MSU/STA/ESD Building USCG Cleveland Harbor Moorings

Project No. 09-L9002 SECTION 01158 Appendix E

APPENDIX E: SPACE CRITERIA SHEETS

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e i

SPACE CRITERIA SHEET INDEX

No Name Page No Name Page 100 Vestibule 1 137 Mess Deck 38 101 Lobby 2 138 Electrical 39 102 Stair A 3 139 Loading 40 103 Corridor 4 140 Telephone 41 104 Corridor 5 141 Mechanical 42 105 Closet 6 142 ESD Large Storage 43 106 Men's Restroom 7 143 ESD 44 107 Women's Restroom 8 144 ESD Supervisor 45 108 Janitor 9 145 ESC Coffee Mess 46 109 Storage 10 146 MDF 47

110 Fitness 11

147 Elevator Machine Room 48

111 Laundry 12 148 Elevator (Cab) 49 112 Locker Corridor 13 200 Lobby 50 113 Men' Locker Corridor 14 201 Stair A 51 114 Men's Restroom 15 202 Corridor 52 115 Men's Showers 16 203 TV / Vending 53 116 Men's Lockers MSU 17 204 Berthing 54 117 Men's Lockers ESD/CGES 18 205 Bathroom 55 118 Men's Lockers STA 19 206 Berthing 54 119 Men's Wetsuit 20 207 Bathroom 55

120 Women's Locker Corridor 21

208 Berthing 54

121 Women's Restroom 22 209 Bathroom 55 122 Women's Showers 23 210 Berthing 54 123 Women's Lockers 24 211 Bathroom 55 124 Women's Wetsuit 25 212 Berthing 54

125 Women's Locker Corridor 26

213 Bathroom 55

126 Locker Vestibule 27 214 Berthing 54 127 Stair Vestibule 28 215 Bathroom 55 128 Stair B 29 216 Conference 56 129 Corridor 30 217 OIC 57 130 Weapons - STA 31 218 Command Center 58 131 Weapons - MSU 32 219 XPO 59 132 Galley Vestibule 33 220 STA Open Office 60 133 Galley Janitor 34 221 SPO 61 134 Galley Toilet 35 222 EPO 62 135 Galley 36 223 Sta OPS 63 136 Galley Office 37 224 Rec Room 64

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e i i

SPACE CRITERIA SHEET INDEX

No Name Page No Name Page 225 Linen / Laundry 65 244 Interview Room 84 226 Mech 66 245 Office - Waterways 85 227 Corridor 67 246 Office - Waterways 86 228 Aux Supplies 68 247 Corridor 87 229 D9 COOP Supplies 69 248 Open Office 88 230 Sea Cadet 70 249 Office - PS/Cont. 89 231 Pollution Response 71 250 Closet 90 232 Stair B 72 251 Coffee/Vending 91 233 Corridor 73 252 Storage - SSI 92 234 Comm 74 253 Corridor 93 235 Women's Restroom 75 254 Conference 94 236 Men's Restroom 76 255 CAC 95 237 Janitor 77 256 SIPRNET 96 238 MSU Waiting/Reception 78 257 Corridor 97 239 Storage 79 258 Office - Invest. 98 240 Corridor 80 259 Office - PS 99 241 SRO 81 260 Office - Insp. 100 242 XO 82 261 Elevator (Cab) 49 243 CO 83

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Vestibule SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES ROOM NO. 100 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB Floor Porcelain tile, recessed entry mat system Walls Paint, 6” wood base Door Sound Ceiling Attenuation Floor Walls Security None Utility Mech. Ventilation per ASHRAE 62.1, heating to 70°F via cabinet unit heater. Services Plumb. None. Elect. Fire alarm remote notification panel. Duplex convenience

receptacles within 10’ on either side of main door. Emergency egress lighting and signage.

Comm. None. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 2

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Lobby SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress, Visitor Seated Waiting Area ADJACENCIES ROOM NO. 101 Min Ceiling Ht. 10'-0" Program Area 210 SF Furniture Qty Item Qty Item and Equipment 1 Building graphics/ 1 Bench directory 1 Floor directional signage Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB painted, provide upgraded acoustic treatment @

50% of ceiling area Floor Porcelain tile Walls Paint, 6” wood base, stainless steel cornerguards to 7’-0”

Provide upgraded finishes, full-height @ east elevator wall & north wall

Door Refer to narrative Sound Ceiling provide upgraded acoustic treatment @ 50% of ceiling area Attenuation Floor Walls Security Install card reader and keypad (combination reader). Install door

contacts on door. Install automatic door closer on door. Install video intercom which shall connect to Command Center.

Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Ambient pendant light fixture. Other Wall protection as necessary

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 3

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Stair A SPACE TYPE Circulation ACTIVITY Vertical circulation, emergency egress ADJACENCIES Within main entrance Lobby ROOM NO. 102 Min Ceiling Ht. 10'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB Floor Porcelain or natural stone tile w/protective treads, nosings & risers

or durable equivalent Walls Paint, 6” wood base, stainless steel handrails with upgraded finish

at wall, full height Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. None. Services Plumb. None. Elect. Provide amenities per specification for Stairs. Comm. None. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 4

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Connects mail lobby and exit to locker room and fitness area ROOM NO. 103 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB; provide estimated 50% of ceiling area to receive

upgraded acoustic treatment Floor Porcelain tile Walls Paint, 6” wood base, stainless steel cornerguards to 7’-0” Door Refer to narrative Sound Ceiling provide estimated 50% of ceiling area to receive upgraded acoustic

treatment Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 5

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Connects front and rear exits ROOM NO. 104 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB; provide estimated 80% of ceiling area to receive

upgraded acoustic treatment Floor Porcelain tile Walls Paint, 6” wood base, stainless steel corner guards to 7’-0” Door Refer to narrative Sound Ceiling provide estimated 80% of ceiling area to receive upgraded acoustic

treatment Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. Electric water cooler. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 6

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Closet SPACE TYPE Storage ACTIVITY Visitor coat storage ADJACENCIES Directly off of main Lobby (101) ROOM NO. 105 Min Ceiling Ht. 8'-0" Program Area 10 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; 1 Shelf and coat rod (metal) Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB Floor Porcelain tile Walls Paint, 4” rubber base Door None Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Storage. Comm. None. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 7

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Men's Restroom SPACE TYPE Wet Room ACTIVITY Personal hygiene ADJACENCIES Directly accessible from main lobby (101) ROOM NO. 106 Min Ceiling Ht. 8'-0" Program Area 60 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 1 Double-roll Toilet Dispenser 22” Counter Top w/ 4” Backsplash Furnished; 1-Set Handicap Grab Bars Contractor 1 Paper Towel Dispenser Installed 1 Soap Dispenser 1 Waste Receptacle Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor Porcelain tile Walls 2”x2” ceramic tile, coved base, one mirrored wall Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH. Services Plumb. One water closet, one urinal, one lavatory, one floor drain. Elect. Provide amenities per specification for Toilet Rooms/Areas. Comm. None. Other Accessible

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 8

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Women's Restroom SPACE TYPE Wet Room ACTIVITY Personal hygiene ADJACENCIES Directly accessible from main lobby (101) ROOM NO. 107 Min Ceiling Ht. 8'-0" Program Area 60 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 1 Double-roll Toilet Dispenser 22” Counter Top w/ 4” Backsplash Furnished; 1-Set Handicap Grab Bars Contractor 1 Paper Towel Dispenser Installed 1 Sanitary Napkin Disposer 1 Soap Dispenser 1 Waste Receptacle Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor Porcelain tile Walls 2”x2” ceramic tile, coved base, one mirrored wall Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH. Services Plumb. One water closet, one lavatory, one floor drain. Elect. Provide amenities per specification for Toilet Rooms/Areas. Comm. None. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 9

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Janitor SPACE TYPE Wet Room ACTIVITY Store janitorial and building maintenance equipment and supplies ADJACENCIES Directly accessible from corridor ROOM NO. 108 Min Ceiling Ht. 8'-0" Program Area 60 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 1 Wall Mounted Hose Holder Furnished; 1 Wall Mounted Mop Hanger Contractor 1 S.S. Self-Draining Shelf Installed 1 Mop Rack Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor 2”x2” tile, 5” h minimum coved base Walls Full height Fiberglass reinforced panels Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Exhaust per ASHRAE 62.1. Services Plumb. One floor mop sink. Elect. Provide amenities per specification for Janitor's Closet. Comm. None. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1 0

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME General Building Storage SPACE TYPE Storage ACTIVITY ADJACENCIES ROOM NO. 109 Min Ceiling Ht. 9'-0" Program Area 300 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Shelving Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Sealed concrete Walls Paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Storage. Comm. Ceiling mounted paging speakers. Other Melamine @ shelving

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1 1

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Fitness SPACE TYPE Activity ACTIVITY Work-out room for men and women ADJACENCIES Direct access to both Men's and Women's lockers, and Laundry ROOM NO. 110 Min Ceiling Ht. 10'-0" Program Area 640 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Existing equipment Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Sealed concrete w/wall to wall Interlocking athletic flooring, min.

1/2" thick, loose-laid on top of slab with no adhesive Walls Epoxy paint, 6” h rubber base, tempered mirror on one wall

Provide painted metal grab bar at mirrored wall Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. One electric water cooler. Elect. Provide amenities per specification for Fitness. Comm. 1 wall phone; 2 TV outlets per wall @ +60" AFF. Ceiling mounted

paging speakers. Provide CATV outlet at each TV location. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1 2

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Laundry SPACE TYPE Support ACTIVITY Machine washing and drying of work clothing ADJACENCIES Directly accessible from Fitness and Men's and Women's Locker rooms ROOM NO. 111 Min Ceiling Ht. 9'-0" Program Area 120 SF Furniture Qty Item Qty Item and Equipment 2 Front-loading Washers &

dryers

(Commercial grade) Energy Star rated Contractor Furnished; 1 10' x 24" counter Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor ceramic tile Walls Tile, coved base, 6’-0” tile wainscot with epoxy paint on green board

above Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust per ASHRAE 62.1, air conditioning, dryer

vents. Services Plumb. Two washing machine connector boxes, one floor drain. Elect. Provide amenities per specification for Laundry. Comm. 1 wall phone. Ceiling mounted paging speakers. Other Casework – high pressure laminate

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1 3

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Locker Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Serves Men's and Women's Lockers and Fitness ROOM NO. 112 Min Ceiling Ht. 9'-0" Program Area = Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x2 suspended acoustic ceiling system Floor Sheet linoleum Walls Epoxy paint, 4” integral coved base, Protective wainscot. Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1 4

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Men's Locker Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Serves Men's Lockers, Men's Restrooms, and Men's Wetsuit ROOM NO. 113 Min Ceiling Ht. 9'-0" Program Area = Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2’x2’ suspended acoustic ceiling system Floor Sheet linoleum Walls Epoxy paint, 4” integral linoleum coved base. Protective wainscot. Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH, dehumidification with

heating and cooling. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1 5

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Men's Restroom SPACE TYPE Wet Room ACTIVITY Personal hygiene ADJACENCIES Directly adjacent Showers, direct access to all Men's Lockers ROOM NO. 114 Min Ceiling Ht. 8'-0" Program Area 225 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 2 Double-roll Toilet Dispensers Counter Top w/ 4” Backsplash Furnished; 1-Set Handicap Grab Bars Contractor 2 Paper Towel Dispensers Installed 2 Soap Dispensers 1 Waste Receptacle Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor ceramic tile Walls tile, coved base, one mirrored wall Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH, dehumidification with

heating and cooling. Services Plumb. Two water closets, four urinals, four lavatories, one floor drain. Elect. Provide amenities per specification for Toilet Rooms/Areas. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1 6

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Men's Showers SPACE TYPE Wet Room ACTIVITY Personal hygiene - showers ADJACENCIES Directly adjacent Men's Restrooms ROOM NO. 115 Min Ceiling Ht. 8'-0" Program Area 125 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor ceramic tile Walls Tile, coved base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH. Services Plumb. Three showers. Elect. Wet location lighting. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1 7

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Men's Lockers MSU SPACE TYPE Wet Room ACTIVITY Work clothing storage and changing ADJACENCIES Accessed by Locker Corridor, Separate space from STA & ESD/CGES lockers ROOM NO. 116 Min Ceiling Ht. 9'-0" Program Area 410 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 32 24" x24" full height metal Furnished; lockers 2 18" x 72" high framed Contractor 3 6' benches mirrors Installed Government Furnished; Government Installed Finishes Ceiling 2’x4’ suspended acoustic ceiling system Floor Sheet linoleum Walls Epoxy paint, 4” integral linoleum coved base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. 1 wall phone. Ceiling mounted paging speakers. Other No door - 48" wide min. access with 7'-0" SS corner guards

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1 8

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Men's Lockers ESD/CGES SPACE TYPE Wet Room ACTIVITY Work-out clothing storage and changing for ESD and CGES ADJACENCIES Accessed by Locker Corridor, Separate space from MSU and STA lockers ROOM NO. 117 Min Ceiling Ht. 9'-0" Program Area 130 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 15 18" x24" full height metal Furnished; lockers 1 18" x 72" high framed Contractor 1 6' bench mirror Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Sheet linoleum Walls Epoxy paint, 4” integral coved linoleum base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other No door - 48" wide min. access with 7'-0" SS corner guards

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1 9

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Men's Lockers STA SPACE TYPE Wet Room ACTIVITY Work clothing storage and changing for STA ADJACENCIES Accessed by Locker Corridor, Separate space from MSU & ESD/CGES lockers ROOM NO. 118 Min Ceiling Ht. 9'-0" Program Area 475 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 40 24" x24" full height metal Furnished; lockers 2 18" x 72" high framed Contractor 3 6' benches mirrors Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Sheet linoleum Walls Epoxy paint, 4” integral coved linoleum base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. 1 wall phone. Ceiling mounted paging speakers. Other No door - 48" wide min. access with 7'-0" SS corner guards

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 2 0

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Men's Wetsuit SPACE TYPE Wet Room ACTIVITY Wet suit changing ADJACENCIES Adjacent Locker Corridor entry, directly accessible from Men's Locker Corr. ROOM NO. 119 Min Ceiling Ht. 8'-0" Program Area 130 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; 2 Heavy duty coat rods

mounted 7’ AFF 30 Heavy duty coat hangers for

suits. Contractor 2 Heavy duty coat rods

mounted 7’ AFF 30 Heavy duty coat hangers for

suits. Installed Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor 2x2 ceramic tile Walls Tile, coved base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH, dehumidification with

heating and cooling. Services Plumb. One hosing station, one floor drain. Elect. Wet location lighting. Comm. None. Other No door - 48" wide min. access with 7'-0" SS corner guards

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 2 1

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Women's Locker Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Serves Women's Lockers and Women's Restrooms ROOM NO. 120 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Sheet linoleum Walls Epoxy paint, 4” integral coved linoleum base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 2 2

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Women's Restroom SPACE TYPE Wet Room ACTIVITY Personal hygiene ADJACENCIES Directly adjacent Showers, direct access to all Women's Lockers ROOM NO. 121 Min Ceiling Ht. 8'-0" Program Area 225 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 3 Double-roll Toilet Dispensers Counter Top w/ 4” Backsplash Furnished; 1-Set Handicap Grab Bars Contractor 2 Paper Towel Dispensers Installed 3 Sanitary Napkin Disposers 2 Soap Dispensers 1 Waste Receptacle Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor ceramic tile Walls tile (full height), coved base, one mirrored wall Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH. Services Plumb. Three water closets, three lavatories, one floor drain. Elect. Provide amenities per specification for Toilet Rooms/Areas. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 2 3

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Women's Showers SPACE TYPE Wet Room ACTIVITY Personal hygiene - showers ADJACENCIES Directly adjacent Women's Restrooms ROOM NO. 122 Min Ceiling Ht. 8'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor ceramic tile Walls Tile (full height), coved base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH. Services Plumb. Two showers. Elect. Wet location lighting. Comm. None. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 2 4

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Women's Lockers SPACE TYPE Wet Room ACTIVITY Work clothing storage and changing ADJACENCIES Direct access to Women' Restrooms and Women's Wetsuit ROOM NO. 123 Min Ceiling Ht. 9'-0" Program Area 250 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; 22 24" x24" full height metal 2 18" x 72" high framed Contractor lockers mirrors Installed 3 6' benches Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Sheet linoleum Walls Epoxy paint, 4” integral coved linoleum base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. 1 wall phone. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 2 5

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Women's Wetsuit SPACE TYPE Wet Room ACTIVITY Wet suit changing ADJACENCIES Adjacent Locker Corridor entry, direct access from Women's Locker Corridor ROOM NO. 124 Min Ceiling Ht. 8'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; 1 Heavy duty coat rod

mounted 7’ AFF 10 Heavy duty coat hangers for

suits Contractor 1 Heavy duty coat rod

mounted 7’ AFF 10 Heavy duty coat hangers for

suits Installed Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor ceramic tile Walls Tile (full height), coved base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH, dehumidification with

heating and cooling. Services Plumb. One hosing station, one floor drain. Elect. Wet location lighting. Comm. None. Other No door - 48" wide min. access with 7'-0" SS corner guards

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 2 6

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Women's Locker Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Serves Women's Lockers and Women's Wetsuit ROOM NO. 125 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Sheet linoleum Walls Epoxy paint, 4” integral coved linoleum base. Protective wainscot. Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust minimum of 15 ACH. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 2 7

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Locker Vestibule SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Serves Men's and Women's Lockers. Provides direct access to exterior and

stair vestibule ROOM NO. 126 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB, provide upgraded acoustic treatment @

estimated 50% of ceiling area Floor Porcelain tile Walls Paint, 6” wood base, stainless steel corner guards to 7’-0”.

Protective wainscot. Door Refer to narrative Sound Ceiling provide upgraded acoustic treatment @ 50% of ceiling area Attenuation Floor Walls Security Install card reader and keypad (combination reader) on exterior of

door leading into vestibule. Install door contacts on door. Install automatic door closer on door.

Utility Mech. Ventilation per ASHRAE 62.1, heating via cabinet unit heater. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 2 8

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Stair Vestibule SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Circulation note for adjacent corridors and Stair B Landing. Provides rear exit.ROOM NO. 127 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB, provide upgraded acoustic treatment @ 50% of

ceiling area Floor Porcelain tile Walls Paint, 6” wood base, stainless steel corner guards to 7’-0”.

Protective wainscot. Door Refer to narrative Sound Ceiling provide upgraded acoustic treatment @ 50% of ceiling area Attenuation Floor Walls Security Install card reader and keypad (combination reader) on exterior of

door leading into vestibule. Install door contacts on door. Install automatic door closer on door.

Utility Mech. Ventilation per ASHRAE 62.1, heating via cabinet unit heater. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 2 9

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Stair B SPACE TYPE Circulation ACTIVITY Vertical circulation, emergency egress ADJACENCIES Landing to be adjacent Stair Vestibule and near locker vistibule ROOM NO. 128 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB Floor Porcelain tile or natural stone tile w/protective treads, nosings &

risers , or durable equivalent Walls Paint, 6” wood base, stainless steel handrails Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. None. Services Plumb. None. Elect. Provide amenities per specification for Stairs. Comm. None. Other Upgraded pendant fixture

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 3 0

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Connects stair with loading area. Provides access to galley. ROOM NO. 129 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB, provide upgraded acoustic treatment @

estimated 50% of ceiling area Floor Porcelain tile Walls Paint, 6” wood base, stainless steel corner guards to 7’-0”.

Protective wainscot. Door Refer to narrative Sound Ceiling provide upgraded acoustic treatment @ estimated 50% of ceiling

area Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. Electric water cooler. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 3 1

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Weapons - STA SPACE TYPE Room ACTIVITY Weapons storage for STA ADJACENCIES Near rear exit (Stair Vestibule) ROOM NO. 130 Min Ceiling Ht. 9'-0" Program Area 80 SF Furniture Qty Item Qty Item and Equipment 1 Stool Contractor Furnished; 1 Workbench w/ durable

butcher block top 1 Set of shelves on wall over

bench Contractor 1 Workbench w/ durable

butcher block top 1 Set of shelves on wall over

bench Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB on metal ceiling framing Floor Sealed concrete Walls Paint, 6” h coved rubber base Door 1-3/4" Solid Core with veneer and clear seal. Full-size 12 ga steel

plate on outside face, painted Sound Ceiling Attenuation Floor Walls Security Construction is as recommended in COMDTINST M5530.1C. Install card

reader and keypad (combination reader) on exterior of door leading into weapons storage. Install automatic door closer on door. Install intrusion detection panel (IDS), keypad and motion detection inside room. Install an audible alarm outside of the weapons storage which notifies personnel of an intruder alert. Connect IDS to a commercial off-site alarm monitoring company. Balanced Magnetic Switches shall be used on the door and connected to the IDS.

Utility Mech. Ventilation per ASHRAE 62.1, exhaust hood with dedicated exhaust fan. Exhaust shall be controlled via a wall switch located in the room. Exhaust fan shall be on emergency power.

Services Plumb. One eye wash. Elect. Provide amenities per specification for Storage. Comm. 1 wall phone. Other

Notes: 1. Walls shall be continuous from true floor to true ceiling.

2. Contractor shall move two 1,200 lb existing safes from old building to new building Weapons Space. Approximate dimensions each (24” wide x 36” deep x 48” tall).

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 3 2

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Weapons - MSU SPACE TYPE Room ACTIVITY Weapons Storage for MSU ADJACENCIES Near rear exit (Stair Vestibule) ROOM NO. 131 Min Ceiling Ht. 9'-0" Program Area 80 SF Furniture Qty Item Qty Item and Equipment 1 Stool Contractor Furnished; 1 Workbench w/ durable

butcher block top 1 Set of shelves on wall over

bench Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB on metal ceiling framing Floor Sealed concrete Walls Paint, 6” h coved rubber base Door 1-3/4" Solid Core with veneer and clear seal. Full-size 12 ga steel

plate on outside face, painted Sound Ceiling Attenuation Floor Walls Security Construction is as recommended in COMDTINST M5530.1C. . Install

card reader and keypad (combination reader) on exterior of door leading into weapons storage. Install automatic door closer on door. Install intrusion detection panel (IDS), keypad and motion detection inside room. Install an audible alarm outside of the weapons storage which notifies personnel of an intruder alert. Connect IDS to a commercial off-site alarm monitoring company. Balanced Magnetic Switches shall be used on the door and connected to the IDS.

Utility Mech. Ventilation per ASHRAE 62.1, exhaust hood with dedicated exhaust fan. Exhaust shall be controlled via a wall switch located in the room. Exhaust fan shall be on emergency power.

Services Plumb. One eye wash. Elect. Provide amenities per specification for Storage. Comm. 1 wall phone. Other

Notes: 1. Walls shall be continuous from true floor to true ceiling.

2. Contractor shall move one 1,200 lb existing safe from old building to new building Weapons Space. Approximate dimensions (24” wide x 36” deep x 48” tall).

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 3 3

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Galley Vestibule SPACE TYPE Circulation ACTIVITY Horizontal circulation ADJACENCIES Provides access to Galley, Galley Janitor and Galley Toilet ROOM NO. 132 Min Ceiling Ht. 10'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling Epoxy paint, 5/8” Type X GWB Floor Quarry tile (non-absorbent & non-slip), ALT: sealed concrete Walls Epoxy paint w/6’-0” stainless steel wainscot (full height at hoods) Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. None. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 3 4

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Galley Janitor SPACE TYPE Support ACTIVITY Store janitorial and maintenance equipment and supplies ADJACENCIES Opens directly into Galley Vestibule ROOM NO. 133 Min Ceiling Ht. 8'-0" Program Area 25 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 1 Wall Mounted Hose Holder Furnished; 1 Wall Mounted Mop Hanger Contractor 1 S.S. Self-Draining Shelf Installed 1 Mop Rack Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor tile, coved base Walls Fiberglass reinforced panels, full height Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Exhaust per ASHRAE 62.1. Services Plumb. Floor mop sink. Elect. Provide amenities per specification for Janitor's Closet. Comm. None. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 3 5

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Galley Toilet SPACE TYPE Support ACTIVITY Personal hygiene ADJACENCIES Opens directly into Galley Vestibule ROOM NO. 134 Min Ceiling Ht. 8'-0" Program Area 40 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 1 Double-roll Toilet Dispensers Furnished; 1-Set Handicap Grab Bars 1 18”X30” Framed Mirror Contractor 1 Paper Towel Dispenser Installed 1 Sanitary Napkin Disposer 1 Soap Dispenser 1 Waste Receptacle Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor ceramic tile Walls tile (full height), coved base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust a minimum of 15 ACH. Services Plumb. One water closet, one lavatory, one floor drain. Elect. Provide amenities per specification for Toilet Rooms/Areas. Comm. None. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 3 6

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Galley SPACE TYPE Room ACTIVITY Meal preparation, serving, dish washing, dry storage, cold storage ADJACENCIES Directly adjacent to Galley Janitor, Galley Toilet, Galley Office and Mess Deck ROOM NO. 135 Min Ceiling Ht. 10'-0" Program Area 750 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Galley Equipment Contractor Installed Government Furnished; Government Installed Finishes Ceiling Epoxy paint, 5/8” Type X GWB Floor Quarry tile (non-absorbent & non-slip), ALT: sealed concrete Walls Epoxy paint w/6’-0” stainless steel wainscot Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust per ASHRAE 62.1. Services Plumb. Provide connections to galley equipment as required. Elect. Provide connections to galley equipment as required. Provide

grill/vent hood interlock as required by Code. Provide one outlet for every 3 feet of countertop, but not less than one per countertop. Provide one duplex outlet for each 10 feet of wall space at the floor line, excluding counter top areas. All outlets shall be GFCI protected. Provide lighting amenities per specification for Kitchens/lunchrooms/breakrooms.

Comm. 1 wall phone. Ceiling mounted paging speakers. Other Casework – high pressure laminate

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 3 7

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Galley Office SPACE TYPE Office,

Private ACTIVITY Office for Galley staff ADJACENCIES Opens directly into Galley or Galley Vestibule ROOM NO. 136 Min Ceiling Ht. 8'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (75sf) incl: (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile, Walls Paint, 4” h rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices. Comm. 1 outlet with 4 CAT5e cables. Other Recessed indirect fluorescent fixtures

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 3 8

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Mess Deck SPACE TYPE Room ACTIVITY Staff dining ADJACENCIES Direct access to Galley and main circulation, and Main Lobby ROOM NO. 137 Min Ceiling Ht. 10'-0" Program Area 480 SF Furniture Qty Item Qty Item and Equipment 8 36" c 36" Table 32 chairs 1 Inventory workstation: incl. 1 Side chair, 1 Fully ergonomic task chair Contractor Furnished; 1 Coat Rack for 12 coats Contractor wall mounted Installed Government Furnished; Government Installed Finishes Ceiling Epoxy paint, 5/8” Type X GWB Floor Quarry tile (non-absorbent & non-slip), ALT: sealed concrete Walls Epoxy paint w/6’-0” stainless steel wainscot Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide one outlet for every 20 feet of wall space. Provide dedicated

receptacle for each vending machine location. Provide lighting amenities per specification for Kitchens/lunchrooms/breakrooms.

Comm. 1 wall phone; 4 outlets each with 2 CAT5e cables. Ceiling mounted paging speakers.

Other Provide special pendant light fixtures and/or wall washers

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 3 9

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Electrical SPACE TYPE Support ACTIVITY Main electrical room ADJACENCIES Direct access to exterior ROOM NO. 138 Min Ceiling Ht. - Program Area 100 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling exposed Floor Sealed concrete Walls paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security Install door contacts on entry door. Install automatic door closer on

door. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Electrical Room. Comm. 1 wall phone. Paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 4 0

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Loading SPACE TYPE Support ACTIVITY Horizontal circulation, recycle bin storage, temporary receiving ADJACENCIES Direct access to exterior via 6' wide roll up door and adjacent man door.

Includes Recycle Area and Temporary Receiving ROOM NO. 139 Min Ceiling Ht. 10'-0" Program Area 250 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB Floor Sealed concrete Walls Paint, 7'0" stainless steel corner guards, 6” h coved rubber base.

Protective wainscot. Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security Install door contacts on roll up door. Install card reader and keypad

(combination reader) at the access door (single door shall have an automatic door closer). Install video intercom at the exterior of the door which shall connect to Command Center.

Utility Mech. Ventilation per ASHRAE 62.1, cabinet unit heater. Services Plumb. None. Elect. Provide one duplex, weatherproof, GFCI receptacle. Provide one

articulated loading dock light for illuminating truck interior. Provide lighting amenities per specification for Other Spaces.

Comm. 1 wall phone. Ceiling mounted paging speakers. Other

Notes:

1. Man door shall have the only required card reader and keypad and intercom (as above) for the loading area.

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 4 1

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Telephone SPACE TYPE Support ACTIVITY Main Telephone Room ADJACENCIES Close access to Loading Area. Door to interior circulation. ROOM NO. 140 Min Ceiling Ht. - Program Area 50 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling exposed Floor Sealed concrete Walls paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. None. Services Plumb. None. Elect. Provide amenities per specification for Telecommunications Room. Comm. 1 wall phone. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 4 2

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Mechanical SPACE TYPE Support ACTIVITY Main Mechanical Room ADJACENCIES Direct access to Exterior via Pair of doors. Access to interior circulation. ROOM NO. 141 Min Ceiling Ht. - Program Area 600 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling exposed Floor Sealed concrete Walls paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security Install door contacts on both doors. Install automatic door closer on

doors. Utility Mech. Ventilation per ASHRAE 62.1. Provide equipment and piping

necessary to support building HVAC systems. Provide unit heater. Services Plumb. Provide equipment and piping necessary to support building

plumbing systems. Provide floor drains, eye wash, water meter. Elect. Provide disconnects per Code, and connections to equipment.

Provide amenities per specification for Mechanical Room. Comm. 1 wall phone; 1 outlet with 2 CAT5e cables for EMCS connections.

Paging speakers. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 4 3

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME ESD Large Storage SPACE TYPE Storage ACTIVITY Large and long equipment storage for ESD. ADJACENCIES Open to ESD shop space. ROOM NO. 142 Min Ceiling Ht. 10'-0" Program Area 400 SF Furniture Qty Item Qty Item and Equipment None Required Contractor SHelving Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile, Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Storage Comm. 1 wall phone; 2 outlets each with 3 CAT5e cables. Ceiling mounted

paging speakers. Other Recessed indirect fluorescent fixtures

Must accommodate 20' long antennas for horizontal storage Melamine @ shelving

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 4 4

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME ESD SPACE TYPE Office, Open ACTIVITY ESD Administrative and shop area open space. ADJACENCIES Direct access to main lobby and loading area, ESD Storage, Supervisor's area,

and ESD Coffee/Mess ROOM NO. 143 Min Ceiling Ht. 10'-0" Program Area 2825 SF Furniture Qty Item Qty Item and Equipment 7 Workstations (6’x7’-6” 6 Workstations (10’x10’) incl. 45 sf): incl. (1) guest chair, (1) guest chair (1) fully ergonomic task (1) fully ergonomic task chair chair 4 36”w x 2h lateral files 6 workbenches 2 Plan/chart files 6 stools 1 Table for copy/fax 6 Parts/tools kits 3 4’ book case Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile, Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Shop Spaces and Offices Comm. 1 outlet per workstation each with 4 CAT5e cables. 1 outlet per

printer/fax/copier locations each with 2 CAT5e cables. Ceiling mounted paging speakers.

Other Provide access floor over 12" recess Includes space for 6 workstations at 100SF ea., 2 mockup assembly areas at 100 SF ea., 6 Part/ Tools storage areas @ 100 SF ea., 1 battery shop @ 100SF, and flammable storage cabinet

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 4 5

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME ESD Supervisor SPACE TYPE Office,

Private ACTIVITY Office ADJACENCIES Within ESD open space. Locate on exterior wall – corner preferred. ROOM NO. 144 Min Ceiling Ht. 9'-0" Program Area 75 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (75sf) incl: (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile, Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 2 outlets each with 4 CAT5e cables. Other Access floor required

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 4 6

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME ESD Coffee Mess SPACE TYPE Open ACTIVITY Office support ADJACENCIES Within or directly adjacent to ESD Open Office ROOM NO. 145 Min Ceiling Ht. 8'-0" Program Area 50 SF Furniture Qty Item Qty Item and Equipment 1 refrigerator 1 microwave 1 Coffee maker Contractor 8 LF of architectural Furnished; Casework (upper & lower Contractor Closed cabinets with Installed Countertop & 4” back- splash Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Sheet linoleum Walls Paint, 4” rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. One counter-top sink, coffee maker rough-in. Elect. Provided dedicated receptacle and circuit each for refrigerator,

microwave, and coffee maker. Provide one general use GFCI duplex receptacle above counter. Provide lighting amenities per specification for Kitchens/lunchrooms/breakrooms.

Comm. None. Other Casework – plam

No access floor below

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 4 7

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME MDF SPACE TYPE Support ACTIVITY Main Communications Room ADJACENCIES Direct connection to ESD shop area ROOM NO. 146 Min Ceiling Ht. - Program Area 180 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling Exposed. Floor Conductive interlocking floor tile, Walls Paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security Install card reader and keypad (combination reader) to door. Install

door contacts on door. Install automatic door closer on door. Walls Provide continuous walls structure to structure

Utility Mech. Provide dedicated split system air conditioning unit. Services Plumb. None. Elect. Provide amenities per specification for Telecommunications Room. Comm. 1 wall phone; 1 outlet on each wall in front and back of racks each

with 2 CAT5e cables. 1 ceiling mounted paging speaker. Other Provide access floor over 12" recess

Provide clean agent fire suppression equipment.

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 4 8

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Elevator Machine Room SPACE TYPE Support ACTIVITY Building Support ADJACENCIES Adjacent Elevator ROOM NO. 147 Min Ceiling Ht. - Program Area 75 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling exposed Floor Sealed concrete Walls paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust per ASHRAE 62.1. Services Plumb. None. Elect. Provide equipment connection with elevator disconnect and fire

alarm interface. Provide one GFCI duplex convenience receptacle. Provide lighting amenities per specification for Shop Spaces.

Comm. 1 pull box with 2 CAT5e cables plus sufficient slack cable to reach the elevator controller. These cables will connect to 2 telephone lines for the cab phone and any auto dialers.

Other Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 4 9

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Elevator (Cab) SPACE TYPE Support ACTIVITY Building Support ADJACENCIES Direct access to main lobby ROOM NO. 148 161 Min Ceiling Ht. 8'-0" Program Area 75SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling None Floor Elevator Standard – Premium (match lobby floor finish) Walls 1 hour fire rated high pressure laminate Door Stainless Steel Sound Ceiling Attenuation Floor Walls STC-45 Security None. Utility Mech. Ventilation and exhaust per ASHRAE 62.1. Services Plumb. None. Elect. None – single point connection at machine room. Comm. As required by elevator code. Other Single piston hydraulic not allowed

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 5 0

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Lobby SPACE TYPE Support ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Directly above Lobby below. Open to lobby below for visibility ROOM NO. 200 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment Floor directional signage Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB Floor Porcelain tile Walls Paint, 6” wood base Door Refer to narrative Sound Ceiling Attenuation Floor Open to below Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. Electric water cooler. Elect. Provide amenities per specification for Corridor. Ambient pendant

light fixture. Comm. Ceiling mounted paging speakers. Other Wall protection as necessary

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 5 1

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Stair A SPACE TYPE Circulation ACTIVITY Vertical circulation, emergency egress ADJACENCIES Within Lobby. Visible from MSU Reception. ROOM NO. 201 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB Floor Porcelain tile or natural stone tile w/ protective treads, nosings &

risers, or durable equivalent Walls Paint, 6” wood base, stainless steel handrails Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. None. Services Plumb. None. Elect. Provide amenities per specification for Stairs. Comm. None. Other

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 5 2

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Serves STA and Berthing from Lobby. Restrict public access from lobby. ROOM NO. 202 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security Install card reader and keypad (combination reader). Install door

contacts on door. Install automatic door closer on door. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 5 3

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME TV / Vending SPACE TYPE Room ACTIVITY Recreation ADJACENCIES Adjacent Berthing suite ROOM NO. 203 Min Ceiling Ht. 9'-0" Program Area 195 SF Furniture Qty Item Qty Item and Equipment 1 sofa 1 Coffee table 1 lounge chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Sheet linoleum Walls Paint, 4” rubber base Door Refer to narrative Sound Ceiling Upgrade acoustic ceiling performance for NRC coefficient Attenuation Floor Walls STC-50 to adjacent office or Berthing Room Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. One dedicated duplex receptacle and circuit per vending machine.

Duplex receptacles for TV. Provide lighting amenities per specification for Kitchens/lunchrooms/breakrooms.

Comm. 1 TV outlet at standard mounting height; 2 outlets on opposite walls each with 2 CAT5e cables; 1 ceiling mounted paging speaker. Provide CATV outlet at each TV location.

Other Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 5 4

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Berthing SPACE TYPE Sleeping

Room ACTIVITY Sleeping and off-duty relaxation ADJACENCIES Direct Access to private Bathroom, Adjacent other Berthing suites. Locate on

exterior wall. ROOM NO. 204 206 208 210 212 214 Min Ceiling Ht. 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" Program Area 240 SF 240 SF 240 SF 240 SF 240 SF 240 SF Furniture Qty Item Qty Item and Equipment 1 Sleeping unit/wardrobe storage unit Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2’x4’ suspended acoustic ceiling system Floor carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls STC-47. STC-50 if adjacent non-Berthing room (except corridor) Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. One lavatory Elect. Provide amenities per specification for Berthing. Comm. 2 outlets on opposite side walls each with 3 CAT5e cables. Other Requires egress windows and sleeping-room exterior ventilation.

Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 5 5

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Bathroom SPACE TYPE Wet Room ACTIVITY Showering, personal hygiene ADJACENCIES Direct access to associated Berthing room ROOM NO. 205 207 209 211 213 215 Min Ceiling Ht. 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" Program Area 36 SF 36 SF 36 SF 36 SF 36 SF 36 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor ceramic tile Walls tile (full height), coved base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Exhaust per ASHRAE 62.1. Services Plumb. One water closet, one shower. Elect. Provide amenities per specification for Toilet Rooms/Areas. Comm. None. Other Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 5 6

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Conference SPACE TYPE Conference ACTIVITY STA Meetings and training ADJACENCIES Adjacent other STA offices. Locate on exterior wall if possible. ROOM NO. 216 Min Ceiling Ht. 10'-0" Program Area 300 SF Furniture Qty Item Qty Item and Equipment 8 Training tables: incl. wire management 15 Conference chairs, 5-star caster base 1 Clg mounted HDTV format

projector

1 Clg mounted projection screen

Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2’x4’ suspended acoustic ceiling system Floor Carpet tile, Walls Paint, 4” h straight rubber base, dry erase & projection wall covering

along length of one wall, track system for visual display boards along length of one wall, including 4 (four) sliding units

Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Conference Rooms. Comm. 1 recessed floor box with 4 CAT5e cables for under conf. table; 1

outlet on each of four walls each with 3 CAT5e cables. 1 ceiling mounted paging speaker with volume control.

Other Over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 5 7

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME OIC SPACE TYPE Office,

Private ACTIVITY STA Officer In Charge office ADJACENCIES Adjacent Command Center, near Executive Officer (XO), Not near SPO. Locate

on exterior wall. ROOM NO. 217 Min Ceiling Ht. 9'-0" Program Area 150 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (150 sf): incl. (1) lounge chair (1) side table (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet on each side wall each with 3 CAT5e cables. Other Over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 5 8

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Command Center SPACE TYPE Conference ACTIVITY Station Command Watchfloor Operations ADJACENCIES Adajcent OIC and XO. Within STA office suite. Locate on exterior wall.

Minimize distance to Antenna Tower. ROOM NO. 218 Min Ceiling Ht. 10'-0" Program Area 300 SF Furniture Qty Item Qty Item and 3 Watchfloor consoles 1 Checkpoint station/sign in Equipment 1 lot COMMS (3 positions) 1 Desk chair, fully ergonomic 3 Watchfloor chairs 3 Side chair file/shelving 1 Chart table area Contractor Furnished; Cont. Installed Government Furnished; Gov' t Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Conductive modular carpet tile with electrostatic resistance (over

access floor) Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Interior: STC-47 Security General Install card reader and keypad (combination reader). Install master

intercom station in room, master station shall have the ability to open doors remotely from command center. Install security monitoring workstation in room. Workstation shall contain software controls for IDS and Access Control systems. Workstation will also contain software controls for CCTV images. Install 60’’ LCD monitor in room to view multiple CCTV views. Install door contacts on door. Install automatic door closer on door.

Walls Provide continuous walls structure to structure Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Command Center. Provide

dark room type red light fixtures for night time use. Comm. 1 PolyPhaser ground busbar to ground antenna cables at point of

entrance into room under raised floor system. 1 19" 24-port patch panel rack mtd inside of console position and equipped with 12 CAT5e outlet connector jacks and cables. 1 ceiling mounted paging speaker.

Other Verify areas to receive raised flooring. Funded separately. Over access floor Provide clean agent fire suppression equipment.

Notes:

1. Optional installation of video intercom at main entry gate which connects to command center.

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 5 9

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME XPO SPACE TYPE Office,

Private ACTIVITY STA private office ADJACENCIES Adjacent Command Center, near (OIC). Locate on exterior wall. ROOM NO. 219 Min Ceiling Ht. 9'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (75-100sf) incl. (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet with 4 CAT5e cables. Other Over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 6 0

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME STA Open Office SPACE TYPE Office -

Optn ACTIVITY STA administrative suite ADJACENCIES Access to all other STA Offices. Access via corridor to Berthing areas. ROOM NO. 220 Min Ceiling Ht. 9'-0" Program Area 450 SF Furniture Qty Item Qty Item and Equipment 6 Workstation (6’x7’-6” 45sf) 1 Table for copy/fax incl (1) guest chair (1) fully ergonomic task chair 2 36”w x 2h lateral files 2 26”w x 3h lateral files Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security Install card reader and keypad (combination reader) to door. Install

door contacts on door. Install automatic door closer on door. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet per each cubicle position each with 4 CAT5e cables. Ceiling

mounted paging speakers. Other Over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 6 1

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME SPO SPACE TYPE Office,

Private ACTIVITY STA SPO Private Office ADJACENCIES Within STA administrative suite. Near administrative cubicles. Not near OIC. ROOM NO. 221 Min Ceiling Ht. 9'-0" Program Area 75 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (75-100sf) incl. (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet with 4 CAT5e cables. Other Over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 6 2

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME EPO SPACE TYPE Office,

Private ACTIVITY STA EPO private office ADJACENCIES Within STA administrative suite. Near administrative cubicles. ROOM NO. 222 Min Ceiling Ht. 9'-0" Program Area 75 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (75-100sf) incl. (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet with 4 CAT5e cables. Other Recessed indirect fluorescent fixtures

Over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 6 3

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Sta OPS SPACE TYPE Office,

Private ACTIVITY STA OPS private office ADJACENCIES Within STA administrative suite. ROOM NO. 223 Min Ceiling Ht. 9'-0" Program Area 75 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (75-100sf) incl. (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet with 4 CAT5e cables. Other Over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 6 4

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Rec Room SPACE TYPE Room ACTIVITY STA Berthing suite recreation room ADJACENCIES Near Berthing suites ROOM NO. 224 Min Ceiling Ht. 9'-0" Program Area 270 SF Furniture Qty Item Qty Item and Equipment 1 sofa 1 Coffee table 2 Lounge chairs Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls STC-50 to adjacent office or Berthing Room Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide lighting amenities per specification for Offices Comm. 1 outlet on each of four wall each with 2 CAT5e cables. 1 TV outlet at

standard height on each wall. 1 ceiling mounted paging speaker. Provide CATV outlet at each TV location.

Other Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 6 5

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Linen / Laundry SPACE TYPE Room ACTIVITY STA berthing suite laundry room and linen storage ADJACENCIES ROOM NO. 225 Min Ceiling Ht. 9'-0" Program Area 170 SF Furniture Qty Item Qty Item and Equipment 2 Front loading Washers &

dryers

Energy Star rated Contractor 8 LF x 24” countertop Furnished; Shelving unit Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor ceramic tile Walls tile, 6” h coved rubber base, 6’-0” tile wainscot with epoxy paint on

green board above Door Refer to narrative Sound Ceiling Attenuation Floor Walls STC-50 to adjacent office or Berthing Room Security None. Utility Mech. Ventilation and exhaust per ASHRAE 62.1. Vent connections for two

dryers. Services Plumb. Two washing machine connector boxes. Elect. Provide special purpose receptacles to match equipment. Provide

amenities per specification for Laundry. Comm. 1 wall phone. Other Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 6 6

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Mech SPACE TYPE Support ACTIVITY Mechanical room ADJACENCIES Access from corridor ROOM NO. 226 Min Ceiling Ht. - Program Area 200 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling exposed Floor Sealed concrete Walls paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Provide equipment and piping

necessary to support building HVAC systems. Services Plumb. Provide equipment and piping necessary to support building

plumbing systems. Provide floor drains, eye wash. Elect. Provide amenities per specification for Mechanical Comm. 1 wall phone; 1 outlet with 2 CAT5e cables for EMCS connections. 1

ceiling mounted Paging speaker. Other Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 6 7

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Connects Stair A Lobby with Stair B. Access to MSU CAC and Public

restrooms. ROOM NO. 227 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB, provide upgraded acoustic treatment @ 50% of

ceiling area Floor Porcelain tile Walls Paint, 6” wood base Door Refer to narrative Sound Ceiling provide upgraded acoustic treatment @ 50% of ceiling area Attenuation Floor Walls Security None Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Provide emergency

egress lighting and signage. Comm. Ceiling mounted paging speakers. Other No access floor requirements

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 6 8

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Aux Supplies SPACE TYPE Storage ACTIVITY MSU CAC Supply Storage ADJACENCIES Access from public corridor. Access should not be from STA or MSU suites. ROOM NO. 228 Min Ceiling Ht. 9'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Shelving Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling Exposed Floor Sealed concrete Walls paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Storage. Comm. 1 outlet RIO for future telecom and data network connections. Other Verify requirements

No access floor requirements Melamine at shelving

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 6 9

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME D9 COOP Supplies SPACE TYPE Storage ACTIVITY ADJACENCIES Access from public corridor. Near MSU CAC. Access should not be from STA

or MSU suites. ROOM NO. 229 Min Ceiling Ht. 9'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Shelving Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling Exposed Floor Sealed concrete Walls paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Storage Comm. 1 outlet RIO for future telecom and data network connections. Other No access floor requirements

Melamine at shelving

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 7 0

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Sea Cadet SPACE TYPE Storage ACTIVITY Sea Cadet storage ADJACENCIES Access from public corridor. Access should not be from STA or MSU suites. ROOM NO. 230 Min Ceiling Ht. 9'-0" Program Area 200 SF Furniture Qty Item Qty Item and Equipment 1 Ergonomic Desk 1 Task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling Exposed Floor Sealed concrete Walls Paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet with 4 CAT5e cables. Plus 3 outlets RIO for future telecom

and data network connections. Other No access floor requirements

Melamine at shelving

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 7 1

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Pollution Response SPACE TYPE Storage ACTIVITY MSU Pollution Response storage ADJACENCIES Access from public corridor. Access should not be from STA or MSU suites. ROOM NO. 231 Min Ceiling Ht. 9'-0" Program Area 350 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling Exposed Floor Sealed concrete Walls paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices. Provide dedicated

duplex receptacle for samples refrigerator. Comm. 5 outlets RIO for future telecom and data network connections. Other No access floor requirements

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 7 2

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Stair B SPACE TYPE Circulation ACTIVITY Vertical circulation, emergency egress ADJACENCIES Primary Access to STA Office Suite. ROOM NO. 232 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB Floor Porcelain tile or natural stone w/protective treads, nosing & risers,

or durable equivalent Walls Paint, 6” wood base, stainless steel handrails Door Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. None. Services Plumb. None. Elect. Provide amenities per specification for Stairs Comm. None. Other Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 7 3

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Connects MSU Suite To Stair B ROOM NO. 233 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 5/8” painted GWB, provide upgraded acoustic treatment @ 50% of

ceiling area Floor Porcelain tile Walls Paint, 6” wood base Door Refer to narrative Sound Ceiling provide upgraded acoustic treatment @ 50% of ceiling area Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other No access floor requirements

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 7 4

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Comm SPACE TYPE Support ACTIVITY Communications equipment room ADJACENCIES Stacked over MDF room below. Near SIPRNET room. Access from corridor. ROOM NO. 234 Min Ceiling Ht. - Program Area 100 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling Exposed Floor Conductive interlocking floor tile, 18x18 Walls Paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security Install card reader and keypad (combination reader) to door. Install

door contacts on door. Install automatic door closer on door. Walls Provide continuous walls structure to structure

Utility Mech. Provide dedicated split system air conditioning unit. Services Plumb. None. Elect. Provide amenities per specification for Telecommunications Room Comm. 1 wall phone. 1 outlet on each of two side walls each with 2 CAT5e

cables. 1 ceiling mounted paging speaker. Other Requires access floor

Provide clean agent fire suppression equipment.

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 7 5

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Women's Restroom SPACE TYPE Wet Room ACTIVITY Personal hygiene ADJACENCIES Directly accessible from central corridor ROOM NO. 235 Min Ceiling Ht. 8'-0" Program Area 60 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 1 Double-roll Toilet Dispensers 22” Counter Top w/ 4” Backsplash Furnished; 1-Set Handicap Grab Bars Contractor 1 Paper Towel Dispensers Installed 1 Sanitary Napkin Disposer 1 Soap Dispensers 1 Waste Receptacle Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor Porcelain tile Walls tile (full height), coved base, one mirrored wall Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust a minimum of 15 ACH. Services Plumb. One water closet, one lavatory, one floor drain. Elect. Provide amenities per specification for Toilet Rooms/Areas. Comm. None. Other Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 7 6

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Men's Restroom SPACE TYPE Wet Room ACTIVITY Personal hygiene ADJACENCIES Directly accessible from central corridor ROOM NO. 236 Min Ceiling Ht. 8'-0" Program Area 60 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 1 Double-roll Toilet Dispenser 22” Counter Top w/ 4” Backsplash Furnished; 1-Set Handicap Grab Bars Contractor 1 Paper Towel Dispenser Installed 1 Soap Dispenser 1 Waste Receptacle Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor Porcelain tile Walls tile (full height), coved base, one mirrored wall Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation and exhaust a minimum of 15 ACH. Services Plumb. One water closet, one urinal, one lavatory, one floor drain. Elect. Provide amenities per specification for Toilet Rooms/Areas. Comm. None. Other Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 7 7

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Janitor SPACE TYPE Wet Room ACTIVITY Store janitorial and building maintenance equipment and supplies ADJACENCIES Directly accessible from corridor ROOM NO. 237 Min Ceiling Ht. 8'-0" Program Area 60 SF Furniture Qty Item Qty Item and Equipment None Required Contractor 1 Wall Mounted Hose Holder Furnished; 1 Wall Mounted Mop Hanger Contractor 1 S.S. Self-Draining Shelf Installed 1 Mop Rack Government Furnished; Government Installed Finishes Ceiling 5/8” Type X GWB, green board with epoxy paint Floor tile, 5” h min coved base Walls Full height Fiberglass reinforced panels Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Exhaust per ASHRAE 62.1. Services Plumb. One floor mop sink. Elect. Provide amenities per specification for Janitor Comm. None. Other Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 7 8

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME MSU Waiting/Reception SPACE TYPE Open ACTIVITY Administrative reception ADJACENCIES Direct access to Lobby and corridors to MSU suite. Direct access to storage.

Requires visual supervision of main entry and Stair via open 2nd level lobby. ROOM NO. 238 Min Ceiling Ht. 9'-0" Program Area 225 SF Furniture Qty Item Qty Item and Equipment 5 Guest lounge chairs 2 Side tables 1 Receptionist workstation (10’x10’ 100sf) incl. (1) guest chair (1) fully ergonomic task chair (1) transaction top Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security Install card reader and keypad (combination reader) to door to

corridor MSU reception from Lobby 200. Install door contacts on door. Install automatic door closer on door.

Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Corridor Comm. 4 outlets spread around area each with 4 CAT5e cables. 2 ceiling

mounted paging speakers. Other Provide relight to Level 1 Lobby as necessary for supervision.

Requires access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 7 9

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Storage SPACE TYPE Storage ACTIVITY Storage for MSU admin. ADJACENCIES Direct access to MSU Reception ROOM NO. 239 Min Ceiling Ht. 9'-0" Program Area 65 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Storage Comm. None. Other No access floor requirements

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 8 0

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Connects MSU Lobby with officers' offices (CO, XO, and SRO) ROOM NO. 240 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Storage Comm. Ceiling mounted paging speakers. Other Provide space for 6 lateral files

No access floor requirements

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 8 1

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME SRO SPACE TYPE Office,

Private ACTIVITY MSU SRO Private Office ADJACENCIES Directly adjacent to MSU Waiting/Reception. Requires visual supervision of

reception. Locate on exterior wall. ROOM NO. 241 Min Ceiling Ht. 9'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (100sf) incl. (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet with 4 CAT5e cables. Other Provide relight to Reception and Corridor full lingth of walls above

36" aff with tinted glazing. Requires access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 8 2

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME XO SPACE TYPE Office,

Private ACTIVITY MSU Executive Officer private office ADJACENCIES Directly adjacent to CO. Locate on exterior wall. ROOM NO. 242 Min Ceiling Ht. 9'-0" Program Area 150 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (150sf) incl. (1) lounge chair (1) side table (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 2 outlets on opposite long walls each with 4 CAT5e cables. Other Requires access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 8 3

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME CO SPACE TYPE Office,

Private ACTIVITY MSU Commanding Officer private office ADJACENCIES Locate on exterior wall, corner. ROOM NO. 243 Min Ceiling Ht. 9'-0" Program Area 150 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (150sf) incl. (1) lounge chair (1) side table (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 2 outlets on opposite long walls each with 4 CAT5e cables. Other Requires access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 8 4

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Interview Room SPACE TYPE Conference ACTIVITY MSU shared interview room. ADJACENCIES Directly accessible from MSU suite. Suggest as buffer between officer's

offices and rest of suite. ROOM NO. 244 Min Ceiling Ht. 9'-0" Program Area 150 SF Furniture Qty Item Qty Item and Equipment 1 Interview room table 4 Interview room chairs Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 2 outlets on opposite long walls each with 4 CAT5e cables. Other Requires access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 8 5

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Office - Waterways SPACE TYPE Office,

Private ACTIVITY MSU Private Office - Waterways ADJACENCIES Directly accessible from MSU suite. ROOM NO. 245 Min Ceiling Ht. 9'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (100sf) incl. (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet with 4 CAT5e cables. Other Requires access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 8 6

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Office - Waterways SPACE TYPE Office,

Private ACTIVITY MSU Private Office - Waterways ADJACENCIES Directly accessible from MSU suite. ROOM NO. 246 Min Ceiling Ht. 9'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (100sf) incl. (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet with 4 CAT5e cables. Other Requires access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 8 7

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Connects officer's offices to rest of MSU Suite ROOM NO. 247 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other No access floor requirements

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 8 8

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Open Office SPACE TYPE Office, Open ACTIVITY MSU cubicle bullpen ADJACENCIES Directly accessible from MSU Corridors. ROOM NO. 248 Min Ceiling Ht. 9'-0" Program Area 1800 SF Furniture Qty Item Qty Item and Equipment 7 Workstations (6’x7’-6” 4 Workstations (8’-6”x8’-6” 45 sf) incl. 75 sf) incl. (1) guest chair (1) guest chair (1) fully ergonomic task (1) fully ergonomic task chair chair 4 Workstations (8’-6”x8’-6” 12 36”w 2h lateral files 75 sf) incl. 12 36”w 3h lateral files (1) guest chair

(1) fully ergonomic task chair

1 Table for copy/fax

Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet for each cubicle each with 4 CAT5e cables. Spread 8 outlets

around walls each with 4 CAT5e cables for use with printers/faxes/copiers and other V/D connections. Ceiling mounted paging speakers.

Other Requires access floor Notes:

1. Confirm workstation configuration and layout with Coast Guard MSU representative.

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 8 9

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Office - PS/Cont. SPACE TYPE Office,

Private ACTIVITY MSU Private Office – Port Security and Contingency ADJACENCIES Directly accessible from MSU suite. Direct access to storage closet. ROOM NO. 249 Min Ceiling Ht. 9'-0" Program Area 165 SF Furniture Qty Item Qty Item and Equipment 2 Workstations (7’x8’-6” 60 sf) incl. (1) guest chair (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 3 outlets on 3 walls each with 4 CAT5e cables. Other Requires access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 9 0

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Closet SPACE TYPE Storage ACTIVITY MSU Port Security and Contingency Storage ADJACENCIES Accessible only from MSU Port Security and Contingency office ROOM NO. 250 Min Ceiling Ht. 9'-0" Program Area 50 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. None. Services Plumb. None. Elect. Provide amenities per specification for Storage Comm. None. Other Minimum interior clear dimension: 3'-0"

No access floor requirements

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 9 1

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Coffee/Vending SPACE TYPE Wet Room ACTIVITY MSU Coffee bar and vending machine area ADJACENCIES Directly accessible from MSU suite. ROOM NO. 251 Min Ceiling Ht. 9'-0" Program Area 110 SF Furniture Qty Item Qty Item and Equipment 1 refrigerator 1 microwave 1 Coffee maker Contractor 8 LF architectural Furnished; Casework w/ upper & Contractor Lower closed cabinets, Installed Countertop w/ 4” back- splash Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Sheet linoleum Walls Paint, 4” rubber base Door No Door Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. One counter-top sink, coffee maker rough-in. Elect. Provide amenities per specification for Break room Comm. None. Other Casework – high pressure laminate face and countertops

Provide floor space for 2 vending machines Not over access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 9 2

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Storage - SSI SPACE TYPE Circulation ACTIVITY MSU Storage ADJACENCIES Directly accessible from MSU suite. ROOM NO. 252 Min Ceiling Ht. 9'-0" Program Area 75 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Shelving Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Storage Comm. 1 outlet RIO for future use. Other No access floor requirements

Melamine at shelving

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 9 3

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Connects MSU Reception with MSU Open Office (bullpen) ROOM NO. 253 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other No access floor requirements

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 9 4

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Conference SPACE TYPE Conference ACTIVITY MSU Conference and Training ADJACENCIES Directly accessible from MSU suite. Contiguous with CAC via movable

partition ROOM NO. 254 Min Ceiling Ht. 10'-0" Program Area 300 SF Furniture Qty Item Qty Item and Equipment 8 Training tables: including 1 Clg mounted HDTV format Wire mgmt projector 24”x60” nominal size 1 Clg mounted projection 15 Fully ergonomic task chars screen Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” straight rubber base, dry erase & projection wall covering

along length of one wall, track system for visual display boards along length of one wall, including 4 (four) sliding units

Door Refer to narrative Sound Ceiling Attenuation Floor Walls STC-47, including movable partition, Provide continuous walls

structure to structure Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Conference Rooms Comm. 1 recessed floor box under conf. table with 4 CAT5e cables. 1 outlet

on each of 3 walls each with 4 CAT5e cables. 1 ceiling mounted paging speaker w volume control.

Other Requires access floor Operable partition, STC rating of 50, finish to be vinyl or fabric, Class A fire rated

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 9 5

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME CAC SPACE TYPE ConferenceACTIVITY MSU Crisis Action Center. ADJACENCIES Directly accessible from MSU suite and central corridor (separate access

points). Contiguous with MSU Conference via movable partition. Close access to D9 COOP Supplies.

ROOM NO. 255 Min Ceiling Ht. 10'-0" Program Area 450 SF Furniture Qty Item Qty Item and Equipment 15 Training tables: incl. 1 Clg mounted HDTV format Wire mgmt, keyboard tray, projector Monitor arm, CPU sling, 1 Clg mounted projection grommet screen 24”x60” nominal size 15 Fully ergonomic task chairs (verify requirements) Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” straight rubber base, dry erase & projection wall covering

along length of one wall, track system for visual display boards along length of one wall, including 4 (four) sliding units

Door Refer to narrative Sound Ceiling Attenuation Floor Walls STC-47, including movable partition. Provide continuous walls

structure to structure Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 15 outlets 1 each per training position each with 4 CAT5e cables

Ceiling mounted paging speakers with volume control. 2 recessed floor boxes each with 8 CAT5e cables.

Other Requires access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 9 6

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME SIPRNET SPACE TYPE Support ACTIVITY Secure Communications Room for SIPRNET equipment ADJACENCIES Directly adjacent CAC. Accessible from corridor or MSU suite. ROOM NO. 256 Min Ceiling Ht. 9'-0" Program Area 150 SF Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Conductive interlocking floor tile Walls Paint, 6” h coved rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security General Provide Kaba Mas X-09 locking device. Provide electric mortise

lockset for the card reader in addition to the X-09. Walls Provide continuous walls structure to structure

Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for MSU SIPRNET Comm. 1 unclassified outlet on each of 3 walls each with 4 CAT5e cables. 1

unclassified outlet adjacent to the SIPRNET cabinet with 2 CAT5e cables for connections to the SIPRNET cabinet. 2 classified SIPRNET outlets surface mounted on the walls each with 2 CAT5e (red) cables and jacks.

Other Requires access floor Provide clean agent fire suppression equipment.

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 9 7

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Corridor SPACE TYPE Circulation ACTIVITY Horizontal circulation, emergency egress ADJACENCIES Connects MSU suite with public corridor at Stair B ROOM NO. 257 Min Ceiling Ht. 9'-0" Program Area - Furniture Qty Item Qty Item and Equipment None Required Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security Install card reader and keypad (combination reader) to door to

corridor 257 from corridor 233. Install door contacts on door. Install automatic door closer on door.

Utility Mech. Ventilation per ASHRAE 62.1. Services Plumb. None. Elect. Provide amenities per specification for Corridor. Comm. Ceiling mounted paging speakers. Other No access floor requirements

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 9 8

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Office - Invest. SPACE TYPE Office,

Private ACTIVITY MSU Private Office - Investigations ADJACENCIES Directly accessible from MSU suite. ROOM NO. 258 Min Ceiling Ht. 9'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (100sf) incl. (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet with 4 CAT5e cables. Other Requires access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 9 9

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Office - PS SPACE TYPE Office,

Private ACTIVITY MSU Private Office – Port Security ADJACENCIES Directly accessible from MSU suite. ROOM NO. 259 Min Ceiling Ht. 9'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (100sf) incl. (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet with 4 CAT5e cables. Other Requires access floor

MSU/STA/ESD Building

U S C G C l e v e l a n d , O h i o | P a g e 1 0 0

SPACE CRITERIA SHEET Rebuild MSU / STA / ESD Building SFRL No.: 09-L9002 Cleveland, Ohio Date: 6/30/2010 SPACE NAME Office - Insp. SPACE TYPE Office,

Private ACTIVITY MSU Private Office - Inspections ADJACENCIES Directly accessible from MSU suite. ROOM NO. 260 Min Ceiling Ht. 9'-0" Program Area 100 SF Furniture Qty Item Qty Item and Equipment 1 Workspace (100sf) incl. (2) guest chairs (1) fully ergonomic task chair Contractor Furnished; Contractor Installed Government Furnished; Government Installed Finishes Ceiling 2x4 suspended acoustic ceiling system Floor Carpet tile Walls Paint, 4” h straight rubber base Door Refer to narrative Sound Ceiling Attenuation Floor Walls Security None. Utility Mech. Ventilation per ASHRAE 62.1, air conditioning. Services Plumb. None. Elect. Provide amenities per specification for Offices Comm. 1 outlet with 4 CAT5e cables. Other Requires access floor