WIDENING SR-96 (MURFREESBORO ROAD) FROM EAST OF SR-252 (WILSON PIKE) TO I-840 WILLIAMSON COUNTY DESIGN PUBLIC MEETING October 24, 2019

Upload: others

Post on 31-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

WIDENING SR-96 (MURFREESBORO ROAD) FROM EAST OF SR-252 (WILSON PIKE) TO I-840

WILLIAMSON COUNTYDESIGN PUBLIC MEETING

October 24, 2019

Page 2: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Welcome & Thank You for Attending

Introduction of TDOT Representatives

Project Presentation Why, Where, What, How, & When

MaterialsHandouts, Plans, &Displays

Breakout Sessionfor Q & A

Comments & Feedback• Court Reporter Available• Comments Cards

Page 3: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Tonight’s Schedule

6:15 p.m. Formal Presentation

7:00 p.m. Question and Answer

Open House• Staff located at displays to answer questions

Gather Feedback• Complete comment cards and/or provide verbal

comments to court reporter

8:00 p.m. Adjourn

Page 4: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Purpose of Meeting

• Discuss proposed SR-96 widening

• Provide preliminary plans for public review

• Receive input from the public– Comment cards– Court reporter

• Answer questions and address concerns

Page 5: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Purpose and Need of the Project

The primary purpose of the project is to improve local and regional mobility by improving traffic flow on SR-96 between the cities of Franklin and Murfreesboro

This project will address safety, traffic congestion, and geometric deficiencies

Safety

Transportation Demand

System Linkage

Traffic and Capacity

Roadway Deficiencies

Page 6: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

History of the Project

• 1995 – Original planning document completed • 1998 – Initial Public Meeting• 2001 – Corridor and Design Public Hearing• 2005 – NEPA Hearings held• 2001 – 2012 Construction of SR-840 through the area• 2017 – Passage of Improve Act • Corridor divided into 3 segments

– Design updated to 5 lane roadway• Segment 1: From East of Arno Road to East of SR-252• Segment 2: From East of SR-252 to I-840• Segment 3: From I-840 to Veterans Parkway

Page 7: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Project Location Map - SR 96 Proposed Corridor

• Full corridor from Franklin to Murfreesboro planned – split into 3 segments

Franklin

MurfreesboroSegment 1

Segment 3

Segment 2

Nolensville

College Grove

Page 8: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Proposed Improvements

• Widening Existing SR-96 to rural five lane typical section– Transitions to urban/curb and gutter section through Triune area –

approx. 0.75 miles

• Widen SR-11 for approx. 0.65 miles to provide turn lanes at the intersection with SR-96

Page 9: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Typical Sections: Proposed SR-96

Page 10: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Typical Sections: Proposed SR-11 at SR-96 Intersection

Page 11: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Proposed Improvements

• Three major structures included in the project

– Bridge over Arrington Creek

– Bridge over Wilson Branch

– Bridge over I-840

Page 12: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬
Page 13: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬
Page 14: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬
Page 15: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Proposed Intersections

• SR-96 Intersections:• SR-11 (Nolensville Road)• Hawk’s Landing Drive• Meadowbrook Boulevard• Frontage Road A• Old Murfreesboro Road• Hawkins Road• Haley Road• Newcastle Road

• SR-11 Intersections:• Old Murfreesboro

Road (in Triune)• Neal Road• Malachi Lane• Frontage Road B

Page 16: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

SR-96 at SR-11 (Nolensville Road)

Page 17: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Project Status

Planning

Environmental

Design

Right-of-Way

Construction

Preliminary EngineeringPhase

Right-of-wayPhase

ConstructionPhase

Project Currently in the Design Phase

Page 18: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Next Steps

• Address Public Comments

• Finalize Design for Right-of-Way

• Right-of-Way Appraisal and Acquisition– Begin Appraisal and Acquisition Process in Summer of 2020

• ROW Neighborhood Meeting• ROW Process Completion Time – 30+ months

• Let to Construction – Once ROW Acquisition is Completed and Funds Budgeted for

Construction

Page 19: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

Comments

REMEMBER…Your comments are very important to us!

How to comment:– Submit written comments on the provided

comments cards• Fill out a comment card tonight• Take a comment card with you and mail it in within 21 days• Mail in a letter with your comments within 21 days

– Provide verbal comments to the court reporter• Comments will be included in the official record

Page 20: t/ E/E' ^Z r õ ò ~DhZ&Z ^ KZK ZK &ZKD ^d K&} u u v 5(0(0%(5¬

THANK YOU!For Your Attendance And Participation In

the SR-96 Design Public Meeting