    5th TPM National Conference

    Session B : Jishu Hozen

    (Autonomous Maintenance)

    Topic :JH Step 1-4

    Presentation by

    Mr J P Garyali

    Sr General Manager

    Shriram Pistons & Rings Ltd

  • 8/22/2019 03 ShriramPistons&RingsLtd

    2/27

    5th TPM National Conference Page 3.1

    Shriram Pistons & Rings Ltd JH Step 1-4

    PRESENTATION ON

    AUTONOMOUS MAINTENANCE (JISHU HOZEN)

    STEP 1 TO STEP - 4

    SHRIRAM PISTONS & RINGS LTD.

    GHAZIABAD

    TPM CLUB ANNUAL CONFERENCE NEW DELHI SLIDE NO. 1

    BY : J.P.GARYALI

    DATE : 1ST MARCH 2005

    OUTLINE OF THE COMPANY

    SHRIRAM PISTONS & RINGS LTD.

    SLIDE NO. 2OUTLINE OF THE COMPANY

  • 8/22/2019 03 ShriramPistons&RingsLtd

    3/27

    5th TPM National Conference Page 3.2

    Shriram Pistons & Rings Ltd JH Step 1-4

    1. OUTLINE OF THE COMPANY

    INCORPORATED IN 1972

    TURNOVER IN LAST F.Y.

    Rs.310 Crores

    TURNOVER IN F.Y. 2005 (PLAN)

    Rs.350 Crores

    OUTLINE OF THE COMPANY

    MAIN COMPANY DETAILS

    TOTAL AREA

    105,000 SQ.M(26 Acres)

    ELECTRIC POWER

    GOVT. 7000 KVAOWN: 12000 KVA

    STAFF

    284

    230

    2476

    OFFICERS

    WORKMEN

    TOTAL EMPLOYEES 2990

    TOTAL NO.OF MACHINE

    830

    SLIDE NO. 4OUTLINE OF THE COMPANY

  • 8/22/2019 03 ShriramPistons&RingsLtd

    4/27

    5th TPM National Conference Page 3.3

    Shriram Pistons & Rings Ltd JH Step 1-4

    PISTONS RINGS

    P I N S ENGINE VALVES

    PRODUCTS

    SLIDE NO. 5OUTLINE OF THE COMPANY

    HFHF

    HONDA FOUNDRY- JAPAN

    (Collaboration since 1989)

    RIKENRIKEN

    RIKEN CORPORATION- JAPAN

    (Collaboration since 1978)

    FUJI- OOZX- JAPAN

    (Collaboration since 1993)

    (Collaboration since 1972)KOLBENSHMIDT- GERMANY

    FOR PISTONS

    FOR RINGS FOR ENGINE VALVES

    FOREIGN COLLABORATIONS

    FOR PISTONS

    SLIDE NO. 6OUTLINE OF THE COMPANY

  • 8/22/2019 03 ShriramPistons&RingsLtd

    5/27

    5th TPM National Conference Page 3.4

    Shriram Pistons & Rings Ltd JH Step 1-4

    JOURNEY TOWARDS EXCELLENCE

    ISO 9001

    YEAR 1994

    QS 9000

    YEAR 1999

    ISO 14001YEAR 2001

    OHSAS 18001

    YEAR 2003

    TS 16949

    YEAR 2003

    TPM EXCELLENCE AWARD

    YEAR 2004

    CHALLENGE TPM SPECIAL AWARD - 2007

    SLIDE NO. 7OUTLINE OF THE COMPANY

    TPM IMPLEMENTATION

    SHRIRAM PISTONS & RINGS LTD.

    SLIDE NO. 8TPM IMPLEMENTATION

  • 8/22/2019 03 ShriramPistons&RingsLtd

    6/27

    5th TPM National Conference Page 3.5

    Shriram Pistons & Rings Ltd JH Step 1-4

    JANUARY 2000

    12. DATE OF TPM INAUGURATION

    TPM was introduced at SPRL

    in

    SLIDE NO. 9TPM IMPLEMENTATION

    3. T P M POLICY

    ZERO FAILURE, ZERO DEFECT & ZERO ACCIDENT

    THROUGH INTRODUCTION OF T P M, WITH

    PARTICIPATION OF ALL EMPLOYEES.

    MAXIMUM PROFITS THROUGH IMPROVEMENT OF

    OVERALL EQUIPMENT EFFICIENCY, REDUCTION IN

    COST AND INCREASE IN CUSTOMER SATISFACTION

    SLIDE NO. 10TPM IMPLEMENTATION

  • 8/22/2019 03 ShriramPistons&RingsLtd

    7/27

    5th TPM National Conference Page 3.6

    Shriram Pistons & Rings Ltd JH Step 1-4

    2. TPM PROMOTION ORGANIZATION

    TPM

    Secretariat

    HOD

    Officer

    S S

    W W W W

    Officer

    S S

    W W W W

    HOD

    Officer

    S S

    W W W W

    Officer

    S S

    W W W W

    HOD

    Officer

    S S

    W W W W

    Officer

    S S

    W W W W

    HOD

    Officer

    S S

    W W W W

    Officer

    S S

    W W W W

    Officer

    S

    W W

    HOD

    Officer

    S S

    W W W W

    Officer

    S S

    W W W W

    HOD

    Officer

    S S

    W W W W

    Officer

    S S

    W W W W

    HOD

    Officer

    S S

    W W W W

    Officer

    S S

    W W W W

    HOD

    Officer

    S S

    W W W W

    Officer

    S S

    W W W W

    HOD

    Officer

    S S

    W W W W

    Officer

    S S

    W W W

    Plant TPM Promotion

    Committee (10 Nos.)

    Area TPM Promotion

    Committee (66 Nos.)

    Circles (242 Nos.)

    TPM

    Secretariat

    Executive Director

    TPM Steering Committee

    H O D H O D H O D H O D H

    H O D H O D H O D H O D

    MANUFACTURING PLANTS & DEPTTS.

    5. Initial Control

    6. Education & Training

    7. Office TPM

    8. Safety, Health & Envimt

    3. Planned Maintenance

    4. Quality Maintenance

    2. Autonomous Maintenance

    1. Kobetsu Kaizen

    SUBCOMMITTEES

    SLIDE NO. 11TPM IMPLEMENTATION

    5. T P M IMPLEMENTATION PROCESS

    TPM TRAININGS

    TPM KICK- OFF

    MODEL MACHINE

    ACTIVITY

    SEMINARS

    SMALL GROUP

    ACTIVITIES

    CONSULTANT AUDIT /GUIDANCE

    SLIDE NO. 12TPM IMPLEMENTATION

  • 8/22/2019 03 ShriramPistons&RingsLtd

    8/27

    5th TPM National Conference Page 3.7

    Shriram Pistons & Rings Ltd JH Step 1-4

    IMPLEMENTATION OF AUTONOMOUS MAINTENANCE

    STEP 1 TO STEP - 4

    SHRIRAM PISTONS & RINGS LTD.

    SLIDE NO. 13JISHU HOZEN ACTIVITY

    SLIDE NO. 14JISHU HOZEN ACTIVITY

    PHILOSOPHY BEHIND AUTONOMOUS MAINTENANCE

    A workman who is operating a machine or equipment, day in &

    day out, is expected to have the best knowledge about the

    machine, operation.

    If a, little knowledge & training is given to this operator on simple

    maintenance areas, it is possible for him to broaden his expertise

    towards the maintenance of this machine as well.

    (Contd.)

  • 8/22/2019 03 ShriramPistons&RingsLtd

    9/27

    5th TPM National Conference Page 3.8

    Shriram Pistons & Rings Ltd JH Step 1-4

    SLIDE NO. 15JISHU HOZEN ACTIVITY

    With each operator, becoming partly a maintenance man also ,

    for his machine, results in, huge benefits as given below :

    ! Enormous reductions in machine breakdowns &

    stoppages, through regular inspection & early defect

    warnings.

    ! Drastic improvement in the life of the machines,

    components through controlling the forced deterioration

    areas, an each machine.

    ! Prevention of leakage of oils/coolants/Air etc..

    !Marked improvement in the availability of the machine

    for production.

    SLIDE NO. 16JISHU HOZEN ACTIVITY

    PREPARATION (STEP 0)

    This is the most important step in the successful implementation of the

    Autonomous maintenance in on organization.

    This comprises of following sub activities.:

    1. Making of a plan :

    ! This includes formation of circles, company wide and allocating

    the various machines to each circle. (to create the ownership

    concept.)

    ! Making of inspection formats for Auditing at the end of each Step

    activities.

    ! Making a schedule of the activities to be undertaken under each

    step.(Contd.)

  • 8/22/2019 03 ShriramPistons&RingsLtd

    10/27

    5th TPM National Conference Page 3.9

    Shriram Pistons & Rings Ltd JH Step 1-4

    SLIDE NO. 17JISHU HOZEN ACTIVITY

    3. Training on the skills of :

    ! Cleaning : Method, correct tools for cleaning (specific to a

    machine)

    ! Lubrication : Purpose, Type, Method quantity, Period etc.

    ! Retightening : Purpose, correct fastening methods, use of correct tools

    etc.

    2. Imparting Trainings

    ! Regarding the basic working of the machine and the accessories/ Sub

    assemblies.

    !Training on safety (Both electrical & Mechanical)

    ! Understanding the conditions of forced deterioration & losses.

    SLIDE NO. 18JISHU HOZEN ACTIVITY

    CHECKPOINTS FOR NUTS AND BOLTS

    Are bolts inserted from below. and are nut visible from the outside ?

    Are devices such as limit switches secured by at least to bolts ?

    Are wing nuts on the right way around ?

    Attachment of

    Nuts & Bolts

    Are Flat washers used on long holes ?

    Are tapered washers used on angle bars and channel ?

    Are spring washers used where parts are subject to vibration ?

    Are identical washers used on identical parts ?

    Washers

    Do all Bolts protrude from nuts by 2 3 thread lengths ?Bolts Lengths

    Are any nuts or Bolts loose ?

    Are any nuts or Bolts missing ?Slight Defects

    Check points are developed to help the operator

    recognize the abnormalities

  • 8/22/2019 03 ShriramPistons&RingsLtd

    11/27

    5th TPM National Conference Page 3.10

    Shriram Pistons & Rings Ltd JH Step 1-4

    SLIDE NO. 19JISHU HOZEN ACTIVITY

    ! Check Points for Lubrication

    ! Check Points for Transmission System

    ! Check Points for Hydraulic

    ! Check Points for Pneumatics

    ! Check Points for Electrical

    ! Check Points for General Purpose Equipment

    SIMILARLY CHECK POINTS ARE DEVELOPEDFOR OTHER PARAMETERS

    FOR EXAMPLE :

    BASIC APPROACH

    Initial Cleaning1

    Contamination Sources2

    Tentative Standards3

    General Inspection4

    Autonomous Inspection5

    Standardization6

    Autonomous Management.7

    Through Participationof all Employees.

    Implementationof each step.

    SLIDE NO. 20JISHU HOZEN ACTIVITY

  • 8/22/2019 03 ShriramPistons&RingsLtd

    12/27

    5th TPM National Conference Page 3.11

    Shriram Pistons & Rings Ltd JH Step 1-4

    CHARACTERISTICS

    Activity board for promotion ofJ.H. Activity.

    Significant learning FromManager Model M/cs.

    Participation of all employees.(Improved 5S)

    Designated place for tooling & WIP.

    SLIDE NO. 21JISHU HOZEN ACTIVITY

    JISHU HOZEN ACTIVITY - MASTER PLAN

    IMPLEMENTATION ESTABLISHMENT

    OCT- 99 APR- 00 OCT- 00 APR- 01 OCT- 01 APR- 0 2 OCT- 02 APR- 03 OCT- 03

    MAR- 00 SEP- 0 0 MAR- 01 SEP- 01 MAR- 02 SEP- 02 MAR- 03 SEP- 03 MAR- 04

    1ST LEVEL

    MACHINES

    (53 MACHINES)

    2ND LEVEL

    MACHINES

    (768 MACHINES)

    PERIOD

    JAN-04~MAR-06

    INTRODUCTION

    PERIOD

    JUNE-01~MAR-03

    PERIOD

    APR-03~DEC-03

    YEAR

    ITEM

    PREPARATION

    (9 MACHINES)

    ACTIVITY

    PLAN OF

    MODEL MACHINE

    PERIOD

    OCT-99 ~MAY-01APR- 04

    MAR- 05

    APR- 05

    MAR- 06

    STEP-1

    STEP 0 STEP 1 - 3 STEP 4 STEP 5 - 6

    PLAN COMPLETED

    KICKOFF-JAN

    2000

    CHALLANGETPM

    EXCELLANCE

    AWARD

    STEP-2

    STEP-3

    STEP-1

    STEP-2

    STEP-3

    STEP-1

    STEP-2

    STEP-3

    STEP - 4

    STEP - 4

    STEP - 4

    SLIDE NO. 22JISHU HOZEN ACTIVITY

  • 8/22/2019 03 ShriramPistons&RingsLtd

    13/27

    5th TPM National Conference Page 3.12

    Shriram Pistons & Rings Ltd JH Step 1-4

    To reduce cleaning / inspection / lubrication time.

    To reduce minor stoppages during machines operation.

    GOOD

    64

    21

    0

    25

    50

    75

    100

    Minor stoppages(Th.Nos./Month)

    GOALS

    OBJECTIVES

    To develop operators ability to MAINTAIN and OPERATE,

    their own equipment / machines, EFFECTIVELY.

    Th.n

    os

    /MONTH

    200

    622

    60

    183

    7224

    0

    150

    300

    450

    600

    750

    900

    1 2

    CLEANING

    INSPECTION

    LUBRICATION

    2000*(Bench Mark)

    2004(Target)

    Time reduction trend (All Plants)(Hours/Day)

    TARGET SETTING

    Hours

    /D

    ay

    GOOD

    64

    11

    0

    25

    50

    75

    100

    2000*

    (Bench Mark)

    2004

    (Target)

    Minor stoppages (All Plants)(Th.Nos/Month)

    Th.N

    os

    /M

    on

    th

    GOOD

    * Data recording started from Year 2000

    * Data recording started from Year 2000

    SLIDE NO. 23JISHU HOZEN ACTIVITY

    SLIDE NO. 24JISHU HOZEN ACTIVITY

    STEP 1 INITIAL CLEANING

    ! Cleaning is required to UNCOVER or DISCOVER, the Leaks, lossness, Damage,

    and any other deteriorated condition of parts on the machine.

    ! one may be able to identify 200 to 500 defects on machines which are

    revealed during cleaning :

    !The defects are categorized & identified as :

    1. White Tags : (Defects which can be corrected by the operator/circle

    members themselves)

    2. Red Tags : (Defects which require the assistance of Maintenance

    personnel for correction.)

    ! For Deciding the correctness & ownership of Red tags a regular meeting is held

    between the circle members & the maintenance personnel.

  • 8/22/2019 03 ShriramPistons&RingsLtd

    14/27

    5th TPM National Conference Page 3.13

    Shriram Pistons & Rings Ltd JH Step 1-4

    SLIDE NO. 25JISHU HOZEN ACTIVITY

    BACKGROUND

    OIL LEAKAGES & COOLANT SPLASH

    DUST & DIRT ON M/CS

    SCATTERED CHIPS

    JUMBLED WIRES

    SLIDE NO. 26JISHU HOZEN ACTIVITY

  • 8/22/2019 03 ShriramPistons&RingsLtd

    15/27

    5th TPM National Conference Page 3.14

    Shriram Pistons & Rings Ltd JH Step 1-4

    SLIDE NO. 27JISHU HOZEN ACTIVITY

    ACTIVITIES UNDER STEP 1 (INITIAL CLEANING)

    Circle Leader + Circle Members

    M/c Allocated : (Boring M/c No. 11) e.g.

    Cleaning for Inspection & Identify Defects

    Put Defect Tags (White Tags or Red Tags)

    Make Matrix of all tags Category wise

    Meeting for allocation of tags

    White Tags Red Tags

    Assign Responsibility to the Circle

    Members with TDC

    Assign Responsibility to Maint.

    Personnel with TDC

    Generate Counter measures Generate Kaizens Generate One Point lesson

    Consolidate the Results as Cumulative Trend Graph (Next Page)

    FLOW

    CHART

    SLIDE NO. 28JISHU HOZEN ACTIVITY

    ACTIVITIES UNDER STEP 1 (INITIAL CLEANING)(Contd.)

    TREND GRAPH

    No. of Defects No. of Kaizen No. of Breakdown Minor Stoppage

  • 8/22/2019 03 ShriramPistons&RingsLtd

    16/27

    5th TPM National Conference Page 3.15

    Shriram Pistons & Rings Ltd JH Step 1-4

    FUGUAIS

    Circle members performing initial cleaning.

    SLIDE NO. 29JISHU HOZEN ACTIVITY

    SLIDE NO. 30JISHU HOZEN ACTIVITY

    Circle Leader + Circle Members

    M/c Allocated : Boring M/c No. 11

    IDENTIFY IDENTIFYConditions of Forced deterioration

    In coolant,chips,slides,moving parts

    Hydraulic etc.

    conditions of hard to access

    areas in and around the machine

    Take up kaizens themes for

    ImprovementDevelop One Point Lessons

    Kaizen Implementation

    By Circles/ Teams themselves.

    ACTIVITIES UNDER STEP 2

    Kaizen Implementation

    By Circle/ Teams with Assistance

    from PM

    Consolidate & Monitor the results as Trend Graphs.

    No. of kaizens No. of OPLNo.of defects

    Found & ClosedNo.of Breakdown

    No.of

    Minor Stoppages

    Eliminate/ reduce :! sources of forced deterioration

    ! Hard to Access Areas.FLOW

    CHART

  • 8/22/2019 03 ShriramPistons&RingsLtd

    17/27

    5th TPM National Conference Page 3.16

    Shriram Pistons & Rings Ltd JH Step 1-4

    Elimination of Source of contamination

    Before After

    Prevent

    coolant

    splashing

    No Guard

    Localized guard

    84 123142

    202284

    329428

    497568

    675

    13781462 1462 1462

    248332

    401478

    607708

    1462 1462 1462

    792

    1243

    49 1861491161010

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

    Apr

    00

    Jul

    00

    Oct

    00

    Jan

    01

    Apr

    01

    Jul

    01

    Oct

    01

    Jan

    02

    Apr

    02

    Jul

    02

    Oct

    02

    Jan

    03

    Apr

    03

    Jul

    03

    Oct

    03

    MONTHS

    NUMBERS

    IDENTIFIED

    RECTIFIED

    GOOD

    Elimination of Sources of contamination - Status(Numbers)

    No coolant splashingaround the M/c.

    SLIDE NO. 31JISHU HOZEN ACTIVITY

    Relayout

    OfHose pipes

    Improper hose

    pipeProper hose pipe

    265458

    698

    11241236

    14101649

    18522015

    2264

    34923 74 2 37 42

    542

    8711076 1124

    12971463

    17641983

    2380

    3 74 2 37 42

    2518

    362

    3320

    1970

    400

    800

    1200

    1600

    2000

    2400

    2800

    3200

    3600

    4000

    4400

    Apr

    00

    Jul

    00

    Oct

    00

    Jan

    01

    Apr

    01

    Jul

    01

    Oct

    01

    Jan

    02

    Apr

    02

    Jul

    02

    Oct

    02

    Jan

    03

    Apr

    03

    Jul

    03

    Oct

    03

    MONTHS

    NUMBERS

    IDENTIFIED

    RECTIFIED

    GOOD

    Simplification of hard to access areas - Status(Numbers)

    Before After

    SLIDE NO. 32JISHU HOZEN ACTIVITY

  • 8/22/2019 03 ShriramPistons&RingsLtd

    18/27

    5th TPM National Conference Page 3.17

    Shriram Pistons & Rings Ltd JH Step 1-4

    SLIDE NO. 33JISHU HOZEN ACTIVITY

    ACTIVITIES UNDER STEP 3MAKING OF TENTATIVE STANDARDS

    After having completed Step 1 & Step 2 activities the operator has now, fairly

    good level of knowledge and he can now set Tentative Standards for :

    ! Inspection

    ! Lubrication

    ! Cleaning

    Based on the above activities he can also fix the standards of time, required for

    each activity.

    After having developed the above standards, the operator may now implement

    these on his machine and observe the results, for at least 3 months.

    All the machines in the plant should now reach the Step 3 level.

    (Contd.)

    SLIDE NO. 34JISHU HOZEN ACTIVITY

    Circle Leader + Circle Members

    M/c Allocated : Boring M/c No. 11

    Develop Tentative Standards for

    1. Inspection

    2. Lubrication

    3. Cleaning

    Implementation for 3 Months

    Paint the Machines now with a standard new colour.

    At the end of Step 3 all the Machines look

    Completely upgraded & wear a new look.

    Next improve the surroundings of all the machines

    Now a complete change of shop floor takes place.

    STEP 3 FLOW CHART

  • 8/22/2019 03 ShriramPistons&RingsLtd

    19/27

    5th TPM National Conference Page 3.18

    Shriram Pistons & Rings Ltd JH Step 1-4

    ACTIVITIES UNDER STEP 3

    Tentative Standard Check Sheet

    Route Map

    Preparation of tentative standard for cleaning, lubrication & inspection.

    SLIDE NO. 35JISHU HOZEN ACTIVITY

    Marking onPressure Gauges

    VISUALIZATION ON MACHINES

    Marking Oil

    Level

    Arrow to indicateDirection of belt

    rotation

    SLIDE NO. 36JISHU HOZEN ACTIVITY

  • 8/22/2019 03 ShriramPistons&RingsLtd

    20/27

    5th TPM National Conference Page 3.19

    Shriram Pistons & Rings Ltd JH Step 1-4

    155281918220718

    220722442625662

    266452877730474

    31886

    39186

    48010 48694

    1146714162

    1672318620

    213182228323494

    2535827221

    29590

    36582

    46270

    8654

    48694

    4869446843

    44389

    48694

    62310

    15000

    30000

    45000

    60000

    75000

    Jan

    00

    Apr

    00

    Jul

    00

    Oct

    00

    Jan

    01

    Apr

    01

    Jul

    01

    Oct

    01

    Jan

    02

    Apr

    02

    Jul

    02

    Oct

    02

    Jan

    03

    Apr

    03

    Jul

    03

    Oct

    03

    MONTHS

    FOUND

    CLOSED

    1266112661

    16436

    16436

    4802

    4802

    3828

    3828 2176

    2176

    50365036

    37553755

    4869448694

    0

    10000

    20000

    30000

    40000

    50000

    (NUMBERS).

    Minor Flaws Unfulfilled

    basic

    condittions

    Inaccessible

    Places

    ontamination

    sources

    Source of

    quality

    defectd

    Unnecessary

    items

    unsafe places Total

    Fuguai classification(Numbers)

    Defects trend (Upto step 3)(Numbers)

    (AS ON 30.6.04)

    1266112661

    16436

    16436

    48024802

    38283828 2176 2176

    50365036

    37553755

    4869448694

    0

    10000

    20000

    30000

    40000

    50000

    Mi no r F la ws U nf ul fi ll ed

    basic

    condittions

    Inaccessible

    Places

    Contamination

    sources

    Source of

    quality

    defectd

    Unnecessary

    items

    unsafe places Total

    Defects classification (Upto step 3)(Numbers)

    Num

    bers

    Num

    bers GOOD

    SLIDE NO. 37JISHU HOZEN ACTIVITY

    SLIDE NO. 38JISHU HOZEN ACTIVITY

    ACTIVITIES UNDER STEP 4 (GENERAL INSPECTION)

    In Step 4, thorough knowledge and Training is given to the operators, to

    upgrade their knowledge and Maintenance skill.

    With the assistance of In house teams of experts and maintenance heads,

    various basic course modules are developed on different topics such as :

    ! Nut & Bolts

    ! Lubrication

    !Hydraulic

    !Pneumatic

    !Drive

    !Electric

    !Safety

    !Machining Condition

    (Contd.)

  • 8/22/2019 03 ShriramPistons&RingsLtd

    21/27

    5th TPM National Conference Page 3.20

    Shriram Pistons & Rings Ltd JH Step 1-4

    SLIDE NO. 39JISHU HOZEN ACTIVITY

    A structured Programme for imparting this knowledge & Training to all the

    employees, is drawn out & training implemented.

    At the end of Step 4, there is a radical improvement in the attitude of the

    operators, due to enhanced knowledge and skill levels.

    (Contd.)

    After these modules are developed, these are reviewed by a common

    core committee & then finalized for issue & Training.

    SLIDE NO. 40JISHU HOZEN ACTIVITY

    Develop 8 Technical Modules

    Imparting Training on 8 Tech modules to all employee

    Reexamine the machines & Equipment with higher knowledge

    & skill achieved under Step - 4

    Now find more defects on the machines.

    Updating the standards (Developed in Step 3)

    Implement the new standards for 3 months

    Consolidate & monitor the progress through following parameter

    No. of

    New kaizens

    No. of new

    defects

    No. of new

    One Point Lesson

    STEP 4 FLOW CHART

  • 8/22/2019 03 ShriramPistons&RingsLtd

    22/27

    5th TPM National Conference Page 3.21

    Shriram Pistons & Rings Ltd JH Step 1-4

    Class room trainingCut models

    Training modules preparation and implementation

    SLIDE NO. 41JISHU HOZEN ACTIVITY

    Example of General Inspection.

    Inspection on Belt Inspection on Coupling

    SLIDE NO. 42JISHU HOZEN ACTIVITY

  • 8/22/2019 03 ShriramPistons&RingsLtd

    23/27

    5th TPM National Conference Page 3.22

    Shriram Pistons & Rings Ltd JH Step 1-4

    1803

    10080

    1148312277

    13248 13292 13323

    7571

    9529

    10451

    12329 12382 12431

    175

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    16000

    Jun' 03 Sep' 03 Dec' 03 Mar' 04 Jun' 04 Sep' 04 Dec' 04

    NUMBERS

    FOUND

    CLOSEDTrend of new Defects (in step 4)

    (Numbers)

    GOOD

    SLIDE NO. 43JISHU HOZEN ACTIVITY

    8933

    1199 1023

    480 627883

    104 74

    959 913

    399 581851

    100 65

    8563

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    4.1

    Nut & Bolts

    4.2

    Lubrication

    4.5

    Drives4.3

    Hydraulic

    4.4

    Pneumatic

    4.6

    Electrical

    4.7

    Safety

    4.8

    Machining

    Condition

    (Number of defects)

    Status of defects classification under step 4

    FOUND - 13323

    CLOSED - 12431

    (AS ON 31.12.04)

    NU

    MBERS

    SLIDE NO. 44JISHU HOZEN ACTIVITY

    Defects

  • 8/22/2019 03 ShriramPistons&RingsLtd

    24/27

    5th TPM National Conference Page 3.23

    Shriram Pistons & Rings Ltd JH Step 1-4

    4.5 4.6 4.7STEP-1

    STEP WISE STATUS OF ALL CIRCLES

    10TOOL ROOM

    49RING PLANT

    25RING FDY.

    55PISTON PLANT

    23AL.FDY.

    18E.V.FORGE

    18PIN PLANT

    32E.V.M/C

    12PAW

    4.84.44.34.24.1

    STEP - 4STEP-3STEP-2

    ALLCIRCLES

    PLANT

    STEP WISE STATUS OF ALL CIRCLES

    (AS ON 30.6.04) Completed

    SLIDE NO. 45JISHU HOZEN ACTIVITY

    486889

    12511648

    20152411

    26802951

    31493358

    3657

    4905

    5941

    66956989

    7318 74267516 7667

    7714

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    Jan

    00

    Apr

    00

    Jul

    00

    Oct

    00

    Jan

    01

    Apr

    01

    Jul

    01

    Oct

    01

    Jan

    02

    Apr

    02

    Jul

    02

    Oct

    02

    Jan

    03

    Apr

    03

    Jul

    03

    Oct

    03

    Jan

    04

    Apr

    04

    Jul

    04

    Oct'

    04

    MONTHS

    NUMBERS

    (Number of Kaizens)(upto step-4)

    6. KAIZEN TREND - OVERALL

    CHAPTER-5 JISHU HOZEN ACTIVITY

    GOOD

    SLIDE NO. 46

  • 8/22/2019 03 ShriramPistons&RingsLtd

    25/27

    5th TPM National Conference Page 3.24

    Shriram Pistons & Rings Ltd JH Step 1-4

    Example - Elimination of Minor Stoppages

    KK JH QM PM SHE OTPM IC ET

    KAIZEN SHEET P Q C D S M

    Plant: PISTON PLANT Machine Name: PRE OVAL TURNING Machine No: 110

    Ka izen theme: Elimina tio n o f Mino r Sto ppa ge . Idea: Modif ied the leng th o f rocker arm to acco ma date.

    Phenomna : Frequent adjustment required in the length of rocker arm small dia pistons

    Problem/prese nt s ta tus : C ounterme as ure : Be nch mark 360 NOS.

    Target ZERO

    Kaize n s tart N OV' 03

    Ka izen finish DEC' 0 3

    (words / sketch) (words / sketch) Team members: MR.VIKASH KUMAR

    MR.PRADEEP SRIVASTWA

    MR.BABLI

    MR.MAHIPAL

    Benefits:

    PRODUCTIVITY INCREASED BY 4 % IN SOME

    Analysis: Results: PISTON MODEL.Minor stoppage occur 4- 5 times in a shift. Minor stoppage reduced.

    Totaling time (360 nos/Month)

    Pressure on rocker arm disturbed. Scope & Plan for Horizontal Deployment

    S.No.

    Spacer used in rocker arm assembly insome small dia models. - - - -

    Inedequate length of rocker arm.

    TDC Responsibility Status

    Activity

    Result

    Area

    -

    TPM/STD/12

    REVISION NO.-00

    Machine

    No.

    Why

    Why

    Why

    Nos/Month

    Before After

    360

    0

    SLIDE NO. 47JISHU HOZEN ACTIVITY

    ONE POINT LESSON TREND - OVERALL

    100 198279

    468 546623 713

    792 872967 1008

    1306

    1768

    2201

    29113131 3218

    3379

    171 172 175 177 182 209354 375

    442 540569 613

    722

    64 118157 168 370

    336325

    285254230139906461514945311862 380

    400

    800

    1200

    1600

    2000

    2400

    2800

    3200

    3600

    Jan

    00

    Apr

    00

    Jul

    00

    Oct

    00

    Jan

    01

    Apr

    01

    Jul

    01

    Oct

    01

    Jan

    02

    Apr

    02

    Jul

    02

    Oct

    02

    Jan

    03

    Apr

    03

    Jul

    03

    Oct

    03

    Jan

    04

    Dec

    04

    MONTHS

    NUMBERS

    BASIC KNOWLEDGE

    IMPROVEMENT CASES

    TROUBLE CASES

    (Category wise One point lessons)(Upto Step - 4)

    GOOD

    109 226361

    617 741836 933

    1015 11081209 1280

    1843

    2354

    2830

    3638

    3996 41234362

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    4500

    Jan

    00

    Apr

    00

    Jul

    00

    Oct

    00

    Jan

    01

    Apr

    01

    Jul

    01

    Oct

    01

    Jan

    02

    Apr

    02

    Jul

    02

    Oct

    02

    Jan

    03

    Apr

    03

    Jul

    03

    Oct

    03

    Jan

    04

    MONTHS

    NUMBERS

    (Number of one point lesson)

    (Upto Step - 4)

    Dec

    04

    GOOD

    SLIDE NO. 48JISHU HOZEN ACTIVITY

  • 8/22/2019 03 ShriramPistons&RingsLtd

    26/27

    5th TPM National Conference Page 3.25

    Shriram Pistons & Rings Ltd JH Step 1-4

    622

    195

    388

    234

    183

    9472 64

    7235 29

    31

    0

    100

    200

    300

    400

    500

    600

    700

    1ST

    PHASE

    2ND

    PHASE

    3RD

    PHASE

    CLEANING

    INSPECTION

    LUBRICATION

    Time reduction trend(Hours/Day)

    (As on 31.12.04)

    TANGIBLE RESULT

    Minor stoppages(Nos./Month)

    2000

    Benchmark

    NOS./

    MONTH

    GOOD

    2000

    (Benchmark)

    RESULTS

    64

    56

    4946

    3933

    23

    2018

    17

    1511

    0

    25

    50

    75

    100

    Oct' 02 Jan ' 03 Apr' 03 Ju l' 03 Oct' 03 Jan ' 04 Apr'04 Jul '04 Oct'04 Dec '04

    Minor stoppages(Th. Nos./Month)

    2000

    (Benchmark)

    2004

    (Target)

    Th.

    Nos./MONTH

    Hours

    /Da

    y

    GOOD77 %Reduction

    SLIDE NO. 49JISHU HOZEN ACTIVITY

    100

    183218

    475

    648

    720

    167

    380

    0

    200

    400

    600

    800

    1000

    RESULTS

    " Breakdown Frequency - Trend

    GOOD

    BREAK

    DOWNNUMBERS/

    MONTH

    PERIOD

    77 %

    Reduction

    2000 2001 2002

    Breakdown Frequency - Trend

    1999(Bench Mark)

    2003 2004(Target)

    2004(Jun 04)

    CHAPTER-6 PLANNED MAINTENANCE ACTIVITY SLIDE NO. 50 TPM REPORT PAGE NO. 114

    2004(Nov 04)

    75 %

    Reduction

  • 8/22/2019 03 ShriramPistons&RingsLtd

    27/27

    Shriram Pistons & Rings Ltd JH Step 1-4

    Improvement in operatorsAttitude

    Active participation / Team work

    Neat and clean shop floor

    INTANGIBLE RESULTS

    SLIDE NO. 51JISHU HOZEN ACTIVITY

    END OF PRESENTATION