06 s2 wb the case of bogota - adrc.asia case of...76.2 76.3 88.1 80.4 96.1 80.1 80.1 80.3 80.1 80.9...
TRANSCRIPT
1
THE USE OF PROBABILISTIC RISK
MODELLING TO GUIDE
VULNERABILITY REDUCTION:
THE CASE OF BOGOTA
Francis Ghesquiere, The Word Bank
Asian Conference on Disaster Reduction , Colombo June 13, 2011
Bogotá District• Colombia’s capital and main economic center• 750,000 residential buildings• 200 hospitals and health centers• 3,500 schools and Universities• Population: Over 7,000,000 (High concentration of pop.)• Exposed value US$40 Billion only building constructions + infrastructure
2
PROBABILISTIC RISK MODELING
Disaster impact Analsyis- Scenario or Stochastic -
Physical Damage
INFRAESTRUCTURE ECONOMIC SOCIAL ENVIRONMENTAL
Hazard VulnerabilityExposure Risk
HazardsHazards
ExposureExposure
VulnerabilityVulnerability
RiskRisk
+
+
+
Applications
Visualization of hazard and risk / DRM indicators
Territorial planning
Infrastructure design
Cost Benefit analysis for mitigation and prevention investments
Scenario analysis for emergency preparedness
Immediate damage assessment
Analysis of financial exposure
4
HazardsHazards
ExposureExposure
VulnerabilityVulnerability
RiskRisk
+
+
+
Applications
Visualization of hazard and risk / DRM indicators
Territorial planning
Infrastructure design
Cost Benefit analysis for mitigation and prevention investments
Scenario analysis for emergency preparedness
Immediate damage assessment
Analysis of financial exposure
7
HazardsHazards
ExposureExposure
VulnerabilityVulnerability
RiskRisk
+
+
+
Applications
Visualization of hazard and risk / DRM indicators
Territorial planning
Infrastructure design
Cost Benefit analysis for mitigation and prevention investments
Scenario analysis for emergency preparedness
Immediate damage assessment
Analysis of financial exposure
DESIGN SPECIFICATIONS FOR INFRASTRUCTURE DESIGN
8
HazardsHazards
ExposureExposure
VulnerabilityVulnerability
RiskRisk
+
+
+
Applications
Visualization of hazard and risk / DRM indicators
Territorial planning
Infrastructure design
Cost Benefit analysis for mitigation and prevention investments
Scenario analysis for emergency preparedness
Immediate damage assessment
Analysis of financial exposure
Salud
0
2
4
6
8
10
12
14
16
18
76
.2
76
.3
88
.1
80
.4
96
.1
80
.1
80
.1
80
.3
80
.1
80
.9
80
.2
100
102
80
.1
80
.7
80
.1
99
.1
199
94
.1
80
.6
80
.5
80
.8
85
.1
76
.1
83
.1
87
.1
88
.2
78
.1
95
.1
84
.2
84
.1
104
82
.1
77
.1
77
.2
77
.3
77
.4
79
.1
110
90
.2
109
100
98
.1
90
.1
89
.1
108
81
.1
75
.1
91
.4
101
102
79
.2
93
.1
97
.1
103
107
86
.1
92
.1
Administración
0
2
4
6
8
10
12
14
16
18
223
.1
200
.1
206
.3
217
.1
216
.1
193
.1
221
.1
198
.2
230
.1
211
.1
194
.1
235
.3
229
.1
214
.1
235
.1
229
.2
197
.1
212
.2
235
.2
196
.2
219
.1
206
.1
206
.2
205
.1
213
.1
212
.1
220
.1
218
.1
196
.1
215
.1
234
.1
198
.1
226
.1
189
.1
233
.1
222
.1
Health sector buildings
Schools buildings
Benefit-Cost Analysis
10
HazardsHazards
ExposureExposure
VulnerabilityVulnerability
RiskRisk
+
+
+
Applications
Visualization of hazard and risk / DRM indicators
Territorial planning
Infrastructure design
Cost Benefit analysis for mitigation and prevention investments
Scenario analysis for emergency preparedness
Immediate damage assessment
Analysis of financial exposure
DAY
Scenario Analysis - # of injured
NIGHT
11
Contingency and Emergency Planning
• Location of emergency units
• Functional vulnerability (emergency routes, etc.)
• Health services requirements
• Housing requirements
• Food requirements
• Utilities requirements (water, energy, etc.)
• Debris and construction materials
• Etc.
HazardsHazards
ExposureExposure
VulnerabilityVulnerability
RiskRisk
+
+
+
Applications
Visualization of hazard and risk / DRM indicators
Territorial planning
Infrastructure design
Cost Benefit analysis for mitigation and prevention investments
Scenario analysis for emergency preparedness
Immediate damage assessment
Analysis of financial exposure
12
Bogotá Accelerograph Network (RAB)Equipment and Net Coverage
ETNA
K2
IMMEDIATE DAMAGE ESTIMATION
Damage Distribution CalculationSurface Response Spatial Distribution
Physical damageHuman losses
13
HazardsHazards
ExposureExposure
VulnerabilityVulnerability
RiskRisk
+
+
+
Applications
Visualization of hazard and risk / DRM indicators
Territorial planning
Infrastructure design
Cost Benefit analysis for mitigation and prevention investments
Scenario analysis for emergency preparedness
Immediate damage assessment
Analysis of financial exposure
Technical premium(annual expected loss)
Insurance
Premium
Calculation
Insurance
Premium
Calculation
14
5%
7%
9%
11%
13%
15%
17%
0 250 500 750 1000 1250 1500
Periodo de Retorno [años]
PM
L[%
]
Deducible 0%
Deducible 3%
Deducible 5%
Loss Exceedence AnalysisLoss Exceedence Analysis
� One risks model can be used for a large number of applications
� Cost of modeling is going down:- geospatial technologies- open source models
� “Models remain models”
FINAL REMARKS