Regional Installation Facilities and
Environment Overview
November 2012
CAPT John Carson, USN, PEMCBCL Public Works Officer
IOC: 1 Oct 2011FOC: 1 Oct 2012
Single Commander for All Installations Functions &
Funding
Command of Marine Corps Installations East, West, and Pacific
3
Marine Corps InstallationsCommand
MCICOM Command Relationships
4
MajGen Kessler serves as HQMC LF, COMMCICOM and COMMCNCR
Double-Hatted as Base and Region
Functional & Financial oversight of Training Bases
• “Combined” HQ Organization is Lean– Many vacant billets still subject to hiring freeze
• Similar Structure for MCICOM, East, West and Pacific– Possible path to improved standardization across installations
• Most Facilities Functions in a Single Directorate– Improved coordination and collaboration
MCICOM Organizational Structure
GFFACILITIES
SPECIAL STAFF
G1PERSONNEL /
SUPPORT
G3/5/7OPS/PLANS/
ASSESSMENTS
G4LOGISTICS
G6INFO SYS
G8RESOURCES
Total HQ Structure – 169
ADC LF / MCICOM /MCNCRC
16
15 25 27 10 25 50
5
Marine Corps Installations CommandGF / Facilities Directorate
6
MCICOM “GF” Coding
• GF-1: Facility Operations and Energy
• GF-2: FSRM
• GF-3: Housing Management
• GF-4: Military Construction
• GF-5: Environmental Management
• GF-6: Real Estate / Asset Utilization
• GF-7: Fac Planning / Conservation
777
MCIEAST / MCB
Camp Lejeune
MCIEAST Installations
MCAF Quantico
MCAS Cherry Point
MCAS New River
MCB Camp Lejeune
MCAS Beaufort
MCLB Albany
MCSF Blount Island
MCRD Parris Island
• 36+ Million square feet of facilities
• 172 Thousand acres
• $12.6 Billion PRV– $126 Million Local (M1/R1)
FSRM
– $210+ Million M2/R2 FSRM
• 8000+ homes
• 231 BQs
• 11 Threatened and Endangered Species
(Functional & Financial oversight)
8
Construction Summary
$3.53 Billion FY 08-12
$2,000,000 – construction per day
9
Fiscal Year
Mil
lion
s of
Dol
lars
FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14
749
1109
1980
27002500
1200
741 863
521 512690
8271059
355 209 207
USMC
MCIEAST
USMC MILCON AveragePre-2007~ $250M
MILCON Funding HistoryUSMC and MCIEAST
MILCON Funding HistoryMCIEAST and NC
Fiscal Year
Mil
lion
s of
Dol
lars
FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14
521 512
690
827
1059
355
209 207436483
605
814855
297127 124
MCIEAST
NC Installations
USMC MILCON AveragePre-2007~ $250M
11
Camp Lejeune, New River and Cherry Point MILCON History
Fiscal Year
Mil
lion
s of
Dol
lars
Record Year
12
MCIEAST North CarolinaMilitary Construction Funding
* Waiting for PRESBUD to be passed.** Submitted in budget process to Congress.
• FY11 ~ Largest MILCON year for Camp Lejeune, New River, and Cherry Point.
• FY12 shows a significant decline in MILCON.
•FY13 pre-award packages are nearing completion .
•FY14 have been authorized for design and continue through the budget approval process.
* **
Future projections return to “normal” funding levels.
Key Installations Funding
13
Total FY07-14 MILCON Program: $3.1BIncludes SOCOM and BUMED funding
FY07-FY14 MILCON DistributionCamp Lejeune
15
USMC POM14 MILCON Summary
USMC Aviation•HMLA•Joint Strike Fighter (JSF)•CH53K•MV22 Osprey
Operational•Marine Corps Security Force Regiment Consolidation•MCTOG/MCLOG/Intel
Professional Military Education•The Basic School•WTBn•Marine Corps University
Pre-decisional – Pending OSD and Congressional Budget Approval
16
FY12 MILCON Projects (NC)
Program Year Station Project Number Project Title Cost
2012 MCAF QUANTICO P611 BEQ 31,374
2012 MCAF QUANTICO P612 Enlisted Dining Facility 5,034
2012 MCAF BEAUFORT P442 Vertical Landing Pads F-35B 21,096
2012 MCAS CHERRY POINT P991 H-1 Y/Z Gearbox Repair & Test Facility 17,760
2012 MCAS NEW RIVER P705 Aircraft Maintenance Hangar and Apron 69,511
2012 MCAS NEW RIVER P710 Ordnance Loading Area Addition 9,4192012 MCB CAMP LEJEUNE P030 Squad Battle Course 16,821
2012 MCB CAMP LEJEUNE P1253 2n Combat Engineer Maint/Ops Complex 75,214
2012 MCB CAMP LEJEUNE P138 BEQ - Wallace Creek 27,439
2012 MCB CAMP LEJEUNE P1383 Base Entry Point and Road - Phase 2 81,008
FY12 MCIEAST MILCON TOTAL: 354,676
2012 SOCOM MCB CAMP LEJEUNE P-1285 SOF Aromory Facility Expansion 6,700
2012 SOCOM MCB CAMP LEJEUNE Q419 SOF Battalion Aid Station Expansion 6,925
Other FY12 TOTAL: 13,625
20
FY13 MILCON Projects (NC)
Pre-decisional – Pending Congressional Budget Approval
Program Year Station Project Number Project Title Cost
2013 MCAS BEAUFORT P465 F-35B Aircraft Hangar - VMFA 42,010
2013 MCAS BEAUFORT P459 Recycling/Hazwaste Facility 3,743
2013 MCAS BEAUFORT P456 Simulated LHD Deck F-35B 12,887
2013 MCAS BEAUFORT P472 Airfield Security Upgrades 13,675
2013 MCAS BEAUFORT P427 Ground Support Equip. Shop 9,465
2013 MCAS CHERRY POINT P163 Marine Air Support Squadron Compound 34,310
2013 MCAS CHERRY POINT P601 Armory 11,581
2013 MCAS NEW RIVER P711 Personnel Administration Center 8,525
2013 MCB CAMP LEJEUNE P1384 New Base Entry Point and Road Ph3 40,904
2013 MCB CAMP LEJEUNE P003 Staff NCO Academy Facilities 28,986
2013 (UMC) MCB CAMP LEJEUNE P1425 Overhead Range Baffle System Construction 2,900
FY13 MCIEAST TOTAL: 208,986
2013 SOCOM MCB CAMP LEJEUNE Q1218 SOF MSOB-Company/Team Facilities 52,663
2013 SOCOM MCB CAMP LEJEUNE Q1393 SOF SERE Training Facilities 5,389
Other FY13 TOTAL: 58,052
FY14 MILCON Projects (NC)
As identified in USMC FY14 MILCON budget proposal.
Program Year Station Project Number Project Title Cost
2014 MCLB Albany P954 CERS Dispatch Facility 1,010
2014 MCLB Albany P934 Weapons Storage/Inspection Facility 15,600
2014 MCAS Beaufort P473 Townsend Bombing Range Land Acq. Ph. 1 63,170
2014 MCAF Quantico P1406 ATC TX/RX Relocation 3,630
2014 MCAS New River P726 Regional Communication Station 20,098
2014 MCAS New River P676 CH-53K Maintenance Training Facility 13,218
2014 MCAS New River P674 Corrosion Control Hangar 12,547
2014 MCB Camp Lejeune P1349 Special Operations Training Complex 22,515
2014 MCB Camp Lejeune P1353 Landfill, Phase IV 20,795
2014 MCB Camp Lejeune P1445 Steam Decentralization - Camp Johnson 2,620
2014 MCB Camp Lejeune P1447 Steam Decentralization - Hadnot Point 13,390
2014 MCB Camp Lejeune P1448 Steam Decentralization - BEQ Nodes 18,679
FY14 MCIEAST TOTAL: 207,272
2014 SOCOM MCB Camp Lejeune P1362 SOF Performance Resliency Center 11,000
2014 SOCOM MCB Camp Lejeune P1391 SOF Sustainment Training Complex 28,600
Other FY14 TOTAL: 39,600
Planned MCCS Maintenance Repair
MCCS Project Title Estimate
Temporary Lodging Facility Addition (awarded)
$11,090,000
New Marine Mart, Onslow Beach (awarded)
$ 1,172,000
Marine Mart Addition/Renovation, French Creek $ 3,205,000Marine Mart Addition/Renovation, Gonzales Blvd $ 2,187,000New Marine Mart, Wallace Creek $ 6,941,000Temporary Lodging Facility Renovation $ 7,861,000Renovate Field House 751 ** $ 2,239,000New Marine Mart, Knox Area (FY14) $ 4,675,000New Marine Mart, Naval Hospital and Wounded Warrior Area (FY14) $ 3,183,000
** All USACE except Renovate Field House 751
23
Facilities Sustainment Restoration and Modernization (FSRM) Program
Types of Work
All things maintenance and repair Barracks Renovations
Mechanical/HVAC ReplacementsRoof Repairs/ReplacementsUtility System UpgradesDemolitionFire Protection System Energy ImprovementsPaving Painting
All new construction less than $750K
24
FY12 “Maintenance and Repair” Construction Program
• MCIEAST North Carolina installations– Ranges from painting to complete building renovation– $160 million awarded for more than 500 projects
• Projects range from a few thousand to several million dollars– Camp Lejeune
• $80 million awarded– New River
• $24 million awarded– Cherry Point
• $56 million awarded
• FY13 funding will be similar to last year– Projects typically approved in November
• Funding projections beyond FY13 remain steady
Energy is a Strategic Imperative
• Unprecedented Funding– $200M+ Executed in FY12– $150M in FY13 – Over $100M in FY14
• Cost Effectiveness
• Meters & Info Management
• Smart Grids & Security
25
26
Energy IntensityMCB Camp Lejeune
GTF/ Newer Footprint
27
Energy Intensity Goal Looking Ahead
• Nearly half of our energy is used to produce steam– Steam used to generate heat and domestic hot water– Good steam distribution system loses 30%
• Our systems lose more than 40%• Maintenance intensive to keep system efficient
• Steam decentralization is key to our “intensity” success……..– Camp Lejeune decentralization contributes 15% towards the regional
goal – “HALF”– As we decentralize, we will lose opportunities for renewable projects that
require central heating plants• Decentralizing steam will make it more difficult to meet both
“intensity” and “renewable” goals– Multi Year plan leveraging ECIP, EIP, and MILCON
• $100M Program slated for execution FY12 – 14
28
Energy News
• Projects– Energy Audits
– FY12 Completes 1st cycle of Audit Requirements
– ~20MSF / ~500 Facilities Audited
– Energy Improvements with M&R program• Building envelope improvements • Replace chillers and HVAC systems• Building lighting retrofits and occupancy sensors• DDC / EMCS
– HID / LED lighting replacement ~20 Facilities awarded
– LED Streetlight replacement ~750 fixtures awarded
– Heat and Hot Water Efficiency Upgrades (Steam Decentralization)
• $40M - FY12 / $70M - FY13/14
– Ground Coupled Heat Pumps installed on BEQs
29
Renewable Energy
• Solar PV– 13 MW of Photovoltaic systems under
design/construction/operation• 1MW contributes 0.2% towards goal at Lejeune
– 5 MW from MILCON reinvestment projects• Wind
– Wind energy is not compatible with operational considerations and training impacts for low level training flights
• Biomass– Discussed potential Biomass plant with Progress Energy– Progress withdrew from discussion due to economics / NC Policy– Evaluation of Biomass continues
30
Energy - Challenges
• Meeting aggressive federal energy mandates
• Renewable energy mandates challenged by low cost of electricity – Progress Energy: Electricity cost 6.5 cents/kwh
– Lowest cost renewable (Biomass) runs 14 cents/kwh
• Funding and training for O&M of ‘newer’ energy technologies
• Management & Accounting of Renewable Energy Credits (?)
• Information technology support for advanced base wide building energy monitoring/metering systems
– IT Security concerns
• Adequate manpower for future Energy Section growth and to stay ahead of the developing technology curve
31
Construction Opportunities
• Traditional construction projects– Military Construction
• New construction and development– These projects are multi-million dollar contracts– Each project approved by Congress
– Renovation, maintenance and repair• Projects can range from a few thousand to several million dollars
– Includes complete building renovations and utility plant and infrastructure repairs
– Funding managed within the Marine Corps– History of consistent funding levels to sustain facilities
• Architectural and Engineering Services– Design drawings (DB and DBB)– Wide range of consulting services
32
Take Aways…
•More than $300 million in construction opportunities in Eastern NC this year.
– Project size varies widely, from a few thousand dollars to tens of millions each.
• FY11 was a “record setting” year• FY12 was the last “larger than normal” year.• FY13 and beyond returning to “normal” .
• Energy has become a significant focus for the Marine Corps •Still more than $2 billion currently under construction
– In various stages of construction
• Record years behind us but still significant work ahead– Approximately $300 million each year over next few years
33
Overview of Contracting Tools by NAVFAC
CDR Scott Cloyd
Midlant A/E Contracts
Indefinite Delivery Indefinite Quantity (IDIQ)
Active Contracts FirmAward Date
Expiration Date
Maximum Amount
Value Engineering and Cost Estimating
Downey and Scott 03/2009 03/2014 $5M/Life
Architectural Design and Engineering Services
HBA 02/2010 02/2015 $15M/Life
Architectural Design and Engineering Services
AECOM 02/2010 02/2015 $15M/Life
Civil Design and Engineering Services Richard Catlin 03/2010 03/2015 $7.5M/Life
Utilities Engineering Services AECOM 03/2010 03/2015 $30M/Life
Civil Design and Engineering Services C. Allan Bamforth, Jr. 06/2010 06/2015 $7.5M/Life
34
Active Contracts
FirmAward Date
Expiration Date
Maximum Amount
Business Type
Mechanical Wiley & Wilson 05/2008 05/2013 $4M LB
Architecture Maune Belangia Faulkenberry 06/2008 06/2013 $4M SB
ArchitectureWalker Group Architecture Inc.
06/2008 6/2013 $4M SDBWO
Planning HBA/VHB Joint Venture 07/2008 07/2013 $3M LB
ArchitectureTalley & Smith Architecture Inc.
07/2008 07/2013 $4M SB
Civil Avolis Engineering 03/2009 03/2014 $4M SB
Civil C. Allen Bamforth 06/2009 06/2014 $4M SB
OICC Local A/E Contracts
Indefinite Delivery Indefinite Quantity (IDIQ)
3535
Cherry Point Local A/E Contracts
Active Contracts FirmAward Date
Expiration Date
Maximum Amount
Business Type
Mechanical & Electrical CEMS 02/2009 02/2013 $3.5M SDVOSB
Civil/Structural NRW Engineering 02/2009 02/2013 $2.5M SB
Mechanical & Electrical Bowman, Foster, & Associates 05/2009 05/2013 $3.5M VOSB
Civil/Structural Greenhorne & O’Mara 05/2009 05/2013 $2.5M LB
ArchitecturalMaune, Belangia, & Faulkenberry
05/2010 05/2014 $3.5M SB
Architectural Walker Group 06/2010 06/2014 $3.5M WOSB
Architectural DJG, Inc 06/2010 06/2014 $3.5M LB
Environmental MACTEC 09/2010 09/2014 $4.0M LB
Environmental EEE Inc. 09/2010 09/2014 $4.0M SDB, 8A
Indefinite Delivery Indefinite Quantity (IDIQ)
36
Midlant D/B MACC
FirmAward Date
Existing Option
Expiration Date
Maximum Amount
Remaining Capacity
DCK North America, LLC
08/16/2010 2nd Option 08/16/2013 $750M/Life$613.7 M for
Life
Whiting-Turner Contracting Company
08/16/2010 2nd Option 08/16/2013 $750M/Life$613.7 M for
Life
Walbridge Aldinger Company
08/16/2010 2nd Option 08/16/2013 $750M/Life$613.7 M for
Life
Sundt Construction, Inc. 08/16/2010 2nd Option 08/16/2013 $750M/Life$613.7 M for
Life
Hardin-WGI Joint Venture
08/16/2010 2nd Option 08/16/2013 $750M/Life$613.7 M for
Life
37
Design Build MACCAwarded as Base + Option Years
MACC Status
Active MACCS
Award DateExisting Option
Expiration Date
Maximum Amount
Remaining Capacity
General Mini 01/13/2009 3rd Option 01/12/2013 $20M/yr. $12.9 M (for option period)
8(a) 03/07/2011 1st Option 03/06/2013 $100M/Life $94.8 M (for life of contract)
Mechanical 04/28/2009 3rd Option 04/27/2013 $300M/Life $193 M (for life of contract)
Painting 05/11/2010 2nd Option 05/10/2013 $100M/Life $95.6 M (for life of contract)
HubZone 08/16/2011 1st Option 08/15/2013 $100M/Life $94 M (for life of contract)
Civil/Paving 09/01/2009 3rd Option 08/31/2013 $90M/Life $11 M (for life of contract)
Roof 09/09/2010 2nd Option 09/08/2013 $100M/Life $90.9 M (for life of contract)
General (SB) 09/15/2010 2nd Option 09/14/2013 $450M/Life $320 M (for life of contract)
3838
New MACCS Award DateMaximum Amount
Status
SDVOSB
(Proposed New)TBD $100M Acquisition Planning
Civil/Paving TBD $100M Acquisition Planning
New MACCs
3939
Services Contracts Status – OICC
Active ContractsAward Date
Existing Option
Expiration Date
Award Amount (Including Options)
Current Contract Value
Wood Grinding and Yard Waste Grinding and Concrete Crushing at Landfill
09/21/11 1st Option 09/20/13 $2,674,110 $891,180
Boiler Controls at Building 1700 09/22/11 1st Option 09/30/13 $241,992 $73,729
EMCS at NH100 09/22/11 1st Option 09/30/13 $3,778,237 $2,478,923
Pest Control 09/30/12 Base Year 09/30/13 $662,340 $132,468
Cleaning of Breach/Shoot Houses
09/30/11 1st Option 09/30/13 $899,880 $636,619
Multiple Service Contract 09/30/11 1st Option 09/30/13 $2,793,466 $1,431,826
Operation of Onslow Beach Bridge
09/26/12 N/A 09/30/12 $97,020 $97,020
Custodial, Naval Hospital & Med/Dental Clinics
09/26/08 3rd Option 09/30/13 $14,588,809 $18,429,706
4040
Services Contracts Status – OICC
Active ContractsAward Date
Existing Option
Expiration Date
Award Amount (Including Options)
Current Contract Value
Bullet Trap Management 01/01/09 3rd Option 12/03/12 $445,000 $289,383
Veeder Root System Repair & Maintenance
12/27/07 4th Option 12/27/12 $408,100 $375,296
Grounds Maintenance, Outlying Roads
06/16/08 3rd Option 12/31/12 $3,075,907 $3,222,547
Morehead City Port Refuse Service
01/01/09 3rd Option 12/31/12 $13,379 $10,542
Custodial Services, Basewide 02/01/10 2nd Option 01/31/13 $5,276,284 $4,775,592
Outdoor Pool Service Contract 02/01/10 2nd Option 01/31/13 $85,250 $50,212
Sampling & Analysis of Wells 02/01/11 1st Option 01/31/13 $702,940 $227,745
Service For Uninterrupted Power
02/19/10 2nd Option 02/15/13 $251,100 $223,155
4141
Services Contracts Status – OICC
Active ContractsAward Date
Existing Option
Expiration Date
Award Amount (Including Options)
Current Contract Value
Scale Hardware/Software Support for Landfill
11/04/09 2nd Option 02/17/13 $35,325 $32,032
Maintenance/Repair Railroad Trackage
03/30/12 Base 03/29/13 $1,375,400 $520,670
Facilities Maintenance Support Services
01/07/10 2nd Option 03/31/13 $187,326,438 $64,497,195
Grounds Maintenance MCAS NR, Camp Geiger and Johnson
03/20/08 4th Option 03/31/13 $4,246,081 $4,484,459
Grounds Maintenance Mainside 03/27/08 4th Option 03/31/13 $9,448,548 $11,034,477
Shrub/Flower Bed Maintenance 05/01/12 Base 04/30/13 $3,801,984 $953,237
Maintenance & Certification of Cranes, Basewide
05/01/11 1st Option 04/30/13 $984,620 $672,776
M&R Screw Pumps, MCBCL 06/01/10 2nd Option 05/31/13 $496,843 $293,636
4242
How do I get this work?
• To be a Prime Contractor
– Register in the Central Contractor Registration (CCR)
– Obtain a Duns & Bradstreet Number (DUNS)
• To Subcontract
– Contact any of the following (Names & POCs listed in handout)
• Multiple Award Construction (MAC) Contractor
• Base Operating Support Contract (BOSC)
• Housing Privatization Contractor
– Meet the minimum requirements to gain access the base
43
• Solicitation & Award Venues:
– Federal Business Opportunities (FedBizOpps) address – https://www.fbo.gov
– Navy Electronic Commerce Online (NECO) address – https://www.neco.navy.mil
– POC: Sharon Taylor, Supervisory Contract Specialist NC IPT, (757) 322-8258