3 SANITARY SEWER COLLECTIONS 3.1 DEFINITION ................................................................................................................ 1 3.1.1 Public Sewage Systems ........................................................................... 1 3.1.2 Private Sewage Systems ......................................................................... 1 3.2 NON-PERMITTED FLOWS .......................................................................................... 1 3.3 LOCATION AND ALIGNMENT .................................................................................... 1 3.3.1 Sanitary Sewers on Private Property ................................................. : ...... 2 3.4 DRAINAGE/SUB-DRAINAGE AREA PLANS .............................................................. 2 3.5 EXTERNAL SEWERSHED LIMITS AND DRAINAGE AREAS ..................................... 2 3.7PEAKING FACTOR CALCULATION ........................................................................... 2 3.8 DESIGN CRITERIA ...................................................................................................... 3 3.8.1 Tributary Areas Less Than 200 ha ........................................................... 3 3.8.2 Tributary Area 200 ha and Larger ............................................................ 4 3.9 PEAK FLOW CALCULATION ...................................................................................... 5 3.10 MANNINGS ROUGHNESSCOEFFIClENT .................................................................. 5 3.11 PIPE SIZE .................................................................................................................... 5 3.12 FLOW VELOCITY ........................................................................................................ 6 3.12.1 Minimum and Maximum Velocities ........................................................... 6 3.12.2 Minimum Grades ...................................................................................... 6 3.13 PIPE MATERIAL ............................. ~ ............................................................................ 6 3.14 PIPE DEPTH AND BEDDING MATERIAL .................................................................... 7 3.14.1 Minimums .................................................................................................. 7 3.14.2 Maximum Depth of Cover ......................................................................... 7 3.14.3 Crossing Clearances ................................................................................ 8 3.14.4 Minimum Distance between Sewers ......................................................... 8 3.15 MAINTENANCE HOLES .............................................................................................. 8 3.15.1 3.15.2 3.15.3 3.15.4 3.15.5 3.15.6 3.15.7 3.15~8 3.15.9 Spacing of Maintenance Holes ................................................................. 8 Precast Maintenance Hole Sizing Criteria ................................................ 9 Maintenance Hole Diameters ................................................................... 9 Maintenance Hole Tees ........................................................................... 9 Maintenance Hole Frame and Covers .................................................... 10 Watertight Maintenance Hole Lids/Covers .............................................. 10 Lockable Maintenance Hole Covers ....................................................... 10 Maintenance Hole Steps ........................................................................ 10 Maintenance Hole Drop Structures ........................................................ 11 Environmental andEngineering Services Department The Corporation of the City of London Updated: December 2005

Upload: smurugan02

Post on 11-Nov-2014

11 views

Category:

Documents


0 download

DESCRIPTION

fdsfs

TRANSCRIPT

Page 1: 03_SanitarySewerCollectionSystem

3 SANITARY SEWER COLLECTIONS

3.1 DEFINITION ................................................................................................................ 13.1.1 Public Sewage Systems ........................................................................... 13.1.2 Private Sewage Systems ......................................................................... 1

3.2 NON-PERMITTED FLOWS .......................................................................................... 1

3.3 LOCATION AND ALIGNMENT .................................................................................... 13.3.1 Sanitary Sewers on Private Property ................................................. : ......2

3.4 DRAINAGE/SUB-DRAINAGE AREA PLANS .............................................................. 2

3.5 EXTERNAL SEWERSHED LIMITS AND DRAINAGE AREAS ..................................... 2

3.7 PEAKING FACTOR CALCULATION ........................................................................... 2

3.8 DESIGN CRITERIA ...................................................................................................... 33.8.1 Tributary Areas Less Than 200 ha ........................................................... 33.8.2 Tributary Area 200 ha and Larger ............................................................ 4

3.9 PEAK FLOW CALCULATION ...................................................................................... 5

3.10 MANNINGS ROUGHNESSCOEFFIClENT .................................................................. 5

3.11 PIPE SIZE .................................................................................................................... 5

3.12 FLOW VELOCITY ........................................................................................................ 63.12.1 Minimum and Maximum Velocities ........................................................... 63.12.2 Minimum Grades ...................................................................................... 6

3.13 PIPE MATERIAL ............................. ~ ............................................................................6

3.14 PIPE DEPTH AND BEDDING MATERIAL .................................................................... 73.14.1 Minimums ..................................................................................................73.14.2 Maximum Depth of Cover ......................................................................... 73.14.3 Crossing Clearances ................................................................................ 83.14.4 Minimum Distance between Sewers ......................................................... 8

3.15 MAINTENANCE HOLES .............................................................................................. 83.15.13.15.23.15.33.15.43.15.53.15.63.15.73.15~83.15.9

Spacing of Maintenance Holes ................................................................. 8Precast Maintenance Hole Sizing Criteria ................................................ 9Maintenance Hole Diameters ................................................................... 9Maintenance Hole Tees ........................................................................... 9Maintenance Hole Frame and Covers .................................................... 10Watertight Maintenance Hole Lids/Covers .............................................. 10Lockable Maintenance Hole Covers ....................................................... 10Maintenance Hole Steps ........................................................................ 10Maintenance Hole Drop Structures ........................................................ 11

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

Page 2: 03_SanitarySewerCollectionSystem

3.16

3.17

3.15.103.15.113.15.123.15.133.15.143.15.153.15.15.13.15.163.15.173.15.18

b)c)

Maintenance Hole Safety Landings ........................................................ 11Benching ................................................................................................11Steps in Benching .................................................................................. 11Adjustment Units .................................................................................... 12Head Losses .......................................................................................... 12Maintenance Hole Access ...................................................................... 14Maintenance Hole Access Below Flood Line .......................................... 14Maintenance Hole Construction Practices .............................................. 14New Subdivisions ................................................................................... 15Sampling/Inspection Maintenance Holes ................................................ 16Location ......... : .....................................................................................16Minimum Size ...................................................................................... 16

PRIVATE DRAIN CONNECTIONS (PDCS) ............................................................. 163,16.13.16.23.16.33.16.43.16.63.16.73.16.83.16.93.16.10

Location .................................................................................................16Minimum Size and Grade ....................................................................... 17Connections to Sewers/Maintenance Holes ........................................... 17Vertical Clearance .................................................................................. 18PDC Risers ............................................................................................18PDC Cleanouts ...................................................................................... 18Pipe Material ..........................................................................................18Depth and Bedding ...... .......................................................................... 18New Subdivisions ................................................................................... 19

EASEMENTS ......... .................................................................................................... 193.17.1 Types of Easements .............................................................................. 193.17.2 Minimum Easement Widths .................................................................... 20

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

Page 3: 03_SanitarySewerCollectionSystem

3 SANITARY SEWER COLLECTION SYSTEM

3.1.2

DEFINITION

Public Sewage Systems

A piped collection system that transports wastes of domestic origins which is humanbody waste, toilet or bathroom waste, waste from other showers and tubs, liquid orwater borne culinary and sink water or laundry waste, and such other waste as issuitable for treatment at a sewage treatment facility in accordance with City ofLondon Waste Discharge By-law WM-16 and Drainage By-law No. WM-4.

Private Sewage Systems

A sewage system (or systems), with a total design capacity of 10,000 litres per dayor less, shall be designed, constructed, operated and maintained in accordance withPart 8 of the Ontario Building Code.

A sewage system (or systems), with a total design capacity greater than 10,000 litresper day, falls under the jurisdiction of the Ministry of the Environment.

3.2 NON-PERMITTED FLOWS

Connections from foundation, weeping tile drainage or roof drainage are notpermitted to enter the sanitary sewer system, in accordance with City of LondonDrainage By-law No. WM-4, or any hazardous waste as defined under the EPARegulation 347.

3.3 LOCATION AND ALIGNMENT

Generally sanitary sewers are to be located in front of, or are in locations accessibleto each lot and block facing a City street. Sanitary sewers are also to be located 1.5metres from the centreline of the road (see DWG. U.C.C.-1M for details andadditional design information). Sanitary sewers are to be located on the inside loopof a proposed crescent with the maintenance hole located at a 1.5 metre offset fromthe centreline of the road.

Where a maintenance hole is designed to be located within the vicinity of aroundabout, sanitary maintenance holes are not permitted to be located within thegrassed area of the roundabout. Sanitary maintenance holes must be located in theasphalt area of the street, for maintenance purposes.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-1

Page 4: 03_SanitarySewerCollectionSystem

3.3.1 Sanitary Sewers on Private Property

Sanitary sewers on private property are regulated by the Ontario Building Code(OBC). Where there are no specific regulations in the OBC, details from this manualwill apply.

3.4 DRAINAGE/SUB-DRAINAGE AREA PLANS

Drainage/sub-drainage area limits for which sewers are to be designed for are tocontain and follow the lot/block lines to the proposed maintenance holes located onthe R.O.W.

Note:’ All areas and populations are to be shown for each drainage/sub-drainageareas.

3.5

3.6

EXTERNAL SEWERSHED LIMITS AND DRAINAGE AREAS

When design abuts undeveloped or un-serviced areas, identify the externalsewershed limit to be designed for.

Note: a) All areas and populations are to be shown for all drainage areas withinexternal sewershed limits; and

b) For new subdivisions, references should be made to the Subdivision Development Guide Manual Section E.14 for additional designinformation required for.new developments.

DESIGN CHART

Sanitary sewer design calculations for approved drainage area plans are to becompleted on the standard design chart. See Figure 3.1 for details and additionaldesign information.

3.7 PEAKING FACTOR CALCULATION

Peaking factor calculations are to be determined based on the Harmon formula:

Harmon formula M = 1 + 144+

WhereM = ratio of peak flow to average flowP = tributary population in thousands

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-2

Page 5: 03_SanitarySewerCollectionSystem

3.8 DESIGN CRITERIA

3.8.1

For determining the peak sanitary flows contributing to a sanitary sewer, differentcriteria are followed depending on the size of the catchment area. These areas aredefined as those less than 200 hectares and those greater than 200 hectares.

Tributary Areas Less Than 200 ha

When designing for parcels of land less than 200 hectares, the following criteria willapply:

a) Residential Commercial & Institutional

i) ZoningLow Density = 30 Units/hectare @ 3 people/unitMedium Density = 75 units/hectare @ 2.4 people/unitHigh Density = 150-300 units/hectare @ 1.6 people/unit

ii) Lot BasisSingle Family = 3 people/unitSemi-detached = 6 people/unit

iii) Area BasisSingle Family = 30 units/hectare @ 3 people/unitSemi-detached = 30 units/hectare @ 3 people/unitMulti-family = 75 units/hectare @ 2.4 people/unit

iv) Commercial/Institutional = 100 people/hectare

v) Elementary School = 400 people

vi) Secondary School = 1500 people

vii) Church = 100 people/hectare

viii) Per Capita Flow = 250 litres/capita/flow

ix) Uncertain Development Factor = 1.1

x) Peaking Factor = Harmon

xi) Infiltration = 8640 litres/hectare/day (0.100 I/s/ha)

Note:The above are maximum densities from the City of London OfficialPlan.The density may be adjusted by the City Engineer as moreinformation becomes available on a specific parcel of land.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-3

Page 6: 03_SanitarySewerCollectionSystem

3.8.2

b) Industrial

i) Flow Allowance - light industrial = 20,000 litres/hectare/day- heavy industrial = 50,000 litres/hectare/day

Note:The above maximum density is from the City of London Official Plan.The densitymay be adjusted by the City Engineer as moreinformation becomes available on a specific parcel of land.

ii) Uncertain Development Factor = 1.1

iii) Peaking Factor= 0.8 x Harmon

iv) Infiltration = 8640 litres/hectare/day (0.100 I/s/ha)

Tributary Area 200 ha and Lar.qer

When designing for parcels of land 200 hectares and larger, the following criteria willapply:

a) Residential, Commercial and Institutional

i) Population Allowance = 55 people per hectare (gross area withany ESA areas netted out)

Note: The above maximum density is from the City of London Official Plan.The density may be adjusted by the City Engineer as more informationbecomes available on a specific parcel of land.

ii) Per Capita Flow = 250 litres/capita/day

iii) Peaking Factor= Harmon

iv) Uncertain Development Factor = 1.0

v) Infiltration Allowance= 8640 litres/hectare/day (0.100 I/s/ha)

b) Industrial

i) Flow Allowance = 30,000 litres/hectare/day

Note: The above maximum density is from the City of London Official Plan. Thedensity may be adjusted by the City Engineer as more informationbecomes available on a specific parcel of land.

ii) Peaking Factor= 0.8 x Harmon

iii) Uncertain development factor= 1.0

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-4

Page 7: 03_SanitarySewerCollectionSystem

iv) Infiltration allowance= 8640 litres/hectare/day (0.100 I/s/ha)

3.9 PEAK FLOW CALCULATION

Peak flow calculations are to be determined based on the following formula:

Peak Flow (Q) = population X per capita flow X peaking Factor (H) X uncertaindevelopment factor + infiltration

Where: Peak Flow (Q) L/sPer Capita Flow = 250 litres/capita/dayPeaking Factor (H) Harmon (section 3.7)Uncertain Development Factor = 1.0 or 1.1 (situation dependant)Infiltration Allowance = 8640 litres/hectare/day (0.100L/ha/s)

3.10 MANNINGS ROUGHNESS COEFFICIENT

A coefficient of 0.013 is to be used for all concrete and PVC pipe for pipe sizes200mm to 1650mm. A coefficient of 0.011 is to be used for all pipe sizes 1800mm orgreater.

3.11 PIPE SIZEPipe size is determined using the formula where the pipe design flow is equal to orgreater than the calculated peak design flow:

Q= 1/n x A x R2/3x S1/2

Where: Q = Design flow (m3/sec.)n = Manning’s roughness coefficientA = cross sectional area of flow (m2)R= hydraulic radius (area/wetted perimeter)S = slope of pipe (m/m) -

Notwithstanding the above, the minimum allowable size of a sanitary sewer shall be200 mm.

On private property, the minimum size for sanitary building sewer shall be 100mm, inaccordance with Part 7 of the OBC.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-5

Page 8: 03_SanitarySewerCollectionSystem

3.12 FLOW VELOCITY

3.12.1

3.12.2

Velocities in sanitary sewers shall be calculated using the following formula:

Where: V = flow velocity (m/sec.)Q = Design flow (I/sec)A = cross sectional area of flow (m2)

Minimum and Maximum Velocities

The minimum velocity permitted in sanitary sewers is 0.6 m/sec.

The maximum velocity permitted in sanitary sewers is 4.5 m/sec.

To determine velocities based on actual flow, refer to Figure 3.2 "HydraulicElements Graph for Circular Pipe".

Minimum Grades

a) The minimum grade on a 200 mm diameter sanitary sewer is 0.33%. Wherethere are only a few dwelling units connected to the upper section of a 200 mmsanitary sewer, the minimum grades shall be adjusted as follows:

b)

1 to 5 units 0.61%6 to 8 units 0.52%9 to 12 unit 0.43%13 or more units 0.33%

The minimum grade on all other sewer sizes shall be established by determiningthe minimum grade necessary to achieve a velocity of at least 0.6m/sec.

3.13 PIPE MATERIAL

Both rigid and flexible pipe are permitted in the construction of sanitary sewersystems including private drain connections. These materials include concrete andpolyvinyl chloride.

The criteria for these materials are described in City of London Standard ContractDocuments - Section 410.05.01.

On private property, materials for sanitary building sewers and private sewers shallcomply with Part 7 of the OBC.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-6

Page 9: 03_SanitarySewerCollectionSystem

3.14.2

PIPE DEPTH AND BEDDING MATERIAL

Minimums

The minimum depth of a sanitary sewer shall be 2.4 m from the finished groundelevation to the obvert of the pipe.

Maximum Depth of Cover

a). Concrete Pipe

i) See City of London SW-I.0 and SW-I.1 for details and additional designinformation for bedding standards for Class A, B and C beddings.

ii) Municipal Proiects

The maximum allowable cover permitted on concrete pipe to be constructedunder a Municipal or Capital Works Project is to be based on OPSD 807.01,807.03, 807.04 and 807.05.

Where the pipe required exceeds the OPSD charts, the Pipe Pac Program 2000will be used, utilizing the following variables:

¯ all units are in metric and conform to C.S.A. standards¯ wall thickness is based on C.S.A A257.2M, Type B wall¯ soil density = 2000 kg/m3¯ Ontario Highway Bridge Design Code (OHBDC)

live load magnitude = 25 tons¯ projection ratio = 0.70¯ lateral pressure ratio = 0.33¯ lateral pressure friction ’m’ = 0.70¯ settlement ratio = 0.70¯ k-mu(p) = 0.1924¯ variable bedding factors B - Lf = 1.9 C - Lf = 1.5

rsdp = 0.49 (calculated)¯ factors of safety

0.3mm crack D-load = 1.00ultimate earth and live load = (ASTM C 76M)DL.03 < 100 N/m/mm = 1.50DL.03 > 140 N/m/mm = 1.25DL.03 between 100 and 140 N/m/mm = interpolated

¯ positive projection embankment installation¯ maximum depth of cover is based on transition width design¯ depth of ground is measured from the ultimate finished ground elevation

to the outside top of pipe.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-7

Page 10: 03_SanitarySewerCollectionSystem

3.14.3

3.14.4

iii) New Subdivisions

The structural design of concrete sewers being constructed as part of a newsubdivision are to be in accordance with one of the following:

¯ the "Maximum Depth of Cover over Pipe - Reinforced Concrete PipeOnly’,, as per the Subdivision & Development Guide Manual;

¯ First Principles (with City of London Variables)¯ Pipe Pac Program (with City of London Variables)

It should be noted that the City is currently in the process of reviewing the twostandards and will establish a single standard in the future.

b) Flexible Pipe

The maximum allowable cover permitted on flexible pipe is 10.5 m. The followingbedding types are to be used:

¯ for up to 4.5 m - Type 1 (see City of London SW-I.0)¯ for up to 10.5 m Type 2 (see City of London SW-I.0)

Crossin.q Clearances

There are minimum clearances required when sanitary sewers cross other services.In all cases this is measured from outside wall diameter to outside wall diameter.

When crossing over or under a storm sewer, 230 mm clearance is required.

When crossing over or under a watermain, 450 mm diameter or less, 150mmclearance is required.

When crossing over or under a watermain larger than 450mm diameter, 600mmclearance is required. Water Engineering Division must review and approve thiscrossing. Refer to Section 7.4.7.2.

Minimum Distance between Sewers

The minimum distance between sewers shall be 3.0 m as per drawing UCC-1M.Special cases to be review for site specific design constraints and depths.

MAINTENANCE HOLES

Spacin.q of Maintenance Holes

The maximum spacing between sanitary maintenance holes shall be 99 metresmeasured horizontally or 110 metres measured vertically from the top of themaintenance hole, to the springline of the pipe, along the springline to the next

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-8

Page 11: 03_SanitarySewerCollectionSystem

3.15.2

3.15.3

3.15.4

maintenance hole and vertically to the top of the maintenance hole.

When spacing of a maintenance hole dictates that the maintenance hole should beplaced within the vicinity of a roundabout, sanitary maintenance holes are notpermitted to be located within the grassed area of the roundabout. Sanitarymaintenance holes must be located in the asphalt area of the street, for maintenancepurposes.

Precast Maintenance Hole Sizinq Criteria

All sizing of sanitary precast maintenance holes are based on incoming and outgoingpipe sizes and should be sized and conform to Figure 3.3.

Maintenance Hole Diameters

Precast maintenance hole diameter requirements are as follows:

a) 1200 mm DiameterSee OPSD 701.010 and OPSD 701.030 for details and additional designinformation.

b) 1500 mm DiameterSee OPSD 701.011information.

and OPSD 701.040 for details and additional design

c) ¯ 1800 mm DiameterSee OPSD 701.012 and QPSD 701.050 for details and additional designinformation.

d) 2400 mm .DiameterSee OPSD 701.013 andinformation.

OPSD 701.060 for details and additional design

e) 3000 mm DiameterSee OPSD 701.014 and OPSD 701.070 for details and additional designinformation.

f) 3600 mm DiameterSee OPSD 701.015 and OPSD 701.080 for details and additional designinformation.

Maintenance Hole Tees

Maintenance Hole tees are not allowed for any sanitary sewer less than 1200 mmdiameter, For sanitary trunk sewers greater than 1200 mm diameter, refer to thestorm sewer section 5.14.4.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-9

Page 12: 03_SanitarySewerCollectionSystem

3.15.5 Maintenance Hole Frame and Covers

3.15.6

3.15.7

3.15.8

Maintenance hole frames and covers are required for all maintenance holes andshall conform with OPSD 401.01. See OPSD 401.01 for details and additional designinformation.

Note: Maintenance hole frames and covers are to be clear of curb and gutters onbends in the road for new construction. Maintenance hole frames and coversmay be located in the curb and gutter on reconstruction projects, only asapproved.

Waterti.qht Maintenance Hole Lids/Covers

Watertight maintenance hole lids are required when sanitary maintenance holes arelocated within overland storm flow routes. These locations are within flood plainareas, within gutter locations and within an easement and/or open space area whereoverland flow is directly over and or adjacent to the maintenance hole lids.Watertight maintenance hole lids are also required under sanitary surchargeconditions. (See City of London SW-5.3 for details and additional designinformation).

Watertight maintenance hole lids are not required under the following circumstances:

Where design dictates that the maintenance hole lids end up in the curb andgutter and where it is possible to rotate the cone so that the maintenancehole lid is clear of the gutter, the cone should be rotated such that a watertight lid would not be required;

Where, in the profile design of the street, the maintenance hole is located inthe low point of an overland flow route, the maintenance hole may be instandard location, but would be submerged under a greater than two yearstorm event. Maintenance holes located in a standard location on streets thatcarry an overland flow route with a continuous grade, or cascading grade(even though some of these may be briefly submerged) do not require watertight lids.

Lockable Maintenance Hole Covers

Lockable maintenance hole covers are required to reduce access by the public.They can be located through park blocks, open space blocks, pumping stations orpollution control plants. See OPSD 401.06 for details and additional designinformation.

Maintenance Hole Steps

Maintenance hole steps are required for access and are to conform with one of thefollowing:

a) Maintenance Hole Steps - HollowSee OPSD 405.010 for details and additional design information.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-10

Page 13: 03_SanitarySewerCollectionSystem

3.15.9

3.15.10

3.15.11

3.15.12

b) Maintenance Hole Steps - SolidSee OPSD 405.020 for details and additional design information.

Note: a) All steps are to be galvanized steel or aluminium; and

b) A detail or restoration plan is required for the relocation of maintenancehole steps within existing maintenance holes, where

applicable; and

c) Maintenance hole steps shall be located to avoid conflict with aninletting or outletting sewer pipe. Access to maintenance holes must beabove the benching platform.

Maintenance Hole Drop Structures

Sanitary drop structures are required when the difference in invert elevationsbetween the upstream and outlet sewers in the maintenance hole is equal to orgreater than 0,6 metres. (See City of London SW-2.0 for details and any additionaldesign information).

Maintenance Hole Safety Landings

Maintenance hole safety landings are required at the mid-point depth of themaintenance hole, when the depth of the maintenance hole is between 5.0 and 10.0metres. Additional safety landings are required at third-point depths, when themaintenance hole is equal to or greater than 10.0m to 15.0m deep. See City ofLondon SW-2.5 for details and additional design information.

Note: Incoming pipes are to be below safety landings, where possible.

Benchin.q

All maintenance holes require benching at the bottom of the maintenance hole andshould conform to OPSD 701.021. Benching height should be increased to obvert toincrease hydraulic benefit as required.

Note: Where benching is different from OPSD 701.021, a benching detail isrequired.

Steps in Benchin.q

Steps in maintenance hole benching are required when the pipe diameter is greaterthan 900 mm and benched to springline, and when the pipe diameter is greater than450 mm and benched to crown. See City of London SW-5.2 for details and additionaldesign information.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-11

Page 14: 03_SanitarySewerCollectionSystem

3.15.13 Adiustment Units

Maintenance hole adjustment units are required on all maintenance holes to ensurethat proper grade is provided between the top of the maintenance hole and themaintenance hole lid. Ensure that the difference in grade between the maintenance

hole lid and the first ladder rung does not exceed 600 mm. See City of London SW-5.0 for details and additional design information. Clay brick will not be allowed for useas maintenance hole adjustment units.

3.15.14 Head Losses

a) Generally, when velocities in the downstream pipe from a maintenance holeexceed a velocity of 1.2 m/s, head losses must be accounted for in the design ofthe sewer. In order to absorb head losses that may exist in maintenance holes, itmay be necessary to improve the benching in the maintenance hole or increasethe size of the downstream pipe where possible. Lowering the crown of theoutgoing sewer below the crown of the incoming sewer by the amount equal tothe head loss, however, is the most effective method of accounting for head lossin most cases.

b) Drops in maintenance holes to compensate for Head Loss (HL) shall calculated using the following formula:

HL = KL. V~ Where2g

KL = Head loss coefficientV = downstream velocityg = 9.8 m2/sec

Note: Also see Figure 3.4 for quick reference for head losses inmaintenance holes.

c) Head loss coefficients (KL) are to be applied as follows:

90 de,qreesNo benching or deflector, or where they are only up to springline.KL =1.5

ii) 90 deqreesBenching or deflector to crown of sewers.

KL= 1.0

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-12

Page 15: 03_SanitarySewerCollectionSystem

iii) Less than 90 deqreesMultiply the head loss coefficient for a 90 degree bend by a head loss ratiofactor from the following chart:

1.5

1.4

1.2

1.0

K~ 0.8

0.6

0.4

0.2

00.2 0.4 0.6 0.8 1.0

Qu/Qo

iv) Junctions

- TeeOutlet at right angles to inlets and no deflector between inlets.K,= 1.5

Deflector between inlets for full height and width of incoming flows.KL= 1.0

- Side and cross junctionsValue of KL is obtained from the following chart:

1.0

0.8

0.6

0.4

0.2

0

//

/0 15 30 45 60 75 90

DEFLECTION IN DEGREES

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-13

Page 16: 03_SanitarySewerCollectionSystem

v) For KL values for calculating head losses in curved sewers (radius pipe),see Figure 3.5.

3.15.15

3.15.15.1

Maintenance Hole Access

a) A 3.0m to 4.6m wide asphalt with granular base access is required formaintenance vehicles and equipment used to access and service sanitarysewers within easements, open space areas, designated blocks and existingright-of-ways (i.e. boulevards). Adequate curves and turn-around facilities arerequired for maintenance vehicles to maneuver. Slopes (10% maximum), cross-falls (2% minimum) and drainage of access roads are also to be addressed in thedesign.

b) Where sanitary sewer maintenance holes are installed below the flood line, theengineer shall be consulted and access road alternatives may be considered inthis situation.

Note: a) A 0.3m separation is required between the maintenance access andthe top/bottom of any slopes; fences; and property line(s); and

b) The design and construction of sewer maintenance access roads inCity Parks and Open Spaces will require the review and approval ofboth Parks Planning and the Environmental & Engineering ServicesDepartment. Wherever possible, sewer access roads in City Parksand Open Spaces shall be integrated into the public open spacepathway networks and respect the City’s natural heritage features.

See Section 3.17 for easement requirements.

Maintenance Hole Access Below Flood Line

Where sanitary sewer maintenance holes are installed below the 100 year flood line,the engineer shall be consulted, and access road alternatives may be considered inthis situation.In this situation, maintenance hole lids must conform to 3.15.6.

3.15.16 Maintenance Hole Construction Practices

a) The void between the sewer pipe and the cored hole of the precastmaintenance hole section shall be filled with cement bricks and approved non-shrinkable grout. Pre booted maintenance holes will be allowed but only withprevious approval by the City.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-14

Page 17: 03_SanitarySewerCollectionSystem

3.15.17

b) All precast maintenance hole section joints shall contain an approved rubbergasket.

c) All joints between bricks are to be completely filled with concrete mortar. Bricksare to be parged on the outside. Parging shall contain an approved bondingagent.

d) All mortar and approved non-shrinkable grout shall be mixed and placed inaccordance with the manufactures specifications.

e) A minimum 300 mm vertical/horizontal clearance between openings on theinside of the maintenance hole is required for all sewer and PDC connections.

f) All maintenance hole frame and covers shall be adjusted to the finished roadgrade by means of metal shims at each corner or by means of an approvedprecast adjustment ring. Metal shims are to be at least 75 mm x 200 mm (3" x 8")and their thickness is to be determined by the adjustment required. The spacebetween the bottom of the maintenance hole frame and cover and the top of theprecast maintenance hole is to be at minimum the thickness of one adjustment

unit and at maximum 300 mm. See City of London SW-5.0 for details andadditional design information.

g) Where adjacent maintenance holes are located in close proximity to oneanother, the area between the adjacent maintenance holes shall be backfilledin accordance with the specifications in the following table:

Distance BetweenAdiacent Maintenance Holes Material

0.6 metres or less concrete or crushed stone

0.6 metres to 2.4 metres granular material

more than 2,4 metres approved native material orgranular material

The above noted backfill shall be compacted to the standard Proctor Densityspecified in the soils report, or as approved by the City Engineer.

New Subdivisions

Reference should be made to .the Subdivision & Development Guide Manual,Section E.07 and E.14 for additional design information required for newdevelopments.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-15

Page 18: 03_SanitarySewerCollectionSystem

3.15.18 Samplin,q/Inspection Maintenance Holes

a) RequirementsSampling/Inspection maintenance holes are typically required where Institutional,Commercial and Industrial developments outlet to sanitary sewers owned andmaintained by the City. Sampling/inspection maintenance holes are required forall industrial and commercial sites.

b) LocationIf required, Sampling/Inspection Maintenance Holes shall be located on privateproperty as close as possible to the property line, or as approved by the CityEngineer.

c) Minimum SizeSampling/Inspection Maintenance Holes shall be a minimum of 1200mmdiameter. A larger diameter Maintenance Hole may be required if noted on theBuilding Permit Application Drawings.

Sampling/Inspection Maintenance Holes that have more than one inlet sewershall be increased in size to ensure that there is a minimum of 0.9m benchinglength downstream of all inlet sewers.

Maintenance Holes shall be to OPSD standards - see Section 3.15.3, and Figure3.7 for further details.

PRIVATE DRAIN CONNECTIONS (PDCs)

Location

PDCs to single family and semi detached lots are to be located in accordance withCity of London SW-7.0.

PDCs to multi-family (town housing, row housing and apartments), commercial andindustrial blocks are to be connected to a maintenance hole on the R.O.W. Seesection 3.16.3 for further details.

PDC’s shall be installed at 90° to the sewer main where possible. Under nocircumstances will flow from the PDC enter the main against the flow in the main.Where horizontal or vertical bends are required, long radius sweeps shall be used.Short bends are not acceptable. Single family and semi~detached lot Sanitary PDC’sshall NOT be connected to a maintenance hole.

Note: Where design constraints arise (ie: top end of cul-de-sac or crescent), PDCsmay have to be located in reverse location and identified as such on theservicing drawings.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-16

Page 19: 03_SanitarySewerCollectionSystem

3.16.2 Minimum Size and Grade

3.16.3

a)

b)

c)

d)

The minimum diameter and grade of a PDC for residential, single family andsemi-detached lots is 100 mm @ 2.0%.

The minimum diameter.and grade of a PDC for a residential multi-family blockis 150 mm diameter @1.0%.

The minimum diameter and grade of a PDC for a non-residential block is 150mm diameter @ 1.0%.

The minimum diameter and grade of a PDC for a commercial block is150 mm diameter @ 1.0%.

e) The minimum diameter and grade of a PDC for an institutional block is 200mmdiameter @1.0%.

Note: The actual size of the PDC required for multi-family, non residential,commercial and institutional blocks is dependant on the flows.

Connections to Sewers/Maintenance Holes

a) Residential

PDCs 100 mm and 150mm in diameter must be connected to the main sewer.No sanitary PDCs are to be constructed into any sanitary maintenance hole.

b) Multi-family, Commercial, Institutional and Industrial

PDCs 200 mm in diameter and larger are to be connected to the main sewer atmaintenance holes.

c) Connections to Existinq Sewers for Lot Infill Situations

In a situation where a lot severance or lot infill condition exists, and a newsanitary service will be connected to an existing sanitary mainline, theadvocate of the severance/infill, or his agent, must determine if the existingsanitary sewer is a combined or poorly separated sewer and is therefore atrisk of surcharging, or if the sewer is a dedicated sanitary sewer but has ahistory of surcharging. This information can be obtained from WastewaterEngineering Division. If it is determined that there is a surcharge risk, thedevelopment advocate must provide surcharge protection to hisdevelopment.

When connecting PDC’s to existing sewers in a lot infill situation,connections must be made utilizing an approved saddle orpremanufactured tee, in accordance with OPSS 410, as amended by theSupplemental Standards for Sewer and Water (SW) in the City of LondonStandard Contract documents for Municipal Connection Projects.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-17

Page 20: 03_SanitarySewerCollectionSystem

3.16.4 Vertical Clearance

3.16.5

3.16.6

3.16.7

3.16.8

3.16.9

A minimum clearance of 150 mm under/over the storm sewer and watermain is to beprovided.

Note: For PDCs that cross over or under a watermain larger than 450mmdiameter, 600 mm clearance is required. Water Engineering Divisionmust review and approve this crossing. Refer to Section 7.4.7.2 forfurther details.

PDC Detail

Typical PDC connection to the main shall be as per City of London SW-6.0.

PDC Risers

a) mv~el

Required for sewer depths greater than or equal to 4.5 m and for excavations instable bank conditions, see City of London SW-6.1 for details and additionaldesign information. When the PDC is installed between 45° and 67.5°, anapproved controlled settlement joint shall be installed at the tee.

b)Required for sewer depths greater than or equal to 4.5 m and for excavations inunstable bank conditions, see City of London SW-6.2 for details and additionaldesign information. When the PDC is installed between 45° and 67.5°, anapproved controlled settlement joint shall be installed at the tee.

PDC Cleanouts

Where PDC cleanouts are required within the right-of-way, they shall conform to SW-6.3. On private property, sanitary building sewers and private sewers shall beprovided with cleanouts/maintenance holes, in accordance with Part 7 of the OBC.Cleanout/maintenance holes shall be located off of the right-of-way.

Pipe Material

Refer to Section 3.13.

Depth and Beddin,q

The minimum depth of a sanitary PDC shall be 2.4 metres from the finished propertyline elevation to the obvert of the PDC. The maximum cover on a sanitary PDC shallbe based on the following:

a) Concrete PipeThe maximum allowable cover permitted on concrete PDCs is to be as perSection 3.14.2 a).

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-18

Page 21: 03_SanitarySewerCollectionSystem

3.16.10

3.16.11

b) Flexible PipeThe maximum allowable cover permitted on flexible PDCs is to be as per Section3.14.2 b).

New Subdivisions

Reference should be made to the Subdivision & Development Guide Manual,Section E.11 for additional design information required for new developments.

Markin,q and Recordin.q PDC Service Connections

Brown painted surface stakes 40mm X 90mm (standard 2" X 4") shall be placed aftertrench restoration to mark the termination of sanitary PDC’s. These stakes shallextend from PDC invert to minimum 450mm above finished boulevard grade.

Plugged or capped service connections shall be marked on the top surface of thelast 3m of the upstream end of the pipe with yellow PVC adhesive tape (50mm wide)labeled continuously in black lettering (40mm wide)"CAUTION SANITARY SEWER"

3.17

3.17.1

EASEMENTS

Easements are required for all sewers to be assumed by the municipality locatedoutside a road allowance on privately owned property.

An easement is required to ensure the municipal services and utilities crossing thesite can be properly installed and maintained by the appropriate authority(municipality or private). An easement provides the right to use private land for specific purpose which is in the public’s interest.

All manholes located within easements require hard surface access. Refer toSection 3.15.15 for hard surface details.

Types of Easements

a) Municipal (Servicinq) Easements

Are required for sanitary sewers and access roads that cross a site and whichare maintained by the City.

b) Utility Easement

Utility easements are required for telephone, hydro, gas and cable televisionservices. Each utility company should be consulted for their specificrequirements.

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-19

Page 22: 03_SanitarySewerCollectionSystem

c) Private Easements

¯ Private easements are required for private sanitary sewers and access roadsthat cross a parcel of land to service other private lands. A joint access andmaintenance agreement between the interested parties shall be entered into.

d) Temporary Easements and Working Easements

Temporary easements are required for sanitary sewers and access roads thatcross a site temporarily. The services in the easement are to be maintained bythe owner of the services.

3.17.2 Minimum Easement Widths

Easement widths are determined by the depth of cover from the centreline of theroad/ground to the invert of a sewer or watermain. Fig 3.6 shows how an easementwidth is to be determined. The minimum width of a sewer easement at a depth ofup 2.4 metres, shall be 4.8 metres (2.4 metres each side of sewer).

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-20

Page 23: 03_SanitarySewerCollectionSystem

SANITARY SEWER COLLECTION SYSTEMS

LIST OF FIGURES

FIGURE 3.1 SANITARY SEWER DESIGN CHART

FIGURE 3.2 HYDRAULIC ELEMENTS GRAPH FOR CIRCULAR SEWERS

FIGURE 3.3 MAXIMUM PIPE SIZES FOR PRECAST MANHOLES

FIGURE 3.4 HEAD LOSSES IN MAINTENANCE HOLES

FIGURE 3.5 KL VALUES FOR CALCULATING HEAD LOSSES IN CURVEDSEWERS

FIGURE 3.6 MINIMUM EASEMENT WIDTHS

FIGURE 3.7 SAMPLING MAINTENANCE HOLE - SANITARY AND STORMSEWERS

Environmental and Engineering Services DepartmentThe Corporation of the City of LondonUpdated: December 2005

3-21

Page 24: 03_SanitarySewerCollectionSystem

RESIDENTIAL I}DPULATION DENSITIES SANITARY SEWER DESIGN ~HEET,ECTABEBASIS

CITY OF LONDONTNE FOLLOWING POPULATION ALLOWANCES WILL APPLY W~IEN RESIGNING SAR[TARY SEWERSILOW DENSITY (SINGLE-FANILY/SERI-UEYACHED= 30 UNITS/HECTARE e 3 PEOPLE/UNIYEDIU~ DENSITY (TOW~HOUSE/RD~DUSE)= ?5 UNITS/HECTARE ~ 2.N PEOPLE/UNITRIGH DENSITY IAPARTWENTS) = 150-300 UNI~r/NECTARE e 1-6 PEOPLE/UNITLOT BASISSINGLE FANILY = ~ PEOPLE

PROJECT NAME:OUPLEX / S£gl = 6 PEOPLE

DESIGN CRITERASEWAGE = 250 L[TRES/CAPITA/OAYINFILTRATION = 8640 L[TREDARECTARE/BAyPEARINO FACTOR: ~ = I+ 14

4+P’0.3DATE:DESIGNED BY:

PROJECT FILE NO.

LOCATION AREA POPUL~’RON SEWAGE FLOWS SEWER DESIGN PROFILENET OR INVERT ELEVATION

AREA No. DELTA TOTALSTREET NANROLE PERWANHDLEGROSSHECTARESNECTARES~HECTARE DELTATO4ALPER LOT

INFILT TOTAL SLOPE CAP VELOCITYLENGOTLOTS POP.FALL IN

POP LIG DROP INL/S n PIPE~SIZ~ LID SEWERHEADLOSS PEANING~ANNDLI FACTOR

CITY OF LONDON

SANITARY SEWER DESIGN CHARTDWG: DATE

FIG. 3.1 2005 08

Page 25: 03_SanitarySewerCollectionSystem

VALUES OF _#._#AND no__

ff n f

1,0 1,2 1.4, 1.6 1.~ 2.0 2,2 2.4 2.6 2.8 3.0 3.2 3.4 3.6

HYDRI ULI CRAD IL S,. R

0 0.1 0.2 0.3 0.4 0,5 0,,6 0.? 0.8 0.9 1.0 1.1 1.2 1.3

HYDRAULIC ELEMENTS V, Q, A, AND R

V~ Q~ Af R#

NOTE:

I. INFORMATION TAKENFROM THE AMERICANSOCIETY OF CIVIL ENGINEERS ( A.S.C.E. ) MANUAL.

CITY OF LONDON

FOR CIRCULAR SEWERS

Page 26: 03_SanitarySewerCollectionSystem

NOTES

I.

MAINTENANCE HOLEINSIDE DIAMETER

(mm)

1200

1500

1800

2400

30O0

3600

3000 x 2400

MAX, PIPE sIZEFOR STRAIGHT THROUGH

INSTALLATION (mm)

600~600

825~~825

1050

MAX. PIPE SIZEFOR RIGHT ANGLE

INSTALLATION (mmO

450

450

600

600

825

825

~ 1.050

050

~50

1650

ALL DIMENS[QNS ARE FOR CONCRETE PIPEo

2, ALL DIMENSIONS ARE IN MILLIMETRES3, KNOCKOUTS FOR SMALL DIAMETER CATCH BASINS LEAD SIZES

300mm OR LESS COULD BE PROVIDED IN ADDITION TO WHAT IS SHOWN.

4. INFORMATION TAKEN FROM THE ONTARIO CONCRETE PIPE ASSOCIATION

(O,C,P,A,)

CITY OF LONDON

MAXIMUMDWG

PIPE SIZES FORDATE

PRECAST MAINTENANCE HOLES

FIG, 3,3 2002 12 17

Page 27: 03_SanitarySewerCollectionSystem

I

0 Z

o o

oo

o

HE

AD

L

OS

S

- m

o

o

?

OO

o0

Page 28: 03_SanitarySewerCollectionSystem

ZO

0 Cl

O.

~ ~C

[---

1.2

~,.,

~1

1.0

0.9

0.8

0.’7

0.6

0.5

0.4

O.~

0.2

0.1 0

0 :1

.2

Zl

68

1012

.

HL

= K

LV

~2g

R=

C/L

R

AD

IUS

OF

BE

ND

- M

ET

RE

SD

= D

IAM

ET

ER

OF

LA

RG

ES

T PIP

E -

M

ET

RE

S

141.

6~

,820

22.2

426

2830

R/D

Page 29: 03_SanitarySewerCollectionSystem

6

7

M~NIMUM WIDTH OF EASEMENT - FROM C/L OFSEWER ~ METERS

0 1 2 3 4 5 6 7 8 9 10

NOTES:

MINIMUM EASEMENT WIDTHMEASURED FRDM C/L OF SEWER PIPEEG: 6TB n~a~ SEWER WITH INVERT 3.9 mBELOW FINISHED SURFACE ELEVATIDN -WIDTH OF EASEMENT REQUIRED = 3.6 ~EACH SIDE DR A TDTAL WIDTH DF 7,~ mo

THROUGH FIELDS, OPENSPACE, ETC,, 9.I ~mln. -3,0 m ON ONE SIBEOF SEWER O/L AND 6.1 mON THE OTHER, OR AT LEAST 3,0 m WIDERTHAR THE MINIMUM W~DTH OBTAINED FROMTHIS CHART. AS REOUIRED BY THE ¢IT~ ENGINEER.

CITY OF LONDON

i " MINIMUM EASEMENT WIDTHDWG DATE

Page 30: 03_SanitarySewerCollectionSystem

A

NOTES:

A

DETAILSHOLE WITH MORE THANONE INLET DRAIN

MAINTENANCEHOLE STEPS

12001OR ’12001~ MIN ~A

,

I

g

20 # GAL STEEL

~EQUIPMENT RUNG

MAINTENANCE

,~/ __~LE__ STEPS

i ~

1200iOR

,"~’-~-1200,L~__MIN"---~

C)L

600 >i ’ , I/2 PIPE

RIS~.~ SECTION

SECTION A-A SECTION B-B

I) DETAILS NOT INDICATED SHALL BE IN ACCORDANCE WITH CITY OF LONDON STANDARDS FOR MAINTENANCE HOLECONSTRUCTION

2) MAINTENANCE HOLE SHALL BE LOCATED ON PRIVATE PROPERTY AS CLOSE AS POSSIBLE TO THE PROPERTYLINE OR AS APPROVED BY THE CITY ENGINEER.

3) 1200mm DIAMETER, OR LARGER, PRECAST MAINTENANCE HOLE TO THE CITY OF LONDON STANDARDS

IS ACCEPTABLE.

4) LARGER MAINTENANCE HOLE SIZE WILL BE REQUIRED IF NOTED ON BUILDING PERMIT

APPLICATION DRAWINGS.

5) MAINTENANCE HOLES THAT HAVE MORE THAN ONE INLET SEWER WILL BE INCREASED IN SIZE TOENSURE A MINIMUM OF 900mm BENCHING LENGTH DOWNSTREAM OF ALL INLET SEWERS (SEE DETAILS ABOVE)

6) MAINTENANCE HOLE STEPS TO BE IN ACCORDANCE WITH OPSD-405.010 & OPSD-405.020

7) CLASS OF CONCRETE :30MPA AT 28 DAYS

NOTE: ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE NOTED

CITY OF LONDON

SAMPLING MAINTENANCE HOLE SANITARY & STORMSEWERS ’

FIG 3.7. DATE2005 08