at the Highway 5 and Route 20
Interchange
Williams, California
Caltrans
Landslide
All Ramps have minor to severe cracks parallel to shoulder.
Wetland
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 2/14
10/27/
Project Description
• Approximately 1.5 miles of unstable slopes• Slope inclination 2:1 to 1.6:1.0• Max slope height 30 feet• Existing interchange approximately 10 years
old.
Ramp Fill Properties• Soil Type = CL‐CH
= o • UC = 2000 psf • Cohesion = 75 psf • o
•
Active zone/slide
plane
=
5ft.• Corrosion Potential corrosive to unprotected steel
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 3/14
10/27/
Plastic Fill Embankments Exhibit Distress
• Shallow Landslides• Slope Creep• Cyclic Shrink/Swell
Shallow Slides Threaten Guard Rail
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 4/14
10/27/
Deep Shrinkage Cracks Form in Summer
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 5/14
10/27/
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 6/14
10/27/
Restricted Wetland Area at Base of Slope
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 7/14
10/27/
Pavement Edge Cracking Due to Creep
PL3
1
2
1
Expansive Clay Fill
Wetland
Shallow Slides Threaten Guard Rail
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 8/14
10/27/
Proposed Repair Alternatives
1. Lime Treated 18 inch thick layer plus 24 inch ‐ .
2. Remove 36 inches of clay and replace with non ‐expansive fill.
3. Remove 5 feet of clay fill and replace with a Rock Slope Protection Layer.
4. Reinforce slope with closely spaced vertical steel elements to eliminate creep and shallow failures. (Platepiles)
Alternative #1
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 9/14
10/27/
Alternative # 2
Alternative # 3
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 10/14
10/27/
Concept: Divide Slopeinto Small Increments
Alternative # 4
Slope IncrementSupported by EachPlate Pile
Unstable Layer
Platepile Slope Stabilization Concept
Platepiles
Stable Material Material
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 11/14
10/27/
Shoulder Displacement and Edge
Cracking Due
to
Slope
Creep
&
Shallow SlidesPavement Edge Cracking
Due to Creep
PLATEPILES3
1
2
1 Wetland
Typical Ramp Cross SectionTypical Ramp Cross Section
xpans ve ay
Original Grade
Existing Grade
Slide Surface
1. Excavate Slide Area2. Push slide debris back and
compact by track rolling.
Slide Repair Procedure
3. Place and compact 24 inches of AB at top of slide under pavement.
4. Install Platepiles5. Pave and replace guard
rail.
SLIDE REPAIR
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 12/14
10/27/
Platepile Layout on 4’ X 8’ GridPlatepile Layout on 4’ X 8’ Grid
10’‐long
Platepiles
Construction Construction Summer 2010Summer 2010
6’‐long Platepiles
9,000 10 foot and 6 foot Platepiles
Production Rates: 400 6‐foot per day max. 200 10‐foot per day
Platepile Layout Flags
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 13/14
10/27/
Installing 10‐foot Platepiles with Vibratory Hammer
Driving 10‐foot Platepiles Using Hydraulic
Hammer
8/17/2019 03 Short PPT stabilizing embankment slopes
http://slidepdf.com/reader/full/03-short-ppt-stabilizing-embankment-slopes 14/14
10/27/
Summary
• 9000 Platepiles installed in 60 days• Savings to owner approximately $3,000,000• No import needed.• Wetlands not touched.• Two excavators installed Platepiles.