000mwork hours: 8am-5pm - stanford university · 2014. 10. 24. · southwest neighborhood update...

2

Upload: others

Post on 20-Jul-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 000mWork Hours: 8am-5pm - Stanford University · 2014. 10. 24. · SOUTHWEST NEIGHBORHOOD UPDATE 10/27/2014 - 10/31/2014 \376\377\000H\000E\000A\000D\000S\000 \000U\000P\000 \000i\000s\000
elandy
Rectangle
elandy
Group
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Polygon
elandy
Polygon
elandy
Rectangle
elandy
Polygon
elandy
Polygon
elandy
Polygon
elandy
Polygon
elandy
Polygon
elandy
Polygon
elandy
Polygon
elandy
Rectangle
elandy
Rectangle
elandy
Text Box
SOUTHWEST NEIGHBORHOOD UPDATE 10/27/2014 - 10/31/2014
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Text Box
408 PANAMA MALL
elandy
Rectangle
elandy
Text Box
HEADS UP is produced by the Stanford University Department of Project Management. For more information on our projects, visit our website: HEADSUP.stanford.edu Thank you in advance for your understanding and cooperation.
elandy
Rectangle
elandy
Text Box
PARKING STRUCTURE 10
elandy
Group
elandy
Group
elandy
Group
elandy
Rectangle
elandy
Rectangle
elandy
Text Box
ROBLE GYM RENOVATION
elandy
Group
elandy
Rectangle
sjlouie
Text Box
Project Contacts: Sandy Louie, Project Engineer, [email protected] Mark Bonino, Project Manager, [email protected]
sjlouie
Text Box
Project Contacts: Jasmine McMahon, Project Engineer, [email protected] Mark Bonino, Project Manager, [email protected]
syuen23
Text Box
Work Hours: 8am-5pm
syuen23
Text Box
Work Hours: 8am-5pm
syuen23
Text Box
Work Hours: 8am-5pm
• Shoring steel delivery will be done early next week.
Text Box
• Current excavation depth is 30-35 feet • Dirt off-haul through end of the year • Installation of tie backs continues • Use caution and obey traffic control around the work site
sjlouie
Text Box
• Seismic retrofit work continues at roof; expect drilling noise and hand tools during this activity • Utility infrastructure work continues inside the job site. • No impacts to Santa Teresa or Panama Streets are anticipated 10/27-31
sjlouie
Text Box
• Installation of cable tie backs begins 10/27 - 10/31 • No dirt off-haul is planned 10/27 - 10/31 • Use caution and obey traffic control around the work site
sjlouie
Text Box
Project Contacts: Sandy Louie, Project Engineer, [email protected] Mark Bonino, Project Manager, [email protected]
syuen23
Image
Page 2: 000mWork Hours: 8am-5pm - Stanford University · 2014. 10. 24. · SOUTHWEST NEIGHBORHOOD UPDATE 10/27/2014 - 10/31/2014 \376\377\000H\000E\000A\000D\000S\000 \000U\000P\000 \000i\000s\000
elandy
Rectangle
elandy
Group
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Polygon
elandy
Polygon
elandy
Rectangle
elandy
Polygon
elandy
Polygon
elandy
Polygon
elandy
Polygon
elandy
Polygon
elandy
Polygon
elandy
Polygon
elandy
Rectangle
elandy
Rectangle
elandy
Text Box
SOUTHWEST NEIGHBORHOOD UPDATE 10/27/2014 - 10/31/2014
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Rectangle
elandy
Text Box
HEADS UP is produced by the Stanford University Department of Project Management. For more information on our projects, visit our website: HEADSUP.stanford.edu Thank you in advance for your understanding and cooperation.
elandy
Rectangle
elandy
Text Box
BUILDING 520 RENOVATION
elandy
Rectangle
sjlouie
Text Box
Project Contacts: Svjetlana Radovic, Project Engineer, [email protected] Wayne Kelly, Project Manager, [email protected]
syuen23
Image
elandy
Rectangle
syuen23
Text Box
NEW RESIDENCES AT LAGUNITA COURT
syuen23
Text Box
Project Contacts: Ethan Landy, Project Engineer, [email protected] Mike Mithen, Project Manager, [email protected]
syuen23
Text Box
Work Hours: 6am-3:30pm
syuen23
Text Box
Work Hours: 8am-5pm
sjlouie
Text Box
• Preparations for tree relocations and removals • Parking lots L-29 (Lagunita Lot) & L-31 (Roble Lot) remain closed
syuen23
Text Box
• Demolition of mezzanine level & trusses continues • Concrete foundation pour at courtyard on Panama Mall • General layout of roof trusses
elandy
Group
syuen23
Rectangle
syuen23
Text Box
SANTA TERESA BIKE IMPROVEMENTS
syuen23
Text Box
• Grading and concrete formwork on north side of Santa Teresa through end of October or early November; please use sidewalks on south side of Santa Teresa during this time. • After restoration of sidewalk on north side of Santa Teresa, concrete demolition on south side of Santa Teresa will begin.
syuen23
Text Box
Project Contact: Kelly Rohlfs, Project Manager, [email protected]
syuen23
Text Box
Work Hours: 8am-4:30pm