this page (1).pdf · 2015-10-26
TRANSCRIPT
-
Content
Instruction Manual
D1402EN/011/8
03--2008 AREVA
SF6 circuit--breaker
GL318
With spring operating mechanisms
FK3--4
This equipment contains Fluorinated Greenhouse Gas (SF6) covered by the Kyoto Protocol, which hasa Global Warming Potential (GWP) of 22200.SF6 should be recovered and not released into the atmosphere.For further information on the use and handling of SF6, please refer to IEC 62271: High-VoltageSwitchgear and Controlgear - Part 303: Use and Handling of Sulphur Hexafluoride (SF6).
Administrator First issue Compiled by Approved by
AHT 19--05--2008 J. Bossu O. Grejon
-
Content
Instruction Manual
D1402EN/012/8
03--2008 AREVA
This page is intentionally blank.
-
Content
Instruction Manual
D1402EN/013/8
03--2008 AREVA
Safety
Product safety sheets Annexes
Technical data
Technical characteristics L10--044EN/01
Description and operation
General description of the circuit--breaker L12--055EN/01
Description of the interrupting chambers L12--105EN/02
Pole operation (interrupting principle) L13--005EN/02
Operating device L14--005EN/03
SF6 gas mixture monitoring L20--001EN/06
Packaging -- Shipping and storage
Packaging -- Identification -- Storage L22--007EN/03
-
Content
Instruction Manual
D1402EN/014/8
03--2008 AREVA
Installation
Erection general instructions L30--002EN/01
Tightening torques L31--001EN/01
Erection general procedures L31--003EN/01
Checking for presence of nitrogen (N2) in pole parts L31--074EN/01
The installation procedure (advised), developedbelow, imposes a lifting equipment with the followingcharacteristics :
NOTE : If it is impossible to obtain the advoca-ted lifting equipment, one complementary instal-lation procedure is supplied in annexes.
3,000 daN)(minimum)
H + 2 m
HH + 1 m
Support--frame assembly L31--137EN/02
Column -- chambers coupling L31--715EN/01
Tipping down the pole of the circuit--breakerand vacuum operation
L31--721EN/02
Installing terminals with preparation of contactsurfaces
L31--734EN/01
Installing the capacitors L31--741EN/03
Installing stress--shields on the interruptingchambers
L31--750EN/04
Lifting and positionning the pole L31--766EN/04
Installing terminals with preparation ofcontact surfaces
L31--770EN/02
Continued on next page.
-
Content
Instruction Manual
D1402EN/015/8
03--2008 AREVA
Installation, continued
Installing the operating device L31--7801EN/01
Fitting the filler unit and its pipe work. L31--982EN/01
Connection the vacuum pump L31--858EN/01
Installing the synchronous device RPH2 L31--871EN/01
RPH2 -- Correspondence between C.B. poles andthe network phases and the phase measuring thereference voltage
L31--872EN/01
Vacuum operation L31--886EN/01
Calculation of the SF6 gas filling pressure for usingthe pressure gauge (tool)
L31--901EN/03
Pre--filling with SF6 gas at 0.05 MPa L31--956EN/01
Filling with SF6 gas L32--017EN/01
Commissioning
Pre--commissioning inspections L34--011EN/02
-
Content
Instruction Manual
D1402EN/016/8
03--2008 AREVA
Maintenance
Maintenance plan L51--004EN/04
Electrical wear limits L51--052EN/03
Electrical contact densimeter threshold inspection L51--113EN/01
Intervention on the operating device L51--303EN/03
Annexes
Tooling and accessories L60--025EN/01
Product safety sheets PS0000/A
Acceptance criteria CA 103 181/3/002
RPH2 -- Outline drawing 58.001.115--01
RPH2 -- Wiring diagram (2SA0) 58.010.111--16E
RPH2 -- Service manual 58.020.034 E
-
Content
Instruction Manual
D1402EN/017/8
03--2008 AREVA
Complementary installation procedure
The complementary installation procedure, devel-oped below, imposes a lifting equipment with the fol-lowing characteristics :
+
3,000 daN)(minimum)
H + 2 m
H
Support--frame assembly L31--138EN/02
Lifting and positionning the pole L31--200EN/04
Installing terminals with preparation of contactsurfaces
L31--505EN/01
Installing the capacitors L31--600EN/03
Installing stress--shields on the interruptingchambers
L31--650EN/04
Column -- chambers coupling L31--716EN/01
Installing the operating device L31--7801EN/01
Installation, continued
-
Content
Instruction Manual
D1402EN/018/8
03--2008 AREVA
This page is intentionally blank.
-
Technical dataTechnical characteristics
L10--044EN/011/2
03--2006E AREVA
GL318 technical characteristics
Performances The table below gives the circuit--breaker performances :
Designation GL318Standard IEC
Ur Rated voltage (r.m.s. value) kV 800Ir Rated normal current A 4000fr Rated frequency Hz 50Ip Rated withstand current (peak value) kA 125Ik Short--time withstand current (r.m.s. value) kA 50
Rated insulation level(At sea level)
UdRated short--duration power--frequency withstandvoltage (r.m.s. value)D Phase--to--earth and phase--to--phase kV 830D Across open contacts kV 1150
UpRated lightning impulse withstand voltage (peakvalue)D Phase--to--earth and phase--to--phase kV 2100D Across open contacts kV 2100 (+455)
IscRated breaking current in symmetrical short--circuit kA 50
Rated making current (peak value) kA 125Total break time ms 40 2
Rated operating sequence O -- 0.3s -- CO -- 3min -- COResistance of main contacts(new contact)
chamber without H.V. connectors 80
The above characteristics are of a general nature, only those values given onthe circuit--breakers rating plates are contractually binding.
Continued on next page.
-
Technical dataTechnical characteristics
L10--044EN/012/2
03--2006E AREVA
GL318 technical characteristics, continued
Absolute pressures ofthe SF6gas mixture
The table below gives the absolute pressures of the SF6 gas mixture :
Minimum admissible temperatureup to --32C
SF6 gas mixture absolute pressureat 20C(68F)pre Filling rated absolute pressure for the
insulation 0.75 MPa
pae Alarm absolute pressure for the insula-tion
0.67 MPa(pme+0.03 MPa)
pme Minimal absolute pressure for the insula-tion 0.64 MPa
SF6gas masses
The table below gives the masses of the SF6 gas :
Mass for one three--pole circuit--breakerSF6 mass 83.10 kg
The above characteristics are of a general nature, only those values given onthe circuit--breakers rating plates are contractually binding.
Operating device The table below gives low voltage components characteristics of the FK3--4operating device :
Auxiliary voltages (usual) :Ua Opening and closing circuits 48--110--125--220--250 V (cc)
Heating (and lighting) circuits 220 V (ac)Motor 110--220 (cc) or 220 V (ac)
Consumption :Closing and opening coilsPermanent heating 100 W / FK -- 50 W / cubicleThermostat heating (if temperature +5C)(+23F)
250 W / cubicle
Motor 1750 W
The above characteristics are of a general nature, only those values given onthe circuit--breakers rating plates are contractually binding.
-
Description and operation
General description of the circuit--breaker
L12--055EN/011/8
03--2008 AREVA
Circuit--breaker GL318 with spring operating mechanism FK3--4
Description The circuit--breaker is made up of three poles. Each pole is made up of twointerrupting modules connected by an electric connection. Each interruptingmodule is controled by an operating device.
Pole parts table The table below gives the main parts of the pole :
B
A
C
D
E
F
Mark Component Page
A Interrupting module 2
B Column 3
C Bearing structure 3
D Operating device 4
E Marshalling cubicle 5
F Electric connection 6
-
Description and operation
General description of the circuit--breaker
L12--055EN/012/8
03--2008 AREVA
Interrupting module
Description The interrupting module is comprised of two interrupting chambers (1) -- in aceramic envelope -- equipped at each end with a corona ring (4) and an HVterminal (5).The interrupting chambers are laid out horizontally and attached, at theirbase, to a common housing (6). This housing contains the mechanism usedto transfer the operating movement to the mobile contacts of both chambers.The interrupting can also be equipped with capacitors (7).
Diagram
6
7
4
1
1
5
47
5
-
Description and operation
General description of the circuit--breaker
L12--055EN/013/8
03--2008 AREVA
Column
Support column Consisting of two, three or four ceramic insulators, the support column (2)allows the circuit--breaker to be ground--insulated and it also encloses theoperating tie--rod which is attached to the interrupting chambers moving con-tacts.The support column can also be equipped with a corona ring (13).
Housing of themechanism
A housing (3) -- situated at the base of the column -- contains the lever andcrank assembly and which operates the moving contact.
Diagram
3
2
13
-
Description and operation
General description of the circuit--breaker
L12--055EN/014/8
03--2008 AREVA
Bearing structure
Description The support--frame (10) -- made upwith four supports fastened to thehousing(3) -- supports all the circuit--breaker components.The support--frame may be supplied by either AREVA or the customers.
Diagram
10
3
-
Description and operation
General description of the circuit--breaker
L12--055EN/015/8
03--2008 AREVA
Operating device
Description Theoperating device (11) is a spring operatingmechanism of the FK3--4 type.The door of the operating device (11) is equipped with two windows. Thesewindows permit to display the optical signalization of the circuit--breaker stateand closing spring state.
Diagram
11
3
Fastening The operating device is fastened on the housing (3).
-
Description and operation
General description of the circuit--breaker
L12--055EN/016/8
03--2008 AREVA
Marshalling cubicle
Description The marshalling cubicle (D) is fastened on the ground near the centralpole. Included with :
The relays required to operate the circuit--breaker.
The interconnection terminals boards.
The terminals boards.
Diagram
D
-
Description and operation
General description of the circuit--breaker
L12--055EN/017/8
03--2008 AREVA
Electrical connection
Description Two interrupting modules are connected by an electric connection (12).
Diagram
12
-
Description and operation
General description of the circuit--breaker
L12--055EN/018/8
03--2008 AREVA
This page is intentionally blank.
-
Description and operationDescription of the interrupting chambers
L12--105EN/021/4
06--2004E AREVA
Presentation
Diagram
B
A
Parts table The table below gives the main parts of the interrupting chambers :
Mark Component PageA Interrupting chamber 2B Upper housing 3
-
Description and operationDescription of the interrupting chambers
L12--105EN/022/4
06--2004E AREVA
Interrupting chamber
Quenching medium The quenching medium is pressurized SF6 gas or -- in particular instances --pressurized SF6+CF4 gas mixture.
Interrupting principle The interrupting chamber is of thermal blasting type, using the energy fromthe arc, with an auxiliary autopneumatic effect.
Diagram
421
Description The interrupting chamber has been designed in such away as to increase themechanical resistanceof theworking part and takeadvantage of the lowwearrate of the contacts subjected to the arc in SF6. The working part is enclosedin a leak tight ceramic envelope, providing insulation between the circuit--breaker input and output.The chamber is made up of the following elements :
Mark Component Information(1) Envelope Can have a long creepage dis-
tance, depending on the pollutionlevel.
(2) Fixed contact(4) Moving contact It is workedby theoperatingmech-
anism and contains the blastingdevice.
-
Description and operationDescription of the interrupting chambers
L12--105EN/023/4
06--2004E AREVA
Upper housing
Description Theupper housingencloses themovement transfer mechanism (15) from theoperating tie--rod (8) to the moving contact (4) of the two chambers.
Diagram
15
8
44
Parts table The table below gives the housing internal and peripheral components :
Mark Component Function(4) Moving contact It is worked by the operating mechanism
and contains the blasting device.(8) Operating tie--rod Transmits the movement to the moving
contact of the two chambers.(15) Mechanism Transfer of the movement.
-
Description and operationDescription of the interrupting chambers
L12--105EN/024/4
06--2004E AREVA
This page is intentionally blank.
-
Description and operationPole operation(Interrupting principle)
L13--005EN/021/6
06--2004E AREVA
Presentation
Introduction In CLOSED position the current passes through :-- the terminal (1),-- the fixed contact support (2),-- the main contacts (3),-- the moving contact (4),-- the moving contact support (5),-- the common housing (6),and follows the opposite chain on the other chamber and the terminal (1).
11 6
2 53
1 4
CLOSING SPRING LOADEDCIRCUIT--BREAKER CLOSED
In this module This module contains the stages of the pole operation :
Stage PageOpening 2Closing 5
-
Description and operationPole operation(Interrupting principle)
L13--005EN/022/6
06--2004E AREVA
Opening
Opening When an electrical or manual opening order is given, the energy accumulatedin the opening spring (7) is released.
The insulating tie--rod (8), directly activated by the opening spring (7), trans-mits the movement to the transfer mechanism (9) inside the housing whichcauses the contacts to separate simultaneously in both chambers.
7
8
9
Continued on next page.
-
Description and operationPole operation(Interrupting principle)
L13--005EN/023/6
06--2004E AREVA
Opening, continued
Operation The table below gives the stages of opening :
Stage DescriptionStart of opening When the moving contact (4) separates from the main
contacts (3), the current is switched onto the arc con-tacts (10). The compression of the (Vp) volume cau-ses the first rise of pressure.
103 4 Vp
Thermal effect When the contacts (10) separate, the arc appears andits energy causes the pressure to rise in the thermalexpansion volume (Vt), closed by the fixed contact rod(11) and the insulating nozzle (12).
12 10 Vt11
Interrupting andassistanceat opening
When the rod (11) comes out of the nozzle (12), thethermal overpressure in the volume (Vt) is releasedcausing an energy blast to occur, just before the cur-rent zero passage, ensuring final quenching of the arc.The (Vp) volume pressure decreases to the ambientpressure by means of the valve (13) to allow the endof the opening.
Vt Vp 1311 12
Continued on next page.
-
Description and operationPole operation(Interrupting principle)
L13--005EN/024/6
06--2004E AREVA
Opening, continued
Molecular sieve The arc has been extinguished.The SF6 molecules, separated by the arc, are re--formed instantaneously.Residual gases left over from the interruption operation are adsorbed by themolecular sieve situated at the base of the pole. A few powdery compoundsare deposited in the form of dust which is quite harmless for the circuit break-er.
Special caseof small currents
For small currents (example : operating no--load lines, transformers or ca-pacitor banks), the thermal energy of the arc is too low to provide enough ex-cess pressure.Consequently, the conventional autopneumatic effect developing in the vol-ume (Vp) is used mainly, to blast the arc.
Vp
-
Description and operationPole operation(Interrupting principle)
L13--005EN/025/6
06--2004E AREVA
Closing
Description When an electrical or manual closing order is given, the energy accumulatedin the closing spring (15) -- situated inside the operating device -- is released.This energy is transmitted directly to the pole operating shaft (16), to ensureclosing.The release of the energy stored up in the closing spring (15) causes displace-ment of the moving parts -- and so the closing of the interrupting chambers-- and also reloads the opening spring (7).
16
7
9
15
-
Description and operationPole operation(Interrupting principle)
L13--005EN/026/6
06--2004E AREVA
This page is intentionally blank.
-
Description and operationOperating device of circuit--breaker
L14--005EN/031/6
05--2003E AREVA
Presentation
Introduction The operating device is a spring operating mechanism of type FK3--4.The operating mechanism is usually electrically remote--controlled.During commissioning or when auxiliary voltage is lacking, operations canalso be performed directly on the mechanism.
Warning OPERATION AUTHORIZED ONLY IF THE OPERATING DEVICE IS CON-NECTED TO THE CIRCUIT BREAKER.THE CIRCUIT BREAKER MUST NOT BE OPERATED AT A SF6 PRES-SURE GAS LOWER THAN THE MINIMAL PRESSURE FOR THE INSULA-TION pme.
In this module This module contains the following topics :
Topic PageDescription of the mechanism 2Auxiliary fittings 3Operating principle 5
-
Description and operationOperating device of circuit--breaker
L14--005EN/032/6
05--2003E AREVA
Description of the mechanism
Drive shaft D The main shaft (1) is linked up to the the circuit--breaker pole by meansof a cylinder (2).D A damper (4) is linked up to the lever (32).D In the CLOSED position, the main shaft (1) rests on the opening latch(6) by means of the lever (5).D In the OPEN position, the lever with roller (11) rests on the closingcam (10).D The opening spring (3) activates the lever (33) by means of the chain(34). This spring is a pressure helical type.
NOTE : The levers (5)--(11)--(32) (33) form one piece only.
Closing shaft D On the closing shaft (7) are placed :-- The inertia flywheel (8).-- The closing cam (10).-- The cam (26) that engages the limit switch (17) of the motor (12).D The closing spring (9) activates the inertia flywheel (8) by means of thechain (15). This spring is a pressure helical type.The rotation torque -- created on the inertia flywheel (8) by means of theloaded closing spring (9) -- is balanced by closing latch (14) / roller (16).
33
Diagram
11
34
532
33 17 12
34
2
1
26
32
7
30
10
14
8
11
5
31
6
33
3
15
17
9
12
16
11
4
-
Description and operationOperating device of circuit--breaker
L14--005EN/033/6
05--2003E AREVA
Auxiliary fittings
Reloading the closingspring
The closing spring (9) is loaded by means of the reducing gears (13) and themotor (12).
Auxiliary electricfittings
D The auxiliary contacts (30) are activated by a rod and a lever (31), thelatter is activated by the main shaft (1).D The limit switch of the motor (17) is activated by the cam (26)The cam (26) is installed on the closing shaft (7).D The closing latch (14) and the opening latch (6) are electrically activatedby coils (22) Closing and (27) Opening.
Auxiliary mechanicalfittings
D The operating mechanism can be activated by the manual levers (24)Closing and (28) Opening.WARNING : Operating the mechanism by the manual levers (24) Closingand (28) Opening overrides electrical interlocks. Ensure it is electrically safeto operate the equipment when using these levers to defeat electrical inter-locks and lockouts.D The indicator (29) gives the OPEN or CLOSED positions of the circuit--breaker. An operation counter (36) gives the number of realized operations.D The indicator (23) gives the CHARGED or DISCHARGED states of theclosing spring.D If the auxiliary current supply fails, the hand--held crank (21) permits theclosing spring to be fully charged.
Diagram
28
7
26
24
30
22
13
14
17
34
23
29
9
12
21
6
31
27
1
-
Description and operationOperating device of circuit--breaker
L14--005EN/034/6
05--2003E AREVA
Operating principle
Warning OPERATION AUTHORIZED ONLY IF THE OPERATING DEVICE IS CON-NECTED TO THE CIRCUIT BREAKER.THE CIRCUIT BREAKER MUST NOT BE OPERATED AT A SF6 PRES-SURE GAS LOWER THAN THE MINIMAL PRESSURE FOR THE INSULA-TION pme.
Closing D When the closing coil is energized or the manual closing lever is operated,the closing latch (14) releases the inertia flywheel (8).D The closing shaft (7) effects a 180 rotation generated by the loaded clos-ing spring (9).D The cam (10) rotates the main shaft (1) by means of the lever with roller(11). After a 60 rotation, the lever (5) rests on the opening latch (6).D Simultaneously, the opening spring (3) is loaded by means of the chain (34)activated by the rotation of the lever (33).D A freewheel, installed on the gear wheel (19), avoids the reducing gears(13) and the motor (12) being driven by the gear wheel of the inertia flywheel(8).
NOTE : A mechanical device (not shown) prevents all closing opera-tions if the circuit--breaker is already in the CLOSED position.
Diagram
2711
10
34
22
13
8
9
12
19 14
6
3
1
28
7
5
24
33
Continued on next page.
-
Description and operationOperating device of circuit--breaker
L14--005EN/035/6
05--2003E AREVA
Operating principle, continued
Reloading the closingspring
D When the motor (12) is supplied with current, it immediately starts to loadthe closing spring (9) by means of the reducing gears (13) of the inertia fly-wheel (8) and the chain (15).D At the full stroke, the gear (19) is at the no tooth sector of the inertia flywheel(8) and the reducing gears (13) can decelerate without causing strain on theclosing latch (14).
NOTE : During the loading of the closing spring, the supplying circuitof the closing coil is cut to avoid an untimely closing operation.
Diagram
13
9
12 19
8
15
8
14
19
Continued on next page.
-
Description and operationOperating device of circuit--breaker
L14--005EN/036/6
05--2003E AREVA
Operating principle, continued
Opening D When the opening coil (27) is energized or the manual opening lever (28)is operated, the opening latch (6) releases the lever (5).D The main shaft (1) effects a 60 clockwise rotation -- generated by theloaded opening spring (3) -- before reaching the circuit--breaker OPEN posi-tion.D A damper (4) dampens the excess energy to smoothly finish travel.
Diagram
27
6
3
1
5
28
4
60
-
Description and operationSF6 gas monitoring
L20--001EN/061/6
09--2004E AREVA
Presentation
Introduction The circuit--breaker uses pressurized SF6 gas as electric arc quenching gas.The SF6 gas pressure monitoring is essential to assure the circuit--breakerperformances.
Principle There is two SF6 gas pressure monitoring types :D Permanent monitoring with the help of a threshold densimeter.
D Periodic monitoring with the help of a dial densimeter (visual control)
Symbols IEC symbols for the apparatus technical characteristics.
Symbol Designationpre Filling rated pressure for the insulationpae Alarm pressure for the insulationpme Minimal pressure for the insulation
In this module This module contains the following topics :
Topic PageGas pressure and density 2Pressure measurement 3Measuring density 4Densimeter 5
-
Description and operationSF6 gas monitoring
L20--001EN/062/6
09--2004E AREVA
Gas pressure and density
Introduction The electrical characteristics of switchgear depend on the density of SF6 gasi.e. the mass of gas pumped into a compartment of a given volume.
Constanttemperature
At constant temperature, an increase of gas density results in a higher gaspressure against the walls of compartment.
Constant density At constant density, with an fixed compartment volume, the pressurechanges in the same way as the temperature. Since the gas density re-mains invariable owing to the fact that no modification occurs in the quanti-ty of gas or the volume of the relevant compartment, the electrical charac-teristics of the switchgear will remain unchanged.
Conclusion Since it is difficult to measure the gas density directly, it is essential toknow accurately its absolute pressure and temperature.
-
Description and operationSF6 gas monitoring
L20--001EN/063/6
09--2004E AREVA
Pressure measurement
Effective pressure ?Absolute pressure ?
Absolute pressure = effective pressure + atmospheric pressure
Pressure Description Diagram
Effective
The pressure of SF6 gas is mea-sured by of a standard pressuregaugewith adeformable diaphragmactuating an indicating pointer.One surface of the diaphragm is incontact with the SF6 gas, while theother is in contact with the atmo-sphere. The difference between thegas and the atmosphere is thusmeasured, taking atmosphericpressure as a reference. This is themeasurement of the effective pres-sure of the SF6 gas.
SF6
Atmospheric pressure
Standard pressure gauge
Absolute
If the deformable diaphragm, onesurface of which is in contact withthe SF6 gas, blocks a volumewherea vacuum has been developed, thepressure gaugemeasures thepres-sure difference between that of theSF6 gas and the vacuum. Since thelatter is zero, the pressure gaugemeasures the absolute pressure ofthe gas.The absolute pressure of the SF6gas, independent of atmosphericpressure, reflects the quantity ofgas introduced into the compart-ment and hence its density at thepresent temperature.This is measured by means of anabsolute pressure gauge which isless generally used and more deli-cate than a effective pressuregauge. This is the reason why a ef-fective pressure gauge is used, pro-vision being made for correctionsrequired by atmospheric pressurevariations resulting from atmo-spheric disturbances and differ-ences of elevation.
SF6
Vacuum volume
Absolutepressure gauge
-
Description and operationSF6 gas monitoring
L20--001EN/064/6
09--2004E AREVA
Measuring density
Pressure units D The international unit pressure is the Pascal (Pa).D The practical unit is the bar (14.503 p.s.i.)
1 bar = 1,000 hPa1 bar = 100 kPa10 bar = 1 MPa
D Standard atmospheric pressure is equal to 101.3 kPa at sea level and anair temperature of 20C (68F).
Measuring density When it is not possible to directly measure density, this may be checkedusing an industrial pressure gauge capable of measuring the effectivepressure.An effective pressure value corresponds to the rated density, determinedfor normal atmospheric pressure (101.3 kPa) and an ambient temperatureof 20C (68F).
For each pressure reading (filling, inspection of densimeter thresholds...), therated effective pressure should be corrected according to the ambient tem-perature and atmospheric pressure of the site at the time the reading is taken.See the module Calculation of the SF6 gas filling pressure to using thepressure gauge (tool).
The real pressure is therefore :
Preal = Prated effective in accordance with temperature + Pp*
* Pp : correction in accordance with atmospheric pressure.
-
Description and operationSF6 gas monitoring
L20--001EN/065/6
09--2004E AREVA
Densimeter
Function D Permanent SF6 gas density monitoring.D Visual SF6 gas real pressure information (MPa -- psi).
Localization The densimeter is situated onto the bottom of the pole of the circuit--breaker,and joined to the gas volume of the circuit--breaker.
Working The densimeter is fitted with internal contacts. These contacts close succes-sively if the gass density diminishes and determine 2 distinct thresholds.These contacts are wired to the terminal block inside the cubicle and are usu-ally left at the users disposal for the following use :D Alarm pressure pae acts as a warning (topping up necessary).
D Minimum functional pressure for insulation pme must be used either tolock the circuit--breaker in position or to cause automatic opening. The optionis chosen by the client in keeping with operating requirements.
All the circuit--breakers rated performances are guaranteed up to the mini-mum specified ambient temperature and theminimum functional pressure forinsulation pme.
Continued on next page.
-
Description and operationSF6 gas monitoring
L20--001EN/066/6
09--2004E AREVA
Densimeter, continued
Reading the dial The dial is divided into three colored areas : Green, Yellow andRed. Theposi-tion of the needle indicates the SF6 gas absolute pressure value.
0
-1
Needle position Colored area Direction
GREEN None
YELLOW Perform a topping--upoperation.
RED
Abnormally low density,find the origin of theleak and contactAREVA T&D S.A.
After--sales Service.
-
Packaging -- Shipping and storage
Packaging -- Identification -- Storage
L22--007EN/031/6
05--2006 AREVA
Presentation
Information The different parts of the poles (chambers and column) are filled with nitrogen(N2) for transport purposes to an effective pressure of 0.03 MPa at 20C(68F) and 101.3 kPa.
In this module This module contains the following topics :
Topic Page
Packaging 2
Identifying sub--assemblies and their packaging 3
Storage 4
-
Packaging -- Shipping and storage
Packaging -- Identification -- Storage
L22--007EN/032/6
05--2006 AREVA
Packaging
Introduction For transport, the different parts of the apparatus are divided--up betweenseveral cases :
Interrupting chambers.
Columns + (corona rings, electrical connections ...).
Operating devices : each operating device is vacuum--wrapped in a pro-tective bag containing desiccants.
Frames if the latter is supplied by AREVA.
The SF6 bottle(s) or -- in particular instances -- SF6 bottle(s) and CF4bottle(s).
Marshalling cubicle.
Assembly products (grease, oil, etc.) used for installation.
Capacitors (if the apparatus is equipped with these).
Characteristics ofpackaging cases
The table below gives the characteristics of the circuit--breaker componentspackaging cases depending on the apparatus :
Packaging casetype
QtyLengthcm
Widthcm
Heightcm
Gross weightkg
Interrupting cham-bersx 3
2 513 181 136
Columns(4 insulators)
2 627 191 105
Frame(H = 4877 mm)
2 546 96 96
Operating device 2 318 103 144
SF6 gas *
(SF6+CF
4)gas
mixture
SF6 gas *
CF4 gas *
Marshalling cubicle 1 131 76 172 284
Necessities (prod-ucts)
for assembly
1 60 60 70 37
Capacitors * 2 266 141 124
* Depending of the apparatus
NOTE : the values in the above table are given as an indication sothat an appropriate means of lifting can be envisaged.
-
Packaging -- Shipping and storage
Packaging -- Identification -- Storage
L22--007EN/033/6
05--2006 AREVA
Identifying sub--assemblies and their packaging
Introduction Each circuit--breaker sub--assembly (poles, operating mechanism, etc.) isidentified by a plate giving its reference numbers.These numbers are marked on the packaging cases of each sub--assembly.
Example of markingand identifying
-- Manufacturer reference No. = 108 657
-- Circuit--breaker identification No. 01
-- Phase number : 3
-- Position in the same phase : 1
108 657 0010no SRIERep. 01/3--1
101 525 0010
MANUFACTURERREFERENCE No.
MARKING OFPACKAGING CASES
IDENTIFICATION OF SUB---ASSEMBLIES AND TOOLING
1
2
0101
CASE No.
PHASENUMBER
CIRCUIT--BREAKERIDENTIFICATION No.
POSITION INTHE SAMEPHASE
Place of the plates Choose and install the components identified by the plate (1).
OUTSIDE PLATE
INSIDE PLATE
108 657 0010no SRIERep. 01/3--1
1
01/3--1
01/3--201/2--1
01/2--201/1--1
01/1--2
-
Packaging -- Shipping and storage
Packaging -- Identification -- Storage
L22--007EN/034/6
05--2006 AREVA
Storage
Introduction The storage procedures defined below are for storage times of less than 2years. For longer periods, special packagingmust bedesigned andappropri-ate procedures devised.
Short--term storage(6 months)
Theapparatusmust be stored in its transport packagingandplacedonbeamsin a flood--proof place.
Medium--term storage(less than 2 years)
The table below indicate how to stock the main components of the circuit---breaker for a medium--term storage :
Component Storage
Componentsof the circuit--breaker pole
The apparatusmust be stored with itstransport packaging open whilstplaced on beams in a closed (indoor),but ventilated, flood--proof place.
Operating device
The operating device should bestored in the same place as the cir-cuit--breaker, these two sub--assem-blies being inseparable. Check thatthe vacuum packaging is leak--tight.If this has been damaged, proceed asfollows :
The operating device should beplaced so that air can enter throughthe vents of the rear plate and sidepanels.
In order to prevent corrosion dam-agedue to formation of condensation,it is mandatory that the heating circuitbe switched on.
Continued on next page.
-
Packaging -- Shipping and storage
Packaging -- Identification -- Storage
L22--007EN/035/6
05--2006 AREVA
Storage
Centralizing cubicle
The centralizing cubicle should bestored in the same place as the cir-cuit--breaker and the operatingdevice, these three sub--assembliesbeing inseparable.
In order to prevent corrosion dam-age due to formation of condensation,it is mandatory that the heating circuitbe switched on. Put vetically thecenttralizing cubicle for that air canenter through the vents.
ANY CHANGEOF LOCATIONOF THE APPARATUS (EVEN AFTERCOM-MISSIONING) SHOULD BE DONE AT A REDUCED PRESSURE OF0.03 MPa.
-
Packaging -- Shipping and storage
Packaging -- Identification -- Storage
L22--007EN/036/6
05--2006 AREVA
This page is intentionally blank.
k
-
InstallationErection general instructions
L30--002EN/011/2
06--2004E AREVA
Erection general instructions
Instructionsof environment
The table below gives the instructions of environment to respect for the erec-tion :
Instruction Comment
A
Verify the Civil engineering work : dimensions,levels of concrete pads (structure fixation), inaccordance with the tolerances given by Civilwork standards (refer to circuit--breaker out-line).
B Avoid any dust production and masonry workduring erection of the circuit--breaker.
Erectioninstructions
The table below gives the instructions to respect for proper erection of the cir-cuit--breaker :
Instruction Comment
1
Read all the Installation modules completelybefore beginning erection works.The erection instructions describe all the proce-dures to be carried out as well as their chrono-logical order.
2 Handle sub--assemblies in a correct manner,particularly insulators.
3
The shipping case should be open as requiredduring erection procedures.CAUTION : Respect sub--assemblies iden-tification.
4
When shipping covers are removed, proceed tothe next assembly sequence in as short as pos-sible time.Store the shipping covers under shelter, for apossible future use.
5 Respect references to other modules,i.e. :Tightening torques.
Warning No responsibility is taken over by AREVA T&D S.A. for damages and dis-turbances resulting out of non--adherence to the Installation modules.
-
InstallationErection general instructions
L30--002EN/012/2
06--2004E AREVA
This page is intentionally blank.
-
InstallationTightening torques
L31--001EN/011/4
06--2004E AREVA
Presentation
Introduction In the assembling with screws, all the fastening screws must be greased be-fore torque tightening.
Products used The table below gives the list of the used products for the screws before tight-ening :
Designation AREVA itemreference
Supplier Supplier itemreference
Grease --01835208(1kg box) MOBIL OILMOBILPLEX 47MOBILUX EP3
Contact grease --01835118(200g tube) EPMFCONTACTAL
HPG
Silicon grease --01835265(100g tube) SAMARO MOLYKOTE 111
Glue --01818327(250ml) LOCTITE LOCTITE 225
In this module This module contains the following topics :
Topic PageScrew greasing before tightening 2Tightening torques values 3
-
InstallationTightening torques
L31--001EN/012/4
06--2004E AREVA
Screw greasing before tightening
Choice of theproduct to use
The table below gives the product to use for the screws before tightening de-pending on the assembling type :
If assembling... Product to use ...
usual MOBILPLEX 47MOBILUX EP3electrical connections CONTACTAL HPG
with seals
Can bedismantled ? Product ...
with seals YES MOLYKOTE 111NO LOCTITE 225
Where to applythe product ?
The table below indicates the part of the screws to treat with the appropriateproduct before tightening depending on the assembling type :
If assembling... With screws With bolts
usual
electrical connections
with seals
Tapping or threading
Tapping or threading
-
InstallationTightening torques
L31--001EN/013/4
06--2004E AREVA
Tightening torques values
Values table The tool and the tightening method must be such that the torque actually ap-plied to the screw head corresponds with the reference torque shown in thetable below, to within a tolerance of 20%.
TIGHTENING TORQUESin daN min daN.m
STEEL SCREWS
CLASS 6.8or CLASS 8 8orSTAINLESS A2--70, A4--70
STAINLESS A2--80, A4--80
CLASS 8.8
M2,5 0,05 0,06
M3 0,09 0,11
M4 0,19 0,26
M5 0,38 0,51
M6 0,66 0,88
M8 1,58 2,11
M10 3,20 4,27
M12 4,97 6,63
M14 8,67 11,56
M16 13,42 17,90
M20 26,22 34,98
M24 45,68 60,93
M30 90,44 120,65
-
InstallationTightening torques
L31--001EN/014/4
06--2004E AREVA
This page is intentionally blank.
-
InstallationErection general procedures
L31--003EN/011/6
06--2004E AREVA
Presentation
Introduction During the erection of the circuit--breaker, some particular mounting or check-ing operations will be realized.
In this module This module contains the following topics :
Topic PagePreparing and installing static seals 2Screw sealing 3Using a water pressure gauge 5
-
InstallationErection general procedures
L31--003EN/012/6
06--2004E AREVA
Preparing and installing static seals
Necessary products List of the AREVA products necessary for the installing :AREVA
reference Diagram Designation
--01861262 Can of ISOPROPANOL (1l)
--01835265 MOLYKOTE 111 (100g tube)
Process The table below gives the steps of installing static seals :
Step Action Comment1 Clean bearing grooves and sur-
faces using ISOPROPANOL.2 Rid the seal of all foreign bodies
such as paintbrush bristles or fil-ings...Remove (where applicable) thecolor identification point with fin-gernail, never with a sharp instru-ment.
Check the condition of the sealwhich should present noscratches or deformation (itshould be neither flattened,stretched, nor broken).
3 Lightly lubricate the seal by handusing MOLYKOTE 111 grease.
Do not use a brush to do this.Eliminate excess grease bysqueezing the seal betweenfingers, leaving only a thin layeron the entire surface.
4 Put the seal(s) in place.5 Lubricate both bearing surfaces
with MOLYKOTE 111.Fill the residual volume of theseals outside groove with grease.
Do not put grease on the insidesurface.
Only seals aregreased in this zoneGreasing
zoneGreasing
zone
-
InstallationErection general procedures
L31--003EN/013/6
06--2004E AREVA
Screw sealing
Introduction To prevent humidity from penetrating SF6 gaskets, the outer mounting screwsshould be sealed by applying an appropriate product.NOTE : This procedure should be applied to all assemblages of partssubmitted to SF6 pressure and electrical connection assembling.
Necessary products List of the AREVA products and accessories necessary for the screw seal-ing :
AREVAreference Diagram Designation
--01818327 LOCTITE 225 (250ml)
--01835265 MOLYKOTE 111 (100g tube)
--01835118 CONTACTAL HPG (200g tube)
Choice of theproduct to use
The table below gives the product to use for the screw sealing depending onthe assembling type :
If assembling... Product to use ...
with seals
Can bedismantled ? Product ...
with seals YES MOLYKOTE 111NO LOCTITE 225
electrical connections CONTACTAL HPG
Continued on next page.
-
InstallationErection general procedures
L31--003EN/014/6
06--2004E AREVA
Screw sealing, continued
Where to applythe product ?
The table below indicates the part of the screws to treat with the appropriateproduct before tightening depending on the assembling type :
Assembling with screws Assembling with bolts
Tapping or threading
Tapping or threading
-
InstallationErection general procedures
L31--003EN/015/6
06--2004E AREVA
Using a water pressure gauge
Introduction In each assemblage performed using a double seal (1) and (2), the volume(3) communicates with the outside by a channel (4), blocked--off by a plug (5)or (6), so that leak--tightness can be checked.
65
1
3
2
4
Process The table below gives the steps of the leak--tightness checking using awater pressure gauge :
Step Action Diagram1 Remove the leak test plug (5) or (6)
and its seal (7) if necessary, leaveopen for half an hour.
2...3 turns
5 7
6
2 Connect up the water pressure gauge(8), using the adapter (9) or (10).
9
10
8
3 Fill the water pressure gauges U tubeto half way up.NOTE : If temperature is lessthan 0C, use an anti--freeze mix-ture instead of water.D After a few minutes note the watercolumn level R1.D Note the water column level R2again after half an hour.The displacement H should be lessthan 10 mm.
H
R1R2
4 At the end of the inspection, pull theadapter of the water pressure gaugeand replace the leak test plug (5) or (6)and its seal (7), where required. 5 7
6
-
InstallationErection general procedures
L31--003EN/016/6
06--2004E AREVA
This page is intentionally blank.
-
Installation
Checking for presence of nitrogen (N2)
in pole parts
L31--074EN/011/4
03--2008 AREVA
Presentation
Introduction The pole parts (chambers and columns) are filled with nitrogen (N2) for trans-port purposes to an effective pressure of 0.03 MPa at 20C and 101.3 kPa.
It is of prime importance that the presence of N2 gas in pole be verifiedbefore going any further with installation.
Necessary tools List of the necessary AREVA tools for the checking for presence of N2 gas inpoles :
Mark Diagram Designation Number
(3) Filling tool 1
In this module This module contains the following topics :
Topic Page
Checking for presence of N2 gas in columns 2
Checking for presence of N2 gas in interrupting chambers 4
-
Installation
Checking for presence of nitrogen (N2)
in pole parts
L31--074EN/012/4
03--2008 AREVA
Checking for presence of N2 gas in columns
Opening the case ofthe columns
Remove only the cover of the case. Remove packaging protection tofree the housing (7) of the column.
NOTE : Keep the packaging protection for later utilization.
7
Visual inspectionof the column
Begin visual inspection to check the condition of ceramic envelopes. Makesure that their enamel has not been chipped or in any way damaged duringtransportation.
Continued on next page.
-
Installation
Checking for presence of nitrogen (N2)
in pole parts
L31--074EN/013/4
03--2008 AREVA
Checking for presence of N2 gas in columns, continued
Process The table below gives the steps of manual checking for presence of N2 gasin columns :
Step Action Diagram
1 Remove the plug (1) and installthe filling tool (3), tighten the fill-ing tool BY HAND.
31
2 Unscrew the valve--cap (4) andpress on the valve briefly :some gas should escape.
If no gas is expelled, contactour Customer Service.
4
3 Replace the valve--cap (4)and remove the filling tool (3).
Re--install the plug (1), ap-plying a tightening torque of4 daN.m; leak--tightness isonly guaranteed if this condi-tion is respected.
1
34
-
Installation
Checking for presence of nitrogen (N2)
in pole parts
L31--074EN/014/4
03--2008 AREVA
Checking for presence of N2 gas in interrupting chambers
Comment A transport cover (5) is installed on the housing (6) common to both interrup-tion chambers. This cover is equipped with a test valve, in turn protected bya plug (8). The case is fitted with a outside trap--door to have access to thetransport cover.
5
6
8
6
Process The table below gives the steps of checking for presence of N2 gas in the inter-rupting chambers (case trap--door removed) :
Step Action Diagram
1 Remove the plug (8) by undoingthe screws (9) and briefly press onthe valve clapper (7) : some gasshould escape.
If no gas is expelled, contactour Customer Service.
7
8
9
2 Re--install the plug (8) using thescrews (9).
9
8
x 2
H M6--200,7 daN.m
-
Installation
Support--frame assembly
L31--137EN/021/10
10--2006 AREVA
Presentation
Reminder Frames may be supplied by either AREVA or the customer.
In this module This module contains the following topics :
Topic Page
Components necessary for the operation 2
Support--frame components (per pole) 3
Preparing the column 5
Frame--support assembly 6
Installing the lifting tools 10
-
Installation
Support--frame assembly
L31--137EN/022/10
10--2006 AREVA
Components necessary for the operation
Necessary product Grease MOBILPLEX 47 -- MOBILUX EP3 (screws greasing).
Necessary tools List of the tools necessary for the installing :
Mark Diagram Designation Number
(1)Lifting strap(3 m)
2
Handling The support--frame assembly operations and liftingthe pole should be performed by at least two per-sons.
-
Installation
Support--frame assembly
L31--137EN/023/10
10--2006 AREVA
Support--frame components (per pole)
Introduction If the support--frame is supplied by AREVA, check the necessary compo-nents to the assembling.
Necessarycomponents
List of the AREVA components necessary for the assembling :
Mark Diagram Designation Number
(2) Support 2
(3) Support 2
(5)ScrewsH M16-45
1
(7)ScrewsH M16-35
16
(9)Washer
NORDLOCK NL16 SS16
Continued on next page.
-
Installation
Support--frame assembly
L31--137EN/024/10
10--2006 AREVA
Support--frame components (per pole), continued
Necessarycomponents,continued
List of the AREVA components necessary for the assembling :
Mark Diagram Designation Number
(20)ScrewsH M16-45
16
(21) Strengthening piece 2
(24) Strengthening piece 4
(25) Strengthening piece 2
-
Installation
Support--frame assembly
L31--137EN/025/10
10--2006 AREVA
Preparing the column
Dismantling the caseof the poles
Remove the side panels of the case.
NOTE : The extraction of the columns will be in the order A, B andC.
Preparing the pole Sling the A column with the aid of two flexible lifting straps (1).
Extract the column from the case and put it down on the case wood coverlaying :-- first, the end of the column,-- second, the support of the operating mechanism (4) on a wedge to ensurethe correct installing of the frame supports.
X minimum = 260 mm
1
4
1
X
-
Installation
Support--frame assembly
L31--137EN/026/10
10--2006 AREVA
Frame--support assembly
Process The table below gives the steps of installing the supports of the frame :
Step Action
1 With the aid of two flexible lifting straps, position the frame--support(3) onto the housing (10) and fasten it with the use of the screws (7)and NORDLOCK washers (9). Do not tighten the screws (7).-- Install the screw (5) only on this support.
10
3
2 x 2
H M16--35
79
x 1
H M16--45
5
2 With the aid of two flexible lifting straps, position the frame--support(2) onto the housing (10) and fasten it with the use of the screws (7)and NORDLOCK washers (9). Do not tighten the screws (7).
102
2 x 2
H M16--35
79
Continued on next page.
-
Installation
Support--frame assembly
L31--137EN/027/10
10--2006 AREVA
Frame--support assembly, continued
Process, continued The table below gives the steps of installing the supports of the frame :
Step Action
3 Install the strengthening pieces (21)--(25) inside the frame--support(2) with the use of the screws (20). Adjust the distance between thesupports and fasten the strengthening pieces (21)--(25) on theframe--support (3). Do not tighten the screws (20).
2
2521
3
x 4
H M16--45
20
4 With the aid of two flexible lifting straps, position the frame--support(2) onto the housing (10) and fasten it with the use of the screws (7)and NORDLOCK washers (9). Do not tighten the screws (7).
2 x 2
H M16--35
79
10
2
5 With the aid of two flexible lifting straps, position the frame--support(3) onto the housing (10) and fasten it with the use of the screws (7)and NORDLOCK washers (9). Do not tighten the screws (7).
10
2 x 2
H M16--35
79
3
Continued on next page.
-
Installation
Support--frame assembly
L31--137EN/028/10
10--2006 AREVA
Frame--support assembly, continued
Process, continued The table below gives the steps of installing the supports of the frame :
Step Action
6 Install the strengthening pieces (21)--(25) inside the frame--support(3) with the use of the screws (20). Adjust the distance between thesupports and fasten the strengthening pieces (21)--(25) on theframe--support (2). Do not tighten the screws (20).
25
21H M16--45
20
2 x 2
3
2
25
21
7 Install the strengthening pieces (24) outside the frame--support withthe use of the screws (20).
24
24
24
24
x 2
20
H M16--45
x 2
20
H M16--45
Continued on next page.
-
Installation
Support--frame assembly
L31--137EN/029/10
10--2006 AREVA
Frame--support assembly, continued
Process, continued The table below gives the steps of installing the supports of the frame :
Step Action
8 Tighten all the screws to the recommended torques.
18 daN.m
-
Installation
Support--frame assembly
L31--137EN/0210/10
10--2006 AREVA
Installing the lifting tools
Necessary tools List of the lifting tools to install on the frame :
Mark Diagram Designation Number
(14) Lifting shackle 4
(15) Ring bolt 4
(16) Washer 8
Process The table below gives the steps of installing the lifting tools on the support---frame :
Step Action
1 Install the lifting shackle (14) in the holes of the frame.
2 Install the ring bolts (15) on the base of the frame, inserting the thickwashers (16).
x 4
15
16
14
-
InstallationColumn -- chambers coupling
L31--715EN/011/14
04--2005E AREVA
Presentation
Identification Before the chambers -- column coupling, check that interrupting chambersand column reference numbers are the right ones.
Coupling duration The final chambers -- column coupling operations must be realized in dura-tion no longer than 40 min.NOTE : The coupling operations should be performed by at least twopersons.
T(max) 40 min
Lifting equipment Provide for appropriate lifting equipment :(3,000 daN) (minimum)
H + 2 m
HH + 1 m
Coupling steps The chambers -- column coupling must be done in several steps :
Step Topic PageA Positioning the case of the chambers 2B Preparing the interrupting chambers 3C Preparing the column stress--shields 4D Preparing the necessary components for the coupling 5E Lifting and preparing the column 7
F Final coupling 8
-
InstallationColumn -- chambers coupling
L31--715EN/012/14
04--2005E AREVA
Positioning the case of the chambers
Introduction To facilitate the lifting of the poles, and to work in complete safety, it is essen-tial that the cases be positioned correctly in relation to the lifting equip-ment.
Positioning of thecase
Using the lifting equipment, position the first case in such a way that :S the axis chambers is perpendicular with the lifting plane.
S the space between the case and the lifting equipment is superior of the col-umn fitted with the frame L + 2 m.
NOTE : The cradle of the first chamber will be use for the column--chambers coupling of the three poles.
Diagram
L + 2 m
-
InstallationColumn -- chambers coupling
L31--715EN/013/14
04--2005E AREVA
Preparing the interrupting chambers
Dismantling the caseof the chambers
Remove the cover and the side panels of the case.
Rotationof the chambers
With two flexible lifting straps, revolve the chambers of 180 and make thetransport cover level.NOTE : Orient the housing (2) in such a way the bosse is situatedon the lifting equipment side.
2
-
InstallationColumn -- chambers coupling
L31--715EN/014/14
04--2005E AREVA
Preparing the column stress--shields
Necessary AREVAcomponents
List of the AREVA components necessary for the assembling (per pole) :
Mark Diagram Designation Number
(33) Stress--shields ring 1
(32) Bracket 4
(34) ScrewsH M10-30 4
Assembling Install the brackets (32) on the stress--shields ring (33) using screws (34)do not tighten.
33
32
34
x 4H M10--30
Positioning Install temporarily the stress--shields ring (33) -- brackets (32) to chambersside -- around the housing (2).
3332
2
-
InstallationColumn -- chambers coupling
L31--715EN/015/14
04--2005E AREVA
Preparing the necessary components for the coupling
Necessary AREVAcomponents
List of the AREVA components necessary for the coupling :
Mark Diagram Designation Number
(12) Seal 1
(14)
ScrewH M16--60 (19 mm)H M16--70 (30 mm)
8
(15) WasherM16 16
(16) Nut 8
Continued on next page.
-
InstallationColumn -- chambers coupling
L31--715EN/016/14
04--2005E AREVA
Preparing the necessary components for the coupling, continued
Necessary AREVAtools
List of the AREVA tools necessary for the coupling :
Mark Diagram Designation Number
(7) Stop 1
(8) Lever 1
(17)(18)
Short Centering spindleLong Centering spindle 1
(21) Rigid electric wire(80 cm) 1
(19) Protection tool 1
(20) Tool for installing the coupling pin 1
(25) Screwing tool 1
Necessary products S MOLYKOTE M111 grease : greasing contact surface.S LOCTITE 225 : screw sealing.S MOBILPLEX 47 -- MOBILUX EP3 : screw greasing.
-
InstallationColumn -- chambers coupling
L31--715EN/017/14
04--2005E AREVA
Lifting and preparing the column
Necessary tools List of the tools necessary :
Mark Diagram Designation Number
(45) Lifting strap(3 m) 4
Process The table below gives the steps of lifting the column :
Step Action Diagram1 Install the strands of the lifting
strap (45) on the lifting tool atthe end of the supports.
45
x 4
2 Lift the column.
3 Hang up the column so as tooperate on its extremity.
-
InstallationColumn -- chambers coupling
L31--715EN/018/14
04--2005E AREVA
Final coupling
Column orientation Orient the column (1) in such a way the support (3) of the operating mech-anism is situated on the same side as the boss of the housing (2).
3
2
1
Assembling thecentering spindles
Assemble sections A, B and C of the spindles (17) and (18), without over--tightening, so that these can be removed later without difficulty.NOTE : Spindle (18) is longer than spindle (17).
17
AB
C18
Deflating thechambers
S Remove the plug (5) from the transport cover (4) and press valve (6) tobring the volume of chambers back to ambient pressure.REMINDER : transport gas pressure : nitrogen (N2) at 0.03 MPa at 20C(101.3 kPa).
S Install the plug (5).
56
4
Continued on next page.
-
InstallationColumn -- chambers coupling
L31--715EN/019/14
04--2005E AREVA
Final coupling, continued
Removing thetransport cover of theinterruptingchambers
The table below gives the steps of removing the transport cover of theinterrupting chambers :
Step Action Diagram1 Remove the screws (13) and
introduce the lever (8) into thebraces (9). Draw on the lever (8)to open the cover (4).
8
x 8
H M16--55
139
4
2 Start of the timing.(The final chambers -- columncoupling operations must berealized in duration no longerthan 40 min).
3 Draw the cover (4) in order togive off the cylinder (10).Using the screwing tool (25), tounscrew the cylinder (10) inorder to release the axis (11).
10
4
25
11
4 Introduce the stop (7) and installthe tool for removing the cou-pling pin (20).Remove the pin (11) and thetransport cover (4)
7
2011
4
Continued on next page.
-
InstallationColumn -- chambers coupling
L31--715EN/0110/14
04--2005E AREVA
Final coupling, continued
Installing thecentering spindles
Install the centering spindles (17) and (18) so that these come to rest againstthe sphere of housing (2), tighten the nuts (30) a little.Install the screws (39) on the centering spindles (17) and (18).Place the protection tool (19).
17
39
18
39
30
302
19
Removing the coverof the column
The table below gives the steps of removing the cover of the column :
Step Action Diagram1 Remove the screws (23) and
open the cover (22).
22
x 8
H M16--55
23
2 Turn the cover (22) of 90 inorder to deposit it.
22
Continued on next page.
-
InstallationColumn -- chambers coupling
L31--715EN/0111/14
04--2005E AREVA
Final coupling, continued
Installing the seal The table below gives the steps of installing the seal :
Step Action Diagram1 Clean contact surfaces A and
B using ISOPROPANOL.Lubricate only the surface Bwith MOLYKOTE M111grease.
A
B
2 Install a newseal (12), referringto Preparing and installingstatic seals.
See the module Erectiongeneral procedures.
12
A
3 install a rigid electric wire (21)-- temporarily -- in order to pre-vent the unsticking of the seal(12) during the column -- cham-bers coupling
12 21
Continued on next page.
-
InstallationColumn -- chambers coupling
L31--715EN/0112/14
04--2005E AREVA
Final coupling, continued
Mountingcoupling pin
The table below gives the steps of mounting the chambers -- column cou-pling pin :
Step Action Diagram1 Move down slowly the column
(1) introducing the centringspindles (17) and (18) into theholes of the flange.
1
26 18
172 Move down slowly the column
to align the hole of the cylinder(10) with the hole of the tie--rod(26).
1710
3 Insert the coupling pin (11)installed on the tool (20).
20
4 Remove the tool (20).
11
20
5 Remove the protection tool(19) and the stop (7).Using the screwing tool (25),screw the cylinder (10) untilstop. 25
7
19
10
Continued on next page.
-
InstallationColumn -- chambers coupling
L31--715EN/0113/14
04--2005E AREVA
Final coupling, continued
Chambers/columnconnection
The table below gives the steps of chambers/column coupling :
Step Action Diagram1 Clean contact surfaces A and
B using ISOPROPANOL.Lubricate only the surface Bwith MOLYKOTE M111 grease.Remove the rigid electric wire(21)
BA
21
2 Move the seal (12) to the thehousing of the interruptingchambers.Move the screws (28) of thecentring spindles.
12
28
28
3 Continue slowly lowering thecolumn until the first sections ofthe centring spindles (17) and(18), which are no longer useful,can be removed in the followingorder :-- first section (C)-- screws (28)-- second section (B)NOTE : The purpose of thisoperation is to avoid damag-ing the ceramic fin of the col-umn.
1718
(C)
(28)
(B)
Continued on next page.
-
InstallationColumn -- chambers coupling
L31--715EN/0114/14
04--2005E AREVA
Final coupling, continued
Chambers/columnconnection
The table below gives the steps of chambers/column coupling :
Step Action Diagram4 Move down the column on the
housing (2) of the chambers.Place the stress--shields ring(33) on the extremity of the col-umn and attach the whole usingscrews (14), washers (15) andspecial nut (16) referring toScrew sealing.
See the module Erection gen-eral procedures.
Tighten the nuts (16) to the rec-ommended torques, holding thehead of the screws (14).
H M16--60 (70)13,5 daN.m
x 614
15
16
33
x 4H M10--303,2 daN.m
34
5 Tighten the screws (34) to therecommended torques. 2
6 End of coupling, stop the timingand note the time passed.
7 Remove the last section (A) andnut (30) of the centring spindles.Install the last screws (14),washers (15) and special nut(16) referring to Screw seal-ing.
See the module Erection gen-eral procedures.
Tighten the nuts (16) to the rec-ommended torques, holding thehead of the screws (14).
H M16--60 (70)13,5 daN.m
x 2
(A)
30
14
15
16
15
-
InstallationTipping down the pole of the circuit--breakerand vacuum operation
L31--721EN/021/4
06--2004E AREVA
Presentation
Introduction The column--chambers coupling is now finished -- the pole is yet maintainedby the lifting equipment. In order to continue the pole installation, it is neces-sary now to lay it on the ground.
In this module This module contains the following topics :
Topic PageTipping down the pole of the circuit--breaker 2Vacuum operation 3Protection of the interrupting chambers 4
-
InstallationTipping down the pole of the circuit--breakerand vacuum operation
L31--721EN/022/4
06--2004E AREVA
Tipping down the pole of the circuit--breaker
Process The table below gives the steps of tipping down the pole of the circuit--breaker :
Step Action1 Using the lifting device, slowly tip down the pole around the axis of
the interrupting chambers until the ground.
Pay attention to do not damage the stress--shields ring (11).
2 Lay the supports of the frame on two wood boards (12).3 Remove the flexible lifting straps (15).4 Remove the ring bolts (13) and the thick washers (14).
11
12
x 4
13
14
15
-
InstallationTipping down the pole of the circuit--breakerand vacuum operation
L31--721EN/023/4
06--2004E AREVA
Vacuum operation
Principle The procedure of the vacuum operation depends on the duration of cham-bers/column coupling.
Process See module :
-- Connection the vacuum pump.-- Vacuum operation.
-
InstallationTipping down the pole of the circuit--breakerand vacuum operation
L31--721EN/024/4
06--2004E AREVA
Protection of the interrupting chambers
Introduction It is important to protect the insulators of the interrupting chambers during thenext operations (installing the terminals, installing the capacitors ...)
Process To protect the interrupting chambers, use packaging protection, retainedfrom the opening of the column case.
-
InstallationInstalling terminalswith preparation of contact surfaces
L31--734EN/011/4
08--2004E AREVA
Presentation
Diagram
XXX XXX 0010no SRIERep. 01/3--1
01/3--1
01/3--201/2--1
01/2--201/1--1
01/1--2
01/3--2
01/2--2
01/1--2
01/3--1
01/2--1
01/1--1
In this module This module contains the following topics :
Topic PageComponents, products and accessories 2Preparing the contact surfaces 3Installing terminal 4
-
InstallationInstalling terminalswith preparation of contact surfaces
L31--734EN/012/4
08--2004E AREVA
Components, products and accessories
Necessarycomponents
List of the AREVA components necessary for the assembling (per pole) :
Mark Diagram Designation Number
(1) Terminal 1
(3) ScrewsH M12--45 4
Necessary productsand accessories
List of the AREVA products and accessories necessary for the installing :
AREVAreference Diagram Designation
--01861262 Can of ISOPROPANOL (1l)
--01835106 Vaseline 204--9
--01835118 Contactal grease
--01831320 Abrasive paper A400
--02212337 Scotch Brite A--VF
--02212334 Rag
--02211842 Round brush No.4
--02211831 Brush No.16
-
InstallationInstalling terminalswith preparation of contact surfaces
L31--734EN/013/4
08--2004E AREVA
Preparing the contact surfaces
Preparing thecontact grease
The contact grease is a mixture composed of Vaseline and Contactal grease.CONTACT GREASE = 50% Vaseline + 50% Contactal grease
Preparing thecontact surfaces
The table below gives the steps of preparing the contact surfaces :
Step Action Diagram
1Remove the temporary screwsfrom the terminal pads X1 orX2.
X1
X2
01/3--2
01/2--2
01/1--2
01/3--1
01/2--1
01/1--1
2 Dry rub with fine emery cloth.
3 Eliminate the dust produced.
4 Coat with CONTACTGREASE.
5 Wipe with a clean rag, leavingjust a thin layer of grease.
6 Rub over the grease with wa-terproof abrasive paper A400.
-
InstallationInstalling terminalswith preparation of contact surfaces
L31--734EN/014/4
08--2004E AREVA
Installing terminal
Process Assemble immediately the terminal (1) on one interrupting chamber (2) afterpreparation of contact surfaces. Fasten the terminal using screws (3); useCONTACT GREASE to seal the screws.
x 4H M12--455 daN.m
3
2
22
1
01/3--2
01/2--2
01/1--2
01/3--1
01/2--1
01/1--1
Comment D The electrical resistance value of the assembly should be :R 2
D Before installing H.V. connectors, prepare the contact surfaces in thesame way.
-
Installation
Installing the capacitors
L31--741EN/031/4
12--2004 AREVA
Presentation
Diagram
Necessary tools List of the tools necessary :
Mark Diagram Designation Number
(12)Lifting strap
(3 m)2
In this module This module contains the following topics :
Topic Page
Components and products 2
Preparing the capacitors 3
Installing the capacitors 4
-
Installation
Installing the capacitors
L31--741EN/032/4
12--2004 AREVA
Components and products
Necessarycomponents
List of the AREVA components necessary for the assembling (per pole) :
Mark Diagram Designation Number
(1) Capacitor 2
(3) Support 2
(4)or
Support(depending on the apparatus)
2
(5)Screws
H M12-308
(8)Screws
H M12-454
(9)Screws
H M12-254
(1) Spacer 4
Necessary products MOBILPLEX 47 -- MOBILUX EP3 : screw greasing.
-
Installation
Installing the capacitors
L31--741EN/033/4
12--2004 AREVA
Preparing the capacitors
Installingthe supports
Install the support (3) on the capacitor (1) using the screws (5).
Install the support (4) on the capacitor (1) using the screws (5).
4
3
x 2
H M12--305 daN.m
5
4
x 2
H M12--305 daN.m
5
1
-
Installation
Installing the capacitors
L31--741EN/034/4
12--2004 AREVA
Installing the capacitors
Process Install the capacitors (1) on the interrupting chambers (6) and (7) using thescrews (8) and (9).
NOTE : Use the two spacers (10) to install the capacitors -- capacitorsupport (4) side.
10
x 2
H M12--455 daN.m
8
x 2
H M12--255 daN.m
9
4 10
4
x 2
H M12--255 daN.m
91
1
7
6
-
InstallationInstalling stress--shields on the interrupting chambers
L31--750EN/041/4
12--2004E AREVA
Presentation
Diagram
In this module This module contains the following topics :
Topic PagePreparing the stress--shields 2Installing the stress--shields 3
-
InstallationInstalling stress--shields on the interrupting chambers
L31--750EN/042/4
12--2004E AREVA
Preparing the stress--shields
Necessary AREVAcomponents
List of the AREVA components necessary for the assembling (per pole) :
Mark Diagram Designation Number
(1) Stress--shields ring 2
(2) Bracket 8
(3) ScrewsH M10-30 8
Necessary product MOBILPLEX 47 -- MOBILUX EP3 : screw greasing.
Assembling Install the brackets (2) on the stress--shields ring (1) using screws (3) do nottighten.
x 4H M10--30
3
2
1
-
InstallationInstalling stress--shields on the interrupting chambers
L31--750EN/043/4
12--2004E AREVA
Installing stress--shields
Necessary AREVAcomponents
List of the AREVA components necessary for the assembling (per pole) :
Mark Diagram Designation Number
(5) ScrewsH M12-30 8
Necessary product LOCTITE 262 (screws locking)
Process Install the stress--shields (1) at each end of the interrupting chambers (4)using the screws (5).
NOTE : Lock the screws (5) with LOCTITE 262.
1
4
4
1
x 4
H M12--305 daN.m
5
1
-
InstallationInstalling stress--shields on the interrupting chambers
L31--750EN/044/4
12--2004E AREVA
This page is intentionally blank.
-
InstallationLifting and positionning the pole
L31--766EN/041/4
04--2007E AREVA
Presentation
Necessary tools List of the necessary AREVA tools for the lifting and positionning of the pole :
Mark Diagram Designation Number
(1) LIFTING STRAP(3 m -- 1000 kg) 4
(2) LIFTING STRAP(6 m-- 1000 kg) 4
In this module This module contains the following topics :
Topic PagePositioning the lifting straps 2Lifting the pole 3Positioning the pole 4
-
InstallationLifting and positionning the pole
L31--766EN/042/4
04--2007E AREVA
Positioning the lifting straps
Process The table below gives the steps of positioning the lifting straps :
Step Action1 D For poles of circuit--breakers fitted with a column made up with
three insulators, four 6 m lifting straps are sufficient.
D For columns made up with four insulators, prepare four wholes :one 3 m lifting strap (1) knotted with one 6 m lifting strap (2).
2 Pass the lifting straps like the picture below.-- The lifting straps a pass over the housing (7).-- The lifting straps b pass under the housing (7).
3 Cross the lifting straps a and b and place them onto the frameusing the four lifting shackles (8).
21
ab
8
8
a
b
b
a
7
7
-
InstallationLifting and positionning the pole
L31--766EN/043/4
04--2007E AREVA
Lifting the pole
Process By means of a lifting device hoist the pole up whilst allowing it to rest on thebase of the frame.Place the trip ropes (10) on the support legs of the chassis frame (9) to ensureguidance of the pole at the time of lifting.Lift the pole with precaution.
10
9
-
InstallationLifting and positionning the pole
L31--766EN/044/4
04--2007E AREVA
Positioning the pole
Process The table below gives the steps of positioning the pole :
Step Action1 Use a lifting device to position the chassis frame onto its ground
attachment points but do not secure it, whilst respecting the orienta-tion of the pole indicated on the sketch of the device.
2 If necessary, place shims under the supports of the frame so that theupper plate is level.
3 Install the washers (12) and clamp the whole to the ground using nut.4 Remove the lifting straps.5
18 daN.m
Check the tightening torques of all frame screws.
6 Tighten the fixings on the two floor seatings in accordance with themodule entitled Tightening Torques and in accordance with thediameters of the anchoring points.
12
-
InstallationInstalling electric connectionwith preparation of contact surfaces
L31--770EN/021/8
08--2004E AREVA
Presentation
Diagram
In this module This module contains the following topics :
Topic PageComponents, products and accessories 2Preparing the connection 3Installing the connection 5
-
InstallationInstalling electric connectionwith preparation of contact surfaces
L31--770EN/022/8
08--2004E AREVA
Components, products and accessories
Necessarycomponents
List of the AREVA components necessary for the assembling (per pole) :
Mark Diagram Designation Number
(1) Terminal 2
(4) Connection flange 2
(5) Connection 2
(6) Flange 2
(7) Stud 2
(8) Connection tube 1
(9) WasherM20 2
(10) NutH M20 2
(11) ScrewsCHc M16--55 8
-
InstallationInstalling electric connectionwith preparation of contact surfaces
L31--770EN/023/8
08--2004E AREVA
Components, products and accessories, continued
Necessary productsand accessories
List of the AREVA products and accessories necessary for the installing :
AREVAreference Diagram Designation
--01861262 Can of ISOPROPANOL (1l)
--01835106 Vaseline 204--9
--01835118 Contactal grease
--01831320 Abrasive paper A400
--02212337 Scotch Brite A--VF
--02212334 Rag
--02211842 Round brush No.4
--02211831 Brush No.16
-
InstallationInstalling electric connectionwith preparation of contact surfaces
L31--770EN/024/8
08--2004E AREVA
Preparing the connection
Preparing thecontact grease
The contact grease is a mixture composed of Vaseline and Contactal grease.CONTACT GREASE = 50% Vaseline + 50% Contactal grease
Preparing thecontact surfaces
The table below gives the steps of preparing the contact surfaces :
Step Action Diagram
1 Dry rub with fine emerycloth.
2 Eliminate the dust pro-duced.
x 2
3 Coat with CONTACTGREASE.
x 24 Wipe with a clean rag, leav-
ing just a thin layer ofgrease.
x 2
5 Rub over the grease withwaterproof abrasive paperA400.
x 2
Continued on next page.
-
InstallationInstalling electric connectionwith preparation of contact surfaces
L31--770EN/025/8
08--2004E AREVA
Preparing the connection, continued
Assembling theconnection
The table below gives the steps of assembling the connection :
Step Action Diagram1 Fasten the connexion flanges
(4) to the terminals (1) usingscrews (11).
4
1CHc M16--5513,5 daN.m
x 411
x 22 Screw and tighten the studs (7)
on the flanges (6) using ascrewdriver.
6
7
3 Put the connections (5) on theconnection tube (8).
55
8
Continued on next page.
-
InstallationInstalling electric connectionwith preparation of contact surfaces
L31--770EN/026/8
08--2004E AREVA
Preparing the connection, continued
Assembling theconnection, continued
The table below gives the steps of assembling the connection :
Step Action Diagram4 Put the connection (5) on the
connection flange (4) and fas-ten the whole with the flange(6), washer (9) and nut (10).NOTE : Do not tighten thenut (10).
9
6
10
4
5
5 Repeat the operation for thesecond connection (5).
5
-
InstallationInstalling electric connectionwith preparation of contact surfaces
L31--770EN/027/8
08--2004E AREVA
Installing the connection
Preparing thecontact surfaces
The table below gives the steps of preparing the contact surfaces :
Step Action Diagram
1Remove the temporary screwsfrom the terminal pads X1 andX2.
2 Dry rub with fine emery cloth.
3 Eliminate the dust produced.
X1 X24 Coat with CONTACT
GREASE.
X1 X2
5 Wipe with a clean rag, leavingjust a thin layer of grease.
6 Rub over the grease with wa-terproof abrasive paper A400.
Continued on next page.
-
InstallationInstalling electric connectionwith preparation of contact surfaces
L31--770EN/028/8
08--2004E AREVA
Installing the connection, continued
Fastening theconnection
The table below gives the steps of fastening the connection :
Step Action1 Sling the connection with the aid of one flexible lifting strap (12).2 Insert the connection between the interrupting chambers (2). Move
the terminal (1) inside to make the operation easier.3 Fasten the first terminal to the interrupting chamber using screws (3);
use CONTACT GREASE to seal the screws.4 Move the terminal (1) to the other interrupting chamber and fasten it
using screws (3); use CONTACT GREASE to seal the screws.5 Tighten -- to recommended torques -- the nuts (10) of the connection
flange (4).6 Make sure that there is no contact between stress--shields (13)
and connection. Correct -- if necessary -- by acting on the fixa-tion of the stress--shields (13).
x 4
H M12--455 daN.m
4
12
10
23 daN.m
3
1
2 2
1
13
x 4
H M12--455 daN.m
3
= =
-
Installation
Installing the operating device
L31--7801EN/011/12
03--2008 AREVA
Presentation
Necessary product Grease MOBILPLEX 47 or MOBILUX EP3 (screws greasing)
Necessary AREVAtools
List of the AREVA tools necessary for the installing :
Mark Diagram Designation Number
(1) Lifting strap 1
(6) Lever 1
Lifting equipment Provide an appropriate lifting equipment (300 daN).
Process The table below gives the steps of installing the operating device on thepole--support :
Step Topic Page
A Preparing the operating device 2
B Preparing the pole operating shaft 3
C Coupling the operating device 5
D Fastening the operating device 7
ERemoving the blocking tool
9
F Low voltage electrical wiring 10
G Permanent heating system 11
-
Installation
Installing the operating device
L31--7801EN/012/12
03--2008 AREVA
Preparing the operating device
Unpacking Remove packaging protection and check that operating device and polereference numbers are the right ones.
Optical signalizations Check the position of operating device optical signalization :
Circuit--breakerOpen
Closing springReleased
Necessarycomponents
List of the AREVA components necessary for the operation :
Mark Diagram Designation Number
(11) Seal 1
(22) Spacer 4
Installing thenecessarycomponents
-- Install the spacers (22) on the screws (9) outside the operating device.
-- Install the seal (11) on the operating shaft (13).
-- Check the presence of grease (ASEOL 0--365.2) on the operating shaft(13).
13
x 49
22
11
-
Installation
Installing the operating device
L31--7801EN/013/12
03--2008 AREVA
Preparing the pole operating shaft
Introduction The pole is equipped -- for transport purposes -- with a blocking tool (4) anda safety sheet metal (5) fixed temporarily at the end of the sleeve (12).To realize the installing of the operating mechanism, it is necessary to :a -- remove the blocking tool (4) and the safety sheet metal (5)b -- proceed to manual opening the polec -- install the blocking tool (4) (open position)
4
7
12
5
4
Grease Check the presence of grease (ASEOL 0--365.2) on the pole operating shaft.
Continued on next page.
-
Installation
Installing the operating device
L31--7801EN/014/12
03--2008 AREVA
Preparing the pole operating shaft, continued
Manual openingoperation
The table below gives the steps of manual opening operation :
Step Action Diagram
1 Remove the blocking tool(4) and the safety sheetmetal (5) then screw thelever (6) on the flange of thesleeve (12).
12
4
5
6
2 With the help of the lever (6),effect a 60 rotation of thesleeve (12).
6
12
3 Put back the blocking tool(4) on the flange of thesleeve (12).
NOTE : This tool ensurethe angular positioning ofpole operating shaftduring the coupling withthe operating mechanism.
6
412
4
M10
4 Remove the lever (6).
-
Installation
Installing the operating device
L31--7801EN/015/12
03--2008 AREVA
Coupling the operating device
Necessarycomponents
List of the AREVA components necessary for the operation :
Mark Diagram Designation Number
(10)Washer
M204
(22) Spacer 1
(26) Spacer 1
(23) Eccentric spacer 2
(14)Nut
H M204
(24) Wedge (thickness 1 mm) 1
(25) Wedge (thickness 0,5 mm) 2
Continued on next page.
-
Installation
Installing the operating device
L31--7801EN/016/12
03--2008 AREVA
Coupling the operating device, continued
Coupling The table below gives the steps of the operating device coupling :
Step Action
1 Sling the operating device using a lifting strap (1) like diagram.
NOTE : Do not remove the roof (17) of the operating devicebefore slinging.
2 Lift the operating device and make this level.Approximate weight 300 kg.
3 Approach the operating device in assembly position, the jib of thelifting equipment must be under the stress--shields ring (to avoid thatthe cables touch the stress--shields ring).
The final approach must be done with extreme caution.
4 Introduce the operating mechanism shaft (13) into the cylinder (12)of the pole operating shaft (7).
5 As soon as the lower fastening screw (9) A emerge from the holeof the operating mechanism support (8), install the spacer (26),washer (10) and the nut (14).
NOTE : Do not tighten the nut (14).
17
12
13
8
A
8
1
14
9
10
26
-
Installation
Installing the operating device
L31--7801EN/017/12
03--2008 AREVA
Fastening the operating device
Installingthe fastening nuts
The table below gives the steps of installing the operating device fasteningnuts :
Step Action
1 Install the spacer (22), washer (10) and the nut (14) on the lowerfastening screw B.
NOTE : Do not tighten the nut (14).
2 Install the eccentric spacers (23), washers (10) and the nuts (14) onthe upper fastening screws C and D.
NOTE : Do not tighten the nuts (14).
3 Rotate the eccentric spacers (23) to do the contact with the loweredge of the pole--support oblong holes.
4 Tighten -- temporarily at the indicated tightening torque -- thefastening screws (9).
22x 1
23
10
14
x 2
10
14
23
5 daN.m
9
B
CD
Continued on next page.
-
Installation
Installing the operating device
L31--7801EN/018/12
03--2008 AREVA
Fastening the operating device, continued
Wedgingand tightening
The table below gives the wedging procedure for the fastening screwsdepending to the X play :
X
22
20Important
35 daN.m
2425
If the X play is ... Action
X
-
Installation
Installing the operating device
L31--7801EN/019/12
03--2008 AREVA
Removing the blocking tool
Process REMOVE THE BLOCKING TOOL (4).
4
-
Installation
Installing the operating device
L31--7801EN/0110/12
03--2008 AREVA
Low voltage electrical wiring
Process Connect up the operating devices wires refer to the wiring diagram of thecircuit--breaker.Connect up the operating devices wires.
NOTE : Use the holes provided on the supports of the frame to fixthe cables.
Connecting up thecontact densimetercable
Connect the wires from the electrical contact SF6 densimeter (18) cable (19)to the operating mechanism terminal block, in accordance with the relativediagram.
18
19
-
Installation
Installing the operating device
L31--7801EN/0111/12
03--2008 AREVA
Permanent heating system
Process Switch on the permanent heating system of the operating device (in bothsummer and winter) to avoid condensation, and the corrosion which mightresult from this.
DO NOT SUPPLY THE OPERATING MECHANISM MOTOR WITHCURRENT TO AVOID THE CLOSING SPRING BEING RELOADED.THE CIRCUIT BREAKER MU