10/27/2011 1  at the Highway 5 and Route 20 Interchange  Williams, California Caltrans Landslide All Ramps have minor to severe cracks parallel  to shoulder. Wetland

Upload: christopherapss

Post on 06-Jul-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 1/14

10/27/

at the Highway 5 and Route 20

Interchange

Williams, California

Caltrans

Landslide

All Ramps have minor to severe cracks parallel to shoulder.

Wetland

Page 2: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 2/14

10/27/

Project Description

• Approximately 1.5 miles of unstable slopes• Slope inclination 2:1 to 1.6:1.0• Max slope height 30 feet• Existing interchange approximately 10 years

old.

Ramp Fill Properties• Soil Type = CL‐CH

= o • UC = 2000 psf • Cohesion = 75 psf • o

Active zone/slide

plane

=

5ft.• Corrosion Potential corrosive to unprotected steel

Page 3: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 3/14

10/27/

Plastic Fill Embankments Exhibit Distress

• Shallow Landslides• Slope Creep• Cyclic Shrink/Swell

Shallow Slides Threaten Guard Rail

Page 4: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 4/14

10/27/

Deep Shrinkage Cracks Form in Summer

Page 5: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 5/14

10/27/

Page 6: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 6/14

10/27/

Restricted Wetland Area at Base of Slope

Page 7: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 7/14

10/27/

Pavement Edge Cracking Due to Creep

PL3

1

2

1

Expansive Clay Fill

Wetland

Shallow Slides Threaten Guard Rail

Page 8: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 8/14

10/27/

Proposed Repair Alternatives

1. Lime Treated 18 inch thick layer plus 24 inch ‐ .

2. Remove 36 inches of clay and replace with non ‐expansive fill.

3. Remove 5 feet of clay fill and replace with a Rock Slope Protection Layer.

4. Reinforce slope with closely spaced vertical steel elements to eliminate creep and shallow failures. (Platepiles)

Alternative #1

Page 9: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 9/14

10/27/

Alternative # 2

Alternative # 3

Page 10: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 10/14

10/27/

Concept: Divide Slopeinto Small Increments

Alternative # 4

Slope IncrementSupported by EachPlate Pile

Unstable Layer

Platepile Slope Stabilization Concept

Platepiles

Stable Material Material

Page 11: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 11/14

10/27/

Shoulder Displacement and Edge

Cracking Due

to

Slope

Creep

&

Shallow SlidesPavement Edge Cracking

Due to Creep

PLATEPILES3

1

2

1 Wetland

Typical Ramp Cross SectionTypical Ramp Cross Section

xpans ve ay

Original Grade

Existing Grade

Slide Surface

1. Excavate Slide Area2. Push slide debris back and

compact by track rolling.

Slide Repair Procedure

3. Place and compact 24 inches of AB at top of slide under pavement.

4. Install Platepiles5. Pave and replace guard

rail.

SLIDE REPAIR

Page 12: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 12/14

10/27/

Platepile Layout on 4’ X 8’ GridPlatepile Layout on 4’ X 8’ Grid

10’‐long

Platepiles

Construction Construction Summer 2010Summer 2010

6’‐long Platepiles

9,000 10 foot and 6 foot Platepiles

Production Rates: 400 6‐foot per day max. 200 10‐foot per day

Platepile Layout Flags

Page 13: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 13/14

10/27/

Installing 10‐foot Platepiles with Vibratory Hammer

Driving 10‐foot Platepiles Using Hydraulic

Hammer

Page 14: 03 Short PPT stabilizing embankment slopes

8/17/2019 03 Short PPT stabilizing embankment slopes

http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 14/14

10/27/

Summary

• 9000 Platepiles installed in 60 days• Savings to owner approximately $3,000,000• No import needed.• Wetlands not touched.• Two excavators installed Platepiles.