Page 2 of 4

Page 18: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

Contractor: Hazco Client: STPA

Quality Control (QC) and Quality Assurance (QA) Testing Summary Table Element: TP7 Oversight: AECOM/CBCL

IQAC: Stantec

Weekly

Monthly From: 25-Sep-11 To: 29-Oct-11

QC Sample ID

SPECIFIED REQUIREMENTS

QC Frequency Date CollectedQA Frequency Spec Section Spec Description Test Type Standard

Form Number: 97918-QAF-059

QA Pass/Fail

NOTES

QA

Project: Remediation of the Tar Ponds and Coke Ovens Sites

RESULTS

QA Frequency

Met? Y/N

QC Frequency

Met? Y/NQC Pass/FailDate QC Result Received QC Test Result QA Test Result

Date QA Result

ReceivedQA Sample ID QCUnitsCriteria

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift22-Sep-11 PF-Com-22 Sept 11

95% (or 92% if moisture

≥ opt. +6%)96.0-100.1 (9.1-11.7) % pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 22-Sep-11 Perm-PF-50 ≤ 1 x 10-6 cm/sec 8.8E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 22-Sep-11 Perm-PF-51 ≤ 1 x 10-6 cm/sec 4.4E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Atterberg Limits ASTM D698 Every 10 000 m3 22-Sep-11 PF-SA#10 Not Specified pending %

For Information

OnlyY

31 22 16 Cohesive Soil BackfillStandard

ProctorASTM D698 Every 10 000 m

3 22-Sep-11 PF-SA#10 Not Specified pending kg/m3 (%)

For Information

OnlyY

31 22 16 Cohesive Soil BackfillParticle Size

AnalysisASTM D422 Every 10 000 m

3 22-Sep-11 PF-SA#10

100% passing 150 mm

≥ 95% passing 100 mm

≥ 80% passing 4.75 mm

≥ 30% passing 0.075 mm

pending % pending Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift23-Sep-11 PF-Com-23 Sept 11

95% (or 92% if moisture

≥ opt. +6%)97.3-100.2 (8.8-11.0) % pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift

1 test or 10% of QC

tests whichever is

greater.

Cohesive Backfill

(G/B-P2B)

Tests 1-6

(23-Sep-11)

23-Sep-11

% Compaction:

96.3-98.9

% M.C.:

7.9-9.6

Pass YAll compactions met the specified 95% minimum

compaction criteria.

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift

1 test or 10% of QC

tests whichever is

greater.

Cohesive Backfill

(L/P-Receiving Pit)

Tests 1-3

(23-Sep-11)

23-Sep-11

% Compaction:

96.5-98.9

% M.C.:

7.5-8.8

Pass YAll compactions met the specified 95% minimum

compaction criteria.

31 22 16 Cohesive Soil Backfill Organic Matter ASTM D2974Every 1000 m

2 for

each lift23-Sep-11 Topsoil-SA#1 4.0-8.0% 4.3 % pass Y

31 22 16 Cohesive Soil BackfillPhysical

PropertiesASTM D5268

Every 1000 m2 for

each lift23-Sep-11 Topsoil-SA#1

20-70% Sand

≥ 7% Clay

95-100% passing 5 mm

48.6% Sand

43.4% Clay

91.9% passing 5 mm

%

pass

pass

fail

Y

31 22 16 Cohesive Soil Backfill Organic Matter ASTM D2974Every 1000 m

2 for

each lift23-Sep-11 Topsoil-SA#2 4.0-8.0% 3.2 % fail Y

31 22 16 Cohesive Soil BackfillPhysical

PropertiesASTM D5268

Every 1000 m2 for

each lift23-Sep-11 Topsoil-SA#2

20-70% Sand

≥ 7% Clay

95-100% passing 5 mm

45.6% Sand

37.7% Clay

83.3% passing 5 mm

%

pass

pass

fail

Y

31 22 16 Cohesive Soil Backfill Organic Matter ASTM D2974Every 1000 m

2 for

each lift24-Sep-11 Topsoil-SA#3 4.0-8.0% 3.1 % fail Y

31 22 16 Cohesive Soil BackfillPhysical

PropertiesASTM D5268

Every 1000 m2 for

each lift24-Sep-11 Topsoil-SA#3

20-70% Sand

≥ 7% Clay

95-100% passing 5 mm

52.9% Sand

36.3% Clay

89.2% passing 5 mm

%

pass

pass

fail

Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift26-Sep-11 PF-Com-26 Sept 11

95% (or 92% if moisture

≥ opt. +6%)96.1-100.3 (7.7-9.6) % pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 26-Sep-11 Perm-PF-52 ≤ 1 x 10-6 cm/sec 6.9E-08 cm/s pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift

1 test or 10% of QC

tests whichever is

greater.

Cohesive Backfill

(P/F)

Tests 1-3

(29-Sep-11)

29-Sep-11

% Compaction:

95.1-101.1

% M.C.:

6.2-7.5

Pass YAll compactions met the specified 95% minimum

compaction criteria.

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift3-Oct-11 LP-Com-03 Oct 11

95% (or 92% if moisture

≥ opt. +6%)96.3-97.1 (9.3-11.5) % pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift4-Oct-11 LP-Com-04 Oct 11

95% (or 92% if moisture

≥ opt. +6%)97.5-100.8 (9.2-12.1) % pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 4-Oct-11 Perm-LP-7 ≤ 1 x 10-6 cm/sec 3.5E-08 cm/s pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift11-Oct-11 LP-Com-11 Oct 11

95% (or 92% if moisture

≥ opt. +6%)97.8-100.5 (9.2-10.4) % pass Y

31 22 16 Cohesive Soil Backfill Organic Matter ASTM D2974Every 1000 m

2 for

each lift11-Oct-11 Topsoil-SA#4 4.0-8.0% 3.9 % fail Y

31 22 16 Cohesive Soil BackfillPhysical

PropertiesASTM D5268

Every 1000 m2 for

each lift11-Oct-11 Topsoil-SA#4

20-70% Sand

≥ 7% Clay

95-100% passing 5 mm

48.0% Sand

33.3% Clay

81.3% passing 5 mm

%

pass

pass

fail

Y

31 22 16 Cohesive Soil Backfill Organic Matter ASTM D2974Every 1000 m

2 for

each lift11-Oct-11 Topsoil-SA#5 4.0-8.0% 3.2 % fail Y

28-Sep-11

28-Sep-11

12-Oct-11

19-Oct-11

19-Oct-11

19-Oct-11

19-Oct-11

19-Oct-11

19-Oct-11

Week 3 09 Oct - 15 Oct, 2011

pending

28-Oct-11

19-Oct-11

28-Oct-11

26-Sep-11

12-Oct-11

12-Oct-11

pending

pending

4-Oct-11

6-Oct-11

24-Oct-11

Week 2 02 Oct - 08 Oct, 2011

12-Oct-11

TP7 2011-10 QA QC Monthly Testing Summary-RM.xlsx

Form Revision: April 07, 2010 Rev 4 Page 3 of 4

Page 19: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

Contractor: Hazco Client: STPA

Quality Control (QC) and Quality Assurance (QA) Testing Summary Table Element: TP7 Oversight: AECOM/CBCL

IQAC: Stantec

Weekly

Monthly From: 25-Sep-11 To: 29-Oct-11

QC Sample ID

SPECIFIED REQUIREMENTS

QC Frequency Date CollectedQA Frequency Spec Section Spec Description Test Type Standard

Form Number: 97918-QAF-059

QA Pass/Fail

NOTES

QA

Project: Remediation of the Tar Ponds and Coke Ovens Sites

RESULTS

QA Frequency

Met? Y/N

QC Frequency

Met? Y/NQC Pass/FailDate QC Result Received QC Test Result QA Test Result

Date QA Result

ReceivedQA Sample ID QCUnitsCriteria

31 22 16 Cohesive Soil BackfillPhysical

PropertiesASTM D5268

Every 1000 m2 for

each lift11-Oct-11 Topsoil-SA#5

20-70% Sand

≥ 7% Clay

95-100% passing 5 mm

45.9% Sand

37.0% Clay

82.8% passing 5 mm

%

pass

pass

fail

Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift12-Oct-11 LP-Com-12 Oct 11

95% (or 92% if moisture

≥ opt. +6%)96.8-99.9 (9.3-10.8) % pass Y

31 22 16 Cohesive Soil Backfill Organic Matter ASTM D2974Every 1000 m

2 for

each lift12-Oct-11 Topsoil-SA#6 4.0-8.0% 4.3 % pass Y

31 22 16 Cohesive Soil BackfillPhysical

PropertiesASTM D5268

Every 1000 m2 for

each lift12-Oct-11 Topsoil-SA#6

20-70% Sand

≥ 7% Clay

95-100% passing 5 mm

51.1% Sand

30.4% Clay

81.5% passing 5 mm

%

pass

pass

fail

Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 12-Oct-11 Perm-LP-8 ≤ 1 x 10-6 cm/sec 1.9E-08 cm/s pass Y

31 22 16 Cohesive Soil Backfill Organic Matter ASTM D2974Every 1000 m

2 for

each lift13-Oct-11 Topsoil-SA#7 4.0-8.0% 3.2 % fail Y

31 22 16 Cohesive Soil BackfillPhysical

PropertiesASTM D5268

Every 1000 m2 for

each lift13-Oct-11 Topsoil-SA#7

20-70% Sand

≥ 7% Clay

95-100% passing 5 mm

39.2% Sand

41.2% Clay

80.3% passing 5 mm

%

pass

pass

fail

Y

31 22 16 Cohesive Soil Backfill Organic Matter ASTM D2974Every 1000 m

2 for

each lift14-Oct-11 Topsoil-SA#8 4.0-8.0% 3.2 % fail Y

31 22 16 Cohesive Soil BackfillPhysical

PropertiesASTM D5268

Every 1000 m2 for

each lift14-Oct-11 Topsoil-SA#8

20-70% Sand

≥ 7% Clay

95-100% passing 5 mm

43.3% Sand

47.8% Clay

91.1% passing 5 mm

%

pass

pass

fail

Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift19-Oct-11 GB-Com-19 Oct 11

95% (or 92% if moisture

≥ opt. +6%)98.0-99.9 (10.5-13.1) % pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 19-Oct-11 Perm-GB-24 ≤ 1 x 10-6 cm/sec 2.5E-08 cm/s pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift22-Oct-11 GB-Com-22 Oct 11

95% (or 92% if moisture

≥ opt. +6%)96.8-100.9 (10.1-12.5) % pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 22-Oct-11 Perm-GB-25 ≤ 1 x 10-6 cm/sec pending cm/s pending Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift24-Oct-11 GB-Com-24 Oct 11

95% (or 92% if moisture

≥ opt. +6%)96.5‐100.2 (9.4‐11.3) % pass Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift25-Oct-11 GB-Com-25 Oct 11

95% (or 92% if moisture

≥ opt. +6%)95.5-98.7 (10.8-12.4) % pass Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 25-Oct-11 Perm-GB-26 ≤ 1 x 10-6 cm/sec pending cm/s pending Y

31 22 16 Cohesive Soil BackfillCompaction

(and Moisture)ASTM D6938

Every 1000 m2 for

each lift29-Oct-11 GB-Com-29 Oct 11

95% (or 92% if moisture

≥ opt. +6%)pending % pending Y

31 22 16 Cohesive Soil Backfill Permeability ASTM D5084 Every 2000 m3 29-Oct-11 Perm-GB-27 ≤ 1 x 10-6 cm/sec pending cm/s pending Y

31 22 16 Cohesive Soil Backfill Atterberg Limits ASTM D698 Every 10 000 m3 29-Oct-11 GB-SA#6 Not Specified pending %

For Information

OnlyY

31 22 16 Cohesive Soil BackfillStandard

ProctorASTM D698 Every 10 000 m

3 29-Oct-11 GB-SA#6 Not Specified pending kg/m3 (%)

For Information

OnlyY

31 22 16 Cohesive Soil BackfillParticle Size

AnalysisASTM D422 Every 10 000 m

3 29-Oct-11 GB-SA#6

100% passing 150 mm

≥ 95% passing 100 mm

≥ 80% passing 4.75 mm

≥ 30% passing 0.075 mm

pending % pending Ypending

pending

pending

pending

pending

24-Oct-11

pending

Week 4 16 Oct - 22 Oct, 2011

20-Oct-11

28-Oct-11

19-Oct-11

13-Oct-11

28-Oct-11

19-Oct-11

Week 5 23 Oct - 29 Oct, 2011

25-Oct-11

26-Oct-11

pending

19-Oct-11

24-Oct-11

28-Oct-11

19-Oct-11

28-Oct-11

TP7 2011-10 QA QC Monthly Testing Summary-RM.xlsx

Form Revision: April 07, 2010 Rev 4 Page 4 of 4

Page 20: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

February File: 1214

Sydney T1 Inglis StPO Box 1Sydney, N

Attention

Dear Ms.

Referenc

At the reqreportable

We trust thesitate to

Sincerely,

STANTEC

Willie McNProject MTel: (902) 5Fax: (902) willie.mcne

\\cd1177-f02\wo

6, 2012 410955.215

ar Ponds Agetreet 028, Stn. A

NS B1P 6J7

n: Ms. Di

Ingraham:

ce: ExtrasIndepe

quest of Sydnee extra items

this informatioo contact us.

,

C CONSULTI

Neil, B.Tech. anager 564-1855 564-8756

[email protected]

orkgroup\1214\active\1

Stantec Consu207-201 ChurcMembertou NSTel: (902) 564-Fax: (902) 564

ency

iane Ingraha

s Section - Sendent Qual

ey Tar Pondsto include in t

on meets you

ING LIMITED

(Env.), CET

m

21410xxx\121410955

ulting Ltd. chill Drive S B1S 0H1 -1855

4-8756

am, Ph.D., PM

TPA Project ity Assuranc

s Agency (STthis section o

r present req

D

5-stpa combined eleme

MP, Quality C

Element TPce (IQAC) Oc

PA), Stantec f the (IQAC) O

uirements. If

ents\215 tp7\700 extra

Contracts Ma

7 ctober 2011 M

Consulting LOctober 2011

you have any

a services\extra sectio

anager

Monthly Sum

imited (Stante1 Monthly Sum

y questions, p

on\tp7 extras section o

mmary Repor

ec) has no mmary Repor

please do not

october 2011.docx

rt

rt

Page 21: : Ms. Di m, PhD., PMP, Quality Contracts Managertarpondscleanup.ca/upload/132941248220120208 TP7...r more inform r present req nts\215 tp7\300 repor P, Quality C orth & Sout Summary

Stantec Consulting Ltd 207-201 Churchill Drive Membertou NS B1S 0H1 Tel: (902) 564-1855 Fax: (902) 564-8756

Sydney Tar Ponds Agency 1 Inglis Street PO Box 1028, Stn. A Sydney, NS B1P 6J7

Attention: Ms. Diane Ingraham, PhD., PMP, Quality Contracts Manager

Dear Ms. Ingraham:

Reference: Monthly Invoices As per the request of the Sydney Tar Ponds Agency, monthly invoices will be submitted in a separate submittal. Sincerely,

STANTEC CONSULTING LTD

Willie McNeil, B.Tech. (Env.), CET Project Manager Tel: (902) 564-1855 Fax: (902) 564-8756 [email protected]