Government of Odisha Works Department
***
Office Memorandum
File No.07556900012013- NV, Dated. D\ \ 1
Sub: Schedule of Rates-2013.
Consequent upon rising of market price of materials and enhancement of labour
rate from time to time issued by Labour & Employees and State Insurance Department, it
was felt necessary to revise the existing Schedule of Rates. After careful consideration
Government have been pleased to approve Schedule of Rates-2013.
1. The new Schedule of Rates-201 3 is effective from 1'' July, 201 3 and will be available
in web-site of State Government.
2. This has been concurred in by the Finance Department vide their U.O.R. No.100-
WF-I Dt.23.4.2013. /
Encl: As above
Memo No. c;C; 3 o ) - NV,Dated. \ , % a ' X I 3
Copy with copy of the Schedule of Rates-2013 forwarded to P. S. to Hon'ble Chief
Minister, Odisha for information and necessary action.
-1 7 / * / J FA - cum- Addl. Secretary to Government
Memo No. Cs 5 C: b NV, Dated. , h 3 Q I ' ' >
Copy with copy of the Schedule of Rates-2013 forwarded to OSD to Chief
Secretary, Odishal P.S. to Development Comrnissioner- cum-Additional Chief Secretary,
Odishal P.S.to Additional Chief Secretary, Finance for information and necessary action.
FA - cum- Addl.
-2- 9
Memo No. c< 7 , c , 2,- M / , Dated. .,. >;. > \ "
Copy with copy of the Schedule of Rates-2013 forwarded to EIC (Civil), Odisha
IEIC, Water Resources, Odishal EIC, Rural Works, Odisha 1 EIC, PH, Odisha 1 EIC-cum-
Chief Electrical Inspector, Odishal FA-cum-Addl. Secy. to Govt., R.D. Deptt.1 FA-cum-
Addl. Secy. to Govt., Water Resources Deptt.1 FA-cum-Addl. Secy. to Govt., H.&U.D.
Deptt.1 FA-cum-Joint Secy. to Govt., Energy Deptt.1 Special Officer-cum-Joint Secy. to
Govt., Fin. Deptt.1 Chief Engineer, World Bank Project, Odishal Chief Engineer, DPI &
Roads, Odishal Chief Engineer, Buildings, Odishal Chief Engineer, National Highways,
Odishal Chief Engineer, Directorate of designs, Odishal Chief Manager, (Tech), State
Procurement Cell, Odisha 1 Chief Architect, Odishal Chief Engineer, Water Resources,
Odishal Chief Engineer, R.W.-I, Odishal Chief Engineer, R.W.-II, Odishal Chief
Engineer, P.H.(Urban), Odishal Chief Engineer, Electricity, Odisha for information and
wide circulation among subordinate offices.
P-3 w f S FA - cum- Addl. Secretary to'dodrnrnent
Memo No. fg '3 6 C3 /W, Dated. \ h 3 " 3
Copy with copy of the Schedule of Rates-201'3 forwarded to Finance Department1
Department of Water Resources1 Housing & Urban Development Department/ Rural
Development Department1 Panchayati Raj Department/ All other Departnientsl Managing
Director, OB & CC Ltd., Bhubaneswar I Managing Director, OCC Ltd., Bhubaneswar for
information and necessary action.
~ / W B FA - cum- Addl. Secreta to Government
Memo No. C; 5 ~ . =\ NV, Dated. \ %- , -J--c: \ 3
Copy with copy of the Schedule of Rates-2013 forwarded to the Accountant
General (A&E), Odisha, Bhubaneswarl Accountant General, Odisha, Puri Branch, Puri
for information and necessary action.
q j m1-3 FA - cum- Addl. Secre a o Government
Memo No. 3 1 0 AN, Dated. \ * K 7-0 \ '3 Copy with copy of the Schedule of Rates-2013 forwarded to the Chief Engineer,
RD & QP (R&B) and Chairman, Rate Board, Odisha, Bhubaneswar for information and
necessary action. *W47>)h./3
FA - cum- Addl. Secret / ry to Government
-3-
Memo No. c., 11 -\ NV, Dated. \ '?̂ 7-'. \ 'I,
Copy with copy of Schedule of Rates-2013 forwarded to the Superintending
Engineer (P&D), 010 the EIC (Civil), Odisha and Member Convenor, Rate Board, Odisha
for information and necessary action.
He is requested to pursue the matter of display of the Schedule of Rates-2013 in
the web-site of State Government & publication in next issue of Odisha Gazette with the
Head, State Portal Group, IT Centre, Ground Floor, North Annexe of Secretariat and the
Director, Printing, Stationary & Publication, Orissa, Cuttack respectively.
FA - cum- Addl.
Memo No. C;s 5 1 ' 3 . NV, Dated. \ * s 3 ~ - 1 '3
Copy with soft copy of Schedule of Rates-2013 forwarded to the Head, State
Portal Group, IT Centre, Ground Floor, North Annexe of Secretariat for information and
necessary action.
He is requested to display this amendment in the web-site of State Government.
FA - cum- Addl.
Memo No. =3\ 3 /W,Dated. \ . K - \ l 5
Copy with soft copy of Schedule of Rates-2013 forwarded to the Director, Printing,
Stationary & Publication, Orissa, Cuttack for information and necessary action.
He is requested to publish this amendment in the next issue of Orissa Gazette.
+"'/wD FA - cum- Addl e r y ' o Government
Memo No. %3b-4, NV,Dated. \ ' E$ ' Mi 3 Copy with copy of the Schedule of Rates-2013 forwarded to all Superintending
Engineers(R&B) /all Executive Engineers(R&B) for information and necessary action.
3 / I > /W/3 FA - cum- Addl. S z e r n m e n t
Memo No. 3 I 5- NV,Dated. 1 . 'jC .
Copy with copy of the Schedule of Rates-2013 forwarded to NC-I Section I NC-II
Section 1 Road Section 1 Plan Section / Building Section 1 Budget Section 1 N.Hs. Section
/ FC & AA Section / PPP Cell / EAP Cell, Works Department for information and
necessary action. Wcp z 1 / i / b / 3 FA - cum- Addl. Secretary to Gove nment
GOVERNMENT OF ODISHA
BASIC RATE OF MATERIALS FOR RDC ZONES
(CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND
HIRE CHARGES OF PLANTS AND MACHINERIES
FOR -2013
WORKS DEPARTMENT
CONTENTS
Chapter
I .
Description .........
111 .
Page
Basic Rates of Materials . . . ......
IV .
1-12
Rates for Conveyance of Materials ......... 16-2 1
Hire Charges of Plants & Machineries ......... 22-25
CHAPTER - I BASIC RATE OF MATERIALS FOR 2013 (CENTRAL ,NORTHERN AND SOUTHERN ZONES)
1st. I Name of items 1 Unit I Rate for I Rate for I Rate for I Central
Revenue Zone 1 2013
Northern Southern Revenue Zone Revenue Zone-
201 3 / 2011 1 crushing strength not less than 35 Kg.ICm2 with dimensionall 1
2
crushing strength not less than 35 Kg.ICm2 with dimensionall 1
Well burnt clamp burnt bricks (25 Cm. x 12Cm. x 8Cm.) having/ 1000 Nos 1 3300.00 3
tolerance r 8 percent.
Well burnt clamp burnt bricks (23 Cm. x 11Cm. x 8Cm.) having
4
1000 Nos
3
2970.00
4
5
2 % 7 Fly ash blocks of 30 Cm. x 20 Cm. x 15 Cm. size having
crushing strength not less than 75 Kg.ICm2 with dimensional tolerance * 2 %
8 Cement concrete solid Block machine mixed and Hydraulic compressed having crushing strength not less than 75kgicm2
lolerance + 8 percent. K.B. bricks (25 Cm x l2Cm x 8Cm) having crushing strength not less than 75 Kg.ICm2 with dimensional tolerance + 8 percent.
6
I lcompressed having crushing strength not less than 70kgicm2 I I
K.B. bricks (23 Cm. x 11Cm. x 8Cm.) having crushing strength not less than 75 Kg.ICm2 with dimensional tolerance + 8 percent. Fly ash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg.ICm2 with dimensional tolerance r
retained on 0.075 mm sieve
1000 Nos
2 % Fly ash bricks of 23 Cm. x 11 Cm. x 8 Cm. size having crushing strength not less than 75 Kg.ICm2 with dimensional tolerance *
1000 Nos
1000 Nos
4950.00
1000 Nos
4400.00
4620.00
17 18 19 20 21
3760.00
4070.00
1 Cum I Cum I Cum 1 Cum 1 Kg.
River single or Bajri (12mm. to 20mm.) Screened and washed sharp sand for mortar Sand for filling and road blinding Clay mortar for masonry work with admixture of sand. Stone lime unslaked.
401 9.00
3400.00
4138.00
3539.00
4180.00
3767.00
88.00 46.00 41 .OO 45.00 13.00
3740.00
90.00 48.00 42.00 48.00 15.00
104.00 52.00 49.00 45.00 15.00
SI. No.
1 22 23 24
1 Cum. 25
26
27
28
29
1 Cum.
Name of items
2 Ghooting lime unslaked. Shell lime unslaked. a) Granite broken stone of size not less than 0.0025 Cum. Stacked b) Granite stone of size not less than 0.0025 Cum. picked up.
Stone other than granite quarried, broken and staked 0.0015 Cum to 0.003 Cum Stone other than granite picked up and staked 0.0015 Cum. to 0.003 Cum Stone other than granite quarried, broken and staked above 0.003 Cum Stone other than granite picked up, broken and staked above 0.003 Cum Granite Stone broken metal 63mm. size Passing through
1 Cum.
1 Cum.
Unit Rate for Central
Revenue Zone- 201 3
3 1 Kg. 1 Kg.
1 Cum.
1 Cum.
Rate for Northern
Revenue Zone- 201 3
30
31
, 32
Rate for Southern
Revenue Zone- 201 3
4 17.00 15.00
214.00
187.00
33
34
I ]passing through 13.2mm sieve & retained on 9.50mm sieve but I I I I I
90mm. Sieve and retained on 53 mm sieve. a) Crusher broken. b) Hand broken. Granite Stone broken metal 45mm. size (Passing through 53mm sieve & retained on 26.5mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken metal 40mm. size a) Crusher broken. b) Hand broken.
,Granite Stone broken metal 26.5mm. size (Passing through
35
36
37
5 19.00 17.00 221 .OO
201 .OO
45mm sieve & retained on 22.4mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken metal 25mm. size (Passing through 40mm sieve & retained on 20mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken metal 22.4mm. size (Passing through
6 19.00 17.00
245.00
200.00
1 Cum. 1 Cum.
1 Cum. 1 Cum.
1 Cum. 1 Cum.
,
26.5mm sieve & retained on I I .2mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken chips 20mm. size (Minimum 65% by Wt. Passing through 19mm sieve & retained on 13.2mm sieve but whole should pass through 26.5mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken chips 13.2mm. Size (Passing through 22.4mm sieve & retained on 11.2mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken chips 12mm. size (Minimum 65% by Wt.
38
1 Cum. 1 Cum.
1 Cum. 1 Cum.
13.2mm sieve & retained on 5.6mm sieve) a) Crusher broken. b) Hand broken.
594.00 473.00
616.00 475.00
682.00 544.00
1 Cum. I Cum.
I Cum. 1 Cum.
I Cum. 1 Cum.
whole should pass throuqh 19mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken chips 11.2mm. size (Passing through
726.00 550.00
737.00 561 .OO
1 Cum. 1 Cum.
607.00 473.00
627.00 486.00
679.00 552.00
759.00 583.00
968.00 753.00
990.00 770.00
1 Cum. 1 Cum.
647.00 492.00
679.00 51 5.00
701 .OO 561 .OO
699.00 556.00
721 .OO 589.00
1012.00 803.00
745.00 570.00
764.00 612.00
742.00 608.00
991 .OO 817.00
996.00 823.00
1001 .OO 781 .OO
797.00 641 .OO
998.00 808.00
1005.00 821 .OO
1042.00 841 .OO
101 6.00 833.00
1084.00 849.00
1031 .OO 834.00
Si. Name of items Unit Rate for Rate for Rate for Central Northern Southern
Revenue Zone- Revenue Zone- Revenue Zone- 201 3 201 3 2013
39 Granite Stone broken chips 10mm. size (Minimum 65% by Wt. Passing through 9.5mm sieve & retained on 6.3mm sieve but whole should pass through 13.2mm sieve) a) Crusher broken. b) Hand broken.
(A) Granite Stone broken chips 6.7mm size (Passing through 1 I .2mm sieve & retained on 2.8mm sieve)
(B)
40
I I I
Granite Stone screening (Passing through 2.36mm sieve & retained on 180 micron sieve) Granite stone broken chips of 4.7 mm size passing through 6.7 mm sieve (crusher broken.) and retained on 2.36 mm sieve.
1 Cum.
1 Cum.
41 42 43 44 45
626.00 605.00
616.00
46
47
48
49
639.00
Stone other than granite broken to 5cm. size. Stone other than granite broken to 4 cm. size. Stone other than granite broken to 2 cm. size. Stone other than granite broken to Icm. size. Stone boulder 15cm. & above size granite picked up and nullah
I I I 1
I I I I
I b) Belongi Bomboo above 4Cm. dia & up to 7Cm. dia & above 1 Each 1 , 36.00 1 35.00 1 35.00 1
646.00
boulders. Soiling stone boulder 15Cm. & above size picked up nullah boulders broken. Stone boulder 15cm. & above size other than granite or laterite picked up and nullah boulders. Soiling stone boulder 15Cm. & above size other than granite or laterite picked up nullah boulders broken. Soling stone boulders 10 Cm. size picked up other than granite.
51 52 53 54 55 56 57 58
656.00
1 Cum. 1 Cum. I Cum. 1 Cum. 1 Cum.
50
1 Cum.
1 Cum.
I Cum.
1 Cum.
180.00
I.R.C. Grade I (90mm-45 mm.) I.R.C. Grade II (63mm. to45mm.) I.R.C.Grade Ill (53mm. to 22.4mm.) Laterite soling stone 23Cm. size Laterite Stone rough dressed Bamboo mat or talai. Bamboo 1ST class 7Cm. to 10Cm. dia &above 6m. long. a) Belongi Bomboo 2.51 Cm. to 4Cm. dia & above 5m. long.
.,
231 .OO 236.00 253.00 264.00 137.00
Hard broken soling stone other than granite (40mrn. to 90mm.) 187.00 I
59 60
61
62
63
64
65
66
67
143.00
110.00
121 .OO
110.00
1 Cum. 1 Cum. 1 Cum. 1 Cum. 1 Cum. I Sqm. Each Each
Sal bullahs 75mm. to 120mm. mean dia up to 5.5m, long. Sal bullahs 150mm. to 200mm. mean dia up to 5.5m. long.
243.00 254.00 281 .OO 290.00 122.00
1 Cum.
Sal bullahs above 200mm. & up to 250mm. mean dia & up to 2.751-11. long. Sal bullahs above 200mm. & up to 250mm. mean dia above 2.75111. long & up to 4.75m. long. Sal bullahs above 200mm. & up to 250mm. mean dia above 4.75m. long Sal bullahs above 250mm. & up to 380mm. mean dia & up to 2.75m, long Sal bullahs above 250mm. & up to 380mm. mean dia & above 2.75m. long up to 4.75111. long Sal bullahs above 250mm. & up to 380mm. mean dia & above 4.75m. long. Non-sal bullahs 75mm. mean dia of any length.
253.00 264.00 286.00 308.00 121.00
138.00
11 5.00
124.00
114.00
176.00
572.00 638.00 682.00 93.00 528.00 110.00 121 .OO 27.00
143.00
1 16.00
129.00
118.00
1Cum.
1Cum.
1Cum.
1Cum.
1Cum.
ICum.
1 Mtr.
561.00 618.00 669.00 94.00 507.00 116.00 129.00 24.00
583.00 646.00 699.00 99.00 559.00 118.00 137.00 23.00
8008.00
9020.00
10340.00
11605.00
14410.00
15911 .OO
44.00
8404.00
9253.00
10678.00
12005.00
14753.00
16685.00
44.00
8250.00
9515.00
10945.00
12166.00
15180.00
16500.00
46.00
i Name of items
1 71 on-~al bullahs above 200mm. & up to 250mm. mean dia UP to I 1Cum. 1 5720.00 1 5571.00 1 5623.00 1
1 68 69 70
1 72 I ~ o n - ~ a l bullahs above 200mm. & up to 250mm. mean dia above1 1Cum. 1 6325.00 1 6064.00 1 6117.00 1
Unit
2 Non-sal bullahs 100mm. mean dia of any length. Non-sal bullahs 125mm. mean dia of any length. Non-Sal bullahs 150mm. to 200mm. mean dia of any length.
73
74
Ra:e for Southern
Revenue Zone- 2013
Rate for Central
Revenue Zone- 201 3
3 1 Mtr. 1 Mtr. 1 Mtr.
75
Rate for Northern
Revenue Zone- 2013
2.5m. long. Seasoned rough dressed sawn Sal wood having minimum dimension 50mm. to 150mm. & up to 2.75m. long.
Seasoned rough dressed sawn Sal wood having minimum dimension 50mm. to 150mm. & above 2.751~1, long.
76
77 78 79
80 81 82 83 84
4 57.00 66.00 82.00
Seasoned Sal wood beam of cross sectional area not less than 150Sq.cm. &least lateral dimension 100mm. & above 2,75m.
85
86
87
88
89
1Cum.
1Cum.
long. Seasoned Sal wood planks not more than 75mm. thick & not less than 200mm. width. Seasoned Piasal wood planks for shutters. Seasoned Teak wood planks for shutters. Non Sal wood scantling & plants(Tentera, Kasi, Gamhari, Kuruma) Non-Sal reapers. Fire wood 1st class Raniganj or Mangalore pattern tiles. Ridges of Raniganj or Mangalore parttern tiles. Flat tiles(l4Cm. x14 Cm.x 1Cm. )
90
91
5 53.00 68.00 82.00
1Cum.
Flat tiles (15Cm xl5Cmx 1.2 Cm )
Flat tiles (30Cm. x 15 Cm.x 2.5 Cm. )
Flat tiles (30Cm. x 30 Cm.x 2.5 Cm. )
Pan tiles
Nuria tiles(20Cm. to 25Cm.)
(a) Up to 0.10 Sqm. (10mm thick) b) Above 0.10 Sqm (i)Above 0.10 Sqm & up to 0.4 sqm (10mm. thick) ii) Above 0.40 sqm. (20mm thick)
6 57.00 71 .OO 88.00
29810.00
32537.00
1Cum.
1Cum. 1Cum. 1Cum.
1Cum. 1Qntl
100 Nos. 100 Nos. 1000 Nos.
Nuria tiles(25Cm. to 30Cm.)
Ridge tiles
96
32812.00
1000 Nos.
1000 Nos.
1000 Nos.
1000 Nos.
1000 Nos.
1 Sqm.
1 Sqm. 1 Sqm.
32802.00
35924.00
29247.00
47192.00 62100.00 17989.00
10941 .OO 385.00 825.00 1301 .OO 264.00
1000 Nos.
1000 Nos.
Kodappa Tiles of 10 mm thick (a) Above 0.1 Sqm & Up to 0.40 Sqm. (b) Above 0.40 Sqrn.
30690.00
32560.00
35742.00
284.00
11 12.00
1298.00
278.00
581 .OO
1067.00
1210.00 1900.00
331 10.00
32654.00
51 158.00 70408.00 18511 .OO
11791 .OO 415.00 917.00 1392.00 301 .OO
685.00
862.00
1 Sqm. 1 Sqm.
30140.00
47740.00 67430.00 18260.00
12100.00 437.00 924.00 1460.00 286.00
327.00
1296.00
1521 .OO
304.00
690.00
1067.00
1210.00 1900.00
308.00
1287.00
1477.00
304.00
693.00
831 .OO
948.00
1067 .OO
1210.00 c 1900.00
275.00 330.00
834.00
950.00
275.00 330.00
275.00 330.00
Name of ltems
1 97 98
to lOmm confirming to IS 13756 of following sizes (I) Vitrified Tile 600mmx600mm Plain (Ivory) (11) Vitrified Tile 600mmx600mm Coloured I Printed
~300mmx300mrn 99 lchequred Tiles. I 1 Sqm. 1 198.00 1 198.00 1 198.00
Unit
2 Dholpuri Stone Tiles. Tiles up to- (a) 20cmx30cm I20cm x 20cm special plain lprinted series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753 (b) 30cm x 30cm I40cm x 40cm special plain I printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755 (c) Vitrified floor tiles of premium grade having thickness 8 mm
series(Homogeneous) (d) Vitrified industrial floor Tile of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size
Rate for Northern
Revenue Zone- 2013
Rate for Central
Revenue Zone- 201 3
3 1 Sqrn.
1 Sqm.
1 Sqm.
1 Sqm. 1 Sqm.
Rate for Southern
Revenue Zone- 2013
1 Sqm.
11 5 116 117 1 18 119 120 121
122
605.00 660.00
123 124
550.00
A.C. ridges 6mm. Thick Plain A.C. Sheet Tar Paper Putty (Wood) Putty (Iron) Wire Nails MS. Angle
M.S. Channel
125 126 127.
605.00 660.00
Bolt, Nut & Washers Holding down bolts minimum 60 Cm. long with 15Cm. x 15 Cm.
a) b) c)
605.00 660.00
550.00
I pair 1 Sqm I Sqm 1 Kg. I Kg. 1 Kg.
1 Qntl.
1 Qntl.
x 6mm. size washer plate Binding Wire. Coir String
550.00
1 Kg. 1 Kg.
Empty Cement bags (HDPE) by lot & not shorted out Empty Cemenl gunny bags by lo1 & not shorted oul Empty Bitumen Drum
171 .OO 210.00 16.00 26.00 90.00 55.00
Rate as fixed by SAIL
Rate as fixed
1 Kg. 1 Kg.
by SAIL 70.00 68.00
100 nos 100 nos
Each
171 .OO 210.00 16 .OO 26.00 90.00 55.00
Rate as fixed by SAIL
Rate as fixed
72.00 42.00 350.00
171 .OO 210.00 16.00 26.00 - 90.00 55.00
Rate as fixed by SAIL
Rate as fixed by SAIL 70.00 68.00
350.00 120.00
by SAIL 70.00 68.00
72.00 42.00 350.00
72.00 . 42.00 350.00
350.00 120.00
350.00 120.00
Si No.
1 d)
128 129 130 131
a)
b)
c)
132 133
134
Rate for Central
Revenue Zone- 201 3
-
4 230.00 250.00 550.00 320.00
Average factory price
of three manufacturers
of cw-nent inside the
State.
1750.00
Rate as fixed by SAIL
5020.00
~ a m e of items
2 Empty Bitumen Emulsion Drum Straw in Bundle Marble Chips. Marble Powder Cement 33 Grade
43 Grade
53 Grade
White Cement. Steel a) Mild Steel
b) HYSD (FE-415) l(FE500)
'Z" type Steel Sheet Piles ~ ~ - . - - - - -
Rate for Northern
Revenue Zone- 201 3
5 230.00 250.00 550.00 320.00
Average factory price
of three manufacturers
of cement inside the
State.
1750.00
Rate as fixed by SAIL
5020.00
Unit
3 Each
100 nos lqntl lgntl
Iqntl
Iqntl
Iqntl
lqntl
Iqntl
Rate for Southern
Revenue Zone- 201 3
6 230.00 250.00 550.00 320.00
Average factory price of
three manufacturers
of cement inside the
State.
1750.00
Rate as fixed by SAIL
5020.00
:;.A- Name of items Unit yo
b) 125mm with 175mm x 40mm flat 2600 26.00 26.00
Revenue Zone- Revenue Zone- Revenue Zone-
c) d)
'I
k) I)
m) n)
141
a) b)
IOOmm with 150mm x 33m flat 75mm with l l8mm x 33mm flat
Each 34.00 34.00 34.00 142 Steel window handle including Nut, bolt & washer (I.S.I.)
2 35x7mm 35xBmm 5Ox7mm 5Ox8mm Steel window stay bar (I.S.I.) 200mm 250mm
Each Each
- 3
100 pcs 100 pcs 100 pcs 100 pcs
Each Each
25.00 24.00
4 56.00 65.00 71 .OO 75.00
23.00 28.00
25.00 24.00
25.00 24.00
5 56.00 65.00 71 .OO 75.00
23.00 28.00
6 56.00 65.00 71 .OO 75.00
23.00 28.00
SI No.
Name of items Unit
1 148
a) b) c) d) ej
149
Rate for Centra!
Revenue Zone- 2013
a) 300mm x 16mm Each 200.00 200.00 200.00
2 Aluminium tower bolt (Barrel type) (I.S.I.) 300mm xlOmm 250mm 10mm 200mm x 10mm 150mm x 10mm 100mm x 1 0mm
Isliding door bolt (Aldrop) (I.S.I.)
Rate for Northern
Revenue Zone- 2013
Rate for 1 Southern
Revenue Zone- 2013
3
Each Each Each Each Each
4
60.00 55.00 50.00 42.00 34.00
5
60.00 55.00 50.00 42.00 34.00
6
60.00 55.00 50.00 42.00 34.00
--
Rate for Central
Revenue Zone- 2013
4
320.00 365.00 485.00 550.00
Unit
3
Sq m Sqm Sqm Sqm
Si No.
1 161
a b c d
Nane of items
2 Glass plain (I.S.I.) 3mm 4mm 5mm 6mm
Rate for Northern
Revenue Zone- 2013
5
320.00 365.00 485.00 550.00
Rate for
Revenue Zone- ~ 2013
6
320.00 365.00 485.00 550.00
SI. No.
Acessories a) sliding outer frame assembly I pc b) sliding shutter Ipc c) Sashbar d) wall fixing with polymide anchor at every 600mm clc of outer
I (material for powder mating) for aluminium section. I Aluminium /
Name of items
173
I I I I I 174(12.5 mm thick gypsum board of size 6' x 4' I One Piece 1 350.00 1 350.00 1 350.00 .
Each Each Each Each
Gasket a) For Shutter Po-153 b) For beading Po-179 c) For Sashbar Po-101 Rate of 60 micron powder coating (including labour charges and
Unit
248.00 305.00 17.00 27.00
Rate for Northern
Revenue Zone- 201 3
Rate for Central
Revenue Zone- 201 3
Mtr Mtr Mtr
Kg of
Rate for Southern
Revenue Zone- 2013 1
248.00 305.00 17.00 27.00
248.00 305.00 17.00 27.00
38.00 50.00 105.00 27.00
38.00 50.00 105.00 27.00
38.00 50.00 105.00 27.00
NOTES: 1 ) All Reinforcement Steel and structural steel shall be procured and used as per
specifications mentioned in BIS's documents- IS: 1786 and lS:2062 respectively. lndependent tests shall be conducted, wherever required, to ensure that the materials procured conform to the specifications.
These steel shall be procured only from those firms, which are established, reliable, lndigenous & primary producers of steel, having Integrated Steel Plants (ISP), using iron ore as the basic raw material as per Ministry of Steel's guidelines.
No re-rolled steel shall be permitted in works. All other specifications and guidelines of MORTH shall be complied. 2) The Cement of the companies having their own manufacturing units in the State of
Odisha is to be used in all works. 3) In case of bridge works expansion joints and bearings are to be procured from only
specified manufacturing units approved by MORTH, 4) Hard stone is to be used in lieu of granite for slope protection work.
I. Stone and Stone Products 1) The rates of materials in SR are basic rates excluding cost of conveyance, royalty but
including cost of stacking and C.S.T.N.A.T. 2) Normally blasted stones should not be used for soling stone where hand broken stones
are available. 3) The box heaps of 1.5mx 1.5mx 0.44m is to be measured as 1 Cu. M.
11. Wood Work (a) The rate of wood work items are equivalent to the rates of Orissa
Forest Corporation on the average. If any change to the rates are made by the Forest Corporation the revised rates shall be taken into consideration while arriving at the finished rates.
(b) For wood works the supply rates as fixed by the Forest Corporation shall prevail over that stated in this schedule of rates.
111. Items under Miscellaneous Head The rates under the sub-head under the Miscellaneous items are enclosure of labour and cost of all materials and conveyance except where otherwise mentioned in the description of items.
N. Weight of Cement 14.30 quintals per one Cu. M.
V. Materials under E.P.M. 1D.G.S. & D.'s Rate 1) In case of item of work or for supply of materials against which rates have been approved by Directorate of Export Promotion and Marketing the same shall be made applicable for adoption in this schedule of rates. In case of items of work or for supply of materials, against which rates have been approved by the D.G.S & D. the same rate shall be made applicable for adoption in this schedule of rates provided that if the rates of same items of work or for supply of materials are also forced by E.P.M. the E.P.M. rates will prevail over D.G.S. & D.'s rates. VI. Rate of Cement, Steel and Bitumen will increaseldecrease as mentioned below:
1) Steel: Rate as fixed by Steel Authority of India Limited (SAIL). 2) Cement: Average factory price of three manufacturers of cement inside the State. 3) Bitumen: Rate as fixed by Indian Oil Corporation Limited (IOCL) 1 Hindustan
Petroleum Corporation Limited (HPCL)/Bharat Petroleum Corporation Limited (BPCL).
VII. In Cement Concrete items of Analysis of Rate centering and shuttering shall be added extra wherever necessary depending upon the item of work.
VIII. Overl~ead Charges include the following elements :-
i. Site accon~modation, setting up plant, access road, water supply, electricity and general site arrangements.
. . 11. Office furniture, equipment and communications iii. Expenditure on
a) Corporate office contractor b) Site supervision
c) Docun~entation and "as built" drawings iv. Mobilisationlde-mobilisation of resources v. Labour camps with minimum amenities and transportation to work sites vi. Light vehicles for site supervision including administrative and managerial
requirements vii. Laboratory equipment and quality control including field and laboratory
testing ... viii. Minor T&P and survey instruments and setting out works, including
verification of line, dimensions, trial pits and bore holes, where required ix. Watch and ward x. Traffic management during construction xi. Expenditure on safeguarding environment xii. Sundries xiii. Financing Expenditure xiv. SalesITurn over tax xv. Work Insurance/compensation xvi.For the purpose of calculation, overhead charges @7.5% to be adopted in Analysis of Rates of various items to work out estimated cost.
CHAPTER-I1 RATE OF LABOUR
DESCRIPTION UNIT 1 A 1
1 2 3 1 Survey Khalasil Chain man
2 Category unskilled
Male mulia Female mulia
Per day 4 B I
I I in flood and other emergent work I
3
Per day Per dav
- 2
Mulia for handling hot binder and Tar boiler men
Scavanger Category Semi skilled
Mulia working in water or arduous nature of work p
Per day
Per day
Per day
4 5 6
Per day 1 7
Sangi mulia Pile driving mate( Guide man ) Mate Helper to carpenter or Blacksmith1 Painter/ Blaster/ Plumber1 Electrician/ Fitter/
Per day Per day Per day
1 Welder 8 9 10
I 11
Hammerman Thatcher/ Gharami
12 13
Per day Per dav
Tile turner Boat man
14 1 5 16
1 Security Guard
Per day Per dav
Bhisti Well sinker
1 17 1 1 8
ello ow man Per day Cate o Skilled
Blaster( Second class ) Per da Mason( Second class ) Per day Black smith ( Second class ) Per day
Per day Per day
Rod binder and bender Cleaner/ Sweeper Stone packer
Per day Per day Per day
Pump helper Watch man( Store)/Gurkha /
Per day Per day
4 5 6
I 7
Carpenter( Second class ) Fitter( Second class )
8 1 Plumber( Second class )
I class)
Per day Per dav
Painter/ Polisher( Second class ) Welder( Second class )
Per day 9
RATE in Rs.
Per day Per dav
10 Stone dresser/ Cutter( Second Per day Driller( Second class ) Per day
- .- - -- - - - --
Wire man/ Lift operator I pump driver1 Telephone operator
13 1 14 Electrician/ Rigger1 Line mad IS gpqz attendant1
( Second class ) Boring Mistryl Pipe driver
16 17
Per day
Per dav Amin Tracer
Per day Per dav
1 I Toolkee~erl Time kee~erl ~ u n s i I I 1
Per day 190.00
190.00 190.00 190.00
18 19
190.00
Jr. progress recorder Store keeper Gr.- I11 Store Asst.1 Account clerk/ Clerk/ Typist1
D 1 2 3
5 6 7 8 9
11
I ( operator/ wire man/ Lift operator/ 1 I I
Per day Per day
Category Highly Skilled Blaster (licensed)
12
1 190.00 190.00
Mason (special) Carpenter(specia1)
fl Fitter(specia1) Painter1 Polisher(specia1) Welder(specia1) Plumber(specia1) Driller (Special)
fl Diver for well sinking in bridge
Per dav
( per shift of four hours.) Electrician/ Air conditioned plant , Per day
13
205.00 Per day Per day Per day -- Per day Per day Per day Per day Per day Per day Per day
205.00
14 15 16
205.00 205.00 205.00 205.00 205.00 205.00 205.00 205.00 205.00 -- 205 .OO
Jeep driver/ Tractor driver 1 Truck driver / Dozer driver / Roller driver /Concrete mixture operator 1 Crane o~erator
17 18
Note :
1. Labour rates for un-skilled, Semi-skilled, Skilled and Highly skilled as are to be fixed
from time to time by Labour Department under Minimum Wages Act shall prevail in
respect of any category what so ever.
2. The rates for above four categories of labour are inclusive of weekly day of rest.
3. An adult Employee shall work for 8 (Eight) hours per day including half-an-hour of
rest.
Per day
Auto electrician Guiniting Machine operator Senior Accountant / Stenographer
19
Supervisor / Manager Testing Laboratory Assistant /
Per day Per day Per day
Instrument Mechanic1 Telephone Mechanic. Rigger and Cobbler with Tools 1
205.00 205.00 205.00
Per day Per day
205.00 205.00
Per day 205.00
I s1 I Description I Unit I Rate in I Other Category (Not covered by the Notification of Labour & Employment Department).
(Rs.1
01
02
I
04 ' Helper to Well Sinker 1 PerDay
Boring Mistry (Special)
03
Winch operator
Per Day
Well Sinker (Special)
05
205.00
Per Day
06
205 .OO
Per Day
Computer Programmer
07
08 09
10
205.00
Data Entry Operator
11
Per Month
Helper to operator of Heavy construction Machineries Mechanic for Heavy construction Machineries Helper to mechanic for heavy construction Machineries Operator for Heavy construction Machineries
7000.00
Per Month
Junior Research Assistant (Technical Assistant)
5200.00
Per Month
Per Month Per Month
Per Month
5000.00
6000.00 5000.00
6000.00
Per Month 5200.00
CHAPTER-111 RATE FOR CONVEYANCE OF MATERIALS
ITEM NO-1. Conveyance of Materials by Ten Tonne Trucks including loading & unloading.
Distance to be carried
Rough stone, metal, khoa, chips, sand, surki, quarry rubbish, moorum laterite stone, washed gravel, flyash & earth (Per 1 cum)
Bricks 23cm= 2500 nos Bricks 25cm= 2000 nos Cement concrete & fly ash blocks 400mmx200mmx200mm= 300 nos 400mmx150mmx200mm= 400 nos 400mmx 100mmx200mm= 600 nos 300mmx200mmx150mm= 550 nos 300mmx 1 50mmx 1 50mm= 730 nos 300mmx100mmx150mm= 1 100 nos All Kinds of tiles = 180 Sqm
(per truck)
Iron, Grills, Cement, / Bulky materials Bitumen, A.C sheet, GCI Sheet & Paint etc(per 1000 kg) Wood (per 1.25 cum)
like Machineries, generators, concrete pipe & furniture etc (per Truck)
Railway station
Note : Extra percentage to be allowed over the rates
Other places
Every extra KM beyond 5 KM and up to 50 Km Every extra
1. For earthen roads or village tracks or cross country tracks, 20 % extra may
be allowed on the certificate of Executive Engineer after his inspection and
duly approved by Superintending Engineer.
2. For declared ghat road, add extra length of ghat road portion.
8.00
5.70
1 F o n d 1 1 1 1
36.00
29.00
7.50
6.40
7.50
6.40
37.00
29.00
ITEM NO. 2: Loading into Trucks and Unloading from trucks (Within 50 m lead) including stacking
Note : a) For item no . 1
9 213 of rate is considered for loading
ii) 113 of rate is considered for unloading
b) for item no 2,3 & 4
i> 50 % of rate is considered for loading
ii) 50 % of rate is considered for unloading
Details of materials Unit Rate in Rs.
rubbish, moorum, laterite stone, washed gravel, & earth
2 Iron, grills, cement, Bitumen, A.C sheet, GCI Sheet ,Coke,coal lime etc
3 Bricks 23cm= 2500 nos 1 truck 448.00 Bricks 25cm= 2000 nos Cement concrete & flyash blocks 400mmx200mmx200mm= 300 nos 400mmx150mmx200mm= 400 nos 400mmx100mmx200mm= 600 nos 300mmx200mmx150mm= 550 nos
ITEM NO. 3 Carriage by Bullock Cart including Loading and Unloading
4
300mmx150mmx150mm= 730 nos 300mmx100mmx150mm= 1100 nos All kinds of tiles= 180 Sqm Bulky material such as a) Hurne pipes & furnitures
b) Heavy machineries such as compressors ,concrete mixer, hotmix plant etc.
S1. No 1
1 truck load 1 truck load
2 Subsequent KM 1 cart load
Distance to be carried.
First KM
611.00
728.00
Unit
1 cart load
Rate in Rs.
67.00
ITEM NO. 4 Unloading from Railway wagon and loading into trucks
S1. No
I I b) Steel, A.C sheet, GCI Sheet, etc
Unloading from Railway wagon and stacking on platform 1.0 m in clear of rails within 15 m lead a) Cement, Bitumen, coal, paint etc
Details of materials.
1 Qtl.
2
ITEM NO. 5 Conveyance by Head load including loading & unloading and stacking.
Unit
1.60
I
b) Steel, A.C sheet, GCI Sheet, etc
Distance to be carried.
Rate in Rs.
Removing from railway platform and loading into trucks a) Cement, Bitumen, coal, paint etc
Rough stone, metal, khoa, chips, sand, surki, quarry rubbish, moorum, laterite stone, moorurn,washed gravel, fly ash & earth
I
1 Qtl.
Iron, grills, cement,lime, Bitumen, A.C sheet, GCI Sheet ,paint etc (per 1 quintal), wood( per 0.125 cum)
1 Qtl.
5.80
I I I ~ e r cum I I
1.60
1
I I and u ~ t o 100 mtr I I 1
1 2
2
Upto50mtr. Beyond 50 mtr
3
3. Rate in Rs.
4 Rate in Rs.
3 3 .OO 38.00
Beyond 100 mtr and upto 150 mtr
8.30 12.40
50.00 18.00
ITEM NO. 6 Conveyance by Boat including loading & unloading
Distance to be carried.
A) In River i)Up to 5 KM. ii)Every extra KM beyond 5.00 Krn and upto 16 KM
iii)Every extra KM beyond 16 KM B) In canal i)Up to 5
Rough stone: metal, khoa chips, sand, surki, quarry rubbish, moorum laterite stone, moorum, washed grave1,fly ash & earth
Bricks 23cm= 2500 nos Bricks 25cm= 2000 nos Cement concrete & flyash blocks 400mmx200n1mx200mn~= 300nos 400mmx 150n1mx200mm= 400 os 400mmx100mmx200mm=600 nos 300mmx200mmx 150mm=550 nos 300mn1x150mmx150mm=730 nos 3OOmmx I OOmmx I 50mm= 1 100 nos
All kind of Tiles=180 Sqm
Iron, grills,cement, lime, Bitumen, A.Csheet, GCI Sheet &, paint etc (per 1 quintal)wood(perO. 125 cum)
(per cum) 2
Rate in Rs. 49.00
5.20
2.60
KM. ii)every extra KM beyond 5.00 Krn and upto 16 KM iii)every extra KM beyond 16
3 Rate in Rs.
280.00
24.70
4 Rate in Rs.
8.40
0.70
5.80
2.60
20.80
16.00
0.90
0.70
1 I . 1 Rough stone and cut laterite stones
I / Sl. No. Description of Items Capacity
Rough stone(Bou1ders)
Cut laterite stone
2
4.00 Cum 1
3
5.00 Cum ~ Gravel, sand & surki 5.50 Cum
Cut stone (granite & hard stone) 5.50 Cum 1 - -
Lime 5.50 Cum
Bricks 23 cm
Wood
, Bricks 25 cm
2500 Nos
5.00 Cum
2000 Nos
Cement concrete & flyash blocks
300 Nos
400 Nos
600 Nos
550 Nos
730 Nos
d) I All kinds of tiles
1 I 300mm x 100mm x 150rnrn
180 Sqm
I 1100 Nos I
Iron, tar, pitch and other materials considered by weight
7.00 tonnes
Cement 8.00 tonnes
Straw for thatching 1000 Nos or 100 head loads or 50 Bhar loads
Hume pipe up to 600mm diameter
10.
5 Nos.
1 12. 1 Hume pipe 900- & above diameter
Bamboos
3 Nos.
30 Bhar loads
Note:
Where materials are to be conveyed by head loads or by pack animals, rates are
to be worked out on actual analysis and approved by the Superintending Engineer.
ltem No. 8: Head Loads
Each head load of straw 1 bundle of 1.5 mtr. in girth ~ S1.No.
1 3. 1 Each head load of bamboo 1 Belangi 10 Nos., muli 3 nos 1
Description of Items
4. 1 Each bhar load of bamboo
Capacity
I Belangi 20 Nos., muli 6 nos
ltem No -9 : Cart Load of Materials
Note: - The rates of conveyance of materials are exclusive of voids of materials.
S1 No
1 1. -
2. 3. 4. 5. 6.
7. 8. -
9. 10. 11.
Description of Items
2
Gravel , Sand & Surki Cut Stone (granite & hard Stone)
Lime and wood Bricks
Cement concrete & flyash blocks 400mm x 200 mm x 200 mm 400mm x 150 mm x 200 rnrn 400mm x 100 mm x 200 mm 3OOmmx2OOmmx15Omm 300 mmx 150 mmxl50 mm 300 mmx100 mmxl50 rnrn
Pan tiles Flat tiles
i) 15cmx15cmx1.25cm ii) 3Ocmx15cmx2.5cm iii) 3Ocmx3Ocrnx2.5cm
Nuria Tiles - 20 cm x 25 cm Mangalore and Ranigang tiles
Iron , Cement,tar,Pitch and other materials by weight
Quantity per cart load
Plain Road 3
0.36 cum 0.20 cum 0.60 cum 200 nos
30 nos 40 nos 60 nos 55 nos 73 nos 110 nos 1000 nos
2000 nos 500 nos 250 nos 800 nos 250 nos 454 kg
Hilly Road 4
0.23 cum 0.28 cum 0.15 cum 0.42 cum 150 nos
22 nos 30 nos 45 nos 41 nos 55 nos 82 nos 800 nos
1600 nos 400 nos 200 nos 600 nos 200 nos 363 kg
CHAPTER -1V HIRE CHARGES OF PLANTS AND MACHINERIES
SI. No.
1
2
3
4 5
6
7
8
9
10
11
12 13
14
15 16
DESCRIPTIONS
Machine Dozer D-50 -A 15
Dozer D-80-A 12
Motor Grader 3.35meter blade
Tractor with ordinary grader Hydraulic Excavator of Icum bucket
Hydraulic Excavator of 2cum bucket Front End loader 1 cum bucket capacity
Tipperdcum
Vibratory Roller 8-1 0 tonne
Smooth wheeled Roller 8 -10 tonne
Sheep foot Roller
Truck mounted water tanker Tractor
Rotavator
Ripper Air Compressor
Output 200cumlhour
100cumlhour 150cumlhour 300cumlhour
150cumlhour 250cumlhour 200cumlhour 200cum/hour
50cumlhour 50cumlhour
60cumlhour
60cumlhour 60cumlhour
60cumlhour
25cumlhour
5.5cum
100cumlhour
60cumlhour 60cumlhour 70cumlhour
25cumlhour
6 KL 50HP
25cumlhour
60cum/hour 1701250cfm
Activity Spreading
Cutting Cleaning Spreading
Cutting Cleaning Clearing Spreading
GSB WMM
Soil ordinary
Soil Marshy Soil unsuitable Soil
Soil loading
Aggregate loading Transportation of soil, GSB, WMM, Hotmix etc.
Earthlsoil
GSB WMM
-ppppp
Soil compaction
BM compaction Soil compaction
Water transport Pulling
Mixing Scarifying General purpose
USAGE RATES
Unit per hour
per hour per hour per hour
per hour per hour per hour per hour
per hour per hour per hour per hour
per hour per hour per hour
per hour
per hour
per km.
per tonne.km
per hour per hour
per hour per hour per hour
per hour per hour
per hour per hour
per hour
per hour per hour
IN RS.
Rate 1831 .OO
2519 00
1545.00
289.00 840.00
1868.00
520.00
24.00
2.50
582.00 994.00
339.00
65.00
582.00 231 .OO
11 .OO
18.00 206.00
17 18 19 20 21
22
23
24
25
26
27
28
29 30
31
32
33
34
35
36
37 38 39
40 41
42
43
44
45
46
Diesel Compressor Diesel Compressor Electrical Compressor Wet Mix Plant 60 TPH Wet Mix Plant 75 TPH
Mechanical broom hydraulic
B~tumen pressure distr~butor
Emulsion pressure distributor
Hotmix plant -120 TPH
Hotmix plant -1 00 TPH
Hotmix plant -60 to 9OTPH
Hotmix plant -40 to 6OTPH
Hotmix plant -8 to 1 OTPH Paver Finisher Hydrostatic with sensor control 100 TPH Paver Finisher ~echanical 100 TPH
Paver Finisher Mechanical
Hydraulic Chips Spreader
Tandem Road Roller
Pneumatic Road Roller
Pot hole repair machine
Bitumen boiler 011 fired Tar boiler GSB Plant 50 cum
Mastic Cooker Batching and Mixing plant 15- 20cum Batching and Mixing plant 30cum Batching and Mixing plant 112.5cum Batching and Mixing plant 262.5cum Transit Mixer
Grout pump
Wet MIX Wet Mix
Surface cleaning
Applying bitumen tack coat Applying emulsion tack coat DBMIBMISDCI Premix DBMIBMISDCI Premix DBMIBMISDCI Premix DBMlBMISDClPremi X
Premix Paving of DBM IBM ISDCIPremlx P ~ ~ ~ ~ ~ W M M I P M C
Paving of DLC
Paving of DLC
Surface Dressing Rolling of Asphalt surface Rolling of Asphalt surface Repair of pot holes
Bitumen spraying Bitumen spraying Producing GSB
Mastic Wearing Coat Concrete Mixing
Concrete Mixing
Concrete Mixing
Concrete Mixing
Transportation of concrete mix to site
400cfm 300cfm 5OOcfm
25cumlhour 34cumlhour
1250sqmlhour
1750sqmlhour
1750sqmlhour
40cumlhour
30cumlhour
25cumlhour
17cumlhour
cumlhour 40cumlhour
40cum/hour
30cumlhour
75cumlhour
1500sqmlhour
30cumlhour
25cumlhour
4cumlhour
1500Litre
40cumIhour
I tonne 13cumlhour
20cumlhour
75cumlhour
175cumlhour
4.5cumlhour
3cumIhour
per hour per hour per hour per hour per hour
per hour
per hour
per hour
per hour
per hour
per hour
per hour
per hour per hour
p e r hour
per hour
per hour
perhour
per hour
per hour
per hour
per hour
per hour per hour
per hour per hour
per hour
per hour
per hour
per hour
per hour per hour
856.00 71 1 00 497 00 777.00 1036 00
230.00
692.00
516.00
151 00.00
11 167.00
8930.00
71 50.00
1025.00 1725.00
- p~
739.00
1846.00
1700.00
738.00
802.00
585.00
128.00
74.00 670.00
1586.00 1200.00
1440.00
2760.00
5160.00
600.00
550.00 65.00
47
48 49 50
I 531~urnp with 50HP electrical I I I I I
I per hour 1 182.00 1
Concrete pump of 45 & 30 cum
51 52
Pump with 5HP diesel engine Pump with 10HP diesel engine Pump with 20HP diesel engine
Pumping Concrete
Pump with 40HP diesel engine Pump with 40HP electrical
54 55 56 57 58
I 63I~oncrete Bucket l ~ o r pouring concrete I lcum I per hour ( 10.00 1
Pumping of Water -ppppp
Pumping of Water Pumping of Water
59
60
6'1
62
33cumlhour 22cumlhour
Pumping of Water
Cranes 80 tonnes Cranes 35 tonnes Cranes 3 tonnes Crawler mounted Crane (18T) Tower Crane
a)04/0.28 cum 1 1b)Olcum
per hour per hour per hour
Welding transformer
Gunneting machine without compressor Mechanical Winch (10T)
Power Winch (40HP)
64 65
7.5cumlhour I per hour
per hour
59.00 108.00 166.00
per hour per hour
Lifting purpose Lifting purpose Lifting purpose Lifting purpose Lifting purpose
165.00
278.00 149.00
Welding
Kerb casting machine Concrete Mixer
I I [Concrete I I I I
per hour per hour per hour per hour per hour
I
825.00 550.00 230.00 1717.00
551.00
per hour
per hour
per hour
per hour
Kerb making Concrete Mixing
66l~ibrator (3HP diesel) l~ompacting
~~ ..-- ~
I 68l~oncrete Paver Finisher with I~av ing of Concrete I 20cumlhour 1 per hour 1 1850.00 1
81 .OO
91 .OO
224.00
220.00
( perhour 1 106.00
67
1 4 0 ~ ~ Motor l~ur face 69llntegrated stone crusher l~rushing of Spalls I 100TPH 1 per hour 1 5590.00
80RMlhour 2.5cumlhour
I I lcrushing of Spalls I - I 1 . I
200TPH I per hour 1 11760.00
Piling Rig with Bantonite Pump
per hour per hour
200.00 177.00
- - . . - . - . - 0.75m dia to 1.2m dia Boring Attachment
70 71
72
73
74
75
76
77
78
2 to 3RMlhour
Stone crusher (electrical) Crushing & processing plant (electrical) Concrete Paver Finisher w~th 40HP Motor Prestressing Jack with Pump & Access Generator 100KVA
Generator 250KVA
Generator 33KVA
Generator 40KVA
Generator 125KVA
per hour
Crushing of Spalls
Paving of Concrete Surface
3525.00
175cumlhour
per hour per hour
per hour
Stressing of Steel WiresIStands
184.00 235.00
16188.00
per hour
per hour
per hour
per hour
per hour
per hour
Generation of Electric Energy Generation of Electric Energy
Generation of Electric Energy Generation of Electric Energy Generation of Electric Energy
83.00
450.00
1125.00
240.00
425.00
905.00
IOOKVA
1 OOKVA
50KVA
KVA
KVA
79
80
81 82
83
84 85
86
87
88
Pneumatic Sinking Plant
Truck 5.5curn per 10 tonnes
Road Marking machine --- Mobile Slurry Seal Equipment
Wagon drill
Dimond drill lnwell rings Jack hammer
Pneumatic rammer
Pusher leg
wells Material Transport
Road marking ( Mixing and laying slurry seal
20.00 2.00
557.00 60.00 650.00
128.00
338.00 72.00
9.00
13.00
5.00
w Z i E 6 - cumlhour 4.5curn
100sqmlhour 2700sqmlhour
Per Krn per tonne.km
per hour perhour PP
per hour
per hour
per hour per hour
per hour
per hour
per hour