1 4 5 6 1 4 1 v a 6 ' --- ---- 1 4 · 035 steam generator 041 steam dump/turbine i-

20
ES-401 PWR Examination Outline Form ES-401-2 Facility: Millstone Unit 2 Date of Exam: 12/18/09 RO KJA Category Points SRO-Only Points Tier Group { K K K K A A A A G r 1 3 4 5 6 1 2 3 4 * A2 G* Total " 1. 1 V A 6 10 "- Emergency & Abnormal 2 /' 9 2 2 4 Plant )< Evolutions Tier Totals '" 27 4 6 10 ./ 1 " "" 28 1 4 5 2. Systems 2 "" 10 N/A 1 2 3 Plant L ........ Tier Totals 2 6 8 3. Generic Knowledge and Abilities "1- --10 1 2 3 4 --- ,...... ---- Categories ---- 2 2 2 1 7 Note: 1. Ensure that at least 2 topics from every KlA category are sampled within each tier of the RO and SRO outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each KlA category shall not be less than 2). 2. The point total for each group and tier in the proposed outline must match those specified in the table. The final point total for each group and tier may deviate by ±1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO·only exam must total 25 points. 3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate KlA statements. 4. SEflect topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution. 5. Absent a plant specific, only those KlAs having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively. 6. Select SRO topics for Tiers 1 and 2 from the shaded systems and KlA categories. * 7. The generic KlAs in Tiens 1 and 2 shall be selected from Section 2 of the KlA Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable KlAs. 8. On the following pages, enter the KlA numbens, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than A2 or G' on the SRO-only exam, enter it on the left side of column A2 for Tier 2 Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams. 9. For Tier 3, s.elect topics form Section 2 of the KIA catalog, and enter the KlA numbers, descriptions, IRs, and point totals (#) on Form ES-40103. Limit SRO selections to K/As that are linked to 10 CFR 55.43. ES-401 PWR Examination Outline Form ES-401-2 Facility: Millstone Unit 2 Date of Exam: 12/18/09 RO KJA Category Points SRO-Only Points Tier Group { K K K K A A A A G r 1 3 4 5 6 1 2 3 4 * A2 G* Total " 1. 1 V A 6 10 "- Emergency & Abnormal 2 /' 9 2 2 4 Plant )< Evolutions Tier Totals '" 27 4 6 10 ./ 1 " "" 28 1 4 5 2. Systems 2 "" 10 N/A 1 2 3 Plant L ........ Tier Totals 2 6 8 3. Generic Knowledge and Abilities "1- --10 1 2 3 4 --- ,...... ---- Categories ---- 2 2 2 1 7 Note: 1. Ensure that at least 2 topics from every KlA category are sampled within each tier of the RO and SRO outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each KlA category shall not be less than 2). 2. The point total for each group and tier in the proposed outline must match those specified in the table. The final point total for each group and tier may deviate by ±1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO·only exam must total 25 points. 3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate KlA statements. 4. SEflect topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution. 5. Absent a plant specific, only those KlAs having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively. 6. Select SRO topics for Tiers 1 and 2 from the shaded systems and KlA categories. * 7. The generic KlAs in Tiens 1 and 2 shall be selected from Section 2 of the KlA Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable KlAs. 8. On the following pages, enter the KlA numbens, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than A2 or G' on the SRO-only exam, enter it on the left side of column A2 for Tier 2 Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams. 9. For Tier 3, s.elect topics form Section 2 of the KIA catalog, and enter the KlA numbers, descriptions, IRs, and point totals (#) on Form ES-40103. Limit SRO selections to K/As that are linked to 10 CFR 55.43.

Upload: others

Post on 19-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 PWR Examination Outline Form ES-401-2

Facility: Millstone Unit 2 Date of Exam: 12/18/09

RO KJA Category Points SRO-Only Points

Tier Group ~{ K K K K A A A A G r1 3 4 5 6 1 2 3 4 * A2 G* Total

" 1. 1 '~ V A 6

~ 10 "­

Emergency & Abnormal 2

/' 9 2 2 4

Plant )<Evolutions Tier Totals

'" 27 4 6 10

./

1 " "" 28 1 4 5

2. Systems 2 "" 10 N/A 1 2 3

Plant L ........

Tier Totals ~ 2 6 8

3. Generic Knowledge and Abilities "1­~ ~,-~--10 1 2 3 4 --- ,...... ---­Categories ~ ---­ 2 2 2 1 7

Note: 1. Ensure that at least 2 topics from every KlA category are sampled within each tier of the RO and SRO outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each KlA category shall not be less than 2).

2. The point total for each group and tier in the proposed outline must match those specified in the table. The final point total for each group and tier may deviate by ±1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO·only exam must total 25 points.

3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate KlA statements.

4. SEflect topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.

5. Absent a plant specific, only those KlAs having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.

6. Select SRO topics for Tiers 1 and 2 from the shaded systems and KlA categories.

*7. The generic KlAs in Tiens 1 and 2 shall be selected from Section 2 of the KlA Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable KlAs.

8. On the following pages, enter the KlA numbens, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than A2 or G' on the SRO-only exam, enter it on the left side of column A2 for Tier 2 Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.

9. For Tier 3, s.elect topics form Section 2 of the KIA catalog, and enter the KlA numbers, descriptions, IRs, and point totals (#) on Form ES-40103. Limit SRO selections to K/As that are linked to 10 CFR 55.43.

ES-401 PWR Examination Outline Form ES-401-2

Facility: Millstone Unit 2 Date of Exam: 12/18/09

RO KJA Category Points SRO-Only Points

Tier Group ~ { K K K K A A A A G r 1 3 4 5 6 1 2 3 4 * A2 G* Total

" 1. 1 '~ V A 6

~ 10 "-

Emergency & Abnormal 2

/' 9 2 2 4

Plant )< Evolutions Tier Totals

'" 27 4 6 10

./

1 " "" 28 1 4 5

2. Systems 2 "" 10 N/A 1 2 3

Plant L ........

Tier Totals ~ 2 6 8

3. Generic Knowledge and Abilities "1-~ ~,-~ --10 1 2 3 4 --- ,...... ----Categories ~ ---- 2 2 2 1 7

Note: 1. Ensure that at least 2 topics from every KlA category are sampled within each tier of the RO and SRO outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each KlA category shall not be less than 2).

2. The point total for each group and tier in the proposed outline must match those specified in the table. The final point total for each group and tier may deviate by ±1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO·only exam must total 25 points.

3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate KlA statements.

4. SEflect topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.

5. Absent a plant specific, only those KlAs having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.

6. Select SRO topics for Tiers 1 and 2 from the shaded systems and KlA categories.

* 7. The generic KlAs in Tiens 1 and 2 shall be selected from Section 2 of the KlA Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable KlAs.

8. On the following pages, enter the KlA numbens, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than A2 or G' on the SRO-only exam, enter it on the left side of column A2 for Tier 2 Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.

9. For Tier 3, s.elect topics form Section 2 of the KIA catalog, and enter the KlA numbers, descriptions, IRs, and point totals (#) on Form ES-40103. Limit SRO selections to K/As that are linked to 10 CFR 55.43.

Page 2: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES·401 2 Form ES-401-2

ES-401 Emerg

E/APE # 1Name 1Safety Function

(BW/E02&E10; CE/E02) Reactor - Recovery 11

000008 Pressurizer Vapor Space Accident 13

000009 Small Break LOCA I 3

000011 Large Break LOCA 13

000015/17 RCP Malfunctions I 4

000022 Loss of Rx Coolant I 2

000025 Loss of RHR System I 4

000026 Loss of Component Cooling Water 18

Pressurizer Pressure Control Malfunction 13

000029 ATWS 11

000038 Steam Gen. Tube Rupture 13

000040 (BW/E05; CE/E05; W/E12) Steam Line Rupture - Excessive Heat Transfer I 4

000054 (CE/E06) Loss of Main Feedwater 14

000055 Station Blackout 1 6

000056 Loss of Off-site Power /6

000057 Loss of Vital AC Inst. Bus 1 6

000058 Loss of DC Power I 6

000065 Loss of Instrument Air 18

000077 Generator Voltage and Electric Grid Disturbances I 6

KIA Category Totals:

PWR Examination Outline Form ES-401-2 and Abnormal Plant Evolutions Tier 1/Group 1

KKK A A G 12312

KIA Topic(s) IR

2.1.31 - Ability to locate control room 4.6/4.3 switches, controls, and indications, and to determine that they correctly reflect the desired plant

EA2.06 - Ability to determine or interpret 3.7*/4.0" the following as they apply to a Large Break LOCA: That fan is in slow speed and dampers are in accident mode . LOCA

2.1.7 - Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

2.1.30 - Ability to locate and operate local controls.

4.4/4/7

4.4/4.0

2.4.35 Knowledge oflocal auxiliary 3.8/4.0 operator tasks during an emergency and the resultant erational effects.

#

2

3

4

5

AA2.06 - Ability to determine and interpret 3.6*/4.2 6 the following as they apply to the Loss of Instrument Air: When to trip reactor if instrument air pressure is de-creasing

Group Point Total:

ES-401

ES·401

ES-401 Emerg

E/APE # 1 Name 1 Safety Function

(BW/E02&E10; CE/E02) Reactor - Recovery 11

000008 Pressurizer Vapor Space Accident 13

000009 Small Break LOCA I 3

000011 Large Break LOCA 13

000015/17 RCP Malfunctions I 4

000022 Loss of Rx Coolant I 2

000025 Loss of RHR System I 4

000026 Loss of Component Cooling Water 18

Pressurizer Pressure Control Malfunction 1 3

000029 ATWS 11

000038 Steam Gen. Tube Rupture 1 3

000040 (BW/E05; CE/E05; W/E12) Steam Line Rupture - Excessive Heat Transfer I 4

000054 (CE/E06) Loss of Main Feedwater 14

000055 Station Blackout 1 6

000056 Loss of Off-site Power /6

000057 Loss of Vital AC Inst. Bus 1 6

000058 Loss of DC Power I 6

000065 Loss of Instrument Air 18

000077 Generator Voltage and Electric Grid Disturbances I 6

KIA Category Totals:

2 Form ES-401-2

PWR Examination Outline Form ES-401-2 and Abnormal Plant Evolutions Tier 1/Group 1

KKK A A G 12312

KIA Topic(s) IR

2.1.31 - Ability to locate control room 4.6/4.3 switches, controls, and indications, and to determine that they correctly reflect the desired plant lineu .

EA2.06 - Ability to determine or interpret 3.7*/4.0" the following as they apply to a Large Break LOCA: That fan is in slow speed and dampers are in accident mode . LOCA

2.1.7 - Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

2.1.30 - Ability to locate and operate cOlnn<me:nts. inelu local controls.

4.4/4/7

4.4/4.0

2.4.35 Knowledge oflocal auxiliary 3.8/4.0 operator tasks during an emergency and the resultant effects.

#

2

3

4

5

AA2.06 - Ability to determine and interpret 3.6*/4.2 6 the following as they apply to the Loss of Instrument Air: When to trip reactor if instrument air pressure is de-creasing

Group Point Total:

ES-401

Page 3: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 3 Form ES-401-2

ES-401 PWR Examination Outline FORM ES-401-2 Emo,rnoni"'\1 and Abnormal Plant Evolutions - Tier 1/Group 2 (RO 1

============~~========~=====9==91

E/APE # 1Name 1Safety Function

000001 Continuous Rod Withdrawal 1 1

000003 Dropped Control Rod 11

Control Rod / 1

0032 Loss of Source Range NI 17

000033 Loss of Intermediate Ran NI/7

000036

000037 Steam Generator Tube Leak 13

000051 Loss of Condenser Vacuum /4

000059 Accidental Li RadWaste ReI. / 9

000060 Accidental Gaseous Radwaste ReI. / 9

000061 ARM System Alarms /7

000067 Plant Fire On-site I 8

000068 Control Room Evac. / 8

000069 (W/E14) Loss of CTMT Integrity /5

000074 (W/E06&E07) Inad. Core Cooling /4

000076 High Reactor Coolant Activity /9

A13; W/E09&E10 Natural Circ./4

- PTS /4

KKK 123

KIA Topic(s) IR #

M2.04 - Ability to determine and 3.4*/3.6* 7 interpret the following as they apply to the Dropped Control Rod: Rod motion stops due to dropped rod

2.4.18 - Knowledge of the specific bases for EOPs.

3.3/4.0 8

2.4.30 - Knowledge of events 2.7/4.1 9 related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.

M2.02 - Ability to determine and 2.4/2.7* 10 interpret the following as they apply to the High Reactor Coolant Activity: 'Nhen demlneralizer resin needs to be replaeed. Does NOT distinguish between a competent and incompetent SRO.

M2.07 - Corrective Actions required 2.8/3.4 for high fission product acti vity in RCS

ES-401

ES-401 3 Form ES-401-2

ES-401 PWR Examination Outline FORM ES-401-2 Emo,rnoni"'\1 and Abnormal Plant Evolutions - Tier 1/Group 2 (RO 1

============~~========~=====9==91

E/APE # 1 Name 1 Safety Function

000001 Continuous Rod Withdrawal 1 1

000003 Dropped Control Rod 1 1

Control Rod / 1

0032 Loss of Source Range NI 17

000033 Loss of Intermediate Ran NI/7

000036

000037 Steam Generator Tube Leak 13

000051 Loss of Condenser Vacuum /4

000059 Accidental Li RadWaste ReI. / 9

000060 Accidental Gaseous Radwaste ReI. / 9

000061 ARM System Alarms /7

000067 Plant Fire On-site I 8

000068 Control Room Evac. / 8

000069 (W/E14) Loss of CTMT Integrity /5

000074 (W/E06&E07) Inad. Core Cooling /4

000076 High Reactor Coolant Activity /9

A13; W/E09&E10 Natural Circ./4

- PTS /4

KKK 123

ES-401

KIA Topic(s) IR #

M2.04 - Ability to determine and 3.4*/3.6* 7 interpret the following as they apply to the Dropped Control Rod: Rod motion stops due to dropped rod

2.4.18 - Knowledge of the specific bases for EOPs.

3.3/4.0 8

2.4.30 - Knowledge of events 2.7/4.1 9 related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.

M2.02 - Ability to determine and 2.4/2.7* 10 interpret the following as they apply to the High Reactor Coolant Activity: 'Nhen demlneralizer resin needs to be replaeed. Does NOT distinguish between a competent and incompetent SRO.

M2.07 - Corrective Actions required 2.8/3.4 for high fission product acti vity in RCS

Page 4: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES·401 4 Form ES-401·2

ES-401 PWR Examination Outli ,s;;.--..... Plant ......\"~r""rns - Tier 2/Grou

Form ES-401-2

System # / Name K 1

K 2

KKK 3 4 5

K 6

KIA Topic(s) IR #

003 Reactor Coolant Pump 2.1.23 - Ability to perform specific system and integrated plant procedures during all modes of

ant "n"ra'C1n"

4.3/4.4 11

004 Chemical and Volume Control

A2.15 - Ability to (a) predictthe impacts of the following malfunctions or operations on the eves; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: High or low PZR level

3.5/3.7 12

005 Residual Heat Removal

006 Emergency Core Cooling

007 Pressurizer Relief/Quench Tank

008 Component Cooling Water

010 Pressurizer Pressure Control

012 Reactor Protection 2.4.4 - Ability to recognize abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures.

4.5/4.7 13

013 Engineered Safety Features Actuation

022 Containment

026 Containment Spray 2.4.50 - Ability to verify system alarm setpoints and operate controls identified in the alarm response manual.

4.2/4.0 14

039 Main and Reheat Steam

059 Main Feedwater

061 Auxiliary/Emergency Feedwater

062 AC Electrical Distribution

063 DC Electrical Distribution

ES-401

ES·401

ES-401

System # / Name

003 Reactor Coolant Pump

004 Chemical and Volume Control

005 Residual Heat Removal

006 Emergency Core Cooling

007 Pressurizer Relief/Quench Tank

008 Component Cooling Water

010 Pressurizer Pressure Control

012 Reactor Protection

013 Engineered Safety Features Actuation

022 Containment

026 Containment Spray

039 Main and Reheat Steam

059 Main Feedwater

061 Auxiliary/Emergency Feedwater

062 AC Electrical Distribution

063 DC Electrical Distribution

K K 1 2

4 Form ES-401·2

PWR Examination Outli ,s;;.--..... Form ES-401-2 Plant ...... \"~r""rns - Tier 2/Grou

KKK K 3 4 5 6

ES-401

KIA Topic(s) IR #

2.1.23 - Ability to perform specific 4.3/4.4 11 system and integrated plant procedures during all modes of

ant "n"ra'C1n"

A2.15 - Ability to (a) predictthe 3.5/3.7 12 impacts of the following malfunctions or operations on the eves; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: High or low PZR level

2.4.4 - Ability to recognize 4.5/4.7 abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures.

2.4.50 - Ability to verify system alarm setpoints and operate controls identified in the alarm response manual.

4.2/4.0

13

14

Page 5: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

15

ES-401 5 Form ES-401·2

ES-401 PWR Examination Outli ' .... _ ..... Form ES-401-2 Plant Systems - Tier 2/Grou

1~==-------======P=r~~==F

System # 1 f\ame

.,.

KKK K 1 234

KIA Topic(s}

Group Point Total:

IR #

3.7/4.1

064 Emergency Diesel Generator

073 Process Radiation

ES-401

ES-401 5

ES-401 PWR Examination Outli ' .... _ ..... Plant Systems - Tier 2/Grou

1~==-------======P=r~~==F

System # 1 f\ame

064 Emergency Diesel Generator

073 Process Radiation

.,.

KKK K 1 234

KIA Topic(s}

Group Point Total:

ES-401

Form ES-401·2

Form ES-401-2

IR #

3.7/4.1 15

Page 6: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 6 Form ES-401·2

ES-401 PWR Examination Outline s - Tier 2/Group 2

1F=====================T==r~==T==r='==T==

System # 1Name

001 Control Rod Drive

002 Reactor Coolant

011 Pressurizer Level Control

014 Rod Position Indication

015 Nuclear Instrumentation

016 Non-nuclear Instrumentation

017 In-core Temperature Monitor

028 Hydrogen Recombiner and Purge Control

029 Containment Purge

033 Spent Fuel Pool Cooling

034 Fuel Handling Equipment

035 Steam Generator

041 Steam Dump/Turbine I-<,"n",.,., Control

045 Main Turbine Generator

055 Condenser Air Removal

056 Condensate

068 Liquid Radwaste

071 Waste Gas Dis

072 Area Radiation Monitoring

075 Circulati Water

079 Station Air

086 Fire Protection

K K 1 2

KKK 345

K 6

KIA Topic(s)

2.1.32 - Ability to explain and apply all system limits and precautions.

Form ES-401-2

IR #

3.8/4.0 16

2.2.36 - Ability to analyze the 3.1/4.2 17 effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations.

A2.03 - Ability to (a) predict 2.7/2.9 the impacts of the following mal- functions or operations on the Fire Protection System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Inadvertent aetuation of the FPS due to circuit failure or wellonl!!:

18

ES-401

ES-401 6

ES-401 PWR Examination Outline s - Tier 2/Group 2

1F=====================T==r~==T==r='==T==

System # 1 Name

001 Control Rod Drive

002 Reactor Coolant

011 Pressurizer Level Control

014 Rod Position Indication

015 Nuclear Instrumentation

016 Non-nuclear Instrumentation

017 In-core Temperature Monitor

028 Hydrogen Recombiner and Purge Control

029 Containment Purge

033 Spent Fuel Pool Cooling

034 Fuel Handling Equipment

035 Steam Generator

041 Steam Dump/Turbine I-<,"n",.,., Control

045 Main Turbine Generator

055 Condenser Air Removal

056 Condensate

068 Liquid Radwaste

071 Waste Gas Dis

072 Area Radiation Monitoring

075 Circulati Water

079 Station Air

086 Fire Protection

K K 1 2

KKK 345

K 6

ES-401

Form ES-401·2

KIA Topic(s)

2.1.32 - Ability to explain and apply all system limits and precautions.

Form ES-401-2

IR #

3.8/4.0 16

2.2.36 - Ability to analyze the 3.1/4.2 17 effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations.

A2.03 - Ability to (a) predict 2.7/2.9 the impacts of the following mal- functions or operations on the Fire Protection System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Inadvertent aetuation of the FPS due to circuit failure or wellonl!!:

18

Page 7: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 7 Form ES-401-2

PWR Examination Outline - Tier 2/Group 2

p Point Total: 3

ES-401 Form ES-401-2 Plant

KKK KIA Topic(s) IR #System # / Name KKK 1 234 5 6

KIA Category Point Totals:

ES-401

ES-401

ES-401

System # / Name

KIA Category Point Totals:

7

PWR Examination Outline Plant - Tier 2/Group 2

KKK KKK 1 234 5 6

ES-401

Form ES-401-2

Form ES-401-2

KIA Topic(s) IR #

p Point Total: 3

Page 8: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3

Facili Millstone Unit 2 Date of Exam: 12/18/09

Category KJA# Topic RO SRO

Knowledge of facility requirements for controlling 2.1.13

vital/controlled access. 1. Conduct of Knowledge of the fuel-handling responsibilities of SROs.2.1.35Operations

Subtotal Knowledge of the process for managing maintenance activities

2.2.17 during power operations, such as risk assessments, work prioritization, and coordination with the transmission system 2.

Equipment Control Knowledge of conditions and limitations in the facility license. 2.2.38

Subtotal

Ability to approve release permits. 2.3.6

3. Knowledge of radiation or contamination hazards that may2.3.14 Radiation arise during normal, abnormal, or emergency conditions or Control activities.

Subtotal Ability to prioritize and interpret the significance of each

2.4.454. annunciator or alarm. Emergency Procedures and Plan

Subtotal

Tier 3 Point Total

ES-401

ES-401

Facili Millstone Unit 2

Category

1. Conduct of Operations

2. Equipment Control

3. Radiation Control

4. Emergency Procedures and Plan

KJA#

2.1.13

2.1.35

Subtotal

2.2.17

2.2.38

Subtotal

2.3.6

2.3.14

Subtotal

2.4.45

Subtotal

Tier 3 Point Total

Generic Knowledge and Abilities Outline (Tier 3)

Date of Exam: 12/18/09

Topic

Knowledge of facility requirements for controlling vital/controlled access.

Knowledge of the fuel-handling responsibilities of SROs.

Knowledge of the process for managing maintenance activities during power operations, such as risk assessments, work prioritization, and coordination with the transmission system

Knowledge of conditions and limitations in the facility license.

Ability to approve release permits.

Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.

Ability to prioritize and interpret the significance of each annunciator or alarm.

ES-401

Form ES-401-3

RO SRO

Page 9: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 Record of Rejected KI As Form ES-401-4

Randomly Reason for Rejection

~ Selected KIA 076-AA2.02 Does NOT distinguish between a competent and

incompetent SRO.

1--­

ES-401, Page 27 of 33

ES-401 Record of Rejected KI As Form ES-401-4

~ Randomly Reason for Rejection

Selected KIA 076-AA2.02 Does NOT distinguish between a competent and

incompetent SRO.

1---

ES-401, Page 27 of 33

Page 10: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

L

Description of the Process Used to Develop the Millstone 2 Exam Outline

Obtained copies of Forms ES-40 1-2, PWR Examination Outlines for SRO and RO, and Form ES-401-3 Generic Knowledge and Abilities Outline (Tier 3).

II. For each Tier and Group, the Example Systematic Sampling Methodology per ES-40 1, Attachment 1 and guidance on ES-401-2 were used to select the topics for the SRO exam as follows:

A. Annotated all systems/topics not applicable to Millstone 2 (Ex. W, BW).

B. Because each group had more topics than required for a Tier/Group, tokens were randomly drawn to determine which topics would receive question coverage.

III. Used the Example Systematic Sampling Methodology per ES-401, Attachment 1 to select the KIA categories ("A2" or "G") for the SRO exam for each topic chosen.

IV. Used the Example Systematic Sampling Methodology per ES-401, Attachment 1 to select the individual KIA statements for the SRO exam as follows:

A. Any individual KIA statement with an importance rating of<2.5 was eliminated prior to the selection process.

B. Prior to randomly selecting the individual KIA statements for Tier I and 2 "Generic" categories, non-relevant KIA statements were removed. Only the Generic KIAs listed in ES-40 I, D.l.b were made available for random selection.

C. Prior to randomly selecting the individual KIA statements for Tier 1 and 2 "A2" categories, non-relevant KIA statements were removed.

V. Verified each KIA category for the SRO exam had at least 2 points in each tier (as applicable).

Description of the Process Used to Develop the Millstone 2 Exam Outline

L Obtained copies of Forms ES-40 1-2, PWR Examination Outlines for SRO and RO, and Form ES-401-3 Generic Knowledge and Abilities Outline (Tier 3).

II. For each Tier and Group, the Example Systematic Sampling Methodology per ES-40 1, Attachment 1 and guidance on ES-401-2 were used to select the topics for the SRO exam as follows:

A. Annotated all systems/topics not applicable to Millstone 2 (Ex. W, BW).

B. Because each group had more topics than required for a Tier/Group, tokens were randomly drawn to determine which topics would receive question coverage.

III. Used the Example Systematic Sampling Methodology per ES-401, Attachment 1 to select the KIA categories ("A2" or "G") for the SRO exam for each topic chosen.

IV. Used the Example Systematic Sampling Methodology per ES-401, Attachment 1 to select the individual KIA statements for the SRO exam as follows:

A. Any individual KIA statement with an importance rating of <2.5 was eliminated prior to the selection process.

B. Prior to randomly selecting the individual KIA statements for Tier I and 2 "Generic" categories, non-relevant KIA statements were removed. Only the Generic KI As listed in ES-40 I, D.l.b were made available for random selection.

C. Prior to randomly selecting the individual KIA statements for Tier 1 and 2 "A2" categories, non-relevant KIA statements were removed.

V. Verified each KIA category for the SRO exam had at least 2 points in each tier (as applicable).

Page 11: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 PWR Examination Outline Form ES-401-2

Facility: Millstone Unit 2 Date of Exam: 12/18/09

Tier Group

RO KIA Category Points SRO-Only Points

~ 1 Ii K

3 i'.

K 4

K 5

K 6

A 1

A 2

A 3

A 4

G * ~ A2 G* Total

1. Emergency &

Abnormal Plant

Evolutions

1

~ /

~ V 18 2 4 6

2 /'

9 2 2 4

Tier Totals l>"" 27 4 6 10

2. Systems

Plant

1 //' "'" ~ 28 1 4 5

2 /V ~ 10 I\J/A 1 2 3

Tier Totals 1/V ........

~ 2 6 8

3. Generic Knowledge and Abilities

Categorie!s

1­~ 3---­ l..--4-­ ---10

---­1 2 3 4

7 ~ ---­ r---­ 2 2 2 1

Note: 1. Ensure that at least 2 topics from every KlA category are sampled within each tier of the RO and SRO outlines (Le., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each KlA category shall not be less than 2).

2. The point total for each group and tier in the proposed outline must match those specified in the table. The final point total for each group and tier may deviate by.±1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.

3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are included on the outline should be added. RefE!r to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate KlA statements.

4. Select topics, from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.

5. Absent a plant specific, only those KlAs having an importance rating (IR) of 2.5 or higher shall be selected. Use the R,O and SRO ratings for the RO and SRO-only portions, respectively.

6. Select SRO topics for Tiers 1 and 2 from the shaded systems and KlA categories.

7. * The generic KlAs in Tiers 1 and 2 shall be selected from Section 2 of the KlA Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable KlAs.

B. On the following pages, enter the KlA numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than A2 or G* on the SRO-only exam, enter it on the left side of column A2 for Tier 2 Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.

9. For Tier 3, sl31ect topics form Section 2 of the KlA catalog, and enter the KlA numbers, descriptions, IRs, and point totals (#) on Form ES-40103. Limit SRO selections to K/As that are linked to 10 CFR 55.43.

ES-401 PWR Examination Outline Form ES-401-2

Facility: Millstone Unit 2 Date of Exam: 12/18/09

RO KIA Category Points SRO-Only Points

Tier Group ~ Ii K K K K A A A A G ~ 1 3 4 5 6 1 2 3 4 * A2 G* Total

i'.

1. 1

~ ~ V 18 2 4 6

Emergency & Abnormal 2

/' 9 2 2 4

Plant l> Evolutions Tier Totals

"" 27 4 6 10

/

1 / "'" ~ 28 1 4 5 2. /'

Systems 2 /V ~ 10 I\J/A 1 2 3 ........

Plant V ~ Tier Totals 1/ 2 6 8

3. Generic Knowledge and Abilities 1-~ 3 l..--4-- ---10 1 2 3 4 -------- r----Categorie!s ~ ---- 2 2 2 1 7

Note: 1. Ensure that at least 2 topics from every KlA category are sampled within each tier of the RO and SRO outlines (Le., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each KlA category shall not be less than 2).

2. The point total for each group and tier in the proposed outline must match those specified in the table. The final point total for each group and tier may deviate by.±1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.

3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are included on the outline should be added. RefE!r to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate KlA statements.

4. Select topics, from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.

5. Absent a plant specific, only those KlAs having an importance rating (IR) of 2.5 or higher shall be selected. Use the R,O and SRO ratings for the RO and SRO-only portions, respectively.

6. Select SRO topics for Tiers 1 and 2 from the shaded systems and KlA categories.

* 7. The generic KlAs in Tiers 1 and 2 shall be selected from Section 2 of the KlA Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable KlAs.

B. On the following pages, enter the KlA numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than A2 or G* on the SRO-only exam, enter it on the left side of column A2 for Tier 2 Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.

9. For Tier 3, sl31ect topics form Section 2 of the KlA catalog, and enter the KlA numbers, descriptions, IRs, and point totals (#) on Form ES-40103. Limit SRO selections to K/As that are linked to 10 CFR 55.43.

Page 12: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES·401 2 Form ES·401·2

ES-401 PWR Examination Outline rnc.rr,,:.nr'\I and Abnormal Plant Evolutions - Tier 1

Form ES-401-2

E/APE # 1Name 1Safety Function

000007 (BW/E02&E10; CE/E02) Reactor Trip - Stabilization - Recovery 11

000008 Pressurizer Vapor Space Accident 13

000009 Small Break LOCA 1 3

000011 Large Brea~: LOCA 13

000015/17 RCP Malfunctions 1 4

000022 Loss of Rx Coolant Makeup 1 2

000025 Loss of RHR System 14

000026 Loss of Component Cooling Water 18

000027 Pressurizer Pressum Control Malfunction 1 3

000029 ATWS 11

000038 Steam Gen. Tube Rupture 1 3

000040 (BW/E05; CE/E05; W/E12) Steam Line Rupture - Excessive Heat Transfer 1 4

000054 (CE/E06) Loss of Main Feedwater 14

000055 Station Blackout 1 6

000056 Loss of O"f-site Power 1 6

000057 Loss of Vital AC Inst. Bus 1 6

000058 Loss of DC Power 1 6

000062 Loss of Nuclear Svc Water 1 4

KKK A A G 12312

KIA Topic(s)

2.1.J1 Ability toloeate eOHtFol Foam switehes, eOHtFols, aHd iHdieatioHs, aHd to deteFmiHe that they eOFFeetly FeOeet the desiFed plaHt liHeup. Does not adequately test SRO knowledge or ability. 2.1.20 - Ability to interpret and execute procedure steps.

EA2.06 Ability to deteFmiHe OF iHteFpFet the followiHg as they apply to a LaFge BFeal( LOCA.I That faH is iH slavi speee aRe eampers are iR aeeieeRt meee el:lriRg bOCA Does not adequately test SRO knowledge or ability. EA2.10 - Ability to determine or interpret the following as they apply to a Large Break LOCA: Verification of adequate core cooling

2.1.7 - Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

2.1.30 - Ability to locate and operate local controls.

IR

4.6/4.6

d.7*!4.0*

4.5/4/7

4.41417

4.4/4.0

2.4.35 - Knowledge oflocal auxiliary 3.8/4.0 operator tasks during an emergency and the resultant effects.

#

2

3

4

5

ES-401

ES·401 2 Form ES·401·2

ES-401 PWR Examination Outline rnc.rr,,:.nr'\I and Abnormal Plant Evolutions - Tier 1

Form ES-401-2

E/APE # 1 Name 1 Safety Function

000007 (BW/E02&E10; CE/E02) Reactor Trip - Stabilization - Recovery 1 1

000008 Pressurizer Vapor Space Accident 13

000009 Small Break LOCA 1 3

000011 Large Brea~: LOCA 13

000015/17 RCP Malfunctions 1 4

000022 Loss of Rx Coolant Makeup 1 2

000025 Loss of RHR System 14

000026 Loss of Component Cooling Water 1 8

000027 Pressurizer Pressum Control Malfunction 1 3

000029 ATWS 11

000038 Steam Gen. Tube Rupture 1 3

000040 (BW/E05; CE/E05; W/E12) Steam Line Rupture - Excessive Heat Transfer 1 4

000054 (CE/E06) Loss of Main Feedwater 14

000055 Station Blackout 1 6

000056 Loss of O"f-site Power 1 6

000057 Loss of Vital AC Inst. Bus 1 6

000058 Loss of DC Power 1 6

000062 Loss of Nuclear Svc Water 1 4

KKK A A G 12312

KIA Topic(s)

2.1.J1 Ability toloeate eOHtFol Foam switehes, eOHtFols, aHd iHdieatioHs, aHd to deteFmiHe that they eOFFeetly FeOeet the desiFed plaHt liHeup. Does not adequately test SRO knowledge or ability. 2.1.20 - Ability to interpret and execute procedure steps.

EA2.06 Ability to deteFmiHe OF iHteFpFet the followiHg as they apply to a LaFge BFeal( LOCA.I That faH is iH slavi speee aRe eampers are iR aeeieeRt meee el:lriRg bOCA Does not adequately test SRO knowledge or ability. EA2.10 - Ability to determine or interpret the following as they apply to a Large Break LOCA: Verification of adequate core cooling

2.1.7 - Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

2.1.30 - Ability to locate and operate local controls.

IR

4.6/4.6

d.7*!4.0*

4.5/4/7

4.41417

4.4/4.0

2.4.35 - Knowledge oflocal auxiliary 3.8/4.0 operator tasks during an emergency and the resultant effects.

ES-401

#

2

3

4

5

Page 13: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 3 Form ES-401-2

PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions - Tier 1/Group 1 (RO

KKK A A G KIA Topic(s) IRE/APE # I Name I Safety Function # 12312

000065 Loss of Instrument Air 18 AA2.06 - Ability to determine and interpret 3.6*/4.2 6 the following as they apply to the Loss of Instrument Air: When to trip reactor if instrument air pressure is de-creasing

000077 Generator Voltage and Electric Grid Disturbances I 6

6KIA Category Totals: Group Point Total:

ES-401

ES-401 3

PWR Examination Outline Emergency and Abnormal Plant Evolutions - Tier 1/Group 1 (RO

E/APE # I Name I Safety Function KKK A A G 12312

KIA Topic(s)

Form ES-401-2

Form ES-401-2

IR #

000065 Loss of Instrument Air 18 AA2.06 - Ability to determine and interpret 3.6*/4.2 6

000077 Generator Voltage and Electric Grid Disturbances I 6

KIA Category Totals:

the following as they apply to the Loss of Instrument Air: When to trip reactor if instrument air pressure is de-creasing

Group Point Total: 6

ES-401

Page 14: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

, ES-401 4 Form ES·401·2

1 PWR Examination Outline mAlrnAn{'\/ and Abnormal Plant Evolutions - Tier 1

FORM ES-40 1-2

E/APE # 1Name 1Safety Function

000001 Continuous Rod Withdrawal I 1

000003 Dropped Control Rod 1 1

000005 Inoperable/Stuck Control Rod 11

000024 Emergency Boration I 1

000028 Pressurizer Level Malfunction I 2

000032 Loss of Source Ra NI/7

000033 Loss of Intmmediate Range Nil 7

000036 BW/A08 Fuel Handling Accident I 8

000037 Steam Generator Tube Leak 13

000051 Loss of Condenser Vacuum 14

000060 Accidental Gaseous Radwast

000061 ARM ""<;!'I"'Tn Alarrns 17

000067 Plant Fire On-site l 8

000068

000069 E14 Loss of CTMT I 15

000074 (W/E06&E07) Inad. Core Cooling 14

000076 High Reactor Coolant Activity 19

BW/E09; CE/A13; W/E09&E10 Natural Circ./4

CEIA 11; W IE08 ReS Overcooling - PTS 14

CE/A16 Excess ReS Leakage 12

CE/E09 Functional

KIA Category Point Totals:

KKK 123

==========~~=======T====~==~l

KIA Topic(s) IR #

AA2.04 - Ability to determine and 3.4*/3.6* 7 interpret the following as they apply to the Dropped Control Rod: Rod motion stops due to dropped rod

2.4.18 - Knowledge of the specific bases for EOPs.

2.4.30 - Knowledge of events related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system 0

3.3/4.0 8

2.7/4.1

AA2.07 - Ability to determine and 2.4/2.7* 10 interpret the following as they apply to the High Reactor Coolant Activity: \l/heH demiHeralizer feSiH Heeds te ae feplaeed.

Does NOT distinguish between a competent and incompetent SRO.

AA2.02 - Corrective Actions required 2.8/3.4 for high fission product activity in RCS

Group Point Total: 4

ES-401

, ES-401 4 Form ES·401·2

1 PWR Examination Outline mAlrnAn{'\/ and Abnormal Plant Evolutions - Tier 1

FORM ES-40 1-2

E/APE # 1 Name 1 Safety Function

000001 Continuous Rod Withdrawal I 1

000003 Dropped Control Rod 1 1

000005 Inoperable/Stuck Control Rod 11

000024 Emergency Boration I 1

000028 Pressurizer Level Malfunction I 2

000032 Loss of Source Ra NI/7

000033 Loss of Intmmediate Range Nil 7

000036 BW/A08 Fuel Handling Accident I 8

000037 Steam Generator Tube Leak 13

000051 Loss of Condenser Vacuum 14

000060 Accidental Gaseous Radwast

000061 ARM ""<;!'I"'Tn Alarrns 17

000067 Plant Fire On-site l 8

000068

000069 E14 Loss of CTMT I 15

000074 (W/E06&E07) Inad. Core Cooling 14

000076 High Reactor Coolant Activity 19

BW/E09; CE/A13; W/E09&E10 Natural Circ./4

CEI A 11; W IE08 ReS Overcooling - PTS 14

CE/A16 Excess ReS Leakage 12

CE/E09 Functional

KIA Category Point Totals:

KKK 123

ES-401

==========~~=======T====~==~l

KIA Topic(s) IR #

AA2.04 - Ability to determine and 3.4*/3.6* 7 interpret the following as they apply to the Dropped Control Rod: Rod motion stops due to dropped rod

2.4.18 - Knowledge of the specific bases for EOPs.

2.4.30 - Knowledge of events related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system 0

3.3/4.0 8

2.7/4.1

AA2.07 - Ability to determine and 2.4/2.7* 10 interpret the following as they apply to the High Reactor Coolant Activity: \l/heH demiHeralizer feSiH Heeds te ae feplaeed.

Does NOT distinguish between a competent and incompetent SRO.

AA2.02 - Corrective Actions required 2.8/3.4 for high fission product activity in RCS

Group Point Total: 4

Page 15: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 5 Form ES-401-2

ES-401 PWR Examination Outli '......__ Tier 2/Grou

Form ES-401-2 Plant ",,,, ..TP1rTlS ­

System # 1Name K K K K K K A KIA Topic(s) 1 2 3 4 5 6 1

003 Reactor Coolant Pump 2.1.23 - Ability to perform specific system and integrated plant procedures during all modes of

004 Chemical and Volume Control

A2.15 - Ability to (a) predict the impacts of the following malfunctions or operations on the eves; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: High or low PZR level

005 Residual Heat Removal

006 Emergency Core Cooling

007 Pressurizer Relief/Quench Tank

008 Component Cooling Water

010 Pressurizer Pressure Control

2.4.4 - Ability to recognize 012 Reactor Protection

013 Engineered Safety Features Actuation

022 Containment Cool

026 Containment Spray

039 Main and Reheat Steam

059 Main Feedwater

IR #

4.3/4.4 11

3.5/3.7 12

4.5/4.7 13

4,2I4..,G 14

Does not adequately test SRO knowledge or ability for this system.

2.4.9 - Knowledge oflow 3.8/4.2 power/shutdown implications in accident (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies.

abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating

2.4 .50 Ability to "Iel'ify system alal'm setpeints and epeFate eentFels identified in the alaFm FespeRse manual.

ES-401

ES-401

ES-401

System # 1 Name

003 Reactor Coolant Pump

004 Chemical and Volume Control

005 Residual Heat Removal

006 Emergency Core Cooling

007 Pressurizer Relief/Quench Tank

008 Component Cooling Water

010 Pressurizer Pressure Control

012 Reactor Protection

013 Engineered Safety Features Actuation

022 Containment Cool

026 Containment Spray

039 Main and Reheat Steam

059 Main Feedwater

K K K 1 2 3

5 Form ES-401-2

PWR Examination Outli ' ...... __ Form ES-401-2 Plant ",,,, .. TP1rTlS - Tier 2/Grou

K K K A 4 5 6 1

ES-401

KIA Topic(s)

2.1.23 - Ability to perform specific system and integrated plant procedures during all modes of

A2.15 - Ability to (a) predict the impacts of the following malfunctions or operations on the eves; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: High or low PZR level

2.4.4 - Ability to recognize abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating

2.4 .50 Ability to "Iel'ify system alal'm setpeints and epeFate eentFels identified in the alaFm FespeRse manual. Does not adequately test SRO knowledge or ability for this system.

IR #

4.3/4.4 11

3.5/3.7 12

4.5/4.7 13

4,2I4..,G 14

2.4.9 - Knowledge oflow 3.8/4.2 power/shutdown implications in accident (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies.

Page 16: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES·401 6 Form ES·401·2

ES-401

System # / Name

061 Auxiliary/Emergency Feedwater

062 AC Electrical Distribution

063 DC Electrical Distribution

064 Emergency Diesel Generator

073 Process Radiation Moni

076 Service Water

078 Instrument Air

103 Containment

KIA VCH,.,YVI Point Totals:

PWR Examination Outl Plant Systems - Tier 2/Gro

KKK KKK A 1 234 561

Form ES-401-2

KIA Topic(s) IR #

2.2.12 - Knowledge of surveillance 3.7/4.1 15 procedures.

5

ES-401

ES·401

ES-401

System # / Name

061 Auxiliary/Emergency Feedwater

062 AC Electrical Distribution

063 DC Electrical Distribution

064 Emergency Diesel Generator

073 Process Radiation Moni

076 Service Water

078 Instrument Air

103 Containment

KIA VCH,.,YVI Point Totals:

6

PWR Examination Outl Plant Systems - Tier 2/Gro

KKK KKK A 1 234 561

ES-401

Form ES·401·2

Form ES-401-2

KIA Topic(s) IR #

2.2.12 - Knowledge of surveillance 3.7/4.1 15 procedures.

5

Page 17: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

. ES-401 7 Form ES-401-2

ES-401

System # / Name

001 Control Rod Drive

002 Reactor Coolant

011 Pressurizer Level Control

. 014 Rod Position Indication

I 015 Nuclear Instn .. mentation

I 016 Non-nuclear • Instrumentation I

017 In-core Temperature Monitor

028 Hydrogen ReGombiner I and Purge Control

029 Containment Purge

I 033 Spent Fuel Pool Cooling

. 034 Fuel Handli

041 Steam Dump/Turbine I"'IVI:JFI!"S Control

045 Main Turbine Generator

055 Condenser Air Removal

056 Condensate

068 Liquid Radwaste

071 Waste Gas Disposal

072 Area Radiation Monitoring

075 Ci Water

079 Station Air

K K 1 2

K K 3 4

Form ES-40 1-2

KIA Toplc(s)

2.1.32 - Ability to explain and apply all system limits and precautions.

IR

3.8/4.0

#

16

2.2.36 Ability to IIRIII~e the ~ 17 effeet of mlliRteftllftee lIeth'ities, sueh liS degnoed poweF saUFees, aft the status of limitiftg eoftditiaRs feF apentiofts.

NO Technical Specifications exist for the Main Turbine Generator; therefore, NO Limiting Conditions for Operation exist.

2.4.47 - Ability to diagnose and 4.2/4.2 recognize trends in an accurate and timely manner utilizing the appropriate control room reference material.

ES-401

. ES-401

ES-401

System # / Name

001 Control Rod Drive

002 Reactor Coolant

011 Pressurizer Level Control

. 014 Rod Position Indication

I 015 Nuclear Instn .. mentation

I 016 Non-nuclear • Instrumentation I

017 In-core Temperature Monitor

028 Hydrogen ReGombiner I and Purge Control

029 Containment Purge

I 033 Spent Fuel Pool Cooling

. 034 Fuel Handli

041 Steam Dump/Turbine I"'IVI:JFI!"S Control

045 Main Turbine Generator

055 Condenser Air Removal

056 Condensate

068 Liquid Radwaste

071 Waste Gas Disposal

072 Area Radiation Monitoring

075 Ci Water

079 Station Air

K K 1 2

K K 3 4

7

PWR Examination Outline 2 (

ES-401

Form ES-401-2

Form ES-40 1-2

KIA Topic(s)

2.1.32 - Ability to explain and apply all system limits and precautions.

IR

3.8/4.0 16

2.2.36 Ability to IIRIII~e the ~ 17 effed of mlliRteftllftee lIetivities, sueD liS degnded poweF saUFees, aft the status of limitiftg eoftditiaRs feF apentiofts.

NO Technical Specifications exist for the Main Turbine Generator; therefore, NO Limiting Conditions for Operation exist.

2.4.47 - Ability to diagnose and 4.2/4.2 recognize trends in an accurate and timely manner utilizing the appropriate control room reference material.

Page 18: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 8 Form ES-401-2

ES-401

System # 1Name

086 Fire Protection

K K 1 2

PWR Examination Outline Plant - Tier 2/Group 2 (

K K 3 4

K 5

K 6

Form ES-401-2

KIA Topic(s) IR #

A2.03 - Ability to (a) predict 2.7/2.9 18 the impacts of the following mal- functions or operations on the Fire Protection System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Inadvertent actuation of the FPS due to circuit failure or """"U1l1'"

ES-401

ES-401

ES-401

System # 1 Name

086 Fire Protection

K K 1 2

8

PWR Examination Outline Plant - Tier 2/Group 2 (

K K 3 4

K 5

K 6

ES-401

Form ES-401-2

Form ES-401-2

KIA Topic(s) IR #

A2.03 - Ability to (a) predict 2.7/2.9 18 the impacts of the following mal- functions or operations on the Fire Protection System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Inadvertent actuation of the FPS due to circuit failure or """"U1l1'"

Page 19: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401·3

Date of Exam: 12/18/09

KJA# Topic RO SROCategory

Knowledge of faeility reE)uirements far controlling2.1.13 'lital/cantrolled aecess.

Rejected by NRC on previous exam. Only General Employee or item.

1. Ability to use procedures to determine the effects on reactivity

Conduct of 2.1.43 of plant changes, such as reactor coolant system temperature,• Operations etc.

Knowledge of the fuel-handling responsibilities of SROs.2.1.35

Subtotal Knowledge of the process for managing maintenance activities

2.2.17 during power operations, such as risk assessments, work prioritization, and coordination with the transmission system 2.

Equipment Control Knowledge of conditions and limitations in the facility license. 2.2.38

Subtotal

Ability to approve release permits. 2.3.6 3. Knowledge of radiation or contamination hazards that may2.3.14Radiation arise during normal, abnormal, or emergency conditions or Control activities.

Subtotal Ability to prioritize and interpret the significance of each

2.4.454. annunciator or alarm. Emergency Procedures and Plan

Subtotal

Tier 3 Point Total

fuel

ES-401

ES-401

Category

1. Conduct of

• Operations

2. Equipment Control

3. Radiation Control

4. Emergency Procedures and Plan

KJA#

2.1.13

2.1.43

2.1.35

Subtotal

2.2.17

2.2.38

Subtotal

2.3.6

2.3.14

Subtotal

2.4.45

Subtotal

Tier 3 Point Total

Generic Knowledge and Abilities Outline (Tier 3)

Date of Exam: 12/18/09

Topic

Knowledge of faeility reE)uirements for controlling 'lital/cantrolled aecess. Rejected by NRC on previous exam. Only General Employee or

item.

Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature,

fuel etc.

Knowledge of the fuel-handling responsibilities of SROs.

Knowledge of the process for managing maintenance activities during power operations, such as risk assessments, work prioritization, and coordination with the transmission system

Knowledge of conditions and limitations in the facility license.

Ability to approve release permits.

Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.

Ability to prioritize and interpret the significance of each annunciator or alarm.

ES-401

Form ES-401·3

RO SRO

Page 20: 1 4 5 6 1 4 1 V A 6 ' --- ---- 1 4 · 035 Steam Generator 041 Steam Dump/Turbine I-

ES-401 Record of Rejected KJAs Form ES-401-4

Tier / Group

Randomly Selected KJA

Reason for Rejection

1/1 009 - 2.1.31 Does NOT adequately test SRO knowledge or ability. Unable to develoE a reasonable SRO guestion to test this KIA.

1/1 011 - EA2.06 Does NOT adequately test SRO knowledge or ability. Determining that CAR Fans shift to slow is a basic RO function and there are NO dampers that shift during a LOCA.

1/2 076 - AA2.07 Does NOT distinguish between a competent and incompetent SRO.

2/1 026 - 2.4.50 Does NOT adequately test SRO knowledge or ability for this system. This system only has one alarm and the response is very basic.

2/2 045 - 2.2.36 No Technical Specifications exist for the Main Turbine Generator; therefore, no Limiting Conditions for Operation exist.

3/0 2.1.13 Rejected by NRC on previous exam. Only General Employee or Security knowledge item.

ES-401, Page 27 of 33

ES-401 Record of Rejected KJAs Form ES-401-4

Tier / Randomly Reason for Rejection Group Selected KJ A

1/1 009 - 2.1.31 Does NOT adequately test SRO knowledge or ability. Unable to develoE a reasonable SRO guestion to test this KIA.

1/1 011 - EA2.06 Does NOT adequately test SRO knowledge or ability. Determining that CAR Fans shift to slow is a basic RO function and there are NO dampers that shift during a LOCA.

1/2 076 - AA2.07 Does NOT distinguish between a competent and incompetent SRO.

2/1 026 - 2.4.50 Does NOT adequately test SRO knowledge or ability for this system. This system only has one alarm and the response is very basic.

2/2 045 - 2.2.36 No Technical Specifications exist for the Main Turbine Generator; therefore, no Limiting Conditions for Operation exist.

3/0 2.1.13 Rejected by NRC on previous exam. Only General Employee or Security knowledge item.

ES-401, Page 27 of 33