Page 1
1 TEMPORARY
CONTROLS
1 1
General:
1 Refer to Contract Drawings for required hoarding, barriers and dust-tight partitions
.2 Submit shop drawings for hoarding, barriers and dust-tight partitions
in
accordance with
Section
1
33 23 for review prior to the erection of Work
.3 Repair and/or repaint damaged hoarding, barriers
and
dust-tight partitions within twenty
four (24) hours
of
damage. Maintain hoarding, barriers and dust-tight partitions graffiti free.
Remove or paint over graffiti within twenty four (24) hours or
as
directed by Commission's
Representative. Wash the surface of the partitions when so directed by the Commission's
Representative .
.4 Repair and restore to original condition any part of the structure or equipment broken or
damaged as a result of installation or removal
of
hoarding, barriers and dust-tight partitions
.5 At Contract Completion, remove all installed and existing hoarding, barriers and
dust
tight
partitions unless otherwise noted
on
Contract Drawings or
as
directed by the Commission's
Representative.
1 2
Hoarding, Fencing and Barriers:
1 Minimum setback of barrier from edges of bus stops and drop-off areas, and rapid transit
platforms shall be 1.5 m or as directed by Commission's Representative .
.2 Before commencing the Work, take over existing hoarding from Other Contractor, and
supply, erect and maintain hoarding lines
as
specified using plywood hoarding
24
mm
high around entire
perimeter
of Site per
Contract
Drawings
t
protect
public
and
private
property from injury or damage. Ensure lockable gates are provided within
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
2/23
Section
1
5
CONSTRUCTION FACILITIES
AND TEMPORARY CONTROLS
Page
Toronto Transit Commission
CONTRACT
A29 1
5
Notify Commission s Representative
in
writing when flag persons are required when
working
on
railway right of way or when Work affects railway operations, minimum three (3)
weeks
in
advance of any Work required .
.6 Supply and install fencing
and
hoarding around railway switches, allowing sufficient space
for the operation of the switches .
.7 Provide barriers
and
covered walkways required by governing authorities for public rights
of-way and for public access to buildings
.8 Install signs for movement
of
public around Work Site
as
directed by the Commission s
Representative .
.9 Provide barriers around trees and plants designated to remain as per Contract Drawings.
Protect from damage
. 1
0 Provide secure, rigid guard rails and barricades around deep excavations, open shafts,
open stair wells,
and
open edges of floors and roofs as required for protection of Work,
Workers and the public
.11
Erect hoarding as required t delineate work zone between A35 26 Contract nd
A29 1 Contract in a co ordinated and agreed location
t
time of Site handover.
1 3
Security:
1 Provide
and
pay for security personnel to guard the Site
and
contents
of
the Site ensuring
the security
of
the Site at all times .
.2 Any security service provided by the Commission
is
for the protection
of
the Commission s
interest
in
the Work
on the
Site and shall not relieve the Contractor
of
the responsibility to
protect the Site and the Work of the Contract.
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
3/23
Toronto Transit Commission
CONTRACT A29 1
Section 01 50 00
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
agel
.3 The Contractor is responsible for providing electrical power, until the earlier of, Contract
Completion, or when permanent power is available and cabling
is
in
place .
.4 Upon Contract Completion, remove electrical plant from the Site, except the distribution ·
system and hydro service equipment required to keep the lighting in operation .
.5 Where temporary lighting system
is
not removed submit all as-built and record drawings
in
accordance with Section 01 33
23
showing all electrical and lighting installations that
remain permanently.
3.2 Contractor s Temporary Water Usage:
.1 Supply and install a temporary water meter at all connections to existing water supply
piping. All cost for equipment, piping and water consumed shall be the responsibility o the
Contractor
.2
No
connections shall be made
to
existing taps, hose bibs or faucets.
3.3 Temporary Water Shutdown:
.1 If in the performance of Work, it is necessary to shut off the water supply either completely
or partially
in
an existing facility, Contractor shall inspect and operate in the presence o the
Commission s Representative all plumbing fixtures affected by the shut off to ensure their
proper operation.
3.4 Temporary Heating:
.1
Provide temporary heating required during construction period, including attendance,
maintenance and fuel.
.2
Temporary fuel fired heating devices to meet OHSA requirements .
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
4/23
Section
1
50 00
Toronto Transit Commission
CONTRACT A29 1ONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
Page
3 5
3 6
3 7
4
4 1
1
1
1
Contractor s Drainage System:
Supply, install and maintain a temporary drainage system o sufficient capacity and
efficiency to maintain excavations free o water during the construction period. Submit a
Plan and install plant as required to safeguard the Site and downstream sites from flooding
in
the event
o
a weather related event and/or utility breaks.
Do
not use any portion o the
permanent drainage system without the permission o the Commission s Representative.
Remove the temporary system upon Contract Completion, unless otherwise indicated on
the Contract Drawings as to
be
handed over to others in good working order at an interface.
Accommodation for Workers:
Supply, install
and
maintain
in
a clean condition suitable and convenient water closet and
drinking water accommodation for Workers
in
accordance with the Occupational Health and
Safety Act and Regulations for Construction Projects. Remove accommodations upon
Contract Completion.
Temporary Utility Support:
Inspect and assume ownership
of
maintaining and repairing all components
of
support system for utilities including temporary bridge structure in accordance with
Section 02 4113
POWER WASHING AND VIDEOTAPING OF SANITARY AND STORM DRAINAGE
SYSTEM
Power wash and videotape storm drainage system in accordance with this Section on two
occasions:
1 Prior to construction activities
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
5/23
Toronto Transit Commission
CONTRACT A29 1
Section
1
5
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
ageS
.4 Videotape index correlating videotape counter with drawing entry points and distance
travelled through drainage system refer to S01500.11
and
S01500.12 attached) .
.5 Drawings indicating system entry points video start points) and extent of videotaping video
stop points) corresponding to videotape counter refer to S01500.11
and
S01500.12
attached).
4.5 Storm Drainage System: Identify all the following fixtures and equipment on drawings.
Refer to the Contract Mechanical) Drawings for extent and details o drainage system.
. 1 Roof Drains
2
Cleanouts .
3
Rain Water Leaders RWL)
.4
Drainage Piping .
5
Underground Storm Mains .
.6 Maintenance Hole/Catchbasin .
4.6 Sanitary Drainage System: Identify following fixtures and equipment
on the
drawings. Refer
to the Contract Mechanical) Drawings for extent and details o drainage system.
. 1
Cleanouts .
2
Floor Drains .
3
Area Drains/Catch Basins
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
6/23
Section 1
5
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
Page
5.2 Protection of Existing Equipment:
Toronto Transit Commission
CONTRACT A29 1
.1
Equipment and existing Work moved or altered
to
facilitate construction, movement
o
material or equipment shall
be
stored, protected with dust tight covers and subsequently
returned to its original location .
.2 The Commission s Representative s approval
is
required for the installation of temporary
support devices into existing roof or wall members for the erection
o
equipment
or
machinery. Repair roof and wall members used for this purpose to the satisfaction o the
Commission s Representative .
.3 Provide necessary screens, covers and hoardings as required .
4
All existing (in use) and new equipment damaged while carrying out the Work shall be
restored with new Products matching the original equipment.
5.3 Fire Protection:
.1
Take precautions to prevent fires. Provide
and
maintain temporary fire protection
equipment o a type appropriate to the hazard anticipated in accordance with authorities
having jurisdiction, governing codes, regulations, by-Jaws and to the satisfaction of the
Commission s Representative and insurance authorities
.2 Supply and install heat detectors, wiring and end
o
line resistors on the construction side
o
any hoarding
and
dust-tight partitions. The number of heat detectors shall
be
as required
by the code. Interconnect the heat detectors and the end o the line resistors to the existing
fire alarm panel
in
each station. After the Work
is
completed, remove the heat detectors,
end
of line resistors
and
its wiring. Install heat detectors in accordance with
CAN/ULC S524-M .
.3 Bulk storage of flammable liquids
and
other hazardous materials is not allowed on Site.
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
7/23
Toronto Transit Commission
CONTRACT
A29 1
Section
1 5
00
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
Page7
5.4 Protection of Workers:
1
Workers shall comply with the Occupational Health and Safety Act and Regulations for
Construction Projects
.2 Workers scheduled
to
perform Work at track level, or where there
is an
overhead electrical
hazard, or when interfacing with the Commission's operating
and
maintenance personnel
within the Commission's transit system or maintenance operations, shall attend
and
successfully meet the requirements o the Commission's rule book training program prior
to
the commencement of
such
Work. Refer to Section
01 59
00
5.5 Protection o Finished Structures Adjacent to Work Areas:
1
The Contractor shall provide a Storm
and
Site Water Management Plan (SSWMP) for the
construction Work area. The Plan shall address measures to minimize or manage water
that would enter the excavation and/or partially completed subsurface works and tunnels
as
a result of weather related events or interruption and/or damage to utilities. The submittal
will include sealed
engineering documents that includes plans showing construction staging
and
sequences, plant to be provided
and
supporting analysis.
TEMPORARY BUILDINGS
6 1 Supply and install the following facilities for the sole use o the Commission at or near
the
Site for the duration of the Contract in locations approved by
the
Commission's
Representative:
1
York University Station Site - Main Office
and
Change Room Furnishings:
1 Location shown on Contract Drawings:
Structure
Quantity
Description Details
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
8/23
Section 01 50
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
PageS
Toronto Transit Commission
CONTRACT A29 1
Structure
Quantity
Description
Details
Interior Office Areas
Interior office areas to be divided as follows
(approximately):
Office 1
1
3500 mm
X
2700 mm
(11'-6
X
8'-1 0 )
complete with door
1
2700 mm x 2700 mm (8'-8 x 8'-8 ) complete
Office #2 with door
Reception area
1
3580 mm x 2700 mm (11'-6 x 9')
Liaison office area 1 6100 mm x 10790 mm (20' x 35'-6 )
Small kitchen area
&
unisex
1
washroom
6100 mm x 7500 mm (20' x 24'-6 )
Meeting room
1
3580 mm x 7500 mm (11'-6 x 24'-6 )
Document
Control
1
room
3580 mm x 2800 mm (11'-6 x 9'-6 )
Printing area
1
3580 mm x 5000 mm (11'-6 x 16'-6'1
Plan review room
1
4750 mm x 4750 mm (15'-6 x 15-6 )
Lunch room
1
3460 mm x 5000 mm (11'-5 x 16'-4 )
IT room
1
3460 mm x 2200 mm (11'-5 x 7'-4 )
Hotel room
1
3460 mm x 2800 mm (11'-5 x 9'-4 )
Women's
1
washroom
3460 mm x 4100 mm (11'-5 x 13'-6 )
Men's washroom
1
3460 mm x 4100 mm (11 '-5 x13'-6 )
Interior Furnishing New Only
Workstations
Total number of
workstations
16. Typical + 1 Special Order Desk for Public Liaison Area.
See
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
9/23
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
10/23
Section
1
50 00
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
Page 10
Toronto Transit Commission
CONTRACT A29 1
Sb·ucture
Quantity
Description
Details
3
Plan
rack Mobile plan rack with 12 hangers capable
o
holding full size plans.
1 Photocopier
All products/equipment to be new.
Sufficient electrical sockets, network and communications sockets to meet the requirements of the
equipment.
All equipment in printer area to be able to be operated from every computer in main site office
complex.
4
Foyer
2
Hand Sanitizer (one sanitizer at either entrance).
1 Notice board
914 mm x 1829 mm (3 x 6 ).
5
Printing Area
All products/equipment to
be
new.
Sufficient electrical sockets, network
and
communications sockets to meet the requirements of the
equipment.
All equipment in printer area to be able to be operated from every computer in main site office
complex
1
Photocopier
Capable o making multiple copies up to A3
size complete with sorting capabilities.
0
Scanner Capable
o
multifeed A3 size.
1
Facsimile
Machine
0
Laser printer
Capable of printing to A3 size, complete with
sorting capabilities.
0 Colour plotter
Ca_pable of plotting to AO size.
1 Heavy duty
paper shredder
1 Large waste bin
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
11/23
Toronto Transit Commission
CONTRACT A29-1
Structure
Quantity
7
Plan
Review Room
8
Site Security
All Products/equipment
to
be new.
Section 1
5
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
Page
11
Description
Details
Custom made 1219 mm x 762 mm x 737 mm (48 x 30 x
plans display
29 ).
shelves.
Windows to have metal grilles
on
outside
Security door to have facility to open from inside electrically
All access door to be self closing.
All Entrance/exit to have access security system.
All windows to have access security system.
Building to have fire alarm system.
1 Security camera
external
1 Security camera
internal
1 Security monitor
2 Fire extinguisher 9
kg
dry chemical for Class BC fires
complete with 150 mm X
200
mm
fire
extinguisher symbol mounted on wall above
fire extinguisher.
1
Fire aid box Complete with 150 mm x 200 mm first aid
symbol mounted on wall above first aid box.
1
Public Access Compact size
Defibrillator
9.
ccess
All Products/equipment
to be
new.
Access as shown
on
the drawings.
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
12/23
Section 1 50 00
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
Page 12
Toronto Transit Commission
CONTRACT A29 1
Structure
Quantity
Description Details
10. Office Requirements
All Products/equipment to be
new
Office to be Disabled Person Accessible - for
wheelchair
users and
ambulant disabled
persons.
Office must meet the requirements of the
Ontario Building Code 2006.
Office must meet the requirements of the
Ontario Code & Guide for Sewage Systems
1997.
Office must meet the requirements of the
Ontario Code
&
Guide for Plumbing 1998.
Office must meet the requirements of
the
Ontario Fire Code 1997.
Office must meet the requirements of the
Ontario Electrical Safety Code 24th Edition.
11.1T Room
In Building Wiring Closets:
Sites forecast
to
house 10 staff occupancy:
1 Dedicated locked room {keyed 14-D3) with minimum dimensions of 2134 mm x
2438 mm (7 feet x 8 feet).
2
Secure standard 483 mm x 2134 mm {19 x 84 ) relay rack with cable
management trays on the sides. This rack must
be
bonded to building ground.
3
1 - Dedicated 15A, 11 V AC duplex outlet with U-grounded receptacle on a
dedicated branch circuit.
4 Dedicated locked room {keyed 14-D3) with minimum dimensions
of
2134 mm x
2438 mm {7 feet x 8 feet).
5 Secure standard 483 mm x 2134 mm {19 x 84 ) relay rack with cable
management trays on the sides. This rack must be bonded to building ground.
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
13/23
Toronto Transit Commission
CONTRACT A29-1
Section 1
50 00
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
Page 13
Structure
Quantity Description
Details
9 Where walls do not exist, modular office furniture systems will provide raceway
space for cables and jack hardware which sits above the work surface when
installed.
10
All 8 Category 5 conductors are to be connected per EIA TIA T568A standards
straight through.
11
Patch cords are to be supplied for wiring closet 40 pieces (green 1219 mm
(4 feet) Long).
12
Patch cords are to be supplied for every wall jack 4 pieces (orange 2743 mm
(9 feet) Long).
13
Both ends of each patch cord will be labelled with the same unique numbers.
14
All cables will be tested and certified by the installer for straight through polarity
and continuity.
15
Every jack must be tested to ensure that it meets level 5 requirements.
16
Warranty of Workmanship: the wiring and the related accessories must be
guaranteed free of defects for duration of Contract.
Bell Service Entrance:
All fibre Connected locations:
1
50.8 mm (2") conduit from wiring closet to the Bell Main Wiring Closet on the
service entrance floor.
2
Contractor to provide 1219 mm x 1829 mm x 19 mm (4' x 6' x %") plywood
Telecom backboard adjacent to main rack location.
3
Contractor to install fish wire.
12.
Women s
Washroom
1 Vanity
Complete with hot and cold water, 4 sinks,
4 faucets, 4 soap dispensers.
1 Hand dryer
Dyson Airblade AB02 120V - Single unit order
code 13043-01 ,
or
equal.
1 Mirror Full height/length of vanity.
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
14/23
Section
1
50 00
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
Page 14
Toronto Transit Commission
CONTRACT A29 1
Structure
Quantity
Description Details
1
Toilet
Complete with lockable door, partition, toilet
paper dispenser.
1 Toilet
Handicap accessible complete with lockable
door, partition, toilet paper dispenser.
3 Urinals
Complete with partitions.
1
Hand sanitizer
station
1
Paper Towel
Holder
1 Waste bin
.2 In addition to the above requirements, all facilities supplied by the Contractor for the
Commission shall include the additional requirements listed below:
Structure
Quantity
1
Description
Details
14. Parking
1
Disabled Person Parking - as close to office as possible - minimum 1 space.
2
Parking for TYSSE
Staff
28 spaces.
15. Additional Notes
1
Office to be Disabled Person Accessible - for wheelchair users and ambulant
disabled persons.
2
Office/change room to meet the requirements
of
the Ontario Building Code
2006.
3
Office/change room to meet the requirements
of
the Ontario Fire Code 1997.
4
Office/change room to meet the requirements of the Ontario Code Guide
for
Sewage Systems 1997.
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
15/23
Toronto Transit Commission
CONTRACT A29 1
Section 01
5
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
Page 15
Structure Quantity 1 Description
I
Details
16. Contractor to Supply and/or Install an office for the Contractor with the following:
1 Electric supply, electric lighting, heat, air conditioning, telephone, fire fighting
and first aid as required by the Workplace Safety and Insurance Board and the
Ontario Ministry of Labour and the various Ontario Building and Fire Codes.
2
Facilities to be installed at or near the site for the duration o the Contract
in
locations approved by the Commission's Representative.
3
Temporary buildings shall have 12.7 mm exterior grade plywood for skirting
closure and for closing gap between trailer roof and canopy roof.
4 Do not locate any buildings, structures or equipment
in
a manner that interferes
with
survey_
alonq the control line and reference line tanqents.
5
Remove temporary buildings upon Contract Completion. Restore area to match
the existinq planned area.
17. Contractor Supply and/or Install
6
All cleaning equipment and supplies for office accommodation, change-house
and toilets.
7
All Security (Hardware and Electronic} Equipment.
8
Security Notification Service offsite for unauthorized entry for fire and flood to
fire, police
and
TYSSE.
9
Daily janitorial services.
1
Compact size Public Access Defibrillator
11
Provide new photocopier capable
o
making multiple copies up to 279 mm x
432 mm { 11 x 17 )
in
size, complete with sorting capabilities.
12
Paper Supply: Letter size - 50 reams/month, Legal size - 5 reams/month,
279 mm x 432 mm { 11 x 17 ) - 20 reams/month.
13
Provide empty conduit with pull strings to each proposed voice telephone
location terminated with a dedicated duplex junction box. The Commission will
be responsible for ordering the voice services from Bell to ensure effective 4-
digit dialling and TTC corporate voice mail services can be provided. Bell will
pull station cable and provide faceplates per TTC contract terms.
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
16/23
Section 1 5 00
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
Page 16
7 PROJECT IDENTIFICATION
Toronto Transit Commission
CONTRACT
A29 1
7 1 The display of signs without the Commission s Representative s written consent is
forbidden.
7.2 Supply and install four (4) signs, each 1980 mm W x 2285 mm H x 20 mm D overlaid
Crezon plywood, mounted approximately 2.5 m above ground on hoarding or separate
posts as appropriate
in
locations as directed by the Commission s Representative. The
Commission shall provide the graphics for signage
in
electronic format.
7.3 Supply and install sufficient posts and braces
o
pressure treated wood with galvanized
nails
and screws to withstand wind and other loads.
7.4 Relocate the signs from time to time if required to expedite the Work
or
to ensure that the
signs remain visible. Refer to Contract Drawings or as directed by the Commission s
Representative for details required on the signs.
7.5 Remove signs upon Contract Completion.
SITE MAINTENANCE
8 1
Maintain the Site and adjacent areas
in
a clean and orderly condition, free from debris and
other objectionable matter. Remove rubbish and surplus material, equipment and
structures immediately. If the Site
is
not cleaned within forty-eight (48) hours after the
Contractor has been instructed
to
do so, the Commission s Representative may clean the
Site and retain the cost from monies due, or to become due, to the Contractor.
9
PUBLIC CONVENIENCE AND SAFETY
9 1 Maintain sidewalks and paved areas at and adjacent to the Site in a safe condition
throughout the Contract. Promptly remove ice and snow.
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
17/23
oronto ransit
Commission
CONTRACT A29-1
Section
01 50
00
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
Page 17
10.3 Take precautions
to
avoid tracking
and
depositing materials, debris and
mud
on roads and
on the Commission s property from vehicles and equipment operating to and from the
construction Site and
be
responsible for removal of such deposits by brooming and
washing to the satisfaction of the Commission s Representative.
10.4 Keep access routes, sidewalks, Site roads, trailer area, storage areas as well as Work
areas free of ice and snow to maintain safe operating conditions and to maintain progress
of the Work. Remove cleared snow from the Site within twelve (12) hours of a snow fall or
as directed by the Commission s Representative.
11
PARKING
11.1 No cars or trucks shall be parked on the Commission s property without the approval
of
the
Commission s Representative. The Commission shall not
be
held responsible for damage
that may occur to any vehicle operated upon or parked upon Commission property.
11.2 Parking will be permitted on Site provided it does not disrupt the performance of Work, Site
safety or the movement of vehicular or pedestrian traffic and is acceptable to the
Commission s Representative.
11.3 Provide thirty (30) parking stalls and two (2) Handicapped stall complete with reserved
signs within 20 m
of
the Commission s Representative s site office for the exclusive use of
the Commission s Representatives.
12
SITE VISITORS
12.1 During the progress of the Work, afford access to visitors duly authorized by the
Commission s Representative and facilitate inspections or testing which they may wish to
carry out.
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
18/23
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
19/23
8
~
cyP:
F D ~ ~
1
1
i
· I ,++ I
- @ > ,
I - J
-4']; ,
e --
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
20/23
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
21/23
I ~ S 0 1 5 0 0 0 1 2 I 0
VIDEO
TAPE
INDEX
START TO END POINT
TIME
(SECONDS)
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
22/23
-
8/9/2019 01 50 00 - Construction Facilities and Temporary Controls
23/23
" · ~
· · · ~ ·
'
17.07m(56'-0 )
r
'
3.58m
,1.42m 4.78m
2.39ml 1.4.3m
3.46m
[
- -
i
r
l I l ~ I
S7199