    Government Sector Projects at Kuwait International AirportAdminist rat ion Bui ld ing, Car Park and Fire Stat ionsPackage No.2DOCUMENT III-2: PARTICULAR SPECIFICATIONS

    Summary Page 01100/1

    SECTION 01100 - SUMMARY

    PART 1 GENERAL

    1.1 RELATED DOCUMENTS

    A. Drawings and general provisions of the Contract, including Conditions ofContract and other Division 1 Specification Sections, apply to this Section.

    1.2 WORK COVERED BY CONTRACT DOCUMENTS

    A. Project Identification: Project comprises the design construction, completionand remedying defects during the Defects Liability Period of the works under

    Kuwait International Airport, Package 2-Administration Building & Fire Stations.

    B. The Employer: Directorate General of Civil Aviation - Government SectorProjects at Kuwait International Airport.

    C. The Engineer: Dar Al-Handasah Consultants (Shair & Partners) in associationwith J assim Qabazard Engineering Consultants.

    D. The Works in this Contract briefly includes but is not limited to the design andexecution of the following:

    1. Design development and construction of the Fire Stations.2. Design development and construction of Administration Building with itsCar Park.3. Installation of all necessary electromechanical Works, Utilities,landscaping, irrigation and roads.

    1.3 CONTRACTS

    A. The Government Sector Projects at Kuwait International Airport will beconstructed under multiple contracts (Packages) as detailed in the Employer'sRequirements (Document III-1).

    B. These separate Sections/Packages and contracts, represent significantconstruction activities, that are correlated with the Works under this Package 2.

    The different parts of the works under this Contract may be performed sequentiallyor concurrently or partially sequentially and partly concurrently and require to becoordinated closely with construction activities performed under othersections/packages and contracts. Sections/Packages and contracts for thisProject include, but are not limited to, the following:

    1. Package 1: Runways 15C/33C, Taxiways, Aprons & Access Roads.2. Package 3: Runways 15L/33R and 15R/33L, Taxiways and Aprons

  • 7/29/2019 01100 Summary Od Works_REVA

    2/3

    Government Sector Projects at Kuwait International AirportAdminist rat ion Bui ld ing, Car Park and Fire Stat ionsPackage No.2DOCUMENT III-2: PARTICULAR SPECIFICATIONS

    Summary Page 01100/2

    C. Coordination is identified in Division 1 Section "Summary of Multiple Contracts".

    1.4 WORK SEQUENCE

    A. The Work shall be executed in parallel and completed in the stages defined inthe Employer's Requirements and within the periods set in the Appendix to

    Tender.

    1.5 WORK UNDER OTHER CONTRACTS

    A. Separate Contract: The Employer has awarded and will award separatecontracts for performance of certain construction operations at, or in the proximityof, the Site. These operations are scheduled to be either substantially complete

    before work under this Contract begins, or conducted concurrently with work underthis Contract. The separate contracts include, but not by way of limitation, thefollowing:

    1. Package 1: Runways 15C/33C, Taxiways, Aprons & Access Roads.

    2. Package 3: Runways 15L/33R and 15R/33L, Taxiways and Aprons

    3. Projects under Construction

    a. Kuwait Airspace System Plan (KASP)

    b. Kuwait Aviation Fuelling Company (KAFCO)c. Fuel Support Facilityd. Main J et Fuel Linee. Existing Cargo Apron Extensionf. Taxiways surrounding Fuel Support Facilityg. VVIP Areah. Electrical Substationsi. New Airport Fence and Gates

    4. Planned Projectsa. Pax. Terminal 2 Building

    b. Catering Facilityc. Air Force Compoundd. South and North Power Stationse. Interchanges at the access points to the airportf. Aircraft Maintenance

    B. Cooperate fully and coordinate with separate contractors and Programme theWorks so that work on those contracts may be carried out efficiently andeffectively. The Contractor shall also replan his activities to minimize interferencewith other contractors.

  • 7/29/2019 01100 Summary Od Works_REVA

    3/3

    Government Sector Projects at Kuwait International AirportAdminist rat ion Bui ld ing, Car Park and Fire Stat ionsPackage No.2DOCUMENT III-2: PARTICULAR SPECIFICATIONS

    Summary Page 01100/3

    1.6 FUTURE WORK

    A. Future Contracts: The Employer reserves the right to perform additional workand/or award further separate contracts for performance of additional work at theProject Site; whether concurrently with, or after substantial completion of, Workunder this Contract. Performance and completion of such additional work maydepend on successful completion of preparatory work under this Contract.

    B. Cooperate fully and coordinate with any future construction forces and/orseparate contractors as necessary, and Programme the Works so far asreasonably possible so that work on those contracts may be carried out efficientlyand effectively, without interfering with or delaying work under this Contract. InParticular, Aprons Contractor shall schedule and organize some of the pavement

    works around the buildings to have them executed only after the BuildingsContractor completes the surrounds of the buildings.

    END OF SECTION