1. COMPANY INTRODUCTION
2. CERTIFICATE OF REGISTRATION
3. EXPERIENCE LIST
4. MAJOR PROJECT PHOTOGRAPHS
5. FACTORY LAYOUT AND FACILITIES IN LAMPUNG
TABLE OF CONTENTS
![Page 3: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/3.jpg)
1. COMPANY INTRODUCTION 1.1. Company History
Lampung Factory Steel Fabrication Workshop (1998)
(2000) Extended Business to EPC Project for : Oil & Gas Project, Power Plant Project
(1997) Established as PMA
1st Factory Extension Str. Capacity 15,000T/Year (2006)
(2007) Completed Dumai SK – Pertamina USD 15 Millions Soil Improvement Cirebon Coal Fired Power Plant
Soil Improvement Seawater Intake Building Works Ashpond Doosan HI – Cirebon Investment : PT. Asia Rubberindo (Sister Company) (2008)
Jetty 13,000DWT, Seawater Intake, Building Structure, Electrical Work for Cirebon CFPP Power Plant Investment : 32.5 Dwt Bulk Carrier (Sister Company) (2009)
(2011) Krakatau-Posco Steel Mill Plant 1st SMP&CCP Civil Work
Krakatau Posco SMP/BF Road & Drainage Work Krakatau-Posco Steel Mill Plant 2nd SMP&CCP Civil Work Posco Power Water Intake On/Offshore Posco-Krakatau Plate Mill Machiney install PT. Cikarang Listrindo Civil, Mechanical, Electrical MM2100 Industrial Estate (2012)
(2013) Alindo – KK3 Civil Work Dong Suh Chemical PNS Project Krakatau Posco Plate Mill Shipping Yard RC Work Clyde Bergemann Mong Duong GS E&C AEON Mall Piling Work&RC Work
(2014) Cikarang Listrindo, Babelan CFPP IP & Kansai, Rajamandala HEP GS E&C Aeon Mall Wet Trade Work HDEC, Sarulla Geothermal Earthwork/ Site Preparation Piling Work & Soil Investigatio n HDEC, Shangri La Residence (2015) Posco E&C Semangka HEPP 2x27.5 MW
(2016) Cirebon 2 CFPP 1000 MW Jetty 15,000 DWT Soil Supply IP Suralaya CFPP Cover Hopper (2017) ABS Palembang, Tank 4000ton Krakatau Engineering HSM #2 WTP and Scale Pit (2018) Jawa 1 CCPP 1600 MW Site Preparation (2019) Amman Mineral Nusa Teng. Dynamometer Facility
(2010) Asphalt Bulk ABS – Medan Daewo Eng. Merak Port ISO 9001:2008 ISO 14001 OHSAS 18001 Certified
Investment : PT. MKE (Sister Company) Alstom Power Steel Str. Fab. (2007)
(2008) Asphalt Bulk Terminal ABS - Aceh Asphalt Bulk Terminal WBG – Palembang
![Page 4: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/4.jpg)
Established in 1997
Registered ISO ISO 9001:2008
ISO 14001
OHSAS 18001
Major Business Line:
EPC Contractor for Oil & Gas, Power Plant
Civil, Architecture, Mech, Steel Structure,
Tank, Piping, Electrical & Instrument
Jakarta Head Office
Karawaci Office Park, Block G
No.1 Lippo Karawaci, Tangerang Indonesia
Tlp. 021-5583888
Fax. 021-5518855
Steel Fabrication Factory
Jl. P. Tirtayasa No.88 Campang Raya –
Bandar Lampung Indonesia
Tlp. 0721-351177/88
Fax. 0721-351222
1.2. Location Of Head Office & Factory
![Page 5: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/5.jpg)
1.3. Target Goal In The Future
GOAL
PUBLIC LISTED
COMPANY
WITHIN 3
YEARS
MISSION ACHIVEING
THE 3RD
CONSTRUCTION
COMPANY
IN INDONESIA
SYSTEM EXCELLENT
INTERNAL MGT
WITH
ISO 9001:2008
ISO 14001
OHSAS 18001
MANPOWER HIGH
PERFORMANCE
PERSONALITY
![Page 6: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/6.jpg)
EPC TEAM • Plant Engineering
• Plant Procurement
• Project Management
PROJECT SITE • Construction Management
• Project Progress Control
• Quality & Safety Control
• Reduce & Improvement
HEAD OFFICE • Project Financing
• Administration
• Business and Proposal
FACTORY • Steel Fabrication
• Material Handling
• Site Work Support
TEKNIKO COMPANY ORGANIZATION
1.4. Organization Structure
Note : CL Babelan, Rajamandala HEPP,
Cirebon 2 Jetty, Jawa 1 Cilamaya, AMNT Batu Hijau
![Page 7: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/7.jpg)
14%
24
Engineer
Commercial
Supervisor
Skill Labor
Inspector
Common Labor
26 %
45
Manpower Status
30 %
52
14 %
24
6 %
10
Below 5 Year
5 - 10 Years
10 - 15 Years
Over 15 Years
Engineering Career
58 %
25
12%
5
23 %
12
7 %
3
1.5. Manpower Status
Site Worker = 1500 persons
10 %
20
![Page 8: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/8.jpg)
923.7 SALES
PROFIT 110.2
CONTRACT
427.8
1.6. Business Plan Status in 2017 (1/2)
![Page 9: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/9.jpg)
200
400
600
1,200
1.6. Business Status in 2017 (2/2)
BILLION IDR
+ 2016 + 2017 + 2011 + 2012 + 2013
924
113
1093
+ 2014
811
70 39
239 225
28
389
110 80
732
+ 2015
94
800
1,000
![Page 10: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/10.jpg)
BALANCE SHEET (30 April 2019, Billion IDR)
542
LONG TERM LIABILITIES 0
SHORT TERM LIABILITIES
E Q U I T Y 530
0
542
142 FIXED ASSET
INVESTMENT
230
170 CASH & OTHER
ACCOUNT
RECEIVABLE
1.7. Financial Status (Consolidated)
PT. Tekniko Indonesia, PT. Tekniko E&C, Tekniko Singapore Pte Ltd
ACCOUNT PAYABLE 12
![Page 11: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/11.jpg)
Business Entity Certificate ISO 9001, ISO14001, OHSAS 18001
2. CERTIFICATION OF REGISTRATION
GRADE : 7
Sertifikasi: SBU Terintegrasi, IUJPTL
![Page 12: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/12.jpg)
3. EXPERIENCE LIST (Mech & Elec. 1/3)
Client Location Project Title Service Project
Period
M Portek S&E Pte., Ltd. Banten Port Pelindo II Multi Purpose Quay Crane for Container & Bulk PC 1998
M PT. Hanjung Indonesia Al-Taeweelah Project Fabrication Work Sandblasting & Painting PC 1999
M PT. Hanjung Indonesia Hoping CFPP 1,320 MW Taiwan ESP Internal Part Steel Structure Fabrication, Sand Blasting &
Painting PC 1999
M PT. Hanjung Indonesia Hanjung's Furnace Facilities Building, Fabrication, Installation, Piping & Equipment EPC 2000
M PT. Hanjung Indonesia JNPT Project,India Rail Mounted Quayside Crane, Fabrication Work, & Sandblasting PC 2000
M PT. Hanjung Indonesia SAGT Project Srilanka Rubber Tyred Gantry Crane, & Fabrication Work Sandblasting PC 2000
M PT. Bumi Tapioka Jaya Sprinkle System Water Pump, Pipe Line & Sprinkle EPC 2001
M PT. Doosan Indonesia/Hanjung Blasting & Painting Shop (2nd) Civil, Steel Structure, Electrical, Rail Transporter Car & Air Pipe
Line EPC 2001
M SW. Multitech Starch Co, Ltd Tapioka Starch Processing Plant Fabrication of S/Str Agitator Tank Cushion Tank PC 2001
M Portek Hongkong. Ltd Hitachi RMQC - Banten Port Ciwandan Modification of RMQC, & fabrication of moveable PC 2001
M Portek System & Energy Pte, Ltd
Singapore Banten Port Ciwandan
Fab. Jacking Tower & New Leg Stay of Hitachi RMQC Banten
Port PC 2001
M PT. Indo Miwon Citra Inti IMCI - Lampung Fabrication & Installation of Mobile Deck PC 2002
M Portek S & E Pte Ltd Singapore Doosan RMQC Batam Port Fabrication & Erection Modification of RMQC PC 2002
M Portek S & E Pte Ltd Singapore Hitachi RMQC Semarang Port Fabrication & Erection Modification of RMQC PC 2002
M Portek S & E Pte Ltd Singapore Hitachi RMQC Makassar Port Fabrication & Modification RMQC PC 2003
M Portek S & E Pte Ltd Hitachi RMQC Semarang Port Fabrication & Modification RMQC PC 2003
M PT. Indomiwon Citra Inti IMCI - Lampung Fabrication & Erection Work for Molasses B Tank PC 2003
M Portek S & E Pte Ltd Singapore IHI RMQC JICT Tj. Priok Port, Jakarta Fabrication & Modification PC 2003
![Page 13: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/13.jpg)
3. EXPERIENCE LIST (Mech & Elec. 2/3)
Client Location Project Title Service Project
Period
M PT. SMART, Tbk. Dumai Bulking Station, Dumai - Riau Tank Farm Facilities 120,000 M3 PC 2004
M PT. Tunas Mekar PT. Petromindo - Asphalt Plant Fabrication & Erection Smeltertank, Storage Tank & Dosage
Tank PC 2004
M PT. Pemuda Prima Usaha Asphalt Storage Tank of PT. Jaya Trade,
Tbk. Storage Tank, Piping & Shelter PC 2004
M PT. SMART, Tbk. KSB Extention 2 of PT. Sumber Indah
Perkasa Steel Structure, Hopper & Roofing PC 2004
M Portek S & E, Pte Ltd Singapore Bitung RMQC North Sulawesi New Leg Structure System PC 2004
M Kingsway Shipping Korea MV. Dongjin Unloader Converyor Belt Line and Ship Unloader EPC 2004
M PT. SMART, Tbk. Belitung Bulking Station, Bangka Belitung Storage Tank 35,000 M3 PC 2005
M PT. SMART, Tbk. Sungai Merah Mill Lampung Storage Tank 1000 MT x 5 Unit PC 2005
M PT. Portek Indonesia JICT - RTGC Tanjung Priok New Leg Fabrication & Supply PC 2005
M PT. Portek Indonesia JICT – RTGC Tanjung Priok Fuel Tank & Genset Support Structure PC 2005
M Alstom Power Service Tarahan CFSPP Unit 3 & 4 Fabric Filler Steel Structure, Hopper & Internal Parts PC 2005
M PT. Kirin Miwon Foods Kirin Miwon Factory Lampung Building & Equipment Dismantling, GAC Plant, Moving & Re
Installation PC 2006
M IMPSA Port System IMPSA RMQC - 653 TPS Surabaya Lower Structure & Access PC 2006
M PT. Pemuda Prima Usaha Aneka Kimia Raya Ciwandan Terminal Steel Storage Tank 70,000 M3 & Structure PC 2006
M Hyundai Shipping MV. Li Ding Gas Piping Repair & Support PC 2006
M PT. Metito Indonesia Pelindo 1 - Dumai Riau Piping, Fabrication & Install System, Pipe Support & Ducting
Work PC 2006
M Doosan Heavy Industry Tarahan CFSPPUnit 3 & 4 Conveyor Structure & Ash Silo PC 2006
![Page 14: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/14.jpg)
3. EXPERIENCE LIST (Mech & Elec. 3/3)
Client Location Project Title Service Project
Period
M Alstom Power Australia Maryvel Power Plant Australia ESP Steel Structure Fabrication PC 2007
M PT. Wahyu Bitumen Graha Palembang, South Sumatra Asphalt Bulk Terminal (Civil, Storage Tank, Piping, Electrical) EPC 2008
M PT. Asphalt Bangun Sarana Malahayati Port - Aceh Asphalt Bulk Terminal (Civil, Mechanical, Electrical & Instrument
Work) EPC 2008
M Doosan Heavy Industry Cirebon Coal Fired Power Plant – 660MW Electrical & Instrument PC 2009
M Doosan Heavy Industry Cirebon Coal Fired Power Plant – 660MW 2 Unit GTSU Erection C 2010
M PT. Asphalt Bangun Sarana Asphalt Bulk Terminal Medan Civil, Mechanical, Electrical & Instrument Work EPC 2010
M Posco E & C Krakatau Steel Plant - Cilegon Electrical Work for Temporary Facilities PC 2011
M PT. Asphalt Bangun Sarana Banten Port Ciwandan Emulsion Asphalt and PMB Plant EPC 2012
M Posco E & C Krakatau Posco – Coke Plant Mechanical Installation (17,500 tons) PC 2012
M PT. IPCR PCR Factory - Cilegon Mechanical and Electrical Work EPC 2012
M Clyde Bergemann Mong Duong Power Plant, Vietnam Stair Tower , Spiral Stair , and Pipe Racks Fabrication PC 2013
M Dongsuh Chemical PNS Project Site, Cikande, West Java Office Building, Pipind & Insulation, Electrcial and
Instrumentation Works PC 2013
M PT. Mitra Energi Batam Batam, 2x225 MW Combine Cycle Power
Plant HRSG, Condenser, Cooling Tower, Turbine, Generator Erection PC 2013
M PT. Cikarang Listrindo Babelan, 3x140 MW Coal Fired Power
Plant GTSU, Stacker Reclaimer, Belt Conveyor, Limestone Handling EPC 2014
M PT. Cikarang Listrindo Babelan, 3x140 MW Coal Fired Power
Plant Limestone Dryer EPC 2015
M PT. Asphalt Bangun Sarana Boom Baru, Palembang Asphalt Storage Tank 4000 ton including Facilities EPC 2017
M Amman Mineral Nusa Tenggara Batu Hijau, Nusa Tenggara Barat Dynamometer and Test Bench Facility EPC 2019
![Page 15: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/15.jpg)
3. EXPERIENCE LIST (Civil & Arch. 1/3)
Client Location Project Title Service Project
Period
C PT. Gunung Madu Plantation PT. Pemuka Sakti Manis Indah Sugar Warehouse Steel Structure PC 1999
C PT. Hanjung Indonesia Hanjung's Ware House Building Civil Work, General Steel Structure, & other Facilities of Building EPC 2000
C PT. Dwi Daya Sentra Prakarsa Workshop & Roadway Civil Work & General Steel Construction EPC 2000
C PT. Hanjung Indonesia Open Bay House Civil Work & General Steel Construction PC 2001
C PT. Wisco Kayu Indonesia Whole Factory Civil, Steel Structure & Electrical EPC 2001
C PT. Portindo Dinamika Banten Port Ciwandan - Warehouse Civil, Steel Structure & Electrical EPC 2001
C PT. Indo Miwon Citra Inti IMCI - Lampung Fabrication & Installation Of Platform PC 2001
C PT. Hanjung Indonesia Gulf Resources Plant - Sumsel Steel Structure of Pipe Rack PC 2002
C PT. Indomiwon Citra IMCI Lampung Civil Work of Press Filter Room EPC 2003
C PT. Portindo Dinamika Container Stacking Yard 2A, Ciwandan Civil, Steel Structure & Electrical EPC 2003
C PT. Smart, Tbk KSB Sungai Buaya Mill Fabrication & Erection of workshop PC 2003
C PT. Indomiwon Citra Inti Transfomer Room IMCI, Lampung Civil Work of Transformer Room PC 2003
C PT. Portindo Dinamika Container Stacking Yard 3A, Ciwandan Civil, Steel Structure & Electrical PC 2003
C PT. Indo Miwon Citra Inti IMCI - Lampung Fabrication & Installation Line PC 2003
C PT. SMART, Tbk. Kasuari & Mambruk Estate - Papua Steel Bridge Fabrication PC 2004
C PT. SMART, Tbk. Dumai Bulking Station Dumai, Riau Civil & Electrical Work PC 2005
![Page 16: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/16.jpg)
3. EXPERIENCE LIST (Civil & Arch. 2/3)
Client Location Project Title Service Project
Period
C Daewoo E & C UIC Revamping Merak Banten Civil Foundation, Bore Pilling & Steel Structure PC 2005
C SK Engineering & Construction Patra SK, Dumai , Sumatera Civil Work, Steel Structure, Electrical & Instrument Work for
Lube Base Oil Project PC 2007
C Doosan Heavy Industries Cirebon Coal Fired Power Plant – 660MW Soil Improvement Work PC 2007
C Doosan Heavy Industry Cirebon Coal Fired Power Plant – 660MW Jetty 13,000 DWT, 2 km Trestle / including Water intake Work EPC 2009
C Doosan Heavy Industry Cirebon Coal Fired Power Plant – 660MW 8 Building Structures / WTP, Transfer Towers & etc. PC 2009
C Doosan Heavy Industry Cirebon Coal Fired Power Plant – 660MW Coal Yard & Ash Pond Soil Improvement PC 2010
C Daewoo Engineering Merak Banten Merak Power Plant (Temporary Facilities Work) EPC 2010
C Doosan Heavy Industry Cirebon Coal Fired Power Plant – 660MW Windbreak & Landscaping PC 2011
C Posco E & C Krakatau – Posco Integrated Steel Mill Reinforced Concrete (SMP & CCP) Work 95,000m3 PC 2011
C PT. IPCR IPCR Factory – Cilegon Material Stock Yard EPC 2012
C PT. IPCR IPCR Factory - Cilegon Material Stock Temporay Work Shop EPC 2012
C Posco E & C Krakatau Posco – Cilegon Steel Structure SMP / CCP, Plate Mill (1500 tons) PC 2012
C Posco E & C Krakatau Posco – Cilegon Road, Drainage for Blast Furnace, SMP & CCP PC 2012
C PT. Seohee Indonesia Krakatau Posco – Cilegon ISM Gas Power Plant Seawater Intake PC 2012
C PT. Cikarang Listrindo Cikarang – MM2100 Industrial Estate Civil, Mechanical, Electrical Works for Switch Yard and Switch
Gear Building EPC 2012
C SAMSUNG C&T IFC 2 and Keppel Tower Sheet Pilling, Concrete Demolition & King Post PC 2012
![Page 17: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/17.jpg)
3. EXPERIENCE LIST (Civil & Arch. 3/3)
Client Location Project Title Service Project
Period
C Air Liquide Hangzhou Alindo – KK3 Cilegon Civil Work Package PC 2013
C Dongsuh Chemical PNS Project Site, Cikande, West Java Piling, Civil and Steel Structure Work PC 2013
C PT. Posco E&C Indonesia Krakatau Posco – Cilegon Plate Mill – Civil and Architectural Work PC 2013
C GS Engineering & Construction AEON Mall - BSD Piling, RC Work, Wet Work and Landscape Work PC 2014
C Hyundai Engineering Rajamandala HEPP 47 MW, West Java Civil, Architectural, Tunnel Work EPC 2014
C Hyundai E&C Sarulla Geothermal, North Sumatera Earthwork / Site Preparation EPC 2014
C Hyundai E&C Sarulla Geothermal, North Sumatera Soil Investigation EPC 2014
C Hyundai E&C Jakarta, Shangri La Residence Shangri La Residence, GCNM Apartment, RC Work PC 2014
C Hyundai E&C Sarulla Geothermal, North Sumatera Piling Work EPC 2014
C PT. Indonesia Power Cilegon, Suralaya CFPP Construction for Cover Hopper Structure EPC 2016
C PT. Posco E&C Lampung, Semangka HEPP Fabrication and Installaion of Main Water Gate and Penstock PC 2017
C PT. Krakatau Engineering Krakatau Industrial Estate, Cilegon Scale Pit and Water Treatment Plant for Hot Mill Strip #2 PC 2017
C Hyundai E&C Cirebon 2 Coal Fired Power Plant 1000 MW Coal jetty 15,000 DWT, Trestle 2700 m, Sea Water Intake EPC 2017
C Samsung C&T Jawa Satu Power, Combined Cycle 1600
MW Site Preparation and Fence PC 2018
C AMNT AMNT Lunyuk, Batu Hijau Civil Work for Dynamo Meter & Transmision Facility EPC 2019
![Page 18: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/18.jpg)
Intake
Service : Civil Work
Location : Rajamandala HEPP, West Java
Period : 2014
Client : Hyundai Engineering
Spillway and Open Channe
Service : Civil Work
Location : Rajamandala HEPP, West Java
Period : 2014
Client : Hyundai Engineering
4. MAJOR PROJECT PHOTOGRAPHS(1/17)
![Page 19: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/19.jpg)
Headrace Tunnel
Service : Civil Work
Location : Rajamandala HEPP, West Java
Period : 2014
Client : Hyundai Engineering
Power House
Service : Civil & Steel Structure Work
Location : Rajamandala HEPP, West Java
Period : 2014
Client : Hyundai Engineering
4. MAJOR PROJECT PHOTOGRAPHS(2/17)
![Page 20: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/20.jpg)
4. MAJOR PROJECT PHOTOGRAPHS(3/17)
CL Babelan 3x140 MW
Service : GSTU, Stacker Reclaimer, BC
Location : Babelan, Bekasi, West Java
Period : 2017
Client : PT. Cikarang Listrindo
CL Babelan 3x140 MW
Service : GSTU, Stacker Reclaimer, BC
Location : Babelan, Bekasi, West Java
Period : 2017
Client : PT. Cikarang Listrindo
![Page 21: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/21.jpg)
4. MAJOR PROJECT PHOTOGRAPHS(4/17)
CL Babelan 3x140 MW
Service : GSTU, Stacker Reclaimer, BC
Location : Babelan, Bekasi, West Java
Period : 2017
Client : PT. Cikarang Listrindo
CL Babelan 3x140 MW
Service : GSTU, Stacker Reclaimer, BC
Location : Babelan, Bekasi, West Java
Period : 2017
Client : PT. Cikarang Listrindo
![Page 22: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/22.jpg)
4. MAJOR PROJECT PHOTOGRAPHS(5/17)
AEON Mall Project
Service : Piling, RC, Wetworks, Landscape
Location : BSD City
Period : 2015
Client : GS Engineering & Construction
Seawater Intake System
Service : ISM Gas Power Plant S W I
Location : Krakatau Posco - Cilegon
Period : 2012
Client : PT. Krakatau Posco
![Page 23: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/23.jpg)
4. MAJOR PROJECT PHOTOGRAPHS(6/17)
MEB CCPP 2 x 22.5 MW
Service : HRSG Erection
Location : Tembesi, Batam
Period : 2013
Client : PT. Mitra Energi Batam
MEB CCPP 2 x 22.5 MW
Service : T/G System Erection
Location : Tembesi, Batam
Period : 2013
Client : PT. Mitra Energi Batam
![Page 24: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/24.jpg)
4. MAJOR PROJECT PHOTOGRAPHS(7/17)
Coke Oven
Service : Civil, Mechanical, St. Structure
Location : Krakatau Posco - Cilegon
Period : 2012
Client : PT. Krakatau Posco
Asphalt Bulk Terminal
Service : Civil, Mechanical, Electrical (EPC)
Location : Belawan Port, North Sumatra
Period : 2010
Client : PT. Asphalt Bangun Sarana
![Page 25: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/25.jpg)
4. MAJOR PROJECT PHOTOGRAPHS(8/17)
SMP-CCP
Service : Steel structure, Road, Drainage
for Blast Furnace.
Location : Krakatau Posco - Cilegon
Period : 2012
Client : PT. Krakatau Posco
Plate Mill
Service : Architecture Work
Location : Krakatau Posco - Cilegon
Period : 2012
Client : PT. Krakatau Posco
![Page 26: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/26.jpg)
Cirebon 660MW Coal Fired Power Plant
Service : GTSU Erection
Location : Cirebon, West Java
Period : 2010
Client : PT. Doosan Heavy Industries
4. MAJOR PROJECT PHOTOGRAPHS(9/17)
Cirebon 660MW Coal Fired Power Plant
Service : GTSU Erection
Location : Cirebon, West Java
Period : 2010
Client : PT. Doosan Heavy Industries
![Page 27: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/27.jpg)
Cirebon 660MW Coal Fired Power Plant
Service : Jetty Work
Location : Cirebon, West Java
Period : 2009
Client : Doosan Heavy Industry
Cirebon 660MW Coal Fired Power Plant
Service : Steel Structure Building Work
Location : Cirebon, West Java
Period : 2009
Client : PT. Doosan Heavy Industries
4. MAJOR PROJECT PHOTOGRAPHS(10/17)
![Page 28: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/28.jpg)
Cirebon 660MW Coal Fired Power Plant
Project
Service : Soil Improvement Work
Location : Cirebon, West Java
Period : 2007 – 2010
Owner : Doosan Heavy Industry
Lube Base Oil Project (L-PROJECT)
Service : P-C Steel Structure Work
Location : Dumai, Riau
Period : 2007
Client : PATRA-SK Corp
Cirebon 660MW Coal Fired Power Plant
Service : Soil Improvement Work
Location : Cirebon, West Java
Period : 2007
Client : PT. Doosan Heavy Industries
4. MAJOR PROJECT PHOTOGRAPHS(11/17)
![Page 29: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/29.jpg)
Lube Base Oil Project (L-PROJECT)
Service : P-C Civil Work
Location : Dumai, Riau
Period : 2007
Client : PATRA-SK Corp
Lube Base Oil Project (L-PROJECT)
Service : P-C Electrical Work
Location : Dumai, Riau
Period : 2007
Client : PATRA-SK Corp
4. MAJOR PROJECT PHOTOGRAPHS(12/17)
![Page 30: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/30.jpg)
Asphalt Bulk Terminal Project
Service : Civil Work (EPC)
Location : Malahayati, Aceh
Period : 2008
Client : Asphalt Bangun Sarana
Asphalt Bulk Terminal Project
Service : Mechanical (EPC)
Location : Malahayati, Aceh
Period : 2008
Client : Asphalt Bangun Sarana
4. MAJOR PROJECT PHOTOGRAPHS(13/17)
![Page 31: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/31.jpg)
Building, Equipment & GAC Plant
Service : EPC
Location : Chemical Plant Lampung
Period : 2006
Client : PT. Kirin Miwon Foods
CPO Bulking Station
Service : P-C
Location : Dumai, Riau
Period : 2005
Client : PT. Smart Tbk
4. MAJOR PROJECT PHOTOGRAPHS(14/17)
![Page 32: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/32.jpg)
RMQC-653 Lower STR & Access
Service : PC
Location : TPS Surabaya, East Java
Period : 2005
Client : Impsa Port System
PPU AKR Fuel Storage Tank
Service : PC
Location : Banten Port, Ciwandan
Period : 2006
Client : PT. Aneka Kimia Raya
4. MAJOR PROJECT PHOTOGRAPHS(15/17)
![Page 33: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/33.jpg)
Steel Structure Work
Service : PC
Location : UIC Merak, Banten
Period : 2005
Client : Daewoo Engineering
Unloaded STR System Hopper
Service : EPC
Location : MV. Dongjin Unloader
Period : 2004
Client : Kingsway Shipping Korea
4. MAJOR PROJECT PHOTOGRAPHS(16/17)
![Page 34: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/34.jpg)
Fabrication & Erection Modification
of RMQC Service : PC Steel Work
Location : Batam Port, Riau
Period : 2002
Client : PT. Doosan Heavy Industries
Container Stacking Yard 2A
Service : EPC
Location : Ciwandan
Period : 2003
Client : PT. Portindo Dinamika
4. MAJOR PROJECT PHOTOGRAPHS(17/17)
![Page 35: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/35.jpg)
5. FACTORY LAYOUT AND FACILITIES AT LAMPUNG(1/5)
Existing Land (2.2 Ha)
Extension of Land (3 Ha)
Factory1 Factory2
Existing Building (7,100 M2)
Packing
&
Products
Area
Blasting & Painting
Shop
Warehouse
Extension of Land
Jl. P. Tirtayasa No. 88
Office
Security Office
![Page 36: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/36.jpg)
Factory 1
Factory 2
5. FACTORY LAYOUT AND FACILITIES AT LAMPUNG(2/5)
![Page 37: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/37.jpg)
Blasting Shop
Shot Room for Blasting
& Painting
5. FACTORY LAYOUT AND FACILITIES AT LAMPUNG(3/5)
![Page 38: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/38.jpg)
Over Head Crane
Machinery Utilities
5. FACTORY LAYOUT AND FACILITIES AT LAMPUNG(4/5)
![Page 39: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/39.jpg)
Bending Plate Machine
Bending Plate Machine
Lathe Machine
Rolling Machine
Radial Drill Machine
Milling Machine
5. FACTORY LAYOUT AND FACILITIES AT LAMPUNG(5/5)
![Page 40: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/40.jpg)
WHAT IS THE MERIT TO BUSINESS WITH
PT. TEKNIKO INDONESIA?
1. EPC MAIN-CON JO PARTNER for “CIVIL, CARGO HANDLING, JETTY,
MECH. INSTALLATION”.
2. NO. 1 “KOREAN & INDONESIAN EXPERT” CONSTRUCTION COMPANY.
3. GAPENRI MEMBER (ASSOCIATION FOR EPC CONTRACTOR) & IUJPTL
PERMIT FOR HYDRO AND COAL FIRED POWER PLANT
4. OWNED STEEL FABRICATION WORKSHOP 15,000 TON/YEAR MORE
THAN 100 HEAVY EQUIPMENT FOR CONSTRUCTION.
5. “ZERO” DEBIT.
6. CONSTRUCTION PROJECT VALUE UP TO “USD 200 MILLION”.
![Page 41: 1. COMPANY INTRODUCTION 2. CERTIFICATE OF REGISTRATION …tekniko.co.id/pdf/568099_532762_591910.pdf · 2019-06-18 · 3. EXPERIENCE LIST (Mech & Elec. 1/3) Client Location Project](https://reader031.vdocument.in/reader031/viewer/2022013020/5e60413e598a3b72e6746420/html5/thumbnails/41.jpg)
P t . t e k n i k o i n d o n e s i a