05/17 manual: no. 7004 installation

20
05/17 (Document reserved for installers) This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes. Manual: No. 7004 INSTALLATION INDUSTRIAL SECTIONAL Vertical discharge Vertical discharge

Upload: others

Post on 05-May-2022

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 05/17 Manual: No. 7004 INSTALLATION

05/17

(Document reserved for installers)This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Manual: No. 7004INSTALLATION

INDUSTRIALSECTIONAL

Vertical discharge

Vertical discharge

Page 2: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.2

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Required equipment ...................................................................................................................................... p.2

Installation instructions .................................................................................................................................. p.3

Checking the levels ........................................................................................................................................ p.4

Assembly (Top vertical rails).......................................................................................................................... p.5

Clip in (joints) + Assembly (stops) - vertical rails............................................................................................... p.5

Positioning (vertical rails)...................................................................................................................................... p.6

Fitting (vertical rails) + Assembly (strike plate) .................................................................................................. p.7

Preparation (compensating axle).................................................................................................................... p.8

Assembly (balance line) ................................................................................................................................ p.9

Preparing the panels .................................................................................................................................... p.10

Assembly (bottom panel) ............................................................................................................................. p.11

Assembly (intermediate panels) .................................................................................................................. p.12

Assembly (top panel) ......................................................................................................................................... p.13

Installation/cable tension ............................................................................................................................. p.14

Principle (determining the number of rotations) .......................................................................................... p.15

Spring tension............................................................................................................................................... p.15

Assembling the rod ...................................................................................................................................... p.16

Check (rail clearance)......................................................................................................................................... p.17

Adjustment (roller guides) ............................................................................................................................ p.17

Adjustment (horizontal level) ....................................................................................................................... p.17

Adjustment (stops)....................................................................................................................................... p.18

Option: Lock or latch.................................................................................................................................... p.19

Install the pull cord (if manual door)............................................................................................................. p.19

Option (electric drive)................................................................................................................................... p.20

In case of incorrect manual functioning......................................................................................................... p.20

- Ladders + 2 trestles- Clamps and locking pliers- Spirit level or laser level- Plumb bob- Cord- Tape measure (5M or 8M)- Hammer drill- Electric screwdriver equipped with Torx 30 mm bit- Steel pins for screws and suitable concrete drill bits- Hammer- Hacksaw

- Wooden shims: 5 mm- Flat wrenches: 10 mm and 13 mm- Socket wrenches: 10 mm and 13 mm- Steel drill bit with Ø4.2 mm, max. length of 30 mm- Steel drill bit with Ø6.5, Ø8, Ø10, Ø11 and Ø16 mm- Screwdriver- Grease with brush + lubricating spray- Angle grinder- Universal clamp- Can of oil- Silicone sealant

Contents

Required equipment

Page 3: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.3

Installation_INDUS_VD_No.7004

* Before beginning the assembly, read this manual carefully.

* This closure must be installed by a professional technician.

* All the parts delivered are specifically sized for this product.Adding and/or using other parts may be detrimental to safety and may affect the product'swarranty.

* Any modification or improvement of this closure must be compliant with the standardEN 13241 + A2.In this case, a "modification/transformation" file must be created by the installer as per thestandard EN 12635 annex C.

* Considerable force is exerted by the torsion springs.This work must therefore be carried out in accordance with the safety instructions.Use the appropriate tools to install these products.Ensure that the work is carried out on a stable floor.

* Ensure that the assembly area is adequately lit, clear, clean and clearly marked out.

* Ensure that no other people are present at the assembly site apart from the installers.Non-authorized persons (children for example!) who are present at the site risk injuryduring assembly.

* All the components of this closure must be installed in compliance with the installationinstructions provided in this manual.

* All the requirements of the standards EN 13241 + A2 must be met and verified ifnecessary.

Max. locking torque:- Assembly screw: 10 Nm- Shutter assembly screw: 12 NmMin. working load per attachment point:- Compensating shaft: 300 daN- Rails: 40 daN

CAUTION! To ensure that this product is assembled, used and

maintained in complete safety, it is important to follow the instructions provided in this document.For everyone's safety, please observe the

precautionary measures below.

Installation instructions

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Page 4: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.4

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Checking the levels

Page 5: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.5

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Doubleclamp plate

Screws: TRPCC M8x12 Nuts: M8

(with notched base)

Assembly (Top vertical rails)

Insert the top vertical rail

Repeat the process with the other vertical rail

KIT no. 212: intellidrive stop

(vertical rails)KIT no. 206: small stop

10 and 13

Screws: TRCC M8x25 Nuts: M8

(with notched base)

Screws:TRCC M8x20 Nuts: M8

(with notched base)

Screws:TRCC M6x16 Nuts: M6

(with notched base)

Repeat the process with the other vertical rail

Clip in (joints) + Assembly (stop)

or

Page 6: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.6

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Insert shims if necessary

Important: Center the panel in relation to the opening.

Panel

Wall

Insert shims if necessary

Positioning (vertical rails)

Positioning the rail

Page 7: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.7

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Important:must be fixed in place

If Indus operator

Screws: FHC M4x35Nuts: M4

Screws: BHC M5x10Nuts: M5

(with notched base)

Fittings adapted to the support (not provided)

Strike plate+ micro switch (if indus operator)

Fitting (vertical rails)+ Assembly (strike plate)

Page 8: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.8

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Redreel

Blackreel

Anti-fallguard

Anti-fallguard support

Redreel

Blamandrel

Blackreel

nne nlee e

Screws: TH M10x20Nuts: M10

(with notched base)

Please note: If the axle has a single spring, center the spring on the axle, in the samedirection, as per the mandrel color (red or black).

OR

Blamandrel

Redmandrel

Redmandrel

Preparation (compensating axle)1-part axle

2-part axle

Notchfacing outwards*

Double bearing** If spring > 30 kg (positioned at roughly 100 mm from the reel)

Reel:Vertical discharge

Key

Page 9: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.9

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Dimension X:

X = X = Identical on both sides.

• If hoist operation:X = 154 mm hoist side.X = 20 mm opposite side to the hoist.

• If Indus operator operation:X = 154 mm operator side.X = 20 mm opposite side to the operator.

• If Intellidrive operation:X = 114 mm max. operator side.X = 20 mm opposite side to the operator.

Important: Center the fall-guardsin relation to the opening.

• If horizon operator or manual operation:

Assembly (balance line)Fittings adapted to the support (not provided)

Dimensions to be observed for manual or motorized versions

Dimension X

Page 10: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.10

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

If glazed panel with stiffenerBefore attaching the lateral hinges to the panels, fit the circlips on to the screws; refer to the image opposite.

Screws: TRPCC M8x12

Please note: If door > 5,000 mm

Screws: Self-drillingTB Torx 6.3x25

Screws: TRCC M6x20Nuts: M6

(with notched base)

Preparing the panels

Double hinges

Foot-operated pedal

Page 11: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.11

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Insert shims ifnecessary

Washer:12x27x2.5

Screws: TRPCC M8x12Nuts: M8

(with notched base)

Screws: Self-drillingTB Torx 6.3x25

Assembly (bottom panel)

Page 12: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.12

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Screws: TRPCC M8x12Nuts: M8

(with notched base)

Screws: Self-drillingTB Torx 6.3x25

Assembly (intermediate panels)

Page 13: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.13

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Screws: Self-drilling TB Torx 6.3x25

Spacer: 10 mm

Screws: TRPCC M8x12Nuts: M8

(with notched base)

Assembly (top panel)Top roller support: KIT no. 235

Page 14: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.14

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Align the axle notches

Important: the reel notches must be aligned.

Lock the nut and the locknut in place, in line with the rail

Notch

Installation/cable tension

Wind the cable until it is taut

Press the reel againstthe bearing

Insert the key then tighten the reel

Cables are taut, lock the axle in place

Passage forthe cable

Page 15: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.15

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

1 2 3 4 5 6

Example : 7 rotations

7

Important:axle locked in place.

Principle (determining the number of rotations):

Spring tension

Spring at rest Taut spring

Page 16: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.16

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Remove

Screws: TRPCC M8x12Nuts: M8

(with notched base)

Assembling the rod

Repeat the process with the other vertical rail

Page 17: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.17

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

- Do not flatten the external lateral jointsof the shutter.

- The roller rod must be able to turn.

Important: Grease the springs and the bottom of the rail.

Panel

Wall

Check (rail clearance)

Adjustment (roller guides)

Adjustment (horizontal level)

Page 18: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.18

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Important: Door open, the top panel must be in contact with the 2 stops.

Adjustment (stops)

Small stop

OR

Intellidrive stop

Page 19: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.19

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

Screws: Self-drillingTB Torx 6.3x25

Screws: Self-drillingTB Torx 6.3x25

Screws: TH M6x16Nuts: M6

(with notched base)

Option: Lock or latchLock (external)

Lock (internal)

Drill hole of Ø16 mmin the rail

Latch: KIT no. 7

(length. 30 mm max.)

Flush with the panel

Install the pull cord(if manual door)

Page 20: 05/17 Manual: No. 7004 INSTALLATION

05/17 p.20

Installation_INDUS_VD_No.7004

This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. The document may be modified at any time in accordance with product changes.

When connecting the operator and the box, refer to the specific manuals provided.

- Check that the vertical rails are plumb and that there is a 48 mm gap between the rails and the edge of the panel.

- Check that the bottoms of the vertical rails are all at the same level.

- Check that the top vertical rails are aligned in relation to the bottom vertical rails and that there is a 48 mm gap from the edge of the panel.

- Raise the door by roughly 1 meter and check that the shutter is level.

- Check that the lateral joints have not been flattened and that the sealing of the shutter is even.

Important: If the shutter is incorrectly adjusted and is flattened too tightly against the lateraljoints, the door will not function correctly.

- Adjust the compensation setting by 1/4 rotation on the springs. This will enable easier manualoperation of the shutter.

Important: Difference of tolerated rotations between the spring = 1/2 rotation.

Please note: After being operated several hundreds of times, it may be necessary to slightly retighten the springs.

For hoist or operator assembly, refer to the specific manuals provided.

If one or more of the anti-fall guards is blocked, contact a trained installer

Option (electric drive)

In case of incorrectmanual functioning