5th TPM National Conference
Session B : Jishu Hozen
(Autonomous Maintenance)
Topic :JH Step 1-4
Presentation by
Mr J P Garyali
Sr General Manager
Shriram Pistons & Rings Ltd
-
8/22/2019 03 ShriramPistons&RingsLtd
2/27
5th TPM National Conference Page 3.1
Shriram Pistons & Rings Ltd JH Step 1-4
PRESENTATION ON
AUTONOMOUS MAINTENANCE (JISHU HOZEN)
STEP 1 TO STEP - 4
SHRIRAM PISTONS & RINGS LTD.
GHAZIABAD
TPM CLUB ANNUAL CONFERENCE NEW DELHI SLIDE NO. 1
BY : J.P.GARYALI
DATE : 1ST MARCH 2005
OUTLINE OF THE COMPANY
SHRIRAM PISTONS & RINGS LTD.
SLIDE NO. 2OUTLINE OF THE COMPANY
-
8/22/2019 03 ShriramPistons&RingsLtd
3/27
5th TPM National Conference Page 3.2
Shriram Pistons & Rings Ltd JH Step 1-4
1. OUTLINE OF THE COMPANY
INCORPORATED IN 1972
TURNOVER IN LAST F.Y.
Rs.310 Crores
TURNOVER IN F.Y. 2005 (PLAN)
Rs.350 Crores
OUTLINE OF THE COMPANY
MAIN COMPANY DETAILS
TOTAL AREA
105,000 SQ.M(26 Acres)
ELECTRIC POWER
GOVT. 7000 KVAOWN: 12000 KVA
STAFF
284
230
2476
OFFICERS
WORKMEN
TOTAL EMPLOYEES 2990
TOTAL NO.OF MACHINE
830
SLIDE NO. 4OUTLINE OF THE COMPANY
-
8/22/2019 03 ShriramPistons&RingsLtd
4/27
5th TPM National Conference Page 3.3
Shriram Pistons & Rings Ltd JH Step 1-4
PISTONS RINGS
P I N S ENGINE VALVES
PRODUCTS
SLIDE NO. 5OUTLINE OF THE COMPANY
HFHF
HONDA FOUNDRY- JAPAN
(Collaboration since 1989)
RIKENRIKEN
RIKEN CORPORATION- JAPAN
(Collaboration since 1978)
FUJI- OOZX- JAPAN
(Collaboration since 1993)
(Collaboration since 1972)KOLBENSHMIDT- GERMANY
FOR PISTONS
FOR RINGS FOR ENGINE VALVES
FOREIGN COLLABORATIONS
FOR PISTONS
SLIDE NO. 6OUTLINE OF THE COMPANY
-
8/22/2019 03 ShriramPistons&RingsLtd
5/27
5th TPM National Conference Page 3.4
Shriram Pistons & Rings Ltd JH Step 1-4
JOURNEY TOWARDS EXCELLENCE
ISO 9001
YEAR 1994
QS 9000
YEAR 1999
ISO 14001YEAR 2001
OHSAS 18001
YEAR 2003
TS 16949
YEAR 2003
TPM EXCELLENCE AWARD
YEAR 2004
CHALLENGE TPM SPECIAL AWARD - 2007
SLIDE NO. 7OUTLINE OF THE COMPANY
TPM IMPLEMENTATION
SHRIRAM PISTONS & RINGS LTD.
SLIDE NO. 8TPM IMPLEMENTATION
-
8/22/2019 03 ShriramPistons&RingsLtd
6/27
5th TPM National Conference Page 3.5
Shriram Pistons & Rings Ltd JH Step 1-4
JANUARY 2000
12. DATE OF TPM INAUGURATION
TPM was introduced at SPRL
in
SLIDE NO. 9TPM IMPLEMENTATION
3. T P M POLICY
ZERO FAILURE, ZERO DEFECT & ZERO ACCIDENT
THROUGH INTRODUCTION OF T P M, WITH
PARTICIPATION OF ALL EMPLOYEES.
MAXIMUM PROFITS THROUGH IMPROVEMENT OF
OVERALL EQUIPMENT EFFICIENCY, REDUCTION IN
COST AND INCREASE IN CUSTOMER SATISFACTION
SLIDE NO. 10TPM IMPLEMENTATION
-
8/22/2019 03 ShriramPistons&RingsLtd
7/27
5th TPM National Conference Page 3.6
Shriram Pistons & Rings Ltd JH Step 1-4
2. TPM PROMOTION ORGANIZATION
TPM
Secretariat
HOD
Officer
S S
W W W W
Officer
S S
W W W W
HOD
Officer
S S
W W W W
Officer
S S
W W W W
HOD
Officer
S S
W W W W
Officer
S S
W W W W
HOD
Officer
S S
W W W W
Officer
S S
W W W W
Officer
S
W W
HOD
Officer
S S
W W W W
Officer
S S
W W W W
HOD
Officer
S S
W W W W
Officer
S S
W W W W
HOD
Officer
S S
W W W W
Officer
S S
W W W W
HOD
Officer
S S
W W W W
Officer
S S
W W W W
HOD
Officer
S S
W W W W
Officer
S S
W W W
Plant TPM Promotion
Committee (10 Nos.)
Area TPM Promotion
Committee (66 Nos.)
Circles (242 Nos.)
TPM
Secretariat
Executive Director
TPM Steering Committee
H O D H O D H O D H O D H
H O D H O D H O D H O D
MANUFACTURING PLANTS & DEPTTS.
5. Initial Control
6. Education & Training
7. Office TPM
8. Safety, Health & Envimt
3. Planned Maintenance
4. Quality Maintenance
2. Autonomous Maintenance
1. Kobetsu Kaizen
SUBCOMMITTEES
SLIDE NO. 11TPM IMPLEMENTATION
5. T P M IMPLEMENTATION PROCESS
TPM TRAININGS
TPM KICK- OFF
MODEL MACHINE
ACTIVITY
SEMINARS
SMALL GROUP
ACTIVITIES
CONSULTANT AUDIT /GUIDANCE
SLIDE NO. 12TPM IMPLEMENTATION
-
8/22/2019 03 ShriramPistons&RingsLtd
8/27
5th TPM National Conference Page 3.7
Shriram Pistons & Rings Ltd JH Step 1-4
IMPLEMENTATION OF AUTONOMOUS MAINTENANCE
STEP 1 TO STEP - 4
SHRIRAM PISTONS & RINGS LTD.
SLIDE NO. 13JISHU HOZEN ACTIVITY
SLIDE NO. 14JISHU HOZEN ACTIVITY
PHILOSOPHY BEHIND AUTONOMOUS MAINTENANCE
A workman who is operating a machine or equipment, day in &
day out, is expected to have the best knowledge about the
machine, operation.
If a, little knowledge & training is given to this operator on simple
maintenance areas, it is possible for him to broaden his expertise
towards the maintenance of this machine as well.
(Contd.)
-
8/22/2019 03 ShriramPistons&RingsLtd
9/27
5th TPM National Conference Page 3.8
Shriram Pistons & Rings Ltd JH Step 1-4
SLIDE NO. 15JISHU HOZEN ACTIVITY
With each operator, becoming partly a maintenance man also ,
for his machine, results in, huge benefits as given below :
! Enormous reductions in machine breakdowns &
stoppages, through regular inspection & early defect
warnings.
! Drastic improvement in the life of the machines,
components through controlling the forced deterioration
areas, an each machine.
! Prevention of leakage of oils/coolants/Air etc..
!Marked improvement in the availability of the machine
for production.
SLIDE NO. 16JISHU HOZEN ACTIVITY
PREPARATION (STEP 0)
This is the most important step in the successful implementation of the
Autonomous maintenance in on organization.
This comprises of following sub activities.:
1. Making of a plan :
! This includes formation of circles, company wide and allocating
the various machines to each circle. (to create the ownership
concept.)
! Making of inspection formats for Auditing at the end of each Step
activities.
! Making a schedule of the activities to be undertaken under each
step.(Contd.)
-
8/22/2019 03 ShriramPistons&RingsLtd
10/27
5th TPM National Conference Page 3.9
Shriram Pistons & Rings Ltd JH Step 1-4
SLIDE NO. 17JISHU HOZEN ACTIVITY
3. Training on the skills of :
! Cleaning : Method, correct tools for cleaning (specific to a
machine)
! Lubrication : Purpose, Type, Method quantity, Period etc.
! Retightening : Purpose, correct fastening methods, use of correct tools
etc.
2. Imparting Trainings
! Regarding the basic working of the machine and the accessories/ Sub
assemblies.
!Training on safety (Both electrical & Mechanical)
! Understanding the conditions of forced deterioration & losses.
SLIDE NO. 18JISHU HOZEN ACTIVITY
CHECKPOINTS FOR NUTS AND BOLTS
Are bolts inserted from below. and are nut visible from the outside ?
Are devices such as limit switches secured by at least to bolts ?
Are wing nuts on the right way around ?
Attachment of
Nuts & Bolts
Are Flat washers used on long holes ?
Are tapered washers used on angle bars and channel ?
Are spring washers used where parts are subject to vibration ?
Are identical washers used on identical parts ?
Washers
Do all Bolts protrude from nuts by 2 3 thread lengths ?Bolts Lengths
Are any nuts or Bolts loose ?
Are any nuts or Bolts missing ?Slight Defects
Check points are developed to help the operator
recognize the abnormalities
-
8/22/2019 03 ShriramPistons&RingsLtd
11/27
5th TPM National Conference Page 3.10
Shriram Pistons & Rings Ltd JH Step 1-4
SLIDE NO. 19JISHU HOZEN ACTIVITY
! Check Points for Lubrication
! Check Points for Transmission System
! Check Points for Hydraulic
! Check Points for Pneumatics
! Check Points for Electrical
! Check Points for General Purpose Equipment
SIMILARLY CHECK POINTS ARE DEVELOPEDFOR OTHER PARAMETERS
FOR EXAMPLE :
BASIC APPROACH
Initial Cleaning1
Contamination Sources2
Tentative Standards3
General Inspection4
Autonomous Inspection5
Standardization6
Autonomous Management.7
Through Participationof all Employees.
Implementationof each step.
SLIDE NO. 20JISHU HOZEN ACTIVITY
-
8/22/2019 03 ShriramPistons&RingsLtd
12/27
5th TPM National Conference Page 3.11
Shriram Pistons & Rings Ltd JH Step 1-4
CHARACTERISTICS
Activity board for promotion ofJ.H. Activity.
Significant learning FromManager Model M/cs.
Participation of all employees.(Improved 5S)
Designated place for tooling & WIP.
SLIDE NO. 21JISHU HOZEN ACTIVITY
JISHU HOZEN ACTIVITY - MASTER PLAN
IMPLEMENTATION ESTABLISHMENT
OCT- 99 APR- 00 OCT- 00 APR- 01 OCT- 01 APR- 0 2 OCT- 02 APR- 03 OCT- 03
MAR- 00 SEP- 0 0 MAR- 01 SEP- 01 MAR- 02 SEP- 02 MAR- 03 SEP- 03 MAR- 04
1ST LEVEL
MACHINES
(53 MACHINES)
2ND LEVEL
MACHINES
(768 MACHINES)
PERIOD
JAN-04~MAR-06
INTRODUCTION
PERIOD
JUNE-01~MAR-03
PERIOD
APR-03~DEC-03
YEAR
ITEM
PREPARATION
(9 MACHINES)
ACTIVITY
PLAN OF
MODEL MACHINE
PERIOD
OCT-99 ~MAY-01APR- 04
MAR- 05
APR- 05
MAR- 06
STEP-1
STEP 0 STEP 1 - 3 STEP 4 STEP 5 - 6
PLAN COMPLETED
KICKOFF-JAN
2000
CHALLANGETPM
EXCELLANCE
AWARD
STEP-2
STEP-3
STEP-1
STEP-2
STEP-3
STEP-1
STEP-2
STEP-3
STEP - 4
STEP - 4
STEP - 4
SLIDE NO. 22JISHU HOZEN ACTIVITY
-
8/22/2019 03 ShriramPistons&RingsLtd
13/27
5th TPM National Conference Page 3.12
Shriram Pistons & Rings Ltd JH Step 1-4
To reduce cleaning / inspection / lubrication time.
To reduce minor stoppages during machines operation.
GOOD
64
21
0
25
50
75
100
Minor stoppages(Th.Nos./Month)
GOALS
OBJECTIVES
To develop operators ability to MAINTAIN and OPERATE,
their own equipment / machines, EFFECTIVELY.
Th.n
os
/MONTH
200
622
60
183
7224
0
150
300
450
600
750
900
1 2
CLEANING
INSPECTION
LUBRICATION
2000*(Bench Mark)
2004(Target)
Time reduction trend (All Plants)(Hours/Day)
TARGET SETTING
Hours
/D
ay
GOOD
64
11
0
25
50
75
100
2000*
(Bench Mark)
2004
(Target)
Minor stoppages (All Plants)(Th.Nos/Month)
Th.N
os
/M
on
th
GOOD
* Data recording started from Year 2000
* Data recording started from Year 2000
SLIDE NO. 23JISHU HOZEN ACTIVITY
SLIDE NO. 24JISHU HOZEN ACTIVITY
STEP 1 INITIAL CLEANING
! Cleaning is required to UNCOVER or DISCOVER, the Leaks, lossness, Damage,
and any other deteriorated condition of parts on the machine.
! one may be able to identify 200 to 500 defects on machines which are
revealed during cleaning :
!The defects are categorized & identified as :
1. White Tags : (Defects which can be corrected by the operator/circle
members themselves)
2. Red Tags : (Defects which require the assistance of Maintenance
personnel for correction.)
! For Deciding the correctness & ownership of Red tags a regular meeting is held
between the circle members & the maintenance personnel.
-
8/22/2019 03 ShriramPistons&RingsLtd
14/27
5th TPM National Conference Page 3.13
Shriram Pistons & Rings Ltd JH Step 1-4
SLIDE NO. 25JISHU HOZEN ACTIVITY
BACKGROUND
OIL LEAKAGES & COOLANT SPLASH
DUST & DIRT ON M/CS
SCATTERED CHIPS
JUMBLED WIRES
SLIDE NO. 26JISHU HOZEN ACTIVITY
-
8/22/2019 03 ShriramPistons&RingsLtd
15/27
5th TPM National Conference Page 3.14
Shriram Pistons & Rings Ltd JH Step 1-4
SLIDE NO. 27JISHU HOZEN ACTIVITY
ACTIVITIES UNDER STEP 1 (INITIAL CLEANING)
Circle Leader + Circle Members
M/c Allocated : (Boring M/c No. 11) e.g.
Cleaning for Inspection & Identify Defects
Put Defect Tags (White Tags or Red Tags)
Make Matrix of all tags Category wise
Meeting for allocation of tags
White Tags Red Tags
Assign Responsibility to the Circle
Members with TDC
Assign Responsibility to Maint.
Personnel with TDC
Generate Counter measures Generate Kaizens Generate One Point lesson
Consolidate the Results as Cumulative Trend Graph (Next Page)
FLOW
CHART
SLIDE NO. 28JISHU HOZEN ACTIVITY
ACTIVITIES UNDER STEP 1 (INITIAL CLEANING)(Contd.)
TREND GRAPH
No. of Defects No. of Kaizen No. of Breakdown Minor Stoppage
-
8/22/2019 03 ShriramPistons&RingsLtd
16/27
5th TPM National Conference Page 3.15
Shriram Pistons & Rings Ltd JH Step 1-4
FUGUAIS
Circle members performing initial cleaning.
SLIDE NO. 29JISHU HOZEN ACTIVITY
SLIDE NO. 30JISHU HOZEN ACTIVITY
Circle Leader + Circle Members
M/c Allocated : Boring M/c No. 11
IDENTIFY IDENTIFYConditions of Forced deterioration
In coolant,chips,slides,moving parts
Hydraulic etc.
conditions of hard to access
areas in and around the machine
Take up kaizens themes for
ImprovementDevelop One Point Lessons
Kaizen Implementation
By Circles/ Teams themselves.
ACTIVITIES UNDER STEP 2
Kaizen Implementation
By Circle/ Teams with Assistance
from PM
Consolidate & Monitor the results as Trend Graphs.
No. of kaizens No. of OPLNo.of defects
Found & ClosedNo.of Breakdown
No.of
Minor Stoppages
Eliminate/ reduce :! sources of forced deterioration
! Hard to Access Areas.FLOW
CHART
-
8/22/2019 03 ShriramPistons&RingsLtd
17/27
5th TPM National Conference Page 3.16
Shriram Pistons & Rings Ltd JH Step 1-4
Elimination of Source of contamination
Before After
Prevent
coolant
splashing
No Guard
Localized guard
84 123142
202284
329428
497568
675
13781462 1462 1462
248332
401478
607708
1462 1462 1462
792
1243
49 1861491161010
200
400
600
800
1000
1200
1400
1600
1800
2000
Apr
00
Jul
00
Oct
00
Jan
01
Apr
01
Jul
01
Oct
01
Jan
02
Apr
02
Jul
02
Oct
02
Jan
03
Apr
03
Jul
03
Oct
03
MONTHS
NUMBERS
IDENTIFIED
RECTIFIED
GOOD
Elimination of Sources of contamination - Status(Numbers)
No coolant splashingaround the M/c.
SLIDE NO. 31JISHU HOZEN ACTIVITY
Relayout
OfHose pipes
Improper hose
pipeProper hose pipe
265458
698
11241236
14101649
18522015
2264
34923 74 2 37 42
542
8711076 1124
12971463
17641983
2380
3 74 2 37 42
2518
362
3320
1970
400
800
1200
1600
2000
2400
2800
3200
3600
4000
4400
Apr
00
Jul
00
Oct
00
Jan
01
Apr
01
Jul
01
Oct
01
Jan
02
Apr
02
Jul
02
Oct
02
Jan
03
Apr
03
Jul
03
Oct
03
MONTHS
NUMBERS
IDENTIFIED
RECTIFIED
GOOD
Simplification of hard to access areas - Status(Numbers)
Before After
SLIDE NO. 32JISHU HOZEN ACTIVITY
-
8/22/2019 03 ShriramPistons&RingsLtd
18/27
5th TPM National Conference Page 3.17
Shriram Pistons & Rings Ltd JH Step 1-4
SLIDE NO. 33JISHU HOZEN ACTIVITY
ACTIVITIES UNDER STEP 3MAKING OF TENTATIVE STANDARDS
After having completed Step 1 & Step 2 activities the operator has now, fairly
good level of knowledge and he can now set Tentative Standards for :
! Inspection
! Lubrication
! Cleaning
Based on the above activities he can also fix the standards of time, required for
each activity.
After having developed the above standards, the operator may now implement
these on his machine and observe the results, for at least 3 months.
All the machines in the plant should now reach the Step 3 level.
(Contd.)
SLIDE NO. 34JISHU HOZEN ACTIVITY
Circle Leader + Circle Members
M/c Allocated : Boring M/c No. 11
Develop Tentative Standards for
1. Inspection
2. Lubrication
3. Cleaning
Implementation for 3 Months
Paint the Machines now with a standard new colour.
At the end of Step 3 all the Machines look
Completely upgraded & wear a new look.
Next improve the surroundings of all the machines
Now a complete change of shop floor takes place.
STEP 3 FLOW CHART
-
8/22/2019 03 ShriramPistons&RingsLtd
19/27
5th TPM National Conference Page 3.18
Shriram Pistons & Rings Ltd JH Step 1-4
ACTIVITIES UNDER STEP 3
Tentative Standard Check Sheet
Route Map
Preparation of tentative standard for cleaning, lubrication & inspection.
SLIDE NO. 35JISHU HOZEN ACTIVITY
Marking onPressure Gauges
VISUALIZATION ON MACHINES
Marking Oil
Level
Arrow to indicateDirection of belt
rotation
SLIDE NO. 36JISHU HOZEN ACTIVITY
-
8/22/2019 03 ShriramPistons&RingsLtd
20/27
5th TPM National Conference Page 3.19
Shriram Pistons & Rings Ltd JH Step 1-4
155281918220718
220722442625662
266452877730474
31886
39186
48010 48694
1146714162
1672318620
213182228323494
2535827221
29590
36582
46270
8654
48694
4869446843
44389
48694
62310
15000
30000
45000
60000
75000
Jan
00
Apr
00
Jul
00
Oct
00
Jan
01
Apr
01
Jul
01
Oct
01
Jan
02
Apr
02
Jul
02
Oct
02
Jan
03
Apr
03
Jul
03
Oct
03
MONTHS
FOUND
CLOSED
1266112661
16436
16436
4802
4802
3828
3828 2176
2176
50365036
37553755
4869448694
0
10000
20000
30000
40000
50000
(NUMBERS).
Minor Flaws Unfulfilled
basic
condittions
Inaccessible
Places
ontamination
sources
Source of
quality
defectd
Unnecessary
items
unsafe places Total
Fuguai classification(Numbers)
Defects trend (Upto step 3)(Numbers)
(AS ON 30.6.04)
1266112661
16436
16436
48024802
38283828 2176 2176
50365036
37553755
4869448694
0
10000
20000
30000
40000
50000
Mi no r F la ws U nf ul fi ll ed
basic
condittions
Inaccessible
Places
Contamination
sources
Source of
quality
defectd
Unnecessary
items
unsafe places Total
Defects classification (Upto step 3)(Numbers)
Num
bers
Num
bers GOOD
SLIDE NO. 37JISHU HOZEN ACTIVITY
SLIDE NO. 38JISHU HOZEN ACTIVITY
ACTIVITIES UNDER STEP 4 (GENERAL INSPECTION)
In Step 4, thorough knowledge and Training is given to the operators, to
upgrade their knowledge and Maintenance skill.
With the assistance of In house teams of experts and maintenance heads,
various basic course modules are developed on different topics such as :
! Nut & Bolts
! Lubrication
!Hydraulic
!Pneumatic
!Drive
!Electric
!Safety
!Machining Condition
(Contd.)
-
8/22/2019 03 ShriramPistons&RingsLtd
21/27
5th TPM National Conference Page 3.20
Shriram Pistons & Rings Ltd JH Step 1-4
SLIDE NO. 39JISHU HOZEN ACTIVITY
A structured Programme for imparting this knowledge & Training to all the
employees, is drawn out & training implemented.
At the end of Step 4, there is a radical improvement in the attitude of the
operators, due to enhanced knowledge and skill levels.
(Contd.)
After these modules are developed, these are reviewed by a common
core committee & then finalized for issue & Training.
SLIDE NO. 40JISHU HOZEN ACTIVITY
Develop 8 Technical Modules
Imparting Training on 8 Tech modules to all employee
Reexamine the machines & Equipment with higher knowledge
& skill achieved under Step - 4
Now find more defects on the machines.
Updating the standards (Developed in Step 3)
Implement the new standards for 3 months
Consolidate & monitor the progress through following parameter
No. of
New kaizens
No. of new
defects
No. of new
One Point Lesson
STEP 4 FLOW CHART
-
8/22/2019 03 ShriramPistons&RingsLtd
22/27
5th TPM National Conference Page 3.21
Shriram Pistons & Rings Ltd JH Step 1-4
Class room trainingCut models
Training modules preparation and implementation
SLIDE NO. 41JISHU HOZEN ACTIVITY
Example of General Inspection.
Inspection on Belt Inspection on Coupling
SLIDE NO. 42JISHU HOZEN ACTIVITY
-
8/22/2019 03 ShriramPistons&RingsLtd
23/27
5th TPM National Conference Page 3.22
Shriram Pistons & Rings Ltd JH Step 1-4
1803
10080
1148312277
13248 13292 13323
7571
9529
10451
12329 12382 12431
175
0
2000
4000
6000
8000
10000
12000
14000
16000
Jun' 03 Sep' 03 Dec' 03 Mar' 04 Jun' 04 Sep' 04 Dec' 04
NUMBERS
FOUND
CLOSEDTrend of new Defects (in step 4)
(Numbers)
GOOD
SLIDE NO. 43JISHU HOZEN ACTIVITY
8933
1199 1023
480 627883
104 74
959 913
399 581851
100 65
8563
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
4.1
Nut & Bolts
4.2
Lubrication
4.5
Drives4.3
Hydraulic
4.4
Pneumatic
4.6
Electrical
4.7
Safety
4.8
Machining
Condition
(Number of defects)
Status of defects classification under step 4
FOUND - 13323
CLOSED - 12431
(AS ON 31.12.04)
NU
MBERS
SLIDE NO. 44JISHU HOZEN ACTIVITY
Defects
-
8/22/2019 03 ShriramPistons&RingsLtd
24/27
5th TPM National Conference Page 3.23
Shriram Pistons & Rings Ltd JH Step 1-4
4.5 4.6 4.7STEP-1
STEP WISE STATUS OF ALL CIRCLES
10TOOL ROOM
49RING PLANT
25RING FDY.
55PISTON PLANT
23AL.FDY.
18E.V.FORGE
18PIN PLANT
32E.V.M/C
12PAW
4.84.44.34.24.1
STEP - 4STEP-3STEP-2
ALLCIRCLES
PLANT
STEP WISE STATUS OF ALL CIRCLES
(AS ON 30.6.04) Completed
SLIDE NO. 45JISHU HOZEN ACTIVITY
486889
12511648
20152411
26802951
31493358
3657
4905
5941
66956989
7318 74267516 7667
7714
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
Jan
00
Apr
00
Jul
00
Oct
00
Jan
01
Apr
01
Jul
01
Oct
01
Jan
02
Apr
02
Jul
02
Oct
02
Jan
03
Apr
03
Jul
03
Oct
03
Jan
04
Apr
04
Jul
04
Oct'
04
MONTHS
NUMBERS
(Number of Kaizens)(upto step-4)
6. KAIZEN TREND - OVERALL
CHAPTER-5 JISHU HOZEN ACTIVITY
GOOD
SLIDE NO. 46
-
8/22/2019 03 ShriramPistons&RingsLtd
25/27
5th TPM National Conference Page 3.24
Shriram Pistons & Rings Ltd JH Step 1-4
Example - Elimination of Minor Stoppages
KK JH QM PM SHE OTPM IC ET
KAIZEN SHEET P Q C D S M
Plant: PISTON PLANT Machine Name: PRE OVAL TURNING Machine No: 110
Ka izen theme: Elimina tio n o f Mino r Sto ppa ge . Idea: Modif ied the leng th o f rocker arm to acco ma date.
Phenomna : Frequent adjustment required in the length of rocker arm small dia pistons
Problem/prese nt s ta tus : C ounterme as ure : Be nch mark 360 NOS.
Target ZERO
Kaize n s tart N OV' 03
Ka izen finish DEC' 0 3
(words / sketch) (words / sketch) Team members: MR.VIKASH KUMAR
MR.PRADEEP SRIVASTWA
MR.BABLI
MR.MAHIPAL
Benefits:
PRODUCTIVITY INCREASED BY 4 % IN SOME
Analysis: Results: PISTON MODEL.Minor stoppage occur 4- 5 times in a shift. Minor stoppage reduced.
Totaling time (360 nos/Month)
Pressure on rocker arm disturbed. Scope & Plan for Horizontal Deployment
S.No.
Spacer used in rocker arm assembly insome small dia models. - - - -
Inedequate length of rocker arm.
TDC Responsibility Status
Activity
Result
Area
-
TPM/STD/12
REVISION NO.-00
Machine
No.
Why
Why
Why
Nos/Month
Before After
360
0
SLIDE NO. 47JISHU HOZEN ACTIVITY
ONE POINT LESSON TREND - OVERALL
100 198279
468 546623 713
792 872967 1008
1306
1768
2201
29113131 3218
3379
171 172 175 177 182 209354 375
442 540569 613
722
64 118157 168 370
336325
285254230139906461514945311862 380
400
800
1200
1600
2000
2400
2800
3200
3600
Jan
00
Apr
00
Jul
00
Oct
00
Jan
01
Apr
01
Jul
01
Oct
01
Jan
02
Apr
02
Jul
02
Oct
02
Jan
03
Apr
03
Jul
03
Oct
03
Jan
04
Dec
04
MONTHS
NUMBERS
BASIC KNOWLEDGE
IMPROVEMENT CASES
TROUBLE CASES
(Category wise One point lessons)(Upto Step - 4)
GOOD
109 226361
617 741836 933
1015 11081209 1280
1843
2354
2830
3638
3996 41234362
0
500
1000
1500
2000
2500
3000
3500
4000
4500
Jan
00
Apr
00
Jul
00
Oct
00
Jan
01
Apr
01
Jul
01
Oct
01
Jan
02
Apr
02
Jul
02
Oct
02
Jan
03
Apr
03
Jul
03
Oct
03
Jan
04
MONTHS
NUMBERS
(Number of one point lesson)
(Upto Step - 4)
Dec
04
GOOD
SLIDE NO. 48JISHU HOZEN ACTIVITY
-
8/22/2019 03 ShriramPistons&RingsLtd
26/27
5th TPM National Conference Page 3.25
Shriram Pistons & Rings Ltd JH Step 1-4
622
195
388
234
183
9472 64
7235 29
31
0
100
200
300
400
500
600
700
1ST
PHASE
2ND
PHASE
3RD
PHASE
CLEANING
INSPECTION
LUBRICATION
Time reduction trend(Hours/Day)
(As on 31.12.04)
TANGIBLE RESULT
Minor stoppages(Nos./Month)
2000
Benchmark
NOS./
MONTH
GOOD
2000
(Benchmark)
RESULTS
64
56
4946
3933
23
2018
17
1511
0
25
50
75
100
Oct' 02 Jan ' 03 Apr' 03 Ju l' 03 Oct' 03 Jan ' 04 Apr'04 Jul '04 Oct'04 Dec '04
Minor stoppages(Th. Nos./Month)
2000
(Benchmark)
2004
(Target)
Th.
Nos./MONTH
Hours
/Da
y
GOOD77 %Reduction
SLIDE NO. 49JISHU HOZEN ACTIVITY
100
183218
475
648
720
167
380
0
200
400
600
800
1000
RESULTS
" Breakdown Frequency - Trend
GOOD
BREAK
DOWNNUMBERS/
MONTH
PERIOD
77 %
Reduction
2000 2001 2002
Breakdown Frequency - Trend
1999(Bench Mark)
2003 2004(Target)
2004(Jun 04)
CHAPTER-6 PLANNED MAINTENANCE ACTIVITY SLIDE NO. 50 TPM REPORT PAGE NO. 114
2004(Nov 04)
75 %
Reduction
-
8/22/2019 03 ShriramPistons&RingsLtd
27/27
Shriram Pistons & Rings Ltd JH Step 1-4
Improvement in operatorsAttitude
Active participation / Team work
Neat and clean shop floor
INTANGIBLE RESULTS
SLIDE NO. 51JISHU HOZEN ACTIVITY