05-how is technical & regulatory examination carried … is...srs_all & gims ngso manual pfd...

50
How is Technical & How is Technical & Regulatory Examination Regulatory Examination carried out in the BR carried out in the BR - - a detailed view a detailed view

Upload: buitruc

Post on 13-Apr-2018

219 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

How is Technical & How is Technical & Regulatory Examination Regulatory Examination

carried out in the BR carried out in the BR -- a detailed viewa detailed view

Page 2: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

TRANSMITTINGEARTH STATION

RECEIVINGEARTH STATION

INTERFERENCE

TERRESTRIAL STATION

GSO SATELLITES

Non-GSO SATELLITES

Possible Interference ScenariosPossible Interference Scenarios

Page 3: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Satellite filings by administrations have

two basic objectives:two basic objectives:

--InterferenceInterference--free operationfree operation

--international recognitioninternational recognition

by recording frequency assignments and, as appropriate, orbital positions used or intended to

be used in the

Master International Frequency Register Master International Frequency Register (MIFR)(MIFR)

Page 4: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

COORDINATION means

Obligatory NEGOTIATION between Administrations

to

arrive at ” interference-free” operation

by

following the processes and Procedures described in Radio Regulations

Radio Regulations-a binding international treaty(No. 31 of the ITU Constitution)

We shall focus upon the: Coordination Approach

Page 5: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

dhh

Coordination is central to the three stage process :

Advance Publication of Information

(API)

Coordination

Notification & Recording in the Master International

Frequency Register(MIFR)

Submission of advance informationthat is published by the BR

Exam. by BR to establish Findings, coordination Requirements and to publish . Coordination is then carried out by the responsible administration.

Examination of the Notification, checking of Coordordination Agreements & Recording in MIFR

Page 6: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Advance Publication of Information

(API)

Coordination

Notification & Recording in the Master International

Frequency Register(MIFR)

Let us now focus on the process of coordination to establish Findings

and coordination Requirements

Page 7: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Coordination Examination comprises of two parts:

No. 9.35 (11.31)

Compliance with Table of Frequency Allocation

No. 9.36:

Identify any administration with which coordination may need to be effected

Page 8: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

No. 9.35 (11.31)Compliance with Table of Frequency Allocation

refers to:

Conformity with

the `Table of Frequency Allocations’

(Article 5)Successful application

of No.9.21(when reqd.)

Conformity with

other procedures i.e. Rules of Procedure(RoP)

Page 9: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

No. 9.35 (11.31)Compliance with Table of Frequency Allocation

refers to:

Conformity with

the `Table of Frequency Allocations’

(Article 5)Successful application

of No.9.21(when reqd.)

Conformity with

other procedures i.e. Rules of Procedure (RoP)

ITU-R Sub-regional Space Regulatory Workshop, Wellington, New Zealand, 26-30 April 2010

Page 10: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

For the frequency For the frequency assignments in a assignments in a

satellite network satellite network ––

how does BR check how does BR check Compliance with Compliance with Table of Freq. Table of Freq. Allocations ?Allocations ?

Let us first getLet us first get……....

…….an overview of the entire processoverview of the entire process of checking compliance with the Table of freq. allocations (Art.5)

Page 11: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIMS Data

Check for applicable provisions of Article 5

SNS Online (Network Analysis)

Network/Frequency Assignments/Provisions

Summary

No. 9.35 (11.31)

SNS (Ingres) – BR’s Primary database

SRS_ALL & GIMS

PREPARATION of Network summaryPREPARATION of Network summary

Network data is

stored here

GIMS & SRS_ALL (BR’s secondary data-base –derived from SNS) are used for coordination

examinationManual check (No software tool exists)

Special query & Network Analysis query on SNS online(http://www.itu.int/sns/ntwktab.html) produce summary of

network – freq. bandwidth Class of stns. Beams…………..as shown in the next slide……

Page 12: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Check for Compliance and applicable Provisions

Extract from SNS Online

(http://www.itu.int/sns/ntwktab.html)

Extract of Table of Frequency Allocations (Article 5)

Footnote

No. 9.35 (11.31)

Page 13: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Check for Compliance and applicable Provisions

Applicable Provisions

No. 9.35 (11.31)

Page 14: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Satellite Network ID Admin Longitude 2D Date Sp Section NoSISCOMIS-6 103520253 B 84°W 04.12.2003 CR/C/

9.7 9.7A 9.7B 9.42 Ap30 Ap30A Res77 Res84 Res539 Res33 3

X

Freq.[MHz]

AssignedBandwidth

[kHz]

Freq. Band

[MHz]

Class o f

Station

7345 600007315

- 7375EG, EJ, EU

7450 – 7750(4 frequency assignments)

4 7449.998 -

7750.002

EK

218 BCN

x

X

Transmit beams

No.9.21 ← No.5.461*Hard PFD limits of Art.21 apply(Coordination requirements under No.9.21/C not necessary)

Unfavourable N X / No.11.31See item 3 of RoP on No.1.23

Freq.[MHz]

AssignedBandwidth

[kHz]

Freq. Band

[MHz]

Class o f

Station

7995 60000 7965 - 8025 EG, EJ, EU

Receivebeam

Remarks

220

x No.9.21 ← No.5.461

9.11 Res 33 2.1 9.11A 9.12 9.12A 9.13 9.14 9.21/A 9.21/B 9.21/C

X X X

Remarks

Applicable provisions

Another Example

of Network summary

Checking for applicable provisions

of Article 5 & conformity

with Rules of Procedure (RoP)

Page 15: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIMS Data

Check for applicable provisions of Article 5

SNS Online

(Network Analysis)

Network/Frequency Assignments/Provisions

Summary

Checking compliance with Table of freq. allocations (Art.5)

SNS (Ingres) – Primary database

SRS_ALL & GIMS

NGSOManual PFD Examination

GSOPFD Program exists to check

Hard EIRP & PFD Limits)

PFD.LST (Text Report)(Used to manually indicate unfavourable

assignments/groups of freq. assignments)

Compliance with EIRP & PFD hard limits is checked (Art.21 & 22, Resolutions, Footnotes). Freq.

assignments are given `unfavourable’ findings when these limits are exceeded

PFD ExaminationPFD Examination

No. 9.35 (11.31)

PFD ExaminationPFD Examination

Page 16: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

1. Enter Network ID

2. Select Exam. Type: Hard Limits

3. Start Program

GIBC GIBC –– PFD Program (To check with Hard EIRP/PFD Limits)PFD Program (To check with Hard EIRP/PFD Limits)

PFD Examination PFD Examination –– ContCont..

GIBCGraphical Interface for

Batch Calculations

Software-tool used for PFD Exam

No. 9.35 (11.31)

GIBC is not for N-GSO networks

(PFD Calculated manually)

Page 17: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Frequency AssignmentWorst case location

where the PFD excess is maximum.

PFDExcess

PFD Limit

– PFD.LST (Text Report)

N- Finding

PFD Examination (Cont.)PFD Examination (Cont.)

Group Id.

Transmit beam

No. 9.35 (11.31)

Page 18: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Unfavourable Finding

designated by N-

BatchResults.mdb (Access Database)

Grp Table

Fdg_ref Table

PFD Examination (Cont.)PFD Examination (Cont.)

Provision No.21.16X/21.16 → Not in accordance with No.21.16

No. 9.35 (11.31)

Page 19: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIMS Data

Check for applicable provisions of Article 5

SNS Online

(Network Analysis)

Network/Frequency Assignments/Provisio

ns Summary

Checking compliance with Table of freq. allocations (Art.5)

SNS (Ingres) – Primary database

SRS_ALL & GIMS

NGSOManual PFD Examination

GSOPFD Program exists to check

Hard EIRP & PFD Limits)

PFD.LST (Text Report)(Used to manually indicate unfavourable

assignments/groups of freq. assignments)

Results.mdb (Access Database)(Groups split according to findings & contains data for entire network)

Split Groups of freq. assignmentsFor network preparation (e.g. provisions)

and for unfavourable findings (N-)

Groups of frequency assignments are then split according to the applicable RR provisions & `Findings’ (Favourable & Unfavourable).

SPLITSSPLITS

No. 9.35 (11.31)

SPLITSSPLITS

Page 20: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

9.79.7

AP30#7.1

Split Groups – According to the applicable Provisions for Network Preparation

This group of frequencies (having 16 frequencies) is split into two groups. Provision No.9.7 is applicable to the first group and Provisions Nos.9.7 & Appendix30 # 7.1 to the second group

First Group

Second Group

SPLITS SPLITS –– Cont.Cont.No. 9.35 (11.31)

Page 21: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Split Groups – According to Findings

SPLITS (Cont.)SPLITS (Cont.)No. 9.35 (11.31)

Page 22: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

SNS (Ingres) – Primary database

GIMS Data

Check for applicable provisions of Article 5

SNS Online

(Network Analysis)

Network/Frequency Assignments/Provisio

ns Summary

Checking compliance with Table of freq. allocations (Art.5)

SNS (Ingres) – Primary database

SRS_ALL & GIMS

NGSOManual PFD Examination

GSOPFD Program exists to check

Hard EIRP & PFD Limits)

PFD.LST (Text Report)(Used to manually indicate unfavourable

assignments/groups of freq. assignments)

Results.mdb (Access Database)(Groups split according to findings & contains data for entire network)

Split GroupsFor network preparation (e.g. provisions)

and for unfavourable findings (N-)

Finally the data is merged with the SNS `Primary - data base’.MERGEMERGE

No. 9.35 (11.31)

MERGEMERGE

Page 23: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

SNS (Ingres) – Primary database

GIMS Data

Check for applicable provisions of Article 5

SNS Online

(Network Analysis)

Network/Frequency Assignments/Provisio

ns Summary

SUMMARY OF STEPSSUMMARY OF STEPS -- Checking compliance with Table of freq. allocations (Art.5)

SNS (Ingres) – Primary database

SRS_ALL & GIMS

NGSOManual PFD Examination

GSOPFD Program exists to check

Hard EIRP & PFD Limits)

PFD.LST (Text Report)(Used to manually indicate unfavourable

assignments/groups of freq. assignments)

Results.mdb (Access Database)(Groups split according to findings & contains data for entire network)

Split GroupsFor network preparation (e.g. provisions)

and for unfavourable findings (N-)

PREPARATION of Network summaryPREPARATION of Network summary

PFD ExaminationPFD Examination

SPLITSSPLITS

MERGEMERGE

Page 24: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIMS Data

To Establish coordination requirements - the list of countries (& satellite networks) with whom coordination is required

No.9.36

SNS (Ingres) – Primary Database

SRS_ALL & GIMS

BSS Plan Database

Terrestrial Data-base

These data-bases arerequired for establishing

coordination requirements

These data-bases are updated every week

Page 25: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

9.79.21/ARS33#3

AP30A#7.1

AP30#7.1

9.119.14

9.21/CRS33#2.1

GSO

9.129.12A9.21/A9.21/B

NGSO

9.139.21/B

GSO

9.119.14

9.21/CRS33#2.1

GSOGSO

GIMS Data

To Establish coordination requirements - the list of countries (& satellite networks) with whom coordination is required

No.9.36

SNS (Ingres) – Primary Database

SRS_ALL & GIMS

BSS Plan Database

Terrestrial Data-base

Provisions applicable for a satellite network Have been identified and listed in the `Network – Summary ‘

Coordination requirements under various applicable

provisions are established by utilising different data-bases, as shown

Page 26: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIBC PFD - TriggerAP8 PXTAP8 FOS(Freq Overlap with

Space Services)

FOT (Freq Overlap with

Terrestrial Services)

9.79.21/ARS33#3

AP30A#7.1

AP30#7.1

9.119.14

9.21/CRS33#2.1

GSO

9.129.12A9.21/A9.21/B

NGSO

9.139.21/B

GSO

9.119.14

9.21/CRS33#2.1

GSOGSO

GIMS Data

To Establish coordination requirements - the list of countries (& satellite networks) with whom coordination is required

No.9.36

SNS (Ingres) – Primary Database

SRS_ALL & GIMS

BSS Plan Database

Terrestrial Data-base

Graphical Interface for Batch calculations

Software tools – GIBC, FOS, FOT - suitably selected to establish coordination requirements

Page 27: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIBC PFD - TriggerAP8 PXTAP8 FOS(Freq Overlap with

Space Services)

FOT (Freq Overlap with

Terrestrial Services)

9.79.21/ARS33#3

AP30A#7.1

AP30#7.1

9.119.14

9.21/CRS33#2.1

GSO

9.129.12A9.21/A9.21/B

NGSO

9.139.21/B

GSO

9.119.14

9.21/CRS33#2.1

GSOGSO

GIMS Data

To Establish coordination requirements - the list of countries (& satellite networks) with whom coordination is requiredNo.9.36

SNS (Ingres) – Primary Database

SRS_ALL & GIMS

BSS Plan Database

Terrestrial Data-base

1. Enter Network Id (e.g. 109520044)

2. Click the start button

Use of GIBC tool for AP8 calculations

Page 28: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Examination under Appendix 8 – output files/data-bases

DT/T > 6%

Coordination Arc

DT/T

RS33#3

AP30A#7.1 *

9.21/A

* Requires BSS Plans database

APP8.LST → Text Report

Existing network

Incoming network (Network under examination)

No.9.36No.9.36

Coordination requirments Established under these Provisions

Page 29: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Examination under Appendix 8 – output files/data-basesNo.9.36No.9.36

Coordination requirements established under these Provisions

Coordination Arc

DT/T

RS33#3

AP30A#7.1

9.21/A

Page 30: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Examination under Appendix 8 – output files/data-basesNTW.LST → Text Report List of satellite Network for which Delta T/T > 6% or which are within Coord. Arc

N = Notification C = Coordination

A = Recorded in MIFR / Already published

T = Under examination

C = Causing Interference

R = Receiving Interference

A = Coordination Arc

No.9.36

Page 31: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Examination under Appendix 8 – output files/data-bases

Provn Table

BatchResults.mdb → Access Database

Tr_aff_ntw

No.9.36

This table contains Coordination provision and the names of countries

This table contains names of satellite networks

Page 32: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIBC PFD - TriggerAP8 PXTAP8 FOS(Freq Overlap with

Space Services)

FOT (Freq Overlap with

Terrestrial Services)

9.79.21/ARS33#3

AP30A#7.1

AP30#7.1

9.119.14

9.21/CRS33#2.1

GSO

9.129.12A9.21/A9.21/B

NGSO

9.139.21/B

GSO

9.119.14

9.21/CRS33#2.1

GSOGSO

.MDB .MDB .MDB .MDB .MDB.MDB

GIMS Data

To Establish the list of countries (& satellite networks) with whom coordination is required

No.9.36

SNS (Ingres) – Primary Database

SRS_ALL & GIMS

BSS Plan Database

Terrestrial Data-base

Use of GIBC tool For PFD Trigger check

Enter Network Id.

Select `Triggers’For PFD

ClickStart

Page 33: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

No.9.36

Beam Group ID

Frequency AssignmentNames of countries over which PFD coordination trigger limits are exceeded. Excess over the

limit is also shown

PFD Limit

PFD.LST → Text Report

A- Finding

Examination against PFD Trigger limits – output files/data-bases

This report contains list of Countries where PFD

coordination trigger limit is exceeded. With the amount of excess

Page 34: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

No.9.36

BatchResults.mdb → Access Database

Examination against PFD Trigger limits – output files/data-bases

Provn Table

This data-base contains List of Countries where PFD

coordination trigger limit is exceeded.

Page 35: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIBC PFD - TriggerAP8 PXTAP8 FOS(Freq Overlap with

Space Services)

FOT (Freq Overlap with

Terrestrial Services)

9.79.21/ARS33#3

AP30A#7.1

AP30#7.1

9.119.14

9.21/CRS33#2.1

GSO

9.129.12A9.21/A9.21/B

NGSO

9.139.21/B

GSO

9.119.14

9.21/CRS33#2.1

GSOGSO

.MDB .MDB .MDB .MDB .MDB.MDB

GIMS Data

To Establish the list of countries (& satellite networks) with whom coordination is required

No.9.36

SNS (Ingres) – Primary Database

SRS_ALL & GIMS

BSS Plan Database

Terrestrial Data-base

Use of GIBC Tool For PXT Exam (AP30#7.1) 1. Enter Network Id.

2. Click Start

Page 36: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

No.9.36

PXT.LST → Text Report

PFD

Existing BSS network

Incoming network

(Network under examination)

Excess

PFD Limit

Coordination Examination PXT – output files/data-bases

AP30#7.1Requires BSS Plans database

Coordination with this administration under AP30#7.1

This report contains List of Countries with whom

coordination is required under AP30#7.1

Page 37: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

No.9.36

NTW.LST → Text Report

Coordination Examination PXT – output files/data-bases

This report contains List of satellite networks with whom

coordination is required under AP30#7.1

Page 38: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

No.9.36

BatchResults.mdb → Access Database

Coordination Examination PXT – output files/data-bases

This access data-base hasthe entire network plus the tables containing list

countries & the satellite networks with whom coordination is required under AP30#7.1

Provn Table

Tr_aff_ntw Table

Page 39: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIBC PFD - TriggerAP8 PXTAP8 FOS(Freq Overlap with

Space Services)

FOT (Freq Overlap with

Terrestrial Services)

9.79.21/ARS33#3

AP30A#7.1

AP30#7.1

9.119.14

9.21/CRS33#2.1

GSO

9.129.12A9.21/A9.21/B

NGSO

9.139.21/B

GSO

9.119.14

9.21/CRS33#2.1

GSOGSO

.MDB .MDB .MDB .MDB .MDB.MDB

GIMS Data

To Establish the list of countries (& satellite networks) with whom coordination is requiredNo.9.36

SNS (Ingres) – Primary Database

SRS_ALL & GIMS

BSS Plan Database

Terrestrial Data-base

Each tool will produce a single database (access data-base) containing the entire network data as well as the coordination requirements.

To find space stations or terrestrial stations with frequency overlap depending on the requirements of the provisions.

Using the software tools FOS & FOT

Page 40: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

No.9.36

FOS & FOT – both produce a text report as well as an access database with coordination requirements stored in the Provn Table.

Coordination Examination Frequency Overlap – output files/data-bases

Provn Table (FOS)

Provn Table (FOT)

Agreement status F means detected

by Frequency Overlap.

Page 41: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIBC PFD - TriggerAP8 PXTAP8 FOS(Freq Overlap with

Space Services)

FOT (Freq Overlap with

Terrestrial Services)

9.79.21/ARS33#3

AP30A#7.1

AP30#7.1

9.119.14

9.21/CRS33#2.1

GSO

9.129.12A9.21/A9.21/B

NGSO

9.139.21/B

GSO

9.119.14

9.21/CRS33#2.1

GSOGSO

.MDB .MDB .MDB .MDB .MDB.MDB

GIMS Data

To Establish the list of countries (& satellite networks) with whom coordination is required

No.9.36

SNS (Ingres) – Primary Database

SRS_ALL & GIMS

BSS Plan Database

Terrestrial Data-base

Each tool will produce a single database (access data-base) containing the entire network data as well as the coordination requirements.

Merging of all the access data-bases produced by each software tool into ONE data-base

Page 42: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Merge Databases (Example)

9.7

A30#7.1

A30A#7.1

ProvnTable

Provision symbol & agreement status are described in Table 11

(BR Preface)

No.9.36

When we merge the databases, all the Provn Tables from various tools

are combined together into one single Provn Table

Page 43: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Merge Databases (Example)No.9.36

When we merge the databases, all the Tr_aff_ntw Table Tables from various tools are combined together

into one single Tr_aff_ntw Table Table

9.7

A30A#7.1

Tr_aff_ntw Table

Page 44: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIBC PFD - TriggerAP8 PXTAP8 FOS(Freq Overlap with

Space Services)

FOT (Freq Overlap with

Terrestrial Services)

9.79.21/ARS33#3

AP30A#7.1

AP30#7.1

9.119.14

9.21/CRS33#2.1

GSO

9.129.12A9.21/A9.21/B

NGSO

9.139.21/B

GSO

9.119.14

9.21/CRS33#2.1

GSOGSO

.MDB .MDB .MDB .MDB .MDB.MDB

GIMS Data

To Establish the list of countries (& satellite networks) with whom coordination is required

No.9.36

SNS (Ingres) – Primary Database

SRS_ALL & GIMS

BSS Plan Database

Terrestrial Data-base

Each tool will produce a single database (access data-base) containing the entire network data as well as the coordination requirements.

Page 45: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

GIBC PFD - TriggerAP8 PXTAP8 FOS(Freq Overlap with

Space Services)

FOT (Freq Overlap with

Terrestrial Services)

SNS

9.79.21/ARS33#3

AP30A#7.1

AP30#7.1

9.119.14

9.21/CRS33#2.1

GSO

9.129.12A9.21/A9.21/B

NGSO

9.139.21/B

GSO

9.119.14

9.21/CRS33#2.1

GSOGSO

Merge into one .MDB

.MDB .MDB .MDB .MDB .MDB.MDB

GIMS Data

To Establish the list of countries (& satellite networks) with whom coordination is required

No.9.36

SNS (Ingres) – Primary Database

SRS_ALL & GIMS

BSS Plan Database

Terrestrial Data-base

And finally the Merged database updates the SNS

Page 46: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Special Section CR/C

IFIC number / date of publication Special Section number

Name of the satellite network

Network ID

Responsible administration

Date of receipt

Last date for receipt of comments (Date of publication + 4 months)

First page

Satellite Network CR/C

Indication of applicable forms of coordination to the network

X 9.7X AP30

#7.1

Page 47: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Special Section CR/C

Second page

Potentially affected administrationsFor information only

Summary of coord. req. per provisionSatellite Network CR/C

Indication of applicable forms of coordination to the network

X 9.7X AP30

#7.1

Page 48: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Coord. req. at group levelBR comments (e.g. N- findings)Notes by administrationGain contours

Network data

Summary of coord. req. per provisionSatellite Network CR/C

Indication of applicable forms of coordination to the network

X 9.7X AP30

#7.1

Special Section CR/C Coordination requirements at group level & BR Comments

Subsequent pages show network parameters, gain contour diagrams, notes submitted by the administrations, comments by the BR including reasons for unfavourable findings and coordination requirements at group level.

Page 49: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Previous special sectionsNetwork List(s) – For info onlyCoord. req. at group level

BR comments (e.g. N- findings)Notes by administrationGain contours

Network dataSummary of coord. req. per provision

Satellite Network CR/C

Indication of applicable forms of coordination to the network

X 9.7X AP30

#7.1

Special Section CR/C List of potentially affected satellite networksFor information only

Page 50: 05-How is Technical & Regulatory Examination carried … is...SRS_ALL & GIMS NGSO Manual PFD Examination GSO PFD Program exists to check Hard EIRP & PFD Limits) PFD.LST (Text Report)

Thank you !