PROJECT NAME HFO DIESEL POWER PLANT - A PROJECT (Karbala)
CLIENT Ministry of Electricity, Iraq
Piping and Instrument Diagram(P&ID)
1 2011.11.25 For Construction J.H.IM Y.S.PARK S.H.SHIN
0 2011.10.25 For Construction J.H.IM Y.S.PARK S.H.SHIN
REV. DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
STX Heavy Industries Co., Ltd.
SECTION SUBCONTRACTOR
General CivilMechanical ○ Quality
Electrical
-
8/16/2019 1. Basic Design
2/51
1/1 STX Heavy Industries Co., Ltd.
Document No. : MOE-A-DOC-BDD-002-3
NOTE
1. Purpose : INF-for Information, ARV-for Approval DWG
2. Document status : A-Approved, B-Approved with comments, not required revised dwg, C-Approved with comments, required revised dwg,
D-Not approved, required revised dwg
No. Drawing No. TitleSize
Purpose
1st Issue
Schedule
Document
StatusRev.0 Rev.1 Rev.2 Rev.3 Rev.4
A3 Iss. by STX 2011.10.25□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.10.25
□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.10.25
□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.10.25 2011.11.25
□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.10.25
□ for INF Rtn by MOE■ for ARV Result
A3 Iss. by STX 2011.10.25
□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.10.25 2011.11.25
□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.10.25 2011.11.25
□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.10.25
□ for INF Rtn by MOE
■ for ARV Result
9 MOE-A-PID-PT-0009-3EMERGENCY DIESEL
GENERATOR SYSTEM2011.09.23
7 MOE-A-PID-PT-0007-3 THERMAL OIL HEATING SYSTEM 2011.09.23
8 MOE-A-PID-PT-0008-3 SLUDGE SYSTEM 2011.09.23
5 MOE-A-PID-PT-0005-3 COMPRESSED AIR SYSTEM 2011.09.23
6 MOE-A-PID-PT-0006-3EXHAUST GAS
SYSTEM(1/2~2/2)2011.09.23
3 MOE-A-PID-PT-0003-3 LUBE OIL SYSTEM 2011.09.23
4 MOE-A-PID-PT-0004-3 COOLING WATER SYSTEM 2011.09.23
CONTENTS & STATUS
1 MOE-A-PID-PT-0001-3 SYMBOL & LEGEND 2011.09.23
2 MOE-A-PID-PT-0002-3 FUEL OIL SYSTEM(1/4~4/4) 2011.09.23
-
8/16/2019 1. Basic Design
3/51
-
8/16/2019 1. Basic Design
4/51
-
8/16/2019 1. Basic Design
5/51
-
8/16/2019 1. Basic Design
6/51
-
8/16/2019 1. Basic Design
7/51
-
8/16/2019 1. Basic Design
8/51
-
8/16/2019 1. Basic Design
9/51
-
8/16/2019 1. Basic Design
10/51
-
8/16/2019 1. Basic Design
11/51
-
8/16/2019 1. Basic Design
12/51
-
8/16/2019 1. Basic Design
13/51
-
8/16/2019 1. Basic Design
14/51
-
8/16/2019 1. Basic Design
15/51
-
8/16/2019 1. Basic Design
16/51
18F. STX Institute of Technology, 93-3
Jungang-dong, Seongsan-gu, Changwon-si
Gyeongsangnam-do, KOREA 641-845
DOC. No. MOE-A-DOC-BDD-003-3
Revision No. 1
Date 2011. 11. 25
Page
PROJECT NO.
PROJECT NAME HFO DIESEL POWER PLANT - A PROJECT (Karbala)
CLIENT Ministry of Electricity, Iraq
Plant Lay-out Drawing
1 2011.11.25 For Construction J.H.IM Y.S.PARK S.H.SHIN
0 2011.10.25 For Construction J.H.IM Y.S.PARK S.H.SHIN
REV. DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
STX Heavy Industries Co., Ltd.
SECTION SUBCONTRACTOR
General CivilMechanical ○ Quality
Electrical
-
8/16/2019 1. Basic Design
17/51
1/1 STX Heavy Industries Co., Ltd.
Document No. : MOE-A-DOC-BDD-003-3
NOTE
1. Purpose : INF-for Information, ARV-for Approval DWG
2. Document status : A-Approved, B-Approved with comments, not required revised dwg, C-Approved with comments, required revised dwg,
D-Not approved, required revised dwg
No. Drawing No. TitleSize
Purpose
1st Issue
Schedule
Document
StatusRev.0 Rev.1 Rev.2 Rev.3 Rev.4
A3 Iss. by STX 2011.10.25 2011.11.25□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.10.25 2011.11.25
□ for INF Rtn by MOE
■ for ARV Result
CONTENTS & STATUS
1 MOE-A-GAD-PT-0001-3GENERAL ARRANGEMENT
(12 Power blocks) Karbala2011.09.23
2 MOE-A-GAD-PT-0002-3
GENERAL ARRANGEMENT
(1 Power block) Karbala
(1/20~20/20)
2011.09.23
-
8/16/2019 1. Basic Design
18/51
-
8/16/2019 1. Basic Design
19/51
-
8/16/2019 1. Basic Design
20/51
-
8/16/2019 1. Basic Design
21/51
-
8/16/2019 1. Basic Design
22/51
-
8/16/2019 1. Basic Design
23/51
-
8/16/2019 1. Basic Design
24/51
-
8/16/2019 1. Basic Design
25/51
-
8/16/2019 1. Basic Design
26/51
-
8/16/2019 1. Basic Design
27/51
-
8/16/2019 1. Basic Design
28/51
-
8/16/2019 1. Basic Design
29/51
-
8/16/2019 1. Basic Design
30/51
-
8/16/2019 1. Basic Design
31/51
-
8/16/2019 1. Basic Design
32/51
-
8/16/2019 1. Basic Design
33/51
-
8/16/2019 1. Basic Design
34/51
-
8/16/2019 1. Basic Design
35/51
-
8/16/2019 1. Basic Design
36/51
-
8/16/2019 1. Basic Design
37/51
-
8/16/2019 1. Basic Design
38/51
-
8/16/2019 1. Basic Design
39/51
18F. STX Institute of Technology, 93-3
Jungang-dong, Seongsan-gu, Changwon-si
Gyeongsangnam-do, KOREA 641-845
DOC. No. MOE-A-KLD-PD-001-3
Revision No. 1
Date 2011. 11.25
Page
PROJECT NO.
PROJECT NAME HFO DIESEL POWER PLANT - A PROJECT (Karbala)
CLIENT Ministry of Electricity, Iraq
Single Line Diagram
1 2011.11.25 For Construction M.G.KIM H.J.KIM S.H.SHIN
0 2011.10.25 For Construction M.G.KIM H.J.KIM K.S.CHO
REV. DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
STX Heavy Industries Co., Ltd.
SECTION SUBCONTRACTOR
General Civil
Mechanical Quality
Electrical ○
-
8/16/2019 1. Basic Design
40/51
Document No. : MOE-A-KLD-PD-001-3
NOTE
1. Purpose : INF-for Information, ARV-for Approval DWG
2. Document status : A-Approved, B-Approved with comments, not required revised dwg, C-Approved with comments, required revised dwg,
D-Not approved, required revised dwg
No. Drawing No. TitleSize
Purpose
1st Issue
Schedule
Document
StatusRev.0 Rev.1 Rev.2 Rev.3 Rev.4
A3 Iss. by STX 2011.10.25 2011.11.25□ for INF Rtn by MOE
■ for ARV Result
CONTENTS & STATUS
1 MOE-A-KLD-PD-001-3 KEY SINGLE LINE DIAGRAM 2011.10.25
1/1 STX Heavy Industries Co., Ltd.
-
8/16/2019 1. Basic Design
41/51
-
8/16/2019 1. Basic Design
42/51
18F. STX Institute of Technology, 93-3
Jungang-dong, Seongsan-gu, Changwon-si
Gyeongsangnam-do, KOREA 641-845
DOC. No. MOE-A-SCD-PD-001-3
Revision No. 1
Date 2011. 11.25
Page
PROJECT NO.
PROJECT NAME HFO DIESEL POWER PLANT - A PROJECT (Karbala)
CLIENT Ministry of Electricity, Iraq
System Configuration Diagram
1 2011.11.25 For Construction M.G.KIM H.J.KIM S.H.SHIN
0 2011.10.25 For Construction M.G.KIM H.J.KIM K.S.CHO
REV. DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
STX Heavy Industries Co., Ltd.
SECTION SUBCONTRACTOR
General Civil
Mechanical Quality
Electrical ○
-
8/16/2019 1. Basic Design
43/51
Document No. : MOE-A-SCD-PD-001-3
NOTE
1. Purpose : INF-for Information, ARV-for Approval DWG
2. Document status : A-Approved, B-Approved with comments, not required revised dwg, C-Approved with comments, required revised dwg,
D-Not approved, required revised dwg
No. Drawing No. TitleSize
Purpose
1st Issue
Schedule
Document
StatusRev.0 Rev.1 Rev.2 Rev.3 Rev.4
A3 Iss. by STX 2011.10.25 2011.11.25□ for INF Rtn by MOE
■ for ARV Result
CONTENTS & STATUS
1 MOE-A-SCD-PD-001-3CONTROL CONFIGURATION
DIAGRAM2011.10.25
1/1 STX Heavy Industries Co., Ltd.
-
8/16/2019 1. Basic Design
44/51
-
8/16/2019 1. Basic Design
45/51
18F. STX Institute of Technology, 93-3
Jungang-dong, Seongsan-gu, Changwon-si
Gyeongsangnam-do, KOREA 641-845
DOC. No. MOE-A-DOC-BDD-004-3
Revision No. 0
Date 2011. 11. 25
Page
PROJECT NO.
PROJECT NAME HFO DIESEL POWER PLANT - A PROJECT (Karbala)
CLIENT Ministry of Electricity, Iraq
Engine Internal Piping Diagram
0 2011.11.25 For Construction J.H.IM Y.S.PARK S.H.SHIN
REV. DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
STX Heavy Industries Co., Ltd.
SECTION SUBCONTRACTOR
General CivilMechanical ○ Quality
Electrical
-
8/16/2019 1. Basic Design
46/51
1/1 STX Heavy Industries Co., Ltd.
Document No. : MOE-A-DOC-BDD-004-3
NOTE
1. Purpose : INF-for Information, ARV-for Approval DWG
2. Document status : A-Approved, B-Approved with comments, not required revised dwg, C-Approved with comments, required revised dwg,
D-Not approved, required revised dwg
No. Drawing No. TitleSize
Purpose
1st Issue
Schedule
Document
StatusRev.0 Rev.1 Rev.2 Rev.3 Rev.4
A3 Iss. by STX 2011.11.25□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.11.25
□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.11.25
□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.11.25
□ for INF Rtn by MOE
■ for ARV Result
A3 Iss. by STX 2011.11.25
□ for INF Rtn by MOE■ for ARV Result
5 MOE-A-EPD-PT-0005-3 EXHAUST GAS PIPING DIAGRAM 2011.11.25
3 MOE-A-EPD-PT-0003-3COOLING WATER PIPING
DIAGRAM2011.11.25
4 MOE-A-EPD-PT-0004-3COMPRESSED AIR PIPING
DIAGRAM2011.11.25
CONTENTS & STATUS
1 MOE-A-EPD-PT-0001-3 FUEL OIL PIPING DIAGRAM 2011.11.25
2 MOE-A-EPD-PT-0002-3LUBRICATING OIL PIPING
DIAGRAM2011.11.25
-
8/16/2019 1. Basic Design
47/51
-
8/16/2019 1. Basic Design
48/51
-
8/16/2019 1. Basic Design
49/51
-
8/16/2019 1. Basic Design
50/51
-
8/16/2019 1. Basic Design
51/51