The information memorandum The full and short name Joint Stock Company «Grodno Azot» JSC «Grodno Azot» The address (location) Pr-t Kosmonavtov 100, Grodno, Republic of Belarus, 230013 Website www.azot.by Data of the State registration Grodno City Executive Committee has registered the Society on 13.09.2002 by the decision No 758 in the Uniform State register for legal bodies and individual businessmen № UNN 500036524 The information about the organization management, contact phones as for 01.04.2014 Mayanov Konstantin Pavlovich General Manager +375 152 79 46 50 (office) +375 29 7808101 (mobile) Posledniaya Tamara Ivanovna First Deputy General Manager - Deputy General Manager on Economy and Finance +375 152 79 45 27 +375 29 7811423 (mobile) Krotov Maxim Viktorovich Chief Engineer +375 152 79 41 17 +375 29 7871023 (mobile) Obukhov Viktor Nikolaevich Acting Deputy General Manager on Production +375 152 79 49 61 +375 29 7871025 (mobile) Petrov Pavel Viktorovich Acting Deputy General Manager on +375 152 79 44 45 +375 29 7871040

Upload: buibao

Post on 28-Mar-2018

227 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

The information memorandum

The full and short name

Joint Stock Company «Grodno Azot»JSC «Grodno Azot»

The address (location) Pr-t Kosmonavtov 100, Grodno, Republic of Belarus, 230013

Website www.azot.by

Data of the State registration

Grodno City Executive Committee has registered the Society on 13.09.2002 by the decision No 758 in the Uniform State register for legal bodies and individual businessmen № UNN 500036524

The information about the organization management, contact phonesas for 01.04.2014

Mayanov Konstantin Pavlovich General Manager +375 152 79 46 50 (office)+375 29 7808101 (mobile)

Posledniaya Tamara Ivanovna First Deputy General Manager - Deputy General Manager on Economy and Finance

+375 152 79 45 27+375 29 7811423 (mobile)

Krotov Maxim Viktorovich Chief Engineer +375 152 79 41 17 +375 29 7871023 (mobile)

Obukhov Viktor Nikolaevich Acting Deputy General Manager on Production

+375 152 79 49 61+375 29 7871025 (mobile)

Petrov Pavel Viktorovich Acting Deputy General Manager on Commercial Matters

+375 152 79 44 45+375 29 7871040 (mobile)

Lipsky Gary Vladimirovich Deputy General Manager on Capital Construction

+375 152 79 40 03+375 29 7871017 (mobile)

Kravchenko Michail Varfolomeevich

Deputy General Manager on Personnel Management, Social Matters and Ideology

+375 152 79 42 29+375 29 7871118 (mobile)

Bobyr, Igor M. Vice General Director - Director of PTC «Khimvolokno»

+375 152 56 12 64+375 29 7800155 (mobile)

Poznyak Alexander Antonovich Assistant to General Manager

+375 152 79 41 11

Rzaeva Antonina Mihajlovna Chief Accountant +375 152 79 45 35+375 29 7871090 (mobile)

Page 2: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

I. General information about the organization

1) History of creation of the enterpriseAccording to the trends of the USSR national economy development for 1959-1969

on 10.04.1959 Council of Ministers of the USSR by the decision № 379 has approved among constructions for the seven-year plan the Belarus nitric fertilizer plant (NFP).

The original project provided annual production of 167 thousand tons of ammonia, 240 thousand tons of weak nitric acid, 70 thousand tons of urea , 313 thousand tons of ammonium nitrate.

In October, 1961 the management of NFP under construction has started to work.On November, 30th, 1963 installation and construction personnel built a starting

complex to the State inspection. On December, 3rd, 1963 in ammonium nitrate division were released first tons of fertilizer on imported ammonia.

In the beginning of January, 1965 the first line of Ammonia-1 plant and then in turn Urea -1 line were put into operation. The second line of Ammonia-1 plant was put into operation in January, 1967. Capacity of the plant reached 200 thousand tons a year.

The second stage of development of the enterprise assumed construction of the second line of ammonia and urea production with designed capacity accordingly 218 and 180 thousand tons per year and caprolactam production with designed capacity of 50 thousand tons.

In March, 1970 Ammonia-2 plant, in April of the same year Caprolactam -1 plant and in June, 1971 – Urea -2 plant were put into operation.

In October, 1970 Grodno fertilizer plant was transformed to chemical combine named after S.O.Pritytsky.

In May, 1975 the Grodno chemical combine was transformed to the Grodno production association "Azot".

The third stage of development was connected with construction in 1976 - 1979 of large-capacity Ammonia-3 plant (capacity of 450 thousand tons/year) which was put into operation in May, 1979, and Urea-3 plant (capacity of 330 thousand tons/year) which was put into operation in October 1979, equipped with modern automatic equipment better , than operated manufactures.

On April, 7th, 1981 valorous activities of the staff were distinguished by a high government award - Order of Peoples' Friendship.

In November, 1981 caprolactam production of 2nd train was started up.In 1985 Ammonia-4 plant with the capacity of 450 thousand tons a year was put into

operation.In 1986 was started up Urea -4 plant with the capacity of 330 thousand tons a year.Since December 1993 production of ammonium nitrate was shifted to production of

liquid nitric fertilizers (UAN), and from July, 1st 1992 manufacture of crystalline urea was shifted to manufacture of urea solution for UAN.

In 1994 crystalline hydroxylamine sulphate was started up.In 1996 on the basis of the deduced from operation plant Ammonia-2 was made the

production of crude methanol. At the end of 1999 according to a government program of import substitution the production of rectified methanol with the capacity of 55 400 tons a year was started up.

In 2002 together with the Dutch Engineering Company "Stamicarbon" was put into operation trial installation on urea granulation in «a boiling bed». By results of installation work high level of technological process and quality of released product was noted. JSC was granted the right to duplicate the technology on her site without licensing.

2

Page 3: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

On August, 16th, 2000 by the decision of Executive Committee № 620 Grodno production association «Azot» was transformed to the Grodno industrial republican unitary enterprise «GPO Azot».

On August, 28th, 2002 according to the order of the Ministry of Economics of the Republic of Belarus № 116 Grodno industrial republican unitary enterprise «GPO Azot» was transformed to open joint-stock company «Grodno Azot».

On the basis of the decision of the Grodno city executive committee the record dtd 30.09.2011 was brought into the Uniform state register of legal bodies and individual businessmen about an exception of open joint-stock company «Grodno Khimvolokno» due to the termination of its activity by joining to JSC «Grodno Azot».

2) Principal activity (an activity from which the enterprise receives the basic volume of revenue, share of the given kind of activity in total revenue amount, in %)

Production of nitric fertilizers - 48,0 %

3) Other kinds of activity carried out by the enterprise

Manufacture of the refined oils and fatsManufacture of ready textile products, except clothes (covers)Manufacture of ropes, cords, twineManufacture of other textile products (cord fabric, technical fabric)Manufacture of petroleum productsManufacture of industrial gasesManufacture of other basic inorganic chemical substancesManufacture of other basic organic chemical substancesManufacture of nitric compoundsManufacture of plastic in primary formsManufacture of agrochemical productsManufacture of paints, varnishes, enamels and mineral pigments for themManufacture of soap and washing cleaning and polishing agentsManufacture of perfumery and cosmetic productsManufacture of the chemical products which are not included into other groupsManufacture of artificial and synthetic fibersManufacture of plastic products for packing of the goodsProcessing of metal products with use of the basic technological processes of mechanical engineeringManufacture of the other metal products which are not included into other groupsManufacture of the equipment and apparatus for chemical processesManufacture of the goffered paper and cardboard, paper and cardboard tareEdition of newspapersPolygraphic activity which is not included in other groupsCapron line for fishingProcessing of a waste and breakage of nonferrous metals, extraction of mercury from lamps, thermometersManufacture of the electric power by thermal power stationsThe electric power developed by power stations of the general use, block stations and other electro generating installations. Electric power distributionManufacture of thermal energy by thermal power stations, independent boiler-houses, other

3

Page 4: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

sourcesCollecting, purification and water distributionRent of the constructing equipment Repair and maintenance service of cars under ordersRetail trade in shopsGranting of services by other places for residingGranting of services by barsPublic cateringActivity of railway industrial transportActivity of the other overland passenger transport which is not submitting to the scheduleActivity of an automobile truck transportLeasing of own real estate Hire of subjects of cultural and householdTechnical tests and researches Preschool educationActivity of sanatorium establishmentsMedical practiceDentist practiceGathering and swapping of drainsActivity at sports objectsCultivation of vegetables, their seeds, sproutsBee keeping

4) Enterprise capacities and market shareDescription Units Capacity on the

beginning of 2014 1 Synthetic ammonia thousand tons 976,82 Sulfuric acid thousand tons 305,03 Nitric fertilizers on 100 % nitrogen

basisthousand tons 750,1

4 Caprolactam thousand tons 121,25 Methanol thousand tons 80,06 Carbonic acid of the highest grade thousand tons 24,07 Biodiesel fuel thousand tons 200,08 FAME thousand tons 30,09 Polyamide-6 thousand tons 93,3410 Polyamide chemical fibers and yarns thousand tons 58,47511 Polyester chemical fibers and yarns thousand tons 3,645

Product description World market share, %Urea less than 1 %UAN 2 – 3 %

Ammonium sulfate 1 - 1,5 %Caprolactam 6 - 8 %

Methanol 2 - 3 %

Share of PTC «Khimvolokno» in the market.Manufacture of cord and industrial yarn in Belarus (PTC «Khimvolokno» JSC

«Grodno Azot») in 2012 made up 37,8 thousand tons that makes 7,3 % of the worlds

4

Page 5: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

production of PA-6 yarn.In 2012 PTC «Khimvolokno» JSC «Grodno Azot» produced 7493 thousand tons of

polyamide texturized yarn what makes 0,83 % of the worlds volume of polyamide (PA6+PA66) carpet yarn production and 1,7 % of the worlds volume of PA6 carpet yarn manufacture.

Consumption of polyamide industrial yarn in the Russian Federation in 2013 was about 14,0 thousand tons. Share of PTC «Khimvolokno» in the market of the Russian Federation was 62,1 %.

Consumption of polyamide cord fabric in the Russian Federation in 2013 was 40005,1 thousand m2. Share of PTC «Khimvolokno» in the market of the Russian Federation was 30,5 %.

5) Advantages of the enterprise (for example, the favorable location, raw-material base presence, presence commodity distribution networks, own transport, available awards of competitions, exhibitions, etc.)

- Proximity to Baltic sea ports;- Presence of the European railway track;- "Know-how" perfection;- Qualified personnel;- High innovative-technical potential.Stability of the work, the guaranteed high quality of production, performance of all

proved requirements of consumers, excellent service - all it promoted creation of worthy image of JSC «Grodno Azot» in the world markets of mineral fertilizers and caprolactam. Acknowledgement to that is delivery to the enterprise of some high government awards, award of the international prizes.

In 1970 as the repeated winner of competition between the industrial enterprises, Grodno production association «Azot» received the Red Banner of the Central Committee of the CPSU and Council of Ministers of the USSR on eternal storage, and in 1981 it was awarded Order of Peoples' Friendship.

In 1970 as the repeated winner of competition between the industrial enterprises, the Grodno production association «Azot» has received the Red Banner of the Central Committee of the CPSU and Ministerial council of the USSR on eternal storage, and in 1981 year it has been awarded by an award of Friendship of the People.

The enterprise is the winner of awards of the Grodno regional executive committee (2002 and 2005), the Governments of the Republic of Belarus (2006) for achievements in the field of quality, in 2002 was awarded the diploma of the Belarus Chamber of commerce as the prize-winner of republican competition" The Best exporter of year”. By results of activities for 2007 «Azot» became the winner of city competition among the industrial enterprises with delivery of the Red Banner.

Among the international awards received by «Azot» there are - a prize of Fund of assistance to development of east countries "Gold globe" (1994), Grand prix of the International program "Partnership for the sake of progress" (1997.), prizes "For the best trade mark" (2000), "Erstmaker-2000" in a nomination "For dynamics and progress of economic development" and others.

Many kinds of products produced by «Azot» were repeatedly included into number of "the Best goods of year of the Republic of Belarus".

6) Licenses, patents, certificates ISO.

5

Page 6: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Quality management system on manufacture of the basic production operates at the enterprise and corresponds to the next requirements:

ISO 9001, certified by the international body of Bureau Veritas - the conformity certificate № UA 226725 dtd 03.11.2011 is valid till 27.11.2014;

STB ISO 9001, certified by Grodno - the certificate of conformity BY/11205.01.007 01237 is confirmed 19.02.2014, valid till 19.02.2017.

In 2013 at the enterprise held the external audits which confirmed conformity of quality management system to standard requirements.

Since 2004 the system of environment control corresponding to the requirements of STB ISO 14001 functions at the enterprise. The system of environment control is certified in National system of acknowledgement of conformity of the Republic of Belarus. The date of the certificate of conformity is confirmed on 22.12.2012 and valid till 22.12.2015.

The control system of a labor safety and industrial safety corresponding to requirements OHSAS 18001, certified by the international body of BUREAU VERITAS operates at the enterprise since 2008. The conformity certificate No UA 226726 dtd 03.11.2011 is valid till 27.11.2014.

In 2012 at the enterprise the system of management of food safety of production of liquid dioxide of carbon, conforming the requirements ISO 22000:2005, ISO/TS 22002-1:2009 is introduced. The certificate of conformity No DNKFRC95891FH dtd 18.09.2012 is valid till 17.09.2015.

Nine divisions of the enterprise are accredited on technical competence according to requirements of standard STB ISO/MEK 17025: test laboratory (Central department of technical control), the central laboratory of enterprise, department of technical diagnostics, laboratory of not destroying control methods, test laboratory of mechanical-repair production, sanitarian laboratory, division of tests and measurements of electric equipment, sewage laboratory, calibration laboratory of Chief Metrologist Department.

At PTC "Khimvolokno" JSC "Grodno Azot" there are certified by BUREAU VERITAS Certification body:

Quality Management System to conform to the requirements of the international standard ISO 9001:2008, Certificate of Compliance UA227037 dd. November 08, 2012. Valid till December 16, 2015;

Environmental Management System to conform to the requirements of the international standard ISO 14001:2004, Certificate of Compliance UA226713 dd. October 25, 2011. Valid till November 15, 2014;

Occupational Safety Management System to conform to the requirements of the international standard OHSAS 18001:2007, Certificate of Compliance UA227038 dd. November 08, 2012. Valid till November 26, 2015.

In 2013 BUREAU VERITAS Certification body carried out supervisory audits of Quality Management System, Environmental Management System and Occupational Safety Management System. The systems were found as conforming to requirements of standards.

At PTC "Khimvolokno" with the purpose to confirm the conformity of activity of test laboratories to requirements of STB ISO / IEC 17025-2007 there were accredited:

chemical research sector (CRS) (certificate No. BY /112 02.2.0. 3345 dd. 30.09.2008, valid from February 20, 2012 till February 20, 2017). Accreditation area of CRS is physical and chemical control of finished products;

methodical and analytical sector (МАS) (certificate No. BY /112 02.2.0. 0359 dd. 30.09.1996, valid from February 06, 2012 till February 06, 2017). МАS ensures control of

6

Page 7: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

raw material, oils, sanitary and industrial control of working zone air, ecological control of ventilation emissions, outdoor air, sewage waters, soils and aerodynamic tests of ventilation systems and air conditioning systems.

Test laboratories are accredited by National accrediting body of the Republic of Belarus (Belarusian State Accreditation Center).

The enterprise has 40 patents for inventions and useful models (including 3 patents for inventions - PTC «Khimvolokno»).

In connection with reorganization of JSC "Grodno Khimvolokno" by joining to JSC “Grodno Azot” all rights of the legal owner to trade marks and the rights of patent holder on patents for inventions (belonging to JSC «Grodno Khimvolokno») have been transferred to legal body of JSC «Grodno Azot» and procedure of the state registration of transition of the exclusive right concerning all objects of intellectual property registered in the State registers of the Republic of Belarus, Russian Federation, Ukraine and Republic of Kazakhstan was made.

The list of security documents of objects of the intellectual property for guarding goods export of PTC "Khimvolokno":

Republic of Belarus:The invention «Fire-resistant polyamide composition»Together with Mechanic Institute of metal polymer systems named after V.A.Beliy » NAS Belarus and ОDО «Tekma»Word trade mark «ГРОДНАМИД»Word trade mark «GRODNAMID»Graphic trade markCombined trade markWord trade mark «Гроднонить-УФ»Word trade mark «grodno-khim»

Patent No. 7161

Certificate No. 333 Certificate No. 334 Certificate No. 10812Certificate No. 10813 Certificate No. 36620 Certificate No. 36379

Russian Federation:The invention «The way of heat&light stabilized polycaproamide yarn reception»The invention «Fire-resistant polyamide composition» Together with Mechanic Institute of metal polymer systems named after V.A.Beliy »NAS Belarus and ОDО «Tekma»Word trade mark «ГРОДНАМИД»Word trade mark «GRODNAMID»Combined trade mark

Patent No. 2330131

Patent No. 2200744

Certificate No. 289384 Certificate No. 280285Certificate No. 463701

Ukraine:Word trade mark «ГРОДНАМИД»Word trade mark «GRODNAMID»Graphic trade mark

Certificate No. 61782 Certificate No. 61783 Certificate No. 126168

KazakhstanCombined trade mark Certificate No. 39708

LISTof special permissions (licenses)

as of 01.04.2014

7

Page 8: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

1 2 3No and date of license issue

State authorities granted the license

The license for the right of the execution of the following activity

02300/1005-1 dtd 30.03.2009

Gospromnadzor, Ministry of Emergency Measures of Republic of Belarus

for the right of activity concerning the industrial safety

02330/0494145dtd 30.04.2004

Ministry of Information of Republic of Belarus

for the right of execution of the printing activity

02190/5-01053 dtd 11.06.2012

Ministry of Transport and Communications of Republic of Belarus

for the right of activity concerning the road transport

02200/0064549 dtd 27.02.2009

Ministry of Finance of Republic of Belarus

for the right of activity connected with the precious metals and jewels

02120/1928dtd 05.12.2011

Ministry of Natural Resources and Environmental Protection of Republic of Belarus

for the right of activity connected with the environment impact

02260/17/160dtd 07.03.2008

Ministry of Industry of Republic of Belarus

for the right of activity connected with manufacture of aluminum, lead, zinc, tin, copper and casting of finished parts and half-finished products from aluminum and heavy nonferrous metals

02140/0184923 dtd 30.03.2009

Ministry of Communications and Information of Republic of Belarus

for the right of activity concerning the communications

02010/0528785dtd 26.02.2010

Ministry of Internal Affairs of Republic of Belarus

for the right of activity concerning the safety of legal and individual persons

02300/605dtd 19.12.2005

Ministry of Emergency Measures of Republic of Belarus

for the right of activity concerning the fire safety

02040/0572445dtd 26.03.2009

Ministry of Health of Republic of Belarus

for the right of activity connected with the turnover of narcotics, psychotropic substances.

02040/6372dtd 26.03.2010

Ministry of Health of Republic of Belarus

for the right of execution of medical activity.

02300/164-4dtd 30.03.2009

Ministry of Emergency Measures of Republic of Belarus

for the right of activity concerning the using of atomic energy and ionizing radiation sources.

09100/00232dtd 05.04.2013

The Belarusian State Concern for Oil and Chemistry

for the right of execution of wholesale and retail trade of petrochemicals

8

Page 9: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

II. Financial indices of business activity of the organization.

Index 2011 2012 2013

Cost of net assets, mln rbl . 5 111 754 6 955 866 7 853 277Product sales, works and services revenue (without taxes), mln rbl. 6 029 269 8 413 436 9 858 427

Profit (loss) from current activity, mln rbl. (page 090 of profit and loss statement) 900854 635043 294647

Product sales, works and services profit, mln rbl. 1 059 258 855 034 980 804

Net profit, mln rbl. 758 376 520 955 27 611Profitability of sales, works, services, % 21,3 11,3 11,0Accounts receivable*, mln rbl.(page 170 + page 250 of balance sheet) 509 371 500 164 928 293

Short-term accounts payable*, mln rbl.(page 630 of balance sheet) 818 474 571 888 790 110

Average wages and salaries, ths rbl. 3 523,6 6 379,6 8 053,3* - Accounts receivable and accounts payable on 01.01.2012, 01.01.2013,

01.01.2014.

III. Information about produced output

No Product description Units 2011 год 2012 год 2013 год

1 Mineral fertilizers in 100% nitrogen t 735 254 745740 762260

2 Caprolactam t 131 434 121269 1291303 Technical methanol t 80 588 84279 723164 Cord fabric thous.m 45 415 49 549 41 2775 Industrial yarn t 19 201 20 753 21 1416 Texturized yarn t 6 102 7 493 6 3667 Polyamide-6 t 22 697 51 625 77 7428 Polymeric composite materials t 10 434 10 384 10 191

IV. Realized (or realized for last 3 years) investment projects with their cost, volumes of the assimilated investments, data on the introduced new technologies, the equipment, increase in volumes of manufacture, assortment expansion etc., new technologies provided with introduction of new equipment.

1. Put in force of fixed capital in 2013: 1 108 187 million rbl. Including major projects: JSC «Grodno Azot»1) Reconstruction of cyclohexanone rectificate production unit, cyclohexanone -2

plant (updating).

9

Page 10: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Cost of fixed assets - 213479 million rbl.Date of input is 03.2013 (the order No 218 dtd 29.03.2013).

2) Reconstruction of hostel No 2 JSC «Grodno Azot». (updating).Cost of fixed assets - 18458 million rbl.Date of input 04.2013 (order dtd 12.04.2013 No 269).3) Reconstruction of hostel No 2 JSC «Grodno Azot». (Updating). Rooms of housing

and utility department.Cost of fixed assets - 864 million rbl.Date of input 04.2013 (order dtd 12.04.2013 No 269).4) Reconstruction of hostel No 2 JSC «Grodno Azot». (updating).Seasonal works.Cost of fixed assets - 936 million rbl.Date of input 06 (order dtd 13.06.2013 No 453).

5) Reconstruction of cyclohexanone rectificate production unit, cyclohexanone -2 plant (updating).

Seasonal works.Cost of fixed assets - 816 million rbl.Date of input 06.2013 (order dtd 13.06.2013 No 456).6) Upgrade of 2 case horizontal reheater of feed water, item 603 of ammonia – 4

plant.Cost of fixed assets - 50347 million rbl.Date of input 08.2013 (order dtd 30.08.2013 No 669).7) Reconstruction of Urea - 4 plant with the purpose of increasing of capacity up to

1200t/day. 1st line of construction. Cost of fixed assets - 74288 million rbl.Date of input 08.2013 (order dtd 30.08.2013 No 670).8) Reconstruction of dairy farm in Gonchary village with the motor road and

construction of two artesian chinks (1-working, 1-reserve).Cost of fixed assets - 43526 million rbl.Date of input 09.2013 (order dtd 30.09.2013 No 740).9) Reconstruction of Caprolactam-1 plant. Reduction of the fire-extinguishing system

in building 2007 to therules NTB 15-2007.Cost of fixed assets - 7526 million rbl.Date of input 11.2013 (order dtd 29.11.2013 No 903).10) Intensification of benzene distillation in Caprolactam-1 plant.Cost of fixed assets - 6342 million rbl.Date of input 11.2013 (order dtd 29.11.2013 No 903).11) Reconstruction of pool in sanatorium «Zhemchuzhina» . 2-nd starting complex.Cost of fixed assets - 2364 million rbl.Date of input 12.2013 (order dtd 31.12.2013 No 1005).

PTC "Khimvolokno"12) Expansion of spinneret workshopFixed assets value – 3 314 mln. rub.Date of realization – 02.2013, (Order No. 254 dd. 28.02.2013);13) Reconstruction of caprolactam warehouse of plastics processing workshop.

Updating.Fixed assets value – 12 991 mln. rub. Date of realization – 08.02.2013, (Order No. 232 dd. 22.02.2013)14) Complete technological spi-draw-winding plants for polyamide (PА6) industrial

yarns. 2nd start-up complex.

10

Page 11: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Fixed assets value – 303 503 mln. rub. Date of realization – 05.2013, (Order No. 621 dd. 31.05.2013) 14) Rebuilding of change room of mechanical repair workshop into medical unitFixed assets value - 1 637 mln. rub. Date of realization – 06.2013, (Order No. 717 dd. 28.06.2013)15) Reconstruction of caprolactam warehouse of plastics processing workshop.

Updating. Seasonal works.Fixed assets value – 100 mln. rub. Date of realization – 06.2013, (Order No. 718, dd. 28.06. 2013) 16) Installation of inspection tableFixed assets value – 5 427 mln. rub.Date of realization – 08.2013, (Order No. 904, dd. 30.08.2013)17) Construction of the market-milk dairy farm for 777 milk-cows in Studeniki

village, Svisloch district. Updating. 2nd start-up complex.Fixed assets value – 38 760 mln. rub. Date of realization – 07.2013, (Order No. 819 dd. 31.07.2013) 18) Construction of grain-cleaning and drying complex КЗСВ – 30 «Lida-Aray» in

agrotown Novy Dvor, Svisloch district. 1st start-up complexFixed assets value – 5 755 mln. rub. Date of realization – 07.2013, (Order No. 818 dd. 31.07.2013) 19) Construction of grain-cleaning and drying complex КЗСВ – 30 «Lida-Aray» in

agrotown Novy Dvor, Svisloch district. 2nd start-up complexFixed assets value – 1 473 mln. rub.Date of realization – 10.2013, (Order No. 1131а dd. 31.10.2013)20) Reconstruction of cord and nylon yarn production site. Reconstruction of twisting

site of TWW. UpdatingFixed assets value – 54 315 mln. rub. Date of realization – 10.2013, (Order No. 1130а dd. 31.10.2013) 21) Reconstruction of farm territory for cattle fattening operation No. 1,2,3 in

agrotown Novy Dvor, Svisloch district.Fixed assets value – 1 936 mln. rub. Date of realization – 11.2013, (Order No. 1272 dd. 10.12.2013).22) Reconstruction of farm territory for cattle reproduction in agrotown Novy Dvor,

Svisloch district.Fixed assets value – 997 mln. rub.Date of realization – 11.2013, (Order No. 1271 dd. 10.12.2013)

Investment projects planned to realization

The investment program of company in 2014 bases on projects which are scheduled in the Program of perspective development of JSC «Grodno Azot» for 2011-2015 and for the period till 2020.

The purpose of the designed program is:- Increase the profit of the enterprise due to increase of volumes of production and

decrease of costs;- Decrease of power consumption of production;- Production of new competitive products;- Reduction of exhausts of harmful substances in an environment.The indicated program ensures the solution of the following tasks:

11

Page 12: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

• Increase of capacities for the production of ammonia, mineral fertilizers, caprolactam, polyamide and products from it;

• Keeping of sales markets as for main kinds of production;• Updating of the basic productive assets;• Introduction of perspective technologies;• Decrease of power constituting in the production cost;• Decrease of specific norms of consumption of main kinds of raw material;• Improving of working conditions and ecologies;• Meeting the needs of the enterprises of Republic of Belarus in the raw

material purchasing for import; • Increase of the profit at the expense of increase of production volumes and

realizations of production in the markets of CIS countries and far abroad; • Decrease of costs for the production at the expense of introduction of the

high-technology equipment; • Mastering of new competitive products.

1. Reconstruction of ammonia-3 plant with the increasing of capacity and decreasing of power consumption

The purpose of the project:- Increase of capacity of the plant on 19,7 thousand tons/year;- Decrease of consumption of power resources (natural gas, return water) on 1

ton of ammonia;- Decrease of exhausts of harmful substances in the environment on 1 ton of

ammonia;- Increase of delivery of excess steam (2,7 MPa in industrial network).At the present time:The technology of heat using of ammonia after the ammonia compressor for the

heating of demineralized water, item 127-СА was introduced;The installation of waste-heat boilers, item 103-C and item 104-C was made;Reconstruction of air compressor, item 101J/JT according to agreement with JSC

NPF «ENTEKHMASH, Saint Petersburg » was made;Reconstruction of the compressor of synthesis gas, item 103J/JT together with the

specialists of company «TRIZ», Saint Petersburg was made.Term of realization: 2010-2015.

2. Reconstruction of ammonia-4 plant with the increasing of capacity and decreasing of power consumption

The purpose of the project:- Increase of ammonia production on 44,8 thousand tons/year;- Decrease of power consumption up to 8,3 gigacal/t;- Increase of excess steam (2,7 MPa in industrial network);- Decrease of exhausts of harmful substances in the environment on 1 ton of

ammonia.At the present time:The installation of the new feed water heater, item 603 waqs made;It is developed and handed over to the Equipment Department the technical

assignment concerning the purchasing of additional section of heat exchanger, item 604, the contract for the delivery was concluded;

12

Page 13: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

It is developed and handed over to the Equipment Department the technical assignment concerning the purchasing of AVO, item 429, the contract was concluded;

The information concerning the reconstruction of AVO, 903 A, B, V, G is examined.Term of realization: 2010-2014.

3. Reconstruction of air separation units at methanol plant.The purpose of the project:- Decrease of power consumption on 43135,54 thousand kW/h per year;- Decrease of consumption of return water on 14446,71 thousand m3 /year;- Improving oxygen quality up to the technical and medical level.At the present time:22.08.2013 on the meeting of competitive commission concerning the purchasing of

two modular air separation units for methanol plant the envelopes with the offers from qualifying applicants were opened.

According to «Method of competitive offers estimation», approved by the chief engineer, the winner of tenders was determined.

It was company «Red Mountain Energy Co», Moscow. The contract with the company «Red Mountain Energy Co.» was concluded 15.10.2013.

At the present time the study of financing and fulfillment of the contract is made. The negotiations with bank «BPS-LEASING» concerning the financing through the purchasing of air separation units in leasing are conducted.

Term of realization: 2010-2016.

4. Construction of the plant for the production of nitric acid with capacity 1200 t/day with the reconstruction of existing UAN production.

The purpose of the project:- Increase of capacity of the plant for the production of nitric acid on 150 thousand

tons/year;- Increase of capacity of the plant for UAN production on 422 thousand

tons/year;- Replacement of old energy-intensive production of nitric acid on modern and

high efficiency;- Decrease of consumption of power resources;- Decrease of exhausts of harmful substances in the environment as a result of

application of modern technologies and equipment.At the present time:Together with the winner of tender (company «ThyssenKrupp Uhde GmbH») the

contract was signed 30.07.2013;The procedures connected with the beginning of work performance under the

contract are carried out, i.e. advance payment is effected and the letter of credit in favor of the seller is opened.

Term of realization: 2010-2017.

5. Reconstruction of caprolactam production.The purpose of the project:- Increase of capacity of caprolactam on 18,8 thousand tonsyear;- Decrease of consumption of heat- and electric power;- Decrease of consumption of benzene and soda caustic for the caprolactam

production;

13

Page 14: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

- Improvement of labour conditions of the operating personnel;- Reduction of exhausts of harmful substances in the environment as a result of

using of modern technologies and equipment.At the present time: The facility «Reconstruction of unit of receiving of rectificate cyclohexanol at cyclohexanone – 2 plant » is put in operation 30.06.2012;The facility «Processing of Х-oils of distillation section at cyclohexanone-1 plant.

The stage of cyclohexanol-rectificate receiving (column C-534 А/V) at cyclohexanone-1 plant» is put in operation 28.11.2012;

The facility of reconstruction of caprolactam-1 plant: «Reconstruction of unit of cyclohexanoneoxime extraction and cyclohexanone

distillation from ammonium sulphate solution of oximation stage of caprolactam-1 plant», « Reconstruction of neutralization stage of caprolactam-1 plant», «Reconstruction of evaporation stage of caprolactam water solution of caprolactam-1 plant» are accepted for operation 18.12.2012;

The facility «Reconstruction of caprolactam distillation stage of caprolactam-1 plant» is accepted for operation 29.12.2012;

The facility «Reconstruction of caprolactam-1 plant. Reduction of the fire-extinguishing system in building 2007 to the rules NPB-15-2007» is accepted for operation 29.11.2013;

The facility «Intensification of benzene distillation stage of caprolactam-1 plant» is accepted for operation 29.11.2013;

The facility «Reconstruction of rectification of cyclohexanone - 2 plant» is accepted for operation 29.03.2013.

For 2014:- Reconstruction of hydroxylamine sulphate plant;- Reconstruction of ammonium sulphate plant.Term of realization - 2014.

6. Construction of granulated polyamide-6 plant with the capacity of 35000 tons/yearThe purpose of the project:- Creation of modern high efficiency production for the production of polyamide-6

granulate;- Arrangement of high-level processing of own raw material;- Arrangement of full process cycle of polyamide-6 granulate production;- Securing of stability of the enterprise to caprolactam market fluctuations;- Creation of additional places of work.At the present time:Company «Aquafil Engineering» (Germany) according to the agreement No B 0708

dtd September 24, 2007 is carried out the delivery of the equipment and the engineering documentation.

Installation and construction works are made, namely:Construction works in the production building, in the warehouse of finish products,

in the boiler-house, in the the water-cooling tower, are made;Installation of equipment of the basic building and boiler-house is made;Works concerning the outside nets of electric-power supply, water pipe and

canalization are made.Planned input in operation of this plant is Q3, 2014.Estimated cost of the project: 315486 mln.rbl.

14

Page 15: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Term of realization - 2007 - 2014.

1. Increase in volume of composite materials production.Project is implemented based on high technology and advanced equipment of

company - LRS planung&technologie, Germany. The project provides for installation of complete line to manufacture chips of polymer composite materials with a production capacity of 9 tons per day.

Implementation period – III Quarter 2012 - II Quarter 2014.Project estimated cost: 17 629 mln.rub.Sources of financing - banks credits and a special fund for financial support of

concern’s organizations.At the present time:it is effected delivery to warehouse and customs clearance of equipment of LRS

planung&technologie, Germany;it is performed work in order to clear the area.

2. Installation of rope making machine to manufacture 3-strand ropes with different diameter.

Scheduled production capacity of machine is up to 2,5 thous. running meters per day.Implementation period - IV Quarter 2012 - IV Quarter 2014.Project estimated cost: 4 840 mln.rub. Sources of financing - banks credits and own means.At the present time it is concluded a Contract for delivery of equipment with

company SIMA, Italy.

3. Installation of rapier weaving machine.Project is intended to increase the volumes of production and to expand the

assortment of industrial fabrics.Implementation period - IV Quarter 2013 - IV Quarter 2014.Project estimated cost: 2 070 mln.rub. Sources of financing – own means and a special fund for financial support of

concern’s organizations.At the present time it is executed Task for procurement of rapier weaving machine.

4. Installation of 48-strand braiding machines (5 pcs) Project is intended to increase the production volume of high quality cordage, which

are in household demand, as well as special-purpose products– safety ropes and fire safety ropes.

Project implementation period - II Quarter 2013 - Quarter 2014. Project estimated cost – 2 625 mln.BYR.Sources of financing – own means.At the present time:it was concluded a Contract for delivery of equipment with company Herzog,

Germany;it was started the preparation of design and estimate documentation.

5. Improvement of conditioning process in TWW.As a consequence of project implementation, it is planned to put into operation 6

conditioners with air recirculation with total air capacity 600 thous. m3/hour, and total rated

15

Page 16: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

consumed power - 564 kW. Conditioners are installed instead of obsolete conditioners with total production air capacity 750 thous. m3/hour, and total rated consumed power 891 kW.

Implementation period - III Quarter 2012 - IV Quarter 2014.Project estimated cost: 20 800 mln.rub.Sources of financing – own means.At the present time:it was concluded a Contract for delivery of equipment with company IООО Ecо-

energo;it was performed prepayment for equipment.

6. Installation of water boiler (to serve peak loads within heating season).Implementation period - IV Quarter 2012 - II Quarter 2014.Project estimated cost: 9 020 mln.rub.Sources of financing – own means.At the present time:the equipment was delivered;it is performed construction and erection work.

V. Structure of the employees (including data from PTC “Khimvolokno”) as of 11.04.2014.:

Age: Total-25 25-35 35-40 40-45 45-50 50-55 55+

Number, including 454 2017 989 1152 1311 1591 843 8357- number of employees with higher education

59 936 438 310 266 353 229 2591

- with specialized college education

187 473 172 207 285 372 191 1887

- with technical education

172 541 325 504 534 462 223 2761

- with secondary education

35 63 53 126 226 402 196 1101

- with base education 1 4 1 5 2 0 4 17

Total number of employees as of 11.04.2014: 8357- number of management personnel 679- number of production and process personnel, 8182

Including the number of basis workers 2116

VI. Structure of products (works, services) realization:

Structure (in %) 2010 2011 2012 2013Domestic market 53,6 30,9 44,3 43,5Foreign market 46,4 69,1 55,7 56,5Total 100 100 100 100

Production of the enterprise is successfully delivered to the markets of Latin and South America, Africa, Europe, Asia and Australia.

16

Page 17: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

VII. Information about the land plots that are in use, rent, property

LIST OF LAND-USE of Grodno State Open Joint Stock «Grodno Azot»

as of 18.04.2014 Grodno

NoUnder which object

the land plot is allotted

Territory,

hectares

State certificate for the right of

land-use (certificate

number, date of issue),

certificate of state

registration

Decision of the overhead organization

(number, date of issue)

The right to land plot

1 Land plot for maintenance of the upper way (railway track with rail gage of 1435 mm for roads and other transportation routes) Grodno Oblast, Grodno,Kosmonavtov Av., 100

4,1321 SC No 018084030.06.2005 Certificate (document ID) №400/356-32806 .05. 2005

Grodno City Executive Committee No97 17.02.2005

permanent use

2 Land plot for maintenance of railway track number 7 (under roads and other transport links)Grodno Oblast, Grodno,Kosmonavtov Av., 100

1,1072 SC No 0180841 30.06.2005 Certificate (document ID) No 400/356-28506.05.2005

Grodno City Executive Committee No97 17.02.2005

permanent use

3 House hold plot, land under hotel "Rubanovka", photo lab, dentistry, sport clubGrodno Oblast, Grodno,Kosmonavtov Av., 100

9,1936 SC No 0180842 30.06.2005Certificate (document ID) No 400/356-28606.05.2005

Grodno City Executive Committee No97 17.02.2005

Permanent use including 6,51 hectares of agricultural lands (2,89 arable land, 3,62 perennial trees)

4 Land plot No 1 for 404,8219 SC №0180843 Grodno City permanent

17

Page 18: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

production area service Grodno Oblast, Grodno,Kosmonavtov Av., 100

30.06.2005 Certificate (document ID) No 400/356-283 06 .05. 2005

Executive Committee No97 17.02.2005,No 213 08.04.2009.

use

5

Land plot No 2 for production area service Grodno Oblast, Grodno,Kosmonavtov Av., 100

1,7485 Certificate (document ID) No 400/448:56609.11.2006

Grodno City Executive Committee №107 08.04.2009

permanent use

6 Land plot for production territory service Grodno Oblast, Grodno,Kosmonavtov Av., 100

1,327 Certificate (document ID) No 400/1119-29427.12.2011

Grodno City Executive Committee №213 15.02.2006

permanent use

7 Kindergarten No 92,GrodnoKosmonavtov Av., 34а

1,0155 SC №026037728.11.2005Certificate (document ID) No 400/92-36611.10.2005

Grodno City Executive Committee No 363 15.06.2005

permanent use

8 Kindergarten No 99, Grodnopr. Kletskova,9

1,0687 SC №026184028.11.2005Certificate (document ID) №400/92-36611.10.2005

Grodno City Executive Committee No 363 15.06.2005

permanent use

9 Kindergarten No 28, Grodnoul. Gorkogo, 69а

1,1320 SC No 0260380 28.11.2005Certificate (document ID) No 400/92-36915.11.2005

Grodno City Executive Committee No 424 20.07.2005

permanent use

10 Kindergarten No 40Grodnoul. Pushkina, 26a

1,0352 SC №0260423 28.11.2005 Certificate (document ID) No 400/92-36831.10.2005

Grodno City Executive Committee No 424 20.07.2005

permanent use

11 Sanatorium ‘Zhemchuzhina” 5,1734

Certificate (document ID)

Grodno City Executive

permanent use

18

Page 19: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Grodno OblastGrodnoul. Sanatornaya, 26

No 400/385-3287 13.12.2010Extract from the Register of Rights, Restrictions of(encumbrances) right to the land plotNo 324:36/14

Committee No 819 24.11.2010 Grodno City Executive Committee No 715 22.12.2012 Extract from the Decision No 390 19.07. 2013 Extract from the Decision No 528 23.09. 2013

12 Land for the operation and maintenance of the boiler house Grodno Oblast Grodnoul.Sanatornaya, 20

0,1840 SC №026175721.12.2005 Certificate (document ID) No 400/267-23708.11.2005

Grodno District Executive Committee No 492 25.08.2005

permanent use

13 Recreation Camp "Kupalinka"Grodno Oblast Grodnoul.Sanatornaya, 20

3,8306 SC №026175721.12.2005 Certificate (document ID) No 400/267-23608.11.2005

Grodno District Executive Committee No 492 25.08.2005

permanent use

14 Land plot No1 for the improvement of the neighborhood for a hostel No 2 (part of land plot is under registration for permanent use for parking lot) Land plot N 4 for construction of power supply networks for the hostel No 2

0,2507

0,2734

Certificate (document ID) No 400/296-3284 06.06.2012

Certificate (document ID) No 400/296-328707.06.2012

Grodno City Executive Committee No 706 09.12. 2013

temporary use

15 Land for hostels:Hostel: 2 ; Grodno, 2nd Pereulok

permanent use

19

Page 20: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Belusha,2

Hostel: 8 ; Grodno, 2nd Pereulok Belusha, 8

Hostel: 4; Grodno, 2nd Pereulok Belusha,4

Hostel: 19; Grodno, ul. Belusha 19

Hostel: 12а ;Grodno ,2nd Pereulok Belusha,12a

ul. Belusha 22

ul.Lidskaya 25; Grodno, ul. Lidskaya, 25

0,1628

0,1681

0,1717

0,2955

0,1552

0,1455

0,1392

SC No 0306808 28.02.2006 Certificate (document ID) No 400/92-5205.01.2006

SC No 030680228.02.2006. Certificate (document ID) No 400/92-5805.01.2006

SC No 030680528.02.2006Certificate (document ID) No 400/92-5705.01.2006

SC No 0306807 28.02.2006 Certificate (document ID) No 400/92-5105.01.2006

SC №030680628.02.2006 Certificate (document ID) No 400/92-5605.01.2006Certificate (document ID) No 400/26:10516.02.2007 SC №0306804 28.02.2006 Certificate (document ID) No 400/92-5405.01.2006

Grodno City Executive Committee No 363 15.06.2005

Grodno City Executive Committee No 504 21.07.2008

Grodno City Executive Committee No 36315.06.2005

20

Page 21: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

16 Pier by the River Neman Grodno OblastGrodno, ul. Karskogo 65

0,0925 Certificate (document ID) No 400/1037-1844 18.05.2010

Grodno District Executive Committee No 117 dd. 02.03.2010

Rent - 25 years

17 Land for allocation of health care buildings and service buildings (for Sanatorium "Zhemchuzhina" Grodno Oblast, Grodno,ul. Sanatornaya, 24

4,5320 Certificate (document ID) No 400/556-454314.02.2014

Grodno District Executive Committee No 36 27.01.2014

permanent use

18 Land for the maintenance and operation of buildings and facilities of the Gagarin Camp

15,7055 Certificate (document ID) No 400/296-2386 18.04.2011

Purchase Agreement No 41-017-10-П 07.12.2010

permanent use

19 Land for servicing small sports facilities rifle sport club, sports complexGrodno Oblast, Grodno,Kosmonavtov Av., 100

1,5687 Certificate (document ID) No 400/1101-366629.08.2012

Grodno City Executive Committee No 80 20.02.2013

permanent use

20 Land for the placement of the processing industry (filter)  Grodno Oblast, Grodno, ul. Karskogo, 65

5,3056 Certificate (document ID) No 400/136-2481No 400/136-2482 28.12.2012

Grodno City Executive Committee No 505 19.09. 2012

Rent until 18 September, 2062

21 Land plot for shutoff and safety valves service, Grodno OblastGrodno, ul.Karskogo 65

0,1001 Certificate (document ID)No 400/136-2491 No 400/136-2492 09.01.2013

Grodno City Executive Committee No 505 19.09.2012

Rent until 18 September, 2062

22 Land for service of pump station of th 1st lift with a protective dike  Grodno Oblast

0,2612 Certificate (document ID) No 400/136-2672No 400/136-2674 22.07.2013

Grodno City Executive Committee No 505 19.09. 2012

Rent until 18 September, 2062

21

Page 22: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Grodno, ul.Karskogo 65

23 Land plot for service of the left sludge collector in Grodno by highway M-6, 2nd km.Grodno OblastGrodno, ul. Karskogo 65

1,9479 Certificate (document ID) No 400/136-2483 № 400/136-2484 28.12. 2012

Grodno City Executive Committee No 505 19.09. 2012

Rent until 18 September, 2062

24 Land plot for service of the left sludge collector in Grodno by highway M-62, 2nd kilometer.Grodno OblastGrodno, ul.Karskogo 65

2,5915 Certificate (document ID) No 400/136-2485 No 400/136-2486 28.12 2012

Grodno City Executive Committee No 505 19.09. 2012

Rent until 18 September, 2062

25 Land for maintenance of access road to the car park near the railway workshops checkpoint No8Grodno Oblast, Grodno,Kosmonavtov Av., 100

0,5297 Certificate (document ID) No 400/136-248705.01.2013

Grodno City Executive Committee No 549 09.10.2012No 615 13.11.2012

Rent - 99 year

26 Land for maintenance of shore protection works near pump station of the 1st lift Grodno Oblast, Grodno, ul.Karskogo

0,4412 Certificate (document ID) No 400/136-2921No 400/136-292021.01.2014

Grodno City Executive Committee No 63918.11.2013

Rent until 17 November, 2063

27 Land for service station of water deferrization and utilities to the station, Grodno, area of health camp for children "Kupalinka" land plot No1, Grodno Oblast, Grodno

0,3288 Certificate (document ID) No400/1007-6023 25.06.2013

Grodno Oblast Executive Committee No 175 27.03. 2013

Rent is valid up to 26.03.2112 (Contract No 2856)

28 Land for service Certificate

22

Page 23: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

station of water deferrization and utilities to the station, Grodno, area of health camp for children "Kupalinka" land plot No2, Grodno Oblast, Grodno

0,0174(document ID) No 400/1007-6020 25.06.2013

29 Land for service station of water deferrization and utilities to the station, Grodno, area of health camp for children "Kupalinka" land plot No3, Grodno Oblast, Grodno

0,0121Certificate (document ID) No400/1007-6021 25.06.201

30 Land for service station of water deferrization and utilities to the station, Grodno, area of health camp for children "Kupalinka" land plot No4, Grodno Oblast, Grodno

0,0871Certificate (document ID) No 400/1007-6024 25.06.2013

31 Land for service station of water deferrization and utilities to the station, Grodno, area of health camp for children "Kupalinka" land plot No5, Grodno Oblast, Grodno

0,0307 Certificate (document ID) No 400/1007-602525.06.201304.07.2013

Grodno Oblast Executive Committee No 175 27.03. 2013

Rent is valid until 26.03.2112 (Contract No 2856)

32 Land plot for the placement of connection objects to the object "Extension of the sanatorium" Zhemchuzhina "JSC Grodno Azot "with the reconstruction of the health center “Zdorovie” in

0,2675 Certificate (document ID) No 400/345-4716 08.08. 2013

Grodno Oblast Executive Committee No 32913.06. 2013

permanent use

23

Page 24: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Grodno, land No 133 Land plot for the

placement of connection objects to the object "Extension of the sanatorium" Zhemchuzhina "JSC Grodno Azot "with the reconstruction of the health center “Zdorovie” in Grodno, land No 2

0,2708 Certificate (document ID) No 00/345-4722 23.08. 2013

Grodno Oblast Executive Committee No 32913.06. 2013

permanent use

34 Grodno OblastGrodno Skidelskoe Highway external heat network

0,26705 Certificate (document ID) No 400/267-51025.07. 2006 г.

Grodno District Executive Committee No 823 от 27.11.2003

permanent use

35 Grodno Oblast Grodno Skidelskoe Highway external heat network up to pavilion П 1-3, У-1

0,0001 Written extract No296:229/12:97/1208.07.2011

Grodno Oblast Executive Committee No 357 25.05.2011

permanent use

36 Grodno Oblast Grodno Skidelskoe Highway external heat network up to pavilion П 1-3, У-2

0,22845 Written extract No 1007:97/1208.07.2011

Grodno District Executive Committee No 823 27.11.2003

permanent use

37 Land plot for the maintenance and operation of water treatment plants,  Grodno Oblast, Grodno, tract "Grandichi"

15,00 No 029160Act registered in the record book for the right to use land No 5229 23.03.1995

Grodno District Executive Committee No 6 16.02.1995

permanent use

38 Land plot for service of underground communications ofriver water.

Grodno Oblast Grodno, Karskogo street.

11,8537 No 006832Act registered in the record book for the right to use land No 516712.10.1993

Grodno District Executive Committee

permanent use

39 Plots of land for reconstruction and

Grodno Oblast

24

Page 25: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

maintenance of pressure collectors workshop and purification of industrial waste water Grodno Oblast, Grodno District, near the interchange at 4,193 km of road P-145-Grodno-Ostrino-Raduń-border of Lithuania

Land plot No1,No 2, No3

Land plot No 4

0,0027 ( 3*0,0009)

1,0452

Certificate (document ID) No 400/202-6586No 400/202-6587 No 400/202-6588 13.03.2014

Certificate (document ID) No 400/202-6589 13.03.2014

Executive Committee No 15 16.01.2014

permanent use

temporary use as for a term of 14 months

40 Land plot for maintenance of kindergarten building,Kindergarten No 56, Grodno, Stroitelei Ave. 19

1,1104 SC 026037828.11.2005 Certificate (document ID) No 400/202-6589

Grodno City Executive Committee No 424 20.07.2005

permanent use

41 Land plot for maintenance of kindergarten building,Kindergarten No 63, Grodnoul. Zakharova, 7

0,9150 SC 026306428.11.2005

Grodno City Executive Committee No 424 20.07.2005

permanent use

42 Land plot for maintenance of kindergarten building,Kindergarten No 50, Grodnoul. Dombrovskogo, 33

1,0415 SC 026037928.11.2005

Grodno City Executive Committee No 424 20.07.2005

permanent use

25

Page 26: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

43 Land plot for maintenance of kindergarten building,Kindergarten No 42, Grodnoul. Kutuzova, 28/1

0,9366 SC 026038128.11.2005

Grodno City Executive Committee No 424 20.07.2005

permanent use

LIST OF LAND-USE of Grodno State Open Joint Stock «Grodno Azot»

as of 18.04.2014 Grodno District

NoUnder which object

the land plot is allotted

Plot territory

, hectares

State certificate for the right of

land-use (certificate

number, date of issue),

certificate of state

registration

Decision of the overhead organization

(number, date of issue)

The right to the land plot

1 Land plot for placement of buildings of "Khimik" camp  Grodno Oblast, Grodno District, area of Beloye Lake

12,54710,

Certificate (document ID) №400/1007-5560 03.01.2013

Grodno District Executive Committee No 193 22.03.2006No 579 07.08.2007No 261 04.04.2008No 77 06.02.2009No 67 25.01.2010 No 905 10.12.2012Grodno Oblast Executive Committee No 82 13.02.2008

permanent use

2 Land plot for maintenance and operation of the transformer plant building Grodno OblastGrodno District, area of Beloye Lake

0,0042 Certificate (document ID) No 400/324-268 10.04.2006

3 Land plot for maintenance and operation of the pumping station building Grodno OblastGrodno District,

0,0739 Certificate (document ID) No 400/324-267 10.04.2006

26

Page 27: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

area of Beloye Lake4 Land plot for

maintenance of bioponds and sludge beds Grodno OblastGrodno District, Sopotskinsky settlement council, area of v.Berezhany

75,8748 Certificate (document ID) No 400/345-319421.06.2008

Grodno District Executive Committee No 669 20.09.2007

permanent use

5 Land plot for maintenance of meat processing unit Grodno OblastGrodno District, Indurskoe Highway, v.Lutskovlyany, ul. Jubilejnaya 56A

0,1384 Certificate (document ID) No 400/601-2792 05.06.2009

Grodno District Executive Committee No 356 30.04.2009

permanent use

6 Land plot for the operation and maintenance of industrial waste landfill Grodno Oblast, Grodno District, area of v.Gornitsa

0,2187 SC №025832128.02.2006 Certificate (document ID) No 400/267-6327.01.2006

Grodno District Executive Committee No 710 25.11.2005

permanent use

7 Plots of land for reconstruction and maintenance of pressure headers of workshop for purification of industrial waste water Grodno Oblast Grodno District, near the interchange at 4,193 km of road P-145-Grodno-Ostrino-Raduń-border of Lithuania

Land plot No1

Land plot No 2

1,1312

1,3293

Certificate (document ID) No 400/202-6581 12 .03.2014

Certificate (document ID) No 400/202-6584 13.03.2014

Grodno Oblast Executive Committee No 15 16.01.2014

temporary use for the period of 14 months

27

Page 28: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Land plot No 3

Land plot No 4

0,7452

0,6862

Certificate (document ID) No 400/202-6580 12.03.2014

Certificate (document ID) No 400/202-656612.03.2014

8 Land plot No 5

Land plot No 6

Land plot No 7

0,7321

1,7817

1,5800

Certificate (document ID) No 400/202-6565dd. 12.03.2014

Certificate (document ID) No 400/202-655211.03.2014

Certificate (document ID) No 400/202-6544 11.03.2014

Grodno Oblast Executive Committee No 15 16.01.2014

temporary use for the period of 14 months

9 Plots of land for reconstruction and maintenance of pressure headers of workshop for purification of industrial waste water Grodno Oblast Grodno District, near the interchange at 4,193 km of road P-145-Grodno-Ostrino-Raduń-border of Lithuania

Land plot No 34

Land plot No 35

0,0024

0,0024

Certificate (document ID) No 400/202-6523 10.03.2014

Certificate (document ID) No 400/202-6524 10.03.2014

Grodno Oblast Executive Committee No 15 16.01.2014

permanent use

28

Page 29: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Land plot No 16

Land plot No 17

0,0024

0,0025

Certificate (document ID) No 400/202-6526 10.03.2014

Certificate (document ID) No 400/202-6527 10.03.2014

10 Land plots for reconstruction and maintenance of pressure headers of workshop for purification of industrial waste water Grodno Oblast Grodno District, near the interchange at 4,193 km of road P-145-Grodno-Ostrino-Raduń-border of Lithuania

Land plot No 41

Land plot No 40, 39, 38, 37, 36, 33.

Land plot No 32,31,30,29.

No28

0,0009

0,0054 (6*0,0009)

0,0036(4*0,0009)

0,0009

Certificate (document ID) No 400/202-653310.03.2014

Certificate (document ID) from No 400/202-6534to No 400/202-6539 11.03.2014

Certificate (document ID) from No 400/202-6540to No 400/202-6543 11.03.2014

Certificate (document ID) No 400/202-6545

Grodno Oblast Executive Committee No 15 16.01.2014

permanent use

29

Page 30: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

11.03.201411 Land plots for

reconstruction and maintenance of pressure headers of workshop for purification of industrial waste water Grodno Oblast Grodno District, near the interchange at 4,193 km of road P-145-Grodno-Ostrino-Raduń-border of Lithuania

Land plot No27, 26,25,24,23,22,21.

No21-0,0009No22-0,0009No23-0,0009No24-0,0024No25-0,0024No26-0,0009No27-0,0009

No27,No26Certificate (document ID) No400/202-6550, No400/202-6551. 11.03.2014No25,No24Certificate (document ID) No400/202-6553, No400/202-6554.dd. 11.03.2014No23,No22,No21.Certificate (document ID) from No 400/202-6555 to No 400/202-6557. 11.03.2014

Grodno Oblast Executive Committee No 15 16.01.2014

permanent use

12 Land plots for reconstruction and maintenance of pressure headers of workshop for purification of industrial waste water Grodno Oblast Grodno District, near the interchange at 4,193 km of road P-145-Grodno-Ostrino-

Grodno Oblast Executive Committee No15 16.01.2014

permanent use

30

Page 31: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Raduń-border of Lithuania

Land plot No20,19,18,15,14.

Land plot No 13

0,0045(5*0,0009)

0,0009

Certificate (document ID) from No 400/202-6560 to No400/202-6564. 11.03.2014

Certificate (document ID) No400/202-6567 12.03.2014

13 Land plots for reconstruction and maintenance of pressure headers of workshop for purification of industrial waste water Grodno Oblast Grodno District, near the interchange at 4,193 km of road P-145-Grodno-Ostrino-Raduń-border of Lithuania

Land plot No8,9,10,0,0027(3*0,0009)

Certificate (document ID) from No 400/202-6577 пto No 400/202-6579. 12.03.2014.

Grodno Oblast Executive Committee No15 16.01.2014

permanent use

14 Land plots for reconstruction and maintenance of pressure headers of workshop for purification of industrial waste water Grodno Oblast Grodno District, near the interchange at 4,193 km of road P-145-Grodno-Ostrino-Raduń-border of

Grodno Oblast Executive Committee No 15 16.01.2014

permanent use

31

Page 32: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

Lithuania

Land plot No 11

Land plot No 12

0,0018

0,0009

Certificate (document ID) No 400/202-6582 12.03.2014

Certificate (document ID) No 400/202-6583 13.03.2014

LIST OF LAND-USE of Grodno Open Joint Stock Company “Grodno Azot” as per

18.04.2014 on the lands of Ivie Region

NoUnder which object

the land plot is allotted

Plot territory

, hectares

State certificate for the right of

land-use (certificate

number, date of issue),

certificate of state

registration

Decision of the overhead organization

(number, date of issue)

The right to the land plot

1 Land plot for construction and service of potato storage houseGrodno Oblast, Ivie Region, Ivie village council ag.Daylidy

3,9761 Certificate (document ID) No 441/627-820215.01.2014

Grodno Oblast Executive Committee No 712 05.12. 2013

permanent use

Land plot for construction and maintenance of potato storage house and engineering structures to it. Grodno OblastIvie Region, Ivie village council ag.Daylidy

0,1832 Certificate (document ID) No 441/627-820615.01.2014

Grodno Oblast Executive Committee No 712 05.12.2013

temporary use for 12 months

3 Land plot for construction and maintenance of potato storage house and

0,0509 Certificate (document ID) No 441/627-820515.01.2014

Grodno Oblast Executive Committee

temporary use for 12 months

32

Page 33: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

engineering structures to it. Grodno OblastIvie Region, Ivie village council ag.Daylidy

No 712 05.12.2013

4 Land plot for construction and service of potato storage house and engineering structures to it. Grodno OblastIvie Region, Ivie village council ag.Daylidy

0,0606 Certificate (document ID) No 441/627-820315.01.2014

Grodno Oblast Executive Committee No 712 5.12.2013

temporary use for 12 months

5

6

Land plot for construction and maintenance of potato storage house and engineering structures to it. Grodno OblastIvie Region, Ivie village council ag.Daylidy

Land plot for house Grodno OblastIvie Region ul. Sovetskaya, 19

0,0082

0,0888

Certificate (document ID) No 441/627-820415.01.2014

Certificate (document ID) No 441/1411-353 07.09.2012

Grodno Oblast Executive Committee No 712 5.12. 2013

Purchase Agreement No 270407.08.2012

temporary use for 12 months

Purchase Agreement is valid until 23 August, 2062

LAND-USEof Grodno Joint Stock Company «Grodno Azot» PTC «Khimvolokno»

as of 18.04.2014, Grodno

Seq. No.

Под какой объект отведена земля

Площадь отвода,

га

Госакт на право землепользовани

я (номер акта, дата выдачи),

свидетельство о государственной

регистрации

Решение вышестоящ

ей организаци

и(номер, дата

выдачи)

Право на земельный участок

1 Land lot for servicing of buildings of health centre

1,3047 Certificate of state registration

Grodno City Executive

permanent use

33

Page 34: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

and building of sewage pumping stationGrodno region, Grodno,ul. Tomina, 26

No.400/1007-4050 of 17.11.2011

Committee No.406 of 13.06.2007

2 Land lot for servicing of building of the service block ofHousing and utilities administration, Grodno region, Grodno, ul. Tomina, 14/1

0,0980 Certificate of state registration No.400/1007-4057 of 18.11.2011

Grodno City Executive Committee No.823 от 03.10.2003г.

permanent use

3 Land lot for upkeep and maintenance of hostel, Grodno region, Grodno, ul. Tomina,20

0,2679 Certificate of state registration No.400/1007-4059 of 21.11.2011

Grodno City Executive Committee No.111 of 18.02.2004

permanent use

4 Land lot for upkeep and maintenance of hostel, Grodno region, Grodno, ul. Tomina, 16

0,2516 Certificate of state registration No.400/1007-4058 of 21.11.2011

Grodno City Executive Committee No.111 of 18.02.2004

permanent use

5 Land lot for upkeep and maintenance of hostel, Grodno region, Grodno, ul. Tomina, 14

0,1700 Certificate of state registration No.400/1007-4060 of 21.11.2011

Grodno City Executive Committee No.111 of 18.02.2004

permanent use

6 Land lot for upkeep and maintenance of hostel, Grodno region, Grodno, ul. Tomina, 18,18А

0,3769 Certificate of state registration No.400/1007-4119 of 05.12.2011

Grodno City Executive Committee No.111 of 18.02.2004 and No.425 of 03.06.2004

permanent use

7 Land lot for upkeep and maintenance of production territory, Grodno region, Grodno, ul. Slavinskogo, 4

68,4036 Certificate of state registration No.400/1007-4137 of 15.11.2011

Grodno City Executive Committee No.111 of 18.02.2004 and No.425 of 03.06.2004

permanent use

8 Land lot of unidentified purpuse (for construction and use of passenger car temporary parking and access road)Grodno region, Grodno, ul. Slavinskogo (near central checkpoint area)

1,0424 Certificate of state registration No.400/1007-4765 of 04.05 2012

Grodno City Executive CommitteeNo.469 of 09.09.2011

permanent use

9 Land lot for upkeep and 0,3484 Certificate of state Grodno City permanent

34

Page 35: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

maintenance of parking near the administrative building,Grodno region, Grodno, ul. Slavinskogo,4)

registration No.400/1007-4744 of 30.04. 2012

Executive Committee No.111 of 18.02.2004

use

10 Land lot for upkeep and maintenance of hostel, Grodno region, Grodno, ul. Tomina 14А

0,2267 Certificate of state registration No.400/1007-4752 of 02.05.2012

Grodno City Executive Committee No.153 of 21.04.2012

permanent use

11 Land lot for upkeep and maintenance of kindergarten No.74, Grodno region, Grodno, ul. Tomina 22

1,0898 Certificate of state registration No.400/1007-4764 of 04.05.2012

Grodno City Executive Committee No.153 of 21.04.2012

permanent use

12 Land lot for upkeep of Central heat unit -1 buildingGrodno region, Grodno, ul. Tomina 16

0,0136 Certificate of state registration No.400/1007-4751 of 02.05.2012

Grodno City Executive Committee No.112 of 28.02.2012

tenant right to27.02.2062

13 Land lot for use and maintenance of railway road,Grodno region, Grodno, area of ul. Slavinskogo, ul.Vesyolaya

3,3753 Certificate of state registration No.400/1007-4795 of 14.05.2012

Grodno City Executive Committee No.133 of 06.03.2012.

permanent use

LAND-USEof Grodno Joint Stock Company «Grodno Azot» PTC «Khimvolokno»

as of 18.04.2014, Grodno region

Seq.No. Под какой объект

отведена земля

Площадь отвода,

га

Госакт на право

землепользования (номер акта, дата выдачи),

свидетельство о государственной регистрации

Решение вышестоящ

ей организаци

и(номер, дата

выдачи)

Право на земельный участок

1 Land lot for use and maintenance of pump stationGrodno region, Grodno district, Koptyovski r/c, Pogorany village.

0,5887 Certificate of state registration No.400/1007-4216 of 28.12.2011

Grodno Region Executive CommitteeNo.524 of 09.08.2000

permanent use

2 Land lot for use and maintenance of the wastes disposal area,Grodno region, Grodno district, near Gornitsa

0,4712 Certificate of state registration No.400/1007-4118 of 05.12.2011

Grodno Region Executive CommitteeNo.635 of

permanent use

35

Page 36: ГОСУДАРСТВЕННЫЙ КОМИТЕТ ПО ИМУЩЕСТВУ structure/info for investors... · Web viewThe original project provided annual production of 167 thousand tons

village 27.08.2007

VIII. Information about capital structures (buildings, constructions) as of 01.04.2014

JSC «Grodno Azot» without PTC «Khimvolokno»:

Name Year of construction

Number of storeys

Quantity of inventory numbers

Quantity of inventory numbers

Buildings 1963-2013 1-12 849 satisfactory Constructions 1962-2013 1091 satisfactory

Regarding «Grodno Azot» floor space let on lease:Buildings and constructions – 128 073,37 m2.

PTC «Khimvolokno»

Name Year of construction

Number of stories

Q-ty of inventory numbers

General state

Buildings 1977-2011 1-12 168 satisfactoryStructures 1977-2013 119 satisfactory

As regards PTC "Khimvolokno" area on lease:buildings 14 104 m2;structures 15 889,2 m2.

IX. Information about the machines and equipment

JSC «Grodno Azot» without PTC «Khimvolokno»:

Name of the equipment, power Quantity Function Commissioning year

Machines and equipment 29 878 production 1963-2013

PTC "Khimvolokno"

Equipment name, manufacturer,

capacity

Number of units

Function(place in

production process)

Year of commissioning

Condition(wear-out percent)

machinery and equipment

as of 01.01.20148 953 units

production 1974 - 2013 31,91