  • 8/9/2019 01 40 00 - Quality Requirements

    1/27

    Toronto Transit

    Commission

    CONTRACT A29-1

    ection

    01

    40 00

    QUALITY REQUIREMENTS

    Page 1

    1 DEFINITIONS

    1 1 Quality Assurance (QA): All planned and systematic activities implemented within the

    Quality Program and demonstrated as needed, to provide adequate confidence that

    Products or services will fulfill the contractual requirements for quality.

    1.2 Quality Control (QC): Operational techniques and activities that are used to fulfill

    requirements for quality.

    1.3 Quality Manual: A document setting out the scope

    of

    the TYSSE Quality Management

    Program including instructions for those sections that must be included in Quality Plans

    1.4 Quality Plan: A document setting out the specific quality practices, resources and

    sequence of activities relevant to the Contract.

    1.5 Quality Program: The co-ordinated execution of applicable QA and QC plan s

    and

    activities

    for a project.

    2 CONTRACTOR S QUALITY PROGRAM

    2 1

    The Contractor shall provide a Quality Program comprising Quality Control

    and

    Quality

    Assurance planning, implementation and record keeping. The Quality Program shall

    address all phases of the Work, including temporary works design and construction,

    materials procurement

    and

    construction.

    2 2

    . 1

    2

    The Quality Program shall include the following principles:

    The required quality and the means of achieving it shall be defined

    All units of the organization and subcontractors working

    on

    the Project shall

    be

    committed

  • 8/9/2019 01 40 00 - Quality Requirements

    2/27

    Section 1 40 00

    QUALITY REQUIREMENTS

    Page

    Toronto Transit Commission

    CONTRACT A29 1

    .12 Changes to Quality Program items, processes, and practices shall be documented,

    controlled and acceptable to the Commission s Representative .

    . 13 Essential records, including records required by the Contract shall be maintained; and

    .14 Periodic assessment of the Quality Assurance program effectiveness shall be conducted by

    the Contractor s management team.

    2.3 The Contractor s Quality Program shall be described in a Quality Plan in a manner

    generally consistent with the IS09001: 2000 Quality System model.

    2.4 At a minimum each Contractor s Quality Plan shall include the following categories

    describing the Contractor s commitment to and procedures covering:

    1 Quality Management System:

    1 Document Control.

    2

    Management responsibility:

    1 Management Commitment.

    2

    Customer Focus .

    .3 Quality Planning .

    .4 Responsibility, Authority, Communication .

    .3 Resource Management:

    1

    Provision o Resources

    .2 Human Resources .

    .3 Infrastructure

  • 8/9/2019 01 40 00 - Quality Requirements

    3/27

    Toronto Transit Commission

    CONTRACT A29 1

    Section

    1 4

    QUALITY REQUIREMENTS

    agel

    2.5 The Contractor's deliverables under the Quality Program shall include, but not

    be

    limited to,

    the following services and deliverables. Work is not to start on Site until

    such

    time that

    these Documents have been submitted to the satisfaction of the Commission's

    Representative

    . 1 A Quality Plan written specifically and utilized by the Contractor for the Project.

    2 An

    Inspection and Testing Plan covering all activities, (including materials sampling,

    development of mock-ups and testing) for which Quality Control is required .

    .3 Quality Control Inspection, surveillance, monitoring and clear documentation th t the Work

    is provided

    in

    conformance with the Contract and the Quality Plan .

    .4 Specifying the appropriate level of accepted standards (ISO, CSA, ASTM, etc.)

    programs/requirements to be implemented during provision

    of

    the Work where these are

    not defined in the Contract Documents

    .5 Communicating all deviations from the Quality Plan to the Commission's Represer.tative as

    they occur and following up with corrective actions

    .6 Carrying out on Site inspections, monitoring and reviewing the quality of workmanship,

    reviewing materials testing and Inspection reports, undertaking required surveying,

    measuring, and verification of materials and construction methods to ensure conformance

    with the Contract Documents

    .7 Notifying the Commission's Representative of any deficiencies

    in

    the Work identified by the

    Contractor's quality control inspection, monitoring and reviews, and the resolutions

    proposed or implemented

    in

    each case.

    2.6 Within thirty (30) business days of the Notification of Award, the Contractor shal l submit in

  • 8/9/2019 01 40 00 - Quality Requirements

    4/27

    Section

    01

    40 00

    Toronto

    Transit Commission

    CONTRACT A29-1

    UALITY REQUIREMENTS

    Page4

    2.10 The Contractor shall carry out Work planning, implementation and measurement activities

    in accordance with procedures and Work instructions where these are components

    of

    the

    Quality Plan. The Contractor shall evaluate all construction Work activities (including safety

    and environmental protection components) and ascertain whether written procedures and

    Work instructions are necessary to control these activities

    in

    order to assure that the

    Contract requirements will be met

    3 WORK METHOD STATEMENTS

    3 1

    Submit a Work Method Statement (WMS) for each major activity. Submit the Work Method

    Statement (WMS) at least twenty-one (21) days prior to the commencement of Work

    affected by the WMS, to the Commission s Representative for review and comment.

    3 2

    1

    2

    3

    4

    5

    6

    7

    The Work Method Statement shall include the following items:

    Outline

    of

    a safe method of Work for a specific job as a means

    of

    planning and controlling

    the Work.

    Hazard identification and control.

    Schedule of Work

    Material details including hazardous details - certificates, MSDS

    Equipment details and maintenance - certificates

    Personnel and workforce details of persons responsible, training requirements, etc

    Quality- Inspection and Test Plan (ITP) and relevant checklists .

  • 8/9/2019 01 40 00 - Quality Requirements

    5/27

    Toronto Transit Commission

    CONTRACT A29 1

    Section 01 4 00

    QUALITY REQUIREMENTS

    PageS

    4 QUALITY MANAGER AND QUALITY CONTROL PERSONNEL

    4 1 The Contractor shall appoint a full time Quality Manager for the Contract. Submit Quality

    Manager qualifications for review

    by

    the Commission. The duties of the Quality Manager

    are independent

    of

    and play no role in the Work production to which Quality Control

    activities are applied. The Quality Manager shall be empowered to carry out duties and to

    require conformance to the quality standards and requirements set out in the Contract

    Documents. The Quality Manager shall not be a subordinate to the Construction

    Manager/Superintendent

    4.2 The Quality Manager shall have approximately ten {10} years relevant experience in

    carrying out a similar role

    on

    projects of equivalent scope to the satisfaction

    of

    the

    Commission s Representative.

    4.3 Quality Control personnel shall

    be

    independent

    of

    production personnel.

    4.4 The Quality Manager is a key liaison person with the Commission s Representative on all

    matters pertaining to quality requirements on the Contract.

    5 AUDIT AND SURVEILLANCE OF QUALITY PROGRAM AND WORK

    5 1 All Contractor quality management activities on the Contract, as well as those Q activities

    undertaken by sub-consultants, Subcontractors, suppliers, manufacturers and fabricators

    working on behalf of the Contractor, are subject to auditing and surveillance by the

    Commission s Representative. Co-operate with the Commission s Representative

    undertaking these activities, including providing access to all Work areas (suppliers/storage,

    off site manufacturing and fabrication,

    on

    Site construction) and provision

    of all

    requested

    quality related documentation (e.g. supplier s/manufacturer s specifications, standards and

    operations/maintenance manuals, test results, QC inspection and surveillance reports).

  • 8/9/2019 01 40 00 - Quality Requirements

    6/27

  • 8/9/2019 01 40 00 - Quality Requirements

    7/27

    Toronto Transit Commission

    CONTRACT

    A29 1

    Section

    14

    QUALITY REQUIREMENTS

    Page7

    7.2 The Contractor shall carry out all inspection and testing as required by the Contract

    Documents, statutes, regulations, by-laws, standards or codes

    or

    any other jurisdictional

    authority. Provide appropriate information

    in

    the Inspection and Test Plan and give the

    Commission's Representative timely notice of the readiness for inspection,

    d te

    and time

    for such inspection for attendance and witnessing by the Commission's Representative.

    The attendance by the Commission's Representative or his agents at inspection and

    witness points shall be as determined by the Commission's Representative. Non

    attendance by the Commission's Representative at quality control inspection points shall

    not be construed to indicate acceptance of the Work.

    7.3 The Contractor shall engage an independent testing company to carry

    out

    all field and

    laboratory quality control and assurance tests. The independent testing company shall

    maintain current certification by CCIL (Canadian Council of Independent Laboratories)

    and/or CSA (Canadian Standards Association), or other testing company s appropriate to

    the testing performed.

    7.4 Personnel conducting field sampling and field and laboratory tests shall carry current

    personal certification from a Canadian certifying authority appropriate to the testing being

    performed.

    7.5 As a minimum all inspection and testing shall be in accordance with City of Toronto

    Inspector Frequency appended to this Section as Section 01 40 00 Appendix. The

    Contractor shall

    be

    responsible for all Inspector,

    QA

    Consultant, Project Engineer and

    Manager Roles as defined

    in

    this document as part of the Contractor's Quality Program.

    7.6 Where required, City of Toronto (City) may perform Inspection for acceptance purposes of

    roadwork and drainage Work on all City property during the Contract. Co-operate with and

    provide sufficient notification to the City, access and assistance as required for City

    inspection personnel to carry out their duties. Provide copies of all materials, testing

    results, engineering certifications and other Quality Control documents related to end

  • 8/9/2019 01 40 00 - Quality Requirements

    8/27

    Section 1 40 00

    QUALITY REQUIREMENTS

    ageS

    Toronto Transit Commission

    CONTRACT A29 1

    8.2 The method o disposition o any Work that is identified as being in non-conformance with

    the Contract Documents shall be as reviewed and accepted by the Commission's

    Representative, and shall

    be

    subject to segregation, quarantine, marking, tagging, etc., by

    the Contractor, as is necessary to identify it in contrast to acceptable parts o the Work. All

    Work subject to disposition

    o

    Repair , Re-work or Use-as-is action will be reviewed by

    the Commission's Representative and may be released only upon written acceptance by

    the Commission's Representative.

    TEMPORARY WORKS HANDOVER INSPECTION

    9 1 An inspection or inspections at which the Contractor will demonstrate the satisfactory

    condition o all temporary works to

    be

    handed over to others, including safety and security

    arrangements and compliance with all relevant technical specifications, to the

    Commission's Representative in the presence

    o

    the interfacing (receiving) contractor.

    9.2 The Temporary Works Handover Inspection will be arranged by the Commission's

    Representative and will be repeated as necessary to confirm adequate condition o all

    elements o the temporary works being handed over for use by the interfacing contractor or

    from others to the contractor.

    9.3 The Contractor shall inspect all parts o the temporary works to be received from others,

    including inspection and monitoring records, shop drawings and manuals for the use o

    equipment such as jacks, pumps or systems.

    9.4 The Contractor shall correct any defects or inadequate conditions found during the

    inspection(s) to the satisfaction of the Commission's Representative, at no cost to the

    Commission.

    9.5 If the Contractor is receiving an element o temporary works as the interfacing contractor,

    then the Contractor shall attend meetings as necessary and co-operate with the

  • 8/9/2019 01 40 00 - Quality Requirements

    9/27

    Toronto Transit Commission

    CONTRACT A29-1

    Section 01 40 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page 1

    Material

    1 General

    Administration and

    Material

    Management

    Duties for Inspector,

    QA Consultants

    and Project

    Engineers/

    Managers.

    On-site Visual Inspection

    Other Actions

    by

    Inspector

    Frequency of Field QA Test

    Visual

    Other Actions

    Inspection

    by

    QA Consultant

    Min. Field Laboratory QA Test

    Testing Other Actions

    Frequency

    by

    QA Consultant

    Min.

    Laboratory

    Testing

    Frequency

    1. Inspector's Administration

    Inspection Duties on Site:

    and

    Material I 1 Q Consultant's Testing

    Reporting Duties

    on

    Site:

    and I 1 QA Consultant's Administration, Testing

    and Reporting Duties:

    • Visually inspect the quality of materials 1 •

    delivered to site and check the quality of

    work

    in

    preparing the materials.

    • Order field testing from QA consultant

    according to the minimum material testing

    frequencies or as required. Collect

    concrete, HM asphalt, aggregates and

    other materials. delivery tickets from truck

    drivers and record where the materials are

    placed.

    • Document field observations, visual 1 •

    inspection findings and record field test

    results in Inspector's Daily Field Report or

    other field records.

    • Inform the general contractor if the

    1 •

    materials delivered

    to

    site have failed

    to

    meet contract specification

    and

    request the

    general contractor and material suppliers to

    rectify the problems.

    Report attendance

    to

    Inspector

    upon arrival

    on

    site.

    Perform field tests and prepare

    samples as directed by Inspector. •

    Based on the field test results,

    advise Inspector if the concrete,

    HM asphalt, aggregates and 1 •

    other materials meet contract

    specification or not

    Submit preliminary field test

    results

    on

    site

    in

    writing to

    Inspector immediately after

    testing.

    Submit final field test results to

    Project Engineer/Manager in

    writing within 7 working days of

    each field test.

    QA consultant review contractor's

    Form

    A or Form B concrete mix designs for all

    concrete types specified

    in

    contract with

    City Project Engineer/Manager.

    Q

    consultant review contractor's HM

    asphalt mix designs for all HM asphalt

    types specified

    in

    contract with City

    Project Engineer/Manager.

    Q consultant review contractor's

    aggregate (crushed limestone

    and

    recycled concrete) QC data with Project

    Engineer/Manager to check if the QC

    data meet with specification.

    City's Q consultant and City Project

    Engineer/Manager request changes to

    concrete and

    HM

    asphalt mix designs

    and aggregate production to meet

    contract requirement from material

    suppliers if necessary.

    Submit all laboratory test results in

    writing

    to

    Project Engineer/Manager

    within 7 working days of each laboratory

    test.

  • 8/9/2019 01 40 00 - Quality Requirements

    10/27

    Toronto Transit Commission

    CONTRACT A29 1

    Material

    1. General

    Administration

    and Material

    Management

    Duties for

    Inspector, QA

    Consultants

    and Project

    Engineers/

    Managers

    continued.

    On site Visual Inspection

    Other Actions by

    Inspector

    Frequency of Field QA Test

    Visual Other Actions

    Inspection by QA Consultant

    • Recommend rejecting the material, including the entire

    truck load of the material, with

    no

    payment to the rejected

    material to the general contractor if field test results show

    the materials have failed

    to

    meet specification.

    • · Recommend payment adjustment to Project

    Engineer/Manager if deficiencies

    on

    volume, weight and

    thickness occurred.

    • If the failed materials have been placed before remedial

    actions can take effect, identify

    and

    document where the

    failed materials were placed.

    • Instruct the general contractor to remove the areas where

    defective materials were placed.

    • Record observation and report

    in

    writing

    to

    Project

    Engineer/Manager on whether corrective actions

    to

    defective materials had taken place or not

    • Project Engineer/Manager

    and

    Inspector follow

    up

    the

    defective material issues with general contractor

    material suppliers.

    • Based

    on

    the field

    and

    laboratory test results, Inspector

    Project Engineer/Manager instruct the general contractor

    to perform corrective actions. Apply price adjustment to

    defective materials/works according

    to

    contract

    specification where warranted.

    Section 1 4 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page

    Min. Field

    Testing

    Frequency

    Laboratory QA

    Test Other

    Actions

    by QA Consultant

    Min.

    Laboratory

    Testing

    Frequency

    • QA consultant compile all field and

    laboratory test results of

    all

    the

    materials tested

    in

    the contract,

    arrange them according to

    construction locations (station

    numbers) and prepare a QA report

    summarizing the quality of all

    materials used, the in-situ densities

    and core thicknesses achieved in

    the contract.

  • 8/9/2019 01 40 00 - Quality Requirements

    11/27

    Toronto Transit Commission

    CONTRACT A29·1

    On site Visual

    Inspection

    Material

    Other

    Actions

    by

    Inspector

    2 Ready Mixed

    1

    Document

    i

    Concrete.

    concrete truck

    drivers are adding

    water, super

    plasticizer or air

    entrainment agent

    to the load on site

    out prior

    authorization from

    the general

    contractor Project

    Engineer/Manager.

    2 Visually check the

    plasticity o fresh

    concrete at point

    o

    discharge.

    Field

    Q

    Test

    Frequency

    of

    Other Actions

    Visual

    Inspection

    byQ

    Consultant

    Typically the first load o

    1

    Perform air

    the day and every

    entrainment

    second load until

    tests.

    consistency

    s

    attained.

    Random checking

    thereafter.

    Typically the first load

    o

    the day and every

    2

    Perform

    second load until

    slump tests.

    consistency s attained.

    Random checking

    thereafter.

    Section 1 4

    CITY OF

    TORONTO

    INSPECTION FREQUENCY

    APPENDIX

    Page3

    Min.

    Min. Field Testing

    Laboratory

    Q

    Test

    Laboratory

    Other Actions

    Frequency

    by QA Consultant

    Testing

    Frequency

    Typically the first 3 1 Trial batching at One trial batch

    loads per mix per concrete supply

    per concrete

    day,

    and

    until plant, conduct air mix design per

    consistency s slump tests on site, contract, or as

    established, one for perform 7 day required.

    every slump test, other strength

    and one for every

    compressive

    strength test. strength tests

    according to the mix

    types 30 working

    days prior to placing

    concrete.

    2

    Perform 24-hour, 7- All samples

    Typically the first 3

    day 28-day

    taken.

    loads per mix per

    compressive

    day, and until

    strength tests, or

    consistency is

    other strength tests

    established, one for for normal early

    every air test, and

    strength concrete as

    one for every

    specified n contract.

    strength test.

  • 8/9/2019 01 40 00 - Quality Requirements

    12/27

    Toronto Transit Commission

    CONTRACT A29 1

    On site Visual

    Inspection

    Material

    Other

    Actions

    by

    lns_pector

    2.

    Ready Mixed

    3

    Order on-site slump

    Concrete

    tests, air tests and

    continued.

    concrete cylinder

    sampling from City s

    QA consultant

    n

    accordance with the

    minimum testing

    frequencies or as

    required.

    4 Collect concrete

    delivery tickets,

    review document

    details

    o

    tickets.

    5

    Check the delivery

    time

    o

    the load

    (time when the

    concrete was

    batched to the time

    the concrete was

    unloaded) if it falls

    within the 2-hour

    delivery time limit.

    Frequency

    of

    Visual

    Inspection

    Refer to QA minimum

    testing frequencies.

    See below.

    Typically the first load of

    the day and every

    second load until

    consistency is attained.

    Random checking

    thereafter.

    Field QA Test

    Other Actions

    by

    QA

    Consultant

    3 Cast concrete

    cylinder

    samples for

    laboratory

    compressive

    strength tests.

    4

    Check and

    document the

    nominal size o

    coarse

    aggregate

    used n the

    mix.

    5 Check and

    document the

    type o coarse

    aggregate

    used

    n

    the mix

    Section 1 40 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page

    Min.

    Min. Field Testing

    Laboratory

    QA

    Test

    Laboratory

    Other Actions

    Frequency

    by QA Consultant

    Testing

    Frequency

    3 cylinders on the first 3

    Determine the One test per

    load o the day

    unit weight

    o

    mix design

    typically and every

    50m

    3

    with no fewer

    concrete sample. per contract.

    than one test for each

    class o concrete

    placed on any one

    day.

    Typically the first load

    delivered to site, or as

    required.

    Typically the first load

    delivered to site, or as

    required.

  • 8/9/2019 01 40 00 - Quality Requirements

    13/27

    Toronto Transit Commission

    CONTRACT A29·1

    On site Visual

    Inspection

    Material

    Other

    Actions by

    Inspector

    6.

    heckiftheload s

    2

    Ready Mixed

    produced from

    Concrete

    concrete plant(s)

    continued.

    that was specified n

    the contract, or the

    plants were agreed

    upon n the pre-

    construction

    meeting or in any

    pre-concrete

    placement meeting.

    7. Verify document

    the actual volume of

    each pour and

    compare with the

    theoretical volume if

    the work s paid by

    volume.

    8. Check the

    conditions

    of

    the

    granular base or

    subgrade before

    concrete s

    discharged.

    Frequency

    of

    Visual

    Inspection

    Typically the first load of

    the day and every

    second load until

    consistency s attained.

    Random checking

    thereafter.

    Random check all areas

    where concrete s

    placed.

    See below.

    Field QA Test Other

    Actions

    by

    Q

    Consultant

    6.

    Record

    n

    all test

    reports the air

    temperature of the

    site during testing.

    7

    Record temperature

    of plastic concrete at

    point of discharge.

    8.

    Determine thickness

    of concrete road

    bases, sidewalks or

    other structures by

    coring i f the

    slab/structure

    s

    paid

    by area or length n

    contract.

    Section 1 40 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    P:1ge 5

    Laboratory Q

    Min.

    Min. Field

    Test Other

    Laboratory

    Testing Actions Testing

    Frequency

    by QA Consultant

    Frequency

    1

    Every test.

    1

    Every air and

    slump test and

    every time

    concrete

    cylinders are

    casted.

    Every 60 m

    lineal length of

    structure.

    I

  • 8/9/2019 01 40 00 - Quality Requirements

    14/27

    Toronto Transit

    Commission

    CONTRACT A29-1

    On-site Visual

    Inspection

    Material

    Other

    Actions by

    Inspector

    9

    Check and

    2

    Ready Mixed

    document the state

    Concrete

    of compaction of the

    continued.

    granular base if

    any) and subgrade.

    10. Recommend the

    general contractor

    to re-com pact

    granular

    base/subgrade

    where necessary.

    11. Request

    QA

    consultant to

    perform com paction

    test

    if

    necessary.

    Frequency

    of

    Visual

    Inspection

    Random check all

    location where fresh

    concrete is discharged

    to.

    Field QA Test

    Other Actions

    by QA Consultant

    9

    Conduct

    concrete in-situ

    properties and

    quality

    assurance

    check by coring

    samples on

    site.

    -

    Section

    1

    4

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page

    Laboratory QA Min.

    Min. Field Testing

    Test Other

    Laboratory

    Frequency Actions Testing

    by QA Consultant

    Frequency

    As directed by

    Inspector and/or

    Project

    Engineer/Manager.

  • 8/9/2019 01 40 00 - Quality Requirements

    15/27

    Toronto Transit

    Commission

    CONTRACT A29-1

    On-site Visual

    Inspection

    Material

    Other

    ctions

    by

    Inspector

    12. Check and

    2 Ready Mixed

    document the

    Concrete

    moisture condition

    continued.

    of the granular base

    (if any) and

    subgrade.

    13. Recommend

    wetting the granular

    base/subgrade to

    the general

    contractor if

    subgrade plastic

    sheeting

    is

    not

    specified to

    be

    used

    in

    contract.

    14. Check and

    document the

    concrete protection

    and curing

    measures applied to

    fresh concrete

    on

    site.

    Frequency

    of

    Field QA Test

    Visual

    Other

    ctions

    Inspection

    by

    QA Consultant

    Random check all

    location where fresh

    concrete

    is

    discharged

    to

    Random check

    all

    concrete structures.

    ______

    Section

    01

    40 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page 7

    Min.

    Min. Field

    Laboratory

    Q

    Test

    Laboratory

    Testing Other

    ctions

    Testing

    Frequency

    by

    QA Consultant

    Frequency

  • 8/9/2019 01 40 00 - Quality Requirements

    16/27

    Toronto Transit

    Commission

    CONTRACT A29·1

    On-site Visual

    Inspection

    Material

    Other

    ctions

    by

    Inspector

    15. Check if the

    2

    Ready Mixed

    protections to wet

    Concrete

    concrete against

    continued.

    adverse weather

    conditions such as

    wind precipitation

    and extreme

    temperatures are

    adequate or not.

    16. Check if curing

    compounds or other

    curing

    materials/measures

    are applied to fresh

    concrete on site.

    17. Check and

    document if

    vibration

    is

    adequately applied

    to fill voids and

    hard-to-reach

    areas.

    18. Ensure the proper

    size and type of

    vibrators are used.

    Frequency

    of

    Field Q Test

    Visual Other ctions

    Inspection by Q Consultant

    Random check all

    structures where

    concrete is placed.

    Random check all

    structures where

    concrete

    is

    placed.

    Random check

    all

    structures where

    concrete is placed.

    Random check

    all

    structures where

    concrete is placed.

    Section 1 4 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    PageS

    Min.

    Min. Field Laboratory Q Test

    Laboratory

    Testing Other ctions

    Testing

    Frequency

    by

    Q Consultant

    Frequency

  • 8/9/2019 01 40 00 - Quality Requirements

    17/27

    Toronto Transit Commission

    CONTRACT A29-1

    On-site Visual

    Inspection

    Material

    Other

    Actions

    by

    Inspector

    2.

    Ready Mixed

    19. Avoid under or over

    Concrete

    vibration.

    continued.

    20. Check and

    document

    deficiencies found

    during finishing of

    fresh concrete.

    21. Check if excessive

    handwork is applied

    to fresh concrete.

    22. Check if water is

    added in finishing

    the concrete.

    23. Check if areas with

    stone segregation

    are found on

    concrete surface.

    24. Check if hot

    weather concrete

    protection is

    adequate or not.

    Frequency of

    Field

    QA

    Test

    Visual

    Other Actions

    Inspection

    by QA Consultant

    Random check

    all

    structures where

    concrete is placed.

    See below.

    Random check all areas

    where concrete is

    placed.

    Random check all areas

    where concrete is

    placed.

    Random check all areas

    where concrete is

    placed.

    Random check all areas

    where concrete

    is

    placed.

    Section 1 40 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page

    Min.

    Min. Field Laboratory QA Test

    Laboratory

    Testing

    Other Actions

    Testing

    Frequency

    by QA Consultant

    Frequency

    I

    I

    i

    i

  • 8/9/2019 01 40 00 - Quality Requirements

    18/27

    Toronto Transit Commission

    CONTRACT

    A29 1

    On site Visual

    Inspection

    Material

    Other

    Actions by

    Inspector

    2 Ready Mixed

    25. Check cold weather

    Concrete

    concrete protection

    continued.

    is

    adequate or

    not

    26. Check if barricades

    are put

    in

    place to

    protect wet concrete

    from pedestrians

    and/or vehicular

    traffic.

    27. Check if

    depressions and

    bumps are found on

    concrete surface.

    28. Check if sidewalks

    or other structures

    are constructed with

    the proper

    gradients.

    Frequency of

    Field

    QA

    Test

    Visual Other

    Actions

    Inspection

    by

    QA Consultant

    Random check

    all

    areas

    where concrete

    is

    placed.

    Random check

    all

    areas

    where concrete

    is

    placed.

    Random check

    all

    areas

    where concrete

    is

    placed.

    Random check

    all

    areas

    where concrete

    is

    placed.

    Section

    01

    4

    00

    CITY

    OF TORONTO

    INSPECTION

    FREQUENCY

    APPENDIX

    Page 1

    Min.

    Min. Field Laboratory QA Test

    Laboratory

    Testing

    Other

    Actions

    Testing

    Frequency

    by

    QA

    Consultant

    Frequency

    '----

  • 8/9/2019 01 40 00 - Quality Requirements

    19/27

    Toronto Transit Commission

    CONTRACT A29 1

    On sit e Visual

    Inspection

    Material

    Other

    ctions by

    Inspector

    29. Check if spalling is

    2

    Ready Mixed

    found

    on

    concrete

    Concrete

    surfaces and at

    continued.

    expansion joint

    cuts.

    30. Check if honey

    combs are

    developing on

    finished concrete

    surface.

    31. Check if cracks are

    developing on

    finished concrete

    surface.

    32. Monitor the work

    performed by Field

    QA testing

    technicians.

    33. Check and

    document

    if

    cylinders are stored

    in an

    acceptable

    curing box or not.

    Frequency of

    Visual

    Inspection

    Random check

    all

    areas

    where concrete is

    placed.

    Random check all areas

    where concrete is

    placed.

    Random check all areas

    where concrete is

    placed.

    All site visits.

    All samples taken until

    consistency

    is

    attained.

    Random checking

    thereafter.

    Field Q Test

    Other ctions

    by

    Q Consultant

    Section

    1 4

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page 11

    Min.

    Min. Field Laboratory Q

    Test

    Laboratory

    Testing

    Other ctions

    TestingFrequency

    by

    Q Consultant

    Frequency

  • 8/9/2019 01 40 00 - Quality Requirements

    20/27

    '

    Toronto

    Transit Commission

    CONTRACT

    A29-1

    On-site Visual

    Inspection

    Material

    Other

    ctions by

    Inspector

    2

    Ready Mixed

    34. Check and

    Concrete

    document if the

    continued.

    curing box

    is

    placed

    at a secured

    location or not.

    35. Check if concrete

    cylinders are

    delivered to testing

    laboratory in

    accordance with the

    time limits or not

    within a maximum

    of

    76

    hours for

    35

    MPa or less

    concrete, or within

    28 hours for

    35

    MPa or higher

    concrete).

    Frequency of Field Q Test

    Visual Other ctions

    Inspection

    by

    Q Consultant

    All samples taken until

    consistency

    is

    attained.

    Random checking

    thereafter.

    All samples taken until

    consistency

    is

    attained.

    Random checking

    thereafter.

    Section 1 40

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page 12

    Min.

    Min. Field

    Laboratory Q Test

    Laboratory

    Testing Other ctions

    TestingFrequency

    by

    Q Consultant

    Frequency

  • 8/9/2019 01 40 00 - Quality Requirements

    21/27

    Toronto Transit Commission

    CONTRACT A29 1

    On site Visual

    Inspection

    Material

    Other

    Actions by

    Inspector

    3

    Hot Mixed

    1

    Check temperature

    Asphalt.

    of

    asphalt mix at

    point of discharge

    (at least 120°C at

    point of discharge)

    and air temperature

    of pavement for M

    asphalt placing (at

    least 7°C}.

    2

    Collect HM asphalt

    delivery tickets,

    review document

    details of tickets.

    Frequency

    of

    Field Q Test

    Visual

    Other Actions

    Inspection

    by QA Consultant

    Typically the first load of

    1

    Perform

    the day and every

    compaction

    second load until

    tests on M

    consistency is attained.

    asphalt mat

    Random checking

    using nuclear

    thereafter.

    density gauge.

    All deliveries to site.

    2

    Prepare plate

    samples

    of

    M

    asphalt on site

    for Extraction

    Gradation tests

    and Marshall

    properties tests

    for each type

    of

    mix (reject

    samples

    prepared by

    shovels).

    Section

    1

    40 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page 13

    Min.

    Min. Field Testing

    Laboratory

    Q

    Test

    Laboratory

    Other ActionsFrequency

    by

    Q

    Consultant

    Testing

    Frequency

    Test strip method 1

    Trial batching at

    One trial

    (proof rolling):

    hot mix asphalt

    batch per hot

    - 1 test section per

    plant and

    mix asphalt

    3 m

    of

    pass

    conduct full

    mix design.

    - Minimum 2 test

    Marshall test

    section per street

    (Extraction

    - 5 tests per test gradation, AC

    section. content and

    Marshall

    properties tests)

    See below: on trial batch 7

    working days

    before asphalt

    placement.

    2

    E G Testing First

    Fast Track production

    Reporting load from the

    (for large quantity asphalt plant

    paving jobs like on each

    arterial road

    paving day.

    paving):

  • 8/9/2019 01 40 00 - Quality Requirements

    22/27

    Toronto Transit Commission

    CONTRACT A29-1

    On-site Visual

    Inspection

    Material

    Other

    Actions by

    Inspector

    3

    Hot Mixed

    3

    Verify the weight o

    Asphalt

    the loads delivered

    continued.

    to site.

    4

    Check and

    document the

    conditions o the hot

    mixed asphalt mat.

    5

    Check if there are

    areas with stone

    segregation on the

    mat and at

    longitudinal joints.

    Field

    Q

    Test

    Frequency of

    Other Actions

    Visual

    byQ

    Inspection

    Consultant

    As per City o Toronto

    3 Large

    Weight Verification

    quantity

    Protocol.

    paving job

    (for example,

    arterial road

    paving).

    See below:

    4 Small

    quantity

    paving jobs.

    Random check all

    locations where HM

    asphalt

    s

    placed.

    5

    Visually

    check the

    nominal size

    o the

    aggregates

    used

    n

    the

    mix if they

    are

    complying

    with

    specification

    or not.

    Section 1 40 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page 14

    Min.

    Min. Field Laboratory Q Test Other

    Laboratory

    Testing Actions

    TestingFrequency by QA Consultant

    Frequency

    First production

    3 Conduct HM Asphalt Every

    load from the Extraction Gradation 250 mg

    asphalt plant on (E G) tests on the first (tonne).

    each paving

    production load sample

    day, every 250 from asphalt plant, report

    mg (tonne) (fax or phone) the E G

    thereafter.

    results to Project

    Engineer/Manager

    Typically the

    asphalt plant as soon as

    first load

    o

    the the test results are ready.

    day, every 250

    Advise changes to

    mg (tonne).

    production if necessary.

    Minimum 1

    sample

    n

    the

    4 E G Testing Regular

    morning 1

    Reporting (7- working-day

    sample

    n

    the

    reporting):

    afternoon.

    5 Conduct HM Asphalt

    All samples

    All test samples

    Extraction Gradation from site.

    taken

    on

    site.

    (E G) tests on the

    samples taken from site.

  • 8/9/2019 01 40 00 - Quality Requirements

    23/27

    Toronto Transit

    Commission

    CONTRACT A29·1

    On-site Visual

    Inspection

    Material

    Other

    Actions by

    Inspector

    3

    Hot Mixed

    6.

    Check if all the

    Asphalt

    stones in the mat

    continued.

    are adequately

    coated with asphalt

    or not.

    7

    Check if there are

    areas with

    flushing/bleeding

    on

    the mat, especially

    on

    hot days.

    8 Check verify the

    thickness of asphalt

    mat if the asphalt is

    paid by area or

    length

    in

    contract.

    9 Check if

    depressions and

    bumps are found

    on

    the surface

    of

    the

    mat.

    10 Check if roll marks

    and scratches are

    found on the

    surface of the mat.

    Frequency of

    Field QA

    Test

    Other

    Visual Actions

    Inspection

    by

    QA Consultant

    Random check all

    6

    Visually check if the

    locations where H M

    type of aggregates

    asphalt is placed.

    used in the mix are

    complying with

    specification or not.

    Random check all

    7

    Determine asphalt mat

    locations where HM

    thickness by coring if

    asphalt is placed.

    the asphalt is paid by

    area or length

    in

    contract.

    Every 50 m length of 8

    Conduct

    HM

    asphalt

    asphalt mat.

    in-situ properties and

    quality assurance

    check by coring

    samples on site.

    Random check all

    9 Record in test report

    locations where HM

    the air temperature of

    asphalt is placed.

    the site during testing.

    10. Record in test report

    the temperature of

    HM

    Random check all asphalt during

    locations where HM sampling.

    asphalt is placed.

    Section

    01

    40 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page 15

    Min.

    Min. Field Laboratory QA Test

    Laboratory

    Testing Other Actions

    Frequency

    by QA Consultant

    Testing

    Frequency

    All test

    6 Conduct

    HM Every 500 mg

    sam pies taken

    Asphalt full

    (tonne) after

    on

    site. Marshall tests

    the first load.

    (Extraction

    Gradation, AC

    content and

    Every60 m

    Marshall properties

    length per

    tests).

    traveling lane.

    7

    ConductAC One test of

    recovered each day of

    penetration test

    paving.

    As directed by when RAP

    Inspector (Reclaimed Asphalt

    and/or Project Pavement) is used

    Engineer/ in the mix.

    Manager.

    8 Conduct One test for

    specification

    each mix

    Every test.

    conformance tests design.

    on Performance

    Graded Asphalt

    Cement (PGAC) if

    required.

    Every test.

  • 8/9/2019 01 40 00 - Quality Requirements

    24/27

  • 8/9/2019 01 40 00 - Quality Requirements

    25/27

    Toronto Transit Commission

    CONTRACT A29-1

    On-site Visual

    Material

    Inspection

    &

    Other Actions

    by Inspector

    4

    Granulars

    1

    Monitor the work

    (Crushed

    performed

    by

    Field

    Limestone

    Q

    testing

    and

    technicians.

    Recycled

    Concrete.

    2

    Visually check for

    deleterious materials

    (1 max) and

    document findings.

    3

    Visually check the

    percent crushed of

    aggregate delivered

    and document

    findings.

    4

    Order

    Q

    gradation

    tests from

    Q

    consultants.

    5

    Order physical

    property test

    of

    aggregates from

    Q

    consultants if

    necessary.

    Frequency of

    Field Q Test Other

    Visual Actions

    Inspection by QA Consultant

    All site visits.

    1

    Conduct compaction

    (including moisture

    content) tests using

    Every load until

    nuclear density

    consistency is

    gauge.

    attained.

    Random

    2

    Sewer & Watermain

    checking

    trenches.

    thereafter.

    3

    Granular bases for

    roads, curbs,

    Every load until

    sidewalks & other

    consistency is

    structures.

    attained.

    Random

    checking

    thereafter.

    4

    Take samples from

    stockpiles on site for

    Every 250 mg

    gradation tests.

    (tonne) per type

    of material.

    As required.

    Section

    1

    4 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Paae 17

    Min. Field Laboratory QA Test

    &

    Min.

    Testing Other Actions

    Laboratory

    Testing

    Frequency by QA Consultant

    Frequency

    All trench

    1

    Sampling at source

    As per TS

    backfill,

    (production plant) and

    1010 and

    granular bases

    perform QA physical

    according to

    and subbases.

    property test and

    the type of

    gradation tests to

    material used,

    verify the physical

    or as required.

    properties and

    gradation of materials

    if necessary.

    One test per

    0.3 m lift for

    each increment

    2

    Conduct gradation All samples

    or fraction of tests. taken from

    150 lineal site.

    meters of

    backfill. 3 Conduct All samples

    Standard/Modified taken from

    One test per lift Proctor Density tests. site.

    for each

    increment or

    fraction

    of

    500

    square meters

    on each lane,

    curb or

    sidewalk.

    Every 250 mg

    (tonne) per type

    of material

  • 8/9/2019 01 40 00 - Quality Requirements

    26/27

    Toronto Transit Commission

    CONTRACT A29·1

    On site Visual

    Inspection

    Material

    Other Actions

    by Inspector

    6.

    Collect aggregate

    4.

    Granulars

    delivery tickets,

    (Crushed

    review document

    Limestone

    and

    details of tickets.

    Recycled

    Concrete

    7.

    Verify the weight of

    continued.

    the loads delivered to

    site if the materials

    are

    paid by

    weight.

    8

    Monitor

    the

    work

    performed by Field

    QA testing

    technicians.

    1.

    Visually check for

    5. Imported

    deleterious materials

    Earth

    and document

    findings.

    2.

    Verify the weight of

    the

    loads delivered to

    site if the materials

    are paid by weight.

    Frequency of

    Visual

    Inspection

    All

    deliveries to

    site

    As per City of

    Toronto Weight

    Verification

    Protocol.

    All site visits.

    Every

    load

    until

    consistency is

    attained.

    Random

    checking

    thereafter.

    As

    per City of

    Toronto Weight

    Verification

    Protocol.

    Field Q Test Other

    Actions

    by Q Consultant

    5.

    Take samples from

    stockpiles on site for

    Proctor density tests.

    6

    Determine granular

    base

    thickness by

    coring or digging test

    pits

    1.

    Conduct compaction

    (including moisture

    content) tests using

    nuclear equipment.

    2. Sewer Watermain

    trenches.

    Section 1 40 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page 18

    Min. Field Laboratory QA Test

    Min.

    Laboratory

    Testing Other Actions

    Testing

    Frequency

    by QA Consultant

    Frequency

    One

    sample per

    type of material

    per

    contract.

    Every 50 m

    length of

    base

    All

    trench

    1.

    Conduct soil

    All

    samples

    backfill,

    and

    classification test. taken.

    subgrade.

    One test per 2. Conduct All samples

    0.3 m lift for

    Standard/Modified taken

    each

    increment

    Proctor Density test.

    or fraction of

    150

    lineal

    meters of

    backfill.

  • 8/9/2019 01 40 00 - Quality Requirements

    27/27

    Toronto Transit

    Commission

    CONTRACT A29-1

    On site Visual

    Inspection

    Material

    Other

    Actions

    by

    Inspector

    5

    Imported Earth

    3

    Collect earth

    continued.

    delivery tickets,

    review document

    details of tickets.

    4 Monitor the work

    performed by Field

    QA testing

    technicians.

    1

    Check the

    6

    Crack Filling

    temperature of

    Material.

    crack filling material

    on site.

    2

    Monitor the work

    performed by Field

    QA testing

    technicians.

    END OF SECTION

    Frequency

    of

    Visual

    Inspection

    All deliveries to site.

    All site visits.

    Every 4 hours of

    operation.

    All site visits.

    -

    Field QA

    Test

    Other

    Actions

    by QA

    Consultant

    3

    Road or

    sidewalk

    subgrade.

    4 Take samples

    from stockpiles

    on site for soil

    classification

    engineering

    properties tests.

    1 Take samples

    on site for AC

    penetration

    tests.

    2

    Inspect verify

    all gauges on

    the melting pot.

    Section 01 40 00

    CITY OF TORONTO INSPECTION FREQUENCY

    APPENDIX

    Page 19

    Laboratory QA

    Min.

    Min. Field Testing

    Test

    Other

    Laboratory

    Frequency

    Actions

    Testing

    by QA

    Consultant

    Frequency

    One test per lift for

    each increment or

    fraction of 500 square

    meters on each

    traveling lane.

    Every 250 mg (tonne)

    per type of material, or

    as required.

    At commencement of 1

    ConductAC All samples

    contract, every

    penetration test. taken.

    20,000 m to 25,000 m

    Every day when

    operation begins.