049-itp for lighting and small power (building).pdf
TRANSCRIPT
-
Pearl GTL Project
LINDE ENGINEERING
Shell Project No: HP-3000-QAT Contractor Project No: 5887
Project Document Number: T.4.318.621 Project Rev.: O Page 1 of 15
SUPPLIER/VENDOR DOCUMENTATION
Purchase Order Number: 2MH127
Equipment Description: N/A
Vendor/Supplier Name: GAMA QATAR CO. W. L. L. Vendor/Supplier Code:
LOC470
Document Title: ITP FOR LIGHTING AND SMALL POWER (BUILDING)
Vendor/Supplier Doc Number:
GAM-ITP-QAC-GTL-049 Vendor/Supplier Revision: C
Tag/Item Number(s): SEE NEXT PAGE
Unit: SEE NEXT PAGE PCWBS: SEE NEXT PAGE
Vendor/Supplier Prepared By Initials / Signature
Vendor/Supplier Checked By
Initials / Signature
Vendor/Supplier Approved By Initials / Signature Vend/Supp
Revision Date
SM KB AG 19.02.2009
Status of Submission (tick applicable box before submission)
For Review/Info: X Final: Certified: As-Built:
Purchaser signature below does not indicate responsibility or liability for accuracy or completeness of this document, nor does it alter any contractual terms or conditions or relieve the Supplier/Vendor of his contractual obligations.
PURCHASER AREA BELOW
Contractor Contract Number: PI 092 Contractor Name: LINDE
Contractor Doc. No: GAMAC-0100-E-PC 1342 Contractor Rev no: 1.0
Review Code and Status Contractor Initials / Signature
Date signed
Code 1 No Comments. ACCEPTED.
Work May Proceed.
Code 2 Comments As Noted. Incorporate Comments, Revise
and Resubmit. Work May Proceed.
Code 3 REJECTED. Incorporate Comments, Revise and Resubmit. Work May NOT Proceed.
Code 4 Not Reviewed. Work May Proceed.
-
Pearl GTL Project
LINDE ENGINEERING
Shell Project No: HP-3000-QAT Contractor Project No: 5887
Project Document Number: T- 4.318.621 Project Rev.: O Page 2 of 15
Purchase Order Number:
2MH127
Tag/Item Number(s):
N/A
Unit(s): ASU
PCWBS: Z
-
QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION
C 19.02.09 Issued For Company Comments SM KB AG ICC
B 19.02.09 Issued For Review SM KB AG IFR
A 19.02.09 Issued For Internal Review SM KB AG IIR
GAMA Rev.
Project Rev
Date Description Prepared
By Checked
By
Approved By
Status
No. No. ORIGINATOR
LINDEGINEERING AG
Document Title:
ITP FOR LIGHTING AND SMALL POWER (Building)
Contractor
Gama Qatar Co. W. L. L.
Document No. LOC470
GAM ITP QAC GTL 049 C
Org.
Code
Doc.
Type
Disc. Code
Geogr. Area
Seq.
No
Rev. No
Vendor Code
Project Document Number: T-4.318.621
Rev No: O
-
QSGTL PEARL PROJECT C2 ASU Construction Works
Document No.: GAM-ITP-QAC-GTL- 049
ITP FOR LIGHTING AND SMALL POWER
(Building) Date: 19.02.2009 Rev. C
S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item Activity Test Frequency Reference Document Acceptance Criteria Responsible Party Verifying Documents S X C A
T.4.318.621 Rev. O Page 4
1.0 METHOD STATEMENTS/PROCEDURES
1.1
Method Statements / Procedures
Preparation
Prior to start of activity
Subcontractor Method Statements / Procedure
Project
Requirements Site Engineer - I R R
2.0 MATERIALS CERTIFICATES
2.1 Check & Verify Materials as per specification
100 % As per vendor
documents
Manufacturers Technical data sheet, certificates, visual damage.
Site Engineer GAM-QCR-QAC-
GTL-079 I R R
2.2 Small tools and equipment inspection
100% T-4.318.619
Manufacturers Technical data sheet, certificates, visual damage.
Site Engineer
GAM-QCR-QAC-
GTL-174 GAM-QCR-QAC-
GTL-175 GAM-QCR-QAC-
GTL-176
I R R
-
QSGTL PEARL PROJECT C2 ASU Construction Works
Document No.: GAM-ITP-QAC-GTL-049
ITP FOR LIGHTING AND SMALL POWER
(Building) Date: 19.02.2009 Rev. C
S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item Activity Test Frequency Reference Document Acceptance Criteria Responsible Party Verifying Documents S X C A
T.4.318.621 Rev-O Page 5
3.0 INSPECTIONS
3.1 Cable tray installation 100 %
T-4.318.616 T-4.318.617
DEP33.64.10.10 & As per project
specification Site Engineer
GAM-QCR-QAC-
GTL-179 H I
3.2
Check earthing connection & bonding properly connected & tightened
100 %
T-4.318.616 T-4.318.617
DEP33.64.10.10 & As per project
specification Site Engineer
GAM-QCR-QAC-
GTL-179 H I
3.3 Conduit installation 100 %
T-4.318.616 T-4.318.617
DEP33.64.10.10 & As per project
specification Site Engineer
GAM-QCR-QAC-
GTL-180 H I
-
QSGTL PEARL PROJECT C2 ASU Construction Works
Document No.: GAM-ITP-QAC-GTL-049
ITP FOR LIGHTING AND SMALL POWER
(Building) Date: 19.02.2009 Rev. C
S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item Activity Test Frequency Reference Document Acceptance Criteria Responsible Party Verifying Documents S X C A
T.4.318.621 Rev-O Page 6
4.0 BUILDINGS LIGHTINGS
4.1 Lighting Fixture Installation
100 %
T-4.318.616 T-4.318.617
DEP33.64.10.10 & As per project
specification Site Engineer
GAM-QCR-QAC-
GTL-181 H I
4.2 Junction box, switches & outlet installation
100 %
T-4.318.616 T-4.318.617
DEP33.64.10.10 & As per project
specification Site Engineer
GAM-QCR-QAC-
GTL-178 H I
4.3 Testing of Cables 100 %
T-4.318.616 T-4.318.617
DEP33.64.10.10 & As per project
specification Site Engineer
GAM-QCR-QAC-
GTL-182 H I
-
C2 ASU PEARL GTL PROJECT
RAS LAFFAN INDUSTRIAL CITY
GAM-QCR-QAC-GTL-079 Rev. O
MATERIAL RECEIPT CHECK SHEET
ITEM No: PO No: REQ No:
UNIT No: MANUFACTURER :
ITEMS TO BE CHECKED INSPECTOR
INITIAL REMARKS
1 Visual damage
2 Quantity
3 Test certificates
4
5
6
7
8
Date of initial inspection:
Name and signature of Inspector:
-
Sr. No.Miktar /
QTY.
Birim
/ Unit
1
2
3
4
5
6
7
8
9
10
11
12
iSiM / Name imza / Signature iSiM / Name imza / Signature
GAM-QCR-QAC-GTL-174 REV. O
Notlar
Chaz Kodu / Material Type :
Markasi / Make :
Tarih :
No. : ..
EL Aleti Tamir Bakm Talep Formu
Electrical Hand Tools Maintenance FormSeri No. /Serial No. :
Ekipman No / Material No. :
Yapilan islem / Description of Repair Work
Kmr degimi / Change of Coil
Kollektr bakm / Maintenance of Collector
Anahtar bakm / Maintenance of Switch
Kablo degiimi / Change of Cable
Disli kutusu ve Rulman bakm / Maintenance of Gear Box and Roller
Bearings
Foreman / Formen :
Engineer / Mhendis :
Foreman / Formen :
TESLIM EDEN /
REQUESTED BY TESLIM ALAN /
RECEIVED BY
Engineer / Mhendis :
-
Sr. No.Miktar
/ QTY.
Birim /
Unit
1
2
3
4
5
6
7
8
9
10
11
12
iSiM / Name imza / Signature iSiM / Name imza / Signature
GAM-QCR-QAC-GTL-175 REV. O
Foreman / Formen :
Engineer / Mhendis :
Foreman / Formen :
TESLIM EDEN /
REQUESTED BY
TESLIM ALAN /
RECEIVED BY
Engineer / Mhendis :
Yapilan islem / Description of Repair Work
Erkek Fi Bakm ve degm / Male Socket Maintenance and change
Dg F bakm ve degm / Female Socket Maintenance and change
Kablo Testi / Cable Test
Kablo Tipi / Cable Type :
Kablo Montaji / Cable Erection :
Tarih :
No. : ..
Ara Kablosu Tamir Bakim Takip FormuExtension Cable Maintenance Form
380 V :
220 V :
Notlar
-
Sr. No.Miktar
/ QTY.
Birim /
Unit
1
2
3
4
5
6
7
8
9
10
11
12
iSiM / Name imza / Signature iSiM / Name imza / Signature
GAM-QCR-QAC-GTL-176 REV. O
TESLIM ALAN /
RECEIVED BY
Engineer / Mhendis :
Foreman / Formen :
TESLIM EDEN /
REQUESTED BY
Engineer / Mhendis :
Foreman / Formen :
Fan motoru bakm ve degiimi / Fan Motor Maintenance & Test
Pense ve ase socket degiimi / Electrod Holder & Socket Change
reosta ve Amper Kademe anahtar bakm / Ampere Range Resistance Test &
Maintenance
Jenerator kaynak makinasi firca degiimi / Generator Welding Machine Carbon
Brusch Change
Kablo degisimi ve tamiri / Cable Maintenance & Change
AC Anahtar testi Bakm / AC Power Supply Switch Test & change
DC voltaj cks testi ve bakimi / DC Voltage Outlet Test
Kart ve elektronik ekipman bakimi / Control Board & Electronic Equipment Test
Malzeme degisimi / Change of Materials
Yapilan islem / Description of Repair Work
Chaz Kodu / Material Type :
Markasi / Make :
Tarih :
No. : ..
Kaynak Maknas Tamr Bakm Talep FormuWelding Machine Maintenance Form
Seri No. /Serial No. :
Ekipman No / Material No. :
Notlar
-
C2 ASU PEARL GTL PROJECT
RAS LAFFAN INDUSTRIAL CITY
Outlet and Switches Inspection Report
Form No : RFI :
Client : Project :
Location : Relevant
Drawings &
Specifications:
Description :
Inspection Outlet and Switches Installation
Item no Description Accept Reject N/A
1 Installed in accordance with relevant drawings and specifications
2 Mechanical Supports Correctly
3 Supports Painted properly
4 Enclosure protection type correct
5 Labeling correct
6 Termination and correct
7 Earthing correct / Tight
8 Components and lines correctly mounted
9 Bolts / screws complete and tight
10 Glands and fitting connected tightly
Remarks :-
GAMA QATAR LINDE QSGTL or its PMC
Name:
Signature:
Date:
GAM-QCR-QAC-GTL- 178 REV.O
-
C2 ASU PEARL GTL PROJECT
RAS LAFFAN INDUSTRIAL CITY
Cable Tray Inspection Report
Form No : RFI :
Client : Project :
Location : Relevant
Drawings &
Specifications:
Description :
Inspection Cable Tray Installation
Item no Description Accept Reject N/A
1 Installed in accordance with relevant drawings and specifications
2 Mechanical Supports Correctly
3 Supports Painted properly
4 Covers Installed properly
5 Earthing connection & bonding properly connected & tightened
6 Divided strips (if any)
Remarks :-
GAMA QATAR LINDE QSGTL or its PMC
Name:
Signature:
Date:
GAM-QCR-QAC-GTL-179 REV.O
-
C2 ASU PEARL GTL PROJECT
RAS LAFFAN INDUSTRIAL CITY
Conduit Inspection Report
Form No : RFI :
Client : Project :
Location : Relevant
Drawings &
Specifications:
Description :
Inspection Conduit Installation
Item no Description Accept Reject N/A
1 Installed in accordance with relevant drawings and specifications
2 Mechanical Supports Correctly
3 Supports Painted properly
Remarks :-
GAMA QATAR LINDE QSGTL or its PMC
Name:
Signature:
Date:
GAM-QCR-QAC-GTL-180 REV. O
-
C2 ASU PEARL GTL PROJECT
RAS LAFFAN INDUSTRIAL CITY
Lighting Inspection Report
Form No : RFI :
Client : Project :
Location : Relevant
Drawings &
Specifications:
Description :
Inspection lighting and outlet Installation
Item no Description Accept Reject N/A
1 Installed in accordance with relevant drawings and specifications
2 Mechanical Supports Correctly
3 Supports Painted properly
4 Enclosure protection type correct
5 Labeling correct
6 Termination and correct
7 Earthing correct / Tight
8 Components and lines correctly mounted
9 Bolts / screws complete and tight
10 Glands and fitting connected tightly
Remarks :-
GAMA QATAR LINDE QSGTL or its PMC
Name:
Signature:
Date:
GAM-QCR-QAC-GTL- 181 REV. O
-
MAKE TYPE DRAWING NO RFI NO
SL NO RANGE AREA DATE
CAL DATE DUE DATE
R-E Y-E B-E N-E R-Y Y-B B-R R-N Y-N B-N A B C
INSULATION TEST , CONTINUITY TEST
LINDETITLE
NAME
DESIGNATION
DATE
SIGNATURE
GAMA QATAR QSGTL or its PMC
INSULATION RESISTANCE IN MEGA OHMS COMMENTSCABLE TAG NO CABLE SIZE CONTINUITY POLARITY SL NO
A : ACCEPTED B : ACCEPTED WITH COMMENTS C : REJECTED
FIELD INSPECTION REPORTINSTRUMENT USED
& POLARITY TEST REPORT