C a p i t o l H i l l S t a t e O f f i c e B u i l d i n g R e p l a c e m e n tS t a t e o f U t a h
C a p i t o l P r e s e r v a t i o n B o a r d
C a p i t o l H i l l C o m p l e x
N o r t h B u i l d i n g A s s e s s m e n tS t a t e O f f i c e B u i l d i n g R e p l a c e m e n t C o n s i d e r a t i o n s
Recent Growth within Agencies located on the Capitol ComplexCapitol, House and Senate Buildings Growth and Space NeedsState Office Building Agency Growth Improved Adjacencies
Parking and Access ConstraintsPublic Access During the Legislative SessionStaff Parking AccessNeighborhood Parking Impacts
Improving the Visitor Experience to the Capitol ComplexBring the Department of Heritage and Arts up to the Capitol ComplexCreate an Engaging and Informative Exhibit Space that Complements the Capitol
Meeting the Growing Needs for Public Engagement in the Legislative ProcessProvide a Conference Center that Includes a Larger Auditorium and Multiple, Larger Committee RoomsProvide Complimentary Services such as Break Out Rooms and Catering Support Spaces
1
2
5/14/2019
2
C a p i t o l H i l l C o m p l e x
N o r t h B u i l d i n g A s s e s s m e n tS t a t e O f f i c e B u i l d i n g R e p l a c e m e n t V i s i o n
The existing State Office Building should be replaced with a new building to better use the physical space and presence of the Capitol Complex, as well as support the vision of the Capitol Complex as a destination for visitors seeking Utah History and Heritage. This new building is envisioned to house a Utah Museum of Arts and Heritage, a conference center, and two levels of office space to support the Executive and Legislative space needs within the Capitol Complex.
C a p i t o l H i l l C o m p l e x
N o r t h B u i l d i n g A s s e s s m e n t
The current massing illustrates the following:
• 117,000 Square Feet
• 4 Levels Above Grade
• Structured Parking Below Plaza Level
• Connection to Existing Data Center for Heritage and Arts Collection Storage
3
4
5/14/2019
3
C a p i t o l H i l l C o m p l e x
N o r t h B u i l d i n g A s s e s s m e n t
OFFICE (DHA / TBD)
OFFICE (DEM / HOTELING / FLEX)
CONFERENCE CENTER
UTAH HERITAGE AND ARTS CENTER
STRUCTURED PARKINGPLAZA
C a p i t o l H i l l C o m p l e x
N o r t h B u i l d i n g A s s e s s m e n tS t a t e O f f i c e B u i l d i n g R e p l a c e m e n t T i m e l i n e
2019 2020 2021 2023Phase M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
Program Team Procurement 1-2 Months)
Programming (6 Months)
Design (12 Months)
Decanting SOB (15 Months)
Demolition / Abatement (6 Months)
Construction (22 Months)
Occupancy (3 Months)
Please note that the construction schedule may extend beyond the anticipated 20 months, if work needs to slow or stop during the legislative session.
5
6
5/14/2019
4
C a p i t o l H i l l C o m p l e x
N o r t h B u i l d i n g A s s e s s m e n t
7