®® questar gas transportation balancing susan davis, director, account & community relations...
TRANSCRIPT
®®
QUESTAR GAS
Transportation Balancing
Susan Davis, Director, Account & Community Relations
February 28, 2014
We develop, transport and deliver clean energy
2®
Questar’s Pipeline System
®
The Flow of Natural Gas
3
City Gate
4
® 5
Questar Rate Structure
Firm Interruptible
Sales GS, FS Residential/Commercial
Commercial/Industrial IS
Minimum Annual DTH7000
Annual ContractsMarket Based
Transportation FT-1, TS
(with firm demand)
Minimum Annual Volumes 120,000 DTH (FT-1)
TS Large Commercial/Industrial
GS - Daily volumes not to exceed 1,250 DTH in any one day during the winter season.
FS - Daily volumes not to exceed 2,500 DTH in any one day during the winter season. Qualifications: Annual dth over 2,100 dth, Load Factor 40% or higher
® 6
®
Transportation Balancing Restrictions
Daily … typically +/- 5%.
- Can be restricted to no over or under deliveries based on system operating constraints.
- Violations of the daily restrictions are subject to penalties as provided in the tariff.
®
Transportation Balancing Restrictions (continued)
Monthly… must be within +/- 5%.
- Imbalances may be traded through 15 days after month end closing.
- Balances not traded within that time are subject to cash out or gas sale provisions provided in the tariff.
®®
Interruption Procedures
®
Deliveries to the city gate are the responsibility of the transportation customer.- If gas is not delivered to the city gate, QGC is not
responsible to supply gas to TS customers, even if customer has firm capacity on QGC.
- Gas delivered to TS customers may be limited to contracted firm amount or daily nomination, whichever is less.
- QGC release capacity is recallable.- Flexed firm capacity is firm, but it is a lower priority.
Supply Curtailment vs. Interruption
®
QGC History of Interruptions
December 5, 2013 Supply Curtailment
Winter 2000-01 three interruptions- Two Northern- One Southern
January 1997 for 36 hours- First partial interruption
December 1990 for 9 days- First interruption since 1982
®
Interruption Process
Winter interruption season:- November through March
But interruptions can happen any time during the year
Simultaneous interruption- Both sales (IS) and transportation (TS)
Geographic interruption possible Partial interruption possible
®
Interruption Procedures
Customers will be notified by QGC account management personnel – day or night
Notify QGC if interruption contacts change – educate all involved in the process
Two-hour maximum allowance to interrupt gas service
®
Failure to Interrupt
Penalty- Distribution non-gas component: $15/dth- Supplier non-gas component: $5.71- Gas-cost component: Highest purchased gas during
period of interruption = $4.75 on Dec. 5, 2013- Total = $25.46/dth
Meter shut-off may be used to maintain system integrity
®
Gas Supply Discussion
Nominations/Scheduling Process- NAESB Cycles
▪ (North American Energy Standard Board)
Events of December 5th, 2013
15
®
8am 12pm 8pm 12am 8am 12pm 8pm 12am
- December 4,2013 - December 5, 2013
Timely Nominations (Cycle 1)
Sent by 10:30 amto the TSP by 10:45 amScheduled at 3:30 pm
8:00 am GD2 Gas Flow
Evening Nominations (Cycle 2) Sent by 5:00 pm
to the TSP by 5:15 pmConfirmations by 8:00 pm
Scheduled by 9:00 pm
8:00 am GD2 Gas Flow
Intraday 1 Nominations (Cycle 3)
Sent by 9:00 amto the TSP by 9:15 am
Confirmations by 1:00 pmScheduled by 1:00 pm
4:00 pm GD2 Gas Flow
Intraday 2 Nominations (Cycle 4)
Sent by 4:00 pmto the TSP by 4:15 pm
Confirmations by 7:00 pmScheduled by 8:00 pm
8:00 pm GD2 Gas Flow
10:0
0 am
Nom
inat
ions
in fo
r Dec
5th (G
D5)
- 15
4,95
3 D
th
Eve
ning
Nom
s fo
r (G
D5)
- 13
9,94
5 D
th
Red
uctio
ns f
or (
GD
5) -
2,34
8 D
th
9:45
am
QG
C n
otifi
ed b
y Q
EP
of c
uts
at B
lack
s
Fork
and
Red
Was
h pl
ants
- Q
GC
sta
rted
wor
king
with
sch
edul
ing
to d
eter
min
e
th
e ex
tent
of c
uts
for t
rans
porta
tion
cust
omer
s
6:00
am
– Q
GC
Gas
Sup
ply
notic
es re
duce
d
flow
from
Bla
cks
Fork
(Pip
evie
wer
)
7:30
am
QG
C G
as S
uppl
y pu
rcha
ses
gas
(ID1)
to
mak
e up
for a
ssum
ed c
uts
at B
lack
s Fo
rk
8:30
am
and
10:
00 a
m L
eRoy
and
Cha
lk C
reek
aqui
fers
to w
ithdr
awal
(Coa
lvill
e w
as a
lread
y on
with
draw
al)
12:0
0 pm
- A
list o
f cus
tom
ers
that
requ
ired
redu
ctio
ns
was
sen
t to
Que
star
Gas
acc
ount
rep
rese
ntat
ives
1:00
pm
- O
ffici
al c
ut n
otifi
catio
ns w
ere
sent
out
to
trans
porta
tion
cust
omer
’s a
gent
s as
par
t of t
he
conf
irmat
ion
of th
e ID
1 cy
cle
7:00
pm
- Q
uest
ar G
as n
otifi
ed c
usto
mer
s th
at th
ey
coul
d re
sum
e us
age
to m
atch
thei
r inc
reas
ed s
uppl
y
that
was
sch
edul
ed to
arr
ive
at 8
pm.
Gas Day 1 Gas Day 2
®®
QUESTIONS?
Thank You.