CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs
Peter Lai, Energy Division
Jeff Hirsch, JJ Hirsch & Associates
June 24, 2009
![Page 2: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/2.jpg)
2
What is DEER, and how it’s being used
![Page 3: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/3.jpg)
3
What is DEER?Database for Energy Efficient Resources (DEER)• Estimates of “typical” or “expected” impacts
that would result from EE measures installations
• Includes residential and non- residential energy efficient measures
• Can be used for forecasting, planning, and analyzing EE activities
• http://www.deeresources.com/
![Page 4: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/4.jpg)
4
What is DEER? (CONT.)• Contains mostly measures for buildings;
new construction and retrofit– DEER Building types
• 3 residential (SFR, MFR, DwMH)• 23 commercial (Edu – Pri, Sec, RelocCL, CC, UC;
Grocery; health - Hosp, NHome; Log - Hot/Mot; Manuf – Light/Bio; Off – Lg/Sm; Rest – Fast/SD; Retail – Lg MF/SF, Sm; Storage Cond/Uncond/Refrig)
– Vintage – several old and new– Location – 16 CEC T24 climates
![Page 5: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/5.jpg)
5
What is DEER? (CONT.)
• Measures (buildings examples)– Lighting (CFL, Linear Fl., MH, Exit)– HVAC
• High Eff. DX a/c and hp (split/packaged) and furnaces • Chillers, Boilers, ChW/HW dist., Air dist• Maintenance – refrig. Charge correction, duct sealing and
insulation
– Water Heating (Lg/Sm Storage, Instant)– Residential Appliances (Refrig, Washer, Dryer, Dish)– Envelope (Windows, Insul.)
![Page 6: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/6.jpg)
6
What is DEER? (CONT.)
• Contains limited industrial and agricultural measures– planned for expansion
![Page 7: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/7.jpg)
7
What is DEER? (CONT.)• Contains measure parameters needed to perform cost-
effectiveness analysis, including estimates of typical:
– Electric and natural gas energy impacts (unit energy savings – kWh, kW, Therms per unit – and load shape – 8760 electric, monthly gas)
– Attribution (net-to-gross – NTG – by delivery method, up/down/midstream, direct install, etc)
– Measure full/remaining life (EUL/RUL)
– Full and incremental cost (new/retrofit, location, up/down delivery)
![Page 8: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/8.jpg)
8
Estimates based on…• RASS Conditional demand analysis (CDA)
of billing data (for calibrating residential baseline heat/cool energy use)
• Measurement studies (to establish measure performance parameters)
• Engineering calculations and simulation models (to project results into typical building types, vintages and locations)
![Page 9: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/9.jpg)
9
How does M&V feed the DEER update?
• EM&V work can provide the data required to update DEER– Update parameters that determine energy usage
• Use profiles (operation schedules, thermostat settings), equipment field performance (actual rather than rated values of parameters),
– Installation rates or quality• Separate from gross savings “potential”
– Attribution– Life
![Page 10: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/10.jpg)
10
When is DEER adjusted?• Baseline change
– new Codes & Standards – Tile 24/20, EPAct, etc– Existing stock inventory shifts
• Measure performance change– improved quality or new data available
• New products/technology improvements– Windows, HVAC, equipment
• Usage patterns change• Correct anomalies or errors
![Page 11: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/11.jpg)
11
Time line of DEER updates
• Current version of DEER is the 2008 DEER mid-December release for IOUs’ 09-11 EE Planning.
• Next update is scheduled for late 2010 for IOUs’ 2012-14 EE Planning.
![Page 12: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/12.jpg)
12
Cost Effectiveness
![Page 13: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/13.jpg)
13
Cost Effectiveness Background• CPUC adopted Standard Practice Manual
• Total Resource Cost (TRC) test:
– Measures the net costs of EE portfolio as a resource option based on the total costs of the portfolio, including both the participants' and the utility's costs.
• TRC ratio = TRC Benefits/TRC Costs, where
– TRC Benefits = supply-side resource avoided or deferred IOU costs
– TRC Costs = all non-freerider non-reimbursed costs incurred to install measures plus all costs incurred by the portfolio administrator
• Cost effectiveness from perspective of ratepayers and utility
![Page 14: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/14.jpg)
14
Cost Effectiveness Calculation
TRC COSTS
Measurefull or incremental non-reimbursed
Total Costs
= Net-To-GrossNet of freeriders
+ Portfolio Costs All expenses
Net-To-GrossMeasure Avoided
Costs
TRC BENEFITS
Measure UESUnit Annual Energy Savings kWh and Therms
Total Benefits =
Number of Installations
Measure
Avoided Costswhere =
Measure Load
Shapes8760 electric &
monthly gas
IOU Avoided Costs8760 electric & monthly gas
per IOU and CTZquarterly
EUL
Installationsactually installed
![Page 15: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/15.jpg)
15
E3 CE Calculator – TRC/PACInput:
• Utility administrative and measure incentive costs
• Participants’ non-reimbursed or “gross” measure costs
• Measure UES, NTG, EUL/RUL data
Output:• Calculated costs and net benefits values• TRC• PAC (like TRC but excludes participants’ costs)
Embedded:• CPUC adopted avoided costs and emissions rates
combined with typical measure electric and gas load shapes
![Page 16: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/16.jpg)
16
CPUC Avoided Costs
![Page 17: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/17.jpg)
17
Avoided Cost Background• CPUC adopted avoided costs provide the
methodology and data used to estimate the dollar benefit resulting from a change in energy use and demand supplied by each IOU– avoided IOU investments and expenses that result in
reduced revenue requirements
• The current adopted avoided costs for use by EE programs were first adopted in 2004 (D.05-04-024) and updated during the first half of 2006 (D.06-06-063)– Update options are being considered for 09-11 EE use
![Page 18: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/18.jpg)
18
Electric Avoided Costs
• The electric AC values include:– Generation (CCGT O&M cost based)
– Transmission & distribution (IOU T&D O&M costs)
– Environmental cost components (NOx, PM10, CO2)
• Values are annual datasets of 8760 hours for each IOU, including 43 climate zone and sub-climate zone divisions across IOU service areas, spanning twenty three years
![Page 19: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/19.jpg)
19
Gas Avoided Costs• Gas avoided costs is the sum of:
– the forecasted commodity price for natural gas
– the avoided transmission and distribution costs
– Environmental cost components (NOx, CO2)
• Values are annual datasets of 12 monthly values for each IOU, including residential and non-residential values, spanning twenty three years
![Page 20: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/20.jpg)
20
Avoided Cost Methodology DimensionsAvoided Cost Time Dimension Area Dimension
Avoided Electricity Generation
Hourly Utility specific
Avoided Electric Transmission and
DistributionHourly
Utility, planning area and climate zone specific
Avoided Natural Gas Procurement
Monthly Utility specific
Avoided Natural Gas Transportation and Delivery
Monthly Utility specific
Environmental Externality Adders for Electric & Gas
Annual value, applied by hour according to implied
heat rate
System-wide(uniform across state)
Reliability Adder Annual valueSystem-wide
(uniform across state)
Price Elasticity of Demand Adder
TOU period (on-vs. off-peak) by month
System-wide (uniform across state)
![Page 21: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/21.jpg)
21
Electric
Period 1 (2004-2008)Platt’s / NYMEX
Period 2Transition
Period 3 (2008-2023)LRMC
1 + Ancillary Services (A/S)
Period 1 (2004-2008)NYMEXPeriod 2
TransitionPeriod 3 (2008-2023)
Long-run Forecast
1 + LUAF + Compression
Commodity
Natural GasCommodity
Market Multiplier
1 + Energy Losses
T&D Costs (1 + Peak Losses )
Environment (1+ Energy Losses)
T&D Costs
+
+
+
• “NYMEX” = “New York Mercantile Exchange”• “LRMC “ = “Long-run marginal cost” all-in cost of combined cycle gas turbine (CCGT)• “LUAF “ = “Loss and unaccounted for”
Formulation of Avoided Costs
Emissions Costs
![Page 22: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/22.jpg)
22
Electric Cost Components• Generation energy and capacity cost
• CCGT O&M with a historical hourly price shape multiplier• x Ancillary Services (CASIO costs) multiplier• x Market Elasticity multiplier (load change impact on
market clearing prices)• x Losses (end user to bulk power grid hub)
• Transmission and distribution capacity cost• T&D capacity avoidable delivery costs, allocation shape by
climate region, peak hour losses multiplier
• Emissions cost• NOX, PM10, CO2; depends on generation heat rate and
losses (and thus also measure load shape)
![Page 23: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/23.jpg)
23
Appropriate Measures• Reduce load or produce energy for hundreds of hours
per year in a predictable pattern, because reductions over hundreds of hours reduce the importance of knowing the exact shape of the electric generation market hourly shape during just the peak hours
• Relatively small (such that they can be installed behind the customer meter), because the smaller the resource relative to the local T&D system, the less the utility needs to plan for the contingency case of the resource failing to provide reductions
• Expected to be installed in large numbers, because the more resources that are installed, the more one can rely upon the expected level of reductions.
![Page 24: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/24.jpg)
24
Total Avoided Cost - 8760 hours by 20 years
{Utility, Climate Zone, Voltage Level, Hour, Year}
Commodity{Utility, Voltage
Level, Hour, Year}
Transmission andDistribution
{Utility, ClimateZone, Voltage
Level, Hour, Year}
Emissions{Voltage Level,
Hour, Year}
Putting the Components Together - Electric:
![Page 25: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/25.jpg)
25
Putting the Components Together - Gas:
Total Avoided Cost - 12 Months by 20 years
{Utility, Service Class, Combustion Type, Month,Year}
Commodity{Utility, Month,
Year}
Transmission andDistribution
{Utility, ServiceClass, Month,
Year}
Emissions{Combustion Type,
Month, Year}
![Page 26: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/26.jpg)
26
Currently…• D.06-06-063 (OP 10 and Attachment 3) adopted
electric and gas avoided cost for use in planning and evaluation of the 2006-2008 energy efficiency IOU portfolios.
• These interim values were not adopted for other uses or future EE cycles.
• April 21, 2008 AC/ALJ Ruling directed IOUs to use in the 09-11 application:– the updated 2007 generation cost (CCGT) values as
adopted in Resolution E-4118 (the updated 2007 Renewable Portfolio Standard [RPS] market price referent [MPR] values)
![Page 27: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/27.jpg)
27
More info available at…
Spreadsheets and reports can be downloaded from the E3 website:
http://www.ethree.com
![Page 28: 1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009](https://reader035.vdocument.in/reader035/viewer/2022062314/56649c7f5503460f94935d6d/html5/thumbnails/28.jpg)
28
Questions