1 BROOKHAVEN SCIENCE ASSOCIATES
Ring Building Construction Status
Michael P. BromfieldConstruction Engineer
NSLS II Conventional Facilities Advisory Committee Review November 9-10, 2009
![Page 2: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/2.jpg)
2 BROOKHAVEN SCIENCE ASSOCIATES
Outline
• Introduction • Technical Progress• Cost Overview
– Budgeted value, – Contract value, – Approved changes to date– Estimate of Potential Changes – EAC
• Schedule Status• Issues & Risks• Look Ahead• Conclusions
![Page 3: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/3.jpg)
3 BROOKHAVEN SCIENCE ASSOCIATES
Introduction
Construction Inspection Team (CIT) - Responsible to:
• Inspect work of the contractor to verify conformance of installed work with contract plans and specifications.
• Coordinate work of BNL support groups with contractor to assure that all required permits are in place prior to commencement of work.
• Assure that contractors perform work in accordance with applicable work controls requirements.
• Coordinate with the NSLS-II CSEs to assure that work progresses in accordance with the contract ESH requirements.
• Review contractor payment requests to verify completed quantities.
• Confirm testing proceeds with contract plans and specifications.
• Timely Response to Contractor(s) Requests• Follow-up on Compliance Notices to Ensure Matter Satisfactorily Resolved.
![Page 4: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/4.jpg)
4 BROOKHAVEN SCIENCE ASSOCIATES
Overview
• Scope (WBS 1.05.03.02)• Construction of the Ring Building, Service Buildings• Installation of Utility Mains to Ring Building, including
– Primary Electric– Connection to Central Chilled Water & Compressed Air Mains– Installation of Water Loop
• On Site Infrastructure Improvements – Roads, Parking, Storm & Sanitary Systems
• Cost• Contract amount = $172.6M
• Initial Baseline = $167M (CD- 3)
• Pre-bid estimate = $194M (Sept 08)
![Page 5: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/5.jpg)
5 BROOKHAVEN SCIENCE ASSOCIATES
Technical Progress
Project Site at January ’09
![Page 6: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/6.jpg)
6 BROOKHAVEN SCIENCE ASSOCIATES
Technical Progress
Project Site at October ‘09
![Page 7: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/7.jpg)
7 BROOKHAVEN SCIENCE ASSOCIATES
Technical Progress
Concrete Phasing Plan
![Page 8: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/8.jpg)
8 BROOKHAVEN SCIENCE ASSOCIATES
Technical Progress
– Baseline Critical Path – Construction Activities thru’ November ‘09
![Page 9: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/9.jpg)
9 BROOKHAVEN SCIENCE ASSOCIATES
Project Site at October ‘09
Technical Progress
Ratchet Wall #25B (Col Ln. 3)
Ratchet Wall 27A (Col Ln. 3)
Ratchet Wall #22A (Col Ln. 103 )
Ratchet Wall #21A (Col Ln. 103 )
![Page 10: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/10.jpg)
10 BROOKHAVEN SCIENCE ASSOCIATES
Technical Progress
Project Site at October ‘09
Vehicle Tunnel
Column Footing B-78
![Page 11: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/11.jpg)
11 BROOKHAVEN SCIENCE ASSOCIATES
Technical Progress
Project Site at October ‘09
Curbs & Sidewalk in
Progress
![Page 12: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/12.jpg)
12 BROOKHAVEN SCIENCE ASSOCIATES
Technical Progress
Underground Utilities
Domestic Water Main Installation
Electrical Ductbank Installation
![Page 13: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/13.jpg)
13 BROOKHAVEN SCIENCE ASSOCIATES
Technical Progress
Some Challenges Faced
Geo-Thermal ExperimentWater Main Relocation for New Steam Line
![Page 14: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/14.jpg)
14 BROOKHAVEN SCIENCE ASSOCIATES
Technical Progress
![Page 15: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/15.jpg)
15 BROOKHAVEN SCIENCE ASSOCIATES
Technical Progress
Ring Building Project: CF Inspection Responsibility Matrix
DIVISION 2 - SITE WORKSPEC.
SECTIONTORCON S/C BNL BNL VENDOR BNL PROCEDURE
SITE EXCAVATION AND ROUGH GRADING INSPECTION 02210 LT-CF-05-001
COMPACTION DENSITY TEST 02210 MT GROUP LT-CF-05-002
MOISTURE DENSITY TEST 02221 MT GROUP LT-CF-05-002
TOP SOIL FINISHED GRADING INSPECTION 02260 LT-CF-05-001
EXFILTRATION TEST ON STORM DRAINAGE SYSTEM 02463 VOLLERS LT-CF-05-001
TESTING OF HIGH PRESSURE STEAM SYSTEM 02490 SIMS LT-CF-05-001
DENSITY TESTS ON PAVING SUB GRADE 02513 VOLLERS LT-CF-05-001
TEST COMPLETED WATER MAINS FOR LEAKAGE 02665 VOLLERS LT-CF-05-001
INSPECT U/G CHILLED WATER SYSTEM BEFORE BACKFILLING 02676 SIMS LT-CF-05-001
PRESSURE TESTING OF EXTERIOR COMPRESSED AIR SYSTEM 02678 SIMS LT-CF-05-001
LEAKAGE TEST OF SANITARY SEWERS 02732 VOLLERS LT-CF-05-001
![Page 16: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/16.jpg)
16 BROOKHAVEN SCIENCE ASSOCIATES
Technical Progress
9/9/09
Meeting with. Testing Agency to Review Concrete Sampling & Testing
procedures
4000 psi
![Page 17: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/17.jpg)
17 BROOKHAVEN SCIENCE ASSOCIATES
Schedule Status
Concrete Cylinder Break Test Results
![Page 18: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/18.jpg)
18 BROOKHAVEN SCIENCE ASSOCIATES
Schedule Status
• Overall Project Status– 16% complete (per cost basis)– Concrete Work on Schedule, recovered rain impacts in June &
September– Underground Utility Work lagging due to Coordination Effort
(required to resolve interferences See Drawing)– Fabrication of Structural Steel slightly behind early finish
projections, but ahead of baseline.
![Page 19: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/19.jpg)
19 BROOKHAVEN SCIENCE ASSOCIATES
Schedule Status
Underground Utility Plan C – 600• Substantial Utility Installation• Extensive coordination
![Page 20: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/20.jpg)
20 BROOKHAVEN SCIENCE ASSOCIATES
Schedule Status
Intermediate Project Milestones thru’ March 2010
![Page 21: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/21.jpg)
21 BROOKHAVEN SCIENCE ASSOCIATES
Schedule Status
Mandatory Project Milestone Report
![Page 22: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/22.jpg)
22 BROOKHAVEN SCIENCE ASSOCIATES
Issues & Risks
• Potential Problems• Winter Concrete Work
– Winter Mix Design, Placement & Protection Plan
• Utility Installation in Inner Courtyard– Resolve Interferences (all resolved to date)– Coordination / Staging of Trades for Utility Work
• Potential for Construction Outpacing Design by ASD & XFD Groups
– Could necessitate revision to installed work
• Coordination between LOB & Ring Building Contractors
![Page 23: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/23.jpg)
23 BROOKHAVEN SCIENCE ASSOCIATES
Look Ahead
• Place Storage Ring Tunnel Floor Slab at Utility & Vehicle Tunnels
– Allows backfill & continuity of Ring Storage Tunnel construction
• Construction of Underground Electric ductbanks• Installation of Steam Main to Project Site• Construct Selected Roadways & Parking Areas
– Control site drainage,– Facilitates better soil erosion control
![Page 24: 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee](https://reader034.vdocument.in/reader034/viewer/2022042822/56649e705503460f94b6e3f0/html5/thumbnails/24.jpg)
24 BROOKHAVEN SCIENCE ASSOCIATES
Conclusion
• Continue to encourage pace of construction• At a safe rate
• Continue diligence of Inspections• Advance Construction Operations with an eye to Minimizing
Risks and Mitigating delays