049-itp for lighting and small power (building).pdf

15

Click here to load reader

Upload: koeksal-patan

Post on 17-Dec-2015

55 views

Category:

Documents


11 download

TRANSCRIPT

  • Pearl GTL Project

    LINDE ENGINEERING

    Shell Project No: HP-3000-QAT Contractor Project No: 5887

    Project Document Number: T.4.318.621 Project Rev.: O Page 1 of 15

    SUPPLIER/VENDOR DOCUMENTATION

    Purchase Order Number: 2MH127

    Equipment Description: N/A

    Vendor/Supplier Name: GAMA QATAR CO. W. L. L. Vendor/Supplier Code:

    LOC470

    Document Title: ITP FOR LIGHTING AND SMALL POWER (BUILDING)

    Vendor/Supplier Doc Number:

    GAM-ITP-QAC-GTL-049 Vendor/Supplier Revision: C

    Tag/Item Number(s): SEE NEXT PAGE

    Unit: SEE NEXT PAGE PCWBS: SEE NEXT PAGE

    Vendor/Supplier Prepared By Initials / Signature

    Vendor/Supplier Checked By

    Initials / Signature

    Vendor/Supplier Approved By Initials / Signature Vend/Supp

    Revision Date

    SM KB AG 19.02.2009

    Status of Submission (tick applicable box before submission)

    For Review/Info: X Final: Certified: As-Built:

    Purchaser signature below does not indicate responsibility or liability for accuracy or completeness of this document, nor does it alter any contractual terms or conditions or relieve the Supplier/Vendor of his contractual obligations.

    PURCHASER AREA BELOW

    Contractor Contract Number: PI 092 Contractor Name: LINDE

    Contractor Doc. No: GAMAC-0100-E-PC 1342 Contractor Rev no: 1.0

    Review Code and Status Contractor Initials / Signature

    Date signed

    Code 1 No Comments. ACCEPTED.

    Work May Proceed.

    Code 2 Comments As Noted. Incorporate Comments, Revise

    and Resubmit. Work May Proceed.

    Code 3 REJECTED. Incorporate Comments, Revise and Resubmit. Work May NOT Proceed.

    Code 4 Not Reviewed. Work May Proceed.

  • Pearl GTL Project

    LINDE ENGINEERING

    Shell Project No: HP-3000-QAT Contractor Project No: 5887

    Project Document Number: T- 4.318.621 Project Rev.: O Page 2 of 15

    Purchase Order Number:

    2MH127

    Tag/Item Number(s):

    N/A

    Unit(s): ASU

    PCWBS: Z

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    C 19.02.09 Issued For Company Comments SM KB AG ICC

    B 19.02.09 Issued For Review SM KB AG IFR

    A 19.02.09 Issued For Internal Review SM KB AG IIR

    GAMA Rev.

    Project Rev

    Date Description Prepared

    By Checked

    By

    Approved By

    Status

    No. No. ORIGINATOR

    LINDEGINEERING AG

    Document Title:

    ITP FOR LIGHTING AND SMALL POWER (Building)

    Contractor

    Gama Qatar Co. W. L. L.

    Document No. LOC470

    GAM ITP QAC GTL 049 C

    Org.

    Code

    Doc.

    Type

    Disc. Code

    Geogr. Area

    Seq.

    No

    Rev. No

    Vendor Code

    Project Document Number: T-4.318.621

    Rev No: O

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    Document No.: GAM-ITP-QAC-GTL- 049

    ITP FOR LIGHTING AND SMALL POWER

    (Building) Date: 19.02.2009 Rev. C

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible Party Verifying Documents S X C A

    T.4.318.621 Rev. O Page 4

    1.0 METHOD STATEMENTS/PROCEDURES

    1.1

    Method Statements / Procedures

    Preparation

    Prior to start of activity

    Subcontractor Method Statements / Procedure

    Project

    Requirements Site Engineer - I R R

    2.0 MATERIALS CERTIFICATES

    2.1 Check & Verify Materials as per specification

    100 % As per vendor

    documents

    Manufacturers Technical data sheet, certificates, visual damage.

    Site Engineer GAM-QCR-QAC-

    GTL-079 I R R

    2.2 Small tools and equipment inspection

    100% T-4.318.619

    Manufacturers Technical data sheet, certificates, visual damage.

    Site Engineer

    GAM-QCR-QAC-

    GTL-174 GAM-QCR-QAC-

    GTL-175 GAM-QCR-QAC-

    GTL-176

    I R R

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    Document No.: GAM-ITP-QAC-GTL-049

    ITP FOR LIGHTING AND SMALL POWER

    (Building) Date: 19.02.2009 Rev. C

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible Party Verifying Documents S X C A

    T.4.318.621 Rev-O Page 5

    3.0 INSPECTIONS

    3.1 Cable tray installation 100 %

    T-4.318.616 T-4.318.617

    DEP33.64.10.10 & As per project

    specification Site Engineer

    GAM-QCR-QAC-

    GTL-179 H I

    3.2

    Check earthing connection & bonding properly connected & tightened

    100 %

    T-4.318.616 T-4.318.617

    DEP33.64.10.10 & As per project

    specification Site Engineer

    GAM-QCR-QAC-

    GTL-179 H I

    3.3 Conduit installation 100 %

    T-4.318.616 T-4.318.617

    DEP33.64.10.10 & As per project

    specification Site Engineer

    GAM-QCR-QAC-

    GTL-180 H I

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    Document No.: GAM-ITP-QAC-GTL-049

    ITP FOR LIGHTING AND SMALL POWER

    (Building) Date: 19.02.2009 Rev. C

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible Party Verifying Documents S X C A

    T.4.318.621 Rev-O Page 6

    4.0 BUILDINGS LIGHTINGS

    4.1 Lighting Fixture Installation

    100 %

    T-4.318.616 T-4.318.617

    DEP33.64.10.10 & As per project

    specification Site Engineer

    GAM-QCR-QAC-

    GTL-181 H I

    4.2 Junction box, switches & outlet installation

    100 %

    T-4.318.616 T-4.318.617

    DEP33.64.10.10 & As per project

    specification Site Engineer

    GAM-QCR-QAC-

    GTL-178 H I

    4.3 Testing of Cables 100 %

    T-4.318.616 T-4.318.617

    DEP33.64.10.10 & As per project

    specification Site Engineer

    GAM-QCR-QAC-

    GTL-182 H I

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    GAM-QCR-QAC-GTL-079 Rev. O

    MATERIAL RECEIPT CHECK SHEET

    ITEM No: PO No: REQ No:

    UNIT No: MANUFACTURER :

    ITEMS TO BE CHECKED INSPECTOR

    INITIAL REMARKS

    1 Visual damage

    2 Quantity

    3 Test certificates

    4

    5

    6

    7

    8

    Date of initial inspection:

    Name and signature of Inspector:

  • Sr. No.Miktar /

    QTY.

    Birim

    / Unit

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    iSiM / Name imza / Signature iSiM / Name imza / Signature

    GAM-QCR-QAC-GTL-174 REV. O

    Notlar

    Chaz Kodu / Material Type :

    Markasi / Make :

    Tarih :

    No. : ..

    EL Aleti Tamir Bakm Talep Formu

    Electrical Hand Tools Maintenance FormSeri No. /Serial No. :

    Ekipman No / Material No. :

    Yapilan islem / Description of Repair Work

    Kmr degimi / Change of Coil

    Kollektr bakm / Maintenance of Collector

    Anahtar bakm / Maintenance of Switch

    Kablo degiimi / Change of Cable

    Disli kutusu ve Rulman bakm / Maintenance of Gear Box and Roller

    Bearings

    Foreman / Formen :

    Engineer / Mhendis :

    Foreman / Formen :

    TESLIM EDEN /

    REQUESTED BY TESLIM ALAN /

    RECEIVED BY

    Engineer / Mhendis :

  • Sr. No.Miktar

    / QTY.

    Birim /

    Unit

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    iSiM / Name imza / Signature iSiM / Name imza / Signature

    GAM-QCR-QAC-GTL-175 REV. O

    Foreman / Formen :

    Engineer / Mhendis :

    Foreman / Formen :

    TESLIM EDEN /

    REQUESTED BY

    TESLIM ALAN /

    RECEIVED BY

    Engineer / Mhendis :

    Yapilan islem / Description of Repair Work

    Erkek Fi Bakm ve degm / Male Socket Maintenance and change

    Dg F bakm ve degm / Female Socket Maintenance and change

    Kablo Testi / Cable Test

    Kablo Tipi / Cable Type :

    Kablo Montaji / Cable Erection :

    Tarih :

    No. : ..

    Ara Kablosu Tamir Bakim Takip FormuExtension Cable Maintenance Form

    380 V :

    220 V :

    Notlar

  • Sr. No.Miktar

    / QTY.

    Birim /

    Unit

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    iSiM / Name imza / Signature iSiM / Name imza / Signature

    GAM-QCR-QAC-GTL-176 REV. O

    TESLIM ALAN /

    RECEIVED BY

    Engineer / Mhendis :

    Foreman / Formen :

    TESLIM EDEN /

    REQUESTED BY

    Engineer / Mhendis :

    Foreman / Formen :

    Fan motoru bakm ve degiimi / Fan Motor Maintenance & Test

    Pense ve ase socket degiimi / Electrod Holder & Socket Change

    reosta ve Amper Kademe anahtar bakm / Ampere Range Resistance Test &

    Maintenance

    Jenerator kaynak makinasi firca degiimi / Generator Welding Machine Carbon

    Brusch Change

    Kablo degisimi ve tamiri / Cable Maintenance & Change

    AC Anahtar testi Bakm / AC Power Supply Switch Test & change

    DC voltaj cks testi ve bakimi / DC Voltage Outlet Test

    Kart ve elektronik ekipman bakimi / Control Board & Electronic Equipment Test

    Malzeme degisimi / Change of Materials

    Yapilan islem / Description of Repair Work

    Chaz Kodu / Material Type :

    Markasi / Make :

    Tarih :

    No. : ..

    Kaynak Maknas Tamr Bakm Talep FormuWelding Machine Maintenance Form

    Seri No. /Serial No. :

    Ekipman No / Material No. :

    Notlar

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Outlet and Switches Inspection Report

    Form No : RFI :

    Client : Project :

    Location : Relevant

    Drawings &

    Specifications:

    Description :

    Inspection Outlet and Switches Installation

    Item no Description Accept Reject N/A

    1 Installed in accordance with relevant drawings and specifications

    2 Mechanical Supports Correctly

    3 Supports Painted properly

    4 Enclosure protection type correct

    5 Labeling correct

    6 Termination and correct

    7 Earthing correct / Tight

    8 Components and lines correctly mounted

    9 Bolts / screws complete and tight

    10 Glands and fitting connected tightly

    Remarks :-

    GAMA QATAR LINDE QSGTL or its PMC

    Name:

    Signature:

    Date:

    GAM-QCR-QAC-GTL- 178 REV.O

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Cable Tray Inspection Report

    Form No : RFI :

    Client : Project :

    Location : Relevant

    Drawings &

    Specifications:

    Description :

    Inspection Cable Tray Installation

    Item no Description Accept Reject N/A

    1 Installed in accordance with relevant drawings and specifications

    2 Mechanical Supports Correctly

    3 Supports Painted properly

    4 Covers Installed properly

    5 Earthing connection & bonding properly connected & tightened

    6 Divided strips (if any)

    Remarks :-

    GAMA QATAR LINDE QSGTL or its PMC

    Name:

    Signature:

    Date:

    GAM-QCR-QAC-GTL-179 REV.O

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Conduit Inspection Report

    Form No : RFI :

    Client : Project :

    Location : Relevant

    Drawings &

    Specifications:

    Description :

    Inspection Conduit Installation

    Item no Description Accept Reject N/A

    1 Installed in accordance with relevant drawings and specifications

    2 Mechanical Supports Correctly

    3 Supports Painted properly

    Remarks :-

    GAMA QATAR LINDE QSGTL or its PMC

    Name:

    Signature:

    Date:

    GAM-QCR-QAC-GTL-180 REV. O

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Lighting Inspection Report

    Form No : RFI :

    Client : Project :

    Location : Relevant

    Drawings &

    Specifications:

    Description :

    Inspection lighting and outlet Installation

    Item no Description Accept Reject N/A

    1 Installed in accordance with relevant drawings and specifications

    2 Mechanical Supports Correctly

    3 Supports Painted properly

    4 Enclosure protection type correct

    5 Labeling correct

    6 Termination and correct

    7 Earthing correct / Tight

    8 Components and lines correctly mounted

    9 Bolts / screws complete and tight

    10 Glands and fitting connected tightly

    Remarks :-

    GAMA QATAR LINDE QSGTL or its PMC

    Name:

    Signature:

    Date:

    GAM-QCR-QAC-GTL- 181 REV. O

  • MAKE TYPE DRAWING NO RFI NO

    SL NO RANGE AREA DATE

    CAL DATE DUE DATE

    R-E Y-E B-E N-E R-Y Y-B B-R R-N Y-N B-N A B C

    INSULATION TEST , CONTINUITY TEST

    LINDETITLE

    NAME

    DESIGNATION

    DATE

    SIGNATURE

    GAMA QATAR QSGTL or its PMC

    INSULATION RESISTANCE IN MEGA OHMS COMMENTSCABLE TAG NO CABLE SIZE CONTINUITY POLARITY SL NO

    A : ACCEPTED B : ACCEPTED WITH COMMENTS C : REJECTED

    FIELD INSPECTION REPORTINSTRUMENT USED

    & POLARITY TEST REPORT

    GAM-QCR-QAC-GTL-182 REV.O