1 2 3 4 5 construct addition, bldg 3200 - humphrey …
TRANSCRIPT
CONSTRUCT ADDITION, BLDG 3200
EA.EA.EA.EA. EACHEACHEACHEACHEEEE
CKT.CKT.CKT.CKT.
CEIL.CEIL.CEIL.CEIL.
CL.CL.CL.CL.
CIRCUITCIRCUITCIRCUITCIRCUIT
CENTER LINECENTER LINECENTER LINECENTER LINE
CEILINGCEILINGCEILINGCEILING
CLOSETCLOSETCLOSETCLOSET
C.M.U.C.M.U.C.M.U.C.M.U.
C.O.C.O.C.O.C.O.
COL.COL.COL.COL.
CONC.CONC.CONC.CONC.
COND.COND.COND.COND.
CONN.CONN.CONN.CONN.
CONST.CONST.CONST.CONST.
CONT.CONT.CONT.CONT.
CONTR. JT.CONTR. JT.CONTR. JT.CONTR. JT.
C.S.C.C.S.C.C.S.C.C.S.C.
C.T.C.T.C.T.C.T.
C.T.B.C.T.B.C.T.B.C.T.B.
C. TO C.C. TO C.C. TO C.C. TO C.
CONCRETE MASONRY UNITCONCRETE MASONRY UNITCONCRETE MASONRY UNITCONCRETE MASONRY UNIT
CLEAN OUTCLEAN OUTCLEAN OUTCLEAN OUT
COLUMNCOLUMNCOLUMNCOLUMN
CONCRETECONCRETECONCRETECONCRETE
CONDENSATECONDENSATECONDENSATECONDENSATE
CONNECTIONCONNECTIONCONNECTIONCONNECTION
CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTION
CONTINUOUSCONTINUOUSCONTINUOUSCONTINUOUS
CONTRACTION JOINTCONTRACTION JOINTCONTRACTION JOINTCONTRACTION JOINT
COLOR SYMBOL CODECOLOR SYMBOL CODECOLOR SYMBOL CODECOLOR SYMBOL CODE
CERAMIC TILECERAMIC TILECERAMIC TILECERAMIC TILE
CERAMIC TILE BASECERAMIC TILE BASECERAMIC TILE BASECERAMIC TILE BASE
CENTER TO CENTERCENTER TO CENTERCENTER TO CENTERCENTER TO CENTER
CLEARCLEARCLEARCLEARCLR.CLR.CLR.CLR.
DET.DET.DET.DET.
DIA.DIA.DIA.DIA.
DIFF.DIFF.DIFF.DIFF.
DIM.DIM.DIM.DIM.
DISC.DISC.DISC.DISC.
D.J.D.J.D.J.D.J.
DN.DN.DN.DN.
DR.DR.DR.DR.
D.S.D.S.D.S.D.S.
DWG.(S)DWG.(S)DWG.(S)DWG.(S)
DETAILDETAILDETAILDETAIL
DIAMETERDIAMETERDIAMETERDIAMETER
DIFFUSERDIFFUSERDIFFUSERDIFFUSER
DIMENSIONDIMENSIONDIMENSIONDIMENSION
DISCONNECTDISCONNECTDISCONNECTDISCONNECT
DUMMY JOINTDUMMY JOINTDUMMY JOINTDUMMY JOINT
DOWNDOWNDOWNDOWN
DRAINDRAINDRAINDRAIN
DOWN SPOUTDOWN SPOUTDOWN SPOUTDOWN SPOUT
DRAWING(S)DRAWING(S)DRAWING(S)DRAWING(S)
DDDD
GA.GA.GA.GA.
GAL.GAL.GAL.GAL.
GALV.GALV.GALV.GALV.
G.F.E.G.F.E.G.F.E.G.F.E.
GL.GL.GL.GL.
GND.GND.GND.GND.
GOV'TGOV'TGOV'TGOV'T
G.P.H.G.P.H.G.P.H.G.P.H.
G.P.M.G.P.M.G.P.M.G.P.M.
GR.GR.GR.GR.
G.W.B.G.W.B.G.W.B.G.W.B.
H.H.H.H.
GAGEGAGEGAGEGAGE
GALLONGALLONGALLONGALLON
GALVANIZEDGALVANIZEDGALVANIZEDGALVANIZED
GOVERNMENT FURNISHED EQUIPMENTGOVERNMENT FURNISHED EQUIPMENTGOVERNMENT FURNISHED EQUIPMENTGOVERNMENT FURNISHED EQUIPMENT
GLASSGLASSGLASSGLASS
GROUNDGROUNDGROUNDGROUND
GOVERNMENTGOVERNMENTGOVERNMENTGOVERNMENT
GALLONS/HOURGALLONS/HOURGALLONS/HOURGALLONS/HOUR
GALLONS/MINUTEGALLONS/MINUTEGALLONS/MINUTEGALLONS/MINUTE
GRILLEGRILLEGRILLEGRILLE
GYPSUM WALL BOARDGYPSUM WALL BOARDGYPSUM WALL BOARDGYPSUM WALL BOARD
HIGHHIGHHIGHHIGH
H.B.H.B.H.B.H.B.
H.C.H.C.H.C.H.C.
HT.HT.HT.HT.
I.D.I.D.I.D.I.D.
I.E.I.E.I.E.I.E.
IN.IN.IN.IN.
INCAND.INCAND.INCAND.INCAND.
INSUL.INSUL.INSUL.INSUL.
INT.INT.INT.INT.
J.B.J.B.J.B.J.B.
JCT.JCT.JCT.JCT.
JT.JT.JT.JT.
KVAKVAKVAKVA
LB.,#LB.,#LB.,#LB.,#
LG.LG.LG.LG.
HOSE BIBBHOSE BIBBHOSE BIBBHOSE BIBB
HOLLOW COREHOLLOW COREHOLLOW COREHOLLOW CORE
HEIGHTHEIGHTHEIGHTHEIGHT
INSIDE DIAMETERINSIDE DIAMETERINSIDE DIAMETERINSIDE DIAMETER
INVERT ELEVATIONINVERT ELEVATIONINVERT ELEVATIONINVERT ELEVATION
INCHESINCHESINCHESINCHES
INCANDESCENTINCANDESCENTINCANDESCENTINCANDESCENT
INSULATIONINSULATIONINSULATIONINSULATION
INTERIORINTERIORINTERIORINTERIOR
JUNCTION BOXJUNCTION BOXJUNCTION BOXJUNCTION BOX
JUNCTIONJUNCTIONJUNCTIONJUNCTION
JOINTJOINTJOINTJOINT
KILOVOLT AMPEREKILOVOLT AMPEREKILOVOLT AMPEREKILOVOLT AMPERE
POUNDPOUNDPOUNDPOUND
LONGLONGLONGLONG
M.M.M.M.
MAINT.MAINT.MAINT.MAINT.
MAX.MAX.MAX.MAX.
M.D.P.M.D.P.M.D.P.M.D.P.
MECH.MECH.MECH.MECH.
MTL.MTL.MTL.MTL.
MIN.MIN.MIN.MIN.
MISC.MISC.MISC.MISC.
M.O.M.O.M.O.M.O.
M.T.M.T.M.T.M.T.
MTD.MTD.MTD.MTD.
MTG.MTG.MTG.MTG.
M.V.M.V.M.V.M.V.
M.G.T.M.G.T.M.G.T.M.G.T.
N.A.N.A.N.A.N.A.
N.I.C.N.I.C.N.I.C.N.I.C.
NO.NO.NO.NO.
O.A.O.A.O.A.O.A.
P.P.P.P.
PART.PART.PART.PART.
MOTORMOTORMOTORMOTOR
MAINTENANCEMAINTENANCEMAINTENANCEMAINTENANCE
MAXIMUMMAXIMUMMAXIMUMMAXIMUM
MAIN DISTRIBUTION PANELMAIN DISTRIBUTION PANELMAIN DISTRIBUTION PANELMAIN DISTRIBUTION PANEL
MECHANICALMECHANICALMECHANICALMECHANICAL
METALMETALMETALMETAL
MINIMUMMINIMUMMINIMUMMINIMUM
MISCELLANEOUSMISCELLANEOUSMISCELLANEOUSMISCELLANEOUS
MASONRY OPENINGMASONRY OPENINGMASONRY OPENINGMASONRY OPENING
METAL THRESHOLDMETAL THRESHOLDMETAL THRESHOLDMETAL THRESHOLD
MOUNTEDMOUNTEDMOUNTEDMOUNTED
MOUNTINGMOUNTINGMOUNTINGMOUNTING
MECHANICAL VENTILATIONMECHANICAL VENTILATIONMECHANICAL VENTILATIONMECHANICAL VENTILATION
MATT GLAZE TILEMATT GLAZE TILEMATT GLAZE TILEMATT GLAZE TILE
NOT APPLICABLENOT APPLICABLENOT APPLICABLENOT APPLICABLE
NOT IN CONTRACTNOT IN CONTRACTNOT IN CONTRACTNOT IN CONTRACT
NUMBERNUMBERNUMBERNUMBER
OUTDOOR AIROUTDOOR AIROUTDOOR AIROUTDOOR AIR
PAPERPAPERPAPERPAPER
PARTITIONPARTITIONPARTITIONPARTITION
PER.PER.PER.PER.
QTR.QTR.QTR.QTR.
QUAN.QUAN.QUAN.QUAN.
R.R.R.R.
R.A.R.A.R.A.R.A.
RAD.RAD.RAD.RAD.
RD.RD.RD.RD.
REG.REG.REG.REG.
REINF.REINF.REINF.REINF.
REQ.REQ.REQ.REQ.
RET.RET.RET.RET.
R.G.R.G.R.G.R.G.
RM.RM.RM.RM.
R.P.M.R.P.M.R.P.M.R.P.M.
PERIMETERPERIMETERPERIMETERPERIMETER
QUARTERQUARTERQUARTERQUARTER
QUANTITYQUANTITYQUANTITYQUANTITY
RISERRISERRISERRISER
RETURN AIRRETURN AIRRETURN AIRRETURN AIR
RADIUSRADIUSRADIUSRADIUS
ROUNDROUNDROUNDROUND
REGISTERREGISTERREGISTERREGISTER
REINFORCINGREINFORCINGREINFORCINGREINFORCING
REQUIREDREQUIREDREQUIREDREQUIRED
RETURNRETURNRETURNRETURN
RETURN GRILLERETURN GRILLERETURN GRILLERETURN GRILLE
ROOMROOMROOMROOM
REVOLUTION/MINUTEREVOLUTION/MINUTEREVOLUTION/MINUTEREVOLUTION/MINUTE
T.T.T.T.
TEL.TEL.TEL.TEL.
TEMP.TEMP.TEMP.TEMP.
THK.THK.THK.THK.
THD.THD.THD.THD.
TOILETTOILETTOILETTOILET
W.W.W.W.
W/W/W/W/
WD.WD.WD.WD.
W.D.W.D.W.D.W.D.
W.G.W.G.W.G.W.G.
WP.WP.WP.WP.
WTR.WTR.WTR.WTR.
W.W.F.W.W.F.W.W.F.W.W.F.
S.A.S.A.S.A.S.A.
SCH.SCH.SCH.SCH.
SECT.SECT.SECT.SECT.
SERV.SERV.SERV.SERV.SHT.SHT.SHT.SHT.
S.J.S.J.S.J.S.J.
SPEC.SPEC.SPEC.SPEC.
SQ. FT.SQ. FT.SQ. FT.SQ. FT.
ST.ST.ST.ST.
STOR.STOR.STOR.STOR.
STRUC.STRUC.STRUC.STRUC.
SUSP.SUSP.SUSP.SUSP.
SW.SW.SW.SW.
SUPPLY AIRSUPPLY AIRSUPPLY AIRSUPPLY AIR
SCHEDULESCHEDULESCHEDULESCHEDULE
SECTIONSECTIONSECTIONSECTION
SERVICESERVICESERVICESERVICESHEETSHEETSHEETSHEET
SAWED JOINTSAWED JOINTSAWED JOINTSAWED JOINT
SPECIFICATIONSSPECIFICATIONSSPECIFICATIONSSPECIFICATIONS
SQUARE FEETSQUARE FEETSQUARE FEETSQUARE FEET
STEELSTEELSTEELSTEEL
STORAGESTORAGESTORAGESTORAGE
STRUCTURALSTRUCTURALSTRUCTURALSTRUCTURAL
SUSPENDEDSUSPENDEDSUSPENDEDSUSPENDED
SWITCHSWITCHSWITCHSWITCH
S.S.S.S. SUPPLYSUPPLYSUPPLYSUPPLY
WOODWOODWOODWOOD
WIDE FLANGEWIDE FLANGEWIDE FLANGEWIDE FLANGE
WINDOW DIMENSIONWINDOW DIMENSIONWINDOW DIMENSIONWINDOW DIMENSION
WATTWATTWATTWATT
WITHWITHWITHWITH
WAINSCOATINGWAINSCOATINGWAINSCOATINGWAINSCOATING
WATER GAGEWATER GAGEWATER GAGEWATER GAGE
WEATHERPROOFWEATHERPROOFWEATHERPROOFWEATHERPROOF
WATERWATERWATERWATER
WELDED WIRE FABRICWELDED WIRE FABRICWELDED WIRE FABRICWELDED WIRE FABRIC
TELEPHONETELEPHONETELEPHONETELEPHONE
TEMPERATURETEMPERATURETEMPERATURETEMPERATURE
THICKNESSTHICKNESSTHICKNESSTHICKNESS
THRESHOLDTHRESHOLDTHRESHOLDTHRESHOLD
PPPP
MMMM
NNNN
QQQQOOOO
RRRR
SSSS
TTTT
WWWW
IIII
JJJJ
KKKK
GGGG
WCWCWCWC
WFWFWFWF
EXT.EXT.EXT.EXT.
EXIST.EXIST.EXIST.EXIST.
EXTERIOREXTERIOREXTERIOREXTERIOR
EXISTINGEXISTINGEXISTINGEXISTING
F.A.F.A.F.A.F.A.
F.C.F.C.F.C.F.C.
F.D.F.D.F.D.F.D.
F.E.C.F.E.C.F.E.C.F.E.C.
FIN.FIN.FIN.FIN.
FL.FL.FL.FL.
FT.FT.FT.FT.
FTG.FTG.FTG.FTG.
FIRE ALARMFIRE ALARMFIRE ALARMFIRE ALARM
FLEXIBLE CONNECTIONFLEXIBLE CONNECTIONFLEXIBLE CONNECTIONFLEXIBLE CONNECTION
FLOOR DRAINFLOOR DRAINFLOOR DRAINFLOOR DRAIN
FIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINET
FINISHFINISHFINISHFINISH
FLOORFLOORFLOORFLOOR
FOOT, FEETFOOT, FEETFOOT, FEETFOOT, FEET
FOOTINGFOOTINGFOOTINGFOOTING
FFFF
EXP. JTEXP. JTEXP. JTEXP. JT
EXH.EXH.EXH.EXH.
E.W.C.E.W.C.E.W.C.E.W.C.
E.W.E.W.E.W.E.W.
EQUIP.EQUIP.EQUIP.EQUIP.ELEC.ELEC.ELEC.ELEC.
E.F.E.F.E.F.E.F.
EXPANSION JOINTEXPANSION JOINTEXPANSION JOINTEXPANSION JOINT
EXHAUSTEXHAUSTEXHAUSTEXHAUST
ELECTRIC WATER COOLERELECTRIC WATER COOLERELECTRIC WATER COOLERELECTRIC WATER COOLER
EACH WAYEACH WAYEACH WAYEACH WAY
EQUIPMENTEQUIPMENTEQUIPMENTEQUIPMENTELECTRICELECTRICELECTRICELECTRIC
EACH FACEEACH FACEEACH FACEEACH FACE
H.P.H.P.H.P.H.P.
HR.HR.HR.HR.
HTG.HTG.HTG.HTG.
HTR.HTR.HTR.HTR.
H.&V.H.&V.H.&V.H.&V.
HW.HW.HW.HW.
HYD.HYD.HYD.HYD.
HORSE POWERHORSE POWERHORSE POWERHORSE POWER
HOURHOURHOURHOUR
HEATINGHEATINGHEATINGHEATING
HEATERHEATERHEATERHEATER
HEATING AND VENTILATINGHEATING AND VENTILATINGHEATING AND VENTILATINGHEATING AND VENTILATING
HARDWAREHARDWAREHARDWAREHARDWARE
HYDRANTHYDRANTHYDRANTHYDRANT
H.M.H.M.H.M.H.M. HOLLOW METALHOLLOW METALHOLLOW METALHOLLOW METAL
HORIZ.HORIZ.HORIZ.HORIZ. HORIZONTALHORIZONTALHORIZONTALHORIZONTAL
LTG.LTG.LTG.LTG. LIGHTINGLIGHTINGLIGHTINGLIGHTING
LIGHTING PANELLIGHTING PANELLIGHTING PANELLIGHTING PANELL.P.L.P.L.P.L.P.
L.L.V.L.L.V.L.L.V.L.L.V. LONG LEG VERTICALLONG LEG VERTICALLONG LEG VERTICALLONG LEG VERTICAL
OL.OL.OL.OL.
OPNG.OPNG.OPNG.OPNG.
OPP.OPP.OPP.OPP.
O.S.D.O.S.D.O.S.D.O.S.D.
OVERLOADOVERLOADOVERLOADOVERLOAD
OPENINGOPENINGOPENINGOPENING
OPPOSITEOPPOSITEOPPOSITEOPPOSITE
OPEN SIGHT DRAINOPEN SIGHT DRAINOPEN SIGHT DRAINOPEN SIGHT DRAIN
O.C.O.C.O.C.O.C. ON CENTERON CENTERON CENTERON CENTER
L, PL.L, PL.L, PL.L, PL.
PLBG.PLBG.PLBG.PLBG.
PLYW'DPLYW'DPLYW'DPLYW'D
PNL.PNL.PNL.PNL.
PRESS.PRESS.PRESS.PRESS.
PSFPSFPSFPSF
PSIPSIPSIPSI
PSIGPSIGPSIGPSIG
PT.PT.PT.PT.
PTD.PTD.PTD.PTD.
PLATEPLATEPLATEPLATE
PLUMBINGPLUMBINGPLUMBINGPLUMBING
PLYWOODPLYWOODPLYWOODPLYWOOD
PANELPANELPANELPANEL
PRESSUREPRESSUREPRESSUREPRESSURE
POUNDS/SQUARE FOOTPOUNDS/SQUARE FOOTPOUNDS/SQUARE FOOTPOUNDS/SQUARE FOOT
POUNDS/SQUARE INCHPOUNDS/SQUARE INCHPOUNDS/SQUARE INCHPOUNDS/SQUARE INCH
POUNDS/SQUARE INCH GAGEPOUNDS/SQUARE INCH GAGEPOUNDS/SQUARE INCH GAGEPOUNDS/SQUARE INCH GAGE
POINTPOINTPOINTPOINT
PAINTEDPAINTEDPAINTEDPAINTED
PPPPPREFORMED JOINT FILLERPREFORMED JOINT FILLERPREFORMED JOINT FILLERPREFORMED JOINT FILLERP.J.F.P.J.F.P.J.F.P.J.F.
TOIL.TOIL.TOIL.TOIL.
TYP.TYP.TYP.TYP.
TOILETTOILETTOILETTOILET
TYPICALTYPICALTYPICALTYPICAL
T.O.C.T.O.C.T.O.C.T.O.C.
T.O.F.T.O.F.T.O.F.T.O.F.
TOP OF CONCRETETOP OF CONCRETETOP OF CONCRETETOP OF CONCRETE
TOP OF FOOTINGTOP OF FOOTINGTOP OF FOOTINGTOP OF FOOTING
V.V.V.V.
V.A.T.V.A.T.V.A.T.V.A.T.
VENT.VENT.VENT.VENT.
VERT.VERT.VERT.VERT.
VOLTVOLTVOLTVOLT
VINYL ASBESTOS TILEVINYL ASBESTOS TILEVINYL ASBESTOS TILEVINYL ASBESTOS TILE
VENTILATIONVENTILATIONVENTILATIONVENTILATION
VERTICALVERTICALVERTICALVERTICAL
VENT THRU ROOFVENT THRU ROOFVENT THRU ROOFVENT THRU ROOF
VVVV
VTRVTRVTRVTR
LLLL
HHHH
INDEX OF DRAWINGSINDEX OF DRAWINGSINDEX OF DRAWINGSINDEX OF DRAWINGSTITLETITLETITLETITLE
EARTH (ORIGINAL GRADE)EARTH (ORIGINAL GRADE)EARTH (ORIGINAL GRADE)EARTH (ORIGINAL GRADE)
EARTH (COMPACTED FILL)EARTH (COMPACTED FILL)EARTH (COMPACTED FILL)EARTH (COMPACTED FILL)
GRAVELGRAVELGRAVELGRAVEL
CONCRETECONCRETECONCRETECONCRETE
MORTAR MORTAR MORTAR MORTAR ---- CEMENT CEMENT CEMENT CEMENT ----
PLASTER PLASTER PLASTER PLASTER ---- STUCCOSTUCCOSTUCCOSTUCCO
CONCRETE MASONRY UNITSCONCRETE MASONRY UNITSCONCRETE MASONRY UNITSCONCRETE MASONRY UNITS
METAL (ELEVATION)METAL (ELEVATION)METAL (ELEVATION)METAL (ELEVATION)
STEEL (CROSS SECTION)STEEL (CROSS SECTION)STEEL (CROSS SECTION)STEEL (CROSS SECTION)
INSULATION (RIGID)INSULATION (RIGID)INSULATION (RIGID)INSULATION (RIGID)
INSULATION (BLANKET AND INSULATION (BLANKET AND INSULATION (BLANKET AND INSULATION (BLANKET AND
ACOUSTICALACOUSTICALACOUSTICALACOUSTICAL
BRICKBRICKBRICKBRICK
WOOD (BLOCKING)WOOD (BLOCKING)WOOD (BLOCKING)WOOD (BLOCKING)
WOOD (FINISH)WOOD (FINISH)WOOD (FINISH)WOOD (FINISH)
PROJECT TEAMPROJECT TEAMPROJECT TEAMPROJECT TEAM
1111
AAAA----101101101101
SIMSIMSIMSIM1111
AAAA----101101101101
SIMSIMSIMSIM
DRAWING SYMBOLSDRAWING SYMBOLSDRAWING SYMBOLSDRAWING SYMBOLS MATERIAL IDENTITYMATERIAL IDENTITYMATERIAL IDENTITYMATERIAL IDENTITY1
View NameView NameView NameView Name1/8" = 1'-0"
BUILDING SECTION REFERENCEBUILDING SECTION REFERENCEBUILDING SECTION REFERENCEBUILDING SECTION REFERENCE
DRAWING NUMBER ON TOPDRAWING NUMBER ON TOPDRAWING NUMBER ON TOPDRAWING NUMBER ON TOP
SHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOM
DRAWING TITLEDRAWING TITLEDRAWING TITLEDRAWING TITLE
DRAWING IDENTIFICATION #DRAWING IDENTIFICATION #DRAWING IDENTIFICATION #DRAWING IDENTIFICATION #
VIEW TITLEVIEW TITLEVIEW TITLEVIEW TITLE
DRAWING SCALEDRAWING SCALEDRAWING SCALEDRAWING SCALE
1111
AAAA----101101101101
SIMSIMSIMSIM
WALL SECTION REFERENCEWALL SECTION REFERENCEWALL SECTION REFERENCEWALL SECTION REFERENCE
DRAWING NUMBER ON TOPDRAWING NUMBER ON TOPDRAWING NUMBER ON TOPDRAWING NUMBER ON TOP
SHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOM
1111
A101A101A101A101
SIMSIMSIMSIM
DETAIL REFERENCEDETAIL REFERENCEDETAIL REFERENCEDETAIL REFERENCE
DRAWING NUMBER ON TOPDRAWING NUMBER ON TOPDRAWING NUMBER ON TOPDRAWING NUMBER ON TOP
SHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOM
1111
A101A101A101A101
SIMSIMSIMSIM
DETAIL CALLOUT REFERENCEDETAIL CALLOUT REFERENCEDETAIL CALLOUT REFERENCEDETAIL CALLOUT REFERENCE
DRAWING NUMBER ON TOPDRAWING NUMBER ON TOPDRAWING NUMBER ON TOPDRAWING NUMBER ON TOP
SHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOMSHEET NUMBER ON BOTTOM
A101A101A101A101
1111
RefRefRefRef
1111
Ref
Ref
Ref
Ref
1111
Ref
Ref
Ref
Ref
1111
RefRefRefRef
AAAA----101101101101
1111 RefRefRefRef
1111
Ref
Ref
Ref
Ref
1111 RefRefRefRef
1111
Ref
Ref
Ref
Ref
ELEVATION REFERENCEELEVATION REFERENCEELEVATION REFERENCEELEVATION REFERENCE
LEFT LEFT LEFT LEFT ---- EXTERIOR ELEVATIONEXTERIOR ELEVATIONEXTERIOR ELEVATIONEXTERIOR ELEVATION
RIGHT RIGHT RIGHT RIGHT ---- INTERIOR ELEVATIONINTERIOR ELEVATIONINTERIOR ELEVATIONINTERIOR ELEVATION
GYPSUM BOARD / SHEATHINGGYPSUM BOARD / SHEATHINGGYPSUM BOARD / SHEATHINGGYPSUM BOARD / SHEATHING
CARPET / FLOOR FINISHCARPET / FLOOR FINISHCARPET / FLOOR FINISHCARPET / FLOOR FINISH
CENTER LINE SYMBOLCENTER LINE SYMBOLCENTER LINE SYMBOLCENTER LINE SYMBOL
CJCJCJCJ CONTROL JOINT SYMBOLCONTROL JOINT SYMBOLCONTROL JOINT SYMBOLCONTROL JOINT SYMBOL
1111 EQUIPMENT TAGEQUIPMENT TAGEQUIPMENT TAGEQUIPMENT TAG
1111 DEMOLITION KEYNOTEDEMOLITION KEYNOTEDEMOLITION KEYNOTEDEMOLITION KEYNOTE
NORTH ARROWNORTH ARROWNORTH ARROWNORTH ARROW
1111 NEW WORK KEYNOTENEW WORK KEYNOTENEW WORK KEYNOTENEW WORK KEYNOTE
0'0'0'0' 3"3"3"3" 6"6"6"6" 1'1'1'1'----0"0"0"0"9"9"9"9"
GRAPHICAL SCALEGRAPHICAL SCALEGRAPHICAL SCALEGRAPHICAL SCALE
101101101101 DOOR TAGDOOR TAGDOOR TAGDOOR TAG
ROOM TAGROOM TAGROOM TAGROOM TAGROOMROOMROOMROOM101101101101
150 SF150 SF150 SF150 SF
REVISION TAGREVISION TAGREVISION TAGREVISION TAG
WALL TAGWALL TAGWALL TAGWALL TAG
REVISION TAGREVISION TAGREVISION TAGREVISION TAG
1i1i1i1i
1t1t1t1t
LEVEL LEVEL LEVEL LEVEL
REFERENCEREFERENCEREFERENCEREFERENCE
Level 1Level 1Level 1Level 10'0'0'0'----0"0"0"0"
CONTRACT NUMBER: CONTRACT NUMBER: CONTRACT NUMBER: CONTRACT NUMBER:
DPW NUMBER: DPW NUMBER: DPW NUMBER: DPW NUMBER:
FISCAL YEAR: FISCAL YEAR: FISCAL YEAR: FISCAL YEAR: 2021202120212021
DWMSDWMSDWMSDWMS DIMENSIONAL WALL DIMENSIONAL WALL DIMENSIONAL WALL DIMENSIONAL WALL
METAL STUDSMETAL STUDSMETAL STUDSMETAL STUDS
LGMSLGMSLGMSLGMS LT GAUGE METAL STUDLT GAUGE METAL STUDLT GAUGE METAL STUDLT GAUGE METAL STUD
SHEET NO.SHEET NO.SHEET NO.SHEET NO.
INSULATION (CLOSEDINSULATION (CLOSEDINSULATION (CLOSEDINSULATION (CLOSED----CELL CELL CELL CELL
SPRAY FOAMSPRAY FOAMSPRAY FOAMSPRAY FOAM
35% REVIEW PACKAGE 35% REVIEW PACKAGE 35% REVIEW PACKAGE 35% REVIEW PACKAGE ---- 01/08/202101/08/202101/08/202101/08/2021
BAL.BAL.BAL.BAL.
BD.BD.BD.BD.
BLDG.BLDG.BLDG.BLDG.
BLK.BLK.BLK.BLK.
BM.BM.BM.BM.
BOT.BOT.BOT.BOT.
BRG.BRG.BRG.BRG.
B.T.U.H.B.T.U.H.B.T.U.H.B.T.U.H.
BALANCEBALANCEBALANCEBALANCE
BOARDBOARDBOARDBOARD
BUILDINGBUILDINGBUILDINGBUILDING
BLANKBLANKBLANKBLANK
BEAMBEAMBEAMBEAM
BOTTOMBOTTOMBOTTOMBOTTOM
BEARINGBEARINGBEARINGBEARING
BRITISH THERMO UNIT/HOURBRITISH THERMO UNIT/HOURBRITISH THERMO UNIT/HOURBRITISH THERMO UNIT/HOUR
BBBB
A.C.A.C.A.C.A.C.
A.D.A.D.A.D.A.D.
AIR CONDITIONEDAIR CONDITIONEDAIR CONDITIONEDAIR CONDITIONED
AREA DRAINAREA DRAINAREA DRAINAREA DRAIN
AAAA
A.H.U.A.H.U.A.H.U.A.H.U.
ALT.ALT.ALT.ALT.
ALUM.ALUM.ALUM.ALUM.
AMP., A.AMP., A.AMP., A.AMP., A.
A.O.A.O.A.O.A.O.
APPROX.APPROX.APPROX.APPROX.
ARCH.ARCH.ARCH.ARCH.
A.T.A.T.A.T.A.T.
A.T.C.A.T.C.A.T.C.A.T.C.
AIR HANDLING UNITAIR HANDLING UNITAIR HANDLING UNITAIR HANDLING UNIT
ALTERNATEALTERNATEALTERNATEALTERNATE
ALUMINUMALUMINUMALUMINUMALUMINUM
AMPERESAMPERESAMPERESAMPERES
ACCESS OPENINGACCESS OPENINGACCESS OPENINGACCESS OPENING
APPROXIMATELYAPPROXIMATELYAPPROXIMATELYAPPROXIMATELY
ARCHITECTURALARCHITECTURALARCHITECTURALARCHITECTURAL
ASPHALT TILEASPHALT TILEASPHALT TILEASPHALT TILE
ACOUSTIC TILE CEILINGACOUSTIC TILE CEILINGACOUSTIC TILE CEILINGACOUSTIC TILE CEILING
A.F.F.A.F.F.A.F.F.A.F.F. ABOVE FINISHED FLOORABOVE FINISHED FLOORABOVE FINISHED FLOORABOVE FINISHED FLOOR
STANDARD ABBREVIATIONSSTANDARD ABBREVIATIONSSTANDARD ABBREVIATIONSSTANDARD ABBREVIATIONS
CAB.CAB.CAB.CAB.
CAP.CAP.CAP.CAP.
C/BC/BC/BC/B
C.D.C.D.C.D.C.D.
CEM.CEM.CEM.CEM.
CER.CER.CER.CER.
C.F.M.C.F.M.C.F.M.C.F.M.
CABINETCABINETCABINETCABINET
CAPACITYCAPACITYCAPACITYCAPACITY
CIRCUIT BREAKERCIRCUIT BREAKERCIRCUIT BREAKERCIRCUIT BREAKER
CEILING DIFFUSERCEILING DIFFUSERCEILING DIFFUSERCEILING DIFFUSER
CEMENTCEMENTCEMENTCEMENT
CERAMICCERAMICCERAMICCERAMIC
CUBIC FEET/MINUTECUBIC FEET/MINUTECUBIC FEET/MINUTECUBIC FEET/MINUTE
CCCC
ARCHITECTUREARCHITECTUREARCHITECTUREARCHITECTURE
STRUCTURESTRUCTURESTRUCTURESTRUCTURE
ELECTRICALELECTRICALELECTRICALELECTRICAL
FIRE ALARMFIRE ALARMFIRE ALARMFIRE ALARM
MECHANICALMECHANICALMECHANICALMECHANICAL
PLUMBINGPLUMBINGPLUMBINGPLUMBING
FIRE PROTECTIONFIRE PROTECTIONFIRE PROTECTIONFIRE PROTECTION
DESIGN/ BUILD CONTRACTORS:DESIGN/ BUILD CONTRACTORS:DESIGN/ BUILD CONTRACTORS:DESIGN/ BUILD CONTRACTORS:
SOUTHEAST CHEROKEE CONSTRUCTION INC.SOUTHEAST CHEROKEE CONSTRUCTION INC.SOUTHEAST CHEROKEE CONSTRUCTION INC.SOUTHEAST CHEROKEE CONSTRUCTION INC.
CONTACT: PATRICK DAWKINSCONTACT: PATRICK DAWKINSCONTACT: PATRICK DAWKINSCONTACT: PATRICK DAWKINS
SOUTHEAST CHEROKEE CONSTRUCTION, INC.SOUTHEAST CHEROKEE CONSTRUCTION, INC.SOUTHEAST CHEROKEE CONSTRUCTION, INC.SOUTHEAST CHEROKEE CONSTRUCTION, INC.
1491 FURNACE STREET1491 FURNACE STREET1491 FURNACE STREET1491 FURNACE STREET
MONTGOMERY, AL 36104MONTGOMERY, AL 36104MONTGOMERY, AL 36104MONTGOMERY, AL 36104
334334334334----264264264264----1717171770
ARCHITECT:ARCHITECT:ARCHITECT:ARCHITECT:
WM2A ARCHITECTS/PLANNERS INC.WM2A ARCHITECTS/PLANNERS INC.WM2A ARCHITECTS/PLANNERS INC.WM2A ARCHITECTS/PLANNERS INC.
CONTACT: YANCEY POWERSCONTACT: YANCEY POWERSCONTACT: YANCEY POWERSCONTACT: YANCEY POWERS
348 COTTON AVENUE, SUITE 500348 COTTON AVENUE, SUITE 500348 COTTON AVENUE, SUITE 500348 COTTON AVENUE, SUITE 500
PO BOX 110 (MAILING)PO BOX 110 (MAILING)PO BOX 110 (MAILING)PO BOX 110 (MAILING)
MACON, GA 31201MACON, GA 31201MACON, GA 31201MACON, GA 31201
T: (478) 745T: (478) 745T: (478) 745T: (478) 745----4945494549454945
ELECTRICALELECTRICALELECTRICALELECTRICAL
QUALITY CONSULTING ENGINEERS, PLCCQUALITY CONSULTING ENGINEERS, PLCCQUALITY CONSULTING ENGINEERS, PLCCQUALITY CONSULTING ENGINEERS, PLCC
CONTACT: DONNIE JONESCONTACT: DONNIE JONESCONTACT: DONNIE JONESCONTACT: DONNIE JONES
6277627762776277----600 CAROLINA COMMONS DRIVE, #350600 CAROLINA COMMONS DRIVE, #350600 CAROLINA COMMONS DRIVE, #350600 CAROLINA COMMONS DRIVE, #350
INDIAN LAND, SOUTH CAROLINA 29707INDIAN LAND, SOUTH CAROLINA 29707INDIAN LAND, SOUTH CAROLINA 29707INDIAN LAND, SOUTH CAROLINA 29707
T: (803) 207T: (803) 207T: (803) 207T: (803) 207----5450545054505450
FIRE PROTECTIONFIRE PROTECTIONFIRE PROTECTIONFIRE PROTECTION
FOSTER ENGINEERING AND CONSULTING LLCFOSTER ENGINEERING AND CONSULTING LLCFOSTER ENGINEERING AND CONSULTING LLCFOSTER ENGINEERING AND CONSULTING LLC
CONTACT: RALPH FOSTERCONTACT: RALPH FOSTERCONTACT: RALPH FOSTERCONTACT: RALPH FOSTER
COLUMBIA, SC 29206COLUMBIA, SC 29206COLUMBIA, SC 29206COLUMBIA, SC 29206
T. (803) 787T. (803) 787T. (803) 787T. (803) 787----4757475747574757
STRUCTURAL:STRUCTURAL:STRUCTURAL:STRUCTURAL:
K&P ENGINEERING, INC.K&P ENGINEERING, INC.K&P ENGINEERING, INC.K&P ENGINEERING, INC.
CONTACT:CONTACT:CONTACT:CONTACT: DAVID L. PADGETT, JR.DAVID L. PADGETT, JR.DAVID L. PADGETT, JR.DAVID L. PADGETT, JR.
478 HIGHWAY 378 WEST, 478 HIGHWAY 378 WEST, 478 HIGHWAY 378 WEST, 478 HIGHWAY 378 WEST,
LEXINGTON, SC 29072LEXINGTON, SC 29072LEXINGTON, SC 29072LEXINGTON, SC 29072
T: (803) 808T: (803) 808T: (803) 808T: (803) 808----8020802080208020
MECHANICAL AND PLUMBING:MECHANICAL AND PLUMBING:MECHANICAL AND PLUMBING:MECHANICAL AND PLUMBING:
SAVANT ENGINEERING, LLCSAVANT ENGINEERING, LLCSAVANT ENGINEERING, LLCSAVANT ENGINEERING, LLC
CONTACT: RAY VELAZQUEZCONTACT: RAY VELAZQUEZCONTACT: RAY VELAZQUEZCONTACT: RAY VELAZQUEZ
5064 ROSWELL ROAD SUITE D5064 ROSWELL ROAD SUITE D5064 ROSWELL ROAD SUITE D5064 ROSWELL ROAD SUITE D----301301301301
SANDY SPRINGS, GA 30342SANDY SPRINGS, GA 30342SANDY SPRINGS, GA 30342SANDY SPRINGS, GA 30342
T: (407) 374T: (407) 374T: (407) 374T: (407) 374----3640364036403640
SEYMOUR JOHNSON AIR FORCE BASE, NORTH CAROLINA
CIVILCIVILCIVILCIVIL
CCCC----100 PROPOSED SITE PLAN100 PROPOSED SITE PLAN100 PROPOSED SITE PLAN100 PROPOSED SITE PLAN
ADADADAD----1 DEMOLITION FLOOR PLAN1 DEMOLITION FLOOR PLAN1 DEMOLITION FLOOR PLAN1 DEMOLITION FLOOR PLAN
A1A1A1A1----1 FLOOR PLAN1 FLOOR PLAN1 FLOOR PLAN1 FLOOR PLAN
A1A1A1A1----2 SCHEDULES WITH DETAILS2 SCHEDULES WITH DETAILS2 SCHEDULES WITH DETAILS2 SCHEDULES WITH DETAILS
A1A1A1A1----9 ROOF PLAN & ROOF DETAILS9 ROOF PLAN & ROOF DETAILS9 ROOF PLAN & ROOF DETAILS9 ROOF PLAN & ROOF DETAILS
A2A2A2A2----1 EXTERIOR ELEVATIONS1 EXTERIOR ELEVATIONS1 EXTERIOR ELEVATIONS1 EXTERIOR ELEVATIONS
A2A2A2A2----2 EXTERIOR ELEVATIONS2 EXTERIOR ELEVATIONS2 EXTERIOR ELEVATIONS2 EXTERIOR ELEVATIONS
A3A3A3A3----1 BUILDING SECTIONS1 BUILDING SECTIONS1 BUILDING SECTIONS1 BUILDING SECTIONS
A3A3A3A3----1A BUILDING SECTIONS1A BUILDING SECTIONS1A BUILDING SECTIONS1A BUILDING SECTIONS
A3A3A3A3----2 WALL SECTIONS2 WALL SECTIONS2 WALL SECTIONS2 WALL SECTIONS
A601 CEILING PLANA601 CEILING PLANA601 CEILING PLANA601 CEILING PLAN
MMMM----001 MECHANICAL NOTES, 001 MECHANICAL NOTES, 001 MECHANICAL NOTES, 001 MECHANICAL NOTES,
SYMBOLS, DETAILS, AND SYMBOLS, DETAILS, AND SYMBOLS, DETAILS, AND SYMBOLS, DETAILS, AND
SCHEDULESSCHEDULESSCHEDULESSCHEDULES
MMMM----101 MECHANICAL FLOOR PLAN101 MECHANICAL FLOOR PLAN101 MECHANICAL FLOOR PLAN101 MECHANICAL FLOOR PLAN
EEEE----001 ELECTRICAL NOTES, 001 ELECTRICAL NOTES, 001 ELECTRICAL NOTES, 001 ELECTRICAL NOTES,
SYMBOLS, DETAILS, AND SYMBOLS, DETAILS, AND SYMBOLS, DETAILS, AND SYMBOLS, DETAILS, AND
SCHEDULESSCHEDULESSCHEDULESSCHEDULES
EEEE----101 ELECTRICAL FLOOR PLAN 101 ELECTRICAL FLOOR PLAN 101 ELECTRICAL FLOOR PLAN 101 ELECTRICAL FLOOR PLAN ----
POWERPOWERPOWERPOWER
EEEE----201 ELECTRICAL FLOOR PLAN 201 ELECTRICAL FLOOR PLAN 201 ELECTRICAL FLOOR PLAN 201 ELECTRICAL FLOOR PLAN ----
LIGHTINGLIGHTINGLIGHTINGLIGHTING
HTRU
OF
FTUB
TS
RI
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
1
D
2 3
C
4 5
A
B
DE
SC
RIP
TIO
ND
AT
ES
YM
BO
LB
Y
SHEET REFERENCE
NUMBER
SHEET X of X
UN
ITE
D S
TA
TE
S A
IR F
OR
CE
4T
H C
IVIL
EN
GIN
EE
R S
QU
AD
RO
NS
EY
MO
UR
JO
HN
SO
N A
IR F
OR
CE
BA
SE
, N
OR
TH
CA
RO
LIN
A
FIL
E N
AM
E:
SU
BM
ITT
ED
BY
:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DA
TE
:
SO
LIC
ITA
TIO
N N
O.:
CO
NT
RA
CT
NO
.:
CA
TE
GO
RY
CO
DE
:
PL
OT
DA
TE
:P
LO
T S
CA
LE
:S
IZE
: D
22
" x 3
4"
XX
XX
XX
XX
35%
RE
VIE
W S
ET
SEYMOUR JOHNSON - BUILDING 3200
2/8/
2021
2:2
8:47
PM
12" = 1'-0"2/8/2021 2:28:47 PM
G0-0
CC CC OO OOVV VV EE EE
RR RR SS SS HH HH
EE EE EE EETT TT
01/27/21
CONS
TRUC
T AD
DITI
ON, B
UILD
ING
3200
VKAG
18-10
89
2020-096STAFFYKP
STAFF
SCALE
FACILITY
H
T
R
F
U
B
T
I
T
S
R
O
F
U
DATE
SHEET
DRAWN BY
OF
PROJECT NUMBER
TRIRIGA PROJECT NUMBER
PR
OJE
CT
T
IT
LE
DR
AW
IN
G S
HE
ET
N
AM
E
TH
UN
IT
ED
S
TA
TE
S A
IR
F
OR
CE
4 C
IV
IL
E
NG
IN
EE
R S
QU
AD
RO
N
SE
YM
OU
R JO
HN
SO
N A
IR
F
OR
CE
B
AS
E, N
OR
TH
C
AR
OL
IN
A
PR
OJE
CT
P
HA
SE
CO
NT
RA
CT
N
o.
TA
SK
O
RD
ER
N
o.
AP
PR
V'D
DA
TE
DE
SC
RIP
TIO
NR
EV
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
7 8 9 10 111 2 3 4 5 6
H
A
B
C
D
E
F
G
H
S:\104\Pursuits\99999-Seymour Johnson Building 3200\DWG\99999C-SPLAYO.dwg
13 AUG 2018
AS-SHOWN
CENME
1003
C-100
VKAG 18-1089
Value
CO
NS
TR
UC
T A
DD
IT
IO
N, B
LD
G 3
20
0
PR
OP
OS
ED
S
IT
E P
LA
N
DE
SIG
N
N
MAG. VAR. 9°-34'W
MAR '17
M
020'
20' 60'
1"=20'
GENERAL NOTES
1. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND COORDINATE ANY
DISCREPANCIES WITH ENGINEER PRIOR TO BEGINNING WORK.
2. CONTRACTOR TO PROTECT ALL ITEMS TO REMAIN AGAINST DAMAGE DUE TO
DEMOLITION WORK. ALL DAMAGE WITH BE THE RESPONSIBILITY OF THE
CONTRACTOR.
3. CONTRACTOR TO DETERMINE NEW METAL ROOF PEAK HEIGHT. DESIGN TO BE
APPROVED BY ENGINEER PRIOR TO COMMENCING WORK.
4. FINISH FLOOR ELEVATION OF WAREHOUSE TO MATCH BUILDING 3200.
5. INSTALL AND MAINTAIN EROSION AND SEDIMENTATION CONTROL MEASURES AS
REQUIRED.
6. REPAIR AND RESTORE ALL DISTURBED AREAS WITH SOD.
DEMOLITION NOTES
1. REMOVE EXISTING CURB AND GUTTER.
2. REMOVE EXIST CONCRETE AS NEEDED TO INSTALL SUMP PUMP DISCHARGE LINE.
3. REMOVE EXISTING GUY ANCHOR AND CONDUIT.
4. REMOVE EXISTING DUCT BANK, MANHOLES, AND COMMUNICATION LINES AS
NECESSARY TO CONSTRUCT BUILDING AND FOOTINGS. (NEW COMMUNICATION
LINES TO BE INSTALLED BY OTHERS PRIOR TO DEMOLITION)
5. REMOVE EXTERIOR WALL OF EXISTING BUILDING TO MAKE CONNECTION TO NEW
WAREHOUSE.
6. REMOVE EXISTING CONCRETE PAD.
PROPOSED KEYED NOTES
7. NEW CONCRETE LOADING DOCK RAMP WITH GRATED TRENCH DRAIN. PROVIDE
HANDRAILS ALONG WALLS FOR FALL PROTECTION.
8. NEW SUBMERSIBLE SUMP PUMP.
9. NEW STORMWATER DISCHARGE PIPE. CONNECT TO CURB INLET.
10. NEW FIRE PROTECTION LINE. TAPPING SLEEVE AND VALVE CONNECTION TO
EXISTING 10' PVC. CONTRACTOR SHALL FIELD VERIFY SIZE AND MATERIAL.
11. NEW ASPHALT DRIVEWAY.
12. NEW 24" CONCRETE CURB & GUTTER.
13. NEW CONCRETE PAD FOR EXTERIOR DOOR.
14. CONNECT TO EXISTING BUILDING.
15. NEW CMU PASSIVE VEHICLE RATED WALL, MINIMUM OF 18" HEIGHT .
LEGEND
HEAVY DUTY ASPHALT (1.5"/2"/10" ABC)
CONCRETE (8"/8" ABC)
TP
INVERT
ELEV. 1'-8"
INVERT
ELEV. 2'
INVERT
ELEV.
1'-81/2 ''
121.1
103.4
103.8
103.7
103.5
SS
MH
MHCOMM
MH
MH
ELEC. BOXSS
SS
COMM CABLE
UGND
COMM CABLE
UGND
COMM CABLE
UGND
F
F
F
F
F
F
F
F
F
FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFF
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
8
7
9
10
11
3
1
2
5
6
14
13
13
4
15
3
2
0
0
S
T
O
P
M
P
H
5
S
T
O
P
HEAVY DUTY ASPHALT
CONCRETE
PROPOSED 1'-6" CURB AND
GUTTER
PROPOSED 1'-6"
CURB AND GUTTER
TIE PROPOSED
C&G TO EXISTING
TIE PROPOSED C&G TO
EXISTING
EXISTING C&G TO BE
REMOVED
GENERAL NOTES:
A. ALL NOTES ARE TYPICAL AND APPLY TO ALL AREAS (NOTED ABOVE) EVEN WHEN THEY ARE NOT NOTED AT EACH INCIDENT. THE CONTRACTOR IS
RESPONSIBLE FOR COUNTING AND INVENTORYING WORK TO BE COMPLETED AND THE DEFECTS TO BE CORRECTED.
B. PRIOR TO ANY CONSTRUCTION WORK THE CONTRACTOR SHALL ENGAGE A FULLY CERTIFIED AND LICENSED TESTING AGENCY/COMPANY WHICH IS
LICENSED IN THE STATE OF GEORGIA; ALSO, ALL EMPLOYEES SHALL BE TESTED/CERTIFIED/LICENSED IN THE STATE OF GEORGIA FOR THEIR AREA OF
RESPONSIBILITY TO PERFORM A HAZARDOUS MATERIAL SURVEY. TESTING OF MATERIALS SHALL BE FOR MATERIALS TO BE RENOVATED, REPLACED
OR REPAIRED AND SHALL BE TESTED FOR PRESENCE/EXISTENCE OF HAZARDOUS MATERIALS I.E. MOLD, ASBESTOS AND LEAD BASED PAINT.
CONTRACTOR SHALL SUBMIT COMPLETE REPORT FOR REVIEW BY THE GOVERNMENT FOR COMPLETENESS AND CONSIDERATION OF ANY POSSIBLE
ACTIONS REQUIRED TO MODIFY THE CONTRACT OR TO CANCEL.
HTRU
OF
FTUB
TS
RI
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
1
D
2 3
C
4 5
A
B
DE
SC
RIP
TIO
ND
AT
ES
YM
BO
LB
Y
SHEET REFERENCE
NUMBER
SHEET X of X
UN
ITE
D S
TA
TE
S A
IR F
OR
CE
4T
H C
IVIL
EN
GIN
EE
R S
QU
AD
RO
NS
EY
MO
UR
JO
HN
SO
N A
IR F
OR
CE
BA
SE
,
NO
RT
H C
AR
OLIN
A
FIL
E N
AM
E:
SU
BM
ITT
ED
BY
:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DA
TE
:
SO
LIC
ITA
TIO
N N
O.:
CO
NT
RA
CT
NO
.:
CA
TE
GO
RY
CO
DE
:
PL
OT
DA
TE
:P
LO
T S
CA
LE
:S
IZE
: D
22
" x 3
4"
XX
XX
XX
XX
35%
RE
VIE
W S
ET
SEYMOUR JOHNSON - BUILDING 3200
2/11
/202
1 2:
26:0
9 PM
As indicated2/11/2021 2:26:09 PM
AD-1
DD DD EE EEMM MM
OO OOLL LL II II
TT TT II IIOO OO
NN NN FF FF LL LL
OO OOOO OO
RR RR PP PP LL LL
AA AA NN NN
01/27/21
CONS
TRUC
T AD
DITI
ON, B
UILD
ING
3200
VKAG
18-10
89
2020-096AuthorChecker
Author
KEYNOTES - DEMOLITION - FLOOR PLANS
NO. DESCRIPTION A. OWNER IS RESPONSIBLE FOR REMOVING ANY FURNITURE PRIOR TO CONSTRUCTION
B. DEMOLITION PLAN IS NOT ALL INCLUSIVE. ADDITIONAL DEMOLITION WORK MAY BE REQUIRED FOR INSTALLING NEW
WORK. SEE MECHANICAL, PLUMBING AND ELECTRICAL DWGS FOR DEMOLITION IN THOSE TRADES. IN AREAS OR
ROOMS WHERE ARCHITECTURAL DEMOLITION IS NOT INDICATED AND MECHANICAL, PLUMBING AND ELECTRICAL IS
REQUIRED, REMOVE AND REPAIR ANY ITEMS TO ACCOMMODATE WORK REQUIRED AND RESTORE AREA TO ORIGINAL
CONDITIONS BEFORE WORK PROCEEDS.
C. PROTECT ALL EXISTING CONDITIONS THAT ARE TO REMAIN, AS NECESSARY, DURING DEMOLITION PHASE OF
CONSTRUCTION. REPAIR ALL DAMAGE PROMPTLY TO ORIGINAL CONDITION.
D. DEMOLITION SHALL INCLUDE ANY REMOVAL OF EXISTING MATERIALS TO MAKE PROVISION FOR NEW FINISHES.
E. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL EXISTING CONDITIONS. THE ARCHITECT IS TO BE
NOTIFIED OF ANY DISCREPANCIES AND ANY DISCREPANCIES RECTIFIED BEFORE WORK IS TO RESUME.
F. ALL STRUCTURAL ITEMS THAT SEEM TO BE SUSPECT FOR REPLACEMENT SHALL BE INSPECTED BY THE PROJECT
ARCHITECT OR STRUCTURAL ENGINEER TO DETERMINE IF THEY SHOULD BE REPLACED. ALL STRUCTURAL ITEMS THAT
ARE DAMAGED AND NEED REPLACING WILL BE TAGGED BY THE STRUCTURAL ENGINEER AND REPLACED BY THE
CONTRACTOR BEFORE ANY OTHER WORK BEGINS
G. ALL DEMOLITION WORK SHALL BE EXECUTED IN A CAREFUL AND ORDERLY MANNER WITH THE LEAST POSSIBLE NOISE,
DUST AND DISTURBANCE TO THE OTHER TENANTS.
H. THE CONTRACTOR SHALL MAINTAIN AT ALL TIMES ALL EXISTING SMOKE AND FIRE PROTECTION SYSTEMS.
I. THE CONTRACTOR SHALL AT ALL TIMES KEEP ALL EXISTING ACCESS/ EGRESS PATHWAYS FREE AND CLEAR OF DEBRIS.
DEMOLITION NOTES
NORTHNORTHNORTHNORTH
3/8" = 1'-0"
GENERAL NOTESGENERAL NOTESGENERAL NOTESGENERAL NOTES
1/8" = 1'-0"1
DEMOLITION FLOOR PLANDEMOLITION FLOOR PLANDEMOLITION FLOOR PLANDEMOLITION FLOOR PLAN
UP
A2-1
A2-1
A2-2
1
A2-2 2
1
24,003 SF4,003 SF4,003 SF4,003 SF
WAREHOUSEWAREHOUSEWAREHOUSEWAREHOUSE24242424
51 SF51 SF51 SF51 SF
RISER ROOMRISER ROOMRISER ROOMRISER ROOM25252525
1111
A3A3A3A3----1111
12'x12' CAGED12'x12' CAGED12'x12' CAGED12'x12' CAGED
STORAGESTORAGESTORAGESTORAGE
FORKLIFTFORKLIFTFORKLIFTFORKLIFT
CHARGINGCHARGINGCHARGINGCHARGING
STATIONSTATIONSTATIONSTATION
PALLETPALLETPALLETPALLET
WRAPPING WRAPPING WRAPPING WRAPPING
MACHINEMACHINEMACHINEMACHINE
14141414
16161616
17171717
15151515
DOCK LEVELERDOCK LEVELERDOCK LEVELERDOCK LEVELER
24'-10 1/4" 25'-0"
6 1/2"
6 1/
2"
1
1
1
1
2
2 2
2 33
3
3
3
3
3
2222
A3A3A3A3----1111
3'-0" 8'-4" 3'-0"
4'-0
"5'
-4"
6'-0" 5'-4"
2222
A3A3A3A3----1A1A1A1A
367 SF367 SF367 SF367 SF
CONNECTORCONNECTORCONNECTORCONNECTOR26262626
1A3-1A
__________
4
MIN
12'-0
"
55
3
3
3
3
78'-11 5/8"
55'-9
3/4
"
3
SYMBOL DESIGNATION
FOR WALL TYPES INDICATED TO RECEIVE SOUND ATTENUATION, EXTEND SOUND
ATTENUATION TO FULL HEIGHT OF WALL UNLESS OTHERWISE INDICATED. REFER TO
INDIVIDUAL WALL TYPE MODIFIER FOR STC RATINGS.
G 3 A 0
WALL TYPE
STUD/CMU WIDTH
FIRE RATING
WALL TYPE MODIFIER
WALL TYPE MODIFIER
A. 5/8" GYP BD EACH SIDE (NO SAB: STC 40 / WITH SAB: STC 44)
B. 5/8" GYP BD EACH SIDE UL# U465, GA FILE NO: WP1200
(NO SAB: STC 40 / WITH SAB: STC 44)
C. (2) LAYERS 5/8" GYP BD EACH SIDE UL# U411, GA FILE NO: WP1548
(NO SAB: STC 50 / WITH SAB: STC 54)
D. (1) LAYER 1" GYP BD SHAFT SIDE, 2 LAYERS 1/2" GYP BD OTHER SIDE
UL# U438, GA FILE NO: WP 7095 (NO SAB: STC 45 / WITH SAB: STC 49)
E. (1) LAYER 5/8" GYP BD EXPOSED SIDE ONLY
F. NO SHEATHING
G. 7/8" HAT CHANNELS W/ 5/8" GYP BD EACH SIDE
H. 7/8" HAT CHANNELS W/ 5/8" GYP BD ONE SIDE ONLY
J. NO MODIFICATIONS
WITH SOUND
ATTENUATION
NO SOUND
ATTENUATION
X#X# X#X#
FIRE RATING
0 NOT RATED
F FULL HEIGHT, NOT RATED
S PARTITION TO RESIST THE PASSAGE OF SMOKE
B 1 HOUR RATED SMOKE BARRIER
C 2 HOUR RATED SMOKE BARRIER
1 1 HOUR RATED FIRE BARRIER
2 2 HOUR RATED FIRE BARRIER / FIRE WALL
3 3 HOUR RATED FIRE WALL
4 4 HOUR RATED FIRE WALL
PARTITION TO RESIST THE PASSAGE OF SMOKE
WALL HATCH PATTERN LEGEND
1 HOUR RATED FIRE BARRIER
2 HOUR RATED FIRE BARRIER / FIRE WALL
1 HOUR RATED SMOKE BARRIER
2 HOUR RATED SMOKE BARRIER
NON RATED MASONRY
1 HOUR RATED MASONRY FIRE BARRIER (UL# U905)
#
0
1
2
3
4
5
6
7
8
12
METAL
0 7/8"
1 5/8"
2 1/2"
3 5/8"
4"
6"
8"
CMU
3 5/8"
5 5/8"
7 5/8"
11 5/8"
WOOD
1x4
2x4
2x6
2x8
WALL TYPES
C CMU (MAY HAVE FURRING)
G GYPSUM BOARD WITH METAL STUDS
S SHAFTWALL
W GYPSUM BOARD WITH WOOD STUDS
STUD/CMU WIDTH
PARTITION TYPE LEGEND
HTRU
OF
FTUB
TS
RI
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
1
D
2 3
C
4 5
A
B
DE
SC
RIP
TIO
ND
AT
ES
YM
BO
LB
Y
SHEET REFERENCE
NUMBER
SHEET X of X
UN
ITE
D S
TA
TE
S A
IR F
OR
CE
4T
H C
IVIL
EN
GIN
EE
R S
QU
AD
RO
NS
EY
MO
UR
JO
HN
SO
N A
IR F
OR
CE
BA
SE
,
NO
RT
H C
AR
OLIN
A
FIL
E N
AM
E:
SU
BM
ITT
ED
BY
:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DA
TE
:
SO
LIC
ITA
TIO
N N
O.:
CO
NT
RA
CT
NO
.:
CA
TE
GO
RY
CO
DE
:
PL
OT
DA
TE
:P
LO
T S
CA
LE
:S
IZE
: D
22
" x 3
4"
XX
XX
XX
XX
35%
RE
VIE
W S
ET
SEYMOUR JOHNSON - BUILDING 3200
2/8/
2021
2:2
8:24
PM
As indicated2/8/2021 2:28:24 PM
A1-1
FF FF LL LLOO OO
OO OORR RR
PP PP LL LLAA AA NN NN
01/27/21
CONS
TRUC
T AD
DITI
ON, B
UILD
ING
3200
VKAG
18-10
89
2020-096STAFFYKP
STAFF
KEYNOTES - NEW WORK - FLOOR PLANSNO. DESCRIPTION
1 PROVIDE 4" BLOCK VENEER
2 PROVIDE 3' HIGH STEEL BOLLARD FILLED W/C CONCRETE. EMBED 4" MIN. IN 24" DIAM. FOOTING
3 PREFINISHED METAL DOWNSPOUT AND CONCRETE SPLASH BLOCK.
4 NEW WORK BENCH W/ SOLID SURFACE COUNTER TOP. MIN. 12' LENGTH. PROVIDE POWER (2X DUPLEX), 2X COMM AND PENDENT TAKS LIGHTING
5 3' 6" HIGH TUBULAR STEEL GUARDRAIL
1/8" = 1'-0"1
NEW WORK FLOOR PLANNEW WORK FLOOR PLANNEW WORK FLOOR PLANNEW WORK FLOOR PLAN NORTHNORTHNORTHNORTH
1 1/2" = 1'-0"
LEGEND LEGEND LEGEND LEGEND ---- WALL TYPES WALL TYPES WALL TYPES WALL TYPES ---- HORIZONTALHORIZONTALHORIZONTALHORIZONTAL
0' 4' 8' 16' 32'
SCALE: 1/8" = 1'-0"
HMHOLLOW METAL
Notes:
Type HNG is always a rated door with fire glass.
(100 in2,max.)
At all other doors where a rating is reqd, provide
fire glass in lieu of indicated safety glass.
At exterior doors, provide insulated glass in lieu
of indicated safety glass.
"V" indicates that dimension varies with door size.
Width
Hei
ght
3/4"
und
ercu
t
12'-0
"
12'-0"
OCOVERHEAD 432 SECTIONAL DOOR
Hei
ght
Width
3/4"
und
ercu
t
SG
HN2HOLLOW METAL
NARROW GLASS 2
V 8" 8"
9"V
3'-6
"
Width
Hei
ght
2" Width 2"
Hei
ght
2"
HM1HOLLOW METAL
2" Width 2"
Hei
ght
2"
HM2HOLLOW METAL
2" Width 2"
Hei
ght
2"
HM3HOLLOW TUBE METAL
07 9200 - SEALANT CONTINUOUS
AROUND FRAME
04 2000 - CMU. REFER TO
STRUCTURAL DRAWINGS FOR
REINFORCING.
08 1113 - HOLLOW METAL FRAME
03 3053 - GROUT FRAME SOLID
08 1113 - ANCHOR AS REQUIRED
07 9200 - SEALANT
CONTINUOUS
AROUND FRAME
04 2000 - CMU BOND
BEAM, REFER TO
STRUCTURAL
DRAWINGS FOR
REINFORCING
08 1113 HOLLOW
METAL FRAME
03 3053 GROUT
FRAME SOLID
PER PLAN
WIDTH
07 2100 - CONTINUOUS 1
1/2" RIGID INSULATION.
APPLY WITH MASTIC
AFTER DAMPPROOFING IS
IN PLACE.
04 2000 - WEEPS AT 24"
O/C.
05 5000 - LOOSE STEEL LINTEL., 5"X
5" STEEL ANGLE
04 2000 UNIT MASONRY
04 2000- CMU VENEER
07 9200 - JOINT
PROTECTION
CONTINUOUS AROUND
FRAME
04 2000 - CMU BOND
BEAM, REFER TO
STRUCTURAL DRAWINGS
FOR REINFORCING
04 2000 - MORTAR NET 10" H
07 1113 - DISCONTINUE
DAMPPROOFING ONE INCH
FROM FACE OF CMU.
07 9200 - PROVIDE SEALANT AND
BACKER ROD BETWEEN
ANODIZED OPENING FLASHING
AND DOOR FRAME
07 6200 - ANODIZED
OPENING FLASHING. PROVIDE
THREE SIDES AT EACH DOOR
OPENING. REFER TO DETAILS
ON A2-5 FOR ADDED
INSTALLATION
INFORMATION. SEPARATE
FROM LINTEL ANGLE WITH
BITUMASTIC COATING. (KEEP
COATING OFF OF EXPOSED
PORTION OF FLASHING.)
07 6500 - ADHERE FLEXIBLE
FLASHING OVER JOINT
BETWEEN OPENING FLASHING
AND HEAD FLASHING.
07 6200 - METAL HEAD
FLASHING. LAP HEAD
FLASHING OVER ANODIZED
OPENING FLASHING 2"
MINIMUM. TERMINATE EACH
END WITH BEAD OF POINTING
MASTIC.
07 6200 - METAL DRIP PROVIDE
HEMMED EDGE AND COMPRESS
FLAT.
07 1113 - BITUMINOUS DAMPPROOFING
Drainage Plan
06 1000 - PT 2X6
BLOCKING, SECURED TO
CMU
8"
SEE PLAN
VARIES
08 1214 HOLLOW
METAL FRAME
03 0600 GROUT FRAME SOLID
5 1/2" 7 3/4"
08 1113 - INSULATED
HOLLOW METAL DOOR
07 1113 - DISCONTINUE
DAMPPROOFING ONE INCH
FROM FACE OF CMU.07 9200 - PROVIDE SEALANT AND
BACKER ROD BETWEEN BRICK AND
ANODIZED OPENING FLASHING AND
BETWEEN ANODIZED OPENING
FLASHING AND DOOR FRAME
07 6500 - ADHERE FLEXIBLE
FLASHING OVER JOINT BETWEEN
OPENING FLASHING AND AIR
BARRIER (DAMP PROOFING)
SYSTEM.
07 6200 - ANODIZED
OPENING FLASHING.
PROVIDE FOUR SIDES AT
OPENING. REFER TO
DETAILS ON A2-5 FOR
ADDED INSTALLATION
INFORMATION.
07 1113 - BITUMINOUS
DAMPPROOFING
04 2000 - CMU VENEER.
RETURN CMU AT JAMBS OF
OPENINGS.
07 9200 -JOINT
PROTECTION CONTINUOUS
AROUND FRAME
04 2000 - CMU , REFER
TO STRUCTURAL
DRAWINGS FOR
REINFORCING
Drainage Plan
06 1000 - PT 2X4 BLOCKING,
SECURED TO CMU
07 2115 - 1 1/2 RIGID
INSULATION APPLY WITH
MASTIC AFTER
DAMPPROOFING IS IN PLACE
08 1214 - HOLLOW METAL
FRAME
03 0600 - GROUT FRAME
SOLID
08 1113 - INSULATED HOLLOW
METAL DOOR
5 1/2" 1 15/16" 4 1/4" 1 9/16"
08 1113 - ANCHOR AS
REQUIRED
04 2000 - BULLNOSE CMU
AT DOOR JAMBS
HTRU
OF
FTUB
TS
RI
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
1
D
2 3
C
4 5
A
B
DE
SC
RIP
TIO
ND
AT
ES
YM
BO
LB
Y
SHEET REFERENCE
NUMBER
SHEET X of X
UN
ITE
D S
TA
TE
S A
IR F
OR
CE
4T
H C
IVIL
EN
GIN
EE
R S
QU
AD
RO
NS
EY
MO
UR
JO
HN
SO
N A
IR F
OR
CE
BA
SE
,
NO
RT
H C
AR
OLIN
A
FIL
E N
AM
E:
SU
BM
ITT
ED
BY
:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DA
TE
:
SO
LIC
ITA
TIO
N N
O.:
CO
NT
RA
CT
NO
.:
CA
TE
GO
RY
CO
DE
:
PL
OT
DA
TE
:P
LO
T S
CA
LE
:S
IZE
: D
22
" x 3
4"
XX
XX
XX
XX
35%
RE
VIE
W S
ET
SEYMOUR JOHNSON - BUILDING 3200
2/8/
2021
2:2
8:29
PM
As indicated2/8/2021 2:28:29 PM
A1-2
SS SS CC CCHH HH EE EE
DD DD UU UULL LL EE EE
SS SS WW WW
II II TT TTHH HH
DD DD EE EETT TT AA AA
II II LL LLSS SS
01/27/21
CONS
TRUC
T AD
DITI
ON, B
UILD
ING
3200
VKAG
18-10
89
2020-096STAFFYKP
STAFF
DOOR SCHEDULE WM2AOPNG NO Qnty FROM ROOM TO ROOM FullWidth Height Door Type Frame Type Head Dtl Jamb Dtl Rated Opng COMMENTS
14 Sngl - Swinging WAREHOUSE 3'-0" 7'-0" HM HM1 CA CA NR
15 Sngl - Swinging RISER ROOM 3'-0" 7'-0" HM HM2 CA CA NR
16 WAREHOUSE
17 WAREHOUSE
23 Pair - Swinging CONNECTOR 5'-0" 7'-0" HM HM1 CA CA NR
24 Pair - Swinging CONNECTOR WAREHOUSE 6'-0" 7'-4" HM HM1 CA CA NR
3/8" = 1'-0"
FRAME ELEVATIONFRAME ELEVATIONFRAME ELEVATIONFRAME ELEVATION
3" = 1'-0"1
JAMB CAJAMB CAJAMB CAJAMB CA---- HM at CMU InteriorHM at CMU InteriorHM at CMU InteriorHM at CMU Interior3" = 1'-0"
6HEAD CA HEAD CA HEAD CA HEAD CA ---- HM at CMU InteriorHM at CMU InteriorHM at CMU InteriorHM at CMU Interior
3" = 1'-0"8
HEAD HEAD HEAD HEAD ---- HM Frame at CMU VENEER / CMUHM Frame at CMU VENEER / CMUHM Frame at CMU VENEER / CMUHM Frame at CMU VENEER / CMU
3" = 1'-0"2
JAMB JAMB JAMB JAMB ---- HM Frame at Brick / CMUHM Frame at Brick / CMUHM Frame at Brick / CMUHM Frame at Brick / CMU
Overhead Coiling Door
Overhead Coiling Door 12'-0" 12'-0"
12'-0" 12'-0" OC HM3
OC HM3
2222
A1A1A1A1----9999
1111
A3A3A3A3----1111
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND
CONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCK
6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED
METAL GUTTER BY P.E.M.B. SUPPLIER METAL GUTTER BY P.E.M.B. SUPPLIER METAL GUTTER BY P.E.M.B. SUPPLIER METAL GUTTER BY P.E.M.B. SUPPLIER
W/SLIP JOINT 32' O.C. MAXW/SLIP JOINT 32' O.C. MAXW/SLIP JOINT 32' O.C. MAXW/SLIP JOINT 32' O.C. MAX
"PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER
ROOF COLOR "BLUE" TO BE CHOSEN FROM MFG ROOF COLOR "BLUE" TO BE CHOSEN FROM MFG ROOF COLOR "BLUE" TO BE CHOSEN FROM MFG ROOF COLOR "BLUE" TO BE CHOSEN FROM MFG
STANDARD COLOR CHARTSSTANDARD COLOR CHARTSSTANDARD COLOR CHARTSSTANDARD COLOR CHARTS
ROOF RIDGE CAPROOF RIDGE CAPROOF RIDGE CAPROOF RIDGE CAP
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND
CONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCK
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND
CONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCK
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND
CONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCK6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED
METAL GUTTER BY P.E.M.B. SUPPLIER METAL GUTTER BY P.E.M.B. SUPPLIER METAL GUTTER BY P.E.M.B. SUPPLIER METAL GUTTER BY P.E.M.B. SUPPLIER
W/SLIP JOINT 32' O.C. MAXW/SLIP JOINT 32' O.C. MAXW/SLIP JOINT 32' O.C. MAXW/SLIP JOINT 32' O.C. MAX
"PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER
ROOF COLOR "BLUE" TO BE CHOSEN FROM MFG ROOF COLOR "BLUE" TO BE CHOSEN FROM MFG ROOF COLOR "BLUE" TO BE CHOSEN FROM MFG ROOF COLOR "BLUE" TO BE CHOSEN FROM MFG
STANDARD COLOR CHARTSSTANDARD COLOR CHARTSSTANDARD COLOR CHARTSSTANDARD COLOR CHARTS
3"
/ 12
"3
" /
12
"
6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED
METAL GUTTER BY P.E.M.B. SUPPLIER METAL GUTTER BY P.E.M.B. SUPPLIER METAL GUTTER BY P.E.M.B. SUPPLIER METAL GUTTER BY P.E.M.B. SUPPLIER
W/SLIP JOINT 32' O.C. MAXW/SLIP JOINT 32' O.C. MAXW/SLIP JOINT 32' O.C. MAXW/SLIP JOINT 32' O.C. MAX
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND
CONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCK
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND
CONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCK
2222
A3A3A3A3----1111
2222
A3A3A3A3----1A1A1A1A
REMOVE EXISTING ROOF PANELS AS REMOVE EXISTING ROOF PANELS AS REMOVE EXISTING ROOF PANELS AS REMOVE EXISTING ROOF PANELS AS
REQUIRED TO INSTALL OVERBUILD FRAMING. REQUIRED TO INSTALL OVERBUILD FRAMING. REQUIRED TO INSTALL OVERBUILD FRAMING. REQUIRED TO INSTALL OVERBUILD FRAMING.
INSTALL NEW VALLEY FLASHING.INSTALL NEW VALLEY FLASHING.INSTALL NEW VALLEY FLASHING.INSTALL NEW VALLEY FLASHING.
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND DOWNSPOUT BY P.E.M.B. SUPPLIER AND
CONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCKCONCRETE SPLASH BLOCK
PANEL CLIP &PANEL CLIP &PANEL CLIP &PANEL CLIP &
FASTENERFASTENERFASTENERFASTENER
MASTICMASTICMASTICMASTIC
RIDGE FLASHINGRIDGE FLASHINGRIDGE FLASHINGRIDGE FLASHING
ROOF FASTENERROOF FASTENERROOF FASTENERROOF FASTENER
LOCLOCLOCLOC----SEAMSEAMSEAMSEAM
ROOF PANELROOF PANELROOF PANELROOF PANEL
RIDGE CLOSURERIDGE CLOSURERIDGE CLOSURERIDGE CLOSURE
ZEEZEEZEEZEE
RIDGE PURLINRIDGE PURLINRIDGE PURLINRIDGE PURLIN
MASTICMASTICMASTICMASTIC
ROOF FASTENERROOF FASTENERROOF FASTENERROOF FASTENER
LEVEL 2LEVEL 2LEVEL 2LEVEL 214'14'14'14'----0"0"0"0"
ROOF FASTENERROOF FASTENERROOF FASTENERROOF FASTENER
"PBR" STYLE 24 GAUGE "PBR" STYLE 24 GAUGE "PBR" STYLE 24 GAUGE "PBR" STYLE 24 GAUGE
EXPOSED FASTENER ROOF PANELEXPOSED FASTENER ROOF PANELEXPOSED FASTENER ROOF PANELEXPOSED FASTENER ROOF PANEL
THERMAL SPACERTHERMAL SPACERTHERMAL SPACERTHERMAL SPACER
GUTTER. PROFILE GUTTER. PROFILE GUTTER. PROFILE GUTTER. PROFILE
BY MNFR.BY MNFR.BY MNFR.BY MNFR.
GUTTER BRACKET & GUTTER BRACKET & GUTTER BRACKET & GUTTER BRACKET &
FASTENER SET IN FASTENER SET IN FASTENER SET IN FASTENER SET IN
BED OF MASTICBED OF MASTICBED OF MASTICBED OF MASTIC
PREFINISHED MTL PREFINISHED MTL PREFINISHED MTL PREFINISHED MTL
GABLE FLASHINGGABLE FLASHINGGABLE FLASHINGGABLE FLASHING
METAL SOFFIT & FASCIA METAL SOFFIT & FASCIA METAL SOFFIT & FASCIA METAL SOFFIT & FASCIA
PANELS OVER HAT PANELS OVER HAT PANELS OVER HAT PANELS OVER HAT
CHANNELS. FIELD CUT CHANNELS. FIELD CUT CHANNELS. FIELD CUT CHANNELS. FIELD CUT
AS REQUIREDAS REQUIREDAS REQUIREDAS REQUIRED
WALL FASTENERWALL FASTENERWALL FASTENERWALL FASTENER
4"3"
2 1/4" 4 3/4"
6"
3/4"
7/8"
3/8"
1/2"
7"
7"
HTRU
OF
FTUB
TS
RI
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
1
D
2 3
C
4 5
A
B
DE
SC
RIP
TIO
ND
AT
ES
YM
BO
LB
Y
SHEET REFERENCE
NUMBER
SHEET X of X
UN
ITE
D S
TA
TE
S A
IR F
OR
CE
4T
H C
IVIL
EN
GIN
EE
R S
QU
AD
RO
NS
EY
MO
UR
JO
HN
SO
N A
IR F
OR
CE
BA
SE
,
NO
RT
H C
AR
OLIN
A
FIL
E N
AM
E:
SU
BM
ITT
ED
BY
:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DA
TE
:
SO
LIC
ITA
TIO
N N
O.:
CO
NT
RA
CT
NO
.:
CA
TE
GO
RY
CO
DE
:
PL
OT
DA
TE
:P
LO
T S
CA
LE
:S
IZE
: D
22
" x 3
4"
XX
XX
XX
XX
35%
RE
VIE
W S
ET
SEYMOUR JOHNSON - BUILDING 3200
2/8/
2021
2:2
8:30
PM
As indicated2/8/2021 2:28:30 PM
A1-9
ROO
F PL
AN &
RO
OF
ROO
F PL
AN &
RO
OF
ROO
F PL
AN &
RO
OF
ROO
F PL
AN &
RO
OF
DD DD EE EETT TT AA AA
II II LL LLSS SS
01/27/21
CONS
TRUC
T AD
DITI
ON, B
UILD
ING
3200
VKAG
18-10
89
2020-096STAFFYKP
STAFF
1/8" = 1'-0"1
ROOF PLAN ROOF PLAN ROOF PLAN ROOF PLAN ---- NEW WORKNEW WORKNEW WORKNEW WORK
0' 4' 8' 16' 32'
SCALE: 1/8" = 1'-0"
3" = 1'-0"2
RIDGE CAPRIDGE CAPRIDGE CAPRIDGE CAP
KEYNOTES - DEMOLITION - FLOOR PLANS
NO. DESCRIPTION
1 1/2" = 1'-0"3
ROOF EAVE DETAILROOF EAVE DETAILROOF EAVE DETAILROOF EAVE DETAIL6" = 1'-0"
4GUTTER PROFILEGUTTER PROFILEGUTTER PROFILEGUTTER PROFILEUPDATE FOR HIP ROOFUPDATE FOR HIP ROOFUPDATE FOR HIP ROOFUPDATE FOR HIP ROOF
1111
A3A3A3A3----1111
"PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER
ROOF COLOR "BLUE" TO BE CHOSEN FROM ROOF COLOR "BLUE" TO BE CHOSEN FROM ROOF COLOR "BLUE" TO BE CHOSEN FROM ROOF COLOR "BLUE" TO BE CHOSEN FROM
MFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTS
6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED
METAL GUTTERMETAL GUTTERMETAL GUTTERMETAL GUTTER
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCK4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK
W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN
BY CONTRACTING OFFICERBY CONTRACTING OFFICERBY CONTRACTING OFFICERBY CONTRACTING OFFICER
FINISH GRADE TO BE MIN 6" FINISH GRADE TO BE MIN 6" FINISH GRADE TO BE MIN 6" FINISH GRADE TO BE MIN 6"
BELOW FINISH FLOORBELOW FINISH FLOORBELOW FINISH FLOORBELOW FINISH FLOOR
RIDGE TRIMRIDGE TRIMRIDGE TRIMRIDGE TRIM
6" DIA. STEEL BOLLARDS6" DIA. STEEL BOLLARDS6" DIA. STEEL BOLLARDS6" DIA. STEEL BOLLARDS
2222
A3A3A3A3----1A1A1A1A
LOADING RAMPLOADING RAMPLOADING RAMPLOADING RAMP----4'4'4'4'----0"0"0"0"
EXTERIOR WALL PACK LIGHTEXTERIOR WALL PACK LIGHTEXTERIOR WALL PACK LIGHTEXTERIOR WALL PACK LIGHT
"PBR" STYLE 24 GAUGE EXPOSED "PBR" STYLE 24 GAUGE EXPOSED "PBR" STYLE 24 GAUGE EXPOSED "PBR" STYLE 24 GAUGE EXPOSED
FASTENER ROOF COLOR "BLUE" TO BE FASTENER ROOF COLOR "BLUE" TO BE FASTENER ROOF COLOR "BLUE" TO BE FASTENER ROOF COLOR "BLUE" TO BE
CHOSEN FROM MFG STANDARD COLOR CHOSEN FROM MFG STANDARD COLOR CHOSEN FROM MFG STANDARD COLOR CHOSEN FROM MFG STANDARD COLOR
CHARTSCHARTSCHARTSCHARTS
6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED
METAL GUTTERMETAL GUTTERMETAL GUTTERMETAL GUTTER
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCK
26 GA ZINC COATED PREFINISHED 26 GA ZINC COATED PREFINISHED 26 GA ZINC COATED PREFINISHED 26 GA ZINC COATED PREFINISHED
METAL WALL PANEL SOFFIT/FASCIA METAL WALL PANEL SOFFIT/FASCIA METAL WALL PANEL SOFFIT/FASCIA METAL WALL PANEL SOFFIT/FASCIA
COLOR "BLUE" TO BE CHOSEN FROM COLOR "BLUE" TO BE CHOSEN FROM COLOR "BLUE" TO BE CHOSEN FROM COLOR "BLUE" TO BE CHOSEN FROM
MFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTS
RIDGE TRIMRIDGE TRIMRIDGE TRIMRIDGE TRIM
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCK
4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK
W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN
BY CONTRACTING OFFICERBY CONTRACTING OFFICERBY CONTRACTING OFFICERBY CONTRACTING OFFICER
CHAIN LINK FENCECHAIN LINK FENCECHAIN LINK FENCECHAIN LINK FENCE
2222
A3A3A3A3----1111
1A3-1A
__________
EXTERIOR WALL PACK LIGHTEXTERIOR WALL PACK LIGHTEXTERIOR WALL PACK LIGHTEXTERIOR WALL PACK LIGHT
HTRU
OF
FTUB
TS
RI
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
1
D
2 3
C
4 5
A
B
DE
SC
RIP
TIO
ND
AT
ES
YM
BO
LB
Y
SHEET REFERENCE
NUMBER
SHEET X of X
UN
ITE
D S
TA
TE
S A
IR F
OR
CE
4T
H C
IVIL
EN
GIN
EE
R S
QU
AD
RO
NS
EY
MO
UR
JO
HN
SO
N A
IR F
OR
CE
BA
SE
,
NO
RT
H C
AR
OLIN
A
FIL
E N
AM
E:
SU
BM
ITT
ED
BY
:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DA
TE
:
SO
LIC
ITA
TIO
N N
O.:
CO
NT
RA
CT
NO
.:
CA
TE
GO
RY
CO
DE
:
PL
OT
DA
TE
:P
LO
T S
CA
LE
:S
IZE
: D
22
" x 3
4"
XX
XX
XX
XX
35%
RE
VIE
W S
ET
SEYMOUR JOHNSON - BUILDING 3200
2/8/
2021
2:2
8:31
PM
1/4" = 1'-0"2/8/2021 2:28:31 PM
A2-1
EE EE XX XXTT TT EE EE
RR RR II IIOO OO
RR RR EE EE LL LL
EE EE VV VVAA AA TT TT
II II OO OONN NN SS SS
01/27/21
CONS
TRUC
T AD
DITI
ON, B
UILD
ING
3200
VKAG
18-10
89
2020-096STAFFYKP
STAFF
KEYNOTES - NEW WORK - ELEVATIONS
NO. DESCRIPTION
1/4" = 1'-0"1
NEW NORTH ELEVATIONNEW NORTH ELEVATIONNEW NORTH ELEVATIONNEW NORTH ELEVATION
1/4" = 1'-0"2
NEW EAST ELEVATIONNEW EAST ELEVATIONNEW EAST ELEVATIONNEW EAST ELEVATION
0' 4' 8' 16' 32'
SCALE: 1/4" = 1'-0"
0' 4' 8' 16' 32'
SCALE: 1/4" = 1'-0"
LEVEL 1LEVEL 1LEVEL 1LEVEL 10"0"0"0"
LEVEL 2LEVEL 2LEVEL 2LEVEL 214'14'14'14'----0"0"0"0"
1111
A3A3A3A3----1111
"PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER
ROOF COLOR "BLUE" TO BE CHOSEN FROM ROOF COLOR "BLUE" TO BE CHOSEN FROM ROOF COLOR "BLUE" TO BE CHOSEN FROM ROOF COLOR "BLUE" TO BE CHOSEN FROM
MFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTS
6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED
METAL GUTTERMETAL GUTTERMETAL GUTTERMETAL GUTTER
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCK
26 GA ZINC COATED PREFINISHED 26 GA ZINC COATED PREFINISHED 26 GA ZINC COATED PREFINISHED 26 GA ZINC COATED PREFINISHED
METAL WALL PANEL SOFFIT/FASCIA. METAL WALL PANEL SOFFIT/FASCIA. METAL WALL PANEL SOFFIT/FASCIA. METAL WALL PANEL SOFFIT/FASCIA.
COLOR "BLUE" TO BE CHOSEN FROM COLOR "BLUE" TO BE CHOSEN FROM COLOR "BLUE" TO BE CHOSEN FROM COLOR "BLUE" TO BE CHOSEN FROM
MFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTS
RIDGE TRIMRIDGE TRIMRIDGE TRIMRIDGE TRIM
CHAIN LINK FENCE
2222
A3A3A3A3----1A1A1A1A
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCK
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCK
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCK
4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK
W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN
BY CONTRACTING OFFICERBY CONTRACTING OFFICERBY CONTRACTING OFFICERBY CONTRACTING OFFICER
"PBR" STYLE 24 GAUGE EXPOSED "PBR" STYLE 24 GAUGE EXPOSED "PBR" STYLE 24 GAUGE EXPOSED "PBR" STYLE 24 GAUGE EXPOSED
FASTENER ROOF COLOR "BLUE" TO BE FASTENER ROOF COLOR "BLUE" TO BE FASTENER ROOF COLOR "BLUE" TO BE FASTENER ROOF COLOR "BLUE" TO BE
CHOSEN FROM MFG STANDARD COLOR CHOSEN FROM MFG STANDARD COLOR CHOSEN FROM MFG STANDARD COLOR CHOSEN FROM MFG STANDARD COLOR
CHARTSCHARTSCHARTSCHARTS 6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED6" 26 GA PREFINISHED
METAL GUTTERMETAL GUTTERMETAL GUTTERMETAL GUTTER
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCK
26 GA ZINC COATED PREFINISHED METAL WALL 26 GA ZINC COATED PREFINISHED METAL WALL 26 GA ZINC COATED PREFINISHED METAL WALL 26 GA ZINC COATED PREFINISHED METAL WALL
PANEL COLOR "BLUE" TO BE CHOSEN FROM PANEL COLOR "BLUE" TO BE CHOSEN FROM PANEL COLOR "BLUE" TO BE CHOSEN FROM PANEL COLOR "BLUE" TO BE CHOSEN FROM
MFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTSMFG STANDARD COLOR CHARTS
RIDGE TRIMRIDGE TRIMRIDGE TRIMRIDGE TRIM
4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL 4" 26 GA PREFINISHED METAL
DOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCKDOWNSPOUT AND SPLASH BLOCK
4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK 4" THICK STANDARD CMU BLOCK
W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN W/ PAINT COLOR TO BE CHOSEN
BY CONTRACTING OFFICERBY CONTRACTING OFFICERBY CONTRACTING OFFICERBY CONTRACTING OFFICER
CHAIN LINK FENCE
2222
A3A3A3A3----1111
1A3-1A
__________
FEW FASCIA HEIGHT TO FEW FASCIA HEIGHT TO FEW FASCIA HEIGHT TO FEW FASCIA HEIGHT TO
MATCH EXISTINGMATCH EXISTINGMATCH EXISTINGMATCH EXISTING
4" 26 GA PREFINISHED 4" 26 GA PREFINISHED 4" 26 GA PREFINISHED 4" 26 GA PREFINISHED
METAL DOWNSPOUT AND METAL DOWNSPOUT AND METAL DOWNSPOUT AND METAL DOWNSPOUT AND
SPLASH BLOCKSPLASH BLOCKSPLASH BLOCKSPLASH BLOCK
4" 26 GA PREFINISHED 4" 26 GA PREFINISHED 4" 26 GA PREFINISHED 4" 26 GA PREFINISHED
METAL DOWNSPOUT AND METAL DOWNSPOUT AND METAL DOWNSPOUT AND METAL DOWNSPOUT AND
SPLASH BLOCKSPLASH BLOCKSPLASH BLOCKSPLASH BLOCK
HTRU
OF
FTUB
TS
RI
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
1
D
2 3
C
4 5
A
B
DE
SC
RIP
TIO
ND
AT
ES
YM
BO
LB
Y
SHEET REFERENCE
NUMBER
SHEET X of X
UN
ITE
D S
TA
TE
S A
IR F
OR
CE
4T
H C
IVIL
EN
GIN
EE
R S
QU
AD
RO
NS
EY
MO
UR
JO
HN
SO
N A
IR F
OR
CE
BA
SE
,
NO
RT
H C
AR
OLIN
A
FIL
E N
AM
E:
SU
BM
ITT
ED
BY
:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DA
TE
:
SO
LIC
ITA
TIO
N N
O.:
CO
NT
RA
CT
NO
.:
CA
TE
GO
RY
CO
DE
:
PL
OT
DA
TE
:P
LO
T S
CA
LE
:S
IZE
: D
22
" x 3
4"
XX
XX
XX
XX
35%
RE
VIE
W S
ET
SEYMOUR JOHNSON - BUILDING 3200
2/8/
2021
2:2
8:33
PM
1/4" = 1'-0"2/8/2021 2:28:33 PM
A2-2
EE EE XX XXTT TT EE EE
RR RR II IIOO OO
RR RR EE EE LL LL
EE EE VV VVAA AA TT TT
II II OO OONN NN SS SS
01/27/21
CONS
TRUC
T AD
DITI
ON, B
UILD
ING
3200
VKAG
18-10
89
2020-096STAFFYKP
STAFF
1/4" = 1'-0"1
NEW SOUTH ELEVATIONNEW SOUTH ELEVATIONNEW SOUTH ELEVATIONNEW SOUTH ELEVATION
1/4" = 1'-0"2
NEW WEST ELEVAIONNEW WEST ELEVAIONNEW WEST ELEVAIONNEW WEST ELEVAION
0' 4' 8' 16' 32'
SCALE: 1/4" = 1'-0"
0' 4' 8' 16' 32'
SCALE: 1/4" = 1'-0"
KEYNOTES - NEW WORK - ELEVATIONS
NO. DESCRIPTION
LEVEL 1LEVEL 1LEVEL 1LEVEL 10"0"0"0"
LEVEL 2LEVEL 2LEVEL 2LEVEL 214'14'14'14'----0"0"0"0"
CONCRETE FOOTING, DIMENSIONS CONCRETE FOOTING, DIMENSIONS CONCRETE FOOTING, DIMENSIONS CONCRETE FOOTING, DIMENSIONS
& REINFORCEMENT TBD& REINFORCEMENT TBD& REINFORCEMENT TBD& REINFORCEMENT TBD
"PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER "PBR" STYLE 24 GAUGE EXPOSED FASTENER
ROOF COLOR "BLUE" TO BE CHOSEN FROM ROOF COLOR "BLUE" TO BE CHOSEN FROM ROOF COLOR "BLUE" TO BE CHOSEN FROM ROOF COLOR "BLUE" TO BE CHOSEN FROM
MFGMFGMFGMFG STANDARD COLORSSTANDARD COLORSSTANDARD COLORSSTANDARD COLORS
PREFINISHED METAL PREFINISHED METAL PREFINISHED METAL PREFINISHED METAL
GUTTER AND DOWNSPOUTGUTTER AND DOWNSPOUTGUTTER AND DOWNSPOUTGUTTER AND DOWNSPOUT
INSULATED SECTIONAL DOOR INSULATED SECTIONAL DOOR INSULATED SECTIONAL DOOR INSULATED SECTIONAL DOOR
RIDGE FLASHINGRIDGE FLASHINGRIDGE FLASHINGRIDGE FLASHING
PREFABRICATED METAL PREFABRICATED METAL PREFABRICATED METAL PREFABRICATED METAL
STUDS @ 48" O.C.STUDS @ 48" O.C.STUDS @ 48" O.C.STUDS @ 48" O.C.
RRRR----38 VINYL FACED 38 VINYL FACED 38 VINYL FACED 38 VINYL FACED
INSULATION BETWEENINSULATION BETWEENINSULATION BETWEENINSULATION BETWEEN
TRUSS CHORDSTRUSS CHORDSTRUSS CHORDSTRUSS CHORDS
METAL DECKINGMETAL DECKINGMETAL DECKINGMETAL DECKING
CONCRETE FOOTING, DIMENSIONS CONCRETE FOOTING, DIMENSIONS CONCRETE FOOTING, DIMENSIONS CONCRETE FOOTING, DIMENSIONS
& REINFORCEMENT TBD& REINFORCEMENT TBD& REINFORCEMENT TBD& REINFORCEMENT TBD
4" VENEER CMU 4" VENEER CMU 4" VENEER CMU 4" VENEER CMU
A3A3A3A3----2222
3333
2222
A3A3A3A3----1111
A3A3A3A3----2222
4444
LOADING RAMPLOADING RAMPLOADING RAMPLOADING RAMP----4'4'4'4'----0"0"0"0"
MECHANICAL EDGEMECHANICAL EDGEMECHANICAL EDGEMECHANICAL EDGE----OFOFOFOF----
DOCK LEVELERDOCK LEVELERDOCK LEVELERDOCK LEVELER
1A3-1A
__________
CONCRETE SLAB OVER GRAVEL BASECONCRETE SLAB OVER GRAVEL BASECONCRETE SLAB OVER GRAVEL BASECONCRETE SLAB OVER GRAVEL BASE
& 10 MIL VAPOR BARRIER& 10 MIL VAPOR BARRIER& 10 MIL VAPOR BARRIER& 10 MIL VAPOR BARRIER
METAL LINER PANEL SECURE TO METAL LINER PANEL SECURE TO METAL LINER PANEL SECURE TO METAL LINER PANEL SECURE TO
STRUCTURE ON ALL SURFACES STRUCTURE ON ALL SURFACES STRUCTURE ON ALL SURFACES STRUCTURE ON ALL SURFACES
ABOVE BLOCK TERMINATIONABOVE BLOCK TERMINATIONABOVE BLOCK TERMINATIONABOVE BLOCK TERMINATION
METAL LINER PANEL METAL LINER PANEL METAL LINER PANEL METAL LINER PANEL
SECURE TO SECURE TO SECURE TO SECURE TO
STRUCTURE ON ALL STRUCTURE ON ALL STRUCTURE ON ALL STRUCTURE ON ALL
SURFACES ABOVE SURFACES ABOVE SURFACES ABOVE SURFACES ABOVE
BLOCK TERMINATIONBLOCK TERMINATIONBLOCK TERMINATIONBLOCK TERMINATION
3" / 12"
3" / 12"
LEVEL 1LEVEL 1LEVEL 1LEVEL 10"0"0"0"
LEVEL 2LEVEL 2LEVEL 2LEVEL 214'14'14'14'----0"0"0"0"
1111
A3A3A3A3----11112222
A3A3A3A3----1A1A1A1A
A3A3A3A3----2222
5555
LOADING RAMPLOADING RAMPLOADING RAMPLOADING RAMP----4'4'4'4'----0"0"0"0"
REMOVE EXISTING ROOF PANELS REMOVE EXISTING ROOF PANELS REMOVE EXISTING ROOF PANELS REMOVE EXISTING ROOF PANELS
AS REQUIRED TO COMPLETE AS REQUIRED TO COMPLETE AS REQUIRED TO COMPLETE AS REQUIRED TO COMPLETE
NEW OVERBUILD FRAMINGNEW OVERBUILD FRAMINGNEW OVERBUILD FRAMINGNEW OVERBUILD FRAMING
CONCRETE SLAB OVER GRAVEL BASECONCRETE SLAB OVER GRAVEL BASECONCRETE SLAB OVER GRAVEL BASECONCRETE SLAB OVER GRAVEL BASE
& 10 MIL VAPOR BARRIER& 10 MIL VAPOR BARRIER& 10 MIL VAPOR BARRIER& 10 MIL VAPOR BARRIER
MTL ROOF OVER PREMTL ROOF OVER PREMTL ROOF OVER PREMTL ROOF OVER PRE----ENGINEEREDENGINEEREDENGINEEREDENGINEERED
METAL TRUSSES & RMETAL TRUSSES & RMETAL TRUSSES & RMETAL TRUSSES & R----38 BATT INSULATION38 BATT INSULATION38 BATT INSULATION38 BATT INSULATION
METAL LINER PANEL METAL LINER PANEL METAL LINER PANEL METAL LINER PANEL
SECURE TO SECURE TO SECURE TO SECURE TO
STRUCTURE ON ALL STRUCTURE ON ALL STRUCTURE ON ALL STRUCTURE ON ALL
SURFACES ABOVE SURFACES ABOVE SURFACES ABOVE SURFACES ABOVE
BLOCK TERMINATIONBLOCK TERMINATIONBLOCK TERMINATIONBLOCK TERMINATION
9'-0"
3" / 12"3" / 12"
MTL ROOF OVER PREMTL ROOF OVER PREMTL ROOF OVER PREMTL ROOF OVER PRE----ENGINEEREDENGINEEREDENGINEEREDENGINEERED
METAL TRUSSES @ 48" O.C.METAL TRUSSES @ 48" O.C.METAL TRUSSES @ 48" O.C.METAL TRUSSES @ 48" O.C.
RRRR----38 BATT INSULATION 38 BATT INSULATION 38 BATT INSULATION 38 BATT INSULATION
BETWEEN TRUSSESBETWEEN TRUSSESBETWEEN TRUSSESBETWEEN TRUSSES
HTRU
OF
FTUB
TS
RI
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
1
D
2 3
C
4 5
A
B
DE
SC
RIP
TIO
ND
AT
ES
YM
BO
LB
Y
SHEET REFERENCE
NUMBER
SHEET X of X
UN
ITE
D S
TA
TE
S A
IR F
OR
CE
4T
H C
IVIL
EN
GIN
EE
R S
QU
AD
RO
NS
EY
MO
UR
JO
HN
SO
N A
IR F
OR
CE
BA
SE
,
NO
RT
H C
AR
OLIN
A
FIL
E N
AM
E:
SU
BM
ITT
ED
BY
:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DA
TE
:
SO
LIC
ITA
TIO
N N
O.:
CO
NT
RA
CT
NO
.:
CA
TE
GO
RY
CO
DE
:
PL
OT
DA
TE
:P
LO
T S
CA
LE
:S
IZE
: D
22
" x 3
4"
XX
XX
XX
XX
35%
RE
VIE
W S
ET
SEYMOUR JOHNSON - BUILDING 3200
2/10
/202
1 4:
35:2
9 PM
1/4" = 1'-0"2/10/2021 4:35:29 PM
A3-1
BB BB UU UUII II LL LL
DD DD II IINN NN GG GG
SS SSEE EE CC CC
TT TT II IIOO OO
NN NN SS SS
01/27/21
CONS
TRUC
T AD
DITI
ON, B
UILD
ING
3200
VKAG
18-10
89
2020-096STAFFYKP
STAFF
1/4" = 1'-0"1SECTION A SECTION A SECTION A SECTION A ---- AAAA
1/4" = 1'-0"2SECTION B SECTION B SECTION B SECTION B ---- BBBB
0' 4' 8' 16' 32'
SCALE: 1/4" = 1'-0"
0' 4' 8' 16' 32'
SCALE: 1/4" = 1'-0"
LEVEL 1LEVEL 1LEVEL 1LEVEL 10"0"0"0"
LEVEL 2LEVEL 2LEVEL 2LEVEL 214'14'14'14'----0"0"0"0"
2222
A3A3A3A3----1111
RIGID INSULATION OVERRIGID INSULATION OVERRIGID INSULATION OVERRIGID INSULATION OVER
8" CMU WALL. REF STRU 8" CMU WALL. REF STRU 8" CMU WALL. REF STRU 8" CMU WALL. REF STRU
FOR WALL REINF.FOR WALL REINF.FOR WALL REINF.FOR WALL REINF.
8" SPLIT FACE 8" SPLIT FACE 8" SPLIT FACE 8" SPLIT FACE
CMU VENEERCMU VENEERCMU VENEERCMU VENEER
STANDING SEAM METAL ROOF PANEL OVER STANDING SEAM METAL ROOF PANEL OVER STANDING SEAM METAL ROOF PANEL OVER STANDING SEAM METAL ROOF PANEL OVER
22 GA. 1 1/2" METAL DECK 22 GA. 1 1/2" METAL DECK 22 GA. 1 1/2" METAL DECK 22 GA. 1 1/2" METAL DECK
PREENGINEERED METAL TRUSS @ 4' O.C. PREENGINEERED METAL TRUSS @ 4' O.C. PREENGINEERED METAL TRUSS @ 4' O.C. PREENGINEERED METAL TRUSS @ 4' O.C.
W/ BATT INSULATION BETWEENW/ BATT INSULATION BETWEENW/ BATT INSULATION BETWEENW/ BATT INSULATION BETWEEN
METAL PANEL SOFFIT & FASCIA METAL PANEL SOFFIT & FASCIA METAL PANEL SOFFIT & FASCIA METAL PANEL SOFFIT & FASCIA
OVER LGMS BLOCKING. MATCH OVER LGMS BLOCKING. MATCH OVER LGMS BLOCKING. MATCH OVER LGMS BLOCKING. MATCH
HEIGHT & DEPTH OF EXISTING HEIGHT & DEPTH OF EXISTING HEIGHT & DEPTH OF EXISTING HEIGHT & DEPTH OF EXISTING
CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTION
4" CONCRETE SLAB OVER 4" GRAVEL 4" CONCRETE SLAB OVER 4" GRAVEL 4" CONCRETE SLAB OVER 4" GRAVEL 4" CONCRETE SLAB OVER 4" GRAVEL
BASE & 10MIL VAPOR BARRIERBASE & 10MIL VAPOR BARRIERBASE & 10MIL VAPOR BARRIERBASE & 10MIL VAPOR BARRIER
A3A3A3A3----2222
1111
LOADING RAMPLOADING RAMPLOADING RAMPLOADING RAMP----4'4'4'4'----0"0"0"0"
PREFINISHED METAL PREFINISHED METAL PREFINISHED METAL PREFINISHED METAL
DOWNSPOUT & SPLASH BLCOKDOWNSPOUT & SPLASH BLCOKDOWNSPOUT & SPLASH BLCOKDOWNSPOUT & SPLASH BLCOK
9'-4
"
RRRR----38 BATT INSULATION 38 BATT INSULATION 38 BATT INSULATION 38 BATT INSULATION
BETWEEN TRUSSESBETWEEN TRUSSESBETWEEN TRUSSESBETWEEN TRUSSES
RIDGE FLASHINGRIDGE FLASHINGRIDGE FLASHINGRIDGE FLASHING
LEVEL 1LEVEL 1LEVEL 1LEVEL 10"0"0"0"
LOADING RAMPLOADING RAMPLOADING RAMPLOADING RAMP----4'4'4'4'----0"0"0"0"
3/4"11"
6"
EXPANSION JOINT EXPANSION JOINT EXPANSION JOINT EXPANSION JOINT
EXPANSION JOINT EXPANSION JOINT EXPANSION JOINT EXPANSION JOINT
6"
REINFORCED CONCRETE SLABREINFORCED CONCRETE SLABREINFORCED CONCRETE SLABREINFORCED CONCRETE SLAB
REINFORCED CONCRETE SLABREINFORCED CONCRETE SLABREINFORCED CONCRETE SLABREINFORCED CONCRETE SLAB
REINFORCED CONCRETE STEPSREINFORCED CONCRETE STEPSREINFORCED CONCRETE STEPSREINFORCED CONCRETE STEPS
REINFORCED FOOTING AT BOTTOM STEPREINFORCED FOOTING AT BOTTOM STEPREINFORCED FOOTING AT BOTTOM STEPREINFORCED FOOTING AT BOTTOM STEP
DIMENSIONS & REINFORCEMENT TBDDIMENSIONS & REINFORCEMENT TBDDIMENSIONS & REINFORCEMENT TBDDIMENSIONS & REINFORCEMENT TBD
SLIP RESISTANT NOSINGSLIP RESISTANT NOSINGSLIP RESISTANT NOSINGSLIP RESISTANT NOSING
AND ANCHORAND ANCHORAND ANCHORAND ANCHOR
2'-1
0 1/
2"1
1/2"
HTRU
OF
FTUB
TS
RI
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
1
D
2 3
C
4 5
A
B
DE
SC
RIP
TIO
ND
AT
ES
YM
BO
LB
Y
SHEET REFERENCE
NUMBER
SHEET X of X
UN
ITE
D S
TA
TE
S A
IR F
OR
CE
4T
H C
IVIL
EN
GIN
EE
R S
QU
AD
RO
NS
EY
MO
UR
JO
HN
SO
N A
IR F
OR
CE
BA
SE
,
NO
RT
H C
AR
OLIN
A
FIL
E N
AM
E:
SU
BM
ITT
ED
BY
:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DA
TE
:
SO
LIC
ITA
TIO
N N
O.:
CO
NT
RA
CT
NO
.:
CA
TE
GO
RY
CO
DE
:
PL
OT
DA
TE
:P
LO
T S
CA
LE
:S
IZE
: D
22
" x 3
4"
XX
XX
XX
XX
35%
RE
VIE
W S
ET
SEYMOUR JOHNSON - BUILDING 3200
2/8/
2021
2:2
8:39
PM
As indicated2/8/2021 2:28:39 PM
A3-1A
BB BB UU UUII II LL LL
DD DD II IINN NN GG GG
SS SSEE EE CC CC
TT TT II IIOO OO
NN NN SS SS
01/27/21
CONS
TRUC
T AD
DITI
ON, B
UILD
ING
3200
VKAG
18-10
89
2020-096STAFFYKP
STAFF1/4" = 1'-0"
2CONNECTOR HALL SECTIONCONNECTOR HALL SECTIONCONNECTOR HALL SECTIONCONNECTOR HALL SECTION
3/4" = 1'-0"1
STAIR SECTIONSTAIR SECTIONSTAIR SECTIONSTAIR SECTION
0' 4' 8' 16' 32'
SCALE: 1/4" = 1'-0"
LEVEL 1LEVEL 1LEVEL 1LEVEL 10"0"0"0"
LEVEL 2LEVEL 2LEVEL 2LEVEL 214'14'14'14'----0"0"0"0"
A1A1A1A1----9999
3333
SOLID FILL CAVITY SOLID FILL CAVITY SOLID FILL CAVITY SOLID FILL CAVITY
BELOW FINISH FLOORBELOW FINISH FLOORBELOW FINISH FLOORBELOW FINISH FLOOR
JOINT WEEPS @ JOINT WEEPS @ JOINT WEEPS @ JOINT WEEPS @
16" O.C. HORIZ.16" O.C. HORIZ.16" O.C. HORIZ.16" O.C. HORIZ.
CONTINUOUS THROUGH CONTINUOUS THROUGH CONTINUOUS THROUGH CONTINUOUS THROUGH
WALL FLASHINGWALL FLASHINGWALL FLASHINGWALL FLASHING
EXPANSION MATERIALEXPANSION MATERIALEXPANSION MATERIALEXPANSION MATERIAL
TURN DOWN SLAB EDGE TURN DOWN SLAB EDGE TURN DOWN SLAB EDGE TURN DOWN SLAB EDGE
W/ BIRCK LEDGE,W/ BIRCK LEDGE,W/ BIRCK LEDGE,W/ BIRCK LEDGE,
DIMENSIONS & DIMENSIONS & DIMENSIONS & DIMENSIONS &
REINFORCEMENT TBDREINFORCEMENT TBDREINFORCEMENT TBDREINFORCEMENT TBD
10" MORTAR NET10" MORTAR NET10" MORTAR NET10" MORTAR NET
WATER RESISTIVE BARRIER,WATER RESISTIVE BARRIER,WATER RESISTIVE BARRIER,WATER RESISTIVE BARRIER,
LAP OVER FLASHINGLAP OVER FLASHINGLAP OVER FLASHINGLAP OVER FLASHING
8" CMU, REF 8" CMU, REF 8" CMU, REF 8" CMU, REF
STRU FOR REINF.STRU FOR REINF.STRU FOR REINF.STRU FOR REINF.
1 1/2" RIGID INSUL.1 1/2" RIGID INSUL.1 1/2" RIGID INSUL.1 1/2" RIGID INSUL.
MASONRY TIES @ MASONRY TIES @ MASONRY TIES @ MASONRY TIES @
16" O.C. HORIZ16" O.C. HORIZ16" O.C. HORIZ16" O.C. HORIZ
2" AIR GAP2" AIR GAP2" AIR GAP2" AIR GAP
4" VENEER CMU4" VENEER CMU4" VENEER CMU4" VENEER CMU
6" CONCRETE SLAB6" CONCRETE SLAB6" CONCRETE SLAB6" CONCRETE SLAB
10 MIL VAPOR BARRIER10 MIL VAPOR BARRIER10 MIL VAPOR BARRIER10 MIL VAPOR BARRIERPERIMETER INSUL.PERIMETER INSUL.PERIMETER INSUL.PERIMETER INSUL.
4" GRAVEL BASE4" GRAVEL BASE4" GRAVEL BASE4" GRAVEL BASE
STEEL MOMENT FRAMESTEEL MOMENT FRAMESTEEL MOMENT FRAMESTEEL MOMENT FRAME
(BEYOND) SIZE TBD(BEYOND) SIZE TBD(BEYOND) SIZE TBD(BEYOND) SIZE TBD
"PBR" STYLE 24 GAUGE EXPOSED FASTENER ROOF COLOR "PBR" STYLE 24 GAUGE EXPOSED FASTENER ROOF COLOR "PBR" STYLE 24 GAUGE EXPOSED FASTENER ROOF COLOR "PBR" STYLE 24 GAUGE EXPOSED FASTENER ROOF COLOR
"BLUE" TO BE CHOSEN FROM "BLUE" TO BE CHOSEN FROM "BLUE" TO BE CHOSEN FROM "BLUE" TO BE CHOSEN FROM MFGMFGMFGMFG STANDARD COLORSSTANDARD COLORSSTANDARD COLORSSTANDARD COLORS
PREFINISHED MTL PREFINISHED MTL PREFINISHED MTL PREFINISHED MTL
GUTTER & BRACKET, GUTTER & BRACKET, GUTTER & BRACKET, GUTTER & BRACKET,
SET IN BED OF MASTICSET IN BED OF MASTICSET IN BED OF MASTICSET IN BED OF MASTIC
PREFINISHED MTL PREFINISHED MTL PREFINISHED MTL PREFINISHED MTL
GABLE FLASHINGGABLE FLASHINGGABLE FLASHINGGABLE FLASHING
RRRR----38 VINYL FACED BATT INSULATION38 VINYL FACED BATT INSULATION38 VINYL FACED BATT INSULATION38 VINYL FACED BATT INSULATION
THERMAL SPACERTHERMAL SPACERTHERMAL SPACERTHERMAL SPACER
METAL LINER PANEL SECURE TO METAL LINER PANEL SECURE TO METAL LINER PANEL SECURE TO METAL LINER PANEL SECURE TO
STRUCTURE ON ALL SURFACES STRUCTURE ON ALL SURFACES STRUCTURE ON ALL SURFACES STRUCTURE ON ALL SURFACES
ABOVE BLOCK TERMINATIONABOVE BLOCK TERMINATIONABOVE BLOCK TERMINATIONABOVE BLOCK TERMINATION
METAL SOFFIT & FASCIA METAL SOFFIT & FASCIA METAL SOFFIT & FASCIA METAL SOFFIT & FASCIA
PANELS OVER HAT PANELS OVER HAT PANELS OVER HAT PANELS OVER HAT
CHANNELS. FIELD CUT CHANNELS. FIELD CUT CHANNELS. FIELD CUT CHANNELS. FIELD CUT
AS REQUIREDAS REQUIREDAS REQUIREDAS REQUIRED
1 1/2" METAL DECK1 1/2" METAL DECK1 1/2" METAL DECK1 1/2" METAL DECK
LGMS @ 24" O.C.LGMS @ 24" O.C.LGMS @ 24" O.C.LGMS @ 24" O.C.
CARRY INSULATION CARRY INSULATION CARRY INSULATION CARRY INSULATION
UP TO DECKUP TO DECKUP TO DECKUP TO DECK
PREFABRICATED METAL TRUSSES @ 48" O.C.PREFABRICATED METAL TRUSSES @ 48" O.C.PREFABRICATED METAL TRUSSES @ 48" O.C.PREFABRICATED METAL TRUSSES @ 48" O.C.
TOP
OF
BLO
CK
14'-0
"
LEVEL 1LEVEL 1LEVEL 1LEVEL 10"0"0"0"
LEVEL 2LEVEL 2LEVEL 2LEVEL 214'14'14'14'----0"0"0"0"
CONCRETE FOOTING, DIMENSIONS & REINFORCEMENT TBDCONCRETE FOOTING, DIMENSIONS & REINFORCEMENT TBDCONCRETE FOOTING, DIMENSIONS & REINFORCEMENT TBDCONCRETE FOOTING, DIMENSIONS & REINFORCEMENT TBD
INSULATED SECTIONAL INSULATED SECTIONAL INSULATED SECTIONAL INSULATED SECTIONAL
OVERHEAD DOOROVERHEAD DOOROVERHEAD DOOROVERHEAD DOOR
DOOR HEADER DOOR HEADER DOOR HEADER DOOR HEADER
DETAILS TBDDETAILS TBDDETAILS TBDDETAILS TBD
STEEL BOLLARDSTEEL BOLLARDSTEEL BOLLARDSTEEL BOLLARD
GRAVEL BASEGRAVEL BASEGRAVEL BASEGRAVEL BASE
10 MIL VAPOR BARRIER10 MIL VAPOR BARRIER10 MIL VAPOR BARRIER10 MIL VAPOR BARRIER
PERIMETER INSULATIONPERIMETER INSULATIONPERIMETER INSULATIONPERIMETER INSULATION
1/2" EXPANSION JOINT1/2" EXPANSION JOINT1/2" EXPANSION JOINT1/2" EXPANSION JOINT
MIN 6" CONCRETE MIN 6" CONCRETE MIN 6" CONCRETE MIN 6" CONCRETE
REINFORCED SLABREINFORCED SLABREINFORCED SLABREINFORCED SLAB
LOADING RAMPLOADING RAMPLOADING RAMPLOADING RAMP----4'4'4'4'----0"0"0"0"
PREFINISHED MTL GUTTERPREFINISHED MTL GUTTERPREFINISHED MTL GUTTERPREFINISHED MTL GUTTER
PROFILE BY MNFR.PROFILE BY MNFR.PROFILE BY MNFR.PROFILE BY MNFR.
METAL LINER PANEL METAL LINER PANEL METAL LINER PANEL METAL LINER PANEL
SECURE TO SECURE TO SECURE TO SECURE TO
STRUCTURE ON ALL STRUCTURE ON ALL STRUCTURE ON ALL STRUCTURE ON ALL
SURFACES ABOVE SURFACES ABOVE SURFACES ABOVE SURFACES ABOVE
BLOCK TERMINATIONBLOCK TERMINATIONBLOCK TERMINATIONBLOCK TERMINATION
STEEL ANGLE, TBDSTEEL ANGLE, TBDSTEEL ANGLE, TBDSTEEL ANGLE, TBD
"PBR" STYLE 24 GAUGE EXPOSED "PBR" STYLE 24 GAUGE EXPOSED "PBR" STYLE 24 GAUGE EXPOSED "PBR" STYLE 24 GAUGE EXPOSED
FASTENER ROOF COLOR "BLUE" TO BE FASTENER ROOF COLOR "BLUE" TO BE FASTENER ROOF COLOR "BLUE" TO BE FASTENER ROOF COLOR "BLUE" TO BE
CHOSEN FROM CHOSEN FROM CHOSEN FROM CHOSEN FROM MFGMFGMFGMFG STANDARD COLORSSTANDARD COLORSSTANDARD COLORSSTANDARD COLORS
PREFINISHED MTL PREFINISHED MTL PREFINISHED MTL PREFINISHED MTL
GUTTER & BRACKET, GUTTER & BRACKET, GUTTER & BRACKET, GUTTER & BRACKET,
SET IN BED OF MASTICSET IN BED OF MASTICSET IN BED OF MASTICSET IN BED OF MASTIC
THERMAL SPACERTHERMAL SPACERTHERMAL SPACERTHERMAL SPACER
1 1/2" METAL DECK1 1/2" METAL DECK1 1/2" METAL DECK1 1/2" METAL DECK
PREFABRICATED METAL PREFABRICATED METAL PREFABRICATED METAL PREFABRICATED METAL
TRUSSES @ 48" O.C.TRUSSES @ 48" O.C.TRUSSES @ 48" O.C.TRUSSES @ 48" O.C.
12'-0
"
PREFINISHED MTL PREFINISHED MTL PREFINISHED MTL PREFINISHED MTL
GABLE FLASHINGGABLE FLASHINGGABLE FLASHINGGABLE FLASHING
METAL SOFFIT & FASCIA METAL SOFFIT & FASCIA METAL SOFFIT & FASCIA METAL SOFFIT & FASCIA
PANELS OVER HAT PANELS OVER HAT PANELS OVER HAT PANELS OVER HAT
CHANNELS. FIELD CUT CHANNELS. FIELD CUT CHANNELS. FIELD CUT CHANNELS. FIELD CUT
AS REQUIREDAS REQUIREDAS REQUIREDAS REQUIRED
CLOSURE STRIPCLOSURE STRIPCLOSURE STRIPCLOSURE STRIP
2 LAYERS 15LB FELT2 LAYERS 15LB FELT2 LAYERS 15LB FELT2 LAYERS 15LB FELT
RRRR----38 BATT 38 BATT 38 BATT 38 BATT
INSULATION BETWEEN INSULATION BETWEEN INSULATION BETWEEN INSULATION BETWEEN
TRUSSESTRUSSESTRUSSESTRUSSES
LEVEL 1LEVEL 1LEVEL 1LEVEL 10"0"0"0"
LEVEL 2LEVEL 2LEVEL 2LEVEL 214'14'14'14'----0"0"0"0"
"PBR" STYLE 24 GAUGE "PBR" STYLE 24 GAUGE "PBR" STYLE 24 GAUGE "PBR" STYLE 24 GAUGE
EXPOSED FASTENER ROOF PANELEXPOSED FASTENER ROOF PANELEXPOSED FASTENER ROOF PANELEXPOSED FASTENER ROOF PANEL
22 GAUGE 1 1/2" METAL DECK22 GAUGE 1 1/2" METAL DECK22 GAUGE 1 1/2" METAL DECK22 GAUGE 1 1/2" METAL DECK
REMOVE EXISTING ROOF PANELS REMOVE EXISTING ROOF PANELS REMOVE EXISTING ROOF PANELS REMOVE EXISTING ROOF PANELS
AS REQUIRED TO COMPLETE AS REQUIRED TO COMPLETE AS REQUIRED TO COMPLETE AS REQUIRED TO COMPLETE
NEW OVERBUILD FRAMINGNEW OVERBUILD FRAMINGNEW OVERBUILD FRAMINGNEW OVERBUILD FRAMING
TIE RAFTERS BACK INTO EXISTING FRAMINGTIE RAFTERS BACK INTO EXISTING FRAMINGTIE RAFTERS BACK INTO EXISTING FRAMINGTIE RAFTERS BACK INTO EXISTING FRAMING
LEVEL 1LEVEL 1LEVEL 1LEVEL 10"0"0"0"
PREFINISHED METAL PREFINISHED METAL PREFINISHED METAL PREFINISHED METAL
GUTTER & BRACKETGUTTER & BRACKETGUTTER & BRACKETGUTTER & BRACKET
GABLE FLASHINGGABLE FLASHINGGABLE FLASHINGGABLE FLASHING
METAL WALL PANELMETAL WALL PANELMETAL WALL PANELMETAL WALL PANEL
METAL SOFFIT PANELMETAL SOFFIT PANELMETAL SOFFIT PANELMETAL SOFFIT PANEL
7/8" HAT CHANNELS7/8" HAT CHANNELS7/8" HAT CHANNELS7/8" HAT CHANNELS
2 LAYERS 15LB FELT2 LAYERS 15LB FELT2 LAYERS 15LB FELT2 LAYERS 15LB FELT
PREFINISHED METAL PREFINISHED METAL PREFINISHED METAL PREFINISHED METAL
DOWNSPOUT W/ SPLASHDOWNSPOUT W/ SPLASHDOWNSPOUT W/ SPLASHDOWNSPOUT W/ SPLASH
BLOCKBLOCKBLOCKBLOCK
RRRR----38 BATT INSULATION38 BATT INSULATION38 BATT INSULATION38 BATT INSULATION
PREENGINEERED LGMS PREENGINEERED LGMS PREENGINEERED LGMS PREENGINEERED LGMS
TRUSS @ 4' O.C.TRUSS @ 4' O.C.TRUSS @ 4' O.C.TRUSS @ 4' O.C.
8" CMU. REF STRRU. 8" CMU. REF STRRU. 8" CMU. REF STRRU. 8" CMU. REF STRRU.
FOR REINFORCEMENTFOR REINFORCEMENTFOR REINFORCEMENTFOR REINFORCEMENT
WEATHER RESISTIVE WEATHER RESISTIVE WEATHER RESISTIVE WEATHER RESISTIVE
BARRIERBARRIERBARRIERBARRIER
METAL SOFFIT JMETAL SOFFIT JMETAL SOFFIT JMETAL SOFFIT J
4" x 8" SPLIT FACE4" x 8" SPLIT FACE4" x 8" SPLIT FACE4" x 8" SPLIT FACE
CMU VENEERCMU VENEERCMU VENEERCMU VENEER
2" AIR GAP2" AIR GAP2" AIR GAP2" AIR GAP
2"RIGID INSULATION2"RIGID INSULATION2"RIGID INSULATION2"RIGID INSULATION
MASONRY TIES @ MASONRY TIES @ MASONRY TIES @ MASONRY TIES @
16" O.C. VERT.16" O.C. VERT.16" O.C. VERT.16" O.C. VERT.
UL 90 THERMAL CLIPUL 90 THERMAL CLIPUL 90 THERMAL CLIPUL 90 THERMAL CLIP
LGMS BUILDOUT LGMS BUILDOUT LGMS BUILDOUT LGMS BUILDOUT
@ 4' O.C.@ 4' O.C.@ 4' O.C.@ 4' O.C.
CONCRETE FOOTING,CONCRETE FOOTING,CONCRETE FOOTING,CONCRETE FOOTING,
DIMENSIONS & DIMENSIONS & DIMENSIONS & DIMENSIONS &
REINFORCEMENT TBDREINFORCEMENT TBDREINFORCEMENT TBDREINFORCEMENT TBD
UTILITY BLOCK UTILITY BLOCK UTILITY BLOCK UTILITY BLOCK
BELOW GRADEBELOW GRADEBELOW GRADEBELOW GRADE
FILL CAVITY SOLID FILL CAVITY SOLID FILL CAVITY SOLID FILL CAVITY SOLID
BELOW GRADEBELOW GRADEBELOW GRADEBELOW GRADE
JOINT WEEPS JOINT WEEPS JOINT WEEPS JOINT WEEPS
@ 2' O.C.@ 2' O.C.@ 2' O.C.@ 2' O.C.
THROUGH WALL THROUGH WALL THROUGH WALL THROUGH WALL
FLASHINGFLASHINGFLASHINGFLASHING
EXPANSION MATERIALEXPANSION MATERIALEXPANSION MATERIALEXPANSION MATERIAL
4" SLAB ON GRADE4" SLAB ON GRADE4" SLAB ON GRADE4" SLAB ON GRADE
10 MIL VAPOR BARRIER10 MIL VAPOR BARRIER10 MIL VAPOR BARRIER10 MIL VAPOR BARRIER
4" GRAVEL BASE4" GRAVEL BASE4" GRAVEL BASE4" GRAVEL BASE
UNDER SLAB UNDER SLAB UNDER SLAB UNDER SLAB
INSULATIONINSULATIONINSULATIONINSULATION
BASE AS SPECIFIEDBASE AS SPECIFIEDBASE AS SPECIFIEDBASE AS SPECIFIED
"PBR" STYLE 24 GAUGE "PBR" STYLE 24 GAUGE "PBR" STYLE 24 GAUGE "PBR" STYLE 24 GAUGE
EXPOSED FASTENER ROOF PANELEXPOSED FASTENER ROOF PANELEXPOSED FASTENER ROOF PANELEXPOSED FASTENER ROOF PANEL
MORTAR NETMORTAR NETMORTAR NETMORTAR NET
5/8" GYP. BOARD5/8" GYP. BOARD5/8" GYP. BOARD5/8" GYP. BOARD
7/8" HAT CHANNELS 7/8" HAT CHANNELS 7/8" HAT CHANNELS 7/8" HAT CHANNELS
@ 16" O.C. @ 16" O.C. @ 16" O.C. @ 16" O.C.
HTRU
OF
FTUB
TS
RI
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
1
D
2 3
C
4 5
A
B
DE
SC
RIP
TIO
ND
AT
ES
YM
BO
LB
Y
SHEET REFERENCE
NUMBER
SHEET X of X
UN
ITE
D S
TA
TE
S A
IR F
OR
CE
4T
H C
IVIL
EN
GIN
EE
R S
QU
AD
RO
NS
EY
MO
UR
JO
HN
SO
N A
IR F
OR
CE
BA
SE
,
NO
RT
H C
AR
OLIN
A
FIL
E N
AM
E:
SU
BM
ITT
ED
BY
:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DA
TE
:
SO
LIC
ITA
TIO
N N
O.:
CO
NT
RA
CT
NO
.:
CA
TE
GO
RY
CO
DE
:
PL
OT
DA
TE
:P
LO
T S
CA
LE
:S
IZE
: D
22
" x 3
4"
XX
XX
XX
XX
35%
RE
VIE
W S
ET
SEYMOUR JOHNSON - BUILDING 3200
2/8/
2021
2:2
8:44
PM
3/4" = 1'-0"2/8/2021 2:28:44 PM
A3-2
WW WWAA AA LL LL
LL LL SS SS EE EE
CC CC TT TTII II OO OO
NN NN SS SS
01/27/21
CONS
TRUC
T AD
DITI
ON, B
UILD
ING
3200
VKAG
18-10
89
2020-096STAFFYKP
STAFF
3/4" = 1'-0"3
GABLE WALL SECTIONGABLE WALL SECTIONGABLE WALL SECTIONGABLE WALL SECTION
3/4" = 1'-0"4
SECTION A SECTION A SECTION A SECTION A ---- A A A A ---- Callout 1Callout 1Callout 1Callout 1
3/4" = 1'-0"5
CONNECTOR HALL TO EXG BLDGCONNECTOR HALL TO EXG BLDGCONNECTOR HALL TO EXG BLDGCONNECTOR HALL TO EXG BLDG
3/4" = 1'-0"1
CONNECTOR HALL WALL SECTIONCONNECTOR HALL WALL SECTIONCONNECTOR HALL WALL SECTIONCONNECTOR HALL WALL SECTION
DIFFUSER - SQUARE SUPPLY
REGISTER - SQUARE RETURN
REGISTER - EXHAUST
LIGHTING - RECESSED FIXTURE
LIGHTING - RECESSED FIXTURE
LIGHTING - RECESSED DOWN LIGHT
S
LIGHTING - RECESSED FIXTURE 24" x 48"
LIGHTING - RECESSED FIXTURE 12" x 48"
LIGHTING - RECESSED FIXTURE 24" x 24"
EXIT SIGN
SPEAKER
OPEN TO STRUCTURE ABOVE,
PAINT STRUCTURE P-_OPEN
CEILING
ACT-1
24" x 24"
ACOUSTIC CEILING TILE
9/16" GRID
LIGHTING - PENDANT FIXTURE 6" MOUNT
ACCESS DOOR - 20" x 20"
LIGHTING
1111
A3A3A3A3----1111
2222
A3A3A3A3----1111
2222
A3A3A3A3----1A1A1A1A
Ac1 9'-0"REF. ELECTRICAL LIGHTING PLAN
METAL LINER PANEL METAL LINER PANEL METAL LINER PANEL METAL LINER PANEL
SECURE TO SECURE TO SECURE TO SECURE TO
STRUCTURE ON ALL STRUCTURE ON ALL STRUCTURE ON ALL STRUCTURE ON ALL
SURFACES ABOVE SURFACES ABOVE SURFACES ABOVE SURFACES ABOVE
BLOCK TERMINATIONBLOCK TERMINATIONBLOCK TERMINATIONBLOCK TERMINATION
EMERGENCY EXIT EMERGENCY EXIT EMERGENCY EXIT EMERGENCY EXIT
LIGHT. REF ELEC. LIGHT. REF ELEC. LIGHT. REF ELEC. LIGHT. REF ELEC.
PLANPLANPLANPLAN
EMERGENCY EXIT EMERGENCY EXIT EMERGENCY EXIT EMERGENCY EXIT
LIGHT. REF ELEC. LIGHT. REF ELEC. LIGHT. REF ELEC. LIGHT. REF ELEC.
PLANPLANPLANPLAN
GENERAL NOTES:
A. ALL NOTES ARE TYPICAL AND APPLY TO ALL AREAS (NOTED ABOVE) EVEN WHEN THEY ARE NOT NOTED AT EACH INCIDENT. THE CONTRACTOR IS
RESPONSIBLE FOR COUNTING AND INVENTORYING WORK TO BE COMPLETED AND THE DEFECTS TO BE CORRECTED.
B. PRIOR TO ANY CONSTRUCTION WORK THE CONTRACTOR SHALL ENGAGE A FULLY CERTIFIED AND LICENSED TESTING AGENCY/COMPANY WHICH IS
LICENSED IN THE STATE OF GEORGIA; ALSO, ALL EMPLOYEES SHALL BE TESTED/CERTIFIED/LICENSED IN THE STATE OF GEORGIA FOR THEIR AREA OF
RESPONSIBILITY TO PERFORM A HAZARDOUS MATERIAL SURVEY. TESTING OF MATERIALS SHALL BE FOR MATERIALS TO BE RENOVATED, REPLACED
OR REPAIRED AND SHALL BE TESTED FOR PRESENCE/EXISTENCE OF HAZARDOUS MATERIALS I.E. MOLD, ASBESTOS AND LEAD BASED PAINT.
CONTRACTOR SHALL SUBMIT COMPLETE REPORT FOR REVIEW BY THE GOVERNMENT FOR COMPLETENESS AND CONSIDERATION OF ANY POSSIBLE
ACTIONS REQUIRED TO MODIFY THE CONTRACT OR TO CANCEL.
HTRU
OF
FTUB
TS
RI
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
1
D
2 3
C
4 5
A
B
DE
SC
RIP
TIO
ND
AT
ES
YM
BO
LB
Y
SHEET REFERENCE
NUMBER
SHEET X of X
UN
ITE
D S
TA
TE
S A
IR F
OR
CE
4T
H C
IVIL
EN
GIN
EE
R S
QU
AD
RO
NS
EY
MO
UR
JO
HN
SO
N A
IR F
OR
CE
BA
SE
,
NO
RT
H C
AR
OLIN
A
FIL
E N
AM
E:
SU
BM
ITT
ED
BY
:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DA
TE
:
SO
LIC
ITA
TIO
N N
O.:
CO
NT
RA
CT
NO
.:
CA
TE
GO
RY
CO
DE
:
PL
OT
DA
TE
:P
LO
T S
CA
LE
:S
IZE
: D
22
" x 3
4"
XX
XX
XX
XX
35%
RE
VIE
W S
ET
SEYMOUR JOHNSON - BUILDING 3200
2/11
/202
1 2:
26:5
6 PM
As indicated2/11/2021 2:26:56 PM
A6-1
CC CC EE EEII II LL LL
II II NN NNGG GG
PP PPLL LL AA AA
NN NN SS SS
01/27/21
CONS
TRUC
T AD
DITI
ON, B
UILD
ING
3200
VKAG
18-10
89
2020-096AuthorChecker
Author
1/8" = 1'-0"
LEGEND - REFLECTED CEILING PLAN
KEYNOTES - NEW WORK - CEILINGS
NO. DESCRIPTION
1/8" = 1'-0"3
REFLECTED CEILING PLAN REFLECTED CEILING PLAN REFLECTED CEILING PLAN REFLECTED CEILING PLAN ---- NEW WORKNEW WORKNEW WORKNEW WORK
3/8" = 1'-0"
GENERAL NOTESGENERAL NOTESGENERAL NOTESGENERAL NOTES
SCALE
FACILITY
H
T
R
F
U
B
T
I
T
S
R
O
F
U
DATE
SHEET
DRAWN BY
OF
PROJECT NUMBER
TRIRIGA PROJECT NUMBER
PR
OJE
CT
T
IT
LE
DR
AW
IN
G S
HE
ET
N
AM
E
TH
UN
IT
ED
S
TA
TE
S A
IR
F
OR
CE
4 C
IV
IL E
NG
IN
EE
R S
QU
AD
RO
N
SE
YM
OU
R JO
HN
SO
N A
IR
F
OR
CE
B
AS
E, N
OR
TH
C
AR
OLIN
A
PR
OJE
CT
P
HA
SE
CO
NT
RA
CT
N
o.
TA
SK
O
RD
ER
N
o.
AP
PR
V'D
DA
TE
DE
SC
RIP
TIO
NR
EV
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
7 8 9 10 111 2 3 4 5 6
H
A
B
C
D
E
F
G
H
CO
NS
TR
UC
TIO
N A
DD
IT
IO
N, B
LD
G 3200
35%
S
UB
MIS
SIO
N
VKAG 18-1089
AS SHOWN
08 JAN 2021
M-001
RGV
07 10
ME
CH
AN
IC
AL N
OT
ES
, S
YM
BO
LS
, D
ET
AILS
, A
ND
S
CH
ED
ULE
S
T
N
SCALE
FACILITY
H
T
R
F
U
B
T
I
T
S
R
O
F
U
DATE
SHEET
DRAWN BY
OF
PROJECT NUMBER
TRIRIGA PROJECT NUMBER
PR
OJE
CT
T
IT
LE
DR
AW
IN
G S
HE
ET
N
AM
E
TH
UN
IT
ED
S
TA
TE
S A
IR
F
OR
CE
4 C
IV
IL E
NG
IN
EE
R S
QU
AD
RO
N
SE
YM
OU
R JO
HN
SO
N A
IR
F
OR
CE
B
AS
E, N
OR
TH
C
AR
OLIN
A
PR
OJE
CT
P
HA
SE
CO
NT
RA
CT
N
o.
TA
SK
O
RD
ER
N
o.
AP
PR
V'D
DA
TE
DE
SC
RIP
TIO
NR
EV
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
7 8 9 10 111 2 3 4 5 6
H
A
B
C
D
E
F
G
H
CO
NS
TR
UC
TIO
N A
DD
IT
IO
N, B
LD
G 3200
35%
S
UB
MIS
SIO
N
VKAG 18-1089
AS SHOWN
08 JAN 2021
M-101
RGV
08 10
ME
CH
AN
IC
AL F
LO
OR
P
LA
N
H
TT
T
MAG. VAR. 9°-22'W
JUN 11
N
0
4'
4' 12'
1/4"=1'-0"
MECHANICAL FLOOR PLAN
SCALE: 1/4" = 1'-0"
UP
1 2 3 4
A
B
C
D
4,015 SF
WAREHOUSE24
51 SF
RISER ROOM25
SCALE
FACILITY
H
T
R
F
U
B
T
I
T
S
R
O
F
U
DATE
SHEET
DRAWN BY
OF
PROJECT NUMBER
TRIRIGA PROJECT NUMBER
PR
OJE
CT
T
IT
LE
DR
AW
IN
G S
HE
ET
N
AM
E
TH
UN
IT
ED
S
TA
TE
S A
IR
F
OR
CE
4 C
IV
IL
E
NG
IN
EE
R S
QU
AD
RO
N
SE
YM
OU
R JO
HN
SO
N A
IR
F
OR
CE
B
AS
E, N
OR
TH
C
AR
OL
IN
A
PR
OJE
CT
P
HA
SE
CO
NT
RA
CT
N
o.
TA
SK
O
RD
ER
N
o.
AP
PR
V'D
DA
TE
DE
SC
RIP
TIO
NR
EV
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
7 8 9 10 111 2 3 4 5 6
H
CO
NS
TR
UC
TIO
N A
DD
IT
IO
N, B
LD
G 3
20
0
35
% S
UB
MIS
SIO
N
VKAG 18-1089
AS SHOWN
08 JAN 2021
RECESSED OR SURFACE MOUNTED FIXTURE, SHADING INDICATES EMERGENCY FIXTURE
STRIP FIXTURE - MOUNTING AS INDICATED, SHADING INDICATES EMERGENCY FIXTURE
RECESSED OR SURFACE MOUNTED DOWNLIGHT, SHADING INDICATES EMERGENCY FIXTURE
WALL MOUNTED FIXTURE, SHADING INDICATES EMERGENCY FIXTURE
SURFACE OR RECESSED DIRECTIONAL FIXTURE
TRACK LIGHTING, TRACK LENGTH AS INDICATED
REMOTE BATTERY UNIT HEADS; SEE FIXTURE SCHEDULE FOR ADDITIONAL INFORMATION
WALL MOUNTED EMERGENCY LIGHTING UNIT AND LIGHT HEADS
CEILING OR WALL MOUNTED JUNCTION BOX, HEIGHT AS INDICATED
FLUSH FLOOR MOUNTED JUNCTION BOX
SINGLE POLE TOGGLE SWITCH - 48" AFF
THREE-WAY TOGGLE SWITCH - 48" AFF
SINGLE POLE DIMMER SWITCH - 48" AFF
KEY OPERATED SWITCH - 48" AFF
TIMER OPERATED SWITCH - 48" AFF
SINGLE POLE TOGGLE SWITCH WITH PILOT LIGHT IN TOGGLE MOUNT 48" AFF
DUPLEX RECEPTACLE - 18" AFF OR AT HEIGHT INDICATED, NEMA 5-20R
DOUBLE DUPLEX RECEPTACLE - 18" AFF OR AT HEIGHT INDICATED, NEMA 5-20R
WEATHERPROOF DUPLEX 20A GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE - 36" AFF
DUPLEX GROUND FAULT CIRCUIT INTERRUPTER RECEPTACLE - 18" AFF NEMA 5-20R
DUPLEX RECEPTACLE - ISOLATED GROUND - 18" AFF NEMA 5-20R
DUPLEX RECEPTACLE, TOP RECEPTACLE SWITCH - 18" AFF UNLESS NOTED, NEMA 5-20R
SINGLE RECEPTACLE STRAIGHT BLADE - HEIGHT AS INDICATED
SPECIAL PURPOSE RECEPTACLE - TYPE AND MOUNTING AS INDICATED
POWER AND TELEPHONE POLE
EQUIPMENT AS NOTED
FLUSH FLOOR BOX WITH DUPLEX RECEPTACLE, NEMA 5-20R
FLUSH FLOOR BOX WITH COMBINATION TELEPHONE/DATA OUTLET
FLUSH FLOOR BOX WITH TELEPHONE OUTLET
FLUSH FLOOR BOX WITH DATA OUTLET
COMBINATION DATA/TELEPHONE OUTLET MOUNT 18" AFF
TELEPHONE OUTLET MOUNT 18" AFF
DATA OUTLET MOUNT 18" AFF
FIRE ALARM CONTROL PANEL: SURFACE / FLUSH
FIRE ALARM PULL STATION - 48" AFF
FIRE ALARM VISUAL SIGNAL (STROBE), ADA APPROVED, BOTTOM MOUNTED 80" AFF 75 CANDELA UNO
CEILING OR WALL MOUNTED SMOKE DETECTOR
CEILING OR WALL MOUNTED HEAT DETECTOR
DUCT MOUNTED SMOKE DETECTOR
CONDUIT INSTALLED CONCEALED IN WALLS AND/OR ABOVE CEILING
CONDUIT INSTALLED CONCEALED IN/OR BELOW FLOOR SLAB OR BELOW GRADE
CONDUIT INSTALLED EXPOSED
ISOLATED GROUND CONDUCTOR
FLEXIBLE METALLIC CONDUIT 6' MAXIMUM LENGTH
SYSTEMS GROUND
CONDUIT TURNING UP/CONDUIT TURNING DOWN
CONDUIT TERMINATION, STUB-OUT WITH THREADED OR SET SCREW CAP
EQUIPMENT BACKBOARD - 3/4" X 4' X 8' PLYWOOD, UNLESS NOTED
PANEL BOARD - SURFACE OR FLUSH MOUNTED
NON-FUSED DISCONNECT SWITCH - RATING/POLES/ENCLOSURE AS INDICATED (e.g: 30/3/3R)
FUSED DISCONNECT SWITCH - RATING/POLES/ENCLOSURE/FUSE AS INDICATED (e.g.: 60/3/3R/F40)
MOTOR, HORSEPOWER AS INDICATED, 'F' INDICATES FRACTIONAL HORSEPOWER
MOTOR RATED SWITCH WITH THERMAL OVERLOAD PROTECTION
TRANSFORMER - VOLTAGE/PHASE/KVA AS INDICATED OR SCHEDULED
DIRECTIONAL LANDSCAPE FIXTURE
NOTES:
ELECTRICAL LEGEND
F
MS
T
F
F
WP
S
PS
ST
SK
DS
3S
J
JJ
HA-1,3,5
B
a
1
V
FIRE ALARM SYSTEM AUDIO/VISUAL SIGNAL, ADA APPROVED, BOTTOM MOUNTED 80" AFF 75 CANDELA UNO
S
D
H
PT
FLUSH CEILING BOX WITH DUPLEX RECEPTACLE, NEMA 5-20R
FLUSH CEILING BOX WITH COMBINATION TELEPHONE/DATA OUTLET
FLUSH CEILING BOX WITH TELEPHONE OUTLET
FLUSH CEILING BOX WITH DATA OUTLET
FLUSH CEILING BOX WITH QUAD RECEPTACLE, NEMA 5-20R
CEILING MOUNTED OCCUPANCY OR VACANCY SENSOR
VS
FLOW AND TAMPER SWITCHESFTCARBON MONOXIDE DETECTORC
FLUSH FLOOR BOX WITH DOUBLE DUPLEX RECEPTACLE, NEMA 5-20R
OCCUPANCY OR VACANCY SENSOR WALL-MOUNTED 48" AFF
S
VS
WALL MOUNTED JUNCTION BOX FOR CARD READER (REFER TO PLANS)CR
HA-1,3,5 ADJACENT TO ARROW INDICATES HOMERUN OF CIRCUIT 1,3,5 TO PANEL HA. SLASH MARKS INDICATE THE
NUMBER OF #12 CONDUCTORS. EQUIPMENT GROUNDING CONDUCTORS ARE REQUIRED BUT ARE NOT SHOWN. NO
MARKS INDICATE TWO #12 CONDUCTORS AND ONE #12 GROUND. NUMBER(S) AND LOWER CASE LETTER(S) INDICATE
CIRCUIT AND SWITCH LEG DESIGNATION, RESPECTIVELY CAPITAL LETTERS DESIGNATE FIXTURE TYPE.
1. ALL MOUNTING HEIGHTS ARE TO CENTERLINE OF DEVICES UNO, AND SHALL BE THE MOUNTING HEIGHT USED,
UNLESS SPECIFICALLY INDICATED OTHERWISE ON THE DRAWINGS.
2. ALL SYMBOLS INDICATED IN THIS LEGEND MAY NOT NECESSARILY BE USED ON THE PLANS.
3. REFER TO SPECIFICATIONS FOR DEVICE AND EQUIPMENT SPECIFICATIONS.
4. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF LIGHTING FIXTURES.
5. MOUNTING HEIGHTS FOR LIGHT SWITCHES, RECEPTACLE, FIRE ALARM DEVICES, AND ETC., COMPLY WITH A.D.A.
DO NOT VARY THESE DIMENSIONS.
6. REFER TO ARCHITECTURAL PLANS FOR EXACT DEVICE LOCATIONS AND DIMENSIONS.
OS
FOUR-WAY TOGGLE SWITCH - 48" AFF4S
S
OS
SURFACE MOUNTED MULTI-OUTLET RACEWAY SYSTEM FOR CONDUCTORS AND DEVICES AS SPECIFIED,
LENGTH AS INDICATED
CABLE BOX-MOUNTING HEIGHT AS INDICATED. PROVIDE 1"C FROM BOX TO ABOVE ACCESSIBLE CEILING.TV
SURGE PROTECTIVE DEVICE - REFER TO SPECIFICATIONS
SPD
WIRELESS ACCESS POINTWAP
MOTION DETECTORMD
KEYPAD/KEYFOB ACCESS CONTROL (REFER TO PLANS)KP
DOOR CONTACTDC
ELECTRIC STRIKEES
GLASS BREAK DETECTORGB
WIRELESS RECEIVERWR
DOOR POSITION SENSORDPS
REQUEST TO EXITREX
EMERGENCY CALLEC
KNOX BOX (REFER TO PLANS)KB
SECURITY CAMERA (REFER TO PLANS)
VACANCY SENSOR DIMMER SWITCH WALL-MOUNTED 48" AFF
S
VS/D
THREE-WAY DIMMER SWITCH - 48" AFF3DS
FOUR-WAY DIMMER SWITCH - 48" AFF4DS
CEILING OR WALL MOUNTED EXIT SIGN, ARROWS DENOTE DIRECTION OF EGRESS, DARKENED QUADRANT
INDICATES FACE
A
LIGHTING FIXTURE SCHEDULE
TYPE MANUFACTURER CATALOG NUMBER VOLT LAMP MOUNTING COMMENTS
MSL 10000LM L/LV MVOLT GZ10 40K 90CRI WH 120 32 W SURFACE
W 120 29 W WALLTWR1 LED ALO 40K MVOLT PE DDBTXD
LITHONIA LIGHTING
NOTES:
1. PROVIDE NECESSARY ACCESSORIES AND PARTS
2. ARCHITECT TO CHOOSE COLOR
3. BATTERY BACKUP FOR 90 MINUTES, DIRECTIONAL ARROWS FOR EACH FIXTURE SHOWN,
4. BATTERY BACKUP FOR 90 MINUTES
5. PROVIDE WITH TWO STEP BALLAST CONTROLLED BY MOTION SENSOR. WHEN OCCUPANT ENTERS ROOM, LIGHT TO TURN ON TO 50% BRIGHTNESS.
OCCUPANT TO USE SWITCH TO TURN LIGHTS TO 100%. 15 MINUTES OF ROOM BECOMING VACANT, LIGHT TO DIM TO 50%.
NOTE 2
NOTE 5
D DSDL60-HDLED 120 19 W SURFACELOADING DOCK NOTE 1
X 120 2 W WALLLQM S W 3 R 120/277 EL N NOTE 3
LITHONIA LIGHTING
120 18 W SURFACE
B 120 32 W RECESSEDLITHONIA LIGHTING NOTE 4
-DENOTES PROVIDE LOCK-ON CIRCUIT BREAKER
--
--
--
--
--
--
--
--
--
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
SPACE
SURFACE
PROVIDE FEED-THRU LUGS:
4
6
8
10
12
14
16
2
20
22
24
26
28
30
32
36
38
40
42
34
18
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
CATEGORY TOTALS CONNECTED (KVA)
MISC MTR A/C HTG REC LTS DESCRIPTION
NO.
CKT.
TRIP
MISCMTRA/CHTGRECLTS
DESCRIPTION
NO.
CKT.
CBA
TOTAL CONNECTED LOAD:
NO
MINIMUM BREAKER AIC: 22,000
MAIN RATING
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
SPACE
SPACESPACE
SPACESPACE
SPACESPACE
SPACESPACE
SPACESPACE
SPACESPACE
SPACESPACE
SPACESPACE
SPACESPACE
SPARESPARE
SPARESPARE
SPARESPARE
SPARESPARE
SPARESPARE
SPARESPARE
SPARESPARE
SPARESPARE
SPARESPARE
SPARESPARE
POLE
TRIP
POLE
--
--
--
--
--
--
--
--
--
--
--
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
20/1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
200A MCB000.0
VAC120/208 PHASE3 WIRE4
MOUNTING:
0.0 0.0
TOTAL DEMAND LOAD:
000.0
CATEGORY TOTALS CONNECTED (KVA)
SCHEDULE OF PANEL SJ
PROVIDE IG BUS BAR: NO
NEMA RATING:1
-DENOTES PROVIDE GFCI CIRCUIT BREAKER -DENOTES PROVIDE AFCI CIRCUIT BREAKER
--
--
SPACE
SPACE
41
2BLT2-40L-ADSM-120V-LP935
F CSS L48 3000LM MVOLT 40K 90CRILITHONIA LIGHTING
X1 120 2 W WALL LHQM LED R NOTE 4
LITHONIA LIGHTING
LITHONIA LIGHTING
NOTE 4
WE 120 15 W WALLWDGE2 LED P4 40K 90CRI VF MVOLT E4WH PE NOTE 2,4LITHONIA LIGHTING
LIGHTNING PROTECTION SYSTEM
1. PROVIDE COMPLETE LIGHTNING PROTECTION SYSTEM IN
ACCORDANCE WITH UFC 3-575-01, "LIGHTNING AND STATIC
ELECTRICITY PROTECTION SYSTEMS." ALSO COMPLY WITH UL
96, UL 96A, AND AFI 32-1065.
2. THE LIGHTNING PROTECTION SYSTEM SHALL HAVE AN LPS
INSPECTION PRIOR TO ACCEPTANCE AND SHALL BE CERTIFIED
BY A THIRD PARTY INSPECTOR AS COMPLIANT WITH AFI 32-1065
AND NFPA 780,
3. PROVIDE UL LIGHTNING PROTECTION INSPECTION CERTIFICATE
CERTIFIED TO NFPA 780 AND LPS SHOP DRAWINGS.
4. BOND THE LIGHTNING PROTECTION SYSTEM TO THE EXISTING
LIGHTNING PROTECTION SYSTEM.
FIRE ALARM SYSTEM
1. NEW FIRE ALARM DEVICES SHALL BE EXTENDED TO AND
CONNECTED TO THE EXISTING SIMPLEX 4100U FIRE ALARM
SYSTEM.
2. INSTALL IN ACCORDANCE WITH UFC 3-600-01 FIRE PROTECTION
ENGINEERING FOR FACILITIES, UFC 010-01, NFPA 13, NFPA 72,
AND NFPA 70.
3. ALL WIRING SHALL BE INSTALLED IN EMT CONDUIT THAT IS
CONCEALED. WHERE NOT CONCEALED, IT SHALL BE PAINTED
RED.
PROVIDE NEW 200A/3P BREAKER IN EXISTING PANEL. REMOVE (2)
100A/2P BREAKERS AT LOCATIONS 6 AND 8 IN PANEL. PROVIDE FILLER
SPACE AS REQUIRED.
VOLTAGE DROP TO BE LESS THAN 3%.
NEW
PANEL
SJ
EXISTING
PANEL
MDP
WAREHOUSE RISER DIAGRAM
E-001
1
SCALE: NONE
4#3/0, 1#6(G), 2"C.
E-001
SCM
UP
1 2 3 4
A
B
C
D
4,015 SF
WAREHOUSE24
51 SF
RISER ROOM25
12'x12' CAGEDSTORAGE
FORKLIFTCHARGINGSTATION
PALLETWRAPPINGMACHINE
WOR
K BENC
H
DOCK LEVELER
1
WP
F
F
WP
WP
WP
1
2
WP3
RECEIVER
RECEIVER
WP
FF
F
F
WP
5
PANEL
L1
4
UH-1
AHU-1
WP
WP
F
6
7
7
EF-01
J MOTORIZED DAMPER
D
F T
FIRE ALARM ANNUNCIATOR
#
ELECTRICAL LEGEND NOTES
1. RECEPTACLES TO CHARGE ELECTRIC PALLET JACKS.
COORDINATE FINAL LOCATION WITH OWNER PRIOR TO ROUGH-IN.
2. RECEPTACLES FOR TURNTABLE PALLET WRAPPER. COORDINATE
FINAL LOCATION WITH OWNER PRIOR TO ROUGH-IN.
3. PROVIDE WIRELESS DOORBELL WITH TWO PLUG IN RECEIVERS
FOR ENTRY. DOORBELL MINIMAL RANGE TO RECEIVERS
REQUIRED TO BE AT LEAST 300 FEET. COORDINATE EXACT
LOCATIONS OF DEVICES WITH OWNER/ARCHITECT PRIOR TO
ROUGH-IN.
4. CEILING MOUNTED RECEPTACLE LOCATED AT A CENTRAL
LOCATION TO SUPPORT WIRELESS ROUTER AND ONE
COMMUNICATION OUTLET WITH CONDUIT LOCATED BESIDE THE
CEILING RECEPTACLE.
5. PROVIDE ADDRESSABLE AUTODIALER TO MONITOR THE
SPRINKLER SYSTEM AND AUTOMATICALLY CALL THE MONITORING
COMPANY IN CASE OF FLOW OR ALARM. PROVIDE PULL STATION
AND AUDIO/VISUAL DEVICE BESIDE PANEL. PROVIDE SMOKE
DETECTOR ABOVE PANEL. PROVIDE FLOW AND TAMPER
SWITCHES AS REQUIRED FOR SPRINKLER SYSTEM. EXTEND (1)
3/4"C. FROM PANEL TO BUILDING TELEPHONE BACKBOARD FOR
PHONE LINE. WIRE 2#12, #12(G),3/4"C. TO CIRCUIT AS SHOWN.
SILENT KNIGHT OR EQUAL.
6. SUMP PUMP.
7. FOR OVERHEAD ROLL UP DOORS.
FLOOR PLAN - POWER
E-101
1
SCALE: 1/4" = 1'-0"
1. ALL RECEPTACLES IN WAREHOUSE SHALL BE 48"AFF FROM THE
TOP OF THE RECEPTACLE.
2. OBTAIN MANUFACTURER'S DATA ON ALL EQUIPMENT, THE
DIMENSIONS OF WHICH MAY AFFECT INSTALLATION. USE THIS
DATA TO COORDINATE PROPER SERVICE CHARACTERISTICS,
ENTRY LOCATIONS, ETC., AND TO INSURE MINIMUM CLEARANCES
ARE MAINTAINED.
3. ALL WIRES SHALL BE TERMINATED WITHIN ELECTRICAL BOXES
AND NOT LEFT LOOSE.
4. ALL JUNCTION BOXES AND RECEPTACLES SHALL INDICATE THE
CIRCUITS CONTAINED WITHIN. PROVIDE TYPED LABEL AND
PERMANENTLY AFFIX TO COVERPLATE.
ELECTRICAL GENERAL NOTES
SCALE
FACILITY
H
T
R
F
U
B
T
I
T
S
R
O
F
U
DATE
SHEET
DRAWN BY
OF
PROJECT NUMBER
TRIRIGA PROJECT NUMBER
PR
OJE
CT
T
IT
LE
DR
AW
IN
G S
HE
ET
N
AM
E
TH
UN
IT
ED
S
TA
TE
S A
IR
F
OR
CE
4 C
IV
IL
E
NG
IN
EE
R S
QU
AD
RO
N
SE
YM
OU
R JO
HN
SO
N A
IR
F
OR
CE
B
AS
E, N
OR
TH
C
AR
OL
IN
A
PR
OJE
CT
P
HA
SE
CO
NT
RA
CT
N
o.
TA
SK
O
RD
ER
N
o.
AP
PR
V'D
DA
TE
DE
SC
RIP
TIO
NR
EV
1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
7 8 9 10 111 2 3 4 5 6
H
CO
NS
TR
UC
TIO
N A
DD
IT
IO
N, B
LD
G 3
20
0
35
% S
UB
MIS
SIO
N
VKAG 18-1089
AS SHOWN
08 JAN 2021
E-101
SCM
UP
1 2 3 4
A
B
C
D
4,015 SF
WAREHOUSE24
51 SF
RISER ROOM25
1
WE
D
F
OS
X
X1
F
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
X1
X1
EMEM
EMEM
EM EM
EMEM
3
3
3
3
X
X
EM
OS
WE
W
OS
OS
OS
OS
BB B
D
W
BB B
FLOOR PLAN - LIGHTING
E-201
1
SCALE: 1/4" = 1'-0"
#
ELECTRICAL LEGEND NOTES
1. SUSPEND FIXTURE 10'AFF OVER THE WORK BENCH AREA FOR
TASK LIGHTING.
SCALE
FACILITY
H
T
R
F
U
B
T
I
T
S
R
O
F
U
DATE
SHEET
DRAWN BY
OF
PROJECT NUMBER
TRIRIGA PROJECT NUMBER
PR
OJE
CT
T
IT
LE
DR
AW
IN
G S
HE
ET
N
AM
E
TH
UN
IT
ED
S
TA
TE
S A
IR
F
OR
CE
4 C
IV
IL
E
NG
IN
EE
R S
QU
AD
RO
N
SE
YM
OU
R JO
HN
SO
N A
IR
F
OR
CE
B
AS
E, N
OR
TH
C
AR
OL
IN
A
PR
OJE
CT
P
HA
SE
CO
NT
RA
CT
N
o.
TA
SK
O
RD
ER
N
o.
AP
PR
V'D
DA
TE
DE
SC
RIP
TIO
NR
EV
1 2 3 4 5 6 7 8 9 10 11
A
C
D
G
7 8 9 10 111 2 3 4 5 6
H
CO
NS
TR
UC
TIO
N A
DD
IT
IO
N, B
LD
G 3
20
0
35
% S
UB
MIS
SIO
N
VKAG 18-1089
AS SHOWN
08 JAN 2021
E-201
SCM