Page 1: 07 VRM Pregrinder

VRM Cement Pre-grinding system

Cement Manufacturing Services / HGRS

Mechanical Process Technology department /

Grinding Technology group

Page 2: 07 VRM Pregrinder

2

SEPT-07HGRS Tikaria_Mill Workshop

Content

Feed Properties

Feed Inlet and Distribution

Dam Ring Modifications

Operation

Page 3: 07 VRM Pregrinder

3

SEPT-07HGRS Tikaria_Mill Workshop

Content

Feed Properties

Feed Inlet and Distribution

Dam Ring Modifications

Operation

Page 4: 07 VRM Pregrinder

4

SEPT-07HGRS Tikaria_Mill Workshop

Keep correct feed size for roller diameter

d

Limited maximum feed sized < 3 [%] DR for hard materials and < 5 [%] DR for soft material

Particle size distribution: Fraction below 1 [mm] to be kept < 30 [%]

[%]

Particle size [mm]

Page 5: 07 VRM Pregrinder

5

SEPT-07HGRS Tikaria_Mill Workshop

Impact of feed which is too fine

d

Vibrations and reduced production

Reasons:

Draw in of feed reduced

Material aeration

Page 6: 07 VRM Pregrinder

6

SEPT-07HGRS Tikaria_Mill Workshop

Actions limiting impact of feed which is too fine

Table speed adaptation (slower rotation)

Increase dam ring height if material hard (e.g. slag)

Increase hydraulic pressure of rollers

Inject water

Page 7: 07 VRM Pregrinder

7

SEPT-07HGRS Tikaria_Mill Workshop

Impact of feed which is too coarse

Symptoms:

High kW absorption of main drive

Vibrations

Measures:

Modify cooler crusher or install a crusher

Sieving of crusher product

Try to work with higher hydraulic pressure

d

Experience: At Rohoznik too coarse feed leads to permanent overload of the motor to achieve the required production

Page 8: 07 VRM Pregrinder

8

SEPT-07HGRS Tikaria_Mill Workshop

Positive results to lower top size

Experiences from India where the vertical raw mill performance was significantly better with finer crusher settings / lower top size:

- Bhatapara, Dorol: 4% production rate increase when hammer crushing setting decreased from 50mm to 25 mm (no change on % particles <2mm)

- Bargarh, Loesche: 8% production rate increase when hammer crushing setting changed from 80mm to 50mm

- Ambuja, 10% production rate increase when the top size was reduced from 100 mm to 75 mm.

Page 9: 07 VRM Pregrinder

9

SEPT-07HGRS Tikaria_Mill Workshop

Content

Feed Properties

Feed Inlet and Distribution

Dam Ring Modifications

Operation

Page 10: 07 VRM Pregrinder

10

SEPT-07HGRS Tikaria_Mill Workshop

Feed distribution

Basic Rule: Feed on Center of table

product extraction

fresh feed

tailings

coarses

fall through

internalcirculation

(pneumatical)

material

gasgas

Page 11: 07 VRM Pregrinder

11

SEPT-07HGRS Tikaria_Mill Workshop

Content

Feed Properties

Feed Inlet and Distribution

Dam Ring Modifications

Operation

Page 12: 07 VRM Pregrinder

12

SEPT-07HGRS Tikaria_Mill Workshop

Dam RingMain tasks:

Control of material retention on table

Control of bed depth

Page 13: 07 VRM Pregrinder

13

SEPT-07HGRS Tikaria_Mill Workshop

Dam ring Increase the level of material

on the table through an increase of the dam ring height

Optimum dam ring height to be found through trial & error

Modify dam ring height by at least 10 [mm] each time

As the table wears, the dam ring height should be reduced accordingly

In Loesche & Fuller mills, possible additional solution is:

grinding bed

roller

liner

nozzles

table

dam ringControls material bed

thickness

Controls material flow leaving the grinding

zone

100 115 Op. pressure [%]

Vibrations [mm/s]

2.5

3.0

3.5

Low dam ring

Medium dam ring

High dam ringgrinding bed

roller

liner

nozzles

table

dam ring

10 [mm]

Page 14: 07 VRM Pregrinder

14

SEPT-07HGRS Tikaria_Mill Workshop

Dam Ring Impact of too high dam ring:

High bed depth Increased power absorption (reduction of pressure required) Reduced grinding efficiency (lower production) Vibrations Lower steepness of PSD

Impact of too low dam ring (also inadequate design):

Low bed depth Vibrations Increased water demand Low power absorption of main drive Lower production Higher PSD steepness

Page 15: 07 VRM Pregrinder

16

SEPT-07HGRS Tikaria_Mill Workshop

Problems - SolutionsSituation:

During the operation of the San Sebastian raw mill, a capacity drop was observed over the time of wear of the table. The necessary cut of the dam ring was not done.

Experience:

After the replacement of the table liner with original thickness a significant capacity increase was observed.

Message:

Cut the dam ring as the table wears to maintain optimal material retention and bed depth!

Page 16: 07 VRM Pregrinder

17

SEPT-07HGRS Tikaria_Mill Workshop

Problems - SolutionsSituation:

During the operation of the Cartago raw mill, a capacity drop was observed over the time of wear of the dam ring (height was NOT affected).

Experience:

After the repair of the dam ring, the capacity was brought up to the original level. This leads to the conclusion, that primarily the gap contributes to the material retention on the grinding table and not the height of the dam ring.

Message:

Keep the gap between rollers and dam ring small.

Page 17: 07 VRM Pregrinder

18

SEPT-07HGRS Tikaria_Mill Workshop

Problems - SolutionsSituation:

During the commissioning of the Ras El Ma cement mill (LM 46 2+2), operation without water let to a reduced production. A Loesche Suggestion was to decrease the dam ring height (removal of 6+8) to reduce vibrations and water injection.

Experience:

After the removal of two dam ring segments the vibrations increased and the production dropped significantly – the water injection had to be increased.

Message:

Lower bed depths do not necessarily lead to an improved grinding performance

Page 18: 07 VRM Pregrinder

19

SEPT-07HGRS Tikaria_Mill Workshop

Content

Feed Properties

Feed Inlet and Distribution

Dam Ring Modifications

Operation

Page 19: 07 VRM Pregrinder

20

SEPT-07HGRS Tikaria_Mill Workshop

Holcim vertical roller mill distribution vs. reducer damages

Mill Supplier

Nu

mb

ers

of

2822 20

13 10

93

16 1223

4 3

58

0102030405060708090

100

F.L

.Sm

idth

/ Fu

ller-

Lo

esch

e

Lo

esch

e

Po

lysi

us

Geb

r.P

feif

fer

Oth

ers

To

tal

VRM

Damaged Reducer

This seriously affects Holcim’s performance

Statistically every 2nd VRM reducer fails

Page 20: 07 VRM Pregrinder

21

SEPT-07HGRS Tikaria_Mill Workshop

Identification of the root cause of a recurrent stoppage is the first step for solving the problem

Symptom Vibrations

Consequence Mill stoppage

Causes

Feed change

Lack of feed

DesignMaintenanceOperation

Low temperatures

High table speedFeeder blockage

But, vibrations can also become a cause for others failures

… …

Hydraulic failed

Worn grinding tools

High operating pressure

Page 21: 07 VRM Pregrinder

22

SEPT-07HGRS Tikaria_Mill Workshop

Interlocking and Protection Loop are a MUST

Protection of Mill Main

Drive