- spe simplified series 2014-06-04 (wellbore survey simplified)

Upload: guillaume-boyer

Post on 08-Jan-2016

18 views

Category:

Documents


1 download

DESCRIPTION

Presentation

TRANSCRIPT

  • Ross LowdonJune 4th 2014

    SPE Aberdeen SimplifiedSeries 2014

    Demystifying Petroleum Engineering

    Sponsored by Shell UK Limited

  • Ross LowdonJune 4th 2014

    SPE Aberdeen SimplifiedSeries 2014

    Demystifying Petroleum Engineering

    WELLBORE

    SURVEY

    SIMPLIFIEDKindly Sponsored by

    Shell UK Limited

  • Agenda

    Defining a survey

    History of Wellbore surveying

    Why do surveys matter?

    Survey errors

    Future of surveying

    3

  • What is a Survey?

    4

    J-67I-67

    A-67C-67

    M-66

    G-67

    K-57

    E-57

    D-57

    P-56O-66

    P-66

    J-66K-66

    P-76

    Wellbore

    MD = lengthOf wellboreAlong path

    TVD = Vertical depthIndependent

    Of path

    SURFACE LOCATIONstart point

    DEPTHmeasured from a datum

    INCLINATIONfrom vertical

    AZIMUTHaligned to a North ref

    D-66

    Existing well

    Currently drilling

    Surface well location

    Wellbore trajectories

  • History of Wellbore surveying

    Texas 1890s

    Next door stealing oil

    Prove it

    Jam Jar acid level

    5

  • History of Wellbore surveying

    1930 Photo Magnetic single shot

    1930 Photo Gyroscopic survey

    1980 Measurement While Drilling

    1999 Gyro While Drilling

    6

  • Survey Technologies

    Magnetic

    Robust and RT 5 second surveys

    Poor reference

    Affected by offset casing

    Gyroscopic

    Excellent Reference

    Sensitive RT 2-7mins

    Not affected by offset casing

    7

  • Why Does a Wellbore Survey Matter

    Avoiding wells collisions

    Avoiding well control issues

    Relief wells

    Ensure you hit the your targets

    LWD to reservoir model tie in

    Reserves estimates

    Legal requirements

    8

  • The Value of Good Surveying Practice

    Shorter gyro run $15K

    Saved casing survey $125K

    Production shut in $700K

    Target sidetrack $23M

    Dry well $25M

    Major collision blowout $$$??

    9

  • Avoiding other Wells

    Well avoidance Complex and contradictory data

    Managing the survey data

    Poor data quality/missing data

    Survey Management Ensuring data accuracy

    Ensuring reserves estimates

    Ensuring HSE

    10

  • Lateral MWD Survey Errors

    Main = Bm Crustal = Bc Disturbance = Bd DS interference = Bds

    11

  • Improving Definition

    BGGM 54 degree

    HDGM 720 degree

    MagVar 5,400 degree

    12

  • Capturing the Crustal FieldAeromag or Marine

    Aeromag schematic 3D mag cube

    13

  • Optimising Lateral Survey Accuracy

    Advanced survey QC

    Local magnetic map

    Multi-station correction

    14

  • TVD Survey Errors

    BHA misalignment

    Mechanical and temperature pipe stretch

    Survey frequency

    Measurement error

    15

  • MWD sensor aligned with wellbore axis

    Tilted MWD sensor from wellbore axis

    BHA Mis-alignment

    What effect does it have?

  • Mechanical and Temperature Stretch

    Steel expands with temperature and stress

    Pipe stretch

    VerticalTVD error

    HorizontalMD error

    1.3 m/1,000 m/100 degCthermal

    Mechanical 1 m/1,000 mforce

    Can be corrected

    17

  • Survey Frequency

    What is happening between

    90 ft surveys?

    Well placement issues

    Reservoir modeling

    Geo-steering

    Log interpretation

    Well engineering issues

    Running casing

    Completion flow modeling

    ESP flow modeling

    18

  • Sensor Errors

    Inclination measurements 0.1

    Industry standard

    Gyro tools same specification

    Calibrated

    Capable of higher accuracy

    19

  • TVD Optimisationis the Accuracy Real?Case Study

    Use RSS + MWD D&I

    EMS used to confirm MWD

    LWD proved TVD

    Captured stabilizer wear

    Saved appraisal well

    12 m TVD error at 12,5 km

    1750

    1760

    1770

    1780

    1790

    2,560 2,570 2,580 2,590 2,600 2,610

    TV

    D (

    m)

    2m

    / d

    ivis

    ion

    Pressure

    (2 psi/division)

    Pre - Production Pressures(2 sigma +/- 6.2m)

    well 1 pressures

    pilot 2 pressures

    well 2 pressures

    well 3 pressures

    well 4 pressures

    well 5 pressures

    well 6 pressures

    well 7 pressures

    (+/- 6.2m)

    20

  • Future of Surveying

    Combined magnetic and gyro tools

    Real time inertial surveying

    Hole curvature measurements

    Autonomous drilling machines

    21

  • Questions?

    22

  • NEXT SIMPLIFIED SERIES PRESENTATION

    Simplified Series is held every first Wednesdayof each calendar Month

    Next Venue Wednesday July 2, 2014

    Station Hotel Aberdeen (The Ballroom)

    Russel Morrice North Sea Drilling Engineering Manager BP

    Drilling Engineering Simplified

    SPE Simplified Series

    Sponsored by Shell UK Limited

  • SPE Aberdeen SimplifiedSeries 2014

    Demystifying Petroleum Engineering

    Organised by SPE Aberdeen Young Professionals

    Contact us: [email protected]

    or [email protected]

    SPE Simplified Series

    Sponsored by Shell UK Limited