04 03 ground floor plan layou - government of jersey · ground +2,800 first wc dining room kitchen...

1
PROJECT / LOCATION DRAWING CLIENT CHECKED DRAWN DATE SCALE DRAWING NUMBER B D K Architects White Lodge, Wellington Road, St. Saviour, JERSEY Channel Islands JE2 7TE Tel: +44 1534 768740 Fax: +44 1534 739115 E: [email protected] GROUND FLOOR PLAN REVISIONS THIS DRAWING AND ALL DESIGN AND DETAILS ARE THE COPYRIGHT OF CHANNEL ARCHITECTS LTD. This drawing must be read in conjunction with all other drawings, details and specifications issued by the Architect, Structural Engineer and other Consultants or approved specialists. Discrepancies between any other drawings, details and/ or specifications must be referred to the Architect for verification at least 7 days prior to commencement of the work. It is the Contractor's responsibility to ensure all work is carried out in accordance with all statutory requirements and to the approval of the Building Control Officer. All roof and structural timbers are to be vacuum preservative treated by approved methods before delivery to site. All roof decking or external plywood to be W.B.P. bonded external grade. All materials to comply with the latest British Standards Specification or have an Agrément Certificate. The Contractor is responsible for all setting out of the works. Use written dimensions only, do not scale off drawings. All dimensions and setting out must be checked on site. If in any doubt refer to the Architect prior to commencement of the work. PLEMONT ESTATES LTD PLEMONT BAY HOLIDAY VILLAGE PLEMONT 28 HOUSES DEVELOPMENT HOUSE 14 JUNE 2010 1:50 @ A0 EN PH PLANNING APPLICATION ±0 Ground +2,800 First wc Dining Room Family / Day Room Kitchen Lounge HOUSE 14 Garage Utility Cloaks / Store Snug HOUSE 15 Store Store ±0 Ground +2,800 First NORTH ELEVATION 1:50 GROUND FLOOR PLAN 1:50 WEST (FRONT) ELEVATION 1:50 A JUNE 2010 Scheme revised as directed by Planning Department & to Planning Requirements. PAP/SB D 1871/H/01 N MATERIAL IMAGE TRADITIONAL BLUE/GREY SLATE (ROOF & RIDGE TILES) GLAZING N/A CUT & DRESSED JERSEY GRANITE (CILLS ) RED BRICKWORK (QUOINS & LINTOLS) CAST IRON (BALCONY BALUSTRADE, GUTTERS & DOWNPIPES) PAINTED PRESERVATIVE TREATED SOFT WOOD - WHITE (FASCIAS, WINDOWS & INFILL PANELS) RANDOM LAID, TRADITIONAL JERSEY GRANITE (EXTERIOR WALLS) PAINTED MORTAR - 'HONEY BEIGE' (JERSEY VERGES) PAINTED PRESERVATIVE TREATED SOFT WOOD - 'FATHOM BLUE' (ENTRANCE DOORS) B July 2010 Scheme revised as directed by Planning Department PM C July 2010 Scheme revised as directed by Planning Department PM TREATED TIMBER ( GARAGE FACADES & BEAMS) D Sept 2010 Revisions to further planning requirements JDH a) Windows/Patio door East elevation centred in gable b) High level small bespoke gable window inserted on East elevation c) Garage doors centred/equalised width and refined with door pairs showing and hinges d) Eaves of Tourelle aligned with main eaves e) Addtional first floor window to East Elevation

Upload: others

Post on 28-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 04 03 GROUND FLOOR PLAN Layou - Government of Jersey · Ground +2,800 First wc Dining Room Kitchen Family / Day Room Lounge HOUSE 14 Garage Utility Cloaks / Store Snug HOUSE 15 Store

PROJECT / LOCATION DRAWING

CLIENT CHECKEDDRAWN

DATE SCALE DRAWING NUMBER

B D K ArchitectsWhite Lodge,Wellington Road,St. Saviour,JERSEYChannel IslandsJE2 7TE

Tel: +44 1534 768740Fax: +44 1534 739115E: [email protected]

GROUND FLOOR PLAN

REVISIONS

THIS DRAWING AND ALL DESIGN AND DETAILS ARE THE COPYRIGHT OF CHANNEL ARCHITECTS LTD.

This drawing must be read in conjunction with all other drawings, details and specifications issued by the Architect,Structural Engineer and other Consultants or approved specialists. Discrepancies between any other drawings,details and/ or specifications must be referred to the Architect for verification at least 7 days prior to commencementof the work. It is the Contractor's responsibility to ensure all work is carried out in accordance with all statutoryrequirements and to the approval of the Building Control Officer. All roof and structural timbers are to be vacuumpreservative treated by approved methods before delivery to site. All roof decking or external plywood to be W.B.P.bonded external grade. All materials to comply with the latest British Standards Specification or have an AgrémentCertificate. The Contractor is responsible for all setting out of the works. Use written dimensions only, do not scaleoff drawings. All dimensions and setting out must be checked on site.If in any doubt refer to the Architect prior to commencement of the work.

PLEMONT ESTATES LTD

PLEMONT BAY HOLIDAY VILLAGEPLEMONT 28 HOUSES DEVELOPMENT

HOUSE 14

JUNE 2010 1:50 @ A0

EN PH

PLANNING APPLICATION

±0Ground

+2,800First

wc

DiningRoom

Family / Day RoomKitchen

Lounge

HOUSE 14

Garage

Utility

Cloaks /Store

Snug

HOUSE 15

StoreStore

±0Ground

+2,800First

NORTH ELEVATION1:50

GROUND FLOOR PLAN1:50

WEST (FRONT) ELEVATION1:50

A JUNE 2010 Scheme revised as directed by Planning Department & to Planning Requirements. PAP/SB

D1871/H/01

N

MATERIAL IMAGE

TRADITIONAL BLUE/GREYSLATE (ROOF & RIDGE TILES)

GLAZING N/A

CUT & DRESSED JERSEY GRANITE(CILLS )

RED BRICKWORK(QUOINS & LINTOLS)

CAST IRON(BALCONY BALUSTRADE, GUTTERS &

DOWNPIPES)

PAINTED PRESERVATIVE TREATEDSOFT WOOD - WHITE

(FASCIAS, WINDOWS & INFILLPANELS)

RANDOM LAID, TRADITIONALJERSEY GRANITE(EXTERIOR WALLS)

PAINTED MORTAR -'HONEY BEIGE'(JERSEY VERGES)

PAINTED PRESERVATIVE TREATEDSOFT WOOD - 'FATHOM BLUE'

(ENTRANCE DOORS)

B July 2010 Scheme revised as directed by Planning Department PM

C July 2010 Scheme revised as directed by Planning Department PM

TREATED TIMBER( GARAGE FACADES &

BEAMS)

D Sept 2010 Revisions to further planning requirements JDH

a) Windows/Patio door East elevation centred in gable

b) High level small bespoke gable window inserted on

East elevation

c) Garage doors centred/equalised width and refined

with door pairs showing and hinges

d) Eaves of Tourelle aligned with main eaves

e) Addtional first floor window to East Elevation