¹ txdot roadway projects in travis county fy 2015 - fy...

1
Austin Pflugerville Lakeway Lago Vista Manor Mustang Ridge Bee Cave Jonestown Webberville Creedmoor West Lake Hills Briarcliff Villiage of Volente Sunset Valley Point Venture Village of The Hills Rollingwood San Leanna T-40 T-15 T-19 T-11 T-10 T-44 T-3 T-13 T-18 T-58 T-31 T-17 T-14 T-55 T-56 T-32 T-4 T-48 T-5 T-8 T-30 T-54 T-50 T-1 T-6 T-2 T-47 T-46 T-52 T-41 T-21 T-9 T-51 T-12 T-49 T-33 T-7 T-20 T-16 T-42 T-43 T-34 T-45 T-59 T-57 T-53 T-36 § ¨ ¦ 35 £ ¤ 290 £ ¤ 290 £ ¤ 290 U V 130 U V 1 U V 71 U V 360 U V 45 U V 275 U V 343 U V 111 U V 212 U V 95 U V 165 U V 343 U V 45 U V 275 U V 71 620 969 1431 734 973 2244 2222 812 2769 1100 1625 3177 2322 2304 1826 1626 685 1325 1825 12 962 973 973 1325 ¹ TxDOT Roadway Projects in Travis County FY 2015 - FY 2018 Llano Travis Lee Burnet Mason Hays Gillespie Bastrop Williamson Blanco Caldwell 0 4 8 12 16 2 Miles * Year: Ready-to-Let Date Austin District Counties Project Type Bridge Project Resurfacing Add Pavement Width Safety and Signalization New/Expanded Roadway Other * Bike accommodation is represented by different color of Map ID (Ex: ) Bike Accommodation Bicycle/Pedestrian Only Facility Wide Curb Lane 4'-8' Shoulder 10' Shoulder Other or N/A Data Source: Texas Department of Transportation As of March 21, 2014 Created by: Texas A&M Transportation Institute ¬ « 45 T-19 Map ID Hwy Description of Work Information Relating to Bicycles Year* Project Cost T-1 IH 35 MILL, SEAL & THIN OVERLAY FRONTAGE ROADS No shoulder exists and will remain 2016 $ 1,687,296 NA LP 275 IMPROVE TRAFFIC SIGNAL No change to roadway 2015 $ 118,944 T-2 IH 35 REPAIR,MILL,SEAL&THIN OVERLAY MAINLANES Bikes not permitted on mainlanes 2016 $ 2,482,478 NA IH 35 IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 100,973 NA IH 35 IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 237,278 NA IH 35 IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 257,691 NA IH 35 IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 385,311 NA IH 35 IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 105,009 T-3 IH 35 MILL, SEAL & THIN OVERLAY FRT ROADS No shoulder exists and will remain; 6'-10' sidewalks 2015 $ 4,056,000 T-4 IH 35 MILL, SEAL AND INLAY ON MAINLANES Bikes not permitted on mainlanes 2017 $ 16,777,000 T-5 IH 35 MILL, SEAL, & OVERLAY FRONTAGE ROADS Existing 0'-2' shoulders to remain 2015 $ 2,072,041 T-6 US 290 TOLLED FREEWAY WITH FRONTAGE ROADS Project still under development (CTRMA) 2018 $650,000,000 T-7 US 290 ADD CENTER TURN LANE & PAVED SHOULDERS Propose to narrow lanes and try to stripe a shoulder 2016 $ 1,330,100 T-8 US 290 MILL, SEAL & OVERLAY FRONTAGE ROADS Propose to narrow lanes and try to stripe a shoulder 2015 $ 2,915,400 T-9 LP 343 MILL, SEAL AND INLAY Propose to narrow lanes and try to stripe a shoulder 2017 $ 430,100 T-10 LP 360 PAVEMENT REPAIR, SEAL & OVERLAY Existing 10' shoulder to remain 2016 $ 2,447,300 T-11 LP 360 SEAL AND THIN OVERLAY Existing 10' shoulder to remain; propose to narrow lanes and try to add small shoulder to right turn lane 2017 $ 1,343,500 T-12 US 183 REPAIR,MILL,SEAL&OVERLAY FRT RDS No shoulder or sidewalks exist and will remain 2016 $ 2,348,786 NA US 183 IMPROVE TRAFFIC SIGNAL No change to roadway 2015 $ 112,850 T-13 US 183 TOLLED FREEWAY WITH FRONTAGE ROADS Proposed shared use path on one side; sidewalk on other side (CTRMA) 2015 $273,200,001 T-14 US 183 CONSTRUCT TOLL FREEWAY W/ FRONTAGE ROADS Proposed shared use path on one side; sidewalk on other side (CTRMA) 2016 $172,700,000 T-15 US 183 OVERLAY Existing 2'-10' shoulder to remain 2017 $ 976,593 T-16 US 183 WIDEN BRIDGE AND INSTALL LEFT TURN LANE Existing 10' shoulder to remain 2016 $ 341,500 T-17 US 183 TOLLED FREEWAY WITH FRONTAGE ROADS Proposed shared use path on one side; sidewalk on other side (CTRMA) 2015 $114,507,649 T-18 SH 71 WIDEN ROADWAY AND CONSTRUCT OVERPASS Proposed 10' shared use path where possible; otherwise 10' shoulders with 6' sidewalks 2014 $ 99,600,000 T-19 RM 3238 ADD SHOULDERS AND LEFT TURN LANE Proposed 4' shoulders 2015 $ 1,485,000 T-20 SH 71 TOLLED FREEWAY WITH FRONTAGE ROADS Project still under development (CTRMA) 2018 $ 53,100,001 T-21 SH 71 SEAL & OVERLAY Proposed X' shoulders 2016 $ 498,056 NA FM 685 IMPROVE TRAFFIC SIGNAL No change to roadway 2015 $ 150,640 T-22 VA FY 2015 SITE-SPECIFIC SIGNALS No change to roadway 2015 $ 1,095,690 T-23 VA FY 2015 NON-SITE SPECIFIC SIGNALS No change to roadway 2015 $ 1,632,613 T-24 VA NON-SITE SPECIFIC ITS MAINTENANCE No change to roadway 2015 $ 1,109,963 T-25 VA FY 2015 SIGNING No change to roadway 2015 $ 554,982 T-26 VA FY 2016 SITE-SPECIFIC SIGNALS No change to roadway 2016 $ 1,139,518 T-27 VA FY 2016 NON-SITE SPECIFIC SIGNALS No change to roadway 2016 $ 1,697,918 T-28 VA INSTALL BICYCLE TRAFF SIGNAL/DETECT Bicycle signal/detection 2016 $ 250,000 T-29 VA ADD BIKE LANE STRIPING & CONST WALKIN Add bike lane 2014 $ 125,000 T-30 CR REHABILITATE BRIDGE AND APPROACHES No shoulder exists and will remain 2017 $ 450,000 T-31 CS REHABILITATE BRIDGE AND APPROACHES Proposed 3' shoulder minimum 2016 $ 550,000 T-32 CS CONSTRUCT BIKE/PEDESTRIAN TRAIL Proposed bike/ped trail 2015 $ 2,300,000 T-33 CR REPLACE BRIDGE AND APPROACHES Project under development; possible 4' shoulder 2017 $ 700,000 T-34 CR REHABILITATE BRIDGE AND APPROACHES Proposed 3' minimum shoulder 2016 $ 200,000 T-35 VA CONSTRUCT CONCRETE SHARED USE PATH Proposed 10' minimum shared use path 2016 $ 2,760,500 NA CS IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 188,412 T-36 CS PRELIMINARY ENGINEERING & DESIGN Proposed bike lanes and sidewalks 2014 $ 700,000 T-37 VA LANDSCAPING & IRRIGATION No change to roadway 2016 $ 310,000 T-38 VA SEAL COAT No change 2018 $ 133,199 T-39 VA RESURFACE ROADS No change 2018 $ 500,000 T-40 FM 969 PROVIDE ADDITIONAL PAVED SURFACE WIDTH Proposed 3' shoulders, no sidewalks 2015 $ 5,575,173 T-41 FM 969 MILL, SEAL & THIN OVERLAY No shoulder exists and will remain 2016 $ 735,764 T-42 FM 969 REHAB ROADWAY; ADD CENTER TURN LANE & SHOULDERS Proposed 4' shoulders and 5' sidewalk 2016 $ 7,740,000 T-43 FM 969 WIDEN ROADWAY Proposed 6' shoulders and 5' sidewalk 2017 $ 5,810,000 T-44 FM 973 FM 973 REALIGNMENT Proposed 10' shoulders and 6' sidewalks 2014 $ 6,865,000 T-45 FM 973 REHAB ROADWAY, ADD 6' SHOULDERS Proposed 6' shoulders, no sidewalks 2014 $ 3,374,067 T-46 SH 45 TOLLED FREEWAY WITH 1-LANE FRONTAGE ROAD Proposed shared use path 2015 $ 88,000,000 T-47 SH 45 MILL, SEAL & THIN OVERLAY Restrip to increase shoulders 2015 $ 875,000 T-48 RM 1431 IMPROVE GUARDRAIL & SAFETY TREAT FIXED OBJ No change to roadway 2016 $ 789,600 T-49 FM 1626 RECONSTRUCT TO 4-LANES WITH CENTER TURN LANE Proposed 5' shoulders 2016 $ 7,903,300 T-50 RM 1826 SEAL & OVERLAY Existing X' shoulders to remain 2017 $ 1,101,949 T-51 FM 1825 FULL DEPTH REPAIR, SEAL & OVERLAY No shoulder exists; lanes cannot be narrowed 2015 $ 395,528 T-52 RM 2222 MILL, SEAL & OVERLAY No shoulder exists; lanes cannot be narrowed 2015 $ 1,017,000 T-53 RM 2222 ADD LEFT TURN & ACCELERATION LANE Proposed 4' shoulder, no sidewalks 2016 $ 1,419,000 T-54 LP 1 SEAL & THIN OVERLAY Existing 8' shoulders to remain 2016 $ 870,600 T-55 LP 1 CONSTRUCT BICYCLE & PEDESTRIAN BRIDGE (PH 1) Proposed 12' minimum width trail and 14' wide pedestrian bridge 2014 $ 2,500,000 T-56 LP 1 OVERLAY FRONTAGE ROADS No shoulder exists and will remain; sidewalk present 2016 $ 1,050,100 T-57 LP 1 CONVERT U-TURN LANE TO U-TURN LEFT No change to current accomodations 2014 $ 150,000 T-58 FM 3177 CONSTRUCT SIDEWALKS Proposed 12' wide pedestrian bridge at Decker Creek and 5' sidewalk 2016 $ 1,912,471 T-59 FM 734 PAVEMENT REPAIR,UNDERSEAL & OVERLAY Existing 4'-10' shoulders will remain 2017 $ 2,891,013 NA FM 734 IMPROVE TRAFFIC SIGNAL No change to roadway 2015 $ 73,345 NA FM 734 IMPROVE TRAFFIC SIGNAL No change to roadway 2015 $ 76,011

Upload: others

Post on 30-Oct-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ¹ TxDOT Roadway Projects in Travis County FY 2015 - FY 2018plans.dot.state.tx.us/pub/txdot-info/aus/bicycle-master-plan/travis.pdfNA LP 275 IMPROVE TRAFFIC SIGNAL No change to roadway

Austin

Pflugerville

Lakeway

Lago Vista

Manor

Mustang Ridge

Bee Cave

Jonestown

Webberville

Creedmoor

West Lake Hills

Briarcliff

Villiage of Volente

Sunset Valley

Point Venture

Village of The Hills

Rollingwood

San Leanna

T-40

T-15

T-19

T-11

T-10

T-44

T-3

T-13

T-18

T-58

T-31

T-17

T-14

T-55

T-56

T-32

T-4

T-48

T-5

T-8

T-30

T-54T-5

0

T-1

T-6

T-2

T-47

T-46

T-52

T-41

T-21

T-9

T-51

T-12

T-49

T-33

T-7

T-20

T-16

T-42T-43

T-34

T-45

T-59

T-57

T-53

T-36

§̈¦35

£¤290

£¤290

£¤290

UV130UV1

UV71

UV360

UV45

UV275

UV343

UV111

UV212

UV95

UV165UV343

UV45

UV275

UV71

620

969

1431

734

973

2244

2222

812

2769

1100

1625

3177

2322

23041826

1626

68513251825

12

962

973

973

1325

¹ TxDOT Roadway Projects in Travis CountyFY 2015 - FY 2018

Llano

Travis Lee

BurnetMason

Hays

GillespieBastrop

Williamson

Blanco

Caldwell0 4 8 12 162Miles

* Year: Ready-to-Let Date

Austin District Counties

Project TypeBridge Project

Resurfacing

Add Pavement Width

Safety and Signalization

New/Expanded Roadway

Other

* Bike accommodation is represented by different color of Map ID (Ex: )Bike AccommodationBicycle/Pedestrian Only FacilityWide Curb Lane4'-8' Shoulder10' ShoulderOther or N/A

Data Source: Texas Department of TransportationAs of March 21, 2014

Created by: Texas A&M Transportation Institute

¬«45

T-19

Map ID Hwy Description of Work Information Relating to Bicycles Year* Project CostT-1 IH 35 MILL, SEAL & THIN OVERLAY FRONTAGE ROADS No shoulder exists and will remain 2016 $ 1,687,296 NA LP 275 IMPROVE TRAFFIC SIGNAL No change to roadway 2015 $ 118,944 T-2 IH 35 REPAIR,MILL,SEAL&THIN OVERLAY MAINLANES Bikes not permitted on mainlanes 2016 $ 2,482,478 NA IH 35 IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 100,973 NA IH 35 IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 237,278 NA IH 35 IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 257,691 NA IH 35 IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 385,311 NA IH 35 IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 105,009 T-3 IH 35 MILL, SEAL & THIN OVERLAY FRT ROADS No shoulder exists and will remain; 6'-10' sidewalks 2015 $ 4,056,000 T-4 IH 35 MILL, SEAL AND INLAY ON MAINLANES Bikes not permitted on mainlanes 2017 $ 16,777,000 T-5 IH 35 MILL, SEAL, & OVERLAY FRONTAGE ROADS Existing 0'-2' shoulders to remain 2015 $ 2,072,041 T-6 US 290 TOLLED FREEWAY WITH FRONTAGE ROADS Project still under development (CTRMA) 2018 $650,000,000 T-7 US 290 ADD CENTER TURN LANE & PAVED SHOULDERS Propose to narrow lanes and try to stripe a shoulder 2016 $ 1,330,100 T-8 US 290 MILL, SEAL & OVERLAY FRONTAGE ROADS Propose to narrow lanes and try to stripe a shoulder 2015 $ 2,915,400 T-9 LP 343 MILL, SEAL AND INLAY Propose to narrow lanes and try to stripe a shoulder 2017 $ 430,100

T-10 LP 360 PAVEMENT REPAIR, SEAL & OVERLAY Existing 10' shoulder to remain 2016 $ 2,447,300 T-11 LP 360 SEAL AND THIN OVERLAY Existing 10' shoulder to remain; propose to narrow lanes and try to

add small shoulder to right turn lane 2017 $ 1,343,500 T-12 US 183 REPAIR,MILL,SEAL&OVERLAY FRT RDS No shoulder or sidewalks exist and will remain 2016 $ 2,348,786 NA US 183 IMPROVE TRAFFIC SIGNAL No change to roadway 2015 $ 112,850

T-13 US 183 TOLLED FREEWAY WITH FRONTAGE ROADS Proposed shared use path on one side; sidewalk on other side (CTRMA) 2015 $273,200,001

T-14 US 183 CONSTRUCT TOLL FREEWAY W/ FRONTAGE ROADS Proposed shared use path on one side; sidewalk on other side (CTRMA) 2016 $172,700,000

T-15 US 183 OVERLAY Existing 2'-10' shoulder to remain 2017 $ 976,593 T-16 US 183 WIDEN BRIDGE AND INSTALL LEFT TURN LANE Existing 10' shoulder to remain 2016 $ 341,500 T-17 US 183 TOLLED FREEWAY WITH FRONTAGE ROADS Proposed shared use path on one side; sidewalk on other side

(CTRMA) 2015 $114,507,649

T-18 SH 71 WIDEN ROADWAY AND CONSTRUCT OVERPASS Proposed 10' shared use path where possible; otherwise 10' shoulders with 6' sidewalks 2014 $ 99,600,000

T-19 RM 3238 ADD SHOULDERS AND LEFT TURN LANE Proposed 4' shoulders 2015 $ 1,485,000 T-20 SH 71 TOLLED FREEWAY WITH FRONTAGE ROADS Project still under development (CTRMA) 2018 $ 53,100,001 T-21 SH 71 SEAL & OVERLAY Proposed X' shoulders 2016 $ 498,056 NA FM 685 IMPROVE TRAFFIC SIGNAL No change to roadway 2015 $ 150,640

T-22 VA FY 2015 SITE-SPECIFIC SIGNALS No change to roadway 2015 $ 1,095,690 T-23 VA FY 2015 NON-SITE SPECIFIC SIGNALS No change to roadway 2015 $ 1,632,613 T-24 VA NON-SITE SPECIFIC ITS MAINTENANCE No change to roadway 2015 $ 1,109,963 T-25 VA FY 2015 SIGNING No change to roadway 2015 $ 554,982 T-26 VA FY 2016 SITE-SPECIFIC SIGNALS No change to roadway 2016 $ 1,139,518 T-27 VA FY 2016 NON-SITE SPECIFIC SIGNALS No change to roadway 2016 $ 1,697,918 T-28 VA INSTALL BICYCLE TRAFF SIGNAL/DETECT Bicycle signal/detection 2016 $ 250,000 T-29 VA ADD BIKE LANE STRIPING & CONST WALKIN Add bike lane 2014 $ 125,000 T-30 CR REHABILITATE BRIDGE AND APPROACHES No shoulder exists and will remain 2017 $ 450,000 T-31 CS REHABILITATE BRIDGE AND APPROACHES Proposed 3' shoulder minimum 2016 $ 550,000 T-32 CS CONSTRUCT BIKE/PEDESTRIAN TRAIL Proposed bike/ped trail 2015 $ 2,300,000 T-33 CR REPLACE BRIDGE AND APPROACHES Project under development; possible 4' shoulder 2017 $ 700,000 T-34 CR REHABILITATE BRIDGE AND APPROACHES Proposed 3' minimum shoulder 2016 $ 200,000 T-35 VA CONSTRUCT CONCRETE SHARED USE PATH Proposed 10' minimum shared use path 2016 $ 2,760,500 NA CS IMPROVE TRAFFIC SIGNAL No change to roadway 2014 $ 188,412

T-36 CS PRELIMINARY ENGINEERING & DESIGN Proposed bike lanes and sidewalks 2014 $ 700,000 T-37 VA LANDSCAPING & IRRIGATION No change to roadway 2016 $ 310,000 T-38 VA SEAL COAT No change 2018 $ 133,199 T-39 VA RESURFACE ROADS No change 2018 $ 500,000 T-40 FM 969 PROVIDE ADDITIONAL PAVED SURFACE WIDTH Proposed 3' shoulders, no sidewalks 2015 $ 5,575,173 T-41 FM 969 MILL, SEAL & THIN OVERLAY No shoulder exists and will remain 2016 $ 735,764 T-42 FM 969 REHAB ROADWAY; ADD CENTER TURN LANE & SHOULDERS Proposed 4' shoulders and 5' sidewalk 2016 $ 7,740,000 T-43 FM 969 WIDEN ROADWAY Proposed 6' shoulders and 5' sidewalk 2017 $ 5,810,000 T-44 FM 973 FM 973 REALIGNMENT Proposed 10' shoulders and 6' sidewalks 2014 $ 6,865,000 T-45 FM 973 REHAB ROADWAY, ADD 6' SHOULDERS Proposed 6' shoulders, no sidewalks 2014 $ 3,374,067 T-46 SH 45 TOLLED FREEWAY WITH 1-LANE FRONTAGE ROAD Proposed shared use path 2015 $ 88,000,000 T-47 SH 45 MILL, SEAL & THIN OVERLAY Restrip to increase shoulders 2015 $ 875,000 T-48 RM 1431 IMPROVE GUARDRAIL & SAFETY TREAT FIXED OBJ No change to roadway 2016 $ 789,600 T-49 FM 1626 RECONSTRUCT TO 4-LANES WITH CENTER TURN LANE Proposed 5' shoulders 2016 $ 7,903,300 T-50 RM 1826 SEAL & OVERLAY Existing X' shoulders to remain 2017 $ 1,101,949 T-51 FM 1825 FULL DEPTH REPAIR, SEAL & OVERLAY No shoulder exists; lanes cannot be narrowed 2015 $ 395,528 T-52 RM 2222 MILL, SEAL & OVERLAY No shoulder exists; lanes cannot be narrowed 2015 $ 1,017,000 T-53 RM 2222 ADD LEFT TURN & ACCELERATION LANE Proposed 4' shoulder, no sidewalks 2016 $ 1,419,000 T-54 LP 1 SEAL & THIN OVERLAY Existing 8' shoulders to remain 2016 $ 870,600 T-55 LP 1 CONSTRUCT BICYCLE & PEDESTRIAN BRIDGE (PH 1) Proposed 12' minimum width trail and 14' wide pedestrian bridge 2014 $ 2,500,000 T-56 LP 1 OVERLAY FRONTAGE ROADS No shoulder exists and will remain; sidewalk present 2016 $ 1,050,100 T-57 LP 1 CONVERT U-TURN LANE TO U-TURN LEFT No change to current accomodations 2014 $ 150,000 T-58 FM 3177 CONSTRUCT SIDEWALKS Proposed 12' wide pedestrian bridge at Decker Creek and 5'

sidewalk 2016 $ 1,912,471 T-59 FM 734 PAVEMENT REPAIR,UNDERSEAL & OVERLAY Existing 4'-10' shoulders will remain 2017 $ 2,891,013 NA FM 734 IMPROVE TRAFFIC SIGNAL No change to roadway 2015 $ 73,345 NA FM 734 IMPROVE TRAFFIC SIGNAL No change to roadway 2015 $ 76,011