| ref.: 3ds corporate presentation v2 2013 03 …...lean, green & compliant sustainability...

81
1 3DS.COM © Dassault Systèmes | Confidential Information | 11/12/2014 | ref.: 3DS_CORPORATE_PRESENTATION_V2_2013_03_12 3DS.COM © Dassault Systèmes | Confidential Information | 11/12/2014 | ref.: 3DS_CORPORATE_PRESENTATION_V2_2013_03_12 3DEXPERIENCE Forum Transportation & Mobility Industry Overview Autonomous Vehicle Innovation On Cloud Las Vegas, November 11 th 2014 Olivier SAPPIN VP, Transportation & Mobility Industry

Upload: others

Post on 24-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

1

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12 3DEXPERIENCE Forum

Transportation & Mobility Industry Overview Autonomous Vehicle Innovation On Cloud

Las Vegas, November 11th 2014

Olivier SAPPINVP, Transportation & Mobility Industry

Page 2: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

2

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

1 Agenda

3 DS Answers to Customer requirements3.1 V5 support & enhancements3.2 Performance & Usability

4 Link & Go – Cloud Based Collaboration Platform for Driverless Car

Agenda

3.3 Coexistence & Transition

2 DS Strategic Investments for Transportation & Mobility

3.4 Focus on Supply Chain

5 Conclusion

Page 3: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

1 Agenda

3 DS Answers to Customer requirements3.1 V5 support & enhancements3.2 Performance & Usability

4 Link & Go – Cloud Based Collaboration Platform for Driverless Car

Agenda

3.3 Coexistence & Transition

2 DS Strategic Investments for Transportation & Mobility

3.4 Focus on Supply Chain

5 Conclusion

Page 4: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

4

Strategy Drivers to Experiences

Innovative Car Design Concepts

Sustainable Design & Manufacturing

Connected & Safe Cars

Flexible & Globalized Design & Production

Innovation in Engineering

Validated & Certified Cars

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance

Collaborate with Suppliers upfront Bid to Win

Page 5: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

5

ConceptInitiation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

ThemeSelection End of Life

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Car P

rogr

am / E

xper

ience

s

Virtual Garage Experience

Marketing and Sales

Virtual Garage ExperienceMarketing Assets creation and management from DesignSales configurators for consumers (web) and dealership (POS)

Page 6: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

6

ConceptInitiation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

ThemeSelection End of Life

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Requirements & System Engineering

Logical & Physical Architecture

Car P

rogr

am / E

xper

ience

s

Virtual Garage Experience

Smart, Safe & Connected

Marketing and Sales

Electrical & Software Engineering

Smart, Safe & ConnectedE/E Architecture (Electronics, Electrical,

Embedded Software, Mechatronic)Mechatronics, Electrical

Systems TestsRegulation (eg: ISO 26262)

Page 7: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

7

ConceptInitiation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

ThemeSelection End of Life

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Requirements & System Engineering

Logical & Physical Architecture

Car P

rogr

am / E

xper

ience

s

Virtual Garage Experience

Target Zero Defect

Smart, Safe & Connected

Marketing and Sales

Manufacturing Process Engineering

Powertrain & Chassis Engineering

Electrical & Software Engineering

BiW & Interior Engineering

Design & Style

Target Zero DefectDesign & Visual ValidationArchitecture and Conceptual EngineeringEnd-to-end processes (Body, Chassis, Interior/Exterior, Powertrain, Final Assembly)Capitalize and reuse knowledge

Page 8: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

8

ConceptInitiation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

ThemeSelection End of Life

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Requirements & System Engineering

Logical & Physical Architecture

Program & Projects

DMDR / Simulation Tests & Validation

Car P

rogr

am / E

xper

ience

s

Global Validation, Proven Performance

Virtual Garage Experience

Target Zero Defect

Smart, Safe & Connected

Marketing and Sales

Manufacturing Process Engineering

Powertrain & Chassis Engineering

Electrical & Software Engineering

BiW & Interior Engineering

Design & Style

Global Validation, Proven PerformanceRequirements Management & Test StrategyVirtual and Physical TestsValidation & Certification

Page 9: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

9

ConceptInitiation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

ThemeSelection End of Life

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Requirements & System Engineering

Logical & Physical Architecture

DMDR / Simulation Tests & Validation

Car P

rogr

am / E

xper

ience

s

Global Validation, Proven Performance

Virtual Garage Experience

Target Zero Defect

Smart, Safe & Connected

Marketing and Sales

Manufacturing Process Engineering

Powertrain & Chassis Engineering

Electrical & Software Engineering

BiW & Interior EngineeringLean, Green & Compliant

Sustainability

Design & Style

Lean, Green & CompliantEnergy balance & weight optimizationMaterial Lifecycle ManagementCompliance & LCAHealth & Environmental impact along the entire lifecycle of the Vehicle

Page 10: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

10

ConceptInitiation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

ThemeSelection End of Life

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Requirements & System Engineering

Logical & Physical Architecture

Program & Projects

Configuration Management

DMDR / Simulation Tests & Validation

Car P

rogr

am / E

xper

ience

s

Global Validation, Proven Performance

Virtual Garage Experience

Target Zero Defect

Smart, Safe & Connected

Modular, Glocal & Secure

EarlyBOM X-BOM

Marketing and Sales

Manufacturing Process Engineering

Powertrain & Chassis Engineering

Electrical & Software Engineering

BiW & Interior EngineeringLean, Green & Compliant

Sustainability

Design & Style Modular, Glocal & SecureVehicle Portfolio and Programs

Platforms and Modules Configurations

BOMs & DMUSupply chain Management

After Sales

Page 11: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

11

ConceptInitiation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

ThemeSelection End of Life

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Requirements & System Engineering

Logical & Physical Architecture

Program & Projects

Configuration Management

DMDR / Simulation Tests & Validation

Car P

rogr

am / E

xper

ience

s

Global Validation, Proven Performance

Virtual Garage Experience

Target Zero Defect

Smart, Safe & Connected

Modular, Glocal & Secure

EarlyBOM X-BOM

Marketing and Sales

Production Run & Operations

Manufacturing Process Engineering

Powertrain & Chassis Engineering

Electrical & Software Engineering

BiW & Interior EngineeringLean, Green & Compliant

Sustainability

Design & Style

Lean Production RunProduction Execution, Material, Quality,

Warehouse, Maintenance and Supply Chain management

& Closed loop with Engineering

Lean Production Run

Page 12: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

12

ConceptInitiation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

ThemeSelection End of Life

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Requirements & System Engineering

Logical & Physical Architecture

Program & Projects

Configuration Management

DMDR / Simulation Tests & Validation

Car P

rogr

am / E

xper

ience

s

Global Validation, Proven Performance

Virtual Garage Experience

Target Zero Defect

Smart, Safe & Connected

Modular, Glocal & Secure

EarlyBOM X-BOM

Marketing and Sales

Production Run & Operations

Manufacturing Process Engineering

Powertrain & Chassis Engineering

Electrical & Software Engineering

BiW & Interior EngineeringLean, Green & Compliant

Sustainability

Design & Style

Lean Production Run

Page 13: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

13

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

DMDR / Simulation Tests & Validation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Requirements Analysis & Distribution

Functional Architectures

Logical & Physical Architecture

Mechanical Engineering

Electrical & Electronic Engineering

Software Engineering

Manufacturing Process Engineering

Product V&V

Process V&V

Production Convergence

Sourcing & Procurement Plant & Logistics

Program & Projects

Configuration Management

DMDR & Virtual Tests

Physical Tests

Concepts & Clinics

Lean, Green & Compliant

My Car Experience

Target Zero Defect

Smart, Safe & Connected

Modular, Glocal & Secure

Collaborative EnvironmentEarlyBOM E-BOM

M-BOMS-BOM

After sales & Service Engineering

Styling / Surface Refinement

Production Run & OperationsRequirements

Auto

mot

ive P

roce

ss E

xper

ience

sDS Areas of investment (1/3)

Single configured-BOM

Early-BOM / Modularization

Costing

OEM/OEM, OEM/Tier 1 Automotive

Collaborative Hub

Global / Local Manufacturing BOM

Spare-Parts management (Search-Based apps)

Configuration rulesEngine

Global Validation, Proven Performance

Page 14: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

14

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

DMDR / Simulation Tests & Validation

Global Validation, Proven Performance

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Requirements Analysis & Distribution

Functional Architectures

Logical & Physical Architecture

Mechanical Engineering

Electrical & Electronic Engineering

Software Engineering

Manufacturing Process Engineering

Product V&V

Process V&V

Production Convergence

Sourcing & Procurement Plant & Logistics

Program & Projects

Configuration Management

DMDR & Virtual Tests

Physical Tests

Concepts & Clinics

Lean, Green & Compliant

My Car Experience

Target Zero Defect

Smart, Safe & Connected

Modular, Glocal & Secure

Collaborative EnvironmentEarlyBOM E-BOM

M-BOMS-BOM

After sales & Service Engineering

Styling / Surface Refinement

Production Run & OperationsRequirements

Auto

mot

ive P

roce

ss E

xper

ience

sDS Areas of investment (1/3)

Single configured-BOM

Early-BOM / Modularization

Costing

OEM/OEM, OEM/Tier 1 Automotive

Collaborative Hub

Global / Local Manufacturing BOM

Spare-Parts management (Search-Based apps)

Configuration rulesEngine

Page 15: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

15

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

Software

Configured FMUHydraulic

Mechanical

Electrical

Organizations / Disciplines

BOMs & Programs

Systems/Modules/Components

PowertrainSuspensionBrakesPedal System

Developed vehicle aligned with initial Program KPIs

Configured Functional MockupMechanical & E/E

Traditional way of tracking project development on a shared structure

#1

#2

#3 #4Architectures & strategies to support a vehicle development

Page 16: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

16

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

Product Convergence

MarketLaunch

StylingFreeze

Product Design Complete

Start of productionPilot w/ Prod. tools

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Product V&V

Process V&V

Production Convergence

Sourcing & Procurement Plant & Logistics

Program & Projects

Configuration Management

Physical TestsLean, Green & Compliant

My Car Experience

Target Zero Defect

Smart, Safe & Connected

Modular, Glocal & Secure

Bid to Win

Collaborative EnvironmentEarlyBOM E-BOM

M-BOMS-BOM

After sales & Service Engineering

Production Run & Operations

Auto

mot

ive P

roce

ss E

xper

ience

sDS Areas of investment (2/3)

DMDR & Virtual Tests

Manufacturing Process Engineering

Mechanical Engineering

Electrical & Electronic Engineering

Software EngineeringElectrical Schematic

3D Master

Concepts & Clinics

Styling / Surface Refinement

Requirements

Surface Refinementnext Generation

Requirements Analysis & Distribution

Functional Architectures

Logical & Physical Architecture

Conceptual Engineering

Composite(« Body in Black »)R / F / L System

Vehicle Architecture

Embedded Software Architecture

Page 17: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

17

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

Page 18: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

18

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

MarketLaunch

StylingFreeze

Product Design Complete

Start of productionPilot w/ Prod. tools

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Requirements Analysis & Distribution

Functional Architectures

Logical & Physical Architecture

Mechanical Engineering

Electrical & Electronic Engineering

Software Engineering

Sourcing & Procurement Plant & Logistics

Program & Projects

Configuration Management

DMDR & Virtual Tests

Concepts & Clinics

Lean, Green & Compliant

My Car Experience

Target Zero Defect

Smart, Safe & Connected

Modular, Glocal & Secure

Bid to Win

Collaborative EnvironmentEarlyBOM E-BOM

M-BOMS-BOM

After sales & Service Engineering

Styling / Surface Refinement

Requirements

Auto

mot

ive P

roce

ss E

xper

ience

s

Product Convergence

Product V&V

Process V&V

Production Convergence

Physical Tests

Robotics Simulation

Integration & Validation Plan

Manufacturing Process Engineering

Production Run & Operations

Virtual Shopfloor

ManufacturingSimulation in Context

Assembly PathPlanning

Final Assembly & Simulation

Body-in-White FastenersEnginerering and Process planning

Production Run(Apriso)

DS Areas of investment (3/3)

Page 19: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

19

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

Page 20: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

20

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V3

_201

3_07

_25_

shar

ed

1 Agenda

3 DS Answers to Customer requirements3.1 V5 support & enhancements3.2 Performance & Usability

4 Link & Go – Cloud Based Collaboration Platform for Driverless Car

Agenda

3.3 Coexistence & Transition

2 DS Strategic Investments for Transportation & Mobility

3.4 Focus on Supply Chain

5 Conclusion

Page 21: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

21

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

013

xCAD management & DMU studybased on 3DExperience Platform

Secure Collaborative

Full Web Open

CATIA V5CATIA V6 STEP, JT

Page 22: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

22

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

Large data scalability testing: Scope & ResultsIdentify the 3DEXPERIENCE Platform ability to support a deployment based on RFLP Scenarios:

Requirement Function Logical Product

10,000,000 70,000 900,000 1,000,000

Scenario Cumulated Steps

Page 23: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

23

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

Improve User Experience

V6 Usability - Major Improvements

Graphic Structure EditorEasy navigation across e-BOM

UI packageGraphical route displayTask Assignment & AllocationProject dashboard / ReportingImprove NLS support

Page 24: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

24

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

ConceptInitiation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

ThemeSelection End of Life

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Body Engineering

Body Engineering & Manufacturing

Tooling Design

Stamping Manufacturing

Body Manufacturing

Painting

Conceptual Engineering

Fastener Design

V5

V6

CATIA V6 Supplemental approachBiW Fastener case

Page 25: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

25

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

Page 26: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

26

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

Focus on Supply Chain

OEMs

Suppliers

• Car OEMs• Light truck OEMs

System & Modulesuppliers: Tier 1

Componentsuppliers:Tier 2-3

Cars

Design, develop and manufacture systems, assemblies, modules, engineer and assemble complete vehicles.

Design, develop and manufacture components

Improve RFx answer process : Time & QualityCollaborate earlier with OEMs with a focus on innovationIT : Reduce Cost of data exchange, Openness

Efficient program & supply chain management (APQP, PPAP)Early BOM & Cost estimationFocus on Useability

1

2

1

2

Page 27: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

27

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

End to End Supplier Processes

APQP definition and execution

6

OEM data management 7

Implement an Integrated Governance Solution

Downstream process management

10

Leverage multi-disciplines end-to-end

Advanced kinematics

98

System Engineering Transform Engineering Processes

with System Engineering

Business portfolio assessment

SpecificationsmanagementQuotation

management

RFP delivery

Conceptual design

15

234

Improve bidding process

Page 28: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

28

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

1 Agenda

3 DS Answers to Customer requirements3.1 V5 support & enhancements3.2 Performance & Usability

4 Link & Go – Cloud Based Collaboration Platform for Driverless Car

Agenda

3.3 Coexistence & Transition

2 DS Strategic Investments for Transportation & Mobility

3.4 Focus on Supply Chain

5 Conclusion

Page 29: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

CO

Das

saul

t Sys

tèm

es |

Con

fiden

tialI

nfor

mat

ion

|12

/11/

2014

ref.:

Doc

umen

t_R

efer

ence

|3D

S.CO

Dass

ault S

ystèm

es| C

onfid

entia

l Infor

matio

n | 1

1/12/2

014

| ref.

: 3DS

_Doc

umen

t_201

2

AKKA Technologies / Dassault SystemesCloud based Collaborative platform to invent the

future of Transportation & Mobility

Page 30: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

CO

Das

saul

t Sys

tèm

es |

Con

fiden

tialI

nfor

mat

ion

|12

/11/

2014

ref.:

Doc

umen

t_R

efer

ence

|

Seven business expertise 11 000 talented individuals €879M 2013 revenue German / French cooperation axis Unique In-house R&D center

AKKA Technologies, an engineering european leader

Page 31: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

CO

Das

saul

t Sys

tèm

es |

Con

fiden

tialI

nfor

mat

ion

|12

/11/

2014

ref.:

Doc

umen

t_R

efer

ence

|

AKKA Research, the innovative exception

Collaborative Environment for Partners More than 300 Engineers Link & Go : invent the future of mobility Development of new working methods

Page 32: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

CO

Das

saul

t Sys

tèm

es |

Con

fiden

tialI

nfor

mat

ion

|12

/11/

2014

ref.:

Doc

umen

t_R

efer

ence

|

Business & Engineering data access from anywhere Open Innovation thru social communities Simplified global platform administration

Cloud based Collaborative platform to invent the future of mobility

AKKA / 3DS Partnership

Page 33: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

33

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_C

ORPO

RATE

_PRE

SENT

ATIO

N_V2

_201

3_03

_12

1 Agenda

3 DS Answers to Customer requirements3.1 V5 support & enhancements3.2 Performance & Usability

4 Link & Go – Cloud Based Collaboration Platform for Driverless Car

Agenda

3.3 Coexistence & Transition

2 DS Strategic Investments for Transportation & Mobility

3.4 Focus on Supply Chain

5 Conclusion

Page 34: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

34

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014 Transportation & Mobility

Strategic Capabilities for Innovative Vehicle Development

Frederic Merceron

Page 35: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

35

Customers Adoption

How to manage complexity

Openness

Agenda

Page 36: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

36

Customers Adoption

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance

• Program Management : 300+ users• Vehicle Visualisation (DMU): 100 users• Design Engineering (CATIA V6).

Page 37: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

37

Customers Adoption

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance• 450+ CATIA V6 designers (Configured

DMU)• 2200+ users on ENOVIA (CATIA V6,

Doc Management and Simulation data management)

Page 38: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

38

Customers Adoption

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance• In production since Feb 2014

Page 39: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

39

Customers Adoption

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance• Already in production with

400+ users with ENOVIA CATIA V5-6

Page 40: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

40

Customers Adoption

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance• ECU development process

standardization

Bid to Win

Page 41: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

41

Bid to Win

Customers Adoption

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance • Project management according to APQP standard

• Streamline and automate global collaboration

• Manage Multi-CAD environment effectively

Page 42: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

42

Bid to Win

Customers Adoption

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance

• Single platform for information management

• Configured DMU context• Improved design-to-

manufacturing processes

Page 43: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

43

Bid to Win

Customers Adoption

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance

• Collaborative environment for designing and managing electrical and electronics architecture.

• Managed increasing product complexity

Page 44: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

44

Bid to Win

Customers Adoption

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance

• Process standardization across organization (Projects, BOM, Multi-CAD)

• Better retain & reuse their Knowledge• APQP-based program management• IP Data management and security

Page 45: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

45

Customers Adoption

How to manage complexity

Openness

Agenda

Page 46: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

46

Challenge

Manage the vehicle complexity by evolving from a bottom-up approach to a top-down model-based architecture in all disciplines concurrently -

Page 47: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

47

Manage Vehicle ComplexityModular, Glocal & Secure

Requirements ManagementProgram ManagementArchitecture and ModularizationSupply Chain Management

Page 48: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

48

Manage Vehicle Complexity

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Requirements ManagementProgram ManagementArchitecture and ModularizationSupply Chain Management

System EngineeringArchitecture(s) developmentDisciplines development

Page 49: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

49

Manage Vehicle Complexity

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Global Validation, Proven Performance

Requirements ManagementProgram ManagementArchitecture and ModularizationSupply Chain Management

Test StrategyValidation & Verification PlanSimulations & Tests

System EngineeringArchitecture(s) developmentDisciplines development

Page 50: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

50

Modular, Glocal & Secure

T&M Industry Solution

Page 51: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

51

Target Zero Defect

Smart, Safe & Connected

Global Validation, Proven Performance

Test StrategyValidation & Verification PlanSimulations & Tests

System EngineeringArchitecture(s) developmentDisciplines development

Manage Vehicle ComplexityModular, Glocal & Secure

Requirements ManagementProgram ManagementArchitecture and ModularizationSupply Chain Management

Page 52: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

52

Early Design Engineering

Early Phase (early BOM\ DMU\ System) support

Vehicle component/module breakdown

Engineering DefinitionsRealised Solutions

Structure based on vehicle template defining the vehicle breakdown and listing the expected components

Specified Expectations

Taking benefits from RFLP Structures for Early Design to define the specifications

[R] Requirements[F] Functional Model

[L] Logical Model

[P] Physical Model

SpecificationTechnical Documentation

3D Style Specs

Logical Specs for EE

Vehicle Execution Planning

Critical Interfaces

Requ

irem

ent E

ngine

ering

?

Logical for powertrain

Taking early benefits from expectations structure with multi facets specifications

Safety Function

Page 53: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

53

Early Design Engineering

Early Phase (early BOM\ DMU\ System) support

Vehicle component/module breakdown

Engineering DefinitionsRealised Solutions

Structure based on vehicle template defining the vehicle breakdown and listing the expected components

Specified Expectations

Taking benefits from RFLP Structures for Early Design to define the specifications

[R] Requirements[F] Functional Model

[L] Logical Model

[P] Physical Model

SpecificationTechnical Documentation

Vehicle Execution Planning

Critical Interfaces

Requ

irem

ent E

ngine

ering

Most critical interfaces are already identified at that stage

?

Functional Referentials, out of Global Architecture Definition

Vehice Axis System

Side MirrorAxis SystemDoor FrameMirror Axis

Page 54: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

54

Modular Architecture Support

Engineering DefinitionsSpecified Expectations

Detailed Answers from Engineering Departments

Product Engineering/ Digital Mock Up

/ System Engineering

Modules Library

Resolved Module Variant Miror

Resolved ModuleFront Chassis

Resolved ModuleVariant Brake

…Resolved ModuleVariant

Vehicle Execution Planning

Interfaces

Vehicle diversity

Early Design Engineering

Configuration Basic example for modularity support : Reuse of Resolved Module Variants

Vehicle component/module breakdown

Page 55: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

55

Modular Architecture mixed with Vehicle specific innovation

Engineering DefinitionsSpecified Expectations

Detailed Answers from Engineering Departments

Modules Library

Vehicle Execution Planning

Interfaces

Vehicle diversity

Early Design Engineering

Configuration

Product Engineering

Resolved Module Variant Miror

Resolved ModuleFront Chassis

Resolved ModuleVariant Brake

Resolved ModuleVariant

Basic example for new components developments

Vehicle component/module breakdown

Page 56: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

56

Realized manufactured components support

Engineering DefinitionsSpecified Expectations

Detailed Answers from Engineering Departments

Vehicle Execution Planning

Vehicle diversity

Early Design Engineering

Configuration

Logical Specs for EE

3D Style Specs

Product Engineering/ Digital Mock Up

/ System Engineering

Modules Library

Realised SolutionsParts produced by manufacturer

-OEM internalor-Supplier

Innov

ation

spec

ific ite

m

Re Use orInnovate

Make or Buy

Realised solutions represent the achieved objectives for mechanical development : resulting manufactured componentVehicle component/module breakdown

Page 57: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

57

Key Concepts summary

Engineering DefinitionsSpecified Expectations

Detailed Answers from Engineering Departments

Vehicle Execution Planning

Vehicle diversity

Early Design Engineering

Configuration

Logical Specs for EE

3D Style Specs

Product Engineering/ Digital Mock Up

/ System Engineering

Modules Library

Realised Solutions

Innov

ation

spec

ific ite

m

Re Use orInnovate

Make or Buy

Answer to

Manufactured

Constraints & requirement

Parts produced by manufacturer

-OEM internalor-Supplier

Vehicle component/module breakdown

Page 58: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

58

Steps to build component/module breakdown for a new vehicle project

…. …. ….

… … … … … …

Clone from generic structure

Adapt the cloned structure

Define/Analyze the specifications Link to the Engineering

Definition : either innovation or re use (module)

G

G

G

Business views

Vehicle XY

Enterprise Referentials

Page 59: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

59

ConceptInitiation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

ThemeSelection End of Life

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Program Planning & Execution

Program Planning & Execution

2

Work-in Progress Management

Work-in-progressManagement

5Enterprise Digital Assets

Enterprise Digital Assets

6Supply Chain Engineering

Supply Chain Engineering

7

Architecture & Modularization

Architecture & Modularization

3Configuration Management

Configuration Management

4

Modular, Glocal & Secure / Components

Page 60: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

60

Modular, Glocal & Secure• Support the definition of vehicle architecture from cross program

concepts, based on a modular vehicle breakdown structure

• Take benefit from generic Architecture Definitions to organize a strategic portfolio in order to match local market needs and to deliver a broaden scope of products to consumers

• Provide Enterprise Asset/IP Referential : secure and optimize enterprise IP thanks to governance re use or tactical carry over

Page 61: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

61

Smart, Safe & Connected

Page 62: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

62

Global Validation, Proven Performance

Test StrategyValidation & Verification PlanSimulations & Tests

Modular, Glocal & Secure

Requirements ManagementProgram ManagementArchitecture and ModularizationSupply Chain Management

Target Zero Defect

Smart, Safe & Connected

System EngineeringArchitecture(s) developmentDisciplines development

Manage Vehicle Complexity

Page 63: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

63

from… Document-basedEngineering

Smart, Safe & Connected | Vision

to… Virtual Functional Mockupconnecting the dots between disciplines to

develop, validate and deliver Customer driving experience innovations

Page 64: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

64

• #1 – Break the Silos• Improve productivity and traceability

• #2 – Make early validation• Take the right decisions – earlier

• #3 – Re-use & Capitalize

Examples of Business Value

Save 30% of embedded systems cost content in a car thanks Embedded Functions Standardization in a Collaborative Platform (Source: Customer B)

Improve Engineering productivity by 15% to 20% thanks function-driven engineering and improved alignment between engineering deliverables and program milestones. (Source : Customer A)

Engineering in V-process left part consumes 5% of the program cost and determines 80% of the product lifecycle cost (source: CIMDATA)

Page 65: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

65

Functional Definition

Logical Architecture

Physical Implementation

Car programs & projects

.

1

2

Collaborative platform to capitalize and re-use knowledge across projects and vehicle programs

Modeling solutions with end-to-end RFLP traceability from requirements to hardware and software components to Virtual + Real Tests

Functional Mockup with dynamic behavior simulation to early validate and integrate new innovations

1

2

3

Governance Product Lifecycle

Smart, Safe & Connected | Value ProposalInformation IntelligenceSocial Innovation

3

Page 66: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

66

Page 67: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

67

System Definition and Performance Validation

Embedded Software Development

Electronic Engineering

Electrical Engineering

Mechatronics Engineering

Functional Safety Delivery (ISO26262)

Embedded Electronic Architecture

Smart, Safe & Connected / Components

Page 68: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

68

Smart, Safe & Connected• Increase number of new innovations delivered

• Reduce time to market by early validating and integrating innovations

• Reduce electrical & electronics cost during product development and integration tests

• Improve quality and safety of embedded system

• Speedup engineering productivity with one collaborative platform

• Increase innovations re-use across vehicles and platforms

Page 69: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

69

Global Validation, Proven Performance

Virtual TestReal Test

Page 70: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

70

Modular, Glocal & Secure

Requirements ManagementProgram ManagementArchitecture and ModularizationSupply Chain Management

Target Zero Defect

Smart, Safe & Connected

System EngineeringArchitecture(s) developmentDisciplines development

Global Validation, Proven Performance

Test StrategyValidation & Verification PlanSimulations & Tests

Manage Vehicle Complexity

Page 71: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

71

Production Run & Operations

Manufacturing Process Engineering

ConceptInitiation

MarketLaunch

StylingFreeze

ConceptApproval

Product Design Complete

Start of productionPilot w/ Prod. tools

ThemeSelection End of Life

Explore System Design Architecture & Solutions

Product & Process Detailed design

Integrate, Verify & Validate Serial Life Pilot Production

Requirements Analysis & Distribution

Functional Architectures

Logical & Physical Architecture

Mechanical Engineering

Electrical & Electronic Engineering

Software Engineering

Sourcing & Procurement Plant & Logistics

Program & Projects

Configuration Management

Concepts & Clinics

Collaborative Environment

EarlyBOM E-BOMM-BOM

S-BOM

After sales & Service EngineeringStyling / Surface Refinement

Product Convergence

Product Validation Process

ProcessValidation Process

Production Convergence

Physical Tests

DMDR & Virtual Tests

OEM typical V+R Validation Process

Global solution for Product & Process Validation

regardless the type of Test

Test Strategy Definition and ExecutionRequirements

V+R Prototype(Unit Under Test)

Page 72: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

72

GOVERNANCEPROTOTYPE MEASUREMENT & TESTING

VIR

TUA

LR

EAL

RESOURCES

45% of the total Product Validation activities cost

V+R Validation Process

Due to absence of commercial products, customers developed their own customized solution to support Governance

Requester, Doer (OEM/Supplier/External Lab)

What Test, Which Vehicle Configuration

Vehicle development program Phase

Requirement, Performance, Regulation to be satisfied

Verification Method to be used

Page 73: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

73

What customers are telling us

GOVERNANCEPROTOTYPE MEASUREMENT & TESTING

VIR

TUA

LR

EAL

RESOURCES

V+R Validation Process

WHAT: Reduction of budget allocated to Real Prototype HOW: 1. Rationalize Physical Prototype # across business organization2. Promote Virtual Test against Real test particularly at Vehicle level 3. Better traceability of Prototype composition & evolution (integration to

Engineering Change management)

WHAT: Optimize vehicleperformance HOW: Streamline the product development process by integrating Virtual and Real testing in a unified process

WHAT : 1. Mitigate the Risk of recall based on objective criteria: Augment Validation process reliability (Vehicle Quality & Reliability)2. Minimize the Validation Cost: Minimized global V+R TestingHOW: 1. Monitor Product & Project KPI 2. Plan & Execute necessary &

sufficient Tests

1

2

3

Page 74: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

74

Global Validation, Proven Performance / Components

654

3

2 1

Performance target Definition with Positioning against competition

Build & Submit Certification files to get the Whole Vehicle Type Approval

Realistic Simulation to Optimize Vehicle Performance

Prepare, Execute, Monitor and Analyze the Tests Planned

Define, Build, Maintain necessary Prototypes for Tests Execution

Plan necessary & sufficient Tests to mitigate the Risk for Recall while

reducing the Cost

Performance Target & Regulation

Certification & Approval

V+R Product PerformanceVerification & Validation

Plan Execution

V+R Prototypes Management

Test Strategy definition

Page 75: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

75

Global Validation, Proven Performance

• Optimize the Test Strategy according to the Initial budget

• Agile Execution of the Verification & Validation Phase

• Optimize Vehicle Performance

• Improve Vehicle Quality & Reliability

Page 76: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

76

Customers Adoption

How to manage complexity

Openness

Agenda

Page 77: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

77

Requirements3DExperiences Openness supports main formats

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance60+ connectors :

standard

Connector

Page 78: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

78

Functional & Logical3DExperiences Openness supports main formats

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance

FMI - Functional Mockup Interface

ELOGstandard

Page 79: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

79

Physical Definition3DExperiences Openness supports main formats

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance

KLB (Electrical Harness)

SW

Elec

Meca

IDF (Printed Circuit Design)

X-CAD ENOVIA Format converter : ACIS, Inventor, Pro/Engineer, Creo, NX, Parasolid

STEP (AP242), IGES, JT …

CAD converters / Partners :

standard

Connector

Page 80: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

80

Simulation & Process3DExperiences Openness supports main formats

Target Zero Defect

Modular, Glocal & Secure

Smart, Safe & Connected

Virtual Garage Experience

Lean, Green & Compliant

Global Validation, Proven Performance

80+ AddOn Components & Partners:

ADAMSANSAANSYSFEMAPLS-DYNAMADYMPOMSC NastranMSC PatranPAMCRASH…

Connector

Page 81: | ref.: 3DS CORPORATE PRESENTATION V2 2013 03 …...Lean, Green & Compliant Sustainability Design & Style Lean Production Run Production Execution, Material, Quality, Warehouse, Maintenance

3DS.

COM

© Da

ssau

lt Sys

tèmes

| Con

fiden

tial In

forma

tion

| 11/1

2/201

4| r

ef.: 3

DS_D

ocum

ent_2

014

81

Conclusion

• Continue to improve V5 solution, empowered by 3DEXPERIENCE• Continue to improve openness to integrate best-in-class legacy and non-

DS solutions for each discipline• Develop new approaches and solutions to manage increasing vehicle

complexity cross disciplines• Already successful 3DEXPERIENCE deployments with significant gains