  • Pearl GTL Project

    LINDE ENGINEERING

    Shell Project No: HP-3000-QAT Contractor Project No : 5887

    Project Document Number: T- 4.234.577 Project Rev.: D Page 2 of 16

    Purchase Order Number:

    2MH127

    Tag/Item Number(s): N/A

    Unit(s): ASU

    PCWBS: Z

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    H D 10.02.09 After clarification with PMC, Issued for Review SK EO AG IFR

    G C 10.12.08 As per Site Condition, Issued for Review SK EO AG IFR

    F B 31.07.08 Issued for Company Comments SB EO AG ICC

    E B 15.07.08 Ready for Construction KC EO AG RFC

    D A 25.06.08 Issued for Company Comments KC EO AG ICC

    C O 10.06.08 Issued for Company Comments FB EO AG ICC

    B 10.06.08 Issued for review FB EO AG IFR

    A 09.06.08 Issued for internal review FB EO AG IIR

    GAMA Rev.

    Project Rev

    Date Description Prepared

    By Checked

    By

    Approved By

    Status

    No. No. ORIGINATOR

    LINDE ENGINEERING AG

    Document Title:

    ITP FOR U/G GRP PIPING

    Contractor

    Gama Qatar Co. W. L. L.

    Document No.

    LOC470 GAM ITP QAC GTL 030 H

    Org.

    Code

    Doc.

    Type

    Disc. Code

    Geogr. Area

    Seq.

    No

    Rev. No

    Vendor Code

    Project Document Number: T-4.234.577 Rev No: D

  • QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030

    C2 ASU Construction Works

    ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009

    S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR

    I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS

    Item Activity Characteristic to be

    Verified Control Procedure

    Reference Acceptance Criteria

    Responsible Party

    Verifying Documents S X C V

    T-4.234.577 Rev. D Page 4

    1.0 METHOD STATEMENTS / PROCEDURES

    1.1

    Method statement for fabrication and installation of GRP PIPING

    Applicable to ASU Pearl GTL

    T-4.234.087 Approved RFC

    Site Engineer

    Approved Documents

    I

    R

    R

    R

    1.2 Testing of GRP piping systems

    Applicable to ASU Pearl GTL

    T-4.234.087

    Manufacturers recommendation

    Approved Documents

    I

    R

    R

    R

    1.3 Verification of qualification of personnel Previous Experience

    ISO 14692 Part 4 Annex D

    Training by Vendor / Manufacturer

    Manufacturer Certificate

    I

    H

    H

    H

    2.0 CONTROL OF INSPECTION ,MEASURING AND TEST EQUIPMENT

    2.1

    Torque Wrench

    Torque Value Achieved

    T-4.250.955

    1 Month

    QA/QC Engineer

    Calibration Certificate

    I R R

    2.2 Pressure Test Gauges

    Validation Sticker T-4.234.548 1 Month Calibration Certificate I R R

    2.3 Visual Inspection of GRP Pipes and components

    DELETED

    3.0 MATERIAL

    3.1

    Material Receipt & Visual Inspection

    As per Company Specification

    Manufactures Data Sheets

    Visual Damage QC Inspector GAM-QCR-QAC-GTL-079 I R

    R

    R

    3.2

    Storage and Preservation

    As per Manufacture recommendation

    Manufactures Data Sheets

    As per Manufacturer recommendation

    Store In charge

    As per specification

    I S S S

    3.3 Sub-Contractor Material Approval DELETED

    4.0 INSPECTIONS

  • QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030

    C2 ASU Construction Works

    ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009

    S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR

    I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS

    Item Activity Characteristic to be

    Verified Control Procedure

    Reference Acceptance Criteria Responsible Party Verifying Documents S X C V

    T-4.234.577 Rev. D Page 5

    4.1 Verification of Trench Excavation Elevation, Orientation & Width

    As per the drg. T-4.259.773

    Survey Report

    QA/QC Engineer

    Excavation Survey Report I S R S

    4.2

    Laying of bedding material, prior to Installation of the GRP pipes

    Bedding Granules level

    As per the drawing

    T-4.259.773 QA/QC Civil Report

    QA/QC Engineer

    Sand Bedding Survey

    Report

    I S S S

    4.2.1

    Cleanliness before laying of pipes into the

    bed

    Internal Cleaning

    T.13.377.360 Rev E

    & DEP 31.40.19-Gen

    No foreign materials inside the pipe & Internal Cleaning before laying into trench

    Site Engineer GAM-QCR-QAC-GTL-139 I W W S

    4.3

    Bell and Spigot a) QC Inspector shall verify correct O

    Ring for the service has been selected

    As per Manufacturer recommendations

    ISO 14692-4:2002 Annex C Figure

    C.3

    As per Manufacturer recommendation

    As per Manufacturer recommendations

    Site Engineer

    GAM-QCR- QAC-GTL-

    045

    I

    S

    S

    W

    b) The surfaces to be connected, including the gasket grooves, shall be clean

    I S S W

    c) The Seal ring and groove to be checked for the correct dimension.

    I S S W

    d) Non-symmetric seals, such as lip seals, shall be checked for correct installation in the grooves

    I S S W

    e) Clean non-contaminated lubricant shall be used on both seals and spigot

    I S S W

  • QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030

    C2 ASU Construction Works

    ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009

    S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR

    I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS

    Item Activity Characteristic to be

    Verified Control Procedure

    Reference Acceptance Criteria Responsible Party Verifying Documents S X C V

    T-4.234.577 Rev. D Page 6

    f) The correct tooling shall be used to enter the spigot into bell to avoid damage to the seals

    I S S W

    g) Entry location marks on the spigot (If applicable) should be checked to ensure correct entry distance

    I S S W

    h) Pipe sections shall be aligned as straight as possible in order to retain the O-rings in their groves

    I S S W

    i) A feeler gauge shall be used to establish good seating of the seals

    I S S W

    j) For key lock tensile resistance joints, clean and lubricated locking strip should be inserted in complete circumference of the locking strip groove ,and the locking strip shall have the correct cross section and length

    I S S W

    k) Identification and repairing of defective joints / pipes etc (if any)

    No leak

    Manufacturer receipt,

    T.13.376.808E& DEP 31.40.10.19

    As per Manufacturer recommendation

    Site Engineer

    GAM-QCR-QAC-GTL-

    045,047,048

    I

    H

    H

    H

  • QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030

    C2 ASU Construction Works

    ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009

    S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR

    I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS

    Item Activity Characteristic to be

    Verified Control Procedure

    Reference Acceptance Criteria Responsible Party Verifying Documents S X C V

    T-4.234.577 Rev. D Page 7

    l) Sealing Test of Joints Leaks T-4.240.925 No Leak QA/QC Engineer

    GAM-QCR-QAC-GTL-045

    I S S W

    4.3.1

    Test Pack Preparation

    As per Specification T.4.234.548 & Manufacturers

    recommendation

    GRP Test Pack

    Site Engineer As per

    specification I R/A R/A

    4.4

    Torque of the flange Bolts

    Bolt Tightness

    T.13.376.808E&

    DEP 31.40.10.19,T.13.

    377.360

    Torque Value Achieved

    Site Engineer

    GAM-QCR- QAC-GTL- 041

    I

    S

    S

    S

    4.5

    Final Inspection Before Test

    1. Visual Check.

    2. Flange alignment verification

    3. Permanent gaskets installation, bolts & nuts (if any)

    4. Valve installation

    5. Dimensionnel check, elevation, orientation etc.

    6. Support installation (If any)

    Installation Complete T.13.377.421 Category A

    Completed/ Corrected Site Engineer

    Linde Mechanical Check of test System(R 01) including punch list

    I H H S

    4.6 Intermediate Back Fill

    As per Manufacturers recommendation & As

    per Company Specifications

    T-4.234.069, Manufacturers

    Recipe, T13.376.808

    &DEP 31.40.19

    GAM-QCR-QAC-GTL-050

    Site Engineer Visual I S R

    4.7 Shifted to 4.3.1

  • QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030

    C2 ASU Construction Works

    ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009

    S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR

    I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS

    Item Activity Characteristic to be

    Verified Control Procedure

    Reference Acceptance Criteria Responsible Party Verifying Documents S X C V

    T-4.234.577 Rev. D Page 8

    4.8

    4.9

    Hydrostatic Pressure Testing

    No Leak

    T-4.234.548 & Manufacturers Recipe & DEP

    31.40.19/Design Code

    Manufacturers recommendation

    Site Engineer/ QA-QC

    Engineer

    Test Pack (MC Inspection & Test record (R02))

    I

    H

    H

    H

    4.9.1 Flushing / Water disposal Water disposal Manufacturers

    recommendation Manufacturers

    recommendation Site Engineer

    MC Inspection & Test record (R02)

    I S S S

    4.10 Re instatement Punch Out Restoration

    T-4.234.074 & DEP 31.40.19

    Manufacturers recommendation

    Site Engineer Reinstatement Check List

    (R03) I H H

    4.11 Final Back Fill Trench No damage of pipe & No voids at bottom of pipe

    Manufacturers recommendation

    Site Engineer QAM-QCR-QAC-GTL-050 I S S

    4.12 Gross leak test for the completed subsystems (for pressure lines).

    No Leak Manufacturers

    recommendation & DEP 31.40.19

    Manufacturers recommendation

    Site Engineer Manufacturers

    recommendation & As per Test Pack

    I W W

    4.13

    Flawless Start-up Initiative (FSI) - Tightness (in Valve boxes)

    a) Bolt

    a) Loose Bolt b) Wrong Type of Bolt c) Flange Face Condition

    DEP 31.40.10.19,

    T.13.377.360 Rev E,

    DEP 70.10.70.11- Gen

    DEP 31.38.01.11-

    Full Tight without leak Site Engineer

    Joint Integrity Control Procedure T.13.377.453 ,

    T.13.377.454 ,

    T.13.376.815 & Flaw List

    I H H

  • QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030

    C2 ASU Construction Works

    ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009

    S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR

    I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS

    Item Activity Characteristic to be

    Verified Control Procedure

    Reference Acceptance Criteria Responsible Party Verifying Documents S X C V

    T-4.234.577 Rev. D Page 9

    b) Gasket Installation

    a) Damaged Gasket b) Gasket Installed off centre c) Old Temporary

    Hydro test Gaskets still in place d) Incorrect Flange alignment in line flanges e) Debris in valve seat

    as a result of transport form manufacturer

    DEP 31.40.10.19-Gen,

    T.13.377.360 Rev E,

    DEP 70.10.70.11- Gen

    DEP 31.38.01.11-

    Full Tight without leak Site Engineer

    Joint Integrity Control Procedure T.13.377.453 ,

    T.13.377.454 ,

    T.13.376.815 & Flaw List

    I H H

    4.14 Flawless Start-up Initiative (FSI)

    Cleanliness Deleted (REF. ITEM CODE 4.2.1)

    4.15

    Closing of the pipe ends after Flushing

    Internal Cleaning

    T-4.231.172

    No foreign materials inside the pipe after flushing

    QA / QC Engineer

    Visual I S S S

    5.0

    Video Recording Internal Inspection of the

    Pipes

    Internal Cleaning

    T-13.377.561 Project Spec. Part

    4, Chapter 6

    No foreign materials inside the pipe after flushing

    QA / QC Engineer

    Recorded Video I R R

  • GAM-QCR-QAC-GTL-041 Rev. O

    C2 ASU PEARL GTL PROJECT

    RASLAFFAN INDUSTRIAL CITY

    BOLT TIGHTENING INSPECTION REPORT

    Subcontract Ref.: Report No.:

    Item Description: Inspection Date:

    Item Location / Area:

    Test Code No.:

    Subsystem: ITP No.:

    Ref. DWG / Docs:

    Used Measuring and test equipment ref. (if applicable):

    INSPECTIONS

    Item No/Spool No

    Mark No./Joint No Bolting Bolt Tightening (Torque Value)

    Inspectors Signature Grade Size

    ORGANIZATIONS DATE NAME SIGNATURE

    Accepte

    d B

    y THIRD PARTY REP.

    GAMA REP.

    LINDE REP.

    QSGTL OR its PMC REP.

  • Sealing Test

    Test Medium

    Visual (Rep. Ref.

    QCR FORM-

    Cutting /Tapering of Joints

    CleanlinessFit-up &

    Allignment

    O-Ring Installation

    Repair Defective

    JointsRemarks

    Inspection Date:

    Test Code No.:

    ITP No.: GAM-ITP-QAC-GTL-

    QATAR - PEARL GTL PROJECT- C2 ASU

    GAMA QATAR REP.

    LINDE REP.

    DATESIGNATURE

    Isometric No.:

    Used Measuring and test equipment ref. (if applicable): Line No.:

    Dia (Inch)

    Pressure ClassUnit No:

    QS GTL or its PMC

    Joint No.

    Note : DSC for lamination and adhesive joint only

    Shop /Field

    Sl. No Spool/ item No.

    NAMEORGANIZATIONS

    A

    C

    C

    E

    P

    T

    E

    D

    GRP SPOOL VISUAL + NIPPLE TEST INSPECTION REPORTReport No.:

    Joint Type

    INSPECTION ACTIVITIES

    Bonder No.

    Item Location / Area:

    Ref. DWG / Documents: Subsystem:

    Item Description:

    QQQ AAA TTT AAA RRR

    GAM-QCR-QAC-GTL-045, Rev-A

  • GAM-QCR-QAC-GTL-047 Rev. O

    C2 ASU PEARL GTL PROJECT

    RASLAFFAN INDUSTRIAL CITY

    BARCOL HARDNESS TESTING REPORT

    Subcontract Ref.: Report No.:

    Item Description: Inspection Date:

    Item Location / Area: Test Code No.:

    Subsystem: ITP No.:

    Ref. DWG / Documents:

    Used Measuring and test equipment ref. (if applicable):

    INSPECTIONS

    SPOOL NO JOINT NO BASE LINE VALUE ACTUAL VALUE PERCENTAGE INSPECTOR SIGNATURE

    REMARKS: The Actual value should not be less than 90% of the Minimum Base line value

    ORGANIZATIONS DATE NAME SIGNATURE

    Accepte

    d B

    y THIRD PARTY REP.

    GAMA REP.

    LINDE REP.

    QSGTL OR its PMC REP.

  • Subcontract Ref.: Report No.Item Description: Inspection Date: Item Location / Area: Test Code No.: Subsystem: ITP No.: Ref. DWG / Documents:

    Drawing No. : Pipe Dia. :Spool No. : Nominal Pressure :

    Lam. kit No. : Test Pressure :Bond Width : Bond Thickness :

    Starting Date on : at hrs. Finishing Date on :Temperature:

    Humidity:Bonder No.:

    Fit LayerW/R Type Resin Quantity

    W/R Type Resin Quantity Delayer

    Top Tape

    Bond Widt Bond Thickness :W/R Type Resin Quantity

    Surface mat.

    ORGANIZATIONS DATE

    No. of Layers Resin Type

    GAMA QATAR REP.

    NAME

    PEARL GTL PROJECT-RLC-QATAR

    DAILY GRP LAMINATION FOLLOW-UP REPORT

    Catalyst LPT Quantity

    Used Measuring and test equipment ref. (if applicable):

    No. of Layers

    at hrs.

    Manufacturer Recipe Ref:

    Acc

    epte

    d B

    y

    LINDE REP.

    QS GTL

    THIRD PARTY REP.SIGNATURE

    Resin Type

    Vinylester

    Catalyst LPT Quan.

    Vinylester

    Catalyst LPT Quantity

    Structure Lay up

    Internal layer

    Vinylester

    No. of Layers Resin Type

    QQQ AAA TTT AAA RRR

    GAM-QCR-QAC-GTL-048, Rev-0

  • GAM-QCR-QAC-GTL-050 Rev. O

    PEARL GTL PROJECT- RLC- QATAR

    EXCAVATION / BACKFILLING REPORT

    Subcontract Ref.: Report No.:

    Item Description: Inspection Date:

    Item Location / Area: Test Code No.:

    Subsystem: ITP No.:

    Ref. DWG / Documents:

    Used Measuring and test equipment ref. (if applicable):

    Area :

    Location :

    Description of Filling :

    a) Sand :

    b) Gravel (SC1) :

    Site Clearance : Excavation : ELEVATION AS PER DRAWING : ACTUAL ELEVATION :

    REMARKS:

    ACCEPTABLE

    YES NO

    ORGANIZATIONS DATE NAME SIGNATURE

    Accepte

    d B

    y THIRD PARTY

    REP.

    GAMA

    LINDE

    QS GTL

    QQQ AAA TTT AAA RRR

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    GAM-QCR-QAC-GTL-079 Rev. O

    MATERIAL RECEIPT CHECK SHEET

    ITEM No: PO No: REQ No:

    UNIT No: MANUFACTURER :

    ITEMS TO BE CHECKED INSPECTOR

    INITIAL REMARKS

    1 Visual damage

    2 Quantity

    3 Test certificates

    4

    5

    6

    7

    8

    Date of initial inspection:

    Name and signature of Inspector:

  • Project No: Project No

    Piping

    Contractor:Page 1 of 1

    Date Signature Date Signature Date Signature Date Signature

    GAMA LINDE PMC

    Company-LindePiping Contractor-GAMA

    Prefabrication Erection

    Inspection

    meth

    od

    Cle

    anlin

    ess C

    lass

    1110 A05MIsometric No:

    (Line No)

    Inspection

    result

    Pre

    serv

    ation

    Meth

    od

    Piping Contractor Company

    Sheet

    Cle

    anin

    g

    Meth

    od

    Spool

    SYSTEM CLEANLINESS ACCEPTANCE REPORT

    Doc.No: 0100-W-QA-1825

    Date: Date: Date:

    Name: Name: Name:

    Signature: Signature Signature:

    GAM-QCR-QAC-GTL-139 Rev. O