  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    1/93

    ENERGIE-MANAGEMENT PRODUTIONS-MANAGEMENT INFRASTRUKTUR-MANAGEMENT

    Produkte und Systeme der Informationstechnologie

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 1Introduction to IEC 61850

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    2/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    LEGACY SYSTEM

    VS

    IEC 61850 SYSTEM

    2

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    3/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 3

    Many Hard Wiring/

    Raceway

    SWYD

    SWGR Trip/Close

    Coil

    Conventional

    CT / VT's

    SWGR Aux

    Contact

    Sensor /

    Switch

    Aux Rly Aux Rly

    Aux Rly

    Aux Rly

    Ann Meter Switch Lamp

    Meter Timer Switch

    Lamp

    Prot Rly

    Cont Room

    Relay RoomMux

    RemoteEnd

    XDCR Aux CT

    F/R

    RTU I/O

    Aux Rly

    RTU AI

    RTU

    RCC

    Legacy System

    Hidden Failures in Protection Systems

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    4/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 4

    Many Hard Wiring/

    Raceway

    SWYD

    SWGR Trip/Close

    Coil

    Conventional

    CT / VT's

    SWGR Aux

    Contact

    Sensor /

    Switch

    Aux Rly Aux Rly

    Aux Rly

    Aux Rly

    Ann Meter Switch Lamp

    Meter Timer Switch

    Lamp

    Prot Rly

    Cont Room

    Relay RoomMux

    RemoteEnd

    XDCR Aux CT

    F/R

    RTU I/O

    Aux Rly

    RTU AI

    RTU

    RCC

    IED

    Legacy System to IEC 61850

    Hidden Failures in Protection Systems

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    5/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 5

    IED

    SWGR Trip/Close

    Coil

    Conventional

    CT / VT's

    SWGR Aux

    Contact

    Sensor /

    Switch

    Operator Station/ Eng WS

    CommunicationNetwork

    INTRANETLAN/WAN

    ERP

    IEC 61850 with conventional primary equipment

    Hidden Failures in Protection Systems

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    6/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 6

    IED

    SWGR Trip/Close

    Coil

    ECVT

    SWGR Aux

    Contact

    Sensor /

    Switch

    Operator Station/ Eng WS

    CommunicationNetwork

    INTRANETLAN/WAN

    ERP

    IEC 61850 with intelligent primary equipment

    Intelligent CB IED MU

    Only FiberOptic Cables

    NoControl

    Room

    Hidden Failures in Protection Systems

    DIGITALSUBSTATION

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    7/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    IEC 61850

    JUST ANOTHER PROTOCOL

    OR

    MORE???

    7

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    8/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 8

    WHAT IS IEC 61850?

    Is it just another communication protocol?

    Yes

    It is a communication protocol and also aTechnology that change way we do things!

    Are you interested and ready to learn, invest and

    use thisNEW TECHNOLOGY!

    RIGHT and WRONG !

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    9/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    SESSION 1

    WHY

    9

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    10/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    HISTORY OF DIGITAL IEDS

    DIGITAL IEDS INTRODUCED SINCE 90S

    PROVEN IN PROTECTION & METERING

    BY MID 90, PROVEN IN CONTROL

    UTILITIES WORLD WIDE ADOPTED DIGITAL IED

    10

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    11/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    IEDs Opened Communication Possibilities

    COMMUNICATION INTERFACES

    ACQUIRE PROCESS INPUTSUSED FOR METERINGEVENT RECORDSOSCILLOGRAPHIC RECORDS

    REMOTE CONFIGURATION OF SETTINGS

    11

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    12/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    START OF AN ERA

    HISTORY OF AUTOMATION IS DIVIDED INTO 2AGES:

    BEFORE 61850 OR UNCIVILIZED AGE

    AFTER 61850 OR CIVILIZED AGE

    12

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    13/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    RESULTING IN ORGANISED CHAOS

    MASTER SLAVE CONCEPT

    HEIRARCHICAL SETUP

    ELEMENTAL ENGINEERING

    13

    PROPRIETORY PROTOCOLS

    MULTIPLICITY OF STANDARDS

    SERIAL COMMUNICATIONS

    Before IEC61850 ERA

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    14/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    WHAT DOES THIS MEAN

    MASTER SLAVE CONCEPT

    MASTER POLLS AND SLAVE ANSWERS RESULTING IN

    UNNECESSARY CLOGGING OF COMMUNICATION LINKS

    TIMING ISSUES

    LIMITATION OF CPU POWER AND THEREFORE MORE HARDWARE

    14

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    15/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    WHAT DOES THIS MEAN

    HEIRARCHICAL SETUP

    TOP DOWN MODEL WITH LEVELS CAUSES

    ADDITIONAL HARDWARE / DATA CONCENTRATORS

    TIMING ISSUES

    15

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    16/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    WHAT DOES THIS MEAN

    ELEMENTAL ENGINEERING

    16

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    17/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    WHAT DOES THIS MEAN

    PROPRIETORY PROTOCOLS

    Manufacturer specific solution due to no communicationstandard

    FRUSTRATION DURING EXPANSIONDEPENDANCE ON SINGLE VENDOR

    COST OF MULTIPLE TRAININGS

    COST OF MULTIPLE UNIQUE SYSTEMS

    17

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    18/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    WHAT DOES THIS MEAN

    MULTIPLICITY OF STANDARDS

    FRUSTRATION ON INTEROPERABILITY..

    Hardware interface (serial, parallel, FO, Copper, Ring, Radial,propriety..)Software interface ( RS 232, RS 485, Serial, Parallel..)Protocol ( 103, SPA, LON, Courier, J Bus, K Bus, MODBUS, DNP.)

    18

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    19/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    WHAT DOES THIS MEAN

    SERIAL COMMUNICATIONS

    DEDICATED CHANNELS

    ONE AT A TIME

    BANDWIDTH AND TIMING ISSUES

    ERRORS AND HANGING PROBLEMS

    19

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    20/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    What is IEC 61850?

    SINCE 1995, EXPERTS FROM 14 COUNTRIES HAVE BEENADDRESSING THESE ISSUES IN THREE IEC WORKING GROUPSOVERSEEN BY IEC TC 57. AS A RESULT, THEY HAVE CREATED ASINGLE, GLOBAL AND FUTURE-PROOF STANDARD FOR SUBSTATION COMMUNICATIONS IEC 61850. THE

    FOLLOWING THREE WORKING GROUPS WERE INVOLVED INTHE SPECIFICATION OF IEC 61850:

    WG 10: FUNCTION ARCHITECTURE, COMMUNICATIONSTRUCTURE AND GENERAL REQUIREMENTS

    WG 11: COMMUNICATION WITHIN AND BETWEEN UNIT ANDSUBSTATION LEVELS

    WG 12: COMMUNICATION WITHIN AND BETWEEN PROCESSAND UNIT LEVELS

    20

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    21/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    The objectives of the standard are to:

    IMPROVE DEVICE DATA INTEGRATION ACROSS THESUBSTATIONTO COVER ALL THE INFORMATION IN SUBSTATIONSEXTENSIBLE FOR FUTURE DEVELOPMENTS. ALL INFORMATIONKNOWN TO BE INCORPORATED AND RULES HAVE BEENDEVELOPED TO INCORPORATE FUTURE APPLICATIONSOPENNESS FOR FUTURE HIGH-EFFICIENCY DATA TRANSFER.ALLOW FOR THE INTEROPERABILITY BETWEEN IEDS.USE OFF THE SHELF INTERNATIONAL STANDARDS.THE STANDARD MUST BE ABLE TO ADAPT ITSELF TO THECHANGES IN COMMUNICATION TECHNOLOGY WITHOUT MAJOR

    REVISIONS TO THE STANDARD.A SYSTEM INTEGRATOR MUST BE ABLE TO BUILD UP /EXPAND/ CONFIGURE A SYSTEM EASILY STANDARDISEDENGINEERING

    21

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    22/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    ENSURE THE STANDARD IS FUTURE PROOF

    OBJECT-ORIENTED COMMUNICATION.

    SEPARATION OF THE APPLICATION RELATED FUNCTIONSFROM THE COMMUNICATION PROCESSES.

    MANUFACTURER INDEPENDENT INFORMATION EXCHANGE FOR CONFIGURATION OF THE AUTOMATION COMPONENT.

    DATA POINTS ARE WELL DEFINED IN SIMPLE LANGUAGE.

    ONE TIME TRAINING FOR STAFF

    22

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    23/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    61850 STANDARDIZES LAN HARDWARE & SOFTWARE INTERFACE

    IEC 61850 USES ETHERNET - LEVERAGE EMERGING ETHERNETTECHNOLOGY, OFF THE SHELF PRODUCTS, LOWERING COST

    TECHNOLOGIES BEING DEVELOPED FOR MULTIPLE

    INDUSTRIES

    MAKES USE OF COMMON AND FAMILIAR VISIBILITY TOOLSSUCH AS BROWSERS ANDDEVICES THAT ALREADY EXIST WITHIN UTILITY BUSINESS

    NETWORKS (SUCH AS ALREADY DEVELOPED SWITCHES,ROUTERS, AND ETHERNET CABLE).

    23

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    24/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 24

    DefineProtection &

    ControlFunctions

    Relay to relaycommunication

    Fault records inComtrade

    format

    Based on Ethernetstandard

    Standardcommunication

    with TCP/IP

    SubstationConfigurationLanguage

    SystemConfiguration

    IEC 61850

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    25/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    IEC61850 and UCA2

    25

    IEC61850

    GOAL: One International Standard

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    26/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    HOW IT IS ACHIEVED

    STANDARD PROTOCOL --- PEER TO PEER COMMUNICATION ----MASTER SLAVE CONCEPT ABOLISHED --- ALL ARE IEDs ANDCAN TALK TO EACH OTHER

    STANDARDISED NOMENCLATURE FOR DATA POINTS --- ALLIEDs CAN UNDERSTAND EACH OTHER

    26

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    27/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    QUESTIONS AND

    SHORT BREAK

    27

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    28/93

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    29/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    HOW IT IS ACHIEVED

    STANDARD PROTOCOL --- PEER TO PEER COMMUNICATION ---- MASTER SLAVE CONCEPT ABOLISHED --- ALL ARE IEDs ANDCAN TALK TO EACH OTHER

    STANDARDISED NOMENCLATURE FOR DATA POINTS --- ALLIEDs CAN UNDERSTAND EACH OTHER

    29

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    30/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    STANDARD PROTOCOL -- 1

    PROTOCOL IS BASED ON ETHERNET ARCHITECTURE. --- ALLKINDS --- STAR, RING, DOUBLE RING ETC ARE POSSIBLE ---TODAY THE TECHNOLOGY HAS IMPROVED TO GIVE HIGHSPEEDS (GIGA byte Ethernet) AND LOW COSTS

    AND TCP/IP PROTOCOL --- TODAY THE TECHNOLOGY ISSTANDARD ACROSS APPLICATIONS AND FAMILIAR

    CONCEPTS EQUALLY VALID ON ANY PEER-PEER COMMUNICATION SYSTEM. IF A BETTER SYSTEM COMES IN THEFUTURE ONLY THE COMM SYSTEM WILL CHANGE AND NOTHINGELSE --- FUTURE PROOFING

    30

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    31/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    STANDARD PROTOCOL -- 2

    DOES NOT DEPEND ON THE COMMUNICATION HARDWARE --- CAN BE RADIO, WIRELESS, VSAT, CAT 5 COPPER, FIBREOPTICS ETC OR ANY FUTURE COMMUNICATION MEDIUM

    DOES NOT DEPEND ON DISTANCE --- THE WORLD IS TRULYGLOCAL

    31

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    32/93

    Copyright(c) by PSI INCONTROL Sdn. Bhd.

    Slide

    STANDARD PROTOCOL -- 3

    AS IT IS BASED ON TCP/IP TECHNOLOGY THE BIT PATTERNOF THE COMMUNICATION TELEGRAMS ARE WIDELY KNOWN

    MULTIPLE COMM. ARCHITECTURES ARE AVAILABLE TOENSURE RELIABILITY --- AGAIN WIDELY KNOWN ANDPRACTICED

    ALSO DIFFERENT APPLICATIONS ARE AVAILABLE TOENSURE SECURITY --- AGAIN WIDELY KNOWN ANDPRACTICED

    32

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    33/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    STANDARD PROTOCOL -- 4

    PROTOCOL DEFINES ALL ASPECTS OF COMMUNICATIONREQUIRED IN A S/S. NO OPTIONS FOR PROPRIETRY USAGE.

    HENCE ALL IEDs CAN TALK TO EACH OTHER

    BUT CAN THEY UNDERSTAND EACH OTHER?????

    33

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    34/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    STANDARDISED NOMENCLATURE -- 1

    EVERY POSSIBLE DATA REQUIRED IN THE SUBSTATION ISGIVEN A STANDARD NAME

    HOWEVER IT REQUIRES VERY LITTLE EXPANSION TOSTANDARDISE THE NAME FOR ANY PROCESS

    HENCE EVERY IED CAN FULLY UNDERSTAND WHAT DATATO ASK FOR AND WHAT DATA IT IS GETTING

    34

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    35/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    STANDARD NOMENCLATURE -- 2

    CONCEPT OF ALL INTELLIGENT DEVICES/SYSTEMS AS IEDsPROTECTION RELAYS/METERS ARE IEDsBCUs ARE IEDsRTU IS AN IEDHMI IS AN IED

    THE MASTER CONTROL CENTRE IS AN IEDDISTURBANCE RECORDER IS AN IEDCIRCUIT BREAKER IS AND IED, WHEN IT BECOMESINTELLIGENTCT/VT ARE IEDs, WHEN THEY BECOME INTELLIGENTFIRE FIGHTING SYSTEM IS AN IED

    ANY DISTINCT INTELLIGENT SYSTEM IS AN IEDEACH DISTINCT SYSTEM HAS ITS OWN COMMUNICATIONADDRESS

    35

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    36/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    STANDARD NOMENCLATURE -- 3

    EVERY DATA POINT IS GIVEN A UNIQUE NAME

    FOR EG. THE STATUS OF A BREAKER IS DEFINED ASXCBR\POS

    THIS NAME OF THIS DATA POINT IS THE SAME IN ALLIEDs

    36

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    37/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    STANDARD NOMENCLATURE -- 4

    THIS DATAPOINT CAN HAVE DIFFERENT ATTRIBUTES LIKEQUALITY, STATUS_VALUE ETC.

    THUS THE DATA BREAKER POSITION IS DEFINED ASXCBR1\ST\POS\stVal

    NAME STANDARD AND MANDATORY IN ALL IEDs

    37

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    38/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    STANDARD NOMENCLATURE -- 5

    TO DEFINE WHICH BREAKER WE USE STANDARD TREEFORMAT

    FOR EG. MELAKA\E01\XCBR1\ST\POS\stVal WILL MEANTHE POSITION/STATUS of the CIRCUIT BREAKER OF BAYE01 IN MELAKA SUBSTATION

    THUS THE NAME OF A DATA ACROSS A NETWORK WILL BE

    UNIQUE

    38

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    39/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    IEC 61850

    ALL IEDS CAN TALK AND UNDERSTAND EACH OTHER

    FULLY STANDARDISED FOR SUBSTATION ENVIRONMENT

    EASILY EXPANDABLE TO OTHER PROCESSES

    39

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    40/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    IEDs CANBUT WHAT ABOUT ENGINEERS ???

    AS ALL DATA POINTS HAVE STANDARDISEDNOMENCLATURE ANY ENGINEERING (HOWEVER DETAILED)DONE BY ANY PERSON IS FULLY UNDERSTOOD BYEVERYBODY ELSE. NO MORE ELEMENTAL ENGINEERING

    BUT CONFIGURATION TOOLS OF INDIVIUAL IED??? IS ITALSO STANDARDISED??

    40

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    41/93

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    42/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    ENGINEERS ALSO CAN !!!

    THE ENGINEERS WILL THEN USE THESE ICD FILES TO CONFIGURETHE IEDs USING xml LANGUAGE / ANY GENERIC SOFTWARE.

    THE CONFIGURED IED DESCRIPTION FILE WILL THEN BE CREATEDAND LOADED INTO THE IED. THIS FILE SHALL BE CALLED CIDFILE

    HOWEVER, THE STANDARD PROVIDES THAT THE UPLOADING ANDDOWNLOADING OF THE ICD AND CID FILES may BE DONE WITHANY NON STANDARD VENDOR SPECIFIC SOFTWARE. HENCE ALL

    VENDORS STILL HAVE THEIR OWN PROPRIETORY SOFTWARE TOLOAD/CHECK THE CONFIGURATIONS. HOWEVER DOES NOT LIMITENGINEERS AS ALL CONFIGURATIONS CAN BE DONE AND ONLYLOADING IS VENDOR SPECIFIC.

    42

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    43/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    FINAL LOOSE ENDS .

    INDIVIDUAL IED CONFIGURATION FILES ARE FINE BUTWHAT ABOUT THE ENTIRE SUBSTATION ENGINEERING

    SIMILAR CONCEPTS HAVE BEEN EXTENDED FOR THESUBSTATION ENGINEERING

    GENERIC xml SOFTWARE IS TO BE CONFIGURE THE ENTIRESUBSTATION, INCLUDING SLD, LOCATIONAL DIAGRAM,ALLOCATION OF VOLTAGES, CONFURATION OF BUSBARS,ALLOCATION OF SPECIFIC IEDs/LOGICAL DEVICES/LOGICAL

    NODES INCLUDING THE CID FILES --- THE ENTIRESUBSTATION CONFIGURATION DESCRIPTION OR A SCD FILE

    43

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    44/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    SUMMARYWITH STANDARD PROTOCOL --- IEDs CAN TALK TO EACHOTHER

    WITH STANDARD NOMENCLATURE --- THEY CANUNDERSTAND

    WITH USE OF xml LANGUAGE ---- ALL ENGINEERS CANENGINEER AND FULLY CONFIGURE THE ENTIRE SUBSTATION

    AND ALL ENGINEERS CAN UNDERSTAND THE ENGINEERINGDONE DUE TO STANDARD NOMENCLATURE

    WITH BROWSING, PLUG AND PLAY CONCEPTS INENGINEERING ARE INTRODUCED

    44

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    45/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    ACHIEVEMENTS --1IEDs CAN TALK AND UNDERSTAND EACH OTHER

    NO MORE VENDOR SPECIFIC SOLUTIONNO MORE PROBLEMS DURING EXPANSIONNO MORE PROBLEMS DURING REPLACEMENTNO MORE DATA CONCENTRATOR OR MASTER

    STANDARD TCP/IP COMMUNICATIONS PROTOCOLHIGH SPEED HARDWARE AVAILABLESECURE AND RELIABLE NETWORKSNO PROBLEMS OF SPEED AND DISTANCE

    CAN BE INTEGRATED WITH MANY STANDARD APPLICATIONSDOES NOT DEPEND ON COMMUNICATION MEDIAREMOTE MANAGEMENT AND TROUBLE SHOOTINGEASY ANALYSIS OF COMMUNICATION LOADING & PROBLEMS

    45

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    46/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    TRADITIONAL vs IEC 61850

    46

    Item Traditional IEC 61850

    DesignDesigned to optimize bandwidth and

    hardware utilization (uP speeds, RAM andROM space base on technology in 1980 th .

    User Oriented,

    Object Oriented

    Format Proprietary tag formats, Arcane addressing,Needs dictionary all the times.Defines standardizedInformation Models

    MappingManually entered, Manually verified, App tied

    to tag or free form alias, Any tagconventions are proprietary.

    Self Description , Intuitive,Drag and Drop, SCL

    Communication Master / Slave

    Client / Server ,Peer to Peer

    System So many components, copper hardwires,raceways, complex Simple

    Shift Data Acquisition (Limited) InformationManagement

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    47/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    ACHIEVEMENTS --2

    ENGINEERS CAN UNDERSTAND EACH OTHER AND THE IED

    STANDARDISED AND THEREFORE EASY AND ERROR FREE ENGG.MODULAR ENGINEERING ACROSS LOCATIONSREUSABILITY AND HENCE HIGHER EFFICIENCY/OUTPUTREPEATED TRAINING NOT REQUIREDDEPENDANCE ON PARTICULAR EXPERTS OBSOLETEEASY TO UNDERSTAND SPECIFICATIONSUTILITY APPROVAL PROCESS MADE EASY AND FASTREMOTE TROUBLE SHOOTING FROM ACROSS THE WORLD

    47

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    48/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    ACHIEVEMENTS --3

    SIMPLE AND CHEAP BUT SECURE AND RELIABLESUBSTATION

    PEER PEER ---- LESS CABLING AND WIRING. NO AUX. RELAYS

    PROCESS DATA --- LESS/NO COPPER CABLING TO THE SWITCHYARD

    LESS/NO CABLE TRENCHES AND SMALL CONTROL CUBICLES

    DISTRIBUTED PROTECTION PANELS

    CHEAPER THAN CONVENTIONAL

    VERY LOW LIFE TIME COST

    48

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    49/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    QUESTIONS

    49

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    50/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    SESSION 3

    BASIC CONCEPTS OF IEC 61850

    50

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    51/93

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    52/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    IEC61850 Standard

    52

    Basic principles Part 1

    Glossary Part 2

    General Requirements Part 3

    System and project management Part 4

    Communication requirements Part 5

    Substation Automation System Configuration Part 6

    Basic Communication Structure Part 7

    Part 9Sampled Measured Values

    Part 8

    Conformance testing Part 10

    Mapping to Ethernet

    Mapping toMMS andEthernet

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    53/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    IEC61850 PRIMARY PARTS

    53

    PART 6-1: SUBSTATION CONFIGURATION LANGUAGE (SCL)

    PART 7-2: ABSTRACT COMMUNICATIONS SERVICEINTERFACE (ACSI) AND BASE TYPES

    PART 7-3: COMMON DATA CLASSES (CDC)

    PART 7-4: LOGICAL NODESPART 8-1: SPECIFIC COMMUNICATIONS SERVICE MAPPINGS

    (SCSM) - MMS & ETHERNET

    PART 9-2: SCSM - SAMPLED VALUES OVER ETHERNET

    PART 10-1: CONFORMANCE TESTING

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    54/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 54

    IEC61850 Scope

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    55/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    Hierarchical Object Model

    55

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    56/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    IEC61850 Class Model

    56

    ObjectNameObjectReference

    Name SERVER/IED

    LOGICAL-DEVICE

    LOGICAL-NODE

    DATA

    DataAttribute

    1

    1..*

    1

    1..*

    1

    1..*

    1

    1..*

    Physical Device:access by network address

    Enables data from multipledevices to be aggregatedinto a single physical device

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    57/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 57

    E01F34LCC1/XCBR1E01F34LCC1

    Accessing Data Tree View

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    58/93

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    59/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    IED NAME = IEC61850 Name for an IED, must be unique and cannot be usedfor another IED in the same network

    Logical Device = Every physical device can have multiple logical devicesaccording to the function. Logical device define the logical function of aphysical device.

    Logical Node = Every logical device will have few logical nodes under itaccording to the detail function.

    Functional Constrain = Function type for a data to differentiate betweenmany type of datas such as Status, Measurement, Command, Settings, etc.

    Data Object = Data object represent the application of the data for example,circuit breaker status will have the data object as Pos for position.

    Data Attribute = Data attribute will give more info of the data in specific, forexample stVal gives the detail of the status value in Boolean format.

    59

    OBJECT NAME STRUCTURE

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    60/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 60

    Logical Node

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    61/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    Logical Node

    A named grouping of data and associated services thatis logically related to some power system function.

    61

    ddd XCBR 1

    Optional Application Specific Prefix

    Logical Node Name perIEC 61850-7-4 (breaker)

    Logical Node Instance #

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    62/93

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    63/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    Logical Node Description

    63

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    64/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 64

    ST Status informationMX Measurands (analogue values)

    CO Control

    SP Setpoint

    SV Substitution

    CF Configuration

    DC Description

    SG Setting group

    SE Setting group editable

    EX Extended definition

    BR Buffered report c

    RP Unbuffered report c

    LG Logging c

    GO Goose control c

    GS Gsse control c

    MS Multicast sampled value control c

    US Unicast sampled value control c

    XX Representing all DataAttributes as a service parameter

    Functional Constrain Description

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    65/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 65

    Common Data Classes - CDC

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    66/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    GENERAL NAMES

    66

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    67/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    Substation Configuration Language SCL

    67

    Standardized file format for substation configuration

    Based on Extensible Markup Language (XML)

    Files exchanged between devices and software engineeringtools

    File may describe one device, or whole substation

    Every IEC 61850 vendor must supply an SCL file

    Format, or schema defined in IEC 61850 Part 6

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    68/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    SCL Files for IEC61850

    68

    System Specification Description ( .SSD ) - A file that describe apower system functions (i.e. substation specification)

    Substation Configuration Description ( .SCD ) - A file describewhere data are and where they need to go

    IED Capability Description ( .ICD ) - A file describe the capabilityor data reported by a type of IED

    Configured IED Description ( .CID ) A file that describe theconfiguration of a specific IED

    All this files are define in XML file format

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    69/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 69

    IEC 61850 Engineering Process

    SpecificationSAS

    Implementationplanning:

    SpecificationDevices

    Implementationplanning:

    SpecificationSystem

    Configurationof

    Device

    Configurationof

    System

    Parameterizing ofDevice Assembly Testing

    By Client

    By System Integrator (SI) By Client & SI

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    70/93

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    71/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 71

    IEC 61850 Engineering Process

    SLD Utility Requirements

    SCL Tool

    SSD FileDone By Utility / Consultant

    SSD File ICD File

    SCL Tool

    SCD File

    IEDIED Tool

    CID File

    Done By SI

    1 2

    3

    4

    76

    5

    8 9

    10

    11

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    72/93

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    73/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 73

    Server-Client & Server-Server Data Exchange

    HMI RTULDC

    MMS Report - data transfer between

    Server & Client

    GOOSE - data transfer between

    Server & Server

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    74/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    Data exchange mechanism between IEC61850 Client & Server

    2 type of MMS reportURCB (Unbuffered Report Control Block) Less secure cause no buffer is keptand no retransmission of data if report loss due to communication issue. Usedfor less critical information onlyBRCB (Buffered report Control Block) Very secured, IED keeps internal bufferand retransmission is possible if data loss due to any reason

    Spontaneous report will be created and send to the client if there isa data change in the server

    Multiple client can connect to one IEC61850 Server at the same timeand individual communication buffer will be created by the server

    Very intelligent and most advance data exchange mechanism inautomation system

    74

    MMS Report

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    75/93

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    76/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 76

    What is GOOSE??......continue

    Publish / Subscribe Allows Peer-to-Peer data exchange

    One device (sender) publishes information, only the subscriber devices are receiving it.

    The reaction of each receiver depends on its configuration and functionality.

    Publishing Device Subscriber Device

    Data travels anonymouslybetween IEDs

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    77/93

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    78/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    FUTURE DESIGNS

    78

    DS

    CB

    DS

    CT

    VT

    SMALL/MANYCONTROL

    ROOMS

    ONLY FIBRE OPTICCABLES

    1. AND ONLY POWERCABLES

    2. EVEN FO CABLESWILL GO WHENSECURE WIRELESS

    NETWORKS AREPERFECTED

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    79/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    ALTERNATE APPLICATION

    79

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    80/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    IEC61850 Substation Architecture

    80

    MU = Merging Unit

    MU

    PT1 OpticalCT

    MU

    PT2 CT2

    MU

    OpticalPT

    OpticalCT

    Relay Relay Relay

    MU PublishesV/I/StatusDatasets

    Relay(s)Subscribe toDatasets

    I/O I/O I/O

    Station Bus - 10/100/1000 MB Ethernet

    Process Bus.1/1/10GB

    Ethernet

    Clk1 Clk2

    Remote Access

    Network

    MU = Merging Unit

    MU

    PT1 OpticalCT

    MU

    PT2 CT2

    MU

    OpticalPT

    OpticalCT

    IED IED IED

    MU PublishesV/I/StatusDatasets

    Relay(s)Subscribe toDatasets

    I/O I/O I/O

    - 10/100/1000 MB Ethernet

    .1/1/10GB

    Ethernet

    Clk1 Clk2

    Remote Access

    Network

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    81/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    ANY QUESTIONS

    81

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    82/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    SHORT BREAK

    82

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    83/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    WHY WE NEED IEC61850

    IEC 61850 DEALS WITH IED TO MASTER STANDARDISATION(SIGNALS AND PROTOCOL) --- NO CHANGE FROM EXISTING SPECSEXCEPT TO SPECIFY 61850 AND OBSOLESENCE OF STATION LEVELCONTROLLER

    IT ALSO STANDARDISES IED TO - IED COMMUNICATION. THISMEANS FUNCTIONS CAN BE DISTRIBUTED TO REDUCE WIRING.

    *NEW*IEDs ARE VENDOR SPECIFIC HENCE TWO IEDs FROM DIFFERENTVENDORS MAY DIFFER ON FUNCTIONALITY. HOWEVER THE SAMEFUNCTION WILL HAVE SAME DATA FOR VENDOR INDEPENDENTCOMMUNICATION,

    BUT IEDs WILL HAVE DIFFERENT ALGORITHMS FOR FUNCTION

    IMPLEMENTATION AND HENCE NEED TO BE APPROVEDVENDOR SHALL DISTRIBUTE THE FUNCTIONS TO REDUCE WIRING

    83

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    84/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    IMPLEMENTATION -- FAT

    COMMON FAT FOR BOTH SAS AND CRP

    FUNCTIONAL TESTING IS SIMPLE AND FAST DUE TO LESSCOPPER WIRES.

    AUTOMATED TESTING AND REPORTING CAN BE IMPLEMENTEDDUE TO MORE SOFTWARE BASE PROCESS INVOLVED.

    84

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    85/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    COMMISSIONING

    EASY TO TEST DUE TO LESS CABLES

    AUTOMATED TESTING AND REPORTING MAKES THE TEST MOREPERFECT AND EASY

    MISTAKES CAN BE MINIMIZED

    LESS MAN POWER REQUIRED DUE TO SOFTWARE BASEDTESTING

    85

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    86/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    STANDARD IEC 61850 SUBSTATIONSTODAY

    SMALL MULTIPLE PROTECTION CUBICLES INSIDE THESWITCHYARD. --- SAY ONE EVERY 4, 132 KV BAYS. DISTRIBUTEDSTATION DC AND BATTERIES

    NO CONTROL ROOM AND NO CONTROL PANELS. SMALLCOMMUNICATION ROOM FOR COMM EQUIPMENT AND HMI (if required)

    CABLE TRENCHES REDUCED. ONLY FROM PRIMARY EQUIPMENT TOTHE RESPECTIVE PROTECTION CUBICLE. FO CABLES BURIEDDIRECTLY

    SIMPLE AND SPACIOUS PROTECTION PANELS WITH 2-4 BOXESAND MINIMAL WIRING

    MINIMAL TESTING AND COMMISSIONING TIME

    EASY EXPANSION AS WELL AS REPLACEMENT

    REMOTE OPERATION & MAINTENANCE AND TROUBLE SHOOTING

    ENORMOUS SAVINGS IN COST

    86

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    87/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    FUTURE SUBSTATION

    ONLY POWER CABLES TO THE SWITCHYARD. LAN CABLESREPLACED WITH SECURE WIRELESS COMMUNICATIONS.

    SMALL MULTIPLE PROTECTION KIOSKS IN THE YARD/CBsAND EVEN ONE CENTRAL PROTECTION ROOM FOR MULTIPLE STATIONS.

    EASY ACCESS TO DATA ACROSS SUBSTATIONS, LDC, WEB.

    PLUG AND PLAY IEDs WITH THE HMI/MASTER CONFIGURING ITSELF!!

    HUGE COST SAVINGS!!!

    87

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    88/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide

    For TNBAbu Bakar Baginda (ABBA) 132/33/11kV SubstationTNBR IEC61850 SVS (System Verification & Simulation) Lab For IEC61850Product approval and Power System Standardization

    For SESBMinintod 132/33/11kV SubstationLokawi 132/33/11kV SubstationPOIC 132/33/11kV SubstationLahad Datu Main Intake 132/33/11kV SubstationGayang 132kV Power Plant SubstationTawau Main Intake 132kV SubstationKunak 132/11kV SubstationDam Road 132kV SubstationKalumpang 132/33kV Substation

    88

    IEC 61850 Projects By PSI Incontrol

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    89/93

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    90/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 90

    TNBR IEC61850 SVS Lab

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    91/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 91

    TNBR IEC61850 SVS Lab

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    92/93

    Copyright (c) by PSI INCONTROL Sdn. Bhd.

    Slide 92

    TNB ABBA 33/11kV IEC61850 System

  • 7/31/2019 05 TNBD_Basic 61850 Seminar

    93/93

    Slid

    IEC 61850

    BASIC SEMINAR ENDS

    OPEN FOR QUESTIONS

    DETAILS IN ADVANCE SEMINAR ---- SOON!!

    93