    DOC. No. MOE-A-DOC-BDD-002-3

    Revision No. 1

    Date 2011. 11. 25

    Page

    PROJECT NO.

    PROJECT NAME HFO DIESEL POWER PLANT - A PROJECT (Karbala) 

    CLIENT Ministry of Electricity, Iraq

    Piping and Instrument Diagram(P&ID)

    1 2011.11.25 For Construction J.H.IM Y.S.PARK S.H.SHIN

    0 2011.10.25 For Construction J.H.IM Y.S.PARK S.H.SHIN

    REV. DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY

    STX Heavy Industries Co., Ltd.

    SECTION SUBCONTRACTOR

    General CivilMechanical ○  Quality

    Electrical

  • 8/16/2019 1. Basic Design

    2/51

    1/1 STX Heavy Industries Co., Ltd.

    Document No. : MOE-A-DOC-BDD-002-3

    NOTE

    1. Purpose : INF-for Information, ARV-for Approval DWG

    2. Document status : A-Approved, B-Approved with comments, not required revised dwg, C-Approved with comments, required revised dwg,

      D-Not approved, required revised dwg

    No. Drawing No. TitleSize

    Purpose

    1st Issue

    Schedule

    Document

    StatusRev.0 Rev.1 Rev.2 Rev.3 Rev.4

     A3 Iss. by STX 2011.10.25□ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.10.25

    □ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.10.25

    □ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.10.25 2011.11.25

    □ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.10.25

    □ for INF Rtn by MOE■ for ARV Result

     A3 Iss. by STX 2011.10.25

    □ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.10.25 2011.11.25

    □ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.10.25 2011.11.25

    □ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.10.25

    □ for INF Rtn by MOE

    ■ for ARV Result

    9 MOE-A-PID-PT-0009-3EMERGENCY DIESEL

    GENERATOR SYSTEM2011.09.23

    7 MOE-A-PID-PT-0007-3 THERMAL OIL HEATING SYSTEM 2011.09.23

    8 MOE-A-PID-PT-0008-3 SLUDGE SYSTEM 2011.09.23

    5 MOE-A-PID-PT-0005-3 COMPRESSED AIR SYSTEM 2011.09.23

    6 MOE-A-PID-PT-0006-3EXHAUST GAS

    SYSTEM(1/2~2/2)2011.09.23

    3 MOE-A-PID-PT-0003-3 LUBE OIL SYSTEM 2011.09.23

    4 MOE-A-PID-PT-0004-3 COOLING WATER SYSTEM 2011.09.23

    CONTENTS & STATUS

    1 MOE-A-PID-PT-0001-3 SYMBOL & LEGEND 2011.09.23

    2 MOE-A-PID-PT-0002-3 FUEL OIL SYSTEM(1/4~4/4) 2011.09.23

  • 8/16/2019 1. Basic Design

    3/51

  • 8/16/2019 1. Basic Design

    4/51

  • 8/16/2019 1. Basic Design

    5/51

  • 8/16/2019 1. Basic Design

    6/51

  • 8/16/2019 1. Basic Design

    7/51

  • 8/16/2019 1. Basic Design

    8/51

  • 8/16/2019 1. Basic Design

    9/51

  • 8/16/2019 1. Basic Design

    10/51

  • 8/16/2019 1. Basic Design

    11/51

  • 8/16/2019 1. Basic Design

    12/51

  • 8/16/2019 1. Basic Design

    13/51

  • 8/16/2019 1. Basic Design

    14/51

  • 8/16/2019 1. Basic Design

    15/51

  • 8/16/2019 1. Basic Design

    16/51

     

    18F. STX Institute of Technology, 93-3

    Jungang-dong, Seongsan-gu, Changwon-si

    Gyeongsangnam-do, KOREA 641-845

    DOC. No. MOE-A-DOC-BDD-003-3

    Revision No. 1

    Date 2011. 11. 25

    Page

    PROJECT NO.

    PROJECT NAME HFO DIESEL POWER PLANT - A PROJECT (Karbala)

    CLIENT Ministry of Electricity, Iraq

    Plant Lay-out Drawing

    1 2011.11.25 For Construction J.H.IM Y.S.PARK S.H.SHIN

    0 2011.10.25 For Construction J.H.IM Y.S.PARK S.H.SHIN

    REV. DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY

    STX Heavy Industries Co., Ltd.

    SECTION SUBCONTRACTOR

    General CivilMechanical ○  Quality

    Electrical

  • 8/16/2019 1. Basic Design

    17/51

    1/1 STX Heavy Industries Co., Ltd.

    Document No. : MOE-A-DOC-BDD-003-3

    NOTE

    1. Purpose : INF-for Information, ARV-for Approval DWG

    2. Document status : A-Approved, B-Approved with comments, not required revised dwg, C-Approved with comments, required revised dwg,

      D-Not approved, required revised dwg

    No. Drawing No. TitleSize

    Purpose

    1st Issue

    Schedule

    Document

    StatusRev.0 Rev.1 Rev.2 Rev.3 Rev.4

     A3 Iss. by STX 2011.10.25 2011.11.25□ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.10.25 2011.11.25

    □ for INF Rtn by MOE

    ■ for ARV Result

    CONTENTS & STATUS

    1 MOE-A-GAD-PT-0001-3GENERAL ARRANGEMENT

    (12 Power blocks) Karbala2011.09.23

    2 MOE-A-GAD-PT-0002-3

    GENERAL ARRANGEMENT

    (1 Power block) Karbala

    (1/20~20/20)

    2011.09.23

  • 8/16/2019 1. Basic Design

    18/51

  • 8/16/2019 1. Basic Design

    19/51

  • 8/16/2019 1. Basic Design

    20/51

  • 8/16/2019 1. Basic Design

    21/51

  • 8/16/2019 1. Basic Design

    22/51

  • 8/16/2019 1. Basic Design

    23/51

  • 8/16/2019 1. Basic Design

    24/51

  • 8/16/2019 1. Basic Design

    25/51

  • 8/16/2019 1. Basic Design

    26/51

  • 8/16/2019 1. Basic Design

    27/51

  • 8/16/2019 1. Basic Design

    28/51

  • 8/16/2019 1. Basic Design

    29/51

  • 8/16/2019 1. Basic Design

    30/51

  • 8/16/2019 1. Basic Design

    31/51

  • 8/16/2019 1. Basic Design

    32/51

  • 8/16/2019 1. Basic Design

    33/51

  • 8/16/2019 1. Basic Design

    34/51

  • 8/16/2019 1. Basic Design

    35/51

  • 8/16/2019 1. Basic Design

    36/51

  • 8/16/2019 1. Basic Design

    37/51

  • 8/16/2019 1. Basic Design

    38/51

  • 8/16/2019 1. Basic Design

    39/51

     

    18F. STX Institute of Technology, 93-3

    Jungang-dong, Seongsan-gu, Changwon-si

    Gyeongsangnam-do, KOREA 641-845

    DOC. No. MOE-A-KLD-PD-001-3

    Revision No. 1

    Date 2011. 11.25

    Page

    PROJECT NO.

    PROJECT NAME HFO DIESEL POWER PLANT - A PROJECT (Karbala)

    CLIENT Ministry of Electricity, Iraq

    Single Line Diagram

    1 2011.11.25 For Construction M.G.KIM H.J.KIM S.H.SHIN

    0 2011.10.25 For Construction M.G.KIM H.J.KIM K.S.CHO

    REV. DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY

    STX Heavy Industries Co., Ltd.

    SECTION SUBCONTRACTOR

    General Civil

    Mechanical Quality

    Electrical ○ 

  • 8/16/2019 1. Basic Design

    40/51

    Document No. : MOE-A-KLD-PD-001-3

    NOTE

    1. Purpose : INF-for Information, ARV-for Approval DWG

    2. Document status : A-Approved, B-Approved with comments, not required revised dwg, C-Approved with comments, required revised dwg,

      D-Not approved, required revised dwg

    No. Drawing No. TitleSize

    Purpose

    1st Issue

    Schedule

    Document

    StatusRev.0 Rev.1 Rev.2 Rev.3 Rev.4

     A3 Iss. by STX 2011.10.25 2011.11.25□ for INF Rtn by MOE

    ■ for ARV Result

    CONTENTS & STATUS

    1 MOE-A-KLD-PD-001-3 KEY SINGLE LINE DIAGRAM 2011.10.25

    1/1 STX Heavy Industries Co., Ltd.

  • 8/16/2019 1. Basic Design

    41/51

  • 8/16/2019 1. Basic Design

    42/51

     

    18F. STX Institute of Technology, 93-3

    Jungang-dong, Seongsan-gu, Changwon-si

    Gyeongsangnam-do, KOREA 641-845

    DOC. No. MOE-A-SCD-PD-001-3

    Revision No. 1

    Date 2011. 11.25

    Page

    PROJECT NO.

    PROJECT NAME HFO DIESEL POWER PLANT - A PROJECT (Karbala)

    CLIENT Ministry of Electricity, Iraq

    System Configuration Diagram

    1 2011.11.25 For Construction M.G.KIM H.J.KIM S.H.SHIN

    0 2011.10.25 For Construction M.G.KIM H.J.KIM K.S.CHO

    REV. DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY

    STX Heavy Industries Co., Ltd.

    SECTION SUBCONTRACTOR

    General Civil

    Mechanical Quality

    Electrical ○ 

  • 8/16/2019 1. Basic Design

    43/51

    Document No. : MOE-A-SCD-PD-001-3

    NOTE

    1. Purpose : INF-for Information, ARV-for Approval DWG

    2. Document status : A-Approved, B-Approved with comments, not required revised dwg, C-Approved with comments, required revised dwg,

      D-Not approved, required revised dwg

    No. Drawing No. TitleSize

    Purpose

    1st Issue

    Schedule

    Document

    StatusRev.0 Rev.1 Rev.2 Rev.3 Rev.4

     A3 Iss. by STX 2011.10.25 2011.11.25□ for INF Rtn by MOE

    ■ for ARV Result

    CONTENTS & STATUS

    1 MOE-A-SCD-PD-001-3CONTROL CONFIGURATION

    DIAGRAM2011.10.25

    1/1 STX Heavy Industries Co., Ltd.

  • 8/16/2019 1. Basic Design

    44/51

  • 8/16/2019 1. Basic Design

    45/51

     

    18F. STX Institute of Technology, 93-3

    Jungang-dong, Seongsan-gu, Changwon-si

    Gyeongsangnam-do, KOREA 641-845

    DOC. No. MOE-A-DOC-BDD-004-3

    Revision No. 0

    Date 2011. 11. 25

    Page

    PROJECT NO.

    PROJECT NAME HFO DIESEL POWER PLANT - A PROJECT (Karbala) 

    CLIENT Ministry of Electricity, Iraq

    Engine Internal Piping Diagram

    0 2011.11.25 For Construction J.H.IM Y.S.PARK S.H.SHIN

    REV. DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY

    STX Heavy Industries Co., Ltd.

    SECTION SUBCONTRACTOR

    General CivilMechanical ○  Quality

    Electrical

  • 8/16/2019 1. Basic Design

    46/51

    1/1 STX Heavy Industries Co., Ltd.

    Document No. : MOE-A-DOC-BDD-004-3

    NOTE

    1. Purpose : INF-for Information, ARV-for Approval DWG

    2. Document status : A-Approved, B-Approved with comments, not required revised dwg, C-Approved with comments, required revised dwg,

      D-Not approved, required revised dwg

    No. Drawing No. TitleSize

    Purpose

    1st Issue

    Schedule

    Document

    StatusRev.0 Rev.1 Rev.2 Rev.3 Rev.4

     A3 Iss. by STX 2011.11.25□ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.11.25

    □ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.11.25

    □ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.11.25

    □ for INF Rtn by MOE

    ■ for ARV Result

     A3 Iss. by STX 2011.11.25

    □ for INF Rtn by MOE■ for ARV Result

    5 MOE-A-EPD-PT-0005-3 EXHAUST GAS PIPING DIAGRAM 2011.11.25

    3 MOE-A-EPD-PT-0003-3COOLING WATER PIPING

    DIAGRAM2011.11.25

    4 MOE-A-EPD-PT-0004-3COMPRESSED AIR PIPING

    DIAGRAM2011.11.25

    CONTENTS & STATUS

    1 MOE-A-EPD-PT-0001-3 FUEL OIL PIPING DIAGRAM 2011.11.25

    2 MOE-A-EPD-PT-0002-3LUBRICATING OIL PIPING

    DIAGRAM2011.11.25

  • 8/16/2019 1. Basic Design

    47/51

  • 8/16/2019 1. Basic Design

    48/51

  • 8/16/2019 1. Basic Design

    49/51

  • 8/16/2019 1. Basic Design

    50/51

  • 8/16/2019 1. Basic Design

    51/51