Scottish Water: Second Draft Business Plan. Operating Cost Special Factors – Contents
CONTENTS
Contents
1. Operating Cost Special Factors’ Claims ...........................................3
2. Population Sparsity: Determining a Proxy for England and Wales within
Scotland ................................................................................5
3. Bad Debt .............................................................................. 10
4. Cryptosporidium..................................................................... 16
5. Electricity: Higher Unit Electricity Prices at Smaller Rural Sites........... 23
6. Public Septic Tanks ................................................................. 29
7. Sewer Laterals ....................................................................... 31
8. Supply of Chemicals ................................................................ 40
9. Travel ................................................................................. 44
10. Complex Water Treatment ........................................................ 59
11. Household Metering................................................................. 65
Scottish Water: Second Draft Business Plan. Operating Cost Special Factors - Summary
3
EXECUTIVE SUMMARY
1. Operating Cost Special Factors’ Claims
Executive Summary
This document sets out Scottish Water’s Special Factor submission to inform the Strategic Review of
Charges for the period 2010-14.
Scottish Water operates in a different environment from England and Wales (E&W) for reasons of
population sparsity, geography and legal obligation.
The table below provides the value of Scottish Water’s special factor submission, split by each special
factor. This is used in our efficiency analysis, which is detailed further in Operating Cost Appendix 4.5 of
the Second Draft Business Plan.
Value Split
Special Factors 2007/08 prices
£m
Water
%
Sewerage
%
Bad debt 13.3 48 52
Cryptosporidium 1.6 100 0
Electricity 1.8 69 31
Public septic tanks 1.2 0 100
Sewer laterals 7.2 0 100
Supply of chemicals 0.3 100 0
Travel 9.1 50 50
Total special factors 34.5
Scope Adjustments:
Complex water treatment 0.0 100 0
Household metering -6.3 51 49
Total scope adjustments -6.3
Net special factors 28.2
Introduction
This document sets out Scottish Water’s Special Factors submission in relation to the Strategic Review of
Charges 2010-14.
Scottish Water has a different operating environment from E&W for reasons of population density,
geography and legal obligation. We have therefore determined a proxy region for comparison purposes
where information from E&W is not available. This analysis is set out in advance of our detailed special
factors submission and has been used specifically to quantify our travel and electricity special factors.
Scope Adjustments
In the Strategic Review of Charges 2006-10, the Water Industry Commission for Scotland introduced
adjustments to the assessment of Scottish Water’s efficiency position based on their assessment of the
differences in the scope of activities and levels of service provided to customers in Scotland compared to
Scottish Water: Second Draft Business Plan. Operating Cost Special Factors - Summary
4
EXECUTIVE SUMMARY
those in E&W. The Commission used Yorkshire Water as the comparator company for its assessment of
the difference in costs that result from differences in scope of activities.
The value of the scope adjustments could vary significantly depending on which company is at the
frontier in 2007/08. Therefore, we propose that where a scope adjustment is appropriate, the valuation
is based on a comparison to the average company in E&W. This approach is in line with that taken for
special factors.
We present cases covering scope adjustments for household metering and complex water treatment.
Scottish Water: Second Draft Business Plan. Population Sparsity
5
POPULATION SPARSITY
2. Population Sparsity: Determining a Proxy for England and Wales within Scotland
Executive summary
The population density of Scotland is significantly lower than that for England and Wales (E&W) (59 and
355 people per square km, respectively). Scottish Water’s geographical coverage extends across the
most rural regions in the whole of Britain and its operating area is almost three times the size of Anglian
Water, the largest company area in E&W. Scottish Water also provides services to 58 inhabited islands,
unlike the water and sewerage companies (WaSCs) in E&W. As a consequence, Scottish Water has a
significantly different operating environment to the WaSCs1:
• The urban population density of Scottish Water is lower than all of the WaSCs with the
exception of Dŵr Cymru.
• The rural population density is lower than any of the WaSCs and less than half that of
Northumbrian Water, the WaSC with the lowest rural population density.
• The overall population density of Scottish Water is lower than any of the WaSCs and less
than half that of Dŵr Cymru, the WaSC with the lowest overall population density.
This report, firstly, demonstrates Scottish Water’s ‘super-rurality’ position amongst the water and
sewerage companies in Great Britain. This makes it an outlier in respect of population (or asset) density
explanatory variables used in the econometric benchmarking models.
Secondly, this report provides the arguments to support the choice of our Ayr, Clyde and Tweed regions
as the Scottish proxy region for an English and Welsh WaSC. We need to establish such a proxy region in
order to be able to undertake a comparative analysis of operational costs between this proxy area and
the rest of Scotland where relevant English and Welsh data are not available.
Rurality in the GB context
The greater sparsity of the population served by Scottish Water compared to that of the WaSCs in E&W
gives rise to a significantly different operating environment. The table below shows the spread of
population and asset densities within Scotland and between Scotland and the WaSCs. Only Ayr and
Tweed are close to the lowest-density WaSCs. The Clyde region is more densely populated than Thames
Water and the remaining regions are significantly less densely populated than any WaSC in E&W.
1 Second Draft Special Factors Submission, April 2005. We have since reviewed the recent mid-2006 population estimates (National Statistics) to verify that the recent increase in migration to the UK has not changed the picture significantly. It shows that E&W have become even more densely populated than Scotland.
Scottish Water: Second Draft Business Plan. Population Sparsity
6
POPULATION SPARSITY Scottish Water Operational Regions and WaSCs – density comparisons
Wastewater Water
Company / Region
Population
Density
(Sewerage
population
per square km
of land area)
Sewerage
Service
Population per
wastewater
treatment
works2
Sewerage
Service
Population per
km length of
Sewer
Water Service
Population per
water
treatment
works
Water Service
Population per
km length of
main
Ayr 153 6,714 97 43,631 135
Clyde 1,439 68,818 121 110,073 227
Don 42 1,701 82 11,683 66
Forth 43 2,170 92 9,114 103
Ness 6 304 55 1,721 35
Nith 82 2,167 95 30,731 97
Tay 73 2,941 93 40,781 109
Tweed 134 5,828 99 37,487 152
Proxy (Ayr, Clyde, Tweed)
204 8,936 105 50,690 165
Scottish Water 59 2,511 95 15,906 106
Anglian 210 5,173 133 30,072 114
Dwr Cymru 143 3,748 165 40,032 105
Northumbrian 290 6,369 169 103,183 230
Severn Trent 399 8,140 157 56,299 161
South West 148 2,439 175 40,717 108
Southern 405 11,548 199 23,244 170
Thames 1,023 39,086 200 89,937 272
United Utilities 487 11,783 173 62,433 162
Wessex 263 6,477 159 11,334 109
Yorkshire 359 7,768 161 71,594 155
Average (E&W) 355 8,432 170 49,681 163
Note: Data taken from Ofwat 2007/08 Annual Returns and Scottish Water’s 2007/08 Annual Return
2 Includes septic tanks
Scottish Water: Second Draft Business Plan. Population Sparsity
7
POPULATION SPARSITY
ANG
WSH
SVT
SWT
TMS
UUT
NES
SRN
WSX
YKY
Scottish Water
Average
0
2
4
6
8
10
12
14
0 10 20 30 40 50 60 70 80 90
Area (1000 km2)
Po
pu
lati
on
(m
illio
ns
)Population Density Comparison of all WaSCs and Scottish Water
The chart above illustrates population density for all WaSCs. It shows that Scottish Water’s population
density is an outlier when compared with the WaSCs because its population per geographical area is far
lower.
Determination of a Scottish Water proxy area for England and Wales
Looking at the different density measures shown above, it can be seen that none of Scottish Water’s
eight regions are directly comparable to any of the WaSCs. We have used population density as the main
parameter to determine rurality since it is entirely outside Scottish Water’s control. Several alternative
proxy areas were evaluated. From this analysis, the combination of Ayr, Clyde and Tweed regions is
considered the most appropriate proxy for the average WaSC in E&W, since its population density falls
within the range of those of the E&W WaSCs.
Ayr, Clyde and Tweed have been grouped together to form a comparator area within Scottish Water. The
other five Scottish Water regions are significantly less densely populated than the WaSC areas in E&W
and are deemed to be causing the extra, rurality-related costs where they are not appropriately captured
in the econometric models. Even then, the proxy chosen is more rural than an average company in E&W;
when applied, for example, to the travel special factor, it will generate a conservatively low estimate of
additional costs.
Scottish Water: Second Draft Business Plan. Population Sparsity
8
POPULATION SPARSITY Annex 1: Abbreviations
Company Abbreviation Water & Sewerage Company (WaSC) / Scottish Water operational region
Scottish Water - Scottish Water
Ayr Region Ayr Ayr Region – Scottish Water
Clyde Region Clyde Clyde Region - Scottish Water
Don Region Don Don Region - Scottish Water
Forth Region Forth Forth Region - Scottish Water
Ness Region Ness Ness Region - Scottish Water
Nith Region Nith Nith Region - Scottish Water
Tay Region Tay Tay Region - Scottish Water
Tweed Region Tweed Tweed Region - Scottish Water
Anglian Water ANG WaSC
Dwr Cymru WSH WaSC
Northumbrian Water NWT WaSC
Severn Trent Water SVT WaSC
South West Water SWT WaSC
Southern Water SRN WaSC
Thames Water TMS WaSC
United Utilities UUT WaSC
Wessex Water WSX WaSC
Yorkshire Water YKY WaSC
Scottish Water: Second Draft Business Plan. Population Sparsity
9
POPULATION SPARSITY
Annex 2: Map of Scottish Water Operational Regions
Scottish Water: Second Draft Business Plan. Bad Debt
10
BAD DEBT
3. Bad Debt
Executive Summary
Scottish Water is currently required by the Scottish Government to use the local authorities to bill,
collect and recover household water and waste water charges.
The level of bad debt incurred in Scotland is higher than experienced with England and Wales (E&W).
This extra cost is out-with managerial control and as such requires a special factor adjustment.
The additional operating costs for Scottish Water’s high level of household bad debt is valued at £13.3m
in 2007/08 prices. This is based on Scottish Water’s reported underlying level of household bad debt
being 4.39% of net charges billed in 2007/08.
Basis for the Special Factor
Background and Management Control
In 1996, when the responsibility for the provision of water and waste services moved to the water
authorities from local government, the former Scottish Office required that councils continued to be the
mechanism for billing and collecting household revenues for water and waste water charges on behalf of
the water authorities. The “Paying for Water Services 2006-2010” consultation of July 2004 stated that
this arrangement will continue until 2010 at the earliest.
The situation is different in E&W where the water and sewerage companies (WaSCs) are directly
responsible for billing, collecting and recovering their household charges. They are therefore more able
to control their collection and bad debt levels.
Despite Scottish councils having improved their collection performance in recent years (refer to Annex
3), poor levels of initial collection contributed to Scottish Water’s level of bad debt remaining higher
than the E&W average.
Quantification
Methodology
Scottish Water carried out an anonymised benchmarking exercise with the WaSCs. Each company was
asked to provide information on their bad debt split by households and non-households.
To determine the additional operating costs associated with Scottish Water’s household billing and
collection, the following approach was adopted:
• Establish what Scottish Water’s household bad debt costs and household billing and
collection costs would be if the average levels experienced in E&W applied in Scotland.
• Quantify the difference between Scottish Water’s actual household bad debt costs and those
using the E&W average.
This is encapsulated in the following formula:
Scottish Water: Second Draft Business Plan. Bad Debt
11
BAD DEBT
Household bad debt special factor
=
Scottish Water cost of bad debt – SW cost of bad debt using E&W average
+
Scottish Water cost of collection – Scottish Water cost of collection using E&W average
Scottish Water – Bad debt
The table below shows the average household bad debt per property in Scotland in 2007/08 prices.
Company Household Bad Debt
(000s) No. of Household Properties (000s)
Average level of household bad debt per
property
Scottish Water £29,590 4,550 £6.50
Note: A household with both water and sewerage is counted as two properties.
The table above reflects Scottish Water’s underlying level of bad debt rather than that reported in the
2007/08 annual return. Scottish Water’s underlying level of bad debt was assessed by adjusting the
annual return 2007/08 charge for the effective release of prior year over provisions. The underlying level
of bad debt was estimated to be 4.39% of net billed charges. Refer to Operating Cost Appendix 4.1 of
the second draft business plan.
England and Wales – Bad debt
The level of debt in E&W is provided by each WaSC in their June Returns as a combined household and
non-household figure. Each of the WaSCs have been approached for benchmarking analysis and asked to
identify the level of household bad debt. Eight of the WaSCs, supplying 82% of households, provided this
breakdown. The average household bad debt per property in E&W has been taken as the weighted
average of the benchmarked companies. The average E&W household debt is £3.19 per property in
2007/08 prices as shown below.
Scottish Water: Second Draft Business Plan. Bad Debt
12
BAD DEBT
Average household bad debt per household property England and Wales
Company Household Bad Debt
(£000s) No. of Household Properties (000s)*
Average level of household debt per
property
Company 1 Benchmarked Confidential Confidential Confidential
Company 2 Benchmarked Confidential Confidential Confidential
Company 3 Benchmarked Confidential Confidential Confidential
Company 4 Benchmarked Confidential Confidential Confidential
Company 5 Benchmarked Confidential Confidential Confidential**
Company 6 Benchmarked Confidential Confidential Confidential***
Company 7 Benchmarked Confidential Confidential Confidential***
Company 8 Benchmarked Confidential Confidential Confidential**
Average E&W £100,823 31,616 £3.19
*A household with both water and sewerage is counted as two properties.
** For these companies, debt per property is calculated using 2006/07 bad debt but inflated to 2007/08
prices divided by the number of properties in 2007/08.
*** 2007/08 Benchmarked figures for household and non-household bad debt adjusted to the total bad
debt figure as reported in June Return 2008.
The order of companies in this table and the corresponding table for cost of collection are not the same.
Quantifying the Bad Debt Special Factor
If the average level of household bad debt per property in E&W is applied to the number of Scottish
Water households the bad debt factor can be quantified as follows:
• Scottish Water household bad debt £29.6m
• Less E&W average bad debt x number SW properties £14.5m [£3.19 x 4.55m]
• Value of bad debt special factor £15.1m
If Scottish Water was able to achieve the average bad debt performance in E&W the cost of bad debt
would reduce by £15.1m in 2007/08 prices.
Cost of the Billing and Collection Service
Scottish Water is obliged to use the councils for billing and collection. As the councils provide this
service at a lower cost to that experienced in E&W this is used as an offsetting factor.
The table below shows the cost to Scottish Water of collecting household charges in 2007/08 prices.
These costs are sourced directly from Scottish Water’s General Ledger.
Household cost of collection per property
Company Cost of Collection – Household (£000s)
No. of Household Properties (000s)
Cost of Collection per Cost per property
Scottish Water 14,316 4,550 £3.15
Scottish Water: Second Draft Business Plan. Bad Debt
13
BAD DEBT
The household billing and collection data shown below for E&W have been sourced from benchmarking
analysis. Each company was asked to provide their cost of collection, billing and debt recovery.
Information was provided by seven companies, supplying 69% of households. The weighted average cost
of the seven reporting companies is shown in the following table.
Household cost of collection per property in England and Wales
Company Cost of Collection – Household (£000s)
No. of Household Properties (000s)*
Cost of Collection per Cost per property**
Company 1 Benchmarked Confidential Confidential Confidential
Company 2 Benchmarked Confidential Confidential Confidential
Company 3 Benchmarked Confidential Confidential Confidential**
Company 4 Benchmarked Confidential Confidential Confidential
Company 5 Benchmarked Confidential Confidential Confidential
Company 6 Benchmarked Confidential Confidential Confidential
Company 7 Benchmarked Confidential Confidential Confidential**
Average E&W £93,561 26,432 £3.54
Note: The order of companies in this table and the corresponding table for bad debt are not the same
*A household with both water and sewerage is counted as two properties.
** For these companies, cost of collection is calculated using 2006/07 cost of collection inflated to
2007/08 prices then divided by the 2007/08 number of properties. The 2006/07 figures were £2.22 and
£2.28 per property respectively.
Quantifying the Collection Factor
If the average cost of collection per property in E&W is applied to the number of Scottish Water
households the cost of collection factor can be quantified as follows:
• Scottish Water household cost of collection £14.3m
• Less E&W average cost of collection x number SW properties £16.1m [£3.54 x 4.55m]
• Value of collection factor -£1.8m
If Scottish Water experienced the same collection levels as those experienced in E&W the cost of
collection would increase by £1.8m in 2007/08 prices.
Mitigating the Impact
Scottish Water is focusing on mitigating any negative effect associated with the obligation to use the
councils. We do this by incentivising the councils to improve their collection rates.
Scottish Water has reviewed the Service Level Agreements (SLAs) with all 32 councils. In 2004/5 there
were 9 SLAs with collection incentives representing 31.4% of households. There are now 27 SLAs with
collection incentives covering 88.5% of households.
Scottish Water: Second Draft Business Plan. Bad Debt
14
BAD DEBT
Collection incentives built into the SLAs for 2007/08 are as follows:
• 17 councils have a current year collection incentive
• 10 councils have a current and prior year incentive
• 2 councils’ performance incentives are currently under negotiation
The remaining councils have not agreed to have collection incentives built into their SLAs, however it
should be noted that they have higher than average collection rates.
In-year billing collection statistics have improved from 91.85% in 2004/05 to 93.44% in 2007/08 (see
Annex 3). Local authorities also have their own initiatives to improve Council Tax collection rates, which
in turn have an impact on the collection of Water and Sewerage charges.
Conclusion
The additional operating costs incurred relative to E&W is valued at £13.3m in 2007/08 prices. This is
based on Scottish Water’s underlying level of household bad debt being 4.39% of net charges billed in
2007/08.
Scottish Water: Second Draft Business Plan. Bad Debt
15
BAD DEBT
Annex 3: Household In-Year Collection* - CONFIDENTIAL
Scottish Water: Second Draft Business Plan. Cryptosporidium
16
CRYPTOSPORIDIUM
4. Cryptosporidium
Executive Summary
The Cryptosporidium (Scottish Water) Directions 2003 place obligations on Scottish Water to carry out
analysis on raw water and treated water at each water treatment works (WTW), at frequencies
determined by the overall risk assessment score associated with that works. This sampling requirement
is in excess of sampling programmes undertaken by the companies in England and Wales (E&W). The
significant differences between the legislation in Scotland and in E&W are:
• The Directions require Scottish Water to sample raw water supplies. This is not required in
E&W.
• The Directions require Scottish Water to sample treated water at all WTWs. Water
companies in E&W are only required to sample at WTWs considered at ‘significant risk’.
Scottish Water samples more WTWs for cryptosporidium than the whole of E&W.
The Scottish Water claim is based on the number of treated water samples taken at low and moderate
risk WTWs and the number of raw water samples that would not be taken if Scottish Water were subject
to E&W legislation. The excess number of samples taken in Scotland is 13,809 based on this approach.
The value of the special factor claim is £1.6m in 2007/08 prices.
Basis for the Special Factor
Background and Management Control
The Drinking Water Directive was transposed into appropriate regulations in the UK. In E&W, The Water
Supply (Water Quality) Regulations 1989 applied and in Scotland, The Water Supply (Water Quality)
(Scotland) Regulations 1990 applied. Both sets of regulations were superseded in December 2003 by The
Water Supply (Water Quality) Regulations 2000 in E&W and The Water Supply (Water Quality) (Scotland)
Regulations 2001 in Scotland.
In general terms both sets of regulations are identical. There is, however, a significant difference in how
these regulations are implemented north and south of the border. This results in the sampling
requirement for Scottish Water being in excess of the sampling programmes carried out by the companies
in E&W.
Sampling Requirements in England and Wales
In E&W the Drinking Water Inspectorate (DWI) took the view that an amendment to the regulations was
required to take account of the increasing risk of cryptosporidium. To this end it incorporated a
treatment standard for cryptosporidium of 1 oocsyt per 10 litres of treated water. Within the
regulations, water companies are obliged to carry out risk assessments to determine whether, in their
judgement, a works carries a significant risk of a breach of this standard. If there is a significant risk the
water company is obliged to carry out the necessary measures to ensure compliance or implement a
suitable sampling regime to monitor for cryptosporidium. Only 11% of the WTWs in E&W are categorised
as at significant risk. Where the risk assessment does not identify a ‘significant’ likelihood of breaching
Scottish Water: Second Draft Business Plan. Cryptosporidium
17
CRYPTOSPORIDIUM
the cryptosporidium standard the E&W companies are under no obligation to sample for cryptosporidium.
This standard applies for the base year 2007/08.
An amendment to the 2000 Regulations applies from 31 December 2007 which removes the treatment
standard for cryptosporidium. This means that a similar situation applies as in Scotland i.e. that
cryptosporidium is covered by the wholesomeness catchall (see below) and that companies are liable to
prosecution if any level of cryptosporidium enters supply. However, no sampling regime has been
prescribed to companies in E&W as companies can choose how best to manage and monitor their risk.
Sampling Requirements in Scotland
In Scotland, the Scottish Executive (now Scottish Government) took the view that the existing regulations
already covered cryptosporidium by way of the wholesomeness catchall (i.e. the water does not contain
any element, organism or substance at a concentration or value which would be detrimental to public
health). To complement the regulations the Scottish Executive issued The Cryptosporidium Direction
2000 obliging the water authorities to carry out risk assessments on all works and carry out remedial
works to ensure that all water treatment works carried a moderate to low risk. The Direction also gave a
benchmark standard that all authorities had to adhere to in terms of monitoring, sampling and analysis
and operational best practice. This was based on Badenoch reports. Later Directions were based on the
Bouchier report.
The Cryptosporidium (Scottish Water) Directions 2003 came into force on 31 December 2003. This set
the baseline levels of cryptosporidium sampling and analysis required (raw and treated water) for each
supply. Details of the sampling requirements in Scotland can be seen in Annex 4.
Sampling Taken in Scotland, England and Wales, 2007
The following table compares numbers of cryptosporidium samples taken at water treatment works in
Great Britain. This shows that Scottish Water has to monitor over twice as many water treatment works
as all the companies in E&W combined.
Cryptosporidium Sampling in England, Wales & Scotland in 2007
E&W Region Number of WTWs Monitored WTWs % WTWs monitored
Number of Samples taken
Northern 232 39 16.8 11,845
Eastern 191 9 4.7 3,133
Midlands 212 11 5.2 3,960
Southern 227 22 9.7 5,905
Thames 195 17 8.7 6,178
Western 153 31 20.3 9,681
Wales 96 20 20.8 6,953
Total E&W 1,306 149 11.4 47,654
Scotland 307 307 100 16,742
Notes: (i) E&W regions data from DWI Drinking Water Quality Report 2007.
(ii) Scottish Water sampling numbers from LIMS. WTW numbers from Water Quality Report 2007
(iii) E&W samples WTWs of significant risk. Scottish Water samples all works regardless of risk.
Scottish Water: Second Draft Business Plan. Cryptosporidium
18
CRYPTOSPORIDIUM
As Scottish Water must comply with the Cryptosporidium (Scottish Water) Direction 2003, the additional
samples required under this Direction are outside management control.
In PR99, companies in E&W applied for, and were granted by Ofwat, investment funding to install robust
treatment to meet the Cryptosporidium Standard. This explains why just 11% of WTWs are at significant
risk and hence reduces the sampling requirements. In Scotland, The Cryptosporidium (Scottish Water)
Directions 2003 required Scottish Water to establish an extensive sampling programme to build a body of
data to understand the extent of cryptosporidium risk exposure. As a result of this monitoring,
investment to reduce cryptosporidium in water supplies is being included to meet a Ministerial objective
for the first time in the 2010-14 period.
Econometric Models
Sampling and analysis costs are captured in the Water Business Activities model. Variations in sampling
requirements for cryptosporidium are not modelled. Predicted opex in this model is based upon the
number of billed properties served. Therefore not only does the model not take account of variations in
legislation, but also it does not account for variations in the asset base necessary to serve the
population. This special factor methodology reflects the additional costs that arise as a result of the
legislative difference only.
Quantification
The requirement for sampling in E&W is restricted to those WTWs where the cryptosporidium risk is
considered to be significant. The method of determination of risk in E&W is judgmental, based on
knowledge and experience of the WTW and catchments. The method of determination of risk in Scotland
is based on a formula and scoring system, which establishes WTWs at high, moderate or low risk.
Scottish Water takes samples for cryptosporidium at all of its WTW, however, only 25 are classed as high
risk (see Annex 4). The number of treated water samples taken at the high risk WTW is 2,933
The method for calculating the claim is as following:
Scottish Water actual
number of samples taken
16,742
- Number of samples taken for treated water
at Scottish Water high risk WTWs
2933
*
SW cost per
sample
£119
The excess number of samples taken under this method in Scotland is 13,809. At a cost for sampling and
analysis of £119 per sample the value of the special factor claim is £1.6m.
It has been assumed that a high risk site in Scotland is broadly equivalent to a site of significant risk in
E&W and therefore sampling at low and moderate risk sites and raw water sampling are additional to the
sampling requirement in E&W3. This is supported by the statistic that 11% of sites in E&W are regarded
as at significant risk compared with 9% of sites in Scotland at high risk.
3 From DWI report for E&W Regions on Water Quality 2006
Scottish Water: Second Draft Business Plan. Cryptosporidium
19
CRYPTOSPORIDIUM
Mitigating the Impact
Cost per Cryptosporidium Sample
The cost of Scottish Water’s sampling and analysis has been determined as £119 per sample in 2007/08
prices (see Annex 5). This £119 per sample compares with the £140 per sample (2002/03 prices) in 2003
and represents a reduction in real terms of 25%. This reflects improvements achieved in sampling and
analysis for Cryptosporidium over the intervening period and an adjustment to the percentage of
overheads allocated to Scientific Services.
In 2008 Scottish Water has sought benchmarking information on an anonymised basis from companies in
E&W. The cost per sample ranges between £91 and £242 for sampling and analysis as shown in the
following table.
Comparison of Cryptosporidium Sampling & Analysis Costs
WaSC No.1*
WaSC No.2*
WaSC No.3*
WaSC No.4**
WaSC No.5**
WaSC No.6**
WaSC No.7**
WaSC No.8**
Cost per sample in E&W
Confidential
*2007/08 prices **2006/07 prices
This suggests that Scottish Water costs are within reasonable E&W range of sampling costs.
Optimising the Sampling Collection Process
In order to minimise the cost of cryptosporidium sampling all necessary samples are taken by a
multifunctional sampling team during a visit to a treatment works and not restricted to cryptosporidium
or other type of sampling. All sampling is regionally coordinated to optimise routes and minimise
distances travelled.
At smaller more remote sites, operations staff will install the sampling filter during routine operational
visits to reduce the number of visits required by the sampling team.
The Cryptosporidium Compliance group has established a new procedure whereby any broken or failing
filter, which results in a missed sample, is reported and the sample is not rescheduled until a report is
returned that the repair is complete. This helps reduce unnecessary trips.
Risk Reduction
Generally Scottish Water does not own catchments supplying WTWs so it is difficult to reduce the risk
from these. On the treatment side, there are a large number of WTWs with robust treatment installed
which, as a by product, reduces the risk of cryptosporidium entering supply, and hence reducing the
required numbed of samples to be taken. Ongoing investment in 2006-10 and planned investment for
2010-14 will further improve treatment and reduce the required number of samples.
Rationalisation
As part of any investment planning process, we seek opportunities to reduce the number of WTWs we
operate by rationalisation of small WTWs and replacement where possible by additional pipelines. This
Scottish Water: Second Draft Business Plan. Cryptosporidium
20
CRYPTOSPORIDIUM
has resulted in the closure of 20 WTWs since 2005/06 and 58 since 2003/04, thus reducing the number of
samples required to be taken and analysed.
Number of Scottish Water’s Water Treatment Works
2003/04 2004/05 2005/06 2006/07 2007/08
Number of water treatment works
371 368 333 319 313
Note: Figures taken from Scottish Water Annual Returns, table E4.
As a result of maintaining old WTW during the commissioning of replacement WTWs, Scottish Water
operated 313 works over the year but only sampled from 307 at any point in time. The rationalisation of
WTWs is an ongoing process.
Conclusion
Scottish Water must undertake significantly more cryptosporidium sampling and analysis than in E&W as a
result of the difference in legislation. A special factor claim to the value of £1.6m in 2007/08 prices is
submitted to reflect the additional operating costs associated with cryptosporidium sampling.
Scottish Water: Second Draft Business Plan. Cryptosporidium
21
CRYPTOSPORIDIUM
Annex 4: Final water and raw water sampling requirements in Scotland
Sampling requirements for final and raw water are given in the following tables.
Final Water Sampling Requirements
WTW Maximum Design Flow (Ml/day)
Final Water ≤ 1 > 1 ≤ 10 > 10 ≤ 50 > 50
High risk
( > 55) 52 104 365 365
Moderate risk (35 - 54)
12 52 52 104
Catchment & Treatment Risk Score
Low risk
(< 35) 12 12 52 52
The risk score is calculated by using a methodology that considers factors that include: the degree of
exposure of the catchment to oocysts, agricultural practices, sewage inputs, water source type, river and
intake management, water treatment, treatment works monitoring, performance and operational
factors, and cryptosporidium monitoring. The methodology is based on a simple scoring system that
assesses the risk by identifying the potential for cryptosporidium to be present in the water4.
In contrast to companies in E&W, Scottish Water is required to sample for cryptosporidium at all WTW
regardless of the level of risk. There is also a requirement in Scotland for sampling of raw water which is
not required in E&W.
Raw Water Sampling Requirements
WTW Maximum Design Flow (Ml/day)
Raw Water ≤ 1 > 1 ≤ 10 > 10 ≤ 50 > 50
High risk
( > 55) 12 26 52 52
Moderate risk (35 - 54)
0 12 12 26
Catchment & Treatment Risk Score
Low risk
(< 35) 0 0 12 12
The determination of whether a WTW is considered to be of a high, moderate or low risk uses a
combination of the risk scores for raw and treated water and applies a weighting according to the
population served. The result of which is 25 of Scottish Water’s WTW are considered high risk.
4 Cryptosporidium Direction 2003, page 16
Scottish Water: Second Draft Business Plan. Cryptosporidium
22
CRYPTOSPORIDIUM
Annex 5: Determination of Sampling and Analysis Cost
• Sampling costs are based on the actual costs for financial year 2007/08 and the actual
number of cryptosporidium samples taken during 2007/08.
• Sampling costs are based on total 2007/08 sampling costs divided by total no of samples with
an adjustment for cryptosporidium to allow two trips for each cryptosporidium sample; one
to put the filter on and one to take it off.
• Sampling costs include for the cost of the filter at £20.20 each.
• Analysis costs are based on actual cryptosporidium analysis costs divided by the number of
cryptosporidium samples.
• Laboratory on-costs from Activity based Management (ABM) are an additional 31.6% and
include for all management, QA, equipment replacement and internal recharge for HR, IT
etc.
Cryptosporidium Sampling and Analysis Costs
Cost per sample
Cost of sampling £51.96
Cost of analysis £38.23
Total direct cost of sampling and analysis £90.19
Overhead uplift for laboratory (from ABM): £28.48 (31.6% of £90.19)
Total cost of sampling and analysis per sample £118.67
Scottish Water: Second Draft Business Plan. Electricity
23
ELECTRICITY
5. Electricity: Higher Unit Electricity Prices at Smaller Rural Sites
Executive summary
Scottish Water incurs costs above those predicted by the econometric model because it needs to operate
a high number of remote, low-power assets. The geography and population sparsity of Scotland,
particularly in the Highlands and Islands, necessitate many small treatment works and pumping stations
to serve small communities. These small sites are charged at a more expensive rate than large sites.
This special factor claim is £1.8m in 2007/08 prices.
Background
Scottish Water’s sites are generally assigned to three broad tariffs depending upon the level of
consumption5:
• Block tariff (profile codes 03 & 04): Typically aimed at small businesses that do not consume
sufficient kWh to benefit from economies of scale. In addition, this tariff is devised for
small use customers who tend to operate at times when electricity is most expensive (i.e.
during the day, Monday to Friday) and not during evenings and weekends. It comprises
simply a daily standing charge and a volumetric charge.
• Maximum demand tariff (profile codes 05-08): For moderate consumers of electricity with a
highest monthly demand of between 45kVa and 100kVa. The tariff is more complex,
comprising a standing charge, a capacity charge, a maximum demand charge and a
volumetric charge which varies by time of day or night.
• Half-hourly (profile code 00): Designed for very large sites whose highest monthly demand
exceeds 100kVA and which have meters that record half-hourly consumption. Each site has a
different tariff structure depending on a number of factors that reflect the variability of
consumption, the maximum demand on the system, the supply voltage and losses specific to
that site relating to the distance from the transmission network.
Scotland includes the most rural and sparsely populated areas in the UK6. Many of Scottish Water’s
customers in the Highlands and Islands live in small remote settlements. Therefore, Scottish Water’s
assets tend to be smaller but more numerous than in E&W. Individually, these sites use relatively little
electricity. As a result, of the total of 4,533 supply points, 3,865 are assigned to the more expensive
Block Tariffs. A larger share of these electricity costs cover standing charges. By contrast, sites that
consume larger volumes of electricity are placed on a Half-Hourly tariff. Scottish Water’s biggest
electricity consuming sites are placed on the Half-Hourly tariff. These 423 supply points account for
approximately 77% of Scottish Water’s electricity consumption.
5 A few legacy contracts remain where supply points are still charged on the domestic tariff, however these amount to very little consumption or cost. Supply points are no longer assigned to this tariff.
6 See ‘Population Sparsity – Determining a Proxy for E&W within Scotland’ report for further detail.
Scottish Water: Second Draft Business Plan. Electricity
24
ELECTRICITY
Total number of Supply Points 2007/08
Region Tariff
Ayr Clyde Don Forth Ness Nith Tay Tweed
Scottish Water
00 HH 58 23 60 50 48 66 65 53 423
01 & 02 Dom 5 1 9 13 4 14 9 15 70
03 & 04 BT 325 186 594 500 706 463 702 389 3,865
05-08 MD 3 7 44 26 21 18 39 17 175
Total 391 217 707 589 779 561 815 474 4,533
Note: HH: half-hourly, Dom: domestic, BT: block tariff, MD: maximum demand.
A comparison of supply points by tariff with E&W shows the difference in demand. Scottish Water
commissioned an independent report7 to compare electricity prices with water companies in E&W. Five
companies contributed to this study representing a spread of both predominantly urban and rural service
areas and is therefore representative of the UK water industry.
Percentage of Electricity Consumed on Each Tariff 2007/08
Tariff Scottish Water
(%) E&W Average* (%)
00 Half-hourly 76.8 Confidential
01-02 Domestic 0.3 Confidential
03-04 Block Tariff 18.4 Confidential
05-08 Maximum Demand 4.5 Confidential
*EIC analysis based upon [Confidential]
Consumption & Cost of Supply Points by Tariff as % of Regional Total 2007/08
Region Tariff
Ayr Clyde Don Forth Ness Nith Tay Tweed
Scottish Water
00 82% 96% 71% 63% 48% 78% 70% 78% 77%
03-04 17% 4% 21% 28% 44% 19% 21% 18% 18% % Region Consumption
05-08 1% 0% 8% 8% 7% 3% 9% 3% 4%
00 77% 93% 67% 57% 44% 72% 63% 73% 71%
03-04 22% 6% 26% 34% 49% 24% 27% 23% 24% % Region Cost
05-08 1% 0% 7% 9% 6% 4% 10% 4% 5%
Water companies in E&W consume a greater proportion of electricity on cheaper half-hourly rates than
Scottish Water. 71% of Scottish Water’s cost is attributed to the 423 large half-hourly supply points. For
Scottish Water as a whole, electricity consumed on the block tariff amounts to 18% of total consumption
and 24% of all electricity costs.
This demand structure puts additional unavoidable cost pressures on Scottish Water, compared to E&W
water companies. Scottish Water has optimised sites to the best tariff as far as possible.
7 Electricity Benchmarking Analysis for Scottish Water, April 2008. Energy Information Centre
Scottish Water: Second Draft Business Plan. Electricity
25
ELECTRICITY
Econometric Models
The cost differentials caused by unavoidable asset dispersion are not taken into account in all of the
econometric models. Differences in the split of consumption between the various tariff types is not
reflected in the models, hence the need for Scottish Water to claim for the additional costs it incurs by
having a higher proportion of consumption on the more expensive non-half-hourly tariffs.
On the wastewater side, power costs are included in the total cost figure of each model. However, scale
is only adequately taken into consideration in the sewage treatment works models. Therefore, power
consumed in wastewater treatment has been excluded from this claim; wastewater networks and sludge
power costs are included.
On the water side, there is a separate model for power consumption that relates costs to distribution
input per average pumping head. The model specification links power costs only to this aggregate
variable. This does not take into account the dispersion of production and pumping of water that leads
to higher power costs in Scotland, due to a larger number of low-powered assets on high tariffs. Further
details are provided in Annex 6.
Quantification
If the more rural regions of Scotland had similar population distributions as E&W, these regions would not
require the same number of assets (and, by implication, supply points). To calculate the additional
electricity cost caused by higher consumption on block tariff supply points, the consumption profile of
E&W has been applied to Scottish Water. The difference between the two scenarios shows the impact of
the different demand structure. Electricity consumption for wastewater treatment is excluded from the
calculation tabulated below as the econometric model is a unit cost model and therefore could reflect
scale of electricity consumption.
Applying the average E&W consumption profile to Scottish Water’s tariffs (excluding wastewater
treatment works)
Total MWh excl consumption at wastewater treatment (A)
Tariff E&W % on Tariff
(B) Scottish Water pence/kWh (C)
Cost (A*B*C)
£m
00 (EHV = 33kV) Confidential 6.00 Confidential
00 (HV = 11kV) Confidential 6.39 Confidential
00 (LV = 0.4kV) Confidential 7.41 Confidential
01 Confidential 8.91 Confidential
02 Confidential 10.08 Confidential
03 Confidential 9.97 Confidential
04 Confidential 8.65 Confidential
375,270
05-08 Confidential 7.95 Confidential
Total 26.44
The table above demonstrates that Scottish Water’s total electricity costs excluding wastewater
treatment would be £26.4 million when the average E&W split between tariffs is applied. Scottish
Scottish Water: Second Draft Business Plan. Electricity
26
ELECTRICITY
Water’s actual cost excluding wastewater treatment is £28.2 million. This amounts to a difference of
£1.8 million in 2007/08 prices.
Mitigation
Scottish Water’s relatively low water pumping head demonstrates that it has been taking advantage of
the opportunities of gravity-feeding the water supply. The scope for an amalgamation of assets is limited
by;
• The water resources available
• The fact that the additional network expenditure necessary would far outweigh the power
cost disadvantage
Benefit realisation of moving to Half-Hourly Tariffs
The Meter Expansion Programme was completed in September 2006. The aim of this was to identify
further sites with a load factor of greater than 40% that could be placed on the half-hourly tariff.
Benefit realisation within Non-Half-Hourly Tariffs
A review of tariffs at 320 operational has been agreed with the supplier, delivering a forecast saving of
around £120,000/annum.
Consumption Reduction Initiatives
All buildings undergoing refurbishment are fitted with Passive Infra Red (PIR) motion sensors to minimise
electricity used in lighting. Currently 13 out of 51 buildings (Offices, labs, depots) already have PIR
sensors fitted and these include all major buildings/complexes.
Major buildings have Building Management Systems to control the temperature and the timing of central
heating.
Limitations to potential for mitigating electricity costs
Distribution and transmission use of system charges are regulated by Ofgem. They cannot be avoided nor
negotiated. Distribution charges are higher on average in Scotland as these reflect the increased cost to
the electricity provider of maintaining a network in sparsely populated areas. Therefore, Scottish Water
cannot take action to mitigate the costs of these higher charges. For details on the cost of delivery see
Annex 7.
Conclusion
Scottish Water incurs costs above those predicted by the econometric model because it operates a high
number of remote, low-power assets. The special factors claim is £1.8m in 2007/08 prices.
Scottish Water: Second Draft Business Plan. Electricity
27
ELECTRICITY
Annex 6: Econometric modelling of water power costs
For water, power costs are modelled separately from all other operational costs. Within the model used,
there is no measure for the total number and the sizes of individual sites. The explanatory variable in
the model is the product of average pumping head and total distribution input.
The Commission has indicated that it regards a possible ‘economies of scale’ effect in the model as
sufficient to account for the higher costs incurred by Scottish Water. We do not agree with this because
the unit cost reduction implicit in an increase in the explanatory variable cannot be interpreted as an
‘economies of scale’ effect. The reasons for this are outlined below.
Although there is a small reduction in estimated costs per Ml per m pumped as the explanatory variable
increases, the value of the explanatory variable rises if either average pumping head or distribution input
increases, leading to counter-intuitive results.
Scenario (i) – current position (ii) – double pumping head
(iii) – double distribution input
Pumping head 56m 112m 56m
Distribution input 2,271 Ml/d 2,271 Ml/d 4,542Ml/d
Predicted cost £13,042,000 £24,534,000 £24,534,000
Unit cost per Ml/d per m head £103 £96 £96
For example, if Scottish Water were to run services for an additional identical area, distribution input
would double but average pumping head remain constant. This is because changes in the numerator and
denominator to calculate average pumping head would each double, leaving average pumping head to be
the same. As a result of increased distribution input, the model would inappropriately allocate a
reduced unit power cost. Essentially, the model would interpret this as a ‘scale’ effect even though this
does not reflect the realities of such a situation, which are that unit costs should remain the same and
total costs should rise accordingly.
The central point is that this special factor claim contends that the geography of Scottish Water’s area
means that Scottish Water incurs higher than predicted power costs due to its many very remote assets
that can only be connected to the grid at relatively disadvantageous rates. A model which is based on
overall volume pumped to a certain height and estimated using the data from companies that face
fundamentally different geographical situations is not able to reflect adequately Scottish Water’s extra
costs that are due to the wide dispersion of its customers.
Scottish Water: Second Draft Business Plan. Electricity
28
ELECTRICITY
Annex 7: Delivery Charges
Delivery charges are the component of the total electricity cost that is regulated by Ofgem and therefore
outside managerial control. They cannot be avoided nor negotiated. EIC has identified that: “The net
effect is that Scottish Water is currently paying an average of 0.12p/kWh more for its delivery charges
than if the average English and Welsh indices applied. This equates to an annual sum of £526,747.”
The table below compares delivery charges in Scotland with E&W using an index to maintain
confidentiality of data.
Assessed delivery prices index
SW E&W
HH HV 100 Confidential
HH LV 100 Confidential
Profile 03 100 Confidential
Profile 04 100 Confidential
Profiles 05-08 100 Confidential
Weighted Average 100 82
Note: EIC analysis based upon [confidential]
We are not adding this onto the calculated claim of £1.8m because we are of the view that it is largely
included in the previous calculations.
Scottish Water: Second Draft Business Plan. Public Septic Tanks
29
PUBLIC SEPTIC TANKS
6. Public Septic Tanks
Executive Summary
Public septic tanks were removed from the small sewage works econometric model in the Strategic
Review of Charges 2006-10 thereby removing any allowance for their operation. In the expectation that
the Commission will adopt the same approach in 2010-14, a special factor allowance is required to
address this. The special factor claim is valued at £1.2m (2007/08 prices), including power and general
and support expenditure; but excluding SEPA charges.
Basis for the Special Factor
Background
Scottish Water operates 1,220 public septic tanks, approximately 62% of the total number of WWTW in
Scotland. Where the level of treatment is appropriate, septic tanks offer the most cost effective form of
treatment and so any change to the number of tanks by changing the treatment method would result in
an increase in overall cost.
Econometric Models
Public septic tanks were removed from the scope of the econometric models by the Commission in the
Strategic Review of Charges 2006-10 (SR06) Final Determination and replaced by an operating cost
allowance for their operation. It is expected that the Commission will adopt the same approach for the
Strategic Review of Charges 2010-14 (SR10) and the operating cost allowance will be recalculated.
Quantification
The current value of the claim is based on the figure in the 2008 Annual Return E table (E8) ‘Wastewater
Explanatory Factors – Sewage Treatment Works’. This has been reviewed by the Reporter. This gives the
direct costs for operation of all public septic tanks as £2.7m including general and support expenditure
(see table below). This figure also includes for SEPA service charges. SEPA charges are excluded from
the quantification of this special factor, as they are excluded from the econometric models. When SEPA
charges are removed, this brings the claim to £1.2m in 2007/08 prices.
Tankering costs are included in Table E10 of the Annual Return and modelled in the Sludge Econometric
model. Therefore these costs are not relevant to this Special Factor and are not included in the value of
the claim.
Scottish Water: Second Draft Business Plan. Public Septic Tanks
30
PUBLIC SEPTIC TANKS
Extract from Table E8 of Annual Return 2008
Septic Tanks 2007/08 Line Ref Unit
Number of septic tanks E8.8 1,220
Load (kg BOD/day) E8.18 7,191
Direct costs for all public septic tanks (£000s) E8.38 2,457
General and support expenditure (£000s) E8.39 251
Service charges SEPA (£000s) E8.42 1,467
Functional expenditure (£000s) E8.40 2,708
Claim: Functional expenditure less SEPA charges £1.2m
Mitigating the Impact
Opportunities for consolidation of numbers of tanks are rare, since assets are usually sited at the most
appropriate location for the community with respect to hydraulics and land availability. Any change to
the current system would most likely require the construction and operation of expensive pump transfer
systems, while there would be no reduction in the volume of sludge to be removed, as there would be no
change in the population served or the resultant sewage loading.
Across the Highlands, it is typical for septic tanks to be visited once per month where the operator will
take turbidity/SS samples and check the tanks for blockages to the inlet and outlet. There are some
tanks that are visited more frequently for specific reasons which include high population, tanks with
soak-away problems and tanks that discharge into sensitive waters. The average time spent servicing
septic tanks across the whole of Scotland has been calculated as 1.8 man days per tank per annum. This
figure is based on FTEs provided by Scottish Water’s Activity Based Management (ABM) system.
A comparison of figures from previous annual returns is given in the table below.
Comparison of Historical Septic Tank Costs
Costs (£,000) 2007/08 2006/07 2005/06 2004/05 2003/04 2002/03
Direct costs for all septic tanks 2,457 2,219 1,927 1,772 1,686 1,342
General and support expenditure 251 330 371 431 375 594
Functional expenditure 2,708 2,549 2,297 2,203 2,061 1,936
Service charges SEPA 1467 1,342 928 989 846 356
Functional expenditure excl SEPA (nominal prices)
1,241 1,207 1,369 1,214 1,215 1,580
Functional expenditure excl SEPA (2007/08 prices)
1,241 1,257 1,479 1,346 1,389 1,856
The table above shows how Scottish Water’s septic tank costs have trended in real terms since 2002/03
and have now established at £1.2m for functional expenditure excluding SEPA charges.
Conclusion
The value of this special factor claim excluding SEPA charges is £1.2m in 2007/08 prices.
Scottish Water: Second Draft Business Plan. Sewer Laterals
31
SEWER LATERALS
7. Sewer Laterals
Executive Summary
Due to a difference in sewerage legislation between Scotland and England and Wales (E&W), only Scottish
Water has the responsibility of operating and maintaining sewer laterals; a specific section of the sewer
network, in 2007/08. This special factor claim quantifies Scottish Water’s operational cost for its sewer
laterals. The claim is calculated as £7.2m in 2007/08 prices, reflecting the additional costs of
maintaining laterals.
Basis for the Special Factor
Background and Management Control
A sewer lateral is a particular section of the sewerage network for which Scottish Water is responsible by
statute under the Sewerage (Scotland) Act (1968) and therefore Scottish Water’s responsibility for sewer
laterals is out with managerial control. By contrast, in E&W with certain exceptions it is the property
owners and not the water and sewerage companies that are presently responsible for maintaining their
sewer laterals. There is an ongoing consultation by DEFRA on the future transfer of responsibility for
sewer laterals in E&W to the water and sewerage companies. However, as the Commission benchmarks
Scottish Water against E&W in the base year (2007/08), this special factor is valid.
The Scottish definition of a sewer lateral is, per the Sewerage (Scotland) Act (1968), the section of a
sewer starting at the curtilage of a property and ending where it joins the public sewer. Under the Act
Scottish Water has statutory responsibility for their operation and maintenance.
In E&W, legislation distinguishes between lateral drains and private sewers. Together they form the
sewer lateral in the Scottish sense. Apart from the sewer laterals of detached houses, ownership of
sewer laterals was vested in the sewerage undertaker until 1936. Thus the sewer laterals built prior to
1937 remain the responsibility of the water and sewerage companies and are known as Section 24 sewers.
The Health Act, 1936, (now Water Industry Act 1991 and The Building Act 1984), made the property
owners responsible for their sewer laterals. The Water Act 2003 made the sewerage undertaker
responsible for providing new sewer laterals but enabled them to charge the property owner for provision
and maintenance costs.
Since privatisation, DEFRA has been consulting with the water industry on how and when the
responsibility for the sewer laterals should be transferred to the sewerage undertakers in England and
Wales.
Econometric Models
Since the water and sewerage companies in England and Wales are not responsible for the operation of
sewer laterals (with the exception of Section 24 sewers), the costs of sewer laterals are not fully
accounted for in the sewer networks estimate. Therefore, the relatively higher cost for their operation
is not forecast by this econometric model.
Scottish Water has re-calculated the Ofwat sewer network model including Scottish Water data (see
Annex 8). This model has the same functional form as Ofwat’s model and predicts operational costs
Scottish Water: Second Draft Business Plan. Sewer Laterals
32
SEWER LATERALS
according to the length of sewer network. Including Scottish Water’s sewer lateral length within its
modelled sewer network length raises costs by £0.5m. This does not fully reflect the operational costs
incurred by Scottish Water with regard to sewer laterals.
Quantification
Introduction
Throughout the Strategic Review process, Scottish Water has considered a number of potential
approaches to calculating the value of our sewer lateral special factor claim. The approach we have
adopted is based on our own data, as this most accurately reflects the operating costs faced by Scottish
Water with respect to sewer laterals.
Operating cost data used
Scottish Water does not separately identify the costs of carrying out specific activities on sewer laterals.
We do, however, identify the total operating cost associated with all sewers. The quantification of the
cost of operating sewers is calculated from Activity Based Management (ABM) data. ABM provides
analysis of the costs of key activities and processes, and links these to the factors that cause or drive
Scottish Water’s level of operating cost. In this case, ABM has been used to summarise captured
operating costs for work relating to all sewers, including laterals (see the table below). The total
operating cost of all sewers was £19.3m in 2007/08.
Operating cost for all sewers from ABM, 2007/08
Activity Group Activity Total Cost (£000)
Opex repair of wastewater service connections 554
Opex repairs and maintenance of wastewater street furniture 195
Opex sewer repairs 7,141
Perform WW Infrastructure Investigations 237
Remove chokes 6,263
Sewer cleansing 1,331
Wastewater transportation
Sewer inspections including CCTV surveys 591
Handle Odour Complaints 450
Handle other Wastewater Complaints 714
Handle Sewer Flooding Complaints 1,570
Wastewater Complaint Investigation
Handle Wastewater Infrastructure Safety Complaints 226
Total 19,272
Cost drivers adopted
A proportion of the total operational cost of sewer networks can be attributed to operating sewer
laterals based on the use of cost drivers to apportion costs in a transparent manner. Two cost drivers
have been used:
Scottish Water: Second Draft Business Plan. Sewer Laterals
33
SEWER LATERALS
• The ratio of the length of sewer mains to sewer laterals as reported in the 2007/08 Annual
Return.
• The proportion of call-outs attributed to sewers and sewer laterals, obtained from Scottish
Water’s Promise system.
Each of these cost drivers can provide an estimate of the costs attributable to sewer laterals. These
estimates are then reduced by 22%, the estimated proportion of sewer laterals operating cost attributed
to S24 sewers. Annex 9 details our approach to calculating this percentage. The cost estimates
associated with each cost driver are provided below.
Quantification - Length of Sewer as the Cost Driver
The length of sewers and laterals, as published in the 2007/08 Annual Return (lines E7.8 and E7.9), has
been used to split the sewer operating by main sewers and laterals (see table below).
Length of Sewer and Laterals in Scottish Water
Type Length (km) Proportion of total length of sewers
Estimate of cost* (£m)
Sewers only 33,451 67% 13.0
Lateral 16,312 33% 6.3
All sewers 49,763 100% 19.3
* Cost is split according to the proportion of sewer length of each type
The unadjusted Scottish Water estimate for operational costs associated with sewer laterals is £6.3m.
This value includes activity on sewer laterals that would be considered as Section 24 sewers under English
and Welsh legislation. Reducing this value by 22%, results in an adjusted value of £4.9m.
Scottish Water recognises that this approach assumes that the operational cost per kilometre of sewer
lateral or main sewer is the same. This may be a conservative assumption, as lateral chokes cause floods
more often than other sewers (see table below regarding call-outs). There are several reasons why this
may happen. The lateral is often a small diameter pipe laid at a low gradient with long periods of low
flow, sometimes with an interceptor close to the public sewer which increases the risk of blockage.
Invasion of tree roots can add to the increased frequency of lateral chokes. Some incidents with laterals
also require multiple callout to a single property, sometimes on a single day. Therefore laterals may be
relatively more expensive to repair than main sewers. Scottish Water does, however, note that as
laterals are often located away from highways, there is less need for traffic management and road
resurfacing during excavations and repair; therefore lower costs might be incurred.
Quantification - Callouts as the Cost Driver
The table below summarises 2007/08 information from Promise on sewer failure due to internal or
external flooding incidences. This illustrates the prevalence of sewer laterals failure relative to main
sewers. If the total cost of all sewer network activities was apportioned by the number of call-outs, the
unadjusted operating cost estimate for sewer laterals is £13.3m. Reducing this estimate by 22% to
account for Section 24 sewers gives an adjusted figure of £10.4m.
Scottish Water: Second Draft Business Plan. Sewer Laterals
34
SEWER LATERALS
Call-outs requiring work on sewers and sewer laterals.
Type Number of call-outs requiring work on sewers and sewer laterals
Proportion of total number of
call-outs
Proportion of cost* (£m)
Sewers only 6,794 31% 6.0
Lateral 15,068 69% 13.3
All sewers 21,826 100% 19.3
* Cost is split according to the proportion of call-outs for each type of sewer
We note that this approach assumes that call-outs to laterals are as costly as call-outs to main sewers.
Overall value of the claim
The value of the claim submitted is based on the following:
• Section 24 adjusted sewer lateral operating costs using length as the cost driver - £4.9m
• Section 24 adjusted sewer lateral operating costs using call-outs as the cost driver - £10.4m
The average of these estimates is £7.7m. The final step is to reduce this by £0.5m, which reflects our
estimate of the sewer lateral operating cost attributed to Scottish Water based on the econometric
models (see Annex 8).
Consequently, the value of the sewer lateral claim is £7.2m.
Mitigating the impact
In line with best practice, Scottish Water minimises sewer lateral operational costs by optimising sewer
lateral activity.
• Call centre decision trees have been in place for several years and allow jobs to be
optimised:
o Most importantly, to ensure that the lateral is the responsibility of Scottish Water
and not a private drain for which the customer is responsible
o To determine whether jobs are urgent and need immediate attention (possibly
resulting in overtime hourly rates) or can be deferred until normal working hours
o To identify the type of problem so that a choke squad or a Network Service Operator
should be sent as appropriate
o To determine the number of operational staff required at a job (area and job
specific)
Previously, choke squads may have been sent out immediately but unnecessarily resulting in
increased costs and unavailability of squads to tackle urgent jobs.
• The Flood Management Action Plan (FMAP) Process has been in place since August 2008. All
internal flooding incidents are now investigated with a CCTV survey to determine the cause
Scottish Water: Second Draft Business Plan. Sewer Laterals
35
SEWER LATERALS
(sewer incapacity, silted sewers, tree root obstruction). This determines where investment
is to be channelled to prevent future reoccurrences. The FMAP process is more streamlined
than its predecessor, the Internal Flooding Other Causes (IFOC) Programme which was
commenced in May 2006. This also investigated the causes of internal flooding to determine
where investment should be made.
Conclusion
Scottish Water has the additional responsibility of operating and maintaining sewer laterals due to
legislative differences between Scotland and England and Wales. Operating expenditure for these
laterals above that taken account of in the econometric models is £7.2m in 2007/08 prices.
Scottish Water: Second Draft Business Plan. Sewer Laterals
36
SEWER LATERALS
Annex 8: Adjustment to Claim to Reflect Operational Costs Predicted by
Sewer Networks Model for Lateral Sewers
Scottish Water’s sewer lateral length is included within its modelled sewer network length. Therefore
the claim is reduced by the value of operational costs the sewer networks model predicts for non section
24 sewer laterals (i.e. sewer laterals built from 1937 that would not be the responsibility of Scottish
Water if legislation from England and Wales applied).
The sewer networks model predicts it should cost Scottish Water:
• £34.2m to operate all of its sewers (33,514km main sewers and 16,312km of sewer laterals)
• £33.7m to operate main sewers and Section 24 sewers (33,514km plus 3,534km of S24 sewer
laterals)
Therefore the claim should be reduced by the £0.5m difference in these two values.
These values are determined by Scottish Water’s re-calculation of Ofwat’s 2007/08 sewer networks
model, published at end January 2009. This model includes Scottish Water data when estimating the
model coefficients.
Scottish Water: Second Draft Business Plan. Sewer Laterals
37
SEWER LATERALS
Annex 9: Sewer Lateral Lengths Used in the Special Factor Claim
Adjustment for Section 24 Sewers
Based on Annual Return data, the total length of sewer laterals under Scottish Water’s responsibility is
16,312km. However, this includes for sewers constructed prior to 1937 known as Section 24 (S24) sewers
in England and Wales, which are already the responsibility of the WaSCs in England and Wales.
Pre 1937 sewers must be accounted for in a special factor submitted, i.e.:
Sewer lateral length used for the special factor claim
=
Scottish Water’s sewer lateral length less assumed Scottish S24 length
The methodology uses property data to determine the percentage of non-S24 sewers in Scotland. This
percentage is then used to reduce the operating cost estimates for sewer laterals to ensure these costs
are not included in the claim.
In the absence of better data the proportion of properties built prior to 1937 has been used to
approximate for the proportion of sewer laterals that would be considered as Section 24 sewers in
England and Wales. The approach adopted is outlined below.
Step 1 - Scottish House Condition Survey (SHCS) data (2005/06 findings) used for this claim is presented
in age band in the table below.
Number of properties in Scotland
Age Band House type
Number of houses in Scotland
(000s)
Other Flats 41
Tenement 152
Detached 90
Semi-detached 60
Pre 1850 to 1919
Terraced 46
Total pre 1850 to 1919 389
Other Flats 98
Tenement 40
Detached 33
Semi-detached 83
1919-1944
Terraced 43
Total 1919 to 1944 297
1945 onwards All types 1,629
Total (up to present day) All 2,315
Step 2 - The SHCS team, from the Scottish Government, provided Scottish Water with further data in
order to better determine the percentage of houses built between 1919 and 1944. This data is presented
below.
Scottish Water: Second Draft Business Plan. Sewer Laterals
38
SEWER LATERALS
Additional Data from SHCS team
Revised SHCS Data
Age Category Number of Buildings Built
(000s)
pre 1919 385
1919-1929 66
1930-1949 326
post 1949 1,537
Total 2,315
Step 3 - Using the additional information provided by the SHCS team and the 1919 to 1944 total number
of properties in Scotland of 297,00 (from the previous table), the estimated number of properties built
between 1945 and 1949 is 95,000 (326,000 + 66,000 - 297,000). This leaves 231,000 properties built
between 1930 and 1944. In order to derive this figure, we have assumed that properties were built at a
constant annual rate through the 1930s and that there was no house building during the war years (1940 –
1945)8. This equates to 23,100 properties per year built during the 1930s.
Step 4 - The additional information provided by the SHCS team, along with the assumption that 23,100
properties were built per year in the 1930 to 1939 period are used in the table below to estimate the
percentage of houses built between 1937-44 in the period 1919–1944.
Calculation of percentage of houses built between 1937 and 1944 in the period 1919–1944
Housing stock built in period 1919 to 1944 (000s) [1]
Housing stock built between 1937 and 1944 (000s) [2]
Percentage of housing stock 1919-1944 built between 1937 and
1944[3] = [2] / [1]
66 + 231 = 297 23.1 x 3 years = 69.3 23.3%
Step 5 - The initial data provided by SCHS is reduced by the number of properties that would be served
by the Scottish equivalent of S24 sewers (i.e. sewer laterals constructed prior to 1937). This gives the
number of properties not connected to main sewers by S24 sewers.
For pre 1850 to 1919 all house types, other than detached9, are affected by S24. For the period 1919 to
1944, 23.3% of all house types, other than detached, are assumed not to be affected by S24. For the
remaining age bands, no properties are affected by S24. This calculation is shown in the table below.
8 The impact on house building from the war was assumed to start in 1940 rather than in 1939. 9 The sewer laterals of detached houses have never been the responsibility of WaSCs in England and Wales and therefore the
operation and maintenance of sewer laterals of detached houses in all age bands represent a difference in responsibility between Scotland and E&W. These are not included in the estimate of Scottish Water’s S24 sewers length.
Scottish Water: Second Draft Business Plan. Sewer Laterals
39
SEWER LATERALS
Number of properties in Scotland (Pre 1850 – 1944)
Age Band House type Number of houses in
Scotland Number of houses not connected by S24 sewer equivalent (000s)
Other Flats 41 0
Tenement 152 0
Detached 90 90
Semi-detached 60 0
Pre 1850 to 1919
Terraced 46 0
Total pre 1850 to 1919 389 90
Other Flats 98 23
Tenement 40 9
Detached 33 33
Semi-detached 83 19
1919-1944
Terraced 43 10
Total 1919-1944 297 94
1945 onwards All types 1,629 1,629
Total (up to present day) All 2,315 1,863 (78%)
78% of properties in Scotland are connected via a sewer lateral operated by Scottish Water that would
otherwise be the responsibility of the home owner under the S24 legislation in England and Wales i.e.
detached or were built in 1937 or subsequently. Therefore approximately 78% of Scottish Water’s sewer
lateral length should be reflected within the special factor claim. Consequently, 78% of the sewer lateral
operating cost estimates provided in the main text are used when deriving the final claim value10.
10 Variations relate to rounding and approximations made in the calculations.
Scottish Water: Second Draft Business Plan. Supply of Chemicals
40
SUPPLY OF CHEMICALS
8. Supply of Chemicals
Executive Summary
Due to Scotland’s sparse nature, remote rural areas and distances from centres of manufacture, Scottish
Water’s suppliers charge Scottish Water higher transportation costs for chemicals. Furthermore, as a
result of the high number of small water treatment works (WTW), chemicals cannot be supplied in bulk
therefore the cost per tonne is greater.
This special factor claim quantifies the additional costs to Scottish Water not faced by water companies
in England and Wales (E&W) and not reflected in the econometric models. The claim is for £0.3m in
2007/08 prices.
Basis for the Special Factor
Background and Management Control
Scottish Water provides water and sewerage services across the most sparsely populated areas of Britain.
Water and wastewater treatment works are situated at appropriate locations in order to serve the
population. Chemicals are required in the treatment process of Scottish Water’s treatment works. As
well as the sparse distribution of assets, the size of Scotland means that the majority of chemicals are
required to be delivered to locations at great distances from centres of manufacture. Scottish Water’s
paper ‘Population Sparsity – Determining a Proxy for E&W within Scotland’ demonstrates that its
population is more sparse than that of the English and Welsh companies.
Scottish Water operates 313 WTW of which 261 WTW treat up to 10Ml/d. An average of 15,906 people
are served per WTW. Only Wessex Water has a smaller average number of people served per WTW (see
‘Population Sparsity – Determining a Proxy for E&W within Scotland’). As a result of the high number of
small water treatment works, chemicals cannot be supplied in bulk therefore the cost per tonne is
greater.
Size band of WTW Number of WTW
<=1 Ml/d 186
>1 - <=2.5 Ml/d 25
>2.5 - <=5 Ml/d 30
>5 - <=10 Ml/d 20
>10 - <=25 Ml/d 23
>25 - <=50 Ml/d 13
>50 - <=100 Ml/d 9
>100 - <=175 Ml/d 4
>175 Ml/d 3
Total number of works 313
This supply of chemicals special factor claim is for the excess cost of supplying chemicals over those
incurred by water companies in E&W. The extra costs are outside management control as Scottish Water
Scottish Water: Second Draft Business Plan. Supply of Chemicals
41
SUPPLY OF CHEMICALS
cannot influence the transportation charges imposed by its suppliers and in the provision of a Scotland-
wide service it cannot exclude costly, remote customers from its customer base.
Econometric Models
The claim reflects the additional costs of supplying two key chemicals, Aluminium Sulphate (Alum) and
Calcium Hydroxide (Lime), to water treatment works (WTW). Therefore the relevant costs appear in the
water resources and treatment model:
R&T functional expenditure = constant + a*(number of sources) – b*propn supply from boreholes
Resident winter population Distribution input
Modelled resources and treatment functional expenditure excludes power and SEPA costs
The variable of the number of sources divided by total distribution input reflects the fact that a company
that supplies its customers from many small sources is predicted to require additional opex. It should be
noted that this ratio is independent of the area served. Two companies could be identical in terms of
distribution input and number of sources but differ substantially in terms of area but this difference
would not be directly reflected in the model and therefore the predicted costs.
Annex 10 demonstrates that Scottish Water has a ratio of number of sources to distribution input that is
close to the E&W average. Because Scottish Water operates in an extremely rural environment and has
to deliver water to very dispersed populations, one would tend to expect a much higher ratio. What this
demonstrates is that Scottish Water has been able to achieve above-average efficiencies through the
consolidation of sources, given that it achieves similar values of sources per DI as far less rural companies
in England.
The crucial difference between E&W companies and Scottish Water is that sources of the same average
size have to be supplied in a far larger area in Scotland. As noted above, the economies-of-scale variable
does not capture these additional costs of remoteness because it does not directly account for area.
Hence the model does not reflect variations in supply costs of chemicals caused by sparsely located
WTWs where transport costs for delivery are higher.
Quantification
The claim for this special factor only includes alum and lime. The annual cost of the supply of these
chemicals for the financial year 2007/08 has been provided. The cost of annual supply for Alum and Lime
are:
• Aluminium Sulphate (Alum): £3.8m, Calcium Hydroxide (Lime): £1.1m
Details of the costs in supplying chemicals to WTW in E&W are not available in sufficient detail to allow
comparison with Scottish Water’s own costs. For this reason a comparison has been made within Scottish
Water between a Scottish area (the proxy area) deemed to be suitably equivalent to E&W, and the
remaining, more rural areas. The most appropriate combination of regions to be considered as the proxy
area for E&W is Ayr, Clyde and Tweed. The analysis behind the establishment of the proxy area is
presented in the ‘Population Sparsity – Determining a Proxy for E&W within Scotland’ report.
Scottish Water: Second Draft Business Plan. Supply of Chemicals
42
SUPPLY OF CHEMICALS
Scottish Water data on the cost of supplying chemicals per tonne is available by WTW and hence by
region. Therefore a comparison can be undertaken between the typical cost of delivering chemicals per
tonne within the Scottish Water proxy region and the other more rural regions.
Claim for Additional Cost of Supplying Chemicals to Remote Scottish Water Regions
ALUM LIME
Average Rate
(£/tonne)
Amount (1000 tonnes)
Cost (£000s)
Cost @ Proxy Rate (£000s)
Average Rate
(£/tonne)
Amount (1000 tonnes)
Cost (£000s)
Cost @ Proxy Rate (£000s)
Ayr 88 10.8 943 943 92 2.2 205 203
Clyde 88 7.4 648 649 89 2.1 186 189
Tweed 88 1.8 161 161 92 1.0 94 93
Ness 129* 1.6* 212 144 142 0.4 63 40
Forth 91* 7.0* 637 612 95 1.1 101 96
Tay 97* 4.0* 389 353 94 1.3 118 114
Don 112* 3.3* 367 286 112 1.3 145 117
Nith 87 4.9 422 425 94 1.1 101 98
Proxy 88 91
Total (£000s) 3,781 3,575 1,013 951
Variance (£000s)
206 62
Total Claim (£000s)
268
* The true volumes and costs have been adjusted downwards in these regions to reflect that certain WTW
are supplied with alum at greater concentrations.
The costs per tonne vary across the proxy regions and so a weighted average is used based upon volume.
The average cost per tonne to supply the chemicals in the proxy regions is then applied to the remaining
regions to calculate the cost at the proxy rate. The claim equates to a cost that would be saved if the
two chemicals listed were supplied to the more rural regions at the same delivery rates as the Scottish
Water proxy region for E&W.
It is apparent from the table above that it is cheaper to supply chemicals to the proxy area than the rural
regions in Scotland. For alum, the average rate of supply in the proxy area is £88 per tonne which is
compared with £129 and £112 per tonne in Ness and Don respectively, which are the two most rural
regions in Scotland.
Mitigating the impact
Scottish Water undertakes a tendering procedure for supply of chemicals to ensure that the lowest cost is
achieved.
Conclusion
Due to Scotland’s sparse nature, remote rural areas and distances from centres of manufacture, Scottish
Water incurs greater costs in the transportation and supply of chemicals. This special factor claim
quantifies the additional costs to Scottish Water not faced by water companies in E&W and not reflected
in the econometric models. The claim is for £0.3m in 2007/08 prices.
Scottish Water: Second Draft Business Plan. Supply of Chemicals
43
SUPPLY OF CHEMICALS
Annex 10: Comparison of Resources & Treatment model:
Number sources / distribution input
Number of sources
Distribution input (Ml/d)
Number of sources / D.I.
Folkestone & Dover 19 44 0.43
Mid Kent 57 155 0.37
Cambridge 25 73 0.34
Wessex 100 353 0.28
South East 106 377 0.28
Tendring Hundred 8 29 0.27
Sutton & E Surrey 35 151 0.23
Southern 119 562 0.21
Anglian 226 1,165 0.19
Dee Valley 12 66 0.18
Scottish Water 371 2,271 0.16
Yorkshire 163 1,280 0.13
South West 54 435 0.12
Portsmouth 22 178 0.12
Three Valleys 102 835 0.12
Dwr Cymru 96 840 0.11
Severn Trent 174 1,883 0.09
Northumbrian 103 1,155 0.09
South Staffs 26 318 0.08
United Utilities 151 1,849 0.08
B&W Hants 10 153 0.07
Bristol 18 282 0.06
Thames 136 2,572 0.05
The above table demonstrates that Scottish Water is in the middle of the pack in respect of the variable
in the resources and treatment model: number of sources / distribution input. This is not what would be
expected from the most rural water company in Britain. The above demonstrates that there is no
particular allowance made in the model for the rurality of Scottish Water’s operational area. The claim
is not for any extra dis-economies of scale costs but for the extra costs of supplying works (be they large
or small) in remote areas.
Scottish Water: Second Draft Business Plan. Travel
44
TRAVEL
9. Travel
Executive Summary
Due to the scale and geography of Scotland, its sparse population and, consequently, the additional
number of assets required to provide water and waste water services, Scottish Water incurs additional
travel costs in operating its assets. These additional costs are outside management control, not faced by
water companies in England and Wales (E&W) and are not reflected in the econometric models. The
claim is for £9.1m in 2007/08 prices, as broken down in the table below.
Summary of additional travel costs incurred by Scottish Water (2007/08 prices)
Claim Operational
Travel (£m p.a.)
Labour time lost due to additional travel 6.1
Excess fuel and mileage costs 2.2
Excess cost of vehicle repairs and maintenance 0.8
Total 9.1
Basis for the Special Factor
Background and Management Control
Scottish Water provides water and sewerage services across the most sparsely populated areas of Britain.
It serves the largest area of all water companies, almost three times the size of the next largest
company, Anglian, and five times larger than the average. As a result, Scottish Water employees must
travel considerable distances between the assets required to serve the sparsely distributed population
which leads to a number of additional costs, comprising:
• The additional time employees spend travelling between assets.
• The additional fuel and maintenance costs associated with travelling long distances.
This travel special factor claim is for excess travel costs incurred by Scottish Water for operational travel
over those incurred by water companies in E&W. The extra costs of sparsity are a result of Scottish
Water’s operational area and are outside management control in so far as Scottish Water has to provide
universal access and cannot exclude costly, remote customers from its customer base.
Econometric Models
The econometric models do not explicitly include travel cost drivers. Instead, travel costs are a
component of the rolled up operational costs included in the models. Some of the models could be
interpreted as reflecting population spread but their relation to company-wide travel costs are rather
ambiguous.
Scottish Water: Second Draft Business Plan. Travel
45
TRAVEL
Do the Efficiency Models Reflect Variation in Travel Costs?
Model Travel costs
included in model Variables
Does the Variable Explain Travel in rural areas
Water distribution Travel to repair leaks and other network activities
% mains > 300mm
No, as model reflects additional costs in urban areas – large trunk mains tend to occur in more urban areas, and companies with a high proportion of large trunk mains are predicted higher opex. It does not predict additional opex for more rural companies who have to drive greater distances to maintain water mains.
Water resources and treatment
Travel to raw water sources and treatment works
Number sources/D.I. & proportion D.I. from boreholes
No, as the variables are not related to travel. See Annex 10 Supply of Chemicals report for comparison of number sources/D.I.
Water power None n/a n/a
Water business activities
Sampling, non-ops travel
Number of billed properties
No. Companies could have similar property numbers but very different pop sparsity & hence asset mix.
Sewerage network
Travel to carry out maintenance and repairs to the sewer network
Holiday:resident pop, pop/km mains,
km mains/area served
Whilst the area served per km of sewer could be expected to act as a proxy for dispersal of assets, and so travel requirements, the population per km is clearly a measure of population density. The coefficient on population per km is larger than the other co-efficients in the model so, as this is a log model, has a greater impact suggesting the model penalises companies with widely dispersed populations.
Large sewage treatment works
Travel to treatment works
Load & tight BOD / suspended solids consents
No, as the model is based only on the volume of treatment and does not take into account variations in pop density.
Small sewage treatment works unit cost
Travel to treatment works
Load and level of treatment
No, as the higher unit costs the model estimates for smaller WWTW are reflective of E&W costs and so do not reflect the extent of travel in Scotland.
Sludge treatment and disposal unit cost
Sludge transportation
Volume of sludge, disposal route
No, as the unit cost estimated by the model is based upon the E&W average from which SW is different. No scale of sludge centre or distance in sludge transportation is factored in.
Sewerage business activities unit cost
Sampling, non-ops travel
Number of billed properties
No. Companies could have similar property numbers but very different pop sparsity & hence asset mix.
The ‘Population Sparsity – Determining a Proxy for E&W within Scotland’ report demonstrates that the
population in Scotland is more sparse than in the areas served by the English and Welsh companies. The
econometric models are biased towards the average E&W aspect in terms of costs and activities
undertaken. Thus, they do not adequately reflect the additional Scottish Water travel costs incurred as a
result of the differing nature of the spread of population.
In 2003/04, Ofwat accepted a special factor submitted by Thames Water for the excess travel costs as a
result of congestion. Amongst E&W companies, Thames Water is an outlier due to its significantly higher
population density. Ofwat’s acceptance of Thames Water’s claim demonstrates that the regulator
recognises that extra density-related costs can occur, which are not captured in the econometric models.
Scottish Water: Second Draft Business Plan. Travel
46
TRAVEL
Just as Thames Water’s costs do not conform to the functional form of the econometric estimates, so do
Scottish Water’s costs exceed the predicted values.
Quantification
The travel special factor claim covers the additional costs associated with:
• Operational staff time lost due to travelling between Scottish Water assets: £6.1m.
• Fuel costs: £2.2m.
• Vehicle repair and maintenance costs: £0.8m.
Scottish Water Proxy for England and Wales
The necessary level of detailed travel data is not available for the water companies in E&W to allow the
claim to be quantified in relation to the costs incurred in E&W. For this reason a proxy for E&W has been
developed, using a combination of several of Scottish Water’s regions, that can be considered to be
reflective of the average situation in E&W, across a number of relevant factors. The analysis behind the
establishment of the proxy area is presented in the ‘Population Sparsity – Determining a Proxy for E&W
within Scotland’ report.
The proxy area, which is a combination of the operating areas of Ayr, Clyde and Tweed, has a similar
urban:rural balance to the most rural companies in E&W. As a result, this claim is on the conservative
side since it is quantified against a base measure which is more-rural than the average experienced in
E&W.
The claim is quantified as the difference between the existing, relevant, Scottish Water costs and the
costs that would be incurred by Scottish Water if the costs in the proxy area applied across all of
Scotland. The three factors (additional travel time, additional fuel costs and additional vehicle repair
and maintenance costs) are established on a per-property basis for the proxy area. These property-based
factors for the proxy area are then applied to the total of properties in Scotland, to establish the costs
that would have been incurred if the E&W proxy area was representative of all of Scottish Water.
The number of properties is considered an appropriate measure of scale as the location of Scottish
Water’s customers is outside managerial control and, furthermore, the number of properties is (or is
correlated to) a cost driver in almost all of the econometric models. The extent to which travel costs
vary on a per property basis broadly indicates the extent to which they are not accounted for in the
models. The table in Annex 12 considers the appropriateness of using properties to scale against each of
the models which contain travel costs.
Methodology: Claim for Labour Time Lost
Scottish Water’s operational staff spend a significant portion of their working day travelling between
assets, particularly in the Highlands and Islands. Generally using Scottish Water vehicles, their travelling
time is captured by telematics, a vehicle-tracking software system (details in Annex 11). The travel time
of operational staff using their own vehicles has been calculated from mileage expense claims using an
Scottish Water: Second Draft Business Plan. Travel
47
TRAVEL
average speed of 42 mph (refer to Annex 13 for average speed data); this approximation contributes just
6% of operational travel time.
This travel time information has been provided for each of Scottish Water’s operating regions so that a
comparison can be undertaken between typical travel time of operational staff within the Scottish Water
proxy region and the other more rural regions. As the regions are of different sizes, the travel data has
been scaled using the number of properties to allow comparison, i.e. travel time per property served in
each region.
The table below presents the calculation for excess operational labour time lost through travel compared
with E&W, using the Ayr, Clyde and Tweed as a proxy for E&W. The claim equates to the cost of the
labour time that would be saved if the more rural regions were able to operate with the same travel time
per property served as the Scottish Water proxy region for E&W.
The average travel time (per property) within the proxy area, is 0.21 hours per property (line E – 239
thousand hours divided by 1,130 thousand properties). This value is an estimate of the average travel
time per property served in E&W. Applying the 0.21 factor to the total properties (2,394,000) gives rise
to a normalised travel time of 507,000 hours across Scotland (line F). When deducted from the total
number of hours spent travelling (approximately 727,000 hours – line C), this represents 220,000 excess
hours spent travelling (line G), over the proxy area (and therefore E&W). Based on an average hourly
rate of £27.89, (see Annex 14 for details), the claim for the excess cost of operational travel time over
E&W amounts to £6.14m.
Value of Excess Labour Time Lost due to Operational Travel
Ref Don Forth Ness Nith Tay Proxy Area Total*
Total
A
Actual time spent travelling in fleet vehicles (000 hrs) 91 81 106 89 92 227 685
B
Estimated time spent travelling for operational staff using own vehicles (000 hrs)
5 5 8 6 6 12 42
C Total time spent travelling (000 hrs) [A+B]
96 85 113 95 98 239 727
D Connected Properties (000s) 245 215 99 350 356 1,130 2,394
E Travel time per connected property (hrs/per prop) [C/D]
0.39 0.40 1.15 0.27 0.28 0.21 0.30
F
Derived time spent travelling (000 hrs) (applying proxy time spent travelling per connected property) [D*EPROXY]
51.8 45.5 20.9 74.2 75.4 239.3 507
G Difference between actual and derived travel time (000 hrs) [C-F]
44 40 93 20 23 0 220
H (Average) of internal labour recharge rates (£/hr) 27.89
I Value of labour time lost due to excess operational travel (£m) [GTOTAL*H] 6.14
* The proxy area consists of Ayr, Clyde and Tweed
Scottish Water: Second Draft Business Plan. Travel
48
TRAVEL
The table above demonstrates that the most travel is undertaken in the Ness region. The notional time
spent travelling in the Ness region is 1.15 hours per connected property which is almost three times more
than that of the region with the next highest time spent travelling per property served. The excess
travel in the Ness region is the largest contributor to the value of the claim. This is in line with the
findings in the ‘Population Sparsity – Determining a Proxy for E&W within Scotland’ report which outlines
that as well as being the largest area, the population and works are sparsely distributed.
Methodology: Excess Fuel Costs and Vehicle Expenses
Fuel costs and vehicle expense claims are a function of distance travelled (mileage).
• Fuel costs are derived from fuel cards used by Scottish Water liveried vehicles to pay for
fuel.
• Vehicle expenses are claimed by employees for journeys made with their own vehicles. The
current mileage rate used by Scottish Water is 40p per mile11. The mileage rate covers the
costs of running and maintaining the vehicle, such as depreciation, fuel, oil, servicing,
repairs, insurance, vehicle excise duty and MOT.
Fuel costs and vehicle expenses, assigned to operational regions, are obtained from Scottish Water’s
financial systems. The quantification of the claim follows a similar methodology used in previous
sections where fuel costs and mileage expenses per property served for each region are compared with
that of the Scottish Water proxy area for E&W. The table below presents the calculation for excess fuel
and mileage costs compared with E&W, using the Ayr, Clyde and Tweed as a proxy for E&W.
The average fuel and mileage cost in the proxy area is £1.23 per property (line E). This value is an
estimate of the fuel and mileage cost per property served by the companies in E&W. Applying the £1.23
per property to the total number of properties (2,394,000) gives rise to a normalised cost of £2.917m
(line F), which is £2.214m lower than the current pan-Scotland figure of £5.131m. Therefore the excess
fuel and mileage costs over E&W is estimated at £2.2m.
11 This rate is in line with HM Revenue and Customs statutory mileage rates from 2002/03 onwards.
Scottish Water: Second Draft Business Plan. Travel
49
TRAVEL
Claim for Excess Fuel and Mileage Costs for Operational Travel
Ref Don Forth Ness Nith Tay Proxy Area Total*
Total
A Fuel cost (£K) 628 584 840 592 657 1,159 4,459
B Mileage costs (£K) 77 62 132 111 72 218 672
C Total fuel and mileage costs (£K) [A+B]
705 646 972 702 729 1,377 5,131
D Connected Properties (000) 245 214 99 350 356 1,130 2,394
E Cost per connected property (£) [C/D]
2.88 3.01 9.86 2.01 2.05 1.22 2.14
F Expected Cost (applying Proxy unit cost) (£K) [D*EPROXY]
298 262 120 427 434 1,377 2,917
G Difference between actual and expected amount (£K) [C-F]
407 384 852 276 295 0 2,214
H Value of Ops Travel claim for fuel and mileage costs (£M) 2.21
* The proxy area consists of Ayr, Clyde and Tweed
Again, the table above demonstrates that the most fuel and mileage costs are incurred in the Ness
region. The average cost in the Ness region is £10 per connected property which is over three times
more than that of the region with the second highest cost per property served. The excess fuel and
mileage cost in the Ness region is the largest contributor to the value of the claim.
Methodology: Excess Vehicle Repairs and Maintenance Costs
Over 2007/08, Scottish Water’s vehicle maintenance and repair costs amounted to £2.7m12. These costs
are a function of distance travelled as vehicles are serviced based on mileage. Additional vehicle repair
and maintenance costs are incurred by Scottish Water due to the necessity to operate and maintain
assets in rural areas.
The following is the calculation of Scottish Water’s excess vehicle maintenance and repair costs over
E&W, using the Ayr, Clyde and Tweed as a proxy for E&W. The claim equates to the estimated cost of
vehicle maintenance and repair that would be saved if the number of miles covered per property in the
more rural regions was the same as that of the Scottish Water proxy region for E&W.
The average mileage per property is much higher in Scottish Water’s rural areas than in the proxy area as
shown in the table below. The number of miles in the non-proxy area (1,264) is multiplied by this
difference of 4.8miles per property to give 6million excess miles in Scotland over E&W.
12 Taken from Scottish Water Fleet invoices
Scottish Water: Second Draft Business Plan. Travel
50
TRAVEL
Mileage per Property
Mileage (000s)
No. of properties (000s)
Mileage per property
Scotland 18,124 2,394 7.6
Proxy Area 5,685 1,130 5.0
Non-proxy Area 12,440 1,264 9.8
Difference between proxy area and non-proxy area
6,755 134 4.8
Excess mileage in Scotland over E&W (based upon proxy area)
1,263,800 properties x 4.8miles per prop
= 6,081,000 miles
SW maintenance cost per mile
£2.7m/18m miles = £0.13/mile
Costs of excess vehicle maintenance & repair
£0.13 per mile x 6m miles = £0.8m
The most mileage is carried out in the sparsely populated Ness region. Therefore, the Ness region is
again the highest contributor to the claim.
Mitigating the Impact
Scottish Water employs a number of methods to mitigate the impact of the amount of travelling
necessary in rural areas.
Local Training
It is the general policy of Scottish Water to send trainers to outlying/remote offices rather than staff
travel to central locations. As a general rule no staff should have to travel more than one hour to get to
a training centre. Exceptions are that staff based in Dumfries and Galloway must travel to Glasgow and
staff based in Campbeltown must travel to Oban.
Where training takes place in the Highlands and Islands, trainers are scheduled to undertake a number of
courses over several days to reduce travel costs. In 2007/08, 671 training courses have been held outside
the central belt (this includes Aberdeen and Inverness offices).
Scottish Water is now outsourcing driver training. This will be rolled out by the end of 2008 and though
concentrating on Health and Safety will consider efficiency. An online course will first identify high risk
drivers who will then undergo further training.
Some events requiring specialist facilities must be run centrally
Cross-Functional Working
Cross-functional working has been implemented in the more remote areas within Scotland. The ability
for staff to operate flexibly across operational boundaries helps reduce mileage travelled to treatment
works or parts of the network requiring maintenance. A multi-functional operator who is ‘on call’ can
Scottish Water: Second Draft Business Plan. Travel
51
TRAVEL
attend to any type of incident in a particular area, avoiding the need for a specialist operator to travel a
greater distance to attend.
Manpower Efficient Assets
In rural areas, it is often more cost effective to install treatment processes which require minimum
manpower intervention e.g. membrane filtration and septic tanks. Scottish Water has a number of
membrane plants throughout the rural areas of Scotland. 32 of 126 WTWs in the Ness Region are
membrane plants with 8 more planned for completion in the 2006 – 2010 period. Membrane plants only
require to be visited twice per week compared with other types of treatment works which are required
to be visited daily or manned full time.
On the wastewater side, where the level of treatment is appropriate, septic tanks offer the most cost
effective form of treatment. Septic tanks require minimal operational input and are typically emptied
once every six months. Scottish Water operates 1,220 septic tanks, predominantly in the rural areas of
Scotland.
Other General Activities to Minimise Travel
Scottish Water has implemented communication procedures to ensure that the costs of travel are
minimised across the business. These include:
• Participation in teleconferencing and video-conferencing to carry out meetings and training,
where feasible. Video facilities are available in 22 offices including all main offices, and
outlying offices including Lerwick, Kirkwall, Portree, Argyll, Stornoway, Caithness, and
Galashiels.
• Avoidance of non-essential meetings.
• Organisation of events locally rather than centrally.
• Encouraging car sharing and public transport
Fuel and Maintenance Cost Reduction Initiatives
Scottish Water has a number of initiatives to help minimise fuel and maintenance costs including
• Highlighting low cost fuel suppliers
• Issuing fuel saving tips
• Driver monitoring using telematics to identify sub-optimal use of vehicles.
• The commercial vehicle management and maintenance contract was re-tendered in July
2007.
Scottish Water: Second Draft Business Plan. Travel
52
TRAVEL
Excluded Activities
To avoid the possibility of double counting it is important that there is no overlap with other special
factors when quantifying the cost of the claim for the travel special factor. For this reason, all vehicles
that are used for cryptosporidium sampling were identified and removed as the travel cost for this will be
included in the crypto special factor.
Conclusion
Scottish Water incurs additional travel costs which are not faced by water companies in E&W as a result
of Scotland’s sparse population and large size. These additional costs are not reflected in the
econometric models. A special factor claim in the value of £8.0m in 2007/08 prices is submitted to allow
for this.
Summary of additional travel costs incurred by Scottish Water (2007/08 prices)
Claim Operational
Travel (£m p.a.)
Labour time lost due to travel 6.1
Excess fuel and mileage costs 2.2
Excess cost of vehicle repairs and maintenance 0.8
Total 9.1
Scottish Water: Second Draft Business Plan. Travel
53
TRAVEL
Annex 11: Telematics
The telematics data used in the analysis covers the 2007/08 financial year. Telematics is a vehicle
tracking software system which monitors approximately 95% of Scottish Water’s fleet of liveried vehicles.
Telematics is capable of monitoring the vehicle user, location, mileage, utilisation and fuel consumption.
Telematics records both the time when the vehicle ignition is switched on and any excessive idling when
a vehicle is stationary for longer than 10 minutes. The data used in sections of this report is the driving
time (time spent travelling) which is calculated by subtracting the excessive idling time from the time
when the vehicle ignition is switched on.
The data is extracted and allocated to regions directly from telematics historical data. Where a vehicle
was not assigned to a region it was allocated to the region where the majority of travel took place or
where the vehicle is based. A large number of vehicles are based at the Scottish Water depots at
Balmore Road, Glasgow (Clyde region) and Muir Road, Livingston (Tweed region). Although the
telematics data is recorded against these regions, some of these vehicles operate elsewhere. We are
unable to identify all the vehicles affected by this issue and so have made an assumption that they all
operate within the region that they are based. This has the effect of undervaluing the claim by
allocating more time to the proxy area (since both Clyde and Tweed regions are part of the proxy area).
Therefore, although the recorded travel time and mileage may be higher than the actual time and
mileage undertaken in the regions, the Scottish Water claim is underestimated as a result.
Operational mileage taken from telematics is also used when calculating excess maintenance costs.
Scottish Water: Second Draft Business Plan. Travel
54
TRAVEL
Annex 12: Scaling Factors Considered for the Travel Special Factor
As the regions are of different sizes and serve different numbers of properties, the travel data has been
scaled. It is important that the scaling factor is closely related (i.e. correlated) with the various
measures of scale used in the models. Each of the models (with the exception of the power model) will
account for an element of travel costs relative to the measure of scale used in that model. For the
purposes of the travel special factor, it is necessary to identify the element of travel not accounted for
by the measure of scale; i.e. there is only a coarse relationship between travel time and population
served or the number of properties served. However, a model using these variables as scaling factors
does not discriminate between variations in population density, and so does not accommodate all
variability in travel time.
Therefore the travel time data has been scaled by dividing by the number of properties to allow
comparison with the proxy area, e.g. travel time per property served in each region. The extent to
which travel costs vary on a per property basis broadly indicates the extent to which they are not
accounted for in the models.
The following table shows that the number of properties is highly correlated to the measures of scale
used in most of the models (or is in fact, the measure of scale) and is therefore an appropriate scaling
variable.
Options for Scaling between Regions to Quantify Travel Claim
Model Measure of Scale used in Model Relation to Number of Properties
Water distribution Winter population Highly positively correlated with the number of properties
Water resources and treatment Winter population Highly positively correlated with the number of properties
Water power NA Not relevant as there are no travel costs associated with power expenditure
Water business activities Number of billed properties Exact match
Sewerage network Kilometre of sewer Low correlation, however this is the only model for which this is the case
Large sewage treatment works Load Function of population equivalent and hence positively correlated with property numbers
Small sewage treatment works unit cost
Load (kg BOD5/day) Function of population equivalent and hence positively correlated with property numbers
Sludge treatment and disposal unit cost
Load (thousand tonnes of dry solids)
Function of population equivalent and hence positively correlated with property numbers
Sewerage business activities unit cost
Number of billed properties Exact match
The table below considers alternative scaling factors and demonstrates that the number of properties or
population is suitable measures of scale. The number of properties is considered an appropriate scaling
factor as the location of Scottish Water’s customers is outside managerial control and is (or is correlated
to) a cost driver in almost all of the econometric models.
Scottish Water: Second Draft Business Plan. Travel
55
TRAVEL
Evaluation of the Alternative Scaling Factors
Scaling factor Pros Cons
No. of properties • Location of SW customers is out with
managerial control. • No. of properties is (or is positively
correlated to) a driver in almost all of the econometric models.
• A property and hence the service it requires from Scottish Water is the same (more or less) regardless of location.
• Includes business customers. • Robust data available from Annual
Returns.
• Not as closely related to some of the models’ measures of scale as population.
Population • Similar impact on claim as number of
properties. • Closely related to those models that use
volume to scale. • Robust data available from Annual
Returns.
• Ignores business customers. • Possibly the number of connections is a
greater driver of SW’s cost rather than population. There could be variances in occupancy rates across the country.
Number of WTW
& WWTWs
• A significant portion of travel is in relation to visiting treatment works.
• Robust data available from Annual Returns.
• Treatment works vary in size, population served and the level of necessary manpower intervention therefore are not easily comparable. This could cause complication in the calculation.
• There is a significant volume of travel related to infrastructure assets.
• Not a measure of scale in the econometric models (with the exception of the large wastewater treatment works model).
Area • Robust data available from Annual
Returns. • Area is positively correlated with distance.
For example, the Ness region has a much higher area/property than any other region. Distance is highly positively correlated with travel time. Therefore using area to scale would remove a significant driver of travel costs and hence removes the operational difference that Scottish Water is aiming to measure in this special factor.
• Not a measure of scale in the econometric models.
Length of
networks
• Robust data available from Annual Returns.
• The length of network is positively correlated with distance. For example, the Ness region has a much higher network/property ratio than any other region. Distance is highly positively correlated with travel time. Therefore using length of network to scale would remove a significant driver of travel costs and hence removes the operational difference that Scottish Water is aiming to measure in this special factor.
• Only used as a measure of scale in one of the econometric models
No. of incidents • An activity that generates travel. • Does not recognise non-infrastructure activity
(i.e. visits to treatment works) • Not a measure of scale or driver of costs in
the econometric models.
No. of employees • Travel time per employee is an easy
statistic to understand. • Robust data available from Annual
Returns.
• Does not take into account differing treatment processes that require different levels of manual intervention.
• Each region employs a different balance of employees across the functions therefore we would not be comparing like with like.
• Not a measure of scale in the econometric models.
Scottish Water: Second Draft Business Plan. Travel
56
TRAVEL
Annex 13: Average Speed
The average speed is used within the claim to estimate the time spent travelling for operational staff
that use their own vehicles.
Average speed data from three different sources (RAC route planner, AA route planner and the
Department for Transport (DFT)) have been analysed and the results are presented in the tables below.
Specific journeys between Scottish Water offices have been run through the RAC and AA systems. The
DFT analysis is based on average speeds across all road types in England.
When considering low traffic (off-peak) conditions, all three sources produce similar results for average
speeds. The average speeds are 46 mph, 46 mph and 48 mph for RAC, AA and DFT respectively when
plotting Scottish Water journeys through their respective systems.
It is assumed that average speed is a function of traffic density which is determined by the time of day
that travel is undertaken. Car traffic is significantly higher during the peak hours of the morning and the
afternoon13. When choosing an average speed, medium traffic conditions are the most appropriate to
take account of travel during busy periods as well as off-peak conditions.
The RAC route planner is the only data source that provides information for medium traffic conditions.
Since all three sources produce similar results for low traffic conditions, it is assumed that the RAC data
is an adequate source. It is therefore used to determine the average speed in medium traffic conditions
for the report. The average speed for medium traffic conditions from the RAC route planner is 42 mph.
13 DFT (2007), ‘Road Statistics 2006: Traffic, Speeds and Congestion’
Scottish Water: Second Draft Business Plan. Travel
57
TRAVEL
Average speed between office locations (From RAC route planner)
Medium Traffic Low Traffic High Traffic
Journeys between main offices greater than 80 miles apart
distance (miles)
journey time (mins)
speed (mph)
journey time (mins)
speed (mph)
journey time (mins)
speed (mph)
Balmore Road (Glasgow) to Torridon House (Inverness)
168 251 40.2 228 44.2 280 36.0
Balmore Road Glasgow) to Kingshill House (Aberdeen)
151 227 39.9 205 44.2 253 35.8
Fairmilehead (Edinburgh) to Torridon House (Inverness)
159 228 41.8 207 46.1 254 37.6
Fairmilehead (Edinburgh) to Kingshill House (Aberdeen)
136 197 41.4 179 45.6 220 37.1
Castle House (Dunfermline) to Torridon House (Inverness)
141 200 42.3 182 46.5 223 37.9
Castle House (Dunfermline) to Kingshill House (Aberdeen)
118 169 41.9 153 46.3 189 37.5
Castle House (Dunfermline) to Marchmont House (Dumfries)
93 133 42.0 121 46.1 148 37.7
Bullion House (Dundee) to Torridon House (Inverness)
130 198 39.4 180 43.3 220 35.5
Bullion House (Dundee) to Marchmont House (Dumfries)
140 180 46.7 163 51.5 200 42.0
Watermark House (Livingston) to Torridon House (Inverness)
161 229 42.2 208 46.4 255 37.9
Watermark House (Livingston) to Kingshill House (Aberdeen)
138 198 41.8 179 46.3 221 37.5
Juniper House (Edinburgh) to Torridon House (Inverness)
154 219 42.2 199 46.4 244 37.9
Juniper House (Edinburgh) to Kingshill House (Aberdeen)
131 188 41.8 170 46.2 210 37.4
Marchmont House (Dumfries) to Torridon House (Inverness)
230 320 43.1 291 47.4 356 38.8
Marchmont House (Dumfries) to Kingshill House (Aberdeen)
213 295 43.3 268 47.7 329 38.8
Kingshill House (Aberdeen) to Torridon House (Inverness)
107 171 37.5 155 41.4 190 33.8
Scottish Water: Second Draft Business Plan. Travel
58
TRAVEL
Annex 14: Re-charge Rates for Operational Travel
The hourly rate or staff cost used for the calculation is based on 1,345 operational staff who undertake a
large amount of travelling as part of their job.
E & M Craftsman Tanker Driver
E & M Maintenance Water Operative
Maintenance Operative Wastewater Operative
Networks NSO & Inspector Modern Apprentice
The average rate is weighted by the number of employees under each of the job titles outlined above to
give an average charge out rate of £27.89 per hour. This includes overheads.
Scottish Water: Second Draft Business Plan. Complex Water Treatment
59
COMPLEX WATER TREATMENT
10. Complex Water Treatment
Executive Summary
Based upon a comparison of the proportion of distribution input (D.I.) that has been treated using the
most complex methods reported in June Returns, the Commission believes that Scottish Water incurs
lower costs in treating water to drinking water standards14. Scottish Water treats a relatively low
percentage of its D.I. using W4 level processes (see Annex 15 for details of the various categories of
treatment complexity). We understand that the Commission considers this represents a difference in
scope of activities between Scottish Water and companies in England and Wales (E&W).
We have found no evidence to suggest that the treatment processes defined as W4 are significantly more
expensive than those defined as W3. The difference in operating cost appears to be between the two
most complex categories of treatment and the three least complex categories of treatment. A
comparable proportion of Scottish Water’s D.I. has been treated using the two most complex categories
as the D.I. of companies in E&W and therefore no scope adjustment is necessary.
Basis for Scope Adjustment
Background
The level of complexity of treatment ranges from simple disinfection to W4 treatment. The various
categories of treatment complexity are summarised below (further detail is provided in Annex 15):
SD: Works providing simple disinfection only
W1: Simple disinfection plus simple physical treatment only
W2: Single stage complex physical or chemical treatment
W3: More than one stage of complex treatment but excluding processes in W4
W4: This category is intended to capture processes with very high operating costs
The Commission’s basis for the scope adjustment results from the fact that a lower proportion of Scottish
Water’s D.I. when compared with companies in E&W has received the most complex level of treatment
(W4), which involves processes with high operating costs. As a result, the Commission believes that
Scottish Water incurs lower costs in treating water to drinking water standards and considers that this
represents a difference in scope of activities between Scottish Water and companies in E&W.
14 Joint Activity Meeting – Working Group 3 (Feedback on Special Factors) held on 17/09/2008. “WICS outline that Scottish Water does not have to treat its water through expensive processes to a comparable degree of an average company in E&W. This is evident when comparing distribution input treated by W4 processes.”
Scottish Water: Second Draft Business Plan. Complex Water Treatment
60
COMPLEX WATER TREATMENT
Comparison of the Percentage of D.I. Treated using Varying Levels of Complexity
Percentage of D.I. treated by level of complexity
Company Simple
Disinfection W1 W2 W3 W4
Sutton & E Surrey 0 0 0 3 97
Dee Valley 5 0 0 4 92
Thames 0 0 4 9 87
B&W Hants 7 1 0 6 86
Three Valleys 6 0 10 14 70
Bristol 1 0 0 30 69
Anglian 2 0 15 14 68
South Staffs 5 0 22 8 66
Folkestone & Dover 28 0 7 0 64
Northumbrian 0 0 4 32 63
Southern 3 0 9 26 61
South East 3 6 17 15 59
South West 1 0 1 44 54
Severn Trent 5 0 7 38 50
United Utilities 0 0 1 61 38
Yorkshire 0 0 8 55 38
Dwr Cymru 3 1 7 53 37
Mid Kent 21 0 40 13 26
Scottish Water 2 0 12 68 18
Wessex 24 5 25 29 17
Cambridge 3 0 18 62 16
Tendring Hundred 0 0 0 84 16
Portsmouth 8 0 38 54 0
Average 3 0 8 36 52
Note: Data taken from Annual Returns 2008
The table above shows that although a lower proportion of Scottish Water’s distribution input (D.I.) than
average has been treated using the most complex treatment, it is not the lowest. A higher proportion of
Scottish Water’s D.I. has been treated using W3 level processes and a relatively low percentage using W4
level processes.
Other water companies also benefit from better raw water quality yet Ofwat does not apply a scope
adjustment. Two of these companies are considered by Ofwat to be amongst the most efficient in terms
of water service operating costs. Therefore, adjusting Scottish Water’s costs for apparently beneficial
raw water quality is not consistent with other companies who have similar operational circumstances. If
the scope adjustment is applied, Scottish Water’s efficiency position would be distorted against other
companies with comparable levels of treatment complexity.
Scottish Water: Second Draft Business Plan. Complex Water Treatment
61
COMPLEX WATER TREATMENT
Percentage of D.I. treated at W3 or W4 level
Company W3 & W4 Simple disinfection,
W1 & W2
Sutton & E Surrey 100% 0%
Tendring Hundred 100% 0%
Bristol 99% 1%
United Utilities 99% 1%
South West 98% 2%
Thames 96% 4%
Dee Valley 96% 4%
Northumbrian 96% 4%
Yorkshire 92% 8%
B&W Hants 92% 9%
Dwr Cymru 90% 10%
Severn Trent 88% 12%
Southern 88% 12%
Scottish Water 86% 14%
Three Valleys 83% 17%
Anglian 83% 17%
Cambridge 78% 22%
South East 74% 26%
South Staffs 74% 27%
Folkestone & Dover 64% 36%
Portsmouth 54% 46%
Wessex 46% 54%
Mid Kent 39% 61%
Note: Data taken from Annual Returns 2008
Furthermore, the above table shows the percentage of D.I. treated at the two most complex levels of
treatment. Scottish Water is towards the middle of the range. This indicates that some companies treat
a higher percentage of D.I. using more simple form of treatment than Scottish Water.
Quantification
Determining the incremental costs of W4 treatment
Companies in E&W do not publish breakdowns of their total operational cost by process type. Without
this data it is not possible to directly calculate the unit cost for each level of treatment. Instead,
Scottish Water used an econometric approach that is similar to that used in the efficiency models to
estimate the unit cost for separate treatment levels. The results of this analysis suggest that the unit
cost for treatment level W3 and W4 are not statistically different. The detail of this analysis is provided
in Annex 16.
The table above shows that Scottish Water treats a comparable proportion of D.I. using processes of
complexity category W3 and W4 as E&W. Given that the unit costs for both categories are not materially
different, no scope adjustment should be applied.
Scottish Water: Second Draft Business Plan. Complex Water Treatment
62
COMPLEX WATER TREATMENT
Conclusion
From our analysis, it appears that the cost of treating D.I. using the most complex processes (W4) is not
materially different from the second most complex processes (W3). Scottish Water treats a comparable
proportion of D.I. using processes of complexity category W3 and W4 as E&W. Therefore no scope
adjustment should be applied.
Scottish Water: Second Draft Business Plan. Complex Water Treatment
63
COMPLEX WATER TREATMENT
Annex 15: The Commission’s definitions of Process type, Annual Return
2008
Categories of treatment process types Examples
SD: Works providing simple disinfection only; • Marginal chlorination
W1: Simple disinfection plus simple physical treatment only;
• Rapid gravity filtration • Slow sand filtration • Pressure filtration
W2: Single stage complex physical or chemical treatment;
W3: More than one stage of complex treatment; but excluding processes in W4.
• Super chlorination • Coagulation • Flocculation • Biofiltration • pH correction • Orthophosphate dosing • Softening • Membrane filtration
W4: This category is intended to capture processes with very high operating costs;
• Ozone addition • Activated carbon / pesticide removal • UV treatment • Arsenic removal • Nitrate removal
Note: These definitions are the same as those used by Ofwat
Scottish Water: Second Draft Business Plan. Complex Water Treatment
64
COMPLEX WATER TREATMENT
Annex 16: Technical detail behind the model
Scottish Water has formulated an econometric model using available data from water companies across
England, Wales and Scotland to determine whether there is a relationship between W4 and higher costs
of treatment. The analysis indicates that the costs of W4 treatment are not significantly different from
W3, but both are significantly different from other treatment levels. This is illustrated by the model
presented below.
Model to estimate the cost differential of complex treatment:
R&T Expenditure = a * D.I. from other treatment + b * D.I. from W3 + c * D.I. from W4
(excl. EA charges & power)
‘DI from other treatment’ covers standard disinfection, W1 and W2 process types
Expenditure is in £m
DI is in Ml/day
Coefficients
(or £m/Ml/day)
Standard Error
t Stat P-value Lower 95%
Upper 95%
D.I. other 0.008 0.017 0.499 0.623 -0.026 0.043
D.I. W3 0.024 0.004 6.074 0.000 0.015 0.032
D.I. W4 0.020 0.003 7.855 0.000 0.015 0.026
The model is a simple linear one, estimated using ordinary least squares regression. This model has no
fixed costs (the intercept term is set to be zero). The coefficients estimate the cost of treatment per
Ml/day, in £m.
Whilst the coefficient on ‘D.I. from other treatment’ is not significant, it is clearly unreasonable to
expect these treatment levels to have a non-positive cost, so this term is retained in the model. This
model has an R2 value of approximately 0.9, which is very high for a cross-sectional model.
This model suggests that the cost of treatment at the W3 level of complexity is not significantly different
from the cost of treatment at the W4 level.
It should be noted that Scottish Water is not proposing this model as an alternative to the existing
resources and treatment model defined by Ofwat. It is presented here simply as a way of estimating the
cost differences between treatment levels.
Scottish Water: Second Draft Business Plan. Household Metering
65
HOUSEHOLD METERING
11. Household Metering
Executive Summary
The only material difference in the scope of activities between Scotland and England and Wales (E&W) is
that Scottish Water’s household metering penetration is low relative to that in E&W. We estimate the
value of the scope adjustment for metering to be £6.3m in 2007/08 prices.
Basis of the Scope Adjustment
Background
In E&W the weighted average level of household metering penetration is 33% for water and 32% for
sewage. In Scotland, household metering is negligible.
Econometric Models
The operating cost of household metering is included within the water and wastewater business activities
models. These models will therefore assume an operational metering cost for Scottish Water based on
that incurred per property by water and sewerage companies in E&W. Therefore it is appropriate to
remove this cost when benchmarking Scottish Water against E&W.
As the models predict operating costs for the average company, we have calculated the scope
adjustment relative to the average level of metering in E&W. This approach is in line with special factor
methodologies where claims are quantified with reference to the average in E&W. This ensures
consistency of approach across special factors and scope adjustments.
Quantification
The scope adjustment is quantified by estimating the expected cost to Scottish Water of metering the
same proportion of households as the average in E&W. For household metering, the number of additional
meters that Scottish Water would need to install to be at a similar level of penetration to the English and
Welsh average is multiplied by £4.26 per service (2007/08 prices). This is Ofwat’s projected differential
for meter reading, billing and account management compared to non-metered customers15.
The table below illustrates the additional operating cost to Scottish Water of metering a similar
proportion of properties as E&W over 2007/08 Scottish Water metering levels. The calculations are
based on Scottish Water’s total number of billed properties for water and sewerage.
15 A differential of £8.52 covering both water and sewerage services, is taken from Ofwat’s letter to Regulatory Directors - 22 September 2008 (RD 18/08). The differential is Ofwat’s means of checking that the difference between measured and unmeasured tariffs is no more than the cost of providing a metered service.
Scottish Water: Second Draft Business Plan. Household Metering
66
HOUSEHOLD METERING
Scottish Water’s additional cost if metering penetration was equivalent to E&W 2007/08
Average penetration in
E&W (2007/08)
Equivalent number of
SW properties
Current number of SW customers
metered
Annual opex (£) (reading, billing & management)
Total Cost (£m)
(1) (2) (3) (4) (5) = (2-3) x 4
Water 33% 758,338 530 4.26 3.2
Sewage 32% 724,795 180 4.26 3.1
Total 6.3
Conclusion
Scottish Water’s household metering penetration is limited relative to that in E&W. Scottish Water
estimates the value of the scope adjustment is £6.3m in 2007/08 prices.