Pearl GTL Project
LINDE ENGINEERING
Shell Project No: HP-3000-QAT Contractor Project No : 5887
Project Document Number: T- 4.234.577 Project Rev.: D Page 2 of 16
Purchase Order Number:
2MH127
Tag/Item Number(s): N/A
Unit(s): ASU
PCWBS: Z
-
QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION
H D 10.02.09 After clarification with PMC, Issued for Review SK EO AG IFR
G C 10.12.08 As per Site Condition, Issued for Review SK EO AG IFR
F B 31.07.08 Issued for Company Comments SB EO AG ICC
E B 15.07.08 Ready for Construction KC EO AG RFC
D A 25.06.08 Issued for Company Comments KC EO AG ICC
C O 10.06.08 Issued for Company Comments FB EO AG ICC
B 10.06.08 Issued for review FB EO AG IFR
A 09.06.08 Issued for internal review FB EO AG IIR
GAMA Rev.
Project Rev
Date Description Prepared
By Checked
By
Approved By
Status
No. No. ORIGINATOR
LINDE ENGINEERING AG
Document Title:
ITP FOR U/G GRP PIPING
Contractor
Gama Qatar Co. W. L. L.
Document No.
LOC470 GAM ITP QAC GTL 030 H
Org.
Code
Doc.
Type
Disc. Code
Geogr. Area
Seq.
No
Rev. No
Vendor Code
Project Document Number: T-4.234.577 Rev No: D
-
QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009
S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR
I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS
Item Activity Characteristic to be
Verified Control Procedure
Reference Acceptance Criteria
Responsible Party
Verifying Documents S X C V
T-4.234.577 Rev. D Page 4
1.0 METHOD STATEMENTS / PROCEDURES
1.1
Method statement for fabrication and installation of GRP PIPING
Applicable to ASU Pearl GTL
T-4.234.087 Approved RFC
Site Engineer
Approved Documents
I
R
R
R
1.2 Testing of GRP piping systems
Applicable to ASU Pearl GTL
T-4.234.087
Manufacturers recommendation
Approved Documents
I
R
R
R
1.3 Verification of qualification of personnel Previous Experience
ISO 14692 Part 4 Annex D
Training by Vendor / Manufacturer
Manufacturer Certificate
I
H
H
H
2.0 CONTROL OF INSPECTION ,MEASURING AND TEST EQUIPMENT
2.1
Torque Wrench
Torque Value Achieved
T-4.250.955
1 Month
QA/QC Engineer
Calibration Certificate
I R R
2.2 Pressure Test Gauges
Validation Sticker T-4.234.548 1 Month Calibration Certificate I R R
2.3 Visual Inspection of GRP Pipes and components
DELETED
3.0 MATERIAL
3.1
Material Receipt & Visual Inspection
As per Company Specification
Manufactures Data Sheets
Visual Damage QC Inspector GAM-QCR-QAC-GTL-079 I R
R
R
3.2
Storage and Preservation
As per Manufacture recommendation
Manufactures Data Sheets
As per Manufacturer recommendation
Store In charge
As per specification
I S S S
3.3 Sub-Contractor Material Approval DELETED
4.0 INSPECTIONS
-
QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009
S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR
I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS
Item Activity Characteristic to be
Verified Control Procedure
Reference Acceptance Criteria Responsible Party Verifying Documents S X C V
T-4.234.577 Rev. D Page 5
4.1 Verification of Trench Excavation Elevation, Orientation & Width
As per the drg. T-4.259.773
Survey Report
QA/QC Engineer
Excavation Survey Report I S R S
4.2
Laying of bedding material, prior to Installation of the GRP pipes
Bedding Granules level
As per the drawing
T-4.259.773 QA/QC Civil Report
QA/QC Engineer
Sand Bedding Survey
Report
I S S S
4.2.1
Cleanliness before laying of pipes into the
bed
Internal Cleaning
T.13.377.360 Rev E
& DEP 31.40.19-Gen
No foreign materials inside the pipe & Internal Cleaning before laying into trench
Site Engineer GAM-QCR-QAC-GTL-139 I W W S
4.3
Bell and Spigot a) QC Inspector shall verify correct O
Ring for the service has been selected
As per Manufacturer recommendations
ISO 14692-4:2002 Annex C Figure
C.3
As per Manufacturer recommendation
As per Manufacturer recommendations
Site Engineer
GAM-QCR- QAC-GTL-
045
I
S
S
W
b) The surfaces to be connected, including the gasket grooves, shall be clean
I S S W
c) The Seal ring and groove to be checked for the correct dimension.
I S S W
d) Non-symmetric seals, such as lip seals, shall be checked for correct installation in the grooves
I S S W
e) Clean non-contaminated lubricant shall be used on both seals and spigot
I S S W
-
QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009
S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR
I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS
Item Activity Characteristic to be
Verified Control Procedure
Reference Acceptance Criteria Responsible Party Verifying Documents S X C V
T-4.234.577 Rev. D Page 6
f) The correct tooling shall be used to enter the spigot into bell to avoid damage to the seals
I S S W
g) Entry location marks on the spigot (If applicable) should be checked to ensure correct entry distance
I S S W
h) Pipe sections shall be aligned as straight as possible in order to retain the O-rings in their groves
I S S W
i) A feeler gauge shall be used to establish good seating of the seals
I S S W
j) For key lock tensile resistance joints, clean and lubricated locking strip should be inserted in complete circumference of the locking strip groove ,and the locking strip shall have the correct cross section and length
I S S W
k) Identification and repairing of defective joints / pipes etc (if any)
No leak
Manufacturer receipt,
T.13.376.808E& DEP 31.40.10.19
As per Manufacturer recommendation
Site Engineer
GAM-QCR-QAC-GTL-
045,047,048
I
H
H
H
-
QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009
S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR
I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS
Item Activity Characteristic to be
Verified Control Procedure
Reference Acceptance Criteria Responsible Party Verifying Documents S X C V
T-4.234.577 Rev. D Page 7
l) Sealing Test of Joints Leaks T-4.240.925 No Leak QA/QC Engineer
GAM-QCR-QAC-GTL-045
I S S W
4.3.1
Test Pack Preparation
As per Specification T.4.234.548 & Manufacturers
recommendation
GRP Test Pack
Site Engineer As per
specification I R/A R/A
4.4
Torque of the flange Bolts
Bolt Tightness
T.13.376.808E&
DEP 31.40.10.19,T.13.
377.360
Torque Value Achieved
Site Engineer
GAM-QCR- QAC-GTL- 041
I
S
S
S
4.5
Final Inspection Before Test
1. Visual Check.
2. Flange alignment verification
3. Permanent gaskets installation, bolts & nuts (if any)
4. Valve installation
5. Dimensionnel check, elevation, orientation etc.
6. Support installation (If any)
Installation Complete T.13.377.421 Category A
Completed/ Corrected Site Engineer
Linde Mechanical Check of test System(R 01) including punch list
I H H S
4.6 Intermediate Back Fill
As per Manufacturers recommendation & As
per Company Specifications
T-4.234.069, Manufacturers
Recipe, T13.376.808
&DEP 31.40.19
GAM-QCR-QAC-GTL-050
Site Engineer Visual I S R
4.7 Shifted to 4.3.1
-
QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009
S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR
I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS
Item Activity Characteristic to be
Verified Control Procedure
Reference Acceptance Criteria Responsible Party Verifying Documents S X C V
T-4.234.577 Rev. D Page 8
4.8
4.9
Hydrostatic Pressure Testing
No Leak
T-4.234.548 & Manufacturers Recipe & DEP
31.40.19/Design Code
Manufacturers recommendation
Site Engineer/ QA-QC
Engineer
Test Pack (MC Inspection & Test record (R02))
I
H
H
H
4.9.1 Flushing / Water disposal Water disposal Manufacturers
recommendation Manufacturers
recommendation Site Engineer
MC Inspection & Test record (R02)
I S S S
4.10 Re instatement Punch Out Restoration
T-4.234.074 & DEP 31.40.19
Manufacturers recommendation
Site Engineer Reinstatement Check List
(R03) I H H
4.11 Final Back Fill Trench No damage of pipe & No voids at bottom of pipe
Manufacturers recommendation
Site Engineer QAM-QCR-QAC-GTL-050 I S S
4.12 Gross leak test for the completed subsystems (for pressure lines).
No Leak Manufacturers
recommendation & DEP 31.40.19
Manufacturers recommendation
Site Engineer Manufacturers
recommendation & As per Test Pack
I W W
4.13
Flawless Start-up Initiative (FSI) - Tightness (in Valve boxes)
a) Bolt
a) Loose Bolt b) Wrong Type of Bolt c) Flange Face Condition
DEP 31.40.10.19,
T.13.377.360 Rev E,
DEP 70.10.70.11- Gen
DEP 31.38.01.11-
Full Tight without leak Site Engineer
Joint Integrity Control Procedure T.13.377.453 ,
T.13.377.454 ,
T.13.376.815 & Flaw List
I H H
-
QSGTL PEARL PROJECT Document No : GAM-ITP-QAC-GTL-030
C2 ASU Construction Works
ITP FOR U/G GRP PIPING Rev / Date : Rev-H / 10.02.2009
S : GAMA QATAR X : CONTRACTOR QC C : COMPANY V : VENDOR
I: INSPECTION R: DOCUMENT REVIEW S: SURVEILLANCE H: HOLD POINT. W: WITNESS
Item Activity Characteristic to be
Verified Control Procedure
Reference Acceptance Criteria Responsible Party Verifying Documents S X C V
T-4.234.577 Rev. D Page 9
b) Gasket Installation
a) Damaged Gasket b) Gasket Installed off centre c) Old Temporary
Hydro test Gaskets still in place d) Incorrect Flange alignment in line flanges e) Debris in valve seat
as a result of transport form manufacturer
DEP 31.40.10.19-Gen,
T.13.377.360 Rev E,
DEP 70.10.70.11- Gen
DEP 31.38.01.11-
Full Tight without leak Site Engineer
Joint Integrity Control Procedure T.13.377.453 ,
T.13.377.454 ,
T.13.376.815 & Flaw List
I H H
4.14 Flawless Start-up Initiative (FSI)
Cleanliness Deleted (REF. ITEM CODE 4.2.1)
4.15
Closing of the pipe ends after Flushing
Internal Cleaning
T-4.231.172
No foreign materials inside the pipe after flushing
QA / QC Engineer
Visual I S S S
5.0
Video Recording Internal Inspection of the
Pipes
Internal Cleaning
T-13.377.561 Project Spec. Part
4, Chapter 6
No foreign materials inside the pipe after flushing
QA / QC Engineer
Recorded Video I R R
-
GAM-QCR-QAC-GTL-041 Rev. O
C2 ASU PEARL GTL PROJECT
RASLAFFAN INDUSTRIAL CITY
BOLT TIGHTENING INSPECTION REPORT
Subcontract Ref.: Report No.:
Item Description: Inspection Date:
Item Location / Area:
Test Code No.:
Subsystem: ITP No.:
Ref. DWG / Docs:
Used Measuring and test equipment ref. (if applicable):
INSPECTIONS
Item No/Spool No
Mark No./Joint No Bolting Bolt Tightening (Torque Value)
Inspectors Signature Grade Size
ORGANIZATIONS DATE NAME SIGNATURE
Accepte
d B
y THIRD PARTY REP.
GAMA REP.
LINDE REP.
QSGTL OR its PMC REP.
-
Sealing Test
Test Medium
Visual (Rep. Ref.
QCR FORM-
Cutting /Tapering of Joints
CleanlinessFit-up &
Allignment
O-Ring Installation
Repair Defective
JointsRemarks
Inspection Date:
Test Code No.:
ITP No.: GAM-ITP-QAC-GTL-
QATAR - PEARL GTL PROJECT- C2 ASU
GAMA QATAR REP.
LINDE REP.
DATESIGNATURE
Isometric No.:
Used Measuring and test equipment ref. (if applicable): Line No.:
Dia (Inch)
Pressure ClassUnit No:
QS GTL or its PMC
Joint No.
Note : DSC for lamination and adhesive joint only
Shop /Field
Sl. No Spool/ item No.
NAMEORGANIZATIONS
A
C
C
E
P
T
E
D
GRP SPOOL VISUAL + NIPPLE TEST INSPECTION REPORTReport No.:
Joint Type
INSPECTION ACTIVITIES
Bonder No.
Item Location / Area:
Ref. DWG / Documents: Subsystem:
Item Description:
QQQ AAA TTT AAA RRR
GAM-QCR-QAC-GTL-045, Rev-A
-
GAM-QCR-QAC-GTL-047 Rev. O
C2 ASU PEARL GTL PROJECT
RASLAFFAN INDUSTRIAL CITY
BARCOL HARDNESS TESTING REPORT
Subcontract Ref.: Report No.:
Item Description: Inspection Date:
Item Location / Area: Test Code No.:
Subsystem: ITP No.:
Ref. DWG / Documents:
Used Measuring and test equipment ref. (if applicable):
INSPECTIONS
SPOOL NO JOINT NO BASE LINE VALUE ACTUAL VALUE PERCENTAGE INSPECTOR SIGNATURE
REMARKS: The Actual value should not be less than 90% of the Minimum Base line value
ORGANIZATIONS DATE NAME SIGNATURE
Accepte
d B
y THIRD PARTY REP.
GAMA REP.
LINDE REP.
QSGTL OR its PMC REP.
-
Subcontract Ref.: Report No.Item Description: Inspection Date: Item Location / Area: Test Code No.: Subsystem: ITP No.: Ref. DWG / Documents:
Drawing No. : Pipe Dia. :Spool No. : Nominal Pressure :
Lam. kit No. : Test Pressure :Bond Width : Bond Thickness :
Starting Date on : at hrs. Finishing Date on :Temperature:
Humidity:Bonder No.:
Fit LayerW/R Type Resin Quantity
W/R Type Resin Quantity Delayer
Top Tape
Bond Widt Bond Thickness :W/R Type Resin Quantity
Surface mat.
ORGANIZATIONS DATE
No. of Layers Resin Type
GAMA QATAR REP.
NAME
PEARL GTL PROJECT-RLC-QATAR
DAILY GRP LAMINATION FOLLOW-UP REPORT
Catalyst LPT Quantity
Used Measuring and test equipment ref. (if applicable):
No. of Layers
at hrs.
Manufacturer Recipe Ref:
Acc
epte
d B
y
LINDE REP.
QS GTL
THIRD PARTY REP.SIGNATURE
Resin Type
Vinylester
Catalyst LPT Quan.
Vinylester
Catalyst LPT Quantity
Structure Lay up
Internal layer
Vinylester
No. of Layers Resin Type
QQQ AAA TTT AAA RRR
GAM-QCR-QAC-GTL-048, Rev-0
-
GAM-QCR-QAC-GTL-050 Rev. O
PEARL GTL PROJECT- RLC- QATAR
EXCAVATION / BACKFILLING REPORT
Subcontract Ref.: Report No.:
Item Description: Inspection Date:
Item Location / Area: Test Code No.:
Subsystem: ITP No.:
Ref. DWG / Documents:
Used Measuring and test equipment ref. (if applicable):
Area :
Location :
Description of Filling :
a) Sand :
b) Gravel (SC1) :
Site Clearance : Excavation : ELEVATION AS PER DRAWING : ACTUAL ELEVATION :
REMARKS:
ACCEPTABLE
YES NO
ORGANIZATIONS DATE NAME SIGNATURE
Accepte
d B
y THIRD PARTY
REP.
GAMA
LINDE
QS GTL
QQQ AAA TTT AAA RRR
-
C2 ASU PEARL GTL PROJECT
RAS LAFFAN INDUSTRIAL CITY
GAM-QCR-QAC-GTL-079 Rev. O
MATERIAL RECEIPT CHECK SHEET
ITEM No: PO No: REQ No:
UNIT No: MANUFACTURER :
ITEMS TO BE CHECKED INSPECTOR
INITIAL REMARKS
1 Visual damage
2 Quantity
3 Test certificates
4
5
6
7
8
Date of initial inspection:
Name and signature of Inspector:
-
Project No: Project No
Piping
Contractor:Page 1 of 1
Date Signature Date Signature Date Signature Date Signature
GAMA LINDE PMC
Company-LindePiping Contractor-GAMA
Prefabrication Erection
Inspection
meth
od
Cle
anlin
ess C
lass
1110 A05MIsometric No:
(Line No)
Inspection
result
Pre
serv
ation
Meth
od
Piping Contractor Company
Sheet
Cle
anin
g
Meth
od
Spool
SYSTEM CLEANLINESS ACCEPTANCE REPORT
Doc.No: 0100-W-QA-1825
Date: Date: Date:
Name: Name: Name:
Signature: Signature Signature:
GAM-QCR-QAC-GTL-139 Rev. O