CONSTRUCTION ENVIRONMENT STUDIO JOURNAL – WEEK 5 Wanzhen Ma 581758 Material:Bricks Manufacture Process: 1.Clay Preparation: mix all materials with water 2. Molding the Clay: to have same shape and size 3. Drying the Bricks: dry the bricks in the kiln. Reasons: 1. less cracking in fired bricks with less water content. 2. less fuel is needed when firing. 4. Firing the Bricks

Upload: celine

Post on 06-Mar-2016

223 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: 05 celine ma

CONSTRUCTION ENVIRONMENT STUDIO JOURNAL – WEEK 5 Wanzhen Ma 581758

Material:Bricks

Manufacture Process:

1.Clay Preparation: mix all materials with water 2. Molding the Clay: to have same shape and size

3. Drying the Bricks: dry the bricks in the kiln.

Reasons: 1. less cracking in fired bricks with less water content. 2. less fuel is needed when firing. 4. Firing the Bricks

Page 2: 05 celine ma

STRUCTURAL DIAGRAM_PLAN(1) STRUCTURAL DIAGRAM_PLAN(2) STRUCTURAL ELEMENTS STRUCTURAL DIAGRAM_SECTION

STRUCTURAL ANALYSIS:How it works.Principles -The columns with concrete footings support a long canopy with internal downpipes in the middle of the columns,collecting rain from canopy.

Building system & process:-The columns and canopy are made of steels they are supported by concrete footings.And C-shape steels hold the canopy roof

Reasoning behind system choice:-Concrete is more sustainable while having compression than extension.SO it was chosen for making the footings.

Economic implications of decisions:-Concrete is cheap and easy to get.However steel needs to have more procedures to get this shape and color.