SBUTHWdSTf R;"l a ELECTRlC mWER COMPANY
January 3 ,20 13
CERTIFIED MAIL No. 70 1 1 2000 0002 1500 5202 Return Receipt Requested
NPDES Permits BranchlStormuater Arkansas Department of Environ~nental Quality 530 1 Northshore Drive North Little Rock, AR 72 1 18-53 17
Re: 20 12 Annual Report, Industrial Stormwater Permit Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277
Enclosed is the Annual Report. and associated documents, including the stormwater discharge monitoring reports (DMR's), site inspection reports, and corrective action plan for the referenced stormwater permit covering the period from January 1 . 201 2, through December 3 1 . 20 12, for the Flint Creek Power Plant in Gentry, Arkansas. Because the recordkeeping practices for the stormwater permit are not conducive to utilizing the Departments Annual Report Form, the required components of the Annual Report are enclosed as separate items (Annual Compliance Evaluation, DMR's. Periodic Visual Inspection Reports. and Corrective Action Plan).
Should there be any questions or the need for additional information, please contact Scott Carney at (479) 736-3526.
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system. or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I arn aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Sincerely,
&% Carl andley General Plant ~ a n a ~ e w
Cc: Randy Solomon, AEP Environmental Services, Dallas, TX (w) lvaunna Neigler, Lab and CEMS Supervisor, Flint Creek Power Plant (w) File: FLC. 150.20 (w)
INDUSTRIAL STORMWATER PERMIT - COMPREHENSIVE SITE COMPLIANCE EVALUATION FLINT CREEK POWER PLANT
1. Visual Inspection of Storm Water Pollutant Sources:
Map Source I Material Storage Capacity Containn~ent Volun~e
Reference
Evidence/Potential for Pollutants to Enter Storm Water Drainage Systcrn?
Cootai~~rnentlBMP's Controls Adequate and Properly I Needed?
Implemented? I 604.555 Gal Stcel Tank 1.499.400 Gal \ I )
I I
Bulk Fuel Oil Tank
Sump: 3.800 and Boon,: >I 0.000 Fuel Oil Purge Tnnks
Used Oil and Waste Drun~ Storage -20 Drums -500 Gallons
\ o
Ignitor Fucl Oil Systcrn
( I. I00 Gallons)
Served by bulk Sucl oil tank
- - - -
Srrvtcl hy hulk fuel oil tank ( Fuel Oil Pumps
Sunlp: 3.800 and Boom: > 10.000
19,677 Gal N Sump. 7.900. Boon]: >10,000
\ o
Turbinc Oil Tank
Sump: 3.800 and Boom: >10.000
Dws. M65. Sh. I
Turbine Oil Syslen~ (piping, boiler fcec pumpis). seal oil system. trap drain)
FD Fans ( 2 1 Non-SPCC I 7 Sump: 3.800 and Boonr: >10.000
ID Fans ( 2 ) 200
I Sump: 3,800 and 1 0 0 x 3
R V ~ I I I : > 10.000 1 Primary Air Fans (3)
Air Hcater Supporl Bearing Oil
Surnp: 3.800 and Boom: > 10.000
\I#
ID Fan Hydraulic Systrln (hladc pitch. hearings) (2 )
-
I Non-SPCC 142
I Sump: 3.800 and 160x 2
Boorn: >10.000
Sump: 3.800 and Boom: > 10.000
Additional Controls Needed?
\ ! B
\ < I
\ I )
\ I ,
\ t e
\ t ,
\ ( I
\ I >
\ 1 2
\o
\ i #
\ ( I
\ ( I
\ I #
\ I )
\ I I
\ I S
\ I $
\ c !
\ o
\ i v
\ ( I
\ i i
M a p Reference
19
20
2 1
17 --
23
24
25
26
27
28
29
30(a)
30( b)
30ic)
3 1
32
33
34
35
36
37
38
39
Source / hlaterial
Hulk Fuel Oil U~iload~ng Arca
Clean Turhlne Oil Tank -
Dirty Turbine Oil Tank
Off-Koad Iliesel Tank (Coal Yard)
Unleaded Gasoline Tank (Coal Yard)
Kerosene Tank (Coal Yard)
Diesel 1 Kerosene 1 Gasoline Unloading Arca (Coal Yard)
Used Oil Tank (Coal Yardj
Used Oil Tank (Oil House)
Fire Pump Diesel Tank (Inlake Structure)
Diesel Fuel Tank (Onan Generator)
Hydraulic Fluid Tank (Coal Car Positioning Systelilj
Hydraulic Fluid Tank (Coal Car position in^ System)
Hydraulic Fluid Tank (Coal Car Positionine System1
Coal Conveyor Beh Motors
Coal Conveyor Belt Gcar Box A Bell
Coal Conveyor Rclt Gear Box - B Belt
Coal Conveyor Belt Gear Box - C Bell
Coal Conveyor Belt Gcar Box - D Belt (Tripper Floor)
Coal Conveyor Belt Gear Box - E Bell (Tripper Floor)
Coal Car Truck Lock Gear Box
Coal Car Dumper Drive Gear Box
Circulatinp Water Purlips (3)
Storage Capacity
Various Tanker Truck Volulilc
1 1.500 Gal Steel Tank
11.500 Gal Steel Tank
15.000 Gal Steel Tank
1.500 Gal Slccl Tank
560 Gal Stccl Tank
Various Tanker Truck Volu~rie
1.000 Gal Steel Tank
500 Gal Steel Tank
200 Gal Steel Tank
Non-SPCC 125 Gal Steel Tank
230 Gal Steel Tank
490 Gal Steel Tank
160 Gal Steel Tank
Non-SPCC 1-55
86
52
Non-SPCC I 30
52 w 2
Non-SPCC 18.5 x 2
270
62.5 w 2
Non-SPCC I Upper tank - 32.5
Non-SPCC I Lower tank - 4.5
I<videncelfotenlial fo r Pollutants to Enter S to rm Wate r Drainage System?
\ I ,
\ I )
\ ( I
\ ( I
\ ( I
\ I )
\ I )
\o
\o
\o
\ I ?
\ i e
\ t r
\ l t
\ I ,
\ I )
\ I *
\(&
\ i s
\ i )
\ < I
\ I )
\ I I
Containment Volun~e
2.283 Gal
19.677 Gal
19.677 Gal
15,648 Gal
15.618 Gal
15.648 Gal
0 I > 5.000
15,648 Gal
1.588 Gal
601 Gal
177 Gal
1,497 Gal
703 Gal
1.690 Gal
Boorn > 10,000
Boom > 10.000
Bouln > 10.000
Boom > 10,000
Boom > 10,000
Sump: 3.800 and Boc~m: >I 0.000
Boom > 10,000
Boom > 10.000
0
Containn~ent/BMP's Adequate a n d Properly
Implemented?
\ (...
\ v,
\ v\
\ v,
\ t , ,
\ r\
1 t,.\
\ c..
\.(,\
\ t , \
\ t,.,
\ tL\
v\
1 r \
1 cS\
\ c\
\ 'c\
\ ' t %
\ ti\
\ v,
\ c\
\ c\
\ I , \
Additio~~al Cor~trols Needed?
\ I)
\ I)
\I,
P
\I#
Map Kcfcrencc
40(a)
43
35
36
Sourcc I hlatcrial
Co\ered Uru111 Storage (east side of Oil House)
Working Ilruln Storage (coal yard)
Porrable Tank (Skid Tmk)
Track Greaser for Rail Spur
Coal Yard - Producl Storage Area
Main Power Transforn~cr (Phase A, B, 3 x 5.200 Gal
5 1
52
53
54
55
Storage Capacity
Multiple 55-gallon d r u ~ n
-9 Drums (495 Gallons)
500 Gal
-114
Auxiliary Transforn~rr (P349. P350)
Rrscrve Auxiliary Transforrr~er (P161.33)
Spare Main Power Tr;~nsformer (P161.23)
Pole-Mounted Transfol-mcrs ( 1 50007 18. 10022700. 10022701) for
Wa~er Recovery Pumps (Located below SWEPCO Lake D a ~ n )
Transformer/Rectifier Scts (Precipila~or)
Containrncr~t Volume
792
Hoo~il> 10.000
>500 Gal
NA
Above-Ground Piping
2 x 2.9 13 Gal
7.578 Gal
5.200 Gal
# 150007 18 - 60 pal
Non-SPCC 1 #I0022700 - 48
,qal Non-SPCC I #I0022701 - 48
gal
I6 x 176 Gal
60
6 1
Evidcr~ceNoter~tial for Pollutar~ls to El~ter Storrn Watcr Drairlage Systcrn'!
\ I)
\I!
\I, -
\I!
Contai~mient/BR.IP's Adequate and Propcrly
Implc~ncnted?
) v \
) v\
v+
) c+
Boon1: > 10.000
2 x 2.694 Gal 1 Sump: 3.900
Buom: > 10,000
3.188 Gal I Sump: 3.900
Boom: > 10.000
0
900
Sump: 3,800 and Boom: > 10.000
Fuel Oil Piping (Kef. Dwg. M64)
Turhine Oil Pipins (Ref. Dwg. M u . sh. I )
\ I >
\II
Yes
\ I 1
\II
N A
N A
\ I.?
\ L,\
No
1 r \
) ( ~ \
)'(,\
) ' c3
\ ( I
\ < )
Yes
\ I 1
\I,
\I?
\ I 1
Sump: 3,800 and Boom: > 10.000
Sump: 3.800 and Boom: > 10.000
\ I D
\< I
M a p Reference
62
63
64
Additional Controls Needed?
\ ( I
\ ( I
\ I 1
Source I Material
Enlcrgcncy Fire Pump Piping
Emergency Generator Piping
Lube Oil Piping (Ref. Dwg. M65. sh.
2)
I<videncc/PotcntiaI for Pollutants to Enter Storni Wate r Drainage System?
\ I )
\ ( I
'"11
75
76
77
7 8
7%a)
7%h)
7 % ~ )
8 0
ContainnsntfRRIP's Adequate a n d Properly
Implemented?
1 t,\
'l t,\
'l'<>\
Storage Capacity
NA
NA
NA
Sulfuric Acid
Caustic-Sodium Hydroxide
Ac~d / Causlic Unload~nz Area
Coal Yard Drum Rack (various cleaners)
Surfactant (BT-2 I OW)
Surfactant (AS - 8896)
Surfactant (BT-2 IOW)
Sodium hypochlorite
C o n t a i n m e ~ ~ t Volume
Sump: 3.800 and Boon): > 10.000
Sump: 3.600 and boor^^: > 10.000
Sump: 3.800 and Boom: >10.000
Other Potential Contaminant Sources 1 Areas
90
9 1
92
93
94
95
96
97
98
\ ( I
\ I #
\ ( I
\ ( I
\ I )
\ ( I
\ ( I
\I>
10.000 Gal Srecl Tank
15.000 Gal Steel Tank
Various Tanker Truck Volunie
5 - 10. 5.5-Gal Drums
1.550 Gal Insulated Plastic Tank
1,550 Gal Plastic Tank
1.550 Gal Plastic Tank
275 Gal Plastic Totc
17.897
17.897
0
I 05 1 Boon] > 10.000
>1.550 / Boom >10,000
>1,550 / Boom >10.000
> 1.550 / Boon1 > 10.000
280
\ I #
\ I ,
\ < I
\ ( I
\o
\ I #
\ ( I
\ ( I
\ I ,
Coal Pile (S~oracge)
Fly Ash / Bottom Ash Landfill
Gencl-al Trash Dumpster
General Trash Dumpster
Plant Roads / Parking Lots
Scrap Metal Roll-Off
Railroad Spur
Shipping/Rccciving Dock
Leachate Tanks (SE Corner of Landfill)
\ ( I
\o
\ t ,
\ I )
\ ( I
\ ( I
\o
\ I )
NA
NA
N A
N A
Varies by vehicle
NA
Varies hy trail]
Various Containers and Materials
2 h 9.000
'l v.,
\c.
'l t,,
'l c ,
1 t* \
\ v \
\ <,\
\ c\
0 / Boom > 10,000
0 / Boom > 10,000
0 1 Boo111 > 10.000
0 1 Boom > 10.000
0 1 Boon1 > 10.000
0
0 1 Room > l0.000
> 5.000
>9.000
\ o
\ ( t
\ ( t
\ < I
\ I I
\ I I
\ I ,
\ I I
\ ( I
Y t 3
1 . v ~
1 v,
1 t:\
1.v.
'l e \
'I e \
'I e \
\ c h
2. Comments From Visual Inspection: Clean ancl Dirty Turhinc Oil Tank Containlncn( Structure: ncctl to rcnlovc accun~ulatcd clirtidchris I'rom co~itainmcnt. The drain i;~lvcs ior the co\crcrl t l l - L I ~ s1or;lgc (casc side of Oil House) ncccl rllainagc trenches installed to facilitate bcttcr drainage of storlnwatcr from containment struclurc. DI-ainagc ditches in vicinily ol'coal yard ncccl IO Ilc clcancd o u ~ (builcl-LIP ol'coal clusc). The three Main Power Tr;insformcrs (Phi~scs A, B, ;lnd C ) and thc Sparc Transfonncr cach contain weeping I'illillga, which h:~s 1.csul1ctl in slaining of rhc translori~lcr coillpollcnls hcncatll the wccp silcs, as \\,ell as limited staining o i thc .soil adiaccn~ to the Sparc Translh~mcr.
Thcsc items have hccn. or arc schctlulcd to be I-cmcdictl in the near fulurc.
3. Is Spill Response Equipment Adequate and in Good Condition? Answer: Thc ccluiprncnl wa\ inapcctcd as part of the colnprchcnsi\c site colnpliancc evaluation, and found to he 111 the condition rcllcctcd in thc reccnt monthly inspcclions.
4. Is the Significant Material Inventory Up To Date? ~ n s w e r : ) r Thc significant malerial inventory is up to date. It was recently uprlatcd on J u ~ i e 18, 2012. as past 0 f i 1 roulinc review of the plan. The update incl~ldcd: Iilndl'ill Icachatc tanks i~nrl coal yard surlrictiint change from AS-8896 LO Bcnctcch BT-2 IOW.
5. Were Periodic Inspections Conducted and Documented? Answer: Pcroidic inspcc~ions arc conducted on a ~nonthly hasis, and arc con~bincd with the rcquircmcnls for routine inspcctions rcrluircd by the Spill Prcvcnlion. Conlrol. and Countcrmcasurc (SPCC) plan. Although monthly inspections arc conduclcd, the inspection form for the 111iddle mvnth of cadi cl~lcndar quarter (February, May, A L ~ L I S ~ , and No\clnbcr) I'or 201 1 arc arlachcd lilr rckrcncc. Thc ~nontly inspections alho scrvc as doc~tlncnta~ion of itcrns i n need ol'attcntion, and list the work ordcr nulnhcrs which arc usccl to assign ~ u i r l [rack corrective ~ncasurcs.
6. Were Annual Storm Water Runoff Monitoring Conducted, Documented, and Properly Submitted? Thc stormualcr monitoring wa\ conducted oncc cach during the January - June 201 1 , period, and oncc bclwccn the July - Deccmhcr 701 I , period. The a\socia~cd rlischargc monitoring reports (DMR) arc attached to the annual report.
7. Based on the Annual Site Compliance Evaluation, Does the SWP3 Need to be UpdatedIRevised? Answer: @
No. the SWP? plan is u p to date ant1 clocs not nccd to he ~.c\,iscd as a r c w l t ol ' t l ic ~ o i ~ ~ [ ~ r ~ t i ~ t i s i \ c site ~ o r i i ~ ~ l i ; t i i ~ c evaluation.
Thc sampling data trlblcs for Stoi-rnwatcr Outfal ls SO01 and SOU? \vcrc updated w i t h tl ic i i ioi l i tor ing rcsulls.
Plant Environmental Coordinator Tillc: Date of ~valua~ionilns~ecrivn:
"I certify under penalty of law that this document and all auachments werc prepared under my direction or supervision in accurclancc with a system designed to assure that qualified persnnnel properly gather and evaluate the information submiued. Based on my inquiry of the person or persons who manage the system. or those persons directly responsible for ga~hcring the information. the inforrnalion submiltcd is, to the best of my knowledge and belief, true. accurate, and complete. I am aware that there are significan~ penalties for submitting falsc information. ~ncluding the possibility of fine and imprisonment for knowing violations."
Plan1 Manager
- Date:
Corrective Action to Issues Identified during the Annual Compliance Inspection 1. Comments: The weeps on the three Main Power Transformers (Phases A, B, and C) and the Spare Transformer will be addressed by having the fittings tightened in an effort to reduce or eliminate the weeps. Additionally, the drip pans beneath the fittings on the transformers are being modified to ~nclude oil-sorbing spill pillows and metal cages to keep spill pillows in place during high winds. The stained soil adjacent to the Spare Transformer will be excavated and properly disposed. As previously mentioned in Item No. 2, the other noted items have been, or are scheduled to be remedied in the near future.
Flint Creek Power Plant Corrective Action Plan for Stormwater Outfall SO01
(Drainage from northern portion of plant)
On October 12,20 12, a stormwater sample was collected from stormwater Outfall S001. The sample was analyzed for COD (chemical oxygen demand), TSS (Total Suspended Solids), O&G (Oil & Grease), and pH, and Total Iron. The Total lron parameter exceeded the benchmark value.
Total Iron Analytical result: 1.23 mg/L. Total lron Benchmark parameter: 1.0 mg/L.
The ADEQ Industrial Stormwater Permit (Permit No. ARR000000) requires that a facility experiencing an exceedance of a benchmark parameter comrncnce the following activities within 30 days of the exceedance:
1. Investigate the cause and/or source of the elevated pollutants, 2. Review the SWPPP and make updates if necessary, 3. Determine and document a corrective action plan to address the benchmark exceedance.
Stormwater Outfall SOOI: the source of stormwater flow to Outfall SO01 is a combination of industrial activities and structures, officc buildings, parking areas. laydown areas, rail spur, and vegetated areas, covering an area of approximately 16 acres. Stormwater accumulates in the drainage ditches in these areas until it is manually drained by opening the gate valves on the drainage ditches, allowing flow to the metal culvert which drains into SWEPCO Lake.
Probable cause and/or source of elevated pollutants: beginning in 201 1, Total Iron was monitored at all stormwater outfalls at the plant (not required by previous ADEQ stormwater permits). The three prior sample results for Total lron at Outfall SO01 are as follows:
c April l I , 201 1 : 0.74 mg/L o October 18,20 1 1 : 0.456 mg/L o January 1 1 . 20 12: 0.154 mglL
Each of the previous samples was below the Total lron benchmark of I .O mg/L. Upon receipt of the laboratory report showing that the benchmark parameter for Total lron collected on October 12,201 2, at Outfall SO01 had been exceeded. a visual reconnaissance ofthe area drained by the outfall was made. No structures, activities, rakb materials, or othcr potential sources of elevated Total lron were observed. In fact, no changes in activities, structures, or ground cover have been made to the drainage area of Outfall SO0 I since Total Iron monitoring commenced in April 201 1 .
Corrective Action Plan:
Review of SWPPP: a review of the SWPPP did not identify the need for changes with respect to management of the area drained by Outfall SO0 1.
Corrective Actions: due to the results of the visual rcconnaissance and review of previous analytical results, there are no corrective actions planned. However, an action plan to begin an investigation to determine if this benchmark excursion was an anomaly, or if background concentrations of iron in thc native soils may be contributing to the periodic elevated iron concentrations in stormwater samples has been put in place.
In order to conduct this investigation, the following activities are planned: 1 . Conduct repeat stormwater monitoring for Total lron at Outfall SO01 in order to determine
whether an anomaly occurred on the October 12.20 12 monitoring event. If Total lron
concentrations below the benchmark value of 1.0 mg/L are present in subsequent samples, then evidence of an anomaly will have been found.
2. Conduct background stormwater sampling at one or more sites which consist of stormwater flow not affected or influenced by plant operations or activities. Two such locations have been identified (see attached map). These samples will be conducted concurrently with the repeat stormwater monitoring at SO01 when possible.
3. Results of the above monitoring will guide subsequent actions.
Implementation Schedule: the repeat and background stormwater monitoring will commence immediately, and will be dictated by the availability of qualifying stormwater sampling events.
Dates:
Date investigation of cause/source conducted: November 14,20 12 (lab report received November 12, 20 1 2).
- Date
Flint Cmk Power Plant, Monthly Inspeft(on Checklist SWP3 1 SPCC Plans
--
1 I I ,, ~ F I ~ C Pump B~exl Tank ( a l l I I
Oil House (Umm S W a p I I I
I I TANK, CONTAME& EQUIPMENT. w STORAGE LOCATION I . . . . . - . . . . . . . . . - - SECONDARY CONTAINMENT
PLANT AREA
Ship pin#Roeoivi~ Do& Id=-+
AIL Ponds (Wmq mnd -0ad.v)
Circle appmptiak unwa
circle a ~ ~ u s mtmw ( U m h a m w e s t d ~ 1 . n l a ) mn~ontmnat~~*rR.COHFI~nn~~ mow dam)
A. Storm water dbch8rlhy d a r i y iuprcUon? YES YEP
SIormwater Coolrol M#sur(l Cuek appmpriaw ~ s w a
c rm- n r v t r i ~ SLW h uu O~OUH~IIT , YEs a YEs
D. Dbmlonlbn olwattr or shdlne tnvkhily oromhll? YES YES a
Aeadca?
YES 1 a E S m r w d V m -
IE. ~ u r ~ ~ l t y of c.mnt dlcbrge, or elevated lurbldlty in a m o l ootfmdl YES I CKQ) I YES I I
YE9
A E x a n w C a d h s r & h a ~ M M d ~ ~ ~ D d c h m ' l
YES I G a
F. Odor horn current dhcbmrgc or In a m olouthtl? I YES YES
Actions Rmuked (dcsaibe umblnn/iuue For dl ' A d a Rdkrd ' i m s cnla W a t ORIU number) W ~ ~ ~ ~ l - * P A f n ~ h r ~ ( p u d h ( W s b l u d * ~ -by
W o n ~ m r U n l O c h n p l 0 1 1 o l ~ h M ~ p t
B. c q d f ?
bsuakh
E h ~ b m m i n p o d m d i h n d pecunEvWmndnrpoina? - .
Stormwater 011tfaf.U 0brw.t ic .n~
NO
B E b h g & o r V d b * h I n D ~ D t ~ ?
YES 1 Ga
C.Rcsmcedpilkdorb*dmu**n
YES
8Onr Walu Ou(la11 SOOl
D M n d M
Yes
8(onnWlkr OuUa6 SOW ICont8inmmnt s h p l u n far mh~o*mwn(.d
DI*hd,
m
C D i x o b n t i o l . T ~ , a O d o r m h . u l q * r ~ . ~ ~ ~ ~ c o . l ~ ~ l l a d MI
Ye8
Flint Creek Power Plant, Monthly IlrspecPion Checklist SWP3 / SPCC I LANDFILL
I~~ use check *arks 8 to indicate 'Aaptablc" w "Action Required" for each itan and category. v
49 W a k h Drum ud Drum sww in tnaa ~m I
~ ~ i n t C& Power Plant, Mon& ~ns&ion ~~eck l i s t SWP;)IspCCPlrar
l17ed d a d vcfllabon. Localned dead rcptatlon
I I
A. I*aiaa? B. Anila*cqmiiy? CRcrenctdrpilledak*odn~riJ7 D.I*brbolQaml
Ash Pomda primly and YES 1 G 3 b u n i c i a l YES YFs
-"*v) Cirde appropn8te w w u E S ~ V ~ ?
F . l r f l W h g b D o m m p D o d ~ m d ~Ivuuehodmvrrborpandl
YES I c%3 'CYES I NO
Stormwater Control Mnsuru mh.inmmDacha? Dnhuac Dnchd, Dl9 Cinie nppmprinte w w e r
YBS YES Y e s m I ) Lllorm Wmr OMm SOW
SIonn yu.lrroutfnll 8 0 ~ (Conpinmen urvnun tor p o ~ n r w n ~ d I (L-r**H--) 1 m n r r o m ~ l n m ~ l - . . *-,..... .l--, I IA. Stom water d i r L r g 1 . ~ during iuprtlbn? I YES 1 - I YES I G ? l I
I~Turbidlty olcumotdbrha~*.orcltntrd ~IIrbidiIy la oloalfa~?I YES I I YES 1 I P. Odor from cmrrcnt diiclaqe or in ana orontlal? I YES YE3
h i o a r Requid ( M b e problernllrue for dl 'Ash Rwuld' imr rndlor enter We& Order number):
WOZ. 98740585 TDBFP Outboard Bsamg b ol le& irpocDa by. D& P8lteroon
Flint Crcck P o w c r P lant , h lont l t ly ll~spcction Cllccklist SWP3 I SPCC I L A N D F I L L
ormslon.. Cmcks. ullrvd dead \cgr.iat~o~~. pr bel!tr~n Imk and lon~nd.lt~oe. m.qe caused b\ q c a l l a n rmlr
Ibl-n I I Artrplnble 1 A i d 1 Acrrplablr I r\<riorr Required I A<ceplsble I Artian Rrquircd I
I 26 l ~ s c d 011 Tank I f l I 1 I
C \ c c l l l C Coal ULDI m Ih,tlt;rgr Dllcllcl ~ l o . n ~ n ~ ~ h a c n i l i or Vlrthl? sl~rnl ~n Unlllrgc Ulr:olor2l!oll.'lsrbldu~.or OOai (11 Onslage E ~ I ~ R Coal P L / c n8sS,~ Scnwx COZI Plld Dtlcl>cr S c n w ~ TOJI Pd:
E\ccrrncConl Dttrlknealll (bnl Col~sr\on'
YES N YES YES YES sloTmu'B~cr hl=n-rs '
,\t ICXIOI.~ ,rn !ca??Y Cm81gtC~vGI ,,11511 slonnnnilILr I! bCInS dBCd W. s l o m ~ ~ ~ ~ d ~ ~ h r ~ ~ t s ! l ~ ~ n ~ ~ s 1 1 ~ ~ 1 ~ ~ ~ ~ OI
I . .
I - - I - - No. 2 l'ucl MI Pump Hmur - - x . j , ' x x I '
SOUTHWESYZSIN IL€,lC ,€R
Flint Cmck Powcr Plant, Monthly Inspection Chccklisl C W W N Y SWP3 ISPCC Plans A r * . r A n U m L - P . a hlonthlYenr: Aug.12
Inaructions; use chcck marks [3 to indicare "Acceptable" or "Aclion Required" for each item and category.
I x l I X I I
I I I I IU
upy'-Dnnn U-olkr reed - x-. J- -.- ,-- . x . *- lbrnp " .-. FA...;
% . -2
SECONDARY COSTAINIIEST
Berm n d o r Swndnrv C o n l a i ~ n l Svsttrn. . Lcvcl of pmipilalion in d k c l ~ r d l ~ h l c capxily. * Ikbril: .Erosion;
Pcrmeahilily ollh: cvlhcn noor oldikcd ma . Cnekr, . Discolomion. Prcsence orspilled or leakcrl mxcrial (standing I~quid); Corrosion; and . Condftion oldrain \.alvc
PLANT AREA
TANK. COSTAIRER,
.STOILAC.EU)CATIOX ALUlOR
F4UlpblFhT
42 WniLsng drum slonge uca (nonh of lurhlnc or1 l u l l )
- - . N A - . - X X
i(b) fficl OU g n ~ ~ e r Surge Tnnk " 3 :s$/<; :,:,- -- - ..," x,~ - , t .. - , - . .-, , - - - s - - --*, ---NA-:- - - , (1 1g id) - , * - . A
r u r l 0 ~ 1 lpn~ler Surgc TmL 2(a) rsnn ..I> x I x I - . -h 'A- - -
Accc~lnblc I Aclion Reauimd Acccnmble I Action Rtnulrcd Acccntnble Arllon L q u l d
I Y I I Y I I
TANK,CONTAISER. EQUIPMENT, or STOMGE LOCATION
I I i I I I '. .a .- I 77 hndlCaulic Unlorlmg x I ...N&L-.
hen I
p t c k Innkc conlnimrs, dnrm.nnd enninmcnl. incllldinr rnumlnliors, tor lcaks or slruclural d c l c c l s . 1 ~
I)np rn*,' Lhsco~o~lon; Puddles conlining spillixl or Il&cd
.Cornsion,. Cnck; LocaJizurl dcsd vc~dalion;
-Gaps bclvccn lank md loundalinn. D~IPC cau.wd hy rcpeta~ i~n mols
IYlrF ) I - - I I I --- .- - -- -- C u m n l Drum Slongc (ens1 dde of 011 Ilousc) x x
Chrck nininr br: . Droplcls olsloxd macnd; Drccolomion. . Cormsion. . Dowing of p i p hclwcen suppons: - E~illcncc ols~onxl rnalcrid xcpapc fmm
vd\vs or.wd$. and Locslizcd dcjd vc(cla1ion
I I I I I ' . a -
92 Tmh Dumpslcr @)d3) x ---NA--- - - -N A... . .
, ,
TAVK. CO>T41YEII.
~~oRA.I:E~.I~ . rT l tn . *IL1lP
EOI.IP~IFsT
v u p t
1 4 Y K . COST415ER. EQI'IP>IE>T. or STORAGE L.OC4TIO'i
... .. . q l 1r.rrh I,ump\iur 15 )ill) .x,i.. 5 ,\... )i i
... NA.-.
SECOSD.IRY COSTAIN>IEST
Ilrm a&r Secondpn Ton(PinmM S,~tum. I.c\cl r>lpwclp8;rn!on in dt l r :ndlrblr r.dpatI?. . I>:l.ns . Ihl%ion.
* I'L~II~~AI~~I~I~ v l !I= c&llvdra llsx~r <!I J!Ld awd . ( ' r u b . - I> iwv lo r~r i~>n, ' Itc%:n~c rJ :p~llcd <8r ~ A L J IIIA~CII~ IslanJ~ny Ilqu~Ji. . Crrrum,n. and
l'<indilton 01 dmrn ~ : d \ r
IS^ PO& (Primar? and S*condsr, )
('trrlc appnlpnllt' znwcr
Slorma.a(er Control %leasums Cirr l r nppropnsc anxurr
(hrrk r p n k r o l u r i w r $ , d u r u u i m c 4 . i m l u l i n e kutiadaliorn. for &kc nr $ m r t u r a l dcfwtr'u. inrhnliw
l l n p rnuua. * I>~rc-ol t~r~l t~rn, I'uJdle?,i<tnuntnp spsllcll o r I r d d
m,;ut.":,~, 7 Clim8\illn. + Crsc1.r.
I .~ l r~ I~ r ;Jdu*J ,;'~c~alwn. - Ciapa h , u ~ ~ n rmk and Iwnd;u~nn: * I)rmaru cxsvd hh\ n.cn:l;$on rcxr*
,\ccellbhk
Check oirfinr (or: . I)m~lc l , ~ ~ T s l ~ ~ r c J rnacn*l. l)l.w,~hsru~,n. C'<tn~%-.~on. . luts-ins o f p i p k;ur.r'n 'uppuns. L.+ldcncc ol $!orcd 1ll4lr.lldl xcp.tge Inmm
xd\l .? . o r ?.L-AI~. wld I .~wdircd d:d $~.).r.lil!~nn
Arrrylnhlc ~r11.n R n ( u m d
4 b>wrf i 'J
113 I a I: S C L ~ ~ ! V~x'eual~trn)
ym I a A I C I I h x I h
m Ika,Mer I)Ic~LT'~
)Is j a
4 r c ~ ~ n e h l r Aclion Requircd
S l n r m m a t c r O u t r a l l O b n c r ~ a t i n n s circle nppropriale ansucr
A. Storm ws l r r dircharpinf during inspeclion? --
U. Prcrrrc of floating matcrialr f m m rurrcnl o r n ~ e n l discharge?
C. Prcxncc of t i r ib lc r k n in rma ofoulfvllf
I). Oircobwl ioo of x s l r r a r slx~rrlino in \icinil) ofoulhl l? .- - .-..
Action ilequircd
I1 . \ ~ a ~ l ~ h l ~ ~ ~ p a c ~ ~ ~ '
I Irnu~fictn1
I: 1s fl<u!tq k r ~ n ~n gmd cclhl8licn arrl suurciy a lndrx l l~ . "nlw p r a ~ '
a I SO
R I-ltuling ~UILIIIIP ( v Vt(iblc t l v ~ n ~n ~>ranugu I),Ic~,~
II.5 (a
E. Turbidit! of cwrcn t discharge. or r l r t a l r d l u r l r i d i ~ i n ama of oulTall? Y1.S n l s r2 -
F. Odor I rotn cuncsl discharge or in area of ouUaU'! YI S YI S
C. l ' r c ~ c x s i l l rplllcd gw ltiM n u ~ a n l !
YCS 1 a
Storm Waler Outlall SW1 ILakeshore wcrt of Hydrogen tanks)
1) lkhr~, \<Ckn~~n)?
Y1.s I a
YllS
Y1.S
V1.S
YY.S
Slorm Wabr Ounall SO03 (Conhinmenl sbuslurr for p o l r m o u n l ~ d bnnsformers 11 W.1.r Resovery Pump.
klm &m)
a a a -- Yl:S
Yl.5 ] - Yl S
YI:S
C' I)~w.lixa~l.m. Iurhulllp IW Orkr I" Ihaln~gc Vltrhr '
1LS 1 a
a a a a --
11 1.n. . .V\CI '.,xi I1c:tt k w ~ h r o d ( , r i w ~ li. Ill aid !I:'
Y1.I
\I." "
I t , TrxL Gresra for b l Spur / f . - - > A - . .
'14 C , d > .?rd ['31h111~: I . ~ t i . . . \ ,\ . . . . . . \ \ - - - I c/ i
L C I U I J I : I I?AIIII~ r: . .~ci~ii l . car \ ,xihi_ \li:~n ill i)i-illm*c I)~*:L>,,~~IIIL.~$. :~sibbai!\ (-! Odot 111 LIratnq~ I \..>h,,CC,,31 > ! a , , I~":-,l, ,< 11 I .a;,:\. r< i)ich;r:<pyL~lpil:-__ -.... -
l l c , l I \ .5lomm>%..,t", < " " I v ~ > I \ l ea \ , , r~ \ <, \ \ A ~!,%:r,,.,,,',~, ":%~~I:$!S,,~ d,>r,z$ '.I,< ,,I,,,.::?<,, k !
22
2 :
24
2 < >
25
. Lnrd~ied d e d rcgcmlla,. G a p brruutn I ~ L mJ rwdatt lm
L)mlll;e c u c d h \qaalon :MI?
Ofl.Rod Dtcwl Tm!.
1 ,,Ic,,\>?J l;,l>,,l,~,c l;u,i
YnmcnrTmA
1 ,cJ 081 l&!L
D,ncl,GlvKmme Lnlos*(mng Area
r r r p l a h l r
J
4cllnn Hrgtratpd
Locl l l~cd d e d 1 epolrl~on
/ j
/ I / ; /TI
. Prercnce OIEPIIIC~ OI I cLcJ mzi..nd Iriantllng 11qut31. . Corm-l~an. md Cmdtltm oldran \ a l \ c
4rrrplrhlr
I". r
\c(cl)li~bC \rlien K P ~ ~ I B ~ P ~ 4rlion Hrquimd
/ 1 / - I
/' I
1 j
/
M Jovrmvzsrrnw -ELCCTRIC -A
Flint Creek Powcr Plant, Monthly Inspcction Checklist cwmNr SFW3 / SPCC Plans ~ n t n m . m t r m M o n f W c n r : Nov-12
Inst~ucrions: use check marks lo indica~o "Acccplnblc" or "Action Rcqui red for each ilem and category.
, No 2 R c l Okl Pump
X I House 1 x x
L,
I x ! I X 1 I
x I 1 -- I 1
Umtrnnlc Hydnullc I .--NA-.- Conlml (UIClTulk
PLANT ARE*
TANK. COSTA 1mR.
STORAGELOCATION. ASWOR
EQU'PhlEhT
Mop
X X I I No 2 Fuel Chl Tank
IC\CJI I X I
I 42 I Working drum (nonh of luhin. .,, I X I I
TANK. CONTAINER. EQUIP.\lENT.or STORAGE LOCATION
X
n u , 1 Working drum rlnngc &TI -.-NA.-- ~ C T ~ K ba
-- Fuel Oil lgnilcr Surgc Tank
' X I X +' -.-NA--. 2o 1119 gal)
rucl011 Ignrrcr S u r ~ c Tank X X -.-NA.--
(360 pd)
75 S U I ~ U ~ C &id Tank X . X
Clicck tnnks, conlninra.clrums. ond c n u i m c n n t ~ w ~ o ~ d ~ l i o m . tor Ienks nr s~mrfurnl $rftrtc, i n e l ~ n l i n ~
Drip m u h : . Dircnlomlillim. Puddles con~dning spilld or Icakcd mxCT/JI:
Corrosion; - Cmb; - k d i m l dcd \ c g c l a l i ~ ; G a p s beln'~m lull; and loundaion;
D m ~ p c c a ~ s d by vdrcllion mnls
Arccplabk I Aclion Rcnuircd
SECONDARY CONTAINMENT
p . l rvc l olphcipilalion m J~kclavil&lc cspru~ty. * Debris; . Ension;
I'crmcsbzl~ly oflhc cmhcn f l ~ o r ofd~ked m a Cmb; . DiJcolontion; Prcscncc olspiUcd or Icdcd rnacrial (amding liquid); Corrosion; and . Conditinn oldnin valve
A I
x
$luck piainr for: - Dmplctsof slorcd mucrirl; , Diwalomion:
Conorion, Boring of pipc brlnrcn s~pponn; E\ldcncc of sloml ma~crid sccpqc from
vdvm orscds, md Locdixd d c d vc~clmion
AcceWble I Aclion Rcsuircd Acccplnblc
1
ASlon Rcqulmd
hiotor.Dnven Dollcr FrrJ
51
, Pump I - X i x I . . . N A - - .
Oil Haunc [Drum Stonpc Dldp ) Cmzml Dmrn Slonge (a side ~f Oil I ~ Y w ) Ma~n I 'ourrTr~nslnncrs ( ~ ' h m s A, I), md C)
M u n h u r T n ( P a 4 Y and 350)
X
x X
x
- - - N,\. -.
x I ' X
x
x x X
x
Actions R c q u i d Fddcrcribc prohkrnlissuc fur dl 'Aclion Rcquiwd" isms d lo ren l c r tYurkOnlcr numherp. Walk Repusll687?5281 wgarinn noob.sZtanpd at #cobgyp#. larprnrrl hy Dale Palterson Work Requell 98775289 oil booms need replaced a! ecology pit.
PLANT AREA
Ash Ponds (Primnr). nnd Sccondsry)
Circlc nppmrriatc msurr
Slonnwatcr Conlml hlcxiurcr Circle spprapriwc mswcr
D k b n ~ orcon-!
YES
C. P~cscnc~ 01 sp!llula IuM cdluhl?
Y T S 1 a
S lo rman tc r Ou l ra l l Obser i~s t ions Circle approprinle answer
A. Slorm Haler discharging durinp imprainn?
u. Presence of flo~tingmolmriak I m m current or recent d i l c h ~ r g ~ ?
C. Pmencc o I r is ibk sl~een innma ploulfnll?
D. Discoloralion 01 wnlcr orshorclinc in vicinilg oIoutlaO?
LTurb id i ly o I cumn l diuhnrgc, or elevaed l lrrbidit~ i n nma oIou~Imll?
F. Odor I m m cumn l discharge o r i n rrca oloullnll?
A Erminn?
YES ) 0. Arailahknpacll)?
I lmu~tricru
Slorm Water OuHall SO03 (Contalnrncnl sLructure lor poltrnounlad Lrmn.lormarm at Water Rcsovary Pumps
below dam)
P Sumsul Vcgmdaa?
YE5 1 Cia A. ExccsivcCd I>un, & h a O l l v hferrial
in DninapcDilchcr?
YES 1 Storm Wabr OuHall500l
(Lakcshore west of Hydrogan tanks)
\'I3
w
WS
YES
Y L S
WS
I- Is ffmdng hmm in p d mnlilion and s m r c l y PIIBCM 10 anclm pDinls?
a I NO
U. ISmting t~wlnisls ol Vi'irihk sl- in Dninafc DitcIm?
W 1 a
1 G3
YTS
n?s
WS
w-5
Y E
-
a a a a
C. Dlsrol~31ion.Turhidity. u O h in Ddnagc I l i l dn?
YES 1 a
a a a a
0. Excesrl,r Car! Durr kn?dt Cml Couvqrn 1)) 2nd D??
YQ
Flint Creek Power Plant, h I o n t l ~ l y Inspec l ion Chccklisr SWP3 ISPCC / LANDFILL
5lonthn'enr:
I I I I I 41 Used OJ Tml; ( W & , K T ~ ~
orvarlor born) /- I
worklng orvm sloragc A3 I I I I I
H,dnuln Fluid - Eyl oC 1~4~: ....*.,",.,,c> I -,/ I I ./ I I I I
.I"..,. I I I I
31 Coal CmnorBdt I ht0lon
C d Car Dvrnpr Onra 38 I,.,. . I I I I
r l o n a m c r conlm! nlr3s~rcr'~ - YES NO -
Needs Grrd~ndArh SprcJd~ng? Obrlrui~~ons m Slam> Wucr RunoffChannelP Erorlnn on Pcnntclcr Bcms? Tmr Gmjring on Psnmclcr Bemi! - YES NO YES YES 9 YES
Lnndfill Hc18h10-1sw pcnn'tted F"l Elc'at'on lnulom~nuc Lljlcnd ~ n r n ~ ~ . m d 6 1 1 1 lm%~on or In%~rb~ l l~? o l ~ l h ~ l o p c ~ . .-
I I
E\cnri\e Coal Durl ~n Ormnsgc 01lchcr Floalmg mmennlr or Virlbk rhccn mn Drmapc D~rmloralion.TuhiC~Iy,or Odor ~n Dranasc Smmr CDII hic5 Dttcher Senrnc Con1 Pale' D>leIlcr S r n ~ n x Conl i'llc?
YES YES YES Starmvalcr Conlrol Llenruru
ExrF(I,,C kne,lh Gn,.qon7
YES
FLINT CREEK EOWER PLANT - RESPONSE EOUIPMENT CHECKLIST
Inspector Name: a : 2-6-\? Enter actions taken to correct deficiencies in Comments area beIow or create work order to correct problem.
Rcv. 12/16/2011 Codes: G-zood condition, F-hir cor~djtion, NR-needs rep:ijr/repfncement, Y-.ffes, N-no
FLINT CREEK POWER PLANT - RESPONSE EOUIPMENT CHECKLIST /---
4c iL#j - Inspector Nan~e: . )h [ Date: 3 HZ/- /a Enter actions taken to correct deficiencies in Comments area below or create work order to correct problem.
Spill llesponsc Equipment locatcd in Warehouse #2 ("Brown
Comments:
Codes: G-@ad condidon, F-Bir condition, NR-needs repair/rpllilcement, Y-yes, N-no
FLINT CREEK POWER PLANT - RESPONSE EQUIPMENT CHECKLIST 1
Inspector Name: ~ J u hLb;5 Date: b- / 0 - I 2 Enter actions taken to correct deficiencies in Comments area below or create work order to correct problem.
SpLl Rcsponsc Equipment locntcd in Wweliousc #2 ("Brown
Comments: , I
/ c 2 C s a l h A
Rev. 12/16/2011 Codes: C-good condition, F-fair condition, NR-needs repiui/replacemenr, Y-yes, N-no
FLINT CREEK POWER PLANT - RESPONSE EOUIPMENT CHECKLIST
,- Inspector Name: . )&LC Date: / I - I S - - ( ~ Enter actions taken to correct deficiencies in Comments area below or create work order to correct problem.
Spill Response Izquipment locared in Warchousc #2 ("Brown
Comments:
Rev. 12/16/2011 Codes: G-good condidon, F-lair condidon, NR-needs repair/repJacement, Y-yes, 16-no
ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY STORMWATER DISCHARGE MONITORING REPORT
(DMR)
PERMIT NUMBER: ARROOB277 AMERICAN ELECTRIC PERMITTEE NAME: POWEK/SWEPCO
FLINT CREEK PLANT NAME: 21797 SWEPCO PLANT RD ADDRESS: GENTRY, AR 72734
INDUSTRIAL 01 OUTFALL SOOl REPORTING SECTOR: NO: YEAR: 2012
Sampling Period: JANUARY-JUNE JULY-DECEMBER
PARAMETER
Chemical Oxygen Demand (COD)
Total Suspended Solids (TSS)
Oil arid Grease (O&G)
PH
Total Iron
Date o f Storm Event Sampled: Duration of Event: Estimate o f Rainfall Event: Time Since Last Measurable Event: Estimate o f Total Discharged Volume:
111 1/12 1011 2/12 hours inches
23 (l2119/11) 6 ( 1 0/6/1 2) 15.752.22 92,340.6 alIoris
Benchmark Value
120
100
15
6.0-9.0
I .O
1 CERTIFY UNDER PENALTY O F LAW T H A T 1 HAVE PERSONALLY EXAMINED A N D AM FAMILIAR WITH T H E INFORMATION SUBMITTED HEREIN; A N D BASED O N MY INQUIRY O F T H O S E INDIVIDUALS IMMEDIATELY RESPONSIBLE FOR OBTAINING THE INFORMATION, 1 BELIEVE T H E SUBMITTED INFORMATION IS TRUE, ACCURATE A N D COMPLETE. I AM AWARE T H A T THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING T H E POSSIBILITY O F FINE A N D IMPRISONMENT.
- Plant Manager Printed Name & Title of Official
5301 Nonhbhore Dr~ve, North I.~ttle Rock, AR 721 18 50 1-682-0623 Fax 501 -682-0880
Version 0813012010
UNITS
mg/L
m g/ L
1ng1L
S.U.
mg/L
QUALlTY O R CONCENTRATION
JANUARY-JUNE
48
3 5
<5
7.5
0.154
JULY-DECEMBER
4 6
40
<5
7.9
1.23
ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY STORMWATER DISCHARGE MONITORING REPORT
(DMR)
PERMIT NUMBER: ARROOB277 AMERICAN ELECTRIC PERMITTEE NAME:
FLINT CREEK PLANT NAME: 2 1797 SWEPCO PLANT R D ADDRESS: GENTRY, AR 72734
INDUSTRIAL 01 OUTFALL, S003 REPORTING 20 SECTOR: NO: YEAR:
Sampling Period: JANUARY-JUNE JULY-DECEMBER
Date o f Storm Event Sampled: Duration o f Event: Estimate of Rainfall Event: Time Since Last Measurable Event: Estimate of Total Discharged Volume:
111 1/12 10/12/12 hours
0.29 inches 23 (12/19/1 I ) 6 (10/6/12) dak s
20.40 1 19.56 eallons
1 CERTIFY UNDER PENALTY O F LAW T H A T I HAVE PERSONALLY EXAMINED A N D AM FAMILIAR WITH T H E INFORMATION SUBMITTED HEREIN; AND BASED ON MY INQUIRY O F THOSE INDIVIDUALS IMMEDIATELY RESPONSIBLE FOR OBTAINING T H E INFORMATION, I BELIEVE T H E SUBMITTED INFORMATION IS TRUE, ACCURATE A N D COMPLETE. I AM AWARE T H A T T H E R E A R E SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLLIDING T H E POSSlBlLlTY O F FINE AND IMPRISONMENT.
- Plant Manager Printed Name & Title of Official
5301 Northshore Drive, North L~ttle Rock, i-ZR 721 18 501 -682-0623 Fax 501 -682-0880
Version 08130120 1 0
Permit Number: ARROO 23 3 AFIN 04 -GQIO'+
Industrial Sector: 611
DMR Review Form
Annual Report Received'? a y e s
TIM I< Received'? ~ Y C S N o
Are ill1 Parameters Okay '! Yes qo l'arnmeters exceeding the benchmark values:
Pollutant
I I I I 1 .;I 3nd 1 I 1 o r ,
1 o r ,
Date information was chtered inkdatabase
Date letter was cohblc'ted