Page 1: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

1

DOKUZ EYLDOKUZ EYLUUL UNIVERL UNIVERSISITY TY DEPARTMENT OF DEPARTMENT OF

INDUSTRINDUSTRIALIAL ENGINEERING ENGINEERINGSUNAY CAN SUNAY CAN

20105030152010503015

Page 2: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

Project management Project management is the discipline of planning organizing, and maintaining resources to bring about the successful completion of specific project goals and objectives.

2

Page 3: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

A project A project is a temporary endeavor, having a defined beginning and ending.

3

Page 4: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

Initiating Planning Execution Monitoring and Controlling Closing

4

Page 5: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

The initation processes stages are;

Project Goals Scope Project Organization Business Case Constraints

5

The initiationinitiation processes determine the nature and scope of the project.

Page 6: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

6

Gantt Chart

Pert Chart (Program Evaluation Review Technique) CPA (Critical Path Analysis)

Page 7: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

The execution The execution phase is where you and your project team actually do the project work to produce the deliverables.

7

Is it too late to add the client’s wish list of features to the project?

Page 8: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

The act of monitoring and monitoring and controlling controlling project processes is essential to maintaining an efficient and effective workflow throughout the project.

8Monitoring and Controlling cycle

Page 9: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

This phase consists of: Project closeProject close: Finalize all

activities across all of the process groups to formally close the project or a project phase.

Contract closureContract closure: Complete and settle each contract (including the resolution of any open items) and close each contract applicable to the project or project phase.

9

Page 10: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

Project control Project control is that element of a project that keeps it on-track, on-time and within budget.

Project control begins early in the project with planning and ends late in the project with post-implementation review, having a thorough involvement of each step in the process. 10

Page 11: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

The Work The Work Breakdown Breakdown Structure Structure (WBS) is a tree structure, which shows a subdivision of effort required to achieve an objective.

11

Page 12: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

Project managers Project managers can have the responsibility of the planning, execution, and closing of any project, typically relating to construction industry, architecture, computer networking , telecommunications or software development..

12

Page 13: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

13

Page 14: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

Projects need to be performed and delivered under certain constraints. These constraints have been listed as "scope," scope," "time," and "cost“."time," and "cost“.

These are also referred to as the "Project Management Triangle", where each side represents a constraint.

14

The Project Management Triangel

Page 15: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

15

Page 16: 1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN 2010503015

16

An increasing number of organizations are using, what is referred to as, project project portfolio portfolio management management (PPM) as a means of selecting the right projects and then using project management techniques as the means for delivering the outcomes in the form of benefits to the performing private or not-for-profit organization.