The 2012 Curaçao Conference on the future of Durable Energy WTC, Curacao, 29th March 2012
The Danish Wind Case and The Bornholm Experiment
Per Lund Chief Engineer Development Department Energinet.dk
2
Agenda
• Introduction to Energinet.dk
• Operating the Danish Electricity System with 25% wind power
• Preparing for 50% wind power in 2020 and a fossil free energy system in 2050
• The Bornholm Experiment
3
Energinet.dk
• National Transmission System Operator for electricity and gas in Denmark (TSO)
• Independent public enterprise under the Ministry of Climate, Energy and Building
• Own Supervisory Board appointed by the Minister
• The finances of Energinet.dk must break even, i.e. a non-profit company
• Approx. 590 employees, Headqueaters in Erritsø - Jutland
• Owns and operates the Danish transmission systems for electricity and natural gas
4
Core Tasks for Energinet.dk
• Ensure short- and long-term security of supply for electricity and gas
• Ensure well-functioning markets for electricity and gas
• Ensure well-functioning emergency preparedness of the energy sector
5
Agenda
• Introduction to Energinet.dk
• Operating the Danish Electricity System with 25% wind power
• Preparing for 50% wind power in 2020 and a fossil free energy system in 2050
• The Bornholm Experiment
6
The Danish electricity system – development and policy
EU 20-20-20 target – 30% renewables in DK:
• Power system may have to handle 50% wind power!
New Danish government – September 2011:
• 2020: 50% wind power in electricity system
• 2035: Fossil free electricity and heating systems
• 2050: Fossil free energy system From primary to local generation
7
Wind power already exceeds hourly demand today!
% Wind power as percentage of consumption in Denmark West, 2010
0
20
40
60
80
100
120
jan-2010 feb-2010 apr-2010 jun-2010 jul-2010 sep-2010 okt-2010 dec-2010
Wind Energy coverage in DK West: 28%
8
Wind power balanced in a flexible generation system
• Coal fired power plants:
• Required to operate down to 35% of rated power
• Some are capable to operate down to 10%
• Combined heat and power plants: • Hot water storage tanks decouple electricity and heat demand
• Electric boilers give flexible demand
• Wind farms: • Grid codes ensure capability to support system
9
The four market places in Denmark:
Spot market (day-ahead)
Intraday market
Regulating power market
Reserves
The electricity market is all about balancing
Electricity- system Consumption
Production regulation
Non-regulating production
Import
Export
10
Balancing and Grid Security
• Operational Planning System:
• providing information on imbalances in the coming hours on the basis of forecasts, up-dated generation plans, on-line measurements and DGM input
• Distributed Generation Management System (DGM):
• providing the basis for forecasting renewable generation and grid security calculations
Energinet.dk has developed two essential IT systems to manage the large amount of renewable generation:
11
Operational Planning System
• Imbalance = Consumption - Wind Power - Local CHP - Primary Power Stations +/- Exchange
• Consumption, Wind Power and a minor share of Local CHP are based on regularly up-dated forecasts
• Primary Power Stations, most Local CHP and Exchange are scheduled by the market players and are continuously updated on-line
• The dispatcher buys and sells regulating power from the regulating power market to bring the imbalance close to zero
• Remaining minor imbalances are balanced by automatic reserves
12
Distributed Generation Management System
Primary power stations Local CHP plants Wind turbines
• 6300 generators on 4600 plants
• 18 Balance Responsible Parties for Production (PBR)
• 4525 plants without individual schedules
• 75 plants with individual schedules
13
Agenda
• Introduction to Energinet.dk
• Operating the Danish Electricity System with 25% wind power
• Preparing for 50% wind power in 2020 and a fossil free energy system in 2050
• The Bornholm Experiment
14
Main challenges for the Danish electricity system
2010 2020
25%
50%
Wind energy in electricity system
2010 2020
Security of supply
2010 2020
Market function
15
Energinet.dk’s strong prioritisation for 2020
50% ?
50% Wind
Smart Grid for efficient control and market based regulation of the power system
Production Means and solutions
Robust transmission grid, strong interconnectors and market integration
Flexibility in demand and production – integrating the heat and transportation sector
+
+
16
Two examples of Smart Grid R&D projects in Denmark
• Cell Controller Pilot Project – Intelligent mobilization of Distributed Energy Resources
• EDISON - Large scale Electrical Vehicles project in Denmark
17 17
Cell Controller Pilot Project world class Smart Grid RD&D
Cell Controller
Industry
Wind turbines
Local CHP units
Households
Households
18
150 kV
∼
∼
∼
∼
60 kV 60 kV 60 kV
10 kV 10 kV 10 kV
60 kV 60 kV
60 kV
10 kV
10 kV 60 kV
10 kV
60 kV
Input Output
Cell Controller
Pilot Cell area Holsted 60 kV Net Installed CHP: 37 MW Installed wind power: 39 MW Peak load: 61 MW 150/60 kV Trans: 100 MVA
19
Typical Danish wind turbines and CHP units
5 CHP units and 47 wind turbines are located in the Holsted pilot area
20
Cell Controller development 2005-2011
Distributed intelligent control at each DER and substation Technical VPP performance respects market operation Active response and balancing of all actions within few sec. A Technical VPP solution is now ready for deployment
Agent
Level 4 DNO SCADA
Agent
Agent Agent
Agent
Agent
Agent
Agent
Agent
Agent Agent Agent
Agent
Agent Agent Level 0 (Units)
Level 1 (Assets)
Level 2 (60/10 kV Substations)
Level 3 (150/60 kV Substation)
Virtual Power Plant Complete report ready for download at www.energinet.dk
21
EDISON – Large scale EV project in Denmark
Electric vehicles in a Distributed and Integrated market using Sustainable energy and Open Networks
Electric Vehicle
Power Exchange
Balance Responsible
Power Dealer
22
Smart Grids aspect: Capacity for EV charging Case study in 0.4 kV feeder with 48 private houses in local grid at DSO NRGi-Net
Max. capacity in feeder
3 EV’s charging at the same time with 16 A 3-Phase in the Peak Hour at dinner time 18:00
65 EV’s might charge their daily consumption if distributed between 16:00 and 7:00
High value of Smart Grids for balancing the grid !
EVs are typical not at home in day hours
Amps
23
Agenda
• Introduction to Energinet.dk
• Operating the Danish Electricity System with 25% wind power
• Preparing for 50% wind power in 2020 and a fossil free energy system in 2050
• The Bornholm Experiment
24
Bornholm
DENMARK Energinet.dk (Initiator) Østkraft Center for Electric Technology, DTU Siemens IBM Landis+Gyr
BELGIUM ELIA EANDIS (+ORES)
GERMANY EnCT Siemens AG*
SPAIN Tecnalia
PORTUGAL EDPD
NORWAY SINTEF ER (Coordinator)
ESTONIA Tallinn University of Technology (TUT)
THE NETHERLANDS ECN TNO
AUSTRIA Austrian Institute of Technology (AIT)
SWITZERLAND IBM Zrl* Siemens, CH*
Bornholm – European Smart Grid lab
Real people – real grid – real solutions!
EcoGrid EU partners
25
EcoGrid EU – not just another Smart Grid project
• EcoGrid EU – cutting edge RD&D project on the Danish island of Bornholm
• Testing a close to real-time market design – 5 min. market
• Ensuring costumer participation
• Ensuring balancing of power flow closer to and within the hour of operation
• Large scale demonstration in real grid with 2,000 real consumers
• Scalability for Europe and many different grid platforms
• Primary focus on the distribution grid and Renewable Energy Sources
• TSO interest is local balance – with much higher penetration of RES
• Alternative is to adopt imbalances in the transmission grid
• Economical benefit for everybody
• Socioeconomically benefit – when RES are being utilized at an optimum
• Using and rewarding consumer behavior for balancing the grid
• Avoiding grid investments
26
EDISON and Cell Controller to Bornholm
Cell Controller
Industry
Wind turbines
Local CHP units
Households
Households