1 dedicated plot in the name of iti - industrial training ... craftsmen instructor training scheme...

80
1 Dedicated plot in the name of ITI

Upload: vuongque

Post on 16-Apr-2018

218 views

Category:

Documents


4 download

TRANSCRIPT

1 Dedicated plot in the name of ITI

2 ITI boundary wall with main entrance gate

3 Availability of Building Completion Certificate by the competent authority

4 Owned building

5 Diversity of Trades - availability of trades over and above “Fitter and Electrician”

6

Availability of high-end/advanced trades such as Machinist / Turner / Welder / MMV / MD / RAC / Tool & Die Making / Power Electronics (as per re-affiliation norms)

7 Availability of high-end machinery and equipment categorized as optional as per NCVT norms – list of optional

machinery and equipment is attached for reference

NIL

8 Re-affiliation of trades as per latest NCVT norms

9 Number of MoUs signed with industry (at least one SME) for industrial visits of students

NIL

10 Number of trainees who have been sent for "dual training" (%)

NIL

11 Functional IMC in case of Govt. ITI and a similar institutional mechanism in case of Pvt. ITI

12 Number of guest faculty from Industry

NIL

13 Employment/placement and apprenticeship engagement (%)

14 Dropout rate (%)

OVERALL UTILIZATION CAPACITY

admission-14-15 result 2016

TOTAL SEATS

(without super

numeric) 412

TOTAL ADMISSION 480

TOTAL EXAM

APPERED TOTAL EXAM PASSED

SCHEME

CTS AFFILATED 348 346

CTS NON AFFILATED 116 115

TOTAL 464 461

DROP OUT% PASSOUT%

TOTAL

ADDIMITED 480

TOTAL EXAM

APPERED 464

TOTAL EXAM PASS

OUT 461

TOTAL EXAM

PASSED 461

0.01041 99%

15 Pass-out rate (%)

16 Number of Companies that have recruited atleast five Passed out each in last 3 Academic Years.

As Per Point No.13

17 Name of 5 employers (together employing 25% of eligible trainees) who did campus recruitment in last

academic year (%)

As Per Point No.13

18

Instructor vacancy against sanctioned posts (%)

19 Availability of "full-time" ITI Principal

20

Craftsmen Instructor Training Scheme (CITS) certification of available instructors (in eligible trades as per NCVT) (%)

10%

21 Number of ITI instructors with “industry experience" of at least 3 years (%)

45%

22 Availability of production center generating revenues (excl. course fee) as per audit report

NIL

23 Capacity utilization (power): No. of electricity units consumed against norms prescribed by DGT

Sr. no. Trade name Max. no. of units

in one shift

Power supply

required as per

norms(in kw)

Total power

supply to be

available(in kw)

1 ELECTRICIAN 1 5.20 5.20

2 ELECTRONIC MECHANIC 1 3.04 3.04

3 FITTER 2 3.51 7.02

4 MECHANIC DIESEL ENGINE 1 5.00 5.00

5 SHEET METAL WORKER 1 11.00 11.00

6 WELDER 1 16.00 16.00

7 WIREMAN 1 5.00 5.00

8 SEWING TECHNOLOGY 1 5.00 5.00

9 COMPUTER OPERATOR

PROGRAMMING

ASSISTANT

1 3.45 3.45

10 MOTOR MECHANIC

VEHICLE

1 4.80 4.80

TOTAL POWER

TO BE USED 65.51 KW

The amount of power consumption for all trade as per NCVT norms is 65.51 kw. we are using

average 2 hours per day machineries and equipments for training .as that according we

65.51*2*180 =23583.6 kwh should be used.

USED POWER DATA:

DURATION OF MONTH USED UNITS

FEBRUARY-2017 4100

MARCH-2017 4790

APRIL-2017 6530

MAY-2017 6800

JUNE-2017 2830

JULY-2017 4620

TOTAL 180 DAYS 29670

24 Capacity Utilization (% of seats) - excluding super-numeri) filled

25 Aadhar number and other details of Instructors entered in NCVT MIS Portal

NIL

26 Number of women students equal to or more than 30% of total student

strength of ITI

Less than 30% of Total Students.

27 Biometric Attendance

NIL

28 Awards and accolades at District / State / National Level

NIL

29 ISO Certification: 29990

30 Patent

NIL

31 Operational IT Lab with Min. 10 computers

32 Availability of library with NIMI books and reference books per trade

33

Functional website of ITI having at least key features such as: about us, schemes, admission criteria, trades affiliated to NCVT/SCVT, infrastructure, industry institute linkage, placement, application format for courses, right to information, certification, staff, sports, other facilities, feedback & suggestions, rating of the institute

34 No. of scholarships available with an ITI

35 Convocation Ceremony of ITI pass outs

36 Grievance Redressal Mechanism in ITI available

37 ITI Logo

38 Skill India Logo

NIL

39 Uniform for all ITI trainees

NIL

40 Availability of separate washroom for girls

41 Availability of logbook in respect of machine repair and maintenance

42

Innovative measures being adopted by ITI viz. rain water harvesting, solar power utilization, utilization of scrap, and waste management

43 Digital transactions