Government of Odisha Works Department *** Office Memorandum File No.07556900012013- NV, Dated. D\ \ 1 Sub: Schedule of Rates-2013. Consequent upon rising of market price of materials and enhancement of labour rate from time to time issued by Labour & Employees and State Insurance Department, it was felt necessary to revise the existing Schedule of Rates. After careful consideration Government have been pleased to approve Schedule of Rates-2013. 1. The new Schedule of Rates-2013 is effective from 1' July, 2013 and will be available in web-site of State Government. 2. This has been concurred in by the Finance Department vide their U.O.R. No.100- WF-I Dt.23.4.2013. / Encl: As above Memo No. c;C; 3 o ) - NV,Dated. \, % a ' X I 3 Copy with copy of the Schedule of Rates-2013 forwarded to P. S. to Hon'ble Chief Minister, Odisha for information and necessary action. - 1 7 /*/J FA - cum- Addl. Secretary to Government Memo No. Cs 5 C: b NV, Dated. , h 3QI''> Copy with copy of the Schedule of Rates-2013 forwarded to OSD to Chief Secretary, Odishal P.S. to Development Comrnissioner- cum-Additional Chief Secretary, Odishal P.S.to Additional Chief Secretary, Finance for information and necessary action. FA - cum- Addl.

Upload: others

Post on 19-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

Government of Odisha Works Department

***

Office Memorandum

File No.07556900012013- NV, Dated. D\ \ 1

Sub: Schedule of Rates-2013.

Consequent upon rising of market price of materials and enhancement of labour

rate from time to time issued by Labour & Employees and State Insurance Department, it

was felt necessary to revise the existing Schedule of Rates. After careful consideration

Government have been pleased to approve Schedule of Rates-2013.

1. The new Schedule of Rates-201 3 is effective from 1'' July, 201 3 and will be available

in web-site of State Government.

2. This has been concurred in by the Finance Department vide their U.O.R. No.100-

WF-I Dt.23.4.2013. /

Encl: As above

Memo No. c;C; 3 o ) - NV,Dated. \ , % a ' X I 3

Copy with copy of the Schedule of Rates-2013 forwarded to P. S. to Hon'ble Chief

Minister, Odisha for information and necessary action.

-1 7 / * / J FA - cum- Addl. Secretary to Government

Memo No. Cs 5 C: b NV, Dated. , h 3 Q I ' ' >

Copy with copy of the Schedule of Rates-2013 forwarded to OSD to Chief

Secretary, Odishal P.S. to Development Comrnissioner- cum-Additional Chief Secretary,

Odishal P.S.to Additional Chief Secretary, Finance for information and necessary action.

FA - cum- Addl.

Page 2: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

-2- 9

Memo No. c< 7 , c , 2,- M / , Dated. .,. >;. > \ "

Copy with copy of the Schedule of Rates-2013 forwarded to EIC (Civil), Odisha

IEIC, Water Resources, Odishal EIC, Rural Works, Odisha 1 EIC, PH, Odisha 1 EIC-cum-

Chief Electrical Inspector, Odishal FA-cum-Addl. Secy. to Govt., R.D. Deptt.1 FA-cum-

Addl. Secy. to Govt., Water Resources Deptt.1 FA-cum-Addl. Secy. to Govt., H.&U.D.

Deptt.1 FA-cum-Joint Secy. to Govt., Energy Deptt.1 Special Officer-cum-Joint Secy. to

Govt., Fin. Deptt.1 Chief Engineer, World Bank Project, Odishal Chief Engineer, DPI &

Roads, Odishal Chief Engineer, Buildings, Odishal Chief Engineer, National Highways,

Odishal Chief Engineer, Directorate of designs, Odishal Chief Manager, (Tech), State

Procurement Cell, Odisha 1 Chief Architect, Odishal Chief Engineer, Water Resources,

Odishal Chief Engineer, R.W.-I, Odishal Chief Engineer, R.W.-II, Odishal Chief

Engineer, P.H.(Urban), Odishal Chief Engineer, Electricity, Odisha for information and

wide circulation among subordinate offices.

P-3 w f S FA - cum- Addl. Secretary to'dodrnrnent

Memo No. fg '3 6 C3 /W, Dated. \ h 3 " 3

Copy with copy of the Schedule of Rates-201'3 forwarded to Finance Department1

Department of Water Resources1 Housing & Urban Development Department/ Rural

Development Department1 Panchayati Raj Department/ All other Departnientsl Managing

Director, OB & CC Ltd., Bhubaneswar I Managing Director, OCC Ltd., Bhubaneswar for

information and necessary action.

~ / W B FA - cum- Addl. Secreta to Government

Memo No. C; 5 ~ . =\ NV, Dated. \ %- , -J--c: \ 3

Copy with copy of the Schedule of Rates-2013 forwarded to the Accountant

General (A&E), Odisha, Bhubaneswarl Accountant General, Odisha, Puri Branch, Puri

for information and necessary action.

q j m1-3 FA - cum- Addl. Secre a o Government

Memo No. 3 1 0 AN, Dated. \ * K 7-0 \ '3 Copy with copy of the Schedule of Rates-2013 forwarded to the Chief Engineer,

RD & QP (R&B) and Chairman, Rate Board, Odisha, Bhubaneswar for information and

necessary action. *W47>)h./3

FA - cum- Addl. Secret / ry to Government

Page 3: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

-3-

Memo No. c., 11 -\ NV, Dated. \ '?̂ 7-'. \ 'I,

Copy with copy of Schedule of Rates-2013 forwarded to the Superintending

Engineer (P&D), 010 the EIC (Civil), Odisha and Member Convenor, Rate Board, Odisha

for information and necessary action.

He is requested to pursue the matter of display of the Schedule of Rates-2013 in

the web-site of State Government & publication in next issue of Odisha Gazette with the

Head, State Portal Group, IT Centre, Ground Floor, North Annexe of Secretariat and the

Director, Printing, Stationary & Publication, Orissa, Cuttack respectively.

FA - cum- Addl.

Memo No. C;s 5 1 ' 3 . NV, Dated. \ * s 3 ~ - 1 '3

Copy with soft copy of Schedule of Rates-2013 forwarded to the Head, State

Portal Group, IT Centre, Ground Floor, North Annexe of Secretariat for information and

necessary action.

He is requested to display this amendment in the web-site of State Government.

FA - cum- Addl.

Memo No. =3\ 3 /W,Dated. \ . K - \ l 5

Copy with soft copy of Schedule of Rates-2013 forwarded to the Director, Printing,

Stationary & Publication, Orissa, Cuttack for information and necessary action.

He is requested to publish this amendment in the next issue of Orissa Gazette.

+"'/wD FA - cum- Addl e r y ' o Government

Memo No. %3b-4, NV,Dated. \ ' E$ ' Mi 3 Copy with copy of the Schedule of Rates-2013 forwarded to all Superintending

Engineers(R&B) /all Executive Engineers(R&B) for information and necessary action.

3 / I > /W/3 FA - cum- Addl. S z e r n m e n t

Memo No. 3 I 5- NV,Dated. 1 . 'jC .

Copy with copy of the Schedule of Rates-2013 forwarded to NC-I Section I NC-II

Section 1 Road Section 1 Plan Section / Building Section 1 Budget Section 1 N.Hs. Section

/ FC & AA Section / PPP Cell / EAP Cell, Works Department for information and

necessary action. Wcp z 1 / i / b / 3 FA - cum- Addl. Secretary to Gove nment

Page 4: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

GOVERNMENT OF ODISHA

BASIC RATE OF MATERIALS FOR RDC ZONES

(CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND

HIRE CHARGES OF PLANTS AND MACHINERIES

FOR -2013

WORKS DEPARTMENT

Page 5: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

CONTENTS

Chapter

I .

Description .........

111 .

Page

Basic Rates of Materials . . . ......

IV .

1-12

Rates for Conveyance of Materials ......... 16-2 1

Hire Charges of Plants & Machineries ......... 22-25

Page 6: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

CHAPTER - I BASIC RATE OF MATERIALS FOR 2013 (CENTRAL ,NORTHERN AND SOUTHERN ZONES)

1st. I Name of items 1 Unit I Rate for I Rate for I Rate for I Central

Revenue Zone 1 2013

Northern Southern Revenue Zone Revenue Zone-

201 3 / 2011 1 crushing strength not less than 35 Kg.ICm2 with dimensionall 1

2

crushing strength not less than 35 Kg.ICm2 with dimensionall 1

Well burnt clamp burnt bricks (25 Cm. x 12Cm. x 8Cm.) having/ 1000 Nos 1 3300.00 3

tolerance r 8 percent.

Well burnt clamp burnt bricks (23 Cm. x 11Cm. x 8Cm.) having

4

1000 Nos

3

2970.00

4

5

2 % 7 Fly ash blocks of 30 Cm. x 20 Cm. x 15 Cm. size having

crushing strength not less than 75 Kg.ICm2 with dimensional tolerance * 2 %

8 Cement concrete solid Block machine mixed and Hydraulic compressed having crushing strength not less than 75kgicm2

lolerance + 8 percent. K.B. bricks (25 Cm x l2Cm x 8Cm) having crushing strength not less than 75 Kg.ICm2 with dimensional tolerance + 8 percent.

6

I lcompressed having crushing strength not less than 70kgicm2 I I

K.B. bricks (23 Cm. x 11Cm. x 8Cm.) having crushing strength not less than 75 Kg.ICm2 with dimensional tolerance + 8 percent. Fly ash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having crushing strength not less than 75 Kg.ICm2 with dimensional tolerance r

retained on 0.075 mm sieve

1000 Nos

2 % Fly ash bricks of 23 Cm. x 11 Cm. x 8 Cm. size having crushing strength not less than 75 Kg.ICm2 with dimensional tolerance *

1000 Nos

1000 Nos

4950.00

1000 Nos

4400.00

4620.00

17 18 19 20 21

3760.00

4070.00

1 Cum I Cum I Cum 1 Cum 1 Kg.

River single or Bajri (12mm. to 20mm.) Screened and washed sharp sand for mortar Sand for filling and road blinding Clay mortar for masonry work with admixture of sand. Stone lime unslaked.

401 9.00

3400.00

4138.00

3539.00

4180.00

3767.00

88.00 46.00 41 .OO 45.00 13.00

3740.00

90.00 48.00 42.00 48.00 15.00

104.00 52.00 49.00 45.00 15.00

Page 7: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

SI. No.

1 22 23 24

1 Cum. 25

26

27

28

29

1 Cum.

Name of items

2 Ghooting lime unslaked. Shell lime unslaked. a) Granite broken stone of size not less than 0.0025 Cum. Stacked b) Granite stone of size not less than 0.0025 Cum. picked up.

Stone other than granite quarried, broken and staked 0.0015 Cum to 0.003 Cum Stone other than granite picked up and staked 0.0015 Cum. to 0.003 Cum Stone other than granite quarried, broken and staked above 0.003 Cum Stone other than granite picked up, broken and staked above 0.003 Cum Granite Stone broken metal 63mm. size Passing through

1 Cum.

1 Cum.

Unit Rate for Central

Revenue Zone- 201 3

3 1 Kg. 1 Kg.

1 Cum.

1 Cum.

Rate for Northern

Revenue Zone- 201 3

30

31

, 32

Rate for Southern

Revenue Zone- 201 3

4 17.00 15.00

214.00

187.00

33

34

I ]passing through 13.2mm sieve & retained on 9.50mm sieve but I I I I I

90mm. Sieve and retained on 53 mm sieve. a) Crusher broken. b) Hand broken. Granite Stone broken metal 45mm. size (Passing through 53mm sieve & retained on 26.5mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken metal 40mm. size a) Crusher broken. b) Hand broken.

,Granite Stone broken metal 26.5mm. size (Passing through

35

36

37

5 19.00 17.00 221 .OO

201 .OO

45mm sieve & retained on 22.4mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken metal 25mm. size (Passing through 40mm sieve & retained on 20mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken metal 22.4mm. size (Passing through

6 19.00 17.00

245.00

200.00

1 Cum. 1 Cum.

1 Cum. 1 Cum.

1 Cum. 1 Cum.

,

26.5mm sieve & retained on I I .2mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken chips 20mm. size (Minimum 65% by Wt. Passing through 19mm sieve & retained on 13.2mm sieve but whole should pass through 26.5mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken chips 13.2mm. Size (Passing through 22.4mm sieve & retained on 11.2mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken chips 12mm. size (Minimum 65% by Wt.

38

1 Cum. 1 Cum.

1 Cum. 1 Cum.

13.2mm sieve & retained on 5.6mm sieve) a) Crusher broken. b) Hand broken.

594.00 473.00

616.00 475.00

682.00 544.00

1 Cum. I Cum.

I Cum. 1 Cum.

I Cum. 1 Cum.

whole should pass throuqh 19mm sieve) a) Crusher broken. b) Hand broken. Granite Stone broken chips 11.2mm. size (Passing through

726.00 550.00

737.00 561 .OO

1 Cum. 1 Cum.

607.00 473.00

627.00 486.00

679.00 552.00

759.00 583.00

968.00 753.00

990.00 770.00

1 Cum. 1 Cum.

647.00 492.00

679.00 51 5.00

701 .OO 561 .OO

699.00 556.00

721 .OO 589.00

1012.00 803.00

745.00 570.00

764.00 612.00

742.00 608.00

991 .OO 817.00

996.00 823.00

1001 .OO 781 .OO

797.00 641 .OO

998.00 808.00

1005.00 821 .OO

1042.00 841 .OO

101 6.00 833.00

1084.00 849.00

1031 .OO 834.00

Page 8: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

Si. Name of items Unit Rate for Rate for Rate for Central Northern Southern

Revenue Zone- Revenue Zone- Revenue Zone- 201 3 201 3 2013

39 Granite Stone broken chips 10mm. size (Minimum 65% by Wt. Passing through 9.5mm sieve & retained on 6.3mm sieve but whole should pass through 13.2mm sieve) a) Crusher broken. b) Hand broken.

(A) Granite Stone broken chips 6.7mm size (Passing through 1 I .2mm sieve & retained on 2.8mm sieve)

(B)

40

I I I

Granite Stone screening (Passing through 2.36mm sieve & retained on 180 micron sieve) Granite stone broken chips of 4.7 mm size passing through 6.7 mm sieve (crusher broken.) and retained on 2.36 mm sieve.

1 Cum.

1 Cum.

41 42 43 44 45

626.00 605.00

616.00

46

47

48

49

639.00

Stone other than granite broken to 5cm. size. Stone other than granite broken to 4 cm. size. Stone other than granite broken to 2 cm. size. Stone other than granite broken to Icm. size. Stone boulder 15cm. & above size granite picked up and nullah

I I I 1

I I I I

I b) Belongi Bomboo above 4Cm. dia & up to 7Cm. dia & above 1 Each 1 , 36.00 1 35.00 1 35.00 1

646.00

boulders. Soiling stone boulder 15Cm. & above size picked up nullah boulders broken. Stone boulder 15cm. & above size other than granite or laterite picked up and nullah boulders. Soiling stone boulder 15Cm. & above size other than granite or laterite picked up nullah boulders broken. Soling stone boulders 10 Cm. size picked up other than granite.

51 52 53 54 55 56 57 58

656.00

1 Cum. 1 Cum. I Cum. 1 Cum. 1 Cum.

50

1 Cum.

1 Cum.

I Cum.

1 Cum.

180.00

I.R.C. Grade I (90mm-45 mm.) I.R.C. Grade II (63mm. to45mm.) I.R.C.Grade Ill (53mm. to 22.4mm.) Laterite soling stone 23Cm. size Laterite Stone rough dressed Bamboo mat or talai. Bamboo 1ST class 7Cm. to 10Cm. dia &above 6m. long. a) Belongi Bomboo 2.51 Cm. to 4Cm. dia & above 5m. long.

.,

231 .OO 236.00 253.00 264.00 137.00

Hard broken soling stone other than granite (40mrn. to 90mm.) 187.00 I

59 60

61

62

63

64

65

66

67

143.00

110.00

121 .OO

110.00

1 Cum. 1 Cum. 1 Cum. 1 Cum. 1 Cum. I Sqm. Each Each

Sal bullahs 75mm. to 120mm. mean dia up to 5.5m, long. Sal bullahs 150mm. to 200mm. mean dia up to 5.5m. long.

243.00 254.00 281 .OO 290.00 122.00

1 Cum.

Sal bullahs above 200mm. & up to 250mm. mean dia & up to 2.751-11. long. Sal bullahs above 200mm. & up to 250mm. mean dia above 2.75111. long & up to 4.75m. long. Sal bullahs above 200mm. & up to 250mm. mean dia above 4.75m. long Sal bullahs above 250mm. & up to 380mm. mean dia & up to 2.75m, long Sal bullahs above 250mm. & up to 380mm. mean dia & above 2.75m. long up to 4.75111. long Sal bullahs above 250mm. & up to 380mm. mean dia & above 4.75m. long. Non-sal bullahs 75mm. mean dia of any length.

253.00 264.00 286.00 308.00 121.00

138.00

11 5.00

124.00

114.00

176.00

572.00 638.00 682.00 93.00 528.00 110.00 121 .OO 27.00

143.00

1 16.00

129.00

118.00

1Cum.

1Cum.

1Cum.

1Cum.

1Cum.

ICum.

1 Mtr.

561.00 618.00 669.00 94.00 507.00 116.00 129.00 24.00

583.00 646.00 699.00 99.00 559.00 118.00 137.00 23.00

8008.00

9020.00

10340.00

11605.00

14410.00

15911 .OO

44.00

8404.00

9253.00

10678.00

12005.00

14753.00

16685.00

44.00

8250.00

9515.00

10945.00

12166.00

15180.00

16500.00

46.00

Page 9: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

i Name of items

1 71 on-~al bullahs above 200mm. & up to 250mm. mean dia UP to I 1Cum. 1 5720.00 1 5571.00 1 5623.00 1

1 68 69 70

1 72 I ~ o n - ~ a l bullahs above 200mm. & up to 250mm. mean dia above1 1Cum. 1 6325.00 1 6064.00 1 6117.00 1

Unit

2 Non-sal bullahs 100mm. mean dia of any length. Non-sal bullahs 125mm. mean dia of any length. Non-Sal bullahs 150mm. to 200mm. mean dia of any length.

73

74

Ra:e for Southern

Revenue Zone- 2013

Rate for Central

Revenue Zone- 201 3

3 1 Mtr. 1 Mtr. 1 Mtr.

75

Rate for Northern

Revenue Zone- 2013

2.5m. long. Seasoned rough dressed sawn Sal wood having minimum dimension 50mm. to 150mm. & up to 2.75m. long.

Seasoned rough dressed sawn Sal wood having minimum dimension 50mm. to 150mm. & above 2.751~1, long.

76

77 78 79

80 81 82 83 84

4 57.00 66.00 82.00

Seasoned Sal wood beam of cross sectional area not less than 150Sq.cm. &least lateral dimension 100mm. & above 2,75m.

85

86

87

88

89

1Cum.

1Cum.

long. Seasoned Sal wood planks not more than 75mm. thick & not less than 200mm. width. Seasoned Piasal wood planks for shutters. Seasoned Teak wood planks for shutters. Non Sal wood scantling & plants(Tentera, Kasi, Gamhari, Kuruma) Non-Sal reapers. Fire wood 1st class Raniganj or Mangalore pattern tiles. Ridges of Raniganj or Mangalore parttern tiles. Flat tiles(l4Cm. x14 Cm.x 1Cm. )

90

91

5 53.00 68.00 82.00

1Cum.

Flat tiles (15Cm xl5Cmx 1.2 Cm )

Flat tiles (30Cm. x 15 Cm.x 2.5 Cm. )

Flat tiles (30Cm. x 30 Cm.x 2.5 Cm. )

Pan tiles

Nuria tiles(20Cm. to 25Cm.)

(a) Up to 0.10 Sqm. (10mm thick) b) Above 0.10 Sqm (i)Above 0.10 Sqm & up to 0.4 sqm (10mm. thick) ii) Above 0.40 sqm. (20mm thick)

6 57.00 71 .OO 88.00

29810.00

32537.00

1Cum.

1Cum. 1Cum. 1Cum.

1Cum. 1Qntl

100 Nos. 100 Nos. 1000 Nos.

Nuria tiles(25Cm. to 30Cm.)

Ridge tiles

96

32812.00

1000 Nos.

1000 Nos.

1000 Nos.

1000 Nos.

1000 Nos.

1 Sqm.

1 Sqm. 1 Sqm.

32802.00

35924.00

29247.00

47192.00 62100.00 17989.00

10941 .OO 385.00 825.00 1301 .OO 264.00

1000 Nos.

1000 Nos.

Kodappa Tiles of 10 mm thick (a) Above 0.1 Sqm & Up to 0.40 Sqm. (b) Above 0.40 Sqrn.

30690.00

32560.00

35742.00

284.00

11 12.00

1298.00

278.00

581 .OO

1067.00

1210.00 1900.00

331 10.00

32654.00

51 158.00 70408.00 18511 .OO

11791 .OO 415.00 917.00 1392.00 301 .OO

685.00

862.00

1 Sqm. 1 Sqm.

30140.00

47740.00 67430.00 18260.00

12100.00 437.00 924.00 1460.00 286.00

327.00

1296.00

1521 .OO

304.00

690.00

1067.00

1210.00 1900.00

308.00

1287.00

1477.00

304.00

693.00

831 .OO

948.00

1067 .OO

1210.00 c 1900.00

275.00 330.00

834.00

950.00

275.00 330.00

275.00 330.00

Page 10: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

Name of ltems

1 97 98

to lOmm confirming to IS 13756 of following sizes (I) Vitrified Tile 600mmx600mm Plain (Ivory) (11) Vitrified Tile 600mmx600mm Coloured I Printed

~300mmx300mrn 99 lchequred Tiles. I 1 Sqm. 1 198.00 1 198.00 1 198.00

Unit

2 Dholpuri Stone Tiles. Tiles up to- (a) 20cmx30cm I20cm x 20cm special plain lprinted series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753 (b) 30cm x 30cm I40cm x 40cm special plain I printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755 (c) Vitrified floor tiles of premium grade having thickness 8 mm

series(Homogeneous) (d) Vitrified industrial floor Tile of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size

Rate for Northern

Revenue Zone- 2013

Rate for Central

Revenue Zone- 201 3

3 1 Sqrn.

1 Sqm.

1 Sqm.

1 Sqm. 1 Sqm.

Rate for Southern

Revenue Zone- 2013

1 Sqm.

11 5 116 117 1 18 119 120 121

122

605.00 660.00

123 124

550.00

A.C. ridges 6mm. Thick Plain A.C. Sheet Tar Paper Putty (Wood) Putty (Iron) Wire Nails MS. Angle

M.S. Channel

125 126 127.

605.00 660.00

Bolt, Nut & Washers Holding down bolts minimum 60 Cm. long with 15Cm. x 15 Cm.

a) b) c)

605.00 660.00

550.00

I pair 1 Sqm I Sqm 1 Kg. I Kg. 1 Kg.

1 Qntl.

1 Qntl.

x 6mm. size washer plate Binding Wire. Coir String

550.00

1 Kg. 1 Kg.

Empty Cement bags (HDPE) by lot & not shorted out Empty Cemenl gunny bags by lo1 & not shorted oul Empty Bitumen Drum

171 .OO 210.00 16.00 26.00 90.00 55.00

Rate as fixed by SAIL

Rate as fixed

1 Kg. 1 Kg.

by SAIL 70.00 68.00

100 nos 100 nos

Each

171 .OO 210.00 16 .OO 26.00 90.00 55.00

Rate as fixed by SAIL

Rate as fixed

72.00 42.00 350.00

171 .OO 210.00 16.00 26.00 - 90.00 55.00

Rate as fixed by SAIL

Rate as fixed by SAIL 70.00 68.00

350.00 120.00

by SAIL 70.00 68.00

72.00 42.00 350.00

72.00 . 42.00 350.00

350.00 120.00

350.00 120.00

Page 11: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

Si No.

1 d)

128 129 130 131

a)

b)

c)

132 133

134

Rate for Central

Revenue Zone- 201 3

-

4 230.00 250.00 550.00 320.00

Average factory price

of three manufacturers

of cw-nent inside the

State.

1750.00

Rate as fixed by SAIL

5020.00

~ a m e of items

2 Empty Bitumen Emulsion Drum Straw in Bundle Marble Chips. Marble Powder Cement 33 Grade

43 Grade

53 Grade

White Cement. Steel a) Mild Steel

b) HYSD (FE-415) l(FE500)

'Z" type Steel Sheet Piles ~ ~ - . - - - - -

Rate for Northern

Revenue Zone- 201 3

5 230.00 250.00 550.00 320.00

Average factory price

of three manufacturers

of cement inside the

State.

1750.00

Rate as fixed by SAIL

5020.00

Unit

3 Each

100 nos lqntl lgntl

Iqntl

Iqntl

Iqntl

lqntl

Iqntl

Rate for Southern

Revenue Zone- 201 3

6 230.00 250.00 550.00 320.00

Average factory price of

three manufacturers

of cement inside the

State.

1750.00

Rate as fixed by SAIL

5020.00

Page 12: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

:;.A- Name of items Unit yo

b) 125mm with 175mm x 40mm flat 2600 26.00 26.00

Revenue Zone- Revenue Zone- Revenue Zone-

c) d)

'I

k) I)

m) n)

141

a) b)

IOOmm with 150mm x 33m flat 75mm with l l8mm x 33mm flat

Each 34.00 34.00 34.00 142 Steel window handle including Nut, bolt & washer (I.S.I.)

2 35x7mm 35xBmm 5Ox7mm 5Ox8mm Steel window stay bar (I.S.I.) 200mm 250mm

Each Each

- 3

100 pcs 100 pcs 100 pcs 100 pcs

Each Each

25.00 24.00

4 56.00 65.00 71 .OO 75.00

23.00 28.00

25.00 24.00

25.00 24.00

5 56.00 65.00 71 .OO 75.00

23.00 28.00

6 56.00 65.00 71 .OO 75.00

23.00 28.00

Page 13: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

SI No.

Name of items Unit

1 148

a) b) c) d) ej

149

Rate for Centra!

Revenue Zone- 2013

a) 300mm x 16mm Each 200.00 200.00 200.00

2 Aluminium tower bolt (Barrel type) (I.S.I.) 300mm xlOmm 250mm 10mm 200mm x 10mm 150mm x 10mm 100mm x 1 0mm

Isliding door bolt (Aldrop) (I.S.I.)

Rate for Northern

Revenue Zone- 2013

Rate for 1 Southern

Revenue Zone- 2013

3

Each Each Each Each Each

4

60.00 55.00 50.00 42.00 34.00

5

60.00 55.00 50.00 42.00 34.00

6

60.00 55.00 50.00 42.00 34.00

--

Page 14: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

Rate for Central

Revenue Zone- 2013

4

320.00 365.00 485.00 550.00

Unit

3

Sq m Sqm Sqm Sqm

Si No.

1 161

a b c d

Nane of items

2 Glass plain (I.S.I.) 3mm 4mm 5mm 6mm

Rate for Northern

Revenue Zone- 2013

5

320.00 365.00 485.00 550.00

Rate for

Revenue Zone- ~ 2013

6

320.00 365.00 485.00 550.00

Page 15: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

SI. No.

Acessories a) sliding outer frame assembly I pc b) sliding shutter Ipc c) Sashbar d) wall fixing with polymide anchor at every 600mm clc of outer

I (material for powder mating) for aluminium section. I Aluminium /

Name of items

173

I I I I I 174(12.5 mm thick gypsum board of size 6' x 4' I One Piece 1 350.00 1 350.00 1 350.00 .

Each Each Each Each

Gasket a) For Shutter Po-153 b) For beading Po-179 c) For Sashbar Po-101 Rate of 60 micron powder coating (including labour charges and

Unit

248.00 305.00 17.00 27.00

Rate for Northern

Revenue Zone- 201 3

Rate for Central

Revenue Zone- 201 3

Mtr Mtr Mtr

Kg of

Rate for Southern

Revenue Zone- 2013 1

248.00 305.00 17.00 27.00

248.00 305.00 17.00 27.00

38.00 50.00 105.00 27.00

38.00 50.00 105.00 27.00

38.00 50.00 105.00 27.00

Page 16: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

NOTES: 1 ) All Reinforcement Steel and structural steel shall be procured and used as per

specifications mentioned in BIS's documents- IS: 1786 and lS:2062 respectively. lndependent tests shall be conducted, wherever required, to ensure that the materials procured conform to the specifications.

These steel shall be procured only from those firms, which are established, reliable, lndigenous & primary producers of steel, having Integrated Steel Plants (ISP), using iron ore as the basic raw material as per Ministry of Steel's guidelines.

No re-rolled steel shall be permitted in works. All other specifications and guidelines of MORTH shall be complied. 2) The Cement of the companies having their own manufacturing units in the State of

Odisha is to be used in all works. 3) In case of bridge works expansion joints and bearings are to be procured from only

specified manufacturing units approved by MORTH, 4) Hard stone is to be used in lieu of granite for slope protection work.

I. Stone and Stone Products 1) The rates of materials in SR are basic rates excluding cost of conveyance, royalty but

including cost of stacking and C.S.T.N.A.T. 2) Normally blasted stones should not be used for soling stone where hand broken stones

are available. 3) The box heaps of 1.5mx 1.5mx 0.44m is to be measured as 1 Cu. M.

11. Wood Work (a) The rate of wood work items are equivalent to the rates of Orissa

Forest Corporation on the average. If any change to the rates are made by the Forest Corporation the revised rates shall be taken into consideration while arriving at the finished rates.

(b) For wood works the supply rates as fixed by the Forest Corporation shall prevail over that stated in this schedule of rates.

111. Items under Miscellaneous Head The rates under the sub-head under the Miscellaneous items are enclosure of labour and cost of all materials and conveyance except where otherwise mentioned in the description of items.

N. Weight of Cement 14.30 quintals per one Cu. M.

V. Materials under E.P.M. 1D.G.S. & D.'s Rate 1) In case of item of work or for supply of materials against which rates have been approved by Directorate of Export Promotion and Marketing the same shall be made applicable for adoption in this schedule of rates. In case of items of work or for supply of materials, against which rates have been approved by the D.G.S & D. the same rate shall be made applicable for adoption in this schedule of rates provided that if the rates of same items of work or for supply of materials are also forced by E.P.M. the E.P.M. rates will prevail over D.G.S. & D.'s rates. VI. Rate of Cement, Steel and Bitumen will increaseldecrease as mentioned below:

1) Steel: Rate as fixed by Steel Authority of India Limited (SAIL). 2) Cement: Average factory price of three manufacturers of cement inside the State. 3) Bitumen: Rate as fixed by Indian Oil Corporation Limited (IOCL) 1 Hindustan

Petroleum Corporation Limited (HPCL)/Bharat Petroleum Corporation Limited (BPCL).

VII. In Cement Concrete items of Analysis of Rate centering and shuttering shall be added extra wherever necessary depending upon the item of work.

Page 17: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

VIII. Overl~ead Charges include the following elements :-

i. Site accon~modation, setting up plant, access road, water supply, electricity and general site arrangements.

. . 11. Office furniture, equipment and communications iii. Expenditure on

a) Corporate office contractor b) Site supervision

c) Docun~entation and "as built" drawings iv. Mobilisationlde-mobilisation of resources v. Labour camps with minimum amenities and transportation to work sites vi. Light vehicles for site supervision including administrative and managerial

requirements vii. Laboratory equipment and quality control including field and laboratory

testing ... viii. Minor T&P and survey instruments and setting out works, including

verification of line, dimensions, trial pits and bore holes, where required ix. Watch and ward x. Traffic management during construction xi. Expenditure on safeguarding environment xii. Sundries xiii. Financing Expenditure xiv. SalesITurn over tax xv. Work Insurance/compensation xvi.For the purpose of calculation, overhead charges @7.5% to be adopted in Analysis of Rates of various items to work out estimated cost.

Page 18: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

CHAPTER-I1 RATE OF LABOUR

DESCRIPTION UNIT 1 A 1

1 2 3 1 Survey Khalasil Chain man

2 Category unskilled

Male mulia Female mulia

Per day 4 B I

I I in flood and other emergent work I

3

Per day Per dav

- 2

Mulia for handling hot binder and Tar boiler men

Scavanger Category Semi skilled

Mulia working in water or arduous nature of work p

Per day

Per day

Per day

4 5 6

Per day 1 7

Sangi mulia Pile driving mate( Guide man ) Mate Helper to carpenter or Blacksmith1 Painter/ Blaster/ Plumber1 Electrician/ Fitter/

Per day Per day Per day

1 Welder 8 9 10

I 11

Hammerman Thatcher/ Gharami

12 13

Per day Per dav

Tile turner Boat man

14 1 5 16

1 Security Guard

Per day Per dav

Bhisti Well sinker

1 17 1 1 8

ello ow man Per day Cate o Skilled

Blaster( Second class ) Per da Mason( Second class ) Per day Black smith ( Second class ) Per day

Per day Per day

Rod binder and bender Cleaner/ Sweeper Stone packer

Per day Per day Per day

Pump helper Watch man( Store)/Gurkha /

Per day Per day

4 5 6

I 7

Carpenter( Second class ) Fitter( Second class )

8 1 Plumber( Second class )

I class)

Per day Per dav

Painter/ Polisher( Second class ) Welder( Second class )

Per day 9

RATE in Rs.

Per day Per dav

10 Stone dresser/ Cutter( Second Per day Driller( Second class ) Per day

Page 19: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

- .- - -- - - - --

Wire man/ Lift operator I pump driver1 Telephone operator

13 1 14 Electrician/ Rigger1 Line mad IS gpqz attendant1

( Second class ) Boring Mistryl Pipe driver

16 17

Per day

Per dav Amin Tracer

Per day Per dav

1 I Toolkee~erl Time kee~erl ~ u n s i I I 1

Per day 190.00

190.00 190.00 190.00

18 19

190.00

Jr. progress recorder Store keeper Gr.- I11 Store Asst.1 Account clerk/ Clerk/ Typist1

D 1 2 3

5 6 7 8 9

11

I ( operator/ wire man/ Lift operator/ 1 I I

Per day Per day

Category Highly Skilled Blaster (licensed)

12

1 190.00 190.00

Mason (special) Carpenter(specia1)

fl Fitter(specia1) Painter1 Polisher(specia1) Welder(specia1) Plumber(specia1) Driller (Special)

fl Diver for well sinking in bridge

Per dav

( per shift of four hours.) Electrician/ Air conditioned plant , Per day

13

205.00 Per day Per day Per day -- Per day Per day Per day Per day Per day Per day Per day

205.00

14 15 16

205.00 205.00 205.00 205.00 205.00 205.00 205.00 205.00 205.00 -- 205 .OO

Jeep driver/ Tractor driver 1 Truck driver / Dozer driver / Roller driver /Concrete mixture operator 1 Crane o~erator

17 18

Note :

1. Labour rates for un-skilled, Semi-skilled, Skilled and Highly skilled as are to be fixed

from time to time by Labour Department under Minimum Wages Act shall prevail in

respect of any category what so ever.

2. The rates for above four categories of labour are inclusive of weekly day of rest.

3. An adult Employee shall work for 8 (Eight) hours per day including half-an-hour of

rest.

Per day

Auto electrician Guiniting Machine operator Senior Accountant / Stenographer

19

Supervisor / Manager Testing Laboratory Assistant /

Per day Per day Per day

Instrument Mechanic1 Telephone Mechanic. Rigger and Cobbler with Tools 1

205.00 205.00 205.00

Per day Per day

205.00 205.00

Per day 205.00

Page 20: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

I s1 I Description I Unit I Rate in I Other Category (Not covered by the Notification of Labour & Employment Department).

(Rs.1

01

02

I

04 ' Helper to Well Sinker 1 PerDay

Boring Mistry (Special)

03

Winch operator

Per Day

Well Sinker (Special)

05

205.00

Per Day

06

205 .OO

Per Day

Computer Programmer

07

08 09

10

205.00

Data Entry Operator

11

Per Month

Helper to operator of Heavy construction Machineries Mechanic for Heavy construction Machineries Helper to mechanic for heavy construction Machineries Operator for Heavy construction Machineries

7000.00

Per Month

Junior Research Assistant (Technical Assistant)

5200.00

Per Month

Per Month Per Month

Per Month

5000.00

6000.00 5000.00

6000.00

Per Month 5200.00

Page 21: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

CHAPTER-111 RATE FOR CONVEYANCE OF MATERIALS

ITEM NO-1. Conveyance of Materials by Ten Tonne Trucks including loading & unloading.

Distance to be carried

Rough stone, metal, khoa, chips, sand, surki, quarry rubbish, moorum laterite stone, washed gravel, flyash & earth (Per 1 cum)

Bricks 23cm= 2500 nos Bricks 25cm= 2000 nos Cement concrete & fly ash blocks 400mmx200mmx200mm= 300 nos 400mmx150mmx200mm= 400 nos 400mmx 100mmx200mm= 600 nos 300mmx200mmx150mm= 550 nos 300mmx 1 50mmx 1 50mm= 730 nos 300mmx100mmx150mm= 1 100 nos All Kinds of tiles = 180 Sqm

(per truck)

Iron, Grills, Cement, / Bulky materials Bitumen, A.C sheet, GCI Sheet & Paint etc(per 1000 kg) Wood (per 1.25 cum)

like Machineries, generators, concrete pipe & furniture etc (per Truck)

Railway station

Note : Extra percentage to be allowed over the rates

Other places

Every extra KM beyond 5 KM and up to 50 Km Every extra

1. For earthen roads or village tracks or cross country tracks, 20 % extra may

be allowed on the certificate of Executive Engineer after his inspection and

duly approved by Superintending Engineer.

2. For declared ghat road, add extra length of ghat road portion.

8.00

5.70

1 F o n d 1 1 1 1

36.00

29.00

7.50

6.40

7.50

6.40

37.00

29.00

Page 22: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

ITEM NO. 2: Loading into Trucks and Unloading from trucks (Within 50 m lead) including stacking

Note : a) For item no . 1

9 213 of rate is considered for loading

ii) 113 of rate is considered for unloading

b) for item no 2,3 & 4

i> 50 % of rate is considered for loading

ii) 50 % of rate is considered for unloading

Details of materials Unit Rate in Rs.

rubbish, moorum, laterite stone, washed gravel, & earth

2 Iron, grills, cement, Bitumen, A.C sheet, GCI Sheet ,Coke,coal lime etc

3 Bricks 23cm= 2500 nos 1 truck 448.00 Bricks 25cm= 2000 nos Cement concrete & flyash blocks 400mmx200mmx200mm= 300 nos 400mmx150mmx200mm= 400 nos 400mmx100mmx200mm= 600 nos 300mmx200mmx150mm= 550 nos

ITEM NO. 3 Carriage by Bullock Cart including Loading and Unloading

4

300mmx150mmx150mm= 730 nos 300mmx100mmx150mm= 1100 nos All kinds of tiles= 180 Sqm Bulky material such as a) Hurne pipes & furnitures

b) Heavy machineries such as compressors ,concrete mixer, hotmix plant etc.

S1. No 1

1 truck load 1 truck load

2 Subsequent KM 1 cart load

Distance to be carried.

First KM

611.00

728.00

Unit

1 cart load

Rate in Rs.

67.00

Page 23: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

ITEM NO. 4 Unloading from Railway wagon and loading into trucks

S1. No

I I b) Steel, A.C sheet, GCI Sheet, etc

Unloading from Railway wagon and stacking on platform 1.0 m in clear of rails within 15 m lead a) Cement, Bitumen, coal, paint etc

Details of materials.

1 Qtl.

2

ITEM NO. 5 Conveyance by Head load including loading & unloading and stacking.

Unit

1.60

I

b) Steel, A.C sheet, GCI Sheet, etc

Distance to be carried.

Rate in Rs.

Removing from railway platform and loading into trucks a) Cement, Bitumen, coal, paint etc

Rough stone, metal, khoa, chips, sand, surki, quarry rubbish, moorum, laterite stone, moorurn,washed gravel, fly ash & earth

I

1 Qtl.

Iron, grills, cement,lime, Bitumen, A.C sheet, GCI Sheet ,paint etc (per 1 quintal), wood( per 0.125 cum)

1 Qtl.

5.80

I I I ~ e r cum I I

1.60

1

I I and u ~ t o 100 mtr I I 1

1 2

2

Upto50mtr. Beyond 50 mtr

3

3. Rate in Rs.

4 Rate in Rs.

3 3 .OO 38.00

Beyond 100 mtr and upto 150 mtr

8.30 12.40

50.00 18.00

Page 24: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

ITEM NO. 6 Conveyance by Boat including loading & unloading

Distance to be carried.

A) In River i)Up to 5 KM. ii)Every extra KM beyond 5.00 Krn and upto 16 KM

iii)Every extra KM beyond 16 KM B) In canal i)Up to 5

Rough stone: metal, khoa chips, sand, surki, quarry rubbish, moorum laterite stone, moorum, washed grave1,fly ash & earth

Bricks 23cm= 2500 nos Bricks 25cm= 2000 nos Cement concrete & flyash blocks 400mmx200n1mx200mn~= 300nos 400mmx 150n1mx200mm= 400 os 400mmx100mmx200mm=600 nos 300mmx200mmx 150mm=550 nos 300mn1x150mmx150mm=730 nos 3OOmmx I OOmmx I 50mm= 1 100 nos

All kind of Tiles=180 Sqm

Iron, grills,cement, lime, Bitumen, A.Csheet, GCI Sheet &, paint etc (per 1 quintal)wood(perO. 125 cum)

(per cum) 2

Rate in Rs. 49.00

5.20

2.60

KM. ii)every extra KM beyond 5.00 Krn and upto 16 KM iii)every extra KM beyond 16

3 Rate in Rs.

280.00

24.70

4 Rate in Rs.

8.40

0.70

5.80

2.60

20.80

16.00

0.90

0.70

Page 25: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

1 I . 1 Rough stone and cut laterite stones

I / Sl. No. Description of Items Capacity

Rough stone(Bou1ders)

Cut laterite stone

2

4.00 Cum 1

3

5.00 Cum ~ Gravel, sand & surki 5.50 Cum

Cut stone (granite & hard stone) 5.50 Cum 1 - -

Lime 5.50 Cum

Bricks 23 cm

Wood

, Bricks 25 cm

2500 Nos

5.00 Cum

2000 Nos

Cement concrete & flyash blocks

300 Nos

400 Nos

600 Nos

550 Nos

730 Nos

d) I All kinds of tiles

1 I 300mm x 100mm x 150rnrn

180 Sqm

I 1100 Nos I

Iron, tar, pitch and other materials considered by weight

7.00 tonnes

Cement 8.00 tonnes

Straw for thatching 1000 Nos or 100 head loads or 50 Bhar loads

Hume pipe up to 600mm diameter

10.

5 Nos.

1 12. 1 Hume pipe 900- & above diameter

Bamboos

3 Nos.

30 Bhar loads

Note:

Where materials are to be conveyed by head loads or by pack animals, rates are

to be worked out on actual analysis and approved by the Superintending Engineer.

Page 26: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

ltem No. 8: Head Loads

Each head load of straw 1 bundle of 1.5 mtr. in girth ~ S1.No.

1 3. 1 Each head load of bamboo 1 Belangi 10 Nos., muli 3 nos 1

Description of Items

4. 1 Each bhar load of bamboo

Capacity

I Belangi 20 Nos., muli 6 nos

ltem No -9 : Cart Load of Materials

Note: - The rates of conveyance of materials are exclusive of voids of materials.

S1 No

1 1. -

2. 3. 4. 5. 6.

7. 8. -

9. 10. 11.

Description of Items

2

Gravel , Sand & Surki Cut Stone (granite & hard Stone)

Lime and wood Bricks

Cement concrete & flyash blocks 400mm x 200 mm x 200 mm 400mm x 150 mm x 200 rnrn 400mm x 100 mm x 200 mm 3OOmmx2OOmmx15Omm 300 mmx 150 mmxl50 mm 300 mmx100 mmxl50 rnrn

Pan tiles Flat tiles

i) 15cmx15cmx1.25cm ii) 3Ocmx15cmx2.5cm iii) 3Ocmx3Ocrnx2.5cm

Nuria Tiles - 20 cm x 25 cm Mangalore and Ranigang tiles

Iron , Cement,tar,Pitch and other materials by weight

Quantity per cart load

Plain Road 3

0.36 cum 0.20 cum 0.60 cum 200 nos

30 nos 40 nos 60 nos 55 nos 73 nos 110 nos 1000 nos

2000 nos 500 nos 250 nos 800 nos 250 nos 454 kg

Hilly Road 4

0.23 cum 0.28 cum 0.15 cum 0.42 cum 150 nos

22 nos 30 nos 45 nos 41 nos 55 nos 82 nos 800 nos

1600 nos 400 nos 200 nos 600 nos 200 nos 363 kg

Page 27: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

CHAPTER -1V HIRE CHARGES OF PLANTS AND MACHINERIES

SI. No.

1

2

3

4 5

6

7

8

9

10

11

12 13

14

15 16

DESCRIPTIONS

Machine Dozer D-50 -A 15

Dozer D-80-A 12

Motor Grader 3.35meter blade

Tractor with ordinary grader Hydraulic Excavator of Icum bucket

Hydraulic Excavator of 2cum bucket Front End loader 1 cum bucket capacity

Tipperdcum

Vibratory Roller 8-1 0 tonne

Smooth wheeled Roller 8 -10 tonne

Sheep foot Roller

Truck mounted water tanker Tractor

Rotavator

Ripper Air Compressor

Output 200cumlhour

100cumlhour 150cumlhour 300cumlhour

150cumlhour 250cumlhour 200cumlhour 200cum/hour

50cumlhour 50cumlhour

60cumlhour

60cumlhour 60cumlhour

60cumlhour

25cumlhour

5.5cum

100cumlhour

60cumlhour 60cumlhour 70cumlhour

25cumlhour

6 KL 50HP

25cumlhour

60cum/hour 1701250cfm

Activity Spreading

Cutting Cleaning Spreading

Cutting Cleaning Clearing Spreading

GSB WMM

Soil ordinary

Soil Marshy Soil unsuitable Soil

Soil loading

Aggregate loading Transportation of soil, GSB, WMM, Hotmix etc.

Earthlsoil

GSB WMM

-ppppp

Soil compaction

BM compaction Soil compaction

Water transport Pulling

Mixing Scarifying General purpose

USAGE RATES

Unit per hour

per hour per hour per hour

per hour per hour per hour per hour

per hour per hour per hour per hour

per hour per hour per hour

per hour

per hour

per km.

per tonne.km

per hour per hour

per hour per hour per hour

per hour per hour

per hour per hour

per hour

per hour per hour

IN RS.

Rate 1831 .OO

2519 00

1545.00

289.00 840.00

1868.00

520.00

24.00

2.50

582.00 994.00

339.00

65.00

582.00 231 .OO

11 .OO

18.00 206.00

Page 28: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

17 18 19 20 21

22

23

24

25

26

27

28

29 30

31

32

33

34

35

36

37 38 39

40 41

42

43

44

45

46

Diesel Compressor Diesel Compressor Electrical Compressor Wet Mix Plant 60 TPH Wet Mix Plant 75 TPH

Mechanical broom hydraulic

B~tumen pressure distr~butor

Emulsion pressure distributor

Hotmix plant -120 TPH

Hotmix plant -1 00 TPH

Hotmix plant -60 to 9OTPH

Hotmix plant -40 to 6OTPH

Hotmix plant -8 to 1 OTPH Paver Finisher Hydrostatic with sensor control 100 TPH Paver Finisher ~echanical 100 TPH

Paver Finisher Mechanical

Hydraulic Chips Spreader

Tandem Road Roller

Pneumatic Road Roller

Pot hole repair machine

Bitumen boiler 011 fired Tar boiler GSB Plant 50 cum

Mastic Cooker Batching and Mixing plant 15- 20cum Batching and Mixing plant 30cum Batching and Mixing plant 112.5cum Batching and Mixing plant 262.5cum Transit Mixer

Grout pump

Wet MIX Wet Mix

Surface cleaning

Applying bitumen tack coat Applying emulsion tack coat DBMIBMISDCI Premix DBMIBMISDCI Premix DBMIBMISDCI Premix DBMlBMISDClPremi X

Premix Paving of DBM IBM ISDCIPremlx P ~ ~ ~ ~ ~ W M M I P M C

Paving of DLC

Paving of DLC

Surface Dressing Rolling of Asphalt surface Rolling of Asphalt surface Repair of pot holes

Bitumen spraying Bitumen spraying Producing GSB

Mastic Wearing Coat Concrete Mixing

Concrete Mixing

Concrete Mixing

Concrete Mixing

Transportation of concrete mix to site

400cfm 300cfm 5OOcfm

25cumlhour 34cumlhour

1250sqmlhour

1750sqmlhour

1750sqmlhour

40cumlhour

30cumlhour

25cumlhour

17cumlhour

cumlhour 40cumlhour

40cum/hour

30cumlhour

75cumlhour

1500sqmlhour

30cumlhour

25cumlhour

4cumlhour

1500Litre

40cumIhour

I tonne 13cumlhour

20cumlhour

75cumlhour

175cumlhour

4.5cumlhour

3cumIhour

per hour per hour per hour per hour per hour

per hour

per hour

per hour

per hour

per hour

per hour

per hour

per hour per hour

p e r hour

per hour

per hour

perhour

per hour

per hour

per hour

per hour

per hour per hour

per hour per hour

per hour

per hour

per hour

per hour

per hour per hour

856.00 71 1 00 497 00 777.00 1036 00

230.00

692.00

516.00

151 00.00

11 167.00

8930.00

71 50.00

1025.00 1725.00

- p~

739.00

1846.00

1700.00

738.00

802.00

585.00

128.00

74.00 670.00

1586.00 1200.00

1440.00

2760.00

5160.00

600.00

550.00 65.00

Page 29: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

47

48 49 50

I 531~urnp with 50HP electrical I I I I I

I per hour 1 182.00 1

Concrete pump of 45 & 30 cum

51 52

Pump with 5HP diesel engine Pump with 10HP diesel engine Pump with 20HP diesel engine

Pumping Concrete

Pump with 40HP diesel engine Pump with 40HP electrical

54 55 56 57 58

I 63I~oncrete Bucket l ~ o r pouring concrete I lcum I per hour ( 10.00 1

Pumping of Water -ppppp

Pumping of Water Pumping of Water

59

60

6'1

62

33cumlhour 22cumlhour

Pumping of Water

Cranes 80 tonnes Cranes 35 tonnes Cranes 3 tonnes Crawler mounted Crane (18T) Tower Crane

a)04/0.28 cum 1 1b)Olcum

per hour per hour per hour

Welding transformer

Gunneting machine without compressor Mechanical Winch (10T)

Power Winch (40HP)

64 65

7.5cumlhour I per hour

per hour

59.00 108.00 166.00

per hour per hour

Lifting purpose Lifting purpose Lifting purpose Lifting purpose Lifting purpose

165.00

278.00 149.00

Welding

Kerb casting machine Concrete Mixer

I I [Concrete I I I I

per hour per hour per hour per hour per hour

I

825.00 550.00 230.00 1717.00

551.00

per hour

per hour

per hour

per hour

Kerb making Concrete Mixing

66l~ibrator (3HP diesel) l~ompacting

~~ ..-- ~

I 68l~oncrete Paver Finisher with I~av ing of Concrete I 20cumlhour 1 per hour 1 1850.00 1

81 .OO

91 .OO

224.00

220.00

( perhour 1 106.00

67

1 4 0 ~ ~ Motor l~ur face 69llntegrated stone crusher l~rushing of Spalls I 100TPH 1 per hour 1 5590.00

80RMlhour 2.5cumlhour

I I lcrushing of Spalls I - I 1 . I

200TPH I per hour 1 11760.00

Piling Rig with Bantonite Pump

per hour per hour

200.00 177.00

- - . . - . - . - 0.75m dia to 1.2m dia Boring Attachment

70 71

72

73

74

75

76

77

78

2 to 3RMlhour

Stone crusher (electrical) Crushing & processing plant (electrical) Concrete Paver Finisher w~th 40HP Motor Prestressing Jack with Pump & Access Generator 100KVA

Generator 250KVA

Generator 33KVA

Generator 40KVA

Generator 125KVA

per hour

Crushing of Spalls

Paving of Concrete Surface

3525.00

175cumlhour

per hour per hour

per hour

Stressing of Steel WiresIStands

184.00 235.00

16188.00

per hour

per hour

per hour

per hour

per hour

per hour

Generation of Electric Energy Generation of Electric Energy

Generation of Electric Energy Generation of Electric Energy Generation of Electric Energy

83.00

450.00

1125.00

240.00

425.00

905.00

IOOKVA

1 OOKVA

50KVA

KVA

KVA

Page 30: -1 7 · RDC ZONES (CENTRAL, NORTHERN & SOUTHERN), RATE OF LABOUR, CONVEYANCE AND HIRE CHARGES OF PLANTS AND MACHINERIES FOR -2013 WORKS DEPARTMENT . CONTENTS Chapter ... broken and

79

80

81 82

83

84 85

86

87

88

Pneumatic Sinking Plant

Truck 5.5curn per 10 tonnes

Road Marking machine --- Mobile Slurry Seal Equipment

Wagon drill

Dimond drill lnwell rings Jack hammer

Pneumatic rammer

Pusher leg

wells Material Transport

Road marking ( Mixing and laying slurry seal

20.00 2.00

557.00 60.00 650.00

128.00

338.00 72.00

9.00

13.00

5.00

w Z i E 6 - cumlhour 4.5curn

100sqmlhour 2700sqmlhour

Per Krn per tonne.km

per hour perhour PP

per hour

per hour

per hour per hour

per hour

per hour

per hour